Loading...
HomeMy WebLinkAboutMiscellaneous Reimbursement Agreements and Receipts - 1961-1 REIMBURSEMT AME1tFM THIS AGREEMENT, dated this day of 19629 by and BETWEEN CITY OF HUNTINGTON BEACH, a municipal corporation hereinafter for conven- ience referred to as9 CITY BUILDER W I T N E S S E T H: WHEREAS, Builder has filed with the City Engineer of the City of Huntington Beach four the eutention of a water main and connection thereto for WHEMS; Builder has entered into an agreement with the City of Huntington Beach relating to performinR the necessary work in the construction of said water line; and i7HEREAS, Builder has agreed, at his own cost and expense to construct and build said off-site water facility all in conformity with the plans, specifications and provisions as approved by the City Engineer; . and NHEREAS, the construction of said water line shall be in conformity with the Huntington Bloch Ordinance Code, more particularly Chapter 35 re- lating to water, and at the completion of said construction and..upon acceptance by the City Engineer as being in full conformity with the plans and specifica- tions approved by said City Engineer, shall be dedicated by the Builder to the City of Huntington Beach; and to WHEREAS, the Builder shall be entitled under said sections of the Huntington Beach Ordinance Code, after such construction and dedication of said water facility to refunds from connections by others to said water facility; NOW THEREFORE, in consideration of the premises and the agreements herein contained, the parties agree as follows: 1m That .upon completion of the construction of the facility hereinafter described by the Builder to the full satisfaction of the City Engineer and on its dedication to the City of Huntington Beach, Builder shall be entitled to refund from connection fees received by the City of Huntington Beach for connections made to said hereinafter described facility in accordance with the provisions of Chapter 35 of the Huntington Beach Ordinance Code* 2* The facility constructed by Builder and for which refunds are hereby agreed to be paid to Builder is described as follows: 3o Builder does hereby acknowledge that he has received a refund in the form of a credit in the amount of by waiver of connection fees* 4. That the cost to the Builder for the construction of said facility is the sum of c17�A. 5* The refund to be paid to the Builder under this Agreement is as follows: Total Job Cost of Facility Total Amount Refundable under Chapter 35 Tress: Refund credited by waiver of �� G fee on connection to lot Net Refundable 20 b. No refund payment shall be made by the Clerk of the City of Huntington Beach to Builder until the City Engineer shall have certified, in writing, to the City Clerk that Builder is entitled to a refund for a specific connection hafting previoutily been made to this particular facility in accordance with Chapter 35 and the City has received the fee for such connection. Dated: CITY OF HUNTINGTON BEACH A municipal corporation, By Mayor City Clerk BUILDER By President By :. Secretary 3. y STATE OF CALIFORNIA 89 COUNTY OF ORANGE ) On this day of 19 . before me, , a Notar7n%"II3,, in and f or County and State, persona appsa HOBERT M. LAMBERT, known to me to be the Mayor, and PAUL C. JONES, known to me to be the City Clerk of the City of Huntington Beach, a.municipal corporation, the corporation that executed the within instrument and acknowledged to me that they executed said instrument on behalf ct such municipal corporation. STATE OF CAIWORNIA ) es COUNTY OF ORANGE ) On this day of 2962, before me, a Notary Public, in and odd Caun y a State# person®17y appeared MM" . known to ne to be the nt and known to me to be the Secreta ry Trsas —r o�� corporation that executed the within instrument and acknowledged to me that they executed said instrument on behalf of such corporation. 4o Q - ` . oUe RED(BURSEVOT AGRZEMT THIS AGREEMENT,' dated this day of s 1962, by and BETWEEN CITY OF HUNTINGTON BEACH, a municipal corporation hereinafter for conven- ience referred to asp CITY BUILDER W I T N E S S E T Ea WIEREAS, Builder has filed with the City Engineer of the S City of Huntington Beach for the extention of a water main and connection thereto for C WREREAS, Builder has entered into an agreement with the City of Huntington Beach relating to performing the necessary work in the construction of said water line; and Z%TMREASp Builder has agreed, at his own cost and expense to construct and build said off-site water facility all in conformity with the plansp specifications and provisions as approved by the City Engineer; . and 'WHEREAS, the construction of said water line shall be in conformity with the Huntington Beach Ordinance Codep more particularly Chapter 35 re- lating to water,, and at the completion of said constriction and upon acceptance by the City Engineer as being in full conformity with the plans and specifica- tions approved by said City Engineer, shall be dedicated by the Builder to the City of Huntington Beach; and to 11 r ' WHEREAS, the Builder shall be entitled under said sections of the Huntington Beach Ordinance Code, after such construction and dedication of said water facility to refunds from connections by others to said grater facility; NON THEREFORE, in consideration of the premises and the agreements herein contained, the .parties agree as follows: 1. That upon completion of the construction of the facility hereinafter described by the Builder to the full satisfaction of the City Engineer and on its dedication to the City of Huntington Beach, Builder shall be entitled to refund from connection fees received by the City of Huntington Beach for connections made to said hereinafter described facility in accordance with the provisions of Chapter 35 of the Huntington Beach Ordinance Code. 2. The facility constructed by Builder and for which refunds are hereby agreed to be paid to Builder is described as follows: 3. Builder does hereby aelmowledge that he has received a refund in the form of a credit in the amount of by waiver of connection fees. 4- That the cost to the Builder for the construction' of said facility is the sum of A. 5. The refund to be paid to the Builder under this Agreement is as follows: Tonal Job Cost of Facility Total Amount Refundable under Chapter 35 Less: Refund credited by waiver of fee on connection t emiet Net Refundable 2. 6, No refund payment shall be made by the Clerk of the City of Huntington Beach to Builder until the City Engineer shall. have certified, in Writing, to the City Clerk that Builder is entitled to a refund. for a'specific connection having previously been made to this particular facility in accordance with Chapter 35 and the City has received the fee for such connection. Dated: o CITY OF HUNTINGTON BEACH A municipal corporation, By Mayor By City Clerk BVIIDER B President By : . ., Secretary APPROVED FOR FO"i+M - - - - ---- 19 d2_ ---- C1?1 ,_I Tt,Rr'EY 3, STATE OF CALIFORNIA ) ss COUNTY OF ORANGE ) On this day of , 19629 before me, c , a NotaziT , in a id for sa County and State, personal appear, ROBERT M. LAMBERT, known to me to be the Mayor, and PAUL C. JONES, known to me to be the City Clerk of the City of Huntington Beach, a municipal corporation, the corporation that executed the within instrument and acknowledged to me that they executed said instrument on behalf of such municipal corporation, STATE OF CALIFORNIA ) as COUNTY OF ORANGE ) On this day of , 19623, before me, a Notary Public, in and fo�said County and States pe onally appeared known to me to be the President and , known to me to be the Secretary-Treasurer of the corporation t iat .executed the within instrument and acknowledged to me that, they executed said instrument on behalf of such corporation. 1�, Y / REDiB RSEYzNT AUNT THIS AGMWM, dated this , ,. day of 3SQ# by and BETWEEN CITY OF HUNTINGTON BEACH, a municipal corporation hereinafter for conven— ience, referred to as, CITY BUILDER W I T N E S -S E T Hs _WHEREAS, Builder has filed with the City Engineer of the s . City of Huntington Beach.for the extention of a -sewer main and connection thereto for WHEREAS, Builder has entered into an agreement with the City of Huntington Beach relating to performing the necessary work in the construction of 'said sewer Uns; and WHEREAS, Builder has agreed, at his own cost and expense to construct. and build said off—site sewer facility all in.conford.ty with 'the plans, specifications and provisions as approved by the City Engineer; and WHEREAS, the construction of said sewer line shall be in conformity with- the Huntington Beach Ordinance Code, more .partioularly Chapter 36 re— lating to sewer, and at the completion of said construction and upon acceptance by the City Engineer as being-in full confoi.%dty with the plans and specifica— tions approved by said City.En&eer, shall be dedicated by the Builder to the City of Huntington Beach; and 1P 9MEMS, the Builder shall be entitled under said sections of the Huntington Beach Ordinance Code; after such construction and dedication of said suer facility to refunds from connections by others to said sever facility; NOW TNERWMS.* in consideration of the premises and the agreements herein contained, the parties agree as follows: 1. That upon completion of the construction of the facility hereinafter described. by the Builder to the full satisfaction of the City Engineer and on its dedication to the City of Huntington Beach' Builder shall be entitled to refund from connection fees received by the City of Huntington Beach for connections made to said hereinafter described facility in accordance with the provisions of Chapter 36 of the Huntington Beach Ordinance Code. 2. The facility contracted by Builder and for xhich refunds are hereby agreed to be paid to Builder is described as _fonowes 3. Builder does hereby aokaowledge that to has received a refund in the form of a credit in the amount of $ : by'vaiver Of connection fees. 4, That the cost to the Builder for the construction of said facility is the sum of a . 50' The refund to be paid to the Builder under this Agreement is as followas Total Job Cost of Facility Total Amount Refundable wader Chapter 36 Lssss Refund cradited by waiver of fee on connection to lot Net Refundable 2. 6. No refund payment shall be made by the Clerk of the City of Huntington Beach to Builder until the City Engineer shall have certifieds, in writing, to the City Clerk that Builder is entitled to a refund for a specific connection having previously been made to this particular facility in accordance with Chapter 36 and the City has received the fee for such connection. Dated: o CITY OF HUNTINGTON BEACH A municipal corporation, 83► WY—Or City C rk BUIDER By re at By Secretary 30 STATE OF CALIFORNIA ) ss COUNTY OF ORANGE ) On this day of , 1962s before me, a Notary b ics in and for said County and State, personally appearee ROBERT M. LAMBERT, known to me to be the Mayor, and PAUL C. JONES, known to me to be the City Clerk of the City of Huntington Beach, a municipal corporation, the corporation that executed the within instrument and acknowledged to me that they executed said instrument on behalf of such municipal corporation. STATE OF CALIFORNIA ) as COUNTY OF ORANGE ) On this day of , 2962, before me, a Notary Public, in and o said County and tate, persona appeared . knrnm to me to be the resident and known to me to be the Secretary-Treasurer, of the corporation that executed the within instrument and acknowledged to me that they executed said instrument on behalf of such corporation. 40 i } : DANIEL ESTRADA CO . SEWER, SEPTIC TANK CONTRACTORS i Roll 1101 W. 5th ST. SANTA ANA, CALIF. Phone KI 2-7937 r T.V. 'halbert Co. DATE June 21, 1963 219 Main Street, Huntington Beach, California YOUR ORDER No. L J TERMS: AT• ' 8181 Garfield, Huntington Beach QUANTITY DESCRIPTION UNIT PRICE TOTAL 1 6" L.G. Water main including hydrants. 2;100.00 TOTAL DUE 2,100.00 T27 STATEMENT - ke ae4 19301 SO. PARAMOUNT BLVD. PHONE 633-5101 PARAMOUNT, CALIFORNIA 5/31/64 Talbert & Company 219 Main Street Huntington Beach, California . PLEASE DETACH AND RETURN UPPER PORTION WITH YOUR REMITTANCE-CANCELLED CHECK IS YOUR RECEIPT. DATE REFERENCE CHARGES CREDITS PREVIOUS BALANCE BALANCE d/ "�'d BALANCEr /Na r ! «/xilr '%;1 1,669.20 �rifa�r/i -ail!f r�j1�5 k'l 5W 3.64 K 19179 KENNEDY MECHANICAL CONTRACTORS 15301 SO. PARAMOUNT BLVD. PARAMOUNT, CALIF. d THE T. .-v. . ALBERT COBPOBATION 219 MAIN STUM HOTIMTON BEACH, CALIFOENIA July 21, 1964 Mr. Bill Hartge- City engineering-Dept: lltntington Beach, Calif; Dear Sirs These two statements indicate the cost of the installation of the A. ,C: rater main including hydrants at 8181 Garfield, in Huntington Beach, The Estrada Co;. installed these. The Kennedy Mechanical Contractors statement was for crossing Garfield Avenue and tapping to your line: Sincerely Francis Wa Herrera The T. P. Talbert Corp: ms:i 4 ;0' a v 3i¢ SCfL 70 y36 d o 49 .� 9 0 12c��w� wdow JIM ANDERSON, Representative CONCRETE BOXES AND VAULTS FOR WATER, GAS, AND ELECTRICAL UNDERGROUND DISTRIBUTION PRDDtICTS, 11C SYSTEMS • PARK BENCHES PRE-CAST SPECIALTIES ROCKWELL AND OLNEY STREETS EL MONTE. CALIFORNIA • CUmberland 3.6471 � r y a d MEMBER - CMA - QUALITY BLOCK"- NCMA BESSER PRECISION CONCRETE AND LIGHTWEIGHT EXPANDED SHALE s CD BUILDING BLOCKS AND SUPPLIES .tY`;• O _ LOCK CO. 8r")- KATELLA AVENUE 2320 SO. MAIN STREET S . TON, CALIFORNIA SANTA ANA, CALIFORNIA Phone JAtkson 7-2239 Phone Klmberly 5-6822 o l //_0 o� 60 r�s '41�7 111 IL 7 --=— ------------------------- Lf L-3 . ©c:> Ac',ea e- 3 NCO 03 LEO WEILER COMMA, Y, 10616 Stanford Avenue GARDEN GROVE, CALIFORNIA Zieenaed SJ zwzt eonEZacto4 JEfferson 7-4137 or 7-4138 WATER LINES - PIPE LINES STORM DRAINS PROPOSAL AND CONTRACT Date_ August 14 , 19—fi3_ To City of Huntington Beach. Huntington Beach-, California (HEREINAFTER CALLED OWNER) Dear Sir: LEO WEILER COMPANY, hereinafter called Contractor, agrees to construct in a good and workmanlike manner for Owner, subject to the terms and conditions set forth herein and on the reverse side hereof, furnishing all labor, material, tools and equipment therefor,work as noted herein: BID FOR INSTALLATION OF WATER LINES CITY OF HUNTINGTON BEACH, CALIF. AT WARNER & HI-WAY 39. 195 - lin. ft. 8" A.C. Pipe C 6.32 per ft. $ 1, 232 .40 1 - Hot tap on 22" CYL line L1a 375 .00 375 .00 1 - 8" Gate Valve with V.B. & C. C 185 .00 185 .00 1 - Fire Hydrant assembly @ 435 .00 435 .00 1 - 3/4" Water Service with 5/8 x 3/4" Meter & Box C 70.00 70.00 1 - 211 Blow Off @ 105 .00 105 .00 $ 2,402 .40 Owner agrees to pay to the Contractor for said work listed above the sum of $ 2,402 -4'0 , unit prices to prevail. Contractor will submit invoices to Owner on the 1st and 15th of each month after commencement of construction for all work done by Contractor to date of invoice. Owner shall pay 90% of the sums presented on each invoice on or before the loth and 25th of each month following presentment of invoice. The entire amount of the contract shall be paid to Contractor on presentation to Owner of waiver or pre- liminary letter of acceptance by appropriate County or City authorities, or;at such time as the mainline sewer is used by Owner or his agents, representatives or successors in interest. Respect bm' ed, BY _ (CONTRACTOR) Partner ACCEPTAN `E You are hereby authorized to furnish all materials and labor required to complete the work mentioned in the above proposal, for which I/we agree to pay the amount mentioned in said proposal, and according to terms thereof. ACCEPTED Date 19 TERMS AND CONDITIONS 1. The contractor agrees to commence work hereunder within days after receipt of written notice from the Owner to do so, and to prosecute said work thereafter diligently and continuously. 2. Contractor shall pay promptly all valid bills and charges for material, labor or otherwise in connection with or arising out of the aforesaid construction and will hold Owner of the property free and harmless against all liens and claims of lien for labor and material thereon filed against the property or any part thereof, and Contractor shall promptly proceed to discharge any such lien or claims of lien should they be filed. 3. The plans and specifications are intended to supplement each other, so that any works exhibited in either and not mentioned in the other are to be executed, whereVerirem'nible,,the same-as-iFtheywire ineniioffod'and,set forthin b©th.. 4. Should the Owner at any time during the progress of the work request any modification, alterations or deviations in, additions to, or omissions from, this contract or the plans or specifications, he shall be at liberty to do so, and the same shall in no way affect or make void this contract: but the price aforesaid shall be adjusted, as the case may be, by a fair and reasonable valuation based upon the actual cost of labor and material plus 12% overhead and 10% profit to the Contractor. This contract shall be held to be completed when the work is finished in accordance with the original plans as amended or modified by such changes, whatever may be the nature or extent thereof. Contractor is not deemed to have waived his right to compensation for extra work if the same is not provided for in writing. Any necessary repairs or cleaning of sewer lines after presentment of waiver or preliminarZ letter of;acceptance or use by T owner or his agents due to causes d'beyontRet6ntractor'3'ontroli.shall bd the rosponsfblfhy of de Owner.1 i. - i I` .• i-� l''t T- i - -I 1. 5. Contractor shall not be responsible for delays in said work caused by (a) the acts of Owner or his agents or employees of those claiming under agreement with or grant from Owner, or by (b) the Acts of God which Contractor could not have reasonably foreseen and provided'against, or%y (c) stormy 6' iAclerrient weather which necessarily delays the!-work of by'-(d) any siki6s,bog&tts or like obstructive action byr•employees or labor organizations, and any uiifdiEseen'contingencies--which. ai beyond'fhe-Control.-of- Contractor and which he cannot reasonably overcome. - ,Any•costs incurred by Contractor as a result of delays'ln construction beyond-Coritiact6es,coin 4l,except�sueli-delays-provided for in sub-paragraphs (b), (c), and (d) above, shall be paid for by the Owner, and;if the Contractor•is- forced'to'ferriporarffy abanllon the job site,or is interrupted in the continuous operation of,the-construction, except as prpvided-,above,.moving­'ih and out"j charges will be added to the price a$aforesaid. _ 6\ The. Contractor shall not be responsible for any damage occasioned by the Owner or Owner's Agent, Act of God, Earthquake, or other causes beyond the control of the Contractor, unless otherwise herein provided or unless he is obligated by the terms hereof to provide . insurance against such hazard or hazards. 7. Contractor shall at his own expense carry all Workmen's Compensation Insurance and Public Liability Insurance necessary for the full protection of Contractor and Owner during the progress of the work. Certificates of such insurance shall be filed with Owner if Owner so requires, and shall be subject to his reasonable approval as to adequacy of protection. 8. All permits, inspection fees, engineering fees, premiums on labor, material and performance bonds and resurfacing costs shall be paid for by Owner. Road Department permits shall be obtained by Owner in his own name. 9. Owner agrees to furnish water at his expense to Contractor within the tract site in amounts sufficient for flooding trenches. 10. All excess dirt from excavations by Contractor shall be left at trench site; any removal of dirt from the trench site shall be the respon- sibility of Owner. 11. Contractor agrees to set manholes to "blue top", elevations shown on grade stakes, set by engineer at the time of installation of man- holes. Any subsequent changes in elevations to a maximum of six (6) inches, shall be responsibility of Owner. 12. In the event Contractor shall institute and prevail in any action or suit for the enforcement of any of its rights hereunder, Owner shall pay to Contractor a reasonable attorney's fee on account thereof. 13. All quotations herein are made by Contractor for immediate acceptance, and are binding on Owner when signed by Owner or his agents. LEO \!y EILEIR CQMPAl viv, 10616 Stanford Avenue GARDEN GROVE, CALIFORNIA 2cQen3e d 4EWE2 S Cw2ftaetos JEfferson 7-4137 or 7-4138 WATER LINES - PIPE LINES STORM DRAINS PROPOSAL AND CONTRACT Date_ August 14 , 19 62 TO City of Huntington Beach, Huntington Beach, California (HEREINAFTER CALLED OWNER) Dear Sir: LEO WEILER COMPANY, hereinafter called Contractor, agrees to construct in a good and workmanlike manner for Owner, subject to the terms and conditions set forth herein and on the reverse side hereof, furnishing all labor, material, tools and equipment therefor,work as noted herein: BID FOR INSTALLATION OF WATER LINES CITY OF RUN NGTON BEACH, CALIF. AT WARNER & HI-WAY 39. 195 - lin. ft. 8" A.C. Pipe 60 6.32 per ft. $ 1,232.40 1 - Hot tap on 22" CYL line @ 375.00 375 .00 1 - 8" date Valve with V.B. & C. @ 185.00 185 .00 1 - Fire Hydrant aseembly @ 43S.00 435.00 1 - 3/4" Water Service with 5/8 x 3/4" Meter & Box 0 70.00 70.00 1 - 2" Blow Off ® 105.00 105.00 2,402.40 Owner agrees to pay to the Contractor for said work listed above the sum of $ 2,402.40 unit prices to prevail. Contractor will submit invoices to Owner on the 1st and 15th of each month after commencement of construction for all work done by Contractor to date of invoice. Owner shall pay 90% of the sums presented on each invoice on or before the loth and 25th of each month following presentment of invoice. The entire amount of the contract shall be paid to Contractor on presentation to Owner of waiver or pre- liminary letter of acceptance by appropriate County or City authorities;or;at such time as the mainline sewer is used by Owner or his agents, representatives or successors in interest. Res:ctTJ- tted, (CONTRACTOR) Partner ACCEPTA14 iE You are hereby authorized to furnish all materials and labor required to complete the work mentioned in the above proposal, for which I/we agree to pay the amount mentioned in said proposal, and according to terms thereof. ACCEPTED - Date y 19 TERMS AND CONDITIONS 1. The contractor agrees to commence work hereunder within days after receipt of written notice from the Owner to do so, and to prosecute said work thereafter diligently and continuously. 2. Contractor shall pay promptly all valid bills and charges for material, labor or otherwise in connection with or arising out of the aforesaid construction and will hold Owner of the property free and harmless against all liens and claims of lien for labor and material thereon filed against the property or any part thereof, and Contractor shall promptly proceed to discharge any such lien or claims of lien should they be filed. 3. The plans and specifications are intended to supplement each other, so that any works exhibited in either and not mentioned in the other are to be executed, wherever reasonable,-the same as if they were mentioned and set forth in both. - '• 4. Should the Owner at any time during the progress of the work request any modification, alterations or deviations in, additions to, or omissions from, this contract or the plans or specifications, he shall be at liberty to do so, and the same shall in no way affect or make void this contract: but the price aforesaid shall be adjusted, as the case may be, by a fair and reasonable valuation based upon the actual cost of labor and material plus 12% overhead and 10% profit to the Contractor. This contract shall be held to be completed when the work is finished in accordance with the original plans as amended or modified by such changes, whatever may be the nature or extent thereof. Contractor is not deemed to have waived his right to compensation for extra work if the same is not provided for in writing. Any necessary repairs or cleaning of sewer lines after presentment of waiver qr preliminary letter of acceptance or.f se by owner or his aunts due to causes beyond the Contractor's control shall be the responsibility of the Owner. 5. Contractor shall not be responsible for delays in said work caused by (a) the acts of Owner or his agents or employees of those claiming under agreement with or grant from Owner, or by (b) the Acts of God which Contractor could not have reasonably foreseen and provided against, or by (c) stormy or inclement weather which necessarily delays the work or by (d) any strikes, boycotts or like obstructive action by employees or labor organizations, and any unforeseen contingencies which are beyond'the control of Contractor and which he cannot reasonably overcome. -Any costs incurred by Contractor as a result of delays in construction beyond Contractor's control, except such delays"provided for in sub-paragraphs (b), (c), and (d) above, shall be paid for by the Owner, and if'the Contractor is forced to temporarily abandon the job site or is interrupted in the continuous operation of the construction, except as provided-above, moving "in and out" charges will be added to the price as aforesaid. r• 6. The Contractor shall not be responsible for any damage occasioned by the Owner or Owner's Agent, Act of God, Earthquake, or other causes beyond the control of the Contractor, unless otherwise herein provided or unless he is obligated by the terms hereof to provide . insurance against such hazard or hazards. 7. Contractor shall at his own expense carry all Workmen's Compensation Insurance and Public Liability Insurance necessary for the full protection of Contractor and Owner during the progress of the work. Certificates of such insurance shall be filed with Owner if Owner so requires, and shall be subject to his reasonable approval as to adequacy of protection. 8. All permits, inspection fees, engineering fees, premiums on labor, material and performance bonds and resurfacing costs shall be paid for by Owner. Road Department permits shall be obtained by Owner in his own name. 9. Owner agrees to furnish water at his expense to Contractor within the tract site in amounts sufficient for flooding trenches. 10. All excess dirt from excavations by Contractor shall be left at trench site; any removal of dirt from the trench site shall be the respon- sibility of Owner. 11. Contractor agrees to set manholes to "blue top", elevations shown on grade stakes, set by engineer at the time of installation of man- holes. Any subsequent changes in elevations to a maximum of six (6) inches, shall be responsibility of Owner. 12. In the event Contractor shall institute and prevail in any action or suit for the enforcement of any of its rights hereunder, Owner shall pay to Contractor a reasonable attorney's fee on account thereof. 13. All quotations herein are made by Contractor for immediate acceptance, and are binding on Owner when signed by Owner or his agents. PROPOSAL and CONTRACT Oasis Pipeline Go. 8632 Oasis Avenue —�— Westminster, Calif. Date_ August 14 19 62 TO City of Huntington Beach P. 0. Box E, Huntington Beach, Calif. Dear Sir: we propose to furnish all materials and perform all labor necessary to complete the following: Installation of approximately 200 ft. of 80 transits 1 - 3f4" service complete 1 - fire hydrant complete 1 - 221 x 80. hot tap On Beach Blvd. at Warner St. All above for lump sum of 62705.00 This proposal void after 30 days. All of the above work to be completed in a substantial and workmanlike manner according to standard practices for the sum of — Dollars ($ ) ,Payments to be made as the work progresses to the value of per cent ( %) of all work completed. The entire amount of contract to be paid within days after completion. Any alteration or deviation from the above specifications involving extra cost of material or labor will only be executed upon written orders for same, and will become an extra charge over the sum mentioned in this contract. All agreements must be made in writing. - Respectfully submitted, Oasis Pi el 0 Parw By ACCEPTANCE You are hereby authorized to furnish all materials and labor required to complete the work mentioned in the above proposal, for which _agree to pay the amount mentioned in said proposal, and according to the terms thereof. ACCEPTED Date 19 PALM STATIONERS 106 PROPOSAL and CONTRACT Caeia 1'�.pc�li.xte Co,' " 8632 Oaois .I'Menue —�— Weatminoterg Calif. Date &drust 14 , 19 62 TO City of RiAntingten Rep-eh P. 0. Bog E, Nnti.ngton Beach. Calif i Dear Sir: -tie--- propose to furnish all materials and perform all labor necessary to complete the following: Installation of rallproxi.mately 200 ft. of 8" transite 1 3/ti" service comn'lete 1 - fire hydrant complete .1 . 220 sc 80 hot tap ;bn Desch Blvd., at Burner Stw All above for lump suln of $2105400 Tktf.e proposal void after 30 daye. All of the above work to be completed in a substantial and workmanlike manner according to standard practices for the sum of — Dollars ($ ) Payments to be made as the work progresses to the value of per cent ( %) of all work completed. The entire amount of contract to be paid within days after completion. Any alteration or deviation from the above specifications involving extra cost of material or labor will only be executed upon written orders for same, and will become an extra charge over the sum mentioned in this contract. All agreements must be made in writing. Respectfully submitted, Oasio ?i el _ Co any By ACCEPTANCE You are hereby authorized to furnish all materials and labor required to complete the work mentioned in the above proposal, for which _agree to pay the amount mentioned in said proposal, and according to the terms thereof. ACCEPTED Date , 19 PALM STATIONERS 106 s PLUMBINVONTRACTORS, INC., SANITA16DIVISION 4214 WEST WESTMINSTER AVENUE P. O. BOX 536 • SANTA ANA, CALIFORNIA SUB-CONTRACTOR'S AGREEMENT •THIS AGREEMENT, made and entered into this 15th day of August 1962 by and between City of Huntington Beach whose address is _ Huntington Beach California, hereinafter referred to as the CONTRACTOR, and Plumbing Contractors, Inc., Sanitary Division, hereinafter referred to as the SUBCONTRACTOR, WITNESSETH: 1. SUBCONTRACTOR will furnish all labor, material and equipment to install complete according to plans and speci- fications, the following, approximately: WATER: Beach Blvd. Installtion of 8" A.C . Water Main, Hot Tap ire Hydrant ; complete , and 3/4" Copper Service epmplete. $$2525.00 All footage is to be measured upon completion. All permits, inspection and engineering fees are to be paid by Contractor. The above price does not include any resurfacing. 2. Contractor agrees to repave said surface within a two week period after ditches have been backfilled and flooded, paving to conform to County, City, or State specifications. Failure of Contractor to repave said surface will cause said Contractor to be liable to Subcontractor at a price of $1.00 per square foot, should Subcontractor elect to repave, upon notice duly given to Contractor. 3. This agreement shall be considered as void should the water lines be installed before the sewer lines, or order to commence work not given within thirty days. 4. PAYMENT Contractor agrees to pay 90% of the total price when ditches are backfilled and flooded, the remaining 10% upon com- pletion. 5. INSURANCE: The Subcontractor shall maintain in full force and effect, compensation insurance and comprehensive liability insurance, Subcontractor also agrees to furnish Contractor with certificates of insurance upon request. 6. BOND: Should the Contractor require a bond, Subcontractor shall furnish said bond and the contractor agrees to pay the premium, which amount.shall not exceed 1 V2% of the total amount of the contract. 7. ATTORNEY FEES: If suit be brought by either party to compel performance under this contract, the prevailing party shall be entitled to the reasonable amount the court awards for attorney fees and court costs. CONTRACTOR: SUBCONTRACTOR: PLUMBING CONTRACTORS, INC. SANITARY DIVISION By Byc�v P PENNIS PRINTERS&STATIONERS.INC. E. A MOLOCZNIK \ `A _ !1. L_��11 'PLU�MBINF ':ONTRACTORS. *INC.. SANITA DIVISION° 4214 WEST.V_NESTMINSTER AVENUE W P. O. BOX 536 SANTA ANA, CALIFORNIA SUB-CONTRACTOR'S AGREEMENT 'THIS AGREEMENT, made and entered into this 15tY1 day of ' — A1t9t_ .96 by and between City of Huntington Beach whose address is — IftIIt >t3oII —California, hereinafter referred to as the CONTRACTOR, and Plumbing Contractors, Inc., Sanitary Division, hereinafter referred to as the SUBCONTRACTOR, WITNESSETH: 1. SUBCONTRACTOR will furnish all labor, material and equipment to install complete according to plans and speci- fications, the following, approximately: WATER_: Beech Blvd: Installtio of 8" AXii Water Main#, Hot Tap,, Fire Hydrant , complete; and 3/4" Copper Service cpmplete. t S2525 ,00 All footage is to be measured upon completion. All permits, inspection and engineering fees are to be paid-by Contractor. The above price does not include any resurfacing. 2. Contractor agrees to repave said surface within a two week period after ditches have been backfilled and flooded, paving to conform to County, City, or State specifications. Failure of Contractor to repave said surface will cause said Contractor to be liable to Subcontractor at a price of $1.00 per square foot, should Subcontractor elect to repave, upon notice duly given to Contractor. 3. This agreement shall be considered as void should the water lines be installed before the sewer lines, or order to commence work not given within thirty days. 4. PAYMENT Contractor agrees to pay 90% of the total price when ditches are backfilled and flooded, the remaining 10% upon com- pletion. 5. INSURANCE: The Subcontractor shall maintain in full force and effect, compensation insurance and comprehensive ' liability insurance, Subcontractor also agrees to furnish Contractor with certificates of insurance upon request. 6. BOND: Should the Contractor require a bond, Subcontractor shall furnish said bond and the contractor agrees to pay the premium, which amount shall not exceed 1/2% of the total amount of the contract. 7. ATTORNEY FEES: If suit be brought by either party to compel performance under this contract, the prevailing party shall be entitled to the;reasonable amount the court awards for attorney .fees and court costs. .CONTRACTOR: SUBCONTRACTOR: PLUMBING CONTRACTORS, INC. SANITARY DIVISION By By - 4ENNI5 PRINTERS&STATIONERS.INC. Ex MOLOCZhStK SANITAR� PIPELINE CO., INC. .O • /- TO TERMS r - I SANITARY PIPELINE CO., INCH, FROM 1302—W—ST—ANNE—PL.K—5= 97 SANTA ANA, CALIF. 19 CITY TERMS 00-1 as v eiRio i Q— I tG Ii j d 1 I le i ' z Al a Z I �I --- I - --- - ---- -------- ------------------ - ----- - -- ---- - --- - 1 t � 0 r CONCRETE BOXES AND VAULTS FOR WATER, GAS, �+ AND ELECTRICAL UNDERGROUND DISTRIBUTION PROOUCTS, IIIC. SYSTEMS • PARK BENCHES PRE-CAST SPECIALTIES ROCKWELL AND OLNEY STREETS EL MONTE, CALIFORNIA Cumberland 3.6471 WILLIAM P . e' ICKER , A . I . A . Architecture and Planning SUITE 262 • 446 NEWPORT BLVD., NEWPORT BEACH, CALIF. MIdway 6-7739 Ju ly 23 , 1962 City of Huntington Beach Engineering Department P. 0. Box 190 Huntington Beach, California Attn: William Hartge Assistant"City Engineer Dear Mr . Hartge: Enclosed is a copy of the invoice from J.P. S. Contracting Company, Inc . , for the installation of a sewer line on Cameron Street. The work has been completed and is in use. It is our understanding, per previous agreement,. that the City of Huntington Beach will pay 50% of this cost and that Dr .. Nelson will assume the cost of the other 507o. Very truly yours, L� W: P. Ficker , A.I .A. WPF:gs e nc 1 00 � 10 . 4 INVOICE J. P. S. CONTRACTING COMPANY, Inc. 3636 W. WESTMINSTER BLVD. • P. O. BOX 3066 • SANTA ANA, CALIF. JEfferson 1-2834 Invoice # 1934 Our Job # 825 Dafe: June 30, 1962 Rat Cam000n 5t. sewer Dr. Leon G. Nelson William P. Ficker., A.I .A. Suite 202 446 ,Newport Blvd Newport Beach, California 660 L.F. 8" V..C.P.. ® $3-.65 per foot $ 2,409 0.00 2 Standard Manhole © $290.00 each 580:00 10 Wyss On x 4") ® $8.00 each 80_06 $ 39069.00 Kindly issue checks as follows: Gladding,_ McBeen & Co. , and J.P.S. Contracting Company, Inc 956.36 Associated Concrete Products, I.nc. and J.-P.S. Contracting Company, Inc 285.97 J.P.-S. Contracting Company, Inc 19826.67 � ? O I vit . :t 7,872 .00 100.00 750 .00 168.00 8,890.00* 17,292 .00 3,920 .00 2,100 .00 500.00 1,400.00 1,5 4 2 .0 0 26,754 .00* 5,670 .00 8,890 .00 778.50 26,754 .00 42,092 .50* Vu G 22,880 .00 525 .00 1,275 .00 210.00 3 3 0__0 0 250.00 1,250.00 26,720.00* , 1,217 .20 200.00 7 0 .0 0 1,602 .20* 1,768.00 200 .00 00 1 3 .0 0* 1,768 .00 100 .00 1,903 .00* 2,442 .00 100.00 2,657 .00* 2,479.00- 200.00 2,679.00* 180.00 1 8 0.0 0* 26,720 .00 1,602.20 2,0 1 3.0 0 1,903 .00 2,657 .00 2,679.00 180.00 a � 3 7,7 5 4 .2 0* 1 s t) t) U.90 8,1 5 0.9 0 38,182 .00 4,1 7 1 .0 '0 2,000 .00 220.00 772 .42 4 5,3 4 5 .4 2 15,817 .50 685 .00 1,229.30 17,731 .80* 6,837 .02 6,150 .90 4 5,3-4 5A 2 17,731 .80 78,065 .14* � �` ! / ' /� ,ICBM �t�'mM t..rlj �J��-J, Z� �%�<t f� 30 - • �. �. . /�.o� � o. Zoo Od R J . W �`4 70 5 PMMNG CONTIUCTMS IMOUP0$AZOD SMITARY RHSION 4214 posT o�z�� AVZW SANTA ANA, CAMUMA B. 0, Deans P. 0. Box S amatin$ton Beach$ eftw. Hof®ronoe s Sewer, Ades Me Off-Ute January�4, 9 �. Glentlaaona A® pro ca to fucniah all labor, material, and ogvd~ to 4ertol3. e aooard to plane and opooifioatione, tho fo.'LLo nd0 wee XAP 154 * 180 1edeelraQk • 11#00 per ft. 3,6 pp Zl a 15" fe41gelook 9 10.90 per .ft. .00 U Nmho2- en o 300000 ea. 3 ,goo 1, TIOW-In to Senitation District Manhole O 000 vG 1 Charnel Crooning $3 40 The bid does not include aa,P import of fill atrial: A32 footaGo in to bo noaoured uDon, oostplotion, all pez%d e -Inqputlm v d caudworina f000 are to bo paid by you. This ootiffite. or bwtwt &MG- not inoludo any rosurfaoing. Tho General Contruobar within a two cook period, conforming to Oounty cpoadfioa�np or vo vrLU ro o eamo at a price of V1.00 por aqua" foot, to be ;'dl by tW Conti-actor, The pri000 on this eatimato bid are void aftor tbL rby dill =d wo Veld 12 U9 crater line io inatallod before tho necror. Campaatian wi12. to obtalrad. by flooding. ant is to bo mado 90% when ditoboa a d and flooftd, ft* re . 10% upon complotion. AOOUTTIM PLTJIM IiGF 00=WT=g IMOMWATM PW,MnTIG COXMIAJCTOIts XWORY(RM sAIiITA y DIVEsim 4214 WEST AI;SZMi'3M AYMM POST OPPICh BOX 536 sANTA AUAO c De Cv DOOM . ALIPOMU P.O. lbx I ltipg �aati, Cad 9 emm "920. January 23, Beforonoo: Sewer, Tract 4493 Gentlomn: S/ � S L�r iZ */0 QWOpono to �.ah all labor, xiatorlal, m d o� to i.�rta1,1 arflM: , aao inn4 to p]ema and ewolfl.oationo, tho ft'23ro AQp tmu# 5�' 4' 1�e • IM per 2 ft. 34�St.9O Z*50 e ©ua s zo AO e:. WmW i2*/3MO Rook w►bore rogvttred O $7*0 ! ton Sewer hawse Q t 1uo por tt 0 purldF to. Sewer h*VAS oamW®tioas to bo betCre era a .�.� Any be grater Valves roquixod to be pal d for by All footnao in to bo noaawed vWon oomplotion, all poaa�t+r ongineorina food are to bo paid by you, "LUG tp cW bantawt, 6m, not i oludo any roswfa,oing. Tho Gam al Odor ems awftco within a two nook periodq confoto comty aw go ro oo eamo at a prico of w1.00p _ per t o to to by tbo Gmv=L Contraotor. Mm paicoa on thi® oetimato bid aro vold aPtor VdxW ft�, and w i9 the water line io inntallod boforo tho aepcir. 0 bo obtagn" by flooding. Pb nt is to ba nado 90 when ditch u aro book:M.17-ad and flooded, fte ]D5t upon complotion. ACCIWM- PLUM G 00=02=6 im �s ls. A, acUo Q No. 5"i)r 1,1, * 4214.WESi WESTMIN:a TER 6014_£YARD ^�.-:A ANA, I-ALIF-QFINIA QUALITY PLUMING AND HEATING JOB NO. TO TRACT NO. � 44�3T DATEGr�}'t`'a ,�'„ � _ INVOICES NOT PAID WITHIN FIFTEEN DAYS BEAR INTEREST AT:THE RATE OF.1%PE$,,,M,Q,�tTH QUANTITY DESCRIPTION - PRICE AMOUNT 42 814 tr 2.51) per m '109W.00 fib. O 24 lkill lkl , i PLUMBINe CONTRACTORS, INC., SANiTA" DIVISION 4214 WEST WESTMINSTER AVENUE P. O. BOX 536 • SANTA ANA, CALIFORNIA SUB-CONTRACTOR'S AGREEMENT PHIS AGREEMENT. tirade and entef-i•d into this 13th die` of August 1962 by and between B.C. Deane P.O. Box E, Bunting ton beach, California whose address is California, hei-einafter referred to rrs rite CONTRACT( )R, and Plumbing Commit i it,,. In; . Simi! ir% i ".ision, hereinafter referred to as the SUBCONTRACTOR. WITNE: SFTI i. I. SUBCOMhRA(:TOH will furbish all labor. material ; mi ,ouiprntt:( „,ill ,; nillate a •-•dint; ti• plans and speci- ficatiuns, the {nllu��inc;. appruximatefJ•: SEWXR TRACT 4740 10' 12" Wedgelock 9 5.00 per ft . 50.00 2664' 8" Wedgelock (t, 2 .50 per ft . 6 ,660.00 2200.' 4" dedgelock d 1.6; per f:. . 3 .630 .00 13 Manholes 0 210.00 each 2 ,730.00 1 Clean out r 75,00 each 75 .oO 1 Tie in to Sanitation distrlcNan hold 6750.00 0.00 $93 ,,895-06 Concrete encasement where required 8" $2.00 per ft . 4" $1.00. per ft . Sewer house connections 6 $1.55 per ft . plus permits. Seger hgt.se connections to be installed before sidewalks and driveways. Any back water valves required to be paid for by contractor. Subject to change upon approval of plane All footage is to, 1w mt-io uccl up„ii mmi,l,•iion All pernuts, utsl,e( tt"r: ,illd ctigmccring fees are io be paid by Contractor. The above price flocs nut include au% w,urlaciug. 2. Contractor agrees to repave said srtrf:ce within a t,so %%..v. !„"ri„d .tit, r troches L„ Iwvii hri, 4 filled and flooded, paving to conform to (;(,unit•, C:ily, or Still,, specifications. Failur,. of t:r`iiirwt(,i !,; iepa•., sod surface will cause said Conti-artor to be iurhle it, Subcortn'aCt(n• :t( a !,rice of Si.UU !u•r s,friaic f•'ot. ,h(It:ld ")ONI'tt•tact•,r clove t,, repave, upon notice duly }riven to Contractor. 3. This agreement shall be considered a, void sh„old the .%mer !mcti be :n;tallcd before the lesser lines, or order to commence work not given within thirty days. a. PAYMENT Contractor ag!cc.; to pay 9U'•; „f the forth price %kheti alien,., ,ire i,:tLHN10(i ,Ind floneicd, the rcntair.uth it)r; ulx,n com- pletion. 5. INSURANCE: Th,• Suhc(-mi-act )r shall malm;ih; in fall f„tic a,t.f , '!ft., : ,,• !;,m nvn,u,cr and comprehensive liability insurance, Subcontractor also agreC, i,, furnish (:,,mt.wtc,i cL,rit (c!:ii t au . f iti,ur.uu, uprut request. 6. BOND: tih„uld the Contractor require a hon(l, tiehr„otrn of sltaii hn : ,l, ,ai,i h, -id .end :h, (-f,w:,wtor agrees to pay the prenihmi. svhic•h amount shall r.,-t exceed I i ," of the ;:,tal artt,mc,t ',! file Lontt.0 i. 7. ATTORNEY FEES: It sui! he h myl—li hs cido-r- piirtc t„ ,,impel Ixri"t:rt.u... Mdcr th„ ,•nttta,t, the prevailing party shall he entitled to th(• reasonable anions! the c„tirt .tstimd, for tt: mv% fees .uxi L ntri cr•s;. CONTRACTOR- til IWON'1'll ACT( R- PI.UMBI;NC CON1'RAC-IFOKS. INC. SANITARY DIVISION PLUMBI' CONTRACTORS, INC., SANIT ! DIVISION 4214 WEST WESTMINSTER AVENUE P. O. BOX 536 • SANTA ANA, CALIFORNIA SUB-CONTRACTOR'S AGREEMENT 'THIS AGREEMENT, made and entered into this.-._13 'h____._. __ day of._-__August _1962 by and between whose address is_. .____- -_ P.O. Box B Huntinton Beach California _ _ _-_ealifarnia, hereinafter referred to as the CONTRACTOR, and Plumbing Contractors, Inc., Sanitary Division, hereinafter referred to as the SUBCONTRACTOR, WITNESSETH: 1. SUBCONTRACTOR will furnish all labor, material and equipment to install complete according to plans and speci- fications, the following, approximately: S, TRACT 4741 2604' 8" Wedgeloak 0 2.50 per ft. 6s510.00 2510' 4" Wedgeloek ! 1.65 per ft. 4 141.50 9 lean hones ! 210.00 each 1:990.00 2 Clean outs ! 75.00 each • 50, Subject to change upon approval of plans. 6*ws r house connectiona a 1.55 per ft. plus permits. Sewer house connections to be installed before sidewalks & driveways. Any back Crater valves required to be paid for by contractor. All footage is to he measured upon completion. All permits, inspection and engineering fees are to bar aid by C:ru:ra.:tc,•-•:. The above price does not include any resurfacing. 2. Contractor agrees to repave said surface within a two week period aster ditches have been in-7 floo-1c.' paving to conform to County, City, or State specifications., Failure of Contractor to repave said surface will Contractor to be liable to Subcontractor at a price of $1.00 per square foot, should Subcontractor c ect to upu.: notice duly given to Contractor. 3. This agreement shall be considered as void should the water lines be installed before the sewer line-_, u. or(2- t-r commence work not given within thirty days. 4. PAYMENT Contractor agrees to pay 90 c of the total price when ditches are backfilled and floodod, the ae;u.in;n- IG,� ple!ion. 5. INSURANCE: The Subcontractor shall maintain in full force and effect, compensation insurNice and ccsnp-,ilt liability insurance, Subcontractor also agrees to furnish Contractor with certilicates of insurance :;pen -equeP. 0. 13 ND: Should the Contractor require a bond, Subcontractor shall furnish said bond and .h thv premium, which amount shall not exceed 1 i2 o of the total amount of the contract. 7. r``'�s IGRNE`.' FEES: If suit be brought by either partk to compel performance under this t:orrtrij:_, tip party shall be entitled to the reasonable amount the court awards for attorney fees and curt costs. CONTRACTOR: SUBCONTRACTOR: PLUMBING CONTRACTORS, INC. SANITARY"'DIVISION By- [,__• C� • Z� ------- ` PENNIS PRINTERS&STATIONERS.INC. - %t s2oi �4'�� `st��r.�•l.�.viir `'�1rS v .. - __ T i 444� �xd� c� �3oc-cU (44 "7411 �. � 7? 665 /Y cYs+srCei/ �5/ o J } �'� 33 /• ,Q ate. �' t � U.ri J,C.. i" `+�' .*x '3'rtj `4 2 1a 'x TM*nrowxs 3�3$CF4 it. �. � � z `a �,a �7►i[A 1L23rLl�OaDif � °% S1`PLNTtN' cglrJtl�t atsvNtra: ,4"ALI `f:IRill I � 1�TC?v 'fii er � 1 b 2 j a, Wxllxams-qr I'arl .Co`xnpaya BOC F' Hu tington 13�h, California Att: J: ck Hillman , r Gentl°ernet�: .x k. ' We have been verbally advised b Bill lax' ge, repres ling the'City of Huntingt n teac t ths,6t they will' prti � e in the expense of storm drain ct7otmr. Tract Noi. t,740 as follows. Construction from Station 0+09 at.Caatery and Adams' xw to Station. 5+64, plus one jun th mika- t hole.. k V,_ 555 LF 48" ItCP 5,0 L '' 5., k . 1 Ea Junction chamber at Clapper .<: and Cannery $ . , Total Assumed by City of Huntington , eacham,Sol,30 e avied partictnb eIn view of,ty h City,of Huntington B,each'in this c onstractioA it quid . youi• net cost w,oulil be-th Ai r ce ':1 i r ., . for tbe,'I tal construction in the at o it of #21. 740, Qt i s the ov a cunt of $16, 502,. or i1, 237.50,. Very, truly yours,, f, COXCO41 INC. By' 3 C_uA wheatca OP k : p * t, JAMA. '. CONSTRUCTION, lot® " X 1202 EAST WASt-IING'1".ON AVENUE I V itce y 'aAN!'SA AAA, CALIFORNIA ft: KltmbCiPLY'3-2314 # KIR 09RLY �-3426 C7 } {TSM QUANTITY D,`SCFdtPT80N, tJMIi P1C • 1PJ7 hew . • } {"a'z to i w'+ �L ii,�,4 " - :,`s'Px7'«Yri.P7 wIgw " i 3;i <`: T.. '+ , , ,: k% PEE2 MONTH ON OVEROVE .80=0UNTS � ' Ec"�(o Ipc+ks 79594 � �M ENGINOON �+ lgli iAMP ON AVM`'ENV( GA►*DEN GROVE, CAt 1;0, * 4A L l # iiington # 0allforyda 4 TO lagt splWoXimato r 160 f Of *1 not, a0ftos trsMo oont41 on ems',,our job ` too*: too 4� f h, < TRACT ACCT. NO /p VOUCHER NO. 4 D $� R A1v1T ram•. O.K. 61 .� �. r x �� 7 f i tp, t k� 1 F A t 3 � w�Y n r, November 23, 1962 Deane Brothers 84Ci.1 Indianapolis Huntington Beach , California Atten: Jack Hillman Dear Sir: The follow!na is a breakdown of engineerin charges to date on Tracts 4.281: , t1339, Wi95, 4-1;.96, 4740 and Ml for offsite sewer, water and drainage . Tract 4284 Offsite water office 101.75 field 69.00 Offsite sewer office 83.25 Drainage office 4.64.27 field 86.63 SSo.yo . 4ol, ao Tract 4339 Drainage office 772.42 Tract li495 Offsite water office _-9.2 Offsite sewer office 120.25 field 575 .00 Drainage office 64.35 �69 • Z� 1 3 7 9 4 BEACH BOULEVARD WESTMINST ER . C A L'I F O R N I'A T W I N O A K 5 3 . 3 5 63 V001 l Deane Brothers November 23, 1962 Page 2 Tract L.L.96 Drainage office 157 .27 field 115 .00 221 .�'► Tract OhO Drainage office 975.42 field 198.38 )17330 Tract 4741 Drainage office 55 .50 In addition to the above it is anticipated that to complete the drainage construction on Tract 4339 and G2814 the following costs may be incurred: Field time $ 800.00 Office time $ 200.00 Should there be any questions regarding this, please contact this office . Yours truly, Milton E. Anderson MEA: Jwt 1 3 7 9 4 BEACH BOULEVARD . W E S T M I N S T E R . CALIFORNIA TWINOAKS 3 _ 3 S 6 3 C�lit�!%IPIl-r-�1/I<I(l' '��l November 23, 1962 Deane Brothers 841,1 Indianapolis Huntington Beach, California Atten: Jack Hillman Dear Sir The following is a breakdown of engineerin charges to date on Tracts 428L , 11339, 41195 , Uf!-96, 4740 and 47�1 for offsite sewer, water and drainage . Tract 4284 Offsite water office 101 .75 field _ 60 Offsite sewer office 83.25 Drainage office L.64.27 field _ 86.63 SSc .�o Sol. go Tract 4339 Drainage office 772,42 Tract 4495 Offsite water office 9.2 Offsite sewer office 120.25 field _577.00 Drainage office - - 64.75-_____ _ IC9 -L �c�ry �/zf y �raika�� ?.A�f- mv"A�' 1 3 7 9 4 BEACH BOULEVARD W E S"T M I N S T ER . CALIFORNIA TWINOAKS 3 • 3 5 63 \i i 3 Deane Brothers November 23, 1962 Page 2 Tract 4496 Drainage office 157 .27 field _ll7 .00 Tract 47t10 Drainage office 975.42 field 198.38 1173 , 90 Tract 4741 Drainage office5 .5p In addition to the above it is anticipated that to complete the drainage construction on Tract 4339 and L284 the following costs may be incurred; Pield time t 800.00 Office time 200.00 Should there be any questions regarding this, please contact this office . Yours truly, Milton E. Anderson MEA: Jwt 1 3 7 9 4 BEACH BOULEVARD WESTMINST ER . CALI F O R N i A TVVINOAIKS 3 3 5 6 3 i a n ✓„S'_ � �sr�! /cif/`:i r" /c/� y �,r� lrn' iC�'•G'G •500-B[� ev CG Go 7,4 t ��' � IPD•livl � �4D,o G � -4 74' 2 • r� �d °/ z, f7/ 9 a io /43.o o �z ST 70/o o < 7, y23 io� PLUMBIN :ONTRACTORS. INC., SANITA DIVISION 4214 WEST WESTMINSTER AVENUE P. O. BOX 536 SANTA ANA, CALIFORNIA SUB-CONTRACTOR'S AGREEMENT THIS AGREEMENT, made and entered into this_ 13t—_h __day of__August 1962 by and between B.C/ Deane P.O. Box E_Huntington Beach . California whose address is _. � _ California, hereinafter referred to as the CONTRACTOR, and Plumbing Contractors, Inc., Sanitary Division, hereinafter referred to as the SUBCONTRACTOR, WITNESSETH: 1. SUBCONTRACTOR will furnish all labor, material and equipment to install complete according to plans and speci- fications, the following, approximately: WATER TRACT 4740 1371' 8"- A.C. water main @ 3 .40 per ft. 4,661.46 780' 6" A.C. Water main @ 2.55 per ft. 1,989.00 516' 4" A.C ., Water main @ 2.20 per ft. 1135.20 4 Fire Hydrants (Complete) @410.00 each 1:640.00 2 2" Blowoffs @135.00 each 270.00 3 8" Gate valves & Boxes @155.00 each 465.00 2 2 4" Gate valves & Boxes @100.00 each 200.00 2 6" Gate valves & Boxes @115.00 each 230.00 1 8" Hot tap @325.00 each 325.00 20' /Concrete encasement @ 2.00 per ft. 40.00 67 3/4" Copper servi ces @ 32.50 each 2,177-50 67 4/4 x 5/$ Meters & Boxes @ 37.50 each 122. 0 $152-v��4 Subject to change upon approval of plans. All footage is to be measured upon completion. All permits, inspection and engineering fees are to be paid by Contractor. The above price does not include any resurfacing. 2. Contractor agrees to repave said surface within a two week period after ditches have been backfilled and flooded, paving to conform to County, City, or State specifications. Failure of Contractor to repave said surface will cause said Contractor to be liable to Subcontractor at a price of $1.00 per square foot, should Subcontractor elect to repave, upon notice duly given to Contractor. 3. This agreement shall be considered as void should the water lines be installed before the sewer lines, or order to commence work not given within thirty days. 4. PAYMENT Contractor agrees to pay 90% of the total price when ditches are backfilled and flooded, the remaining 10% upon com- pletion. 5. INSURANCE: The Subcontractor shall maintain in full force and effect, compensation insurance and comprehensive liability insurance, Subcontractor also agrees to furnish Contractor with certificates of insurance upon request. 6. BOND: Should the Contractor require a bond, Subcontractor shall furnish said bond and the contractor agrees to pay the premium, which amount shall not exceed 1 V2% of the total amount of the contract. 7. ATTORNEY FEES: If suit be brought by either party to compel performance under this contract, the prevailing party shall be entitled to the reasonable amount the court awards for attorney fees and court costs. CONTRACTOR: SUBCONTRACTOR: PLUMBING CONTRACTORS, INC. SANITARY DIVISIIOO,N By---. ----- By PENNIS PRINTER§6 STATIONERS.INC. ' I.Ae MOLOCZNIK 1 PLUMBING 'ONTRACTORS. INC.. SANITAP" DIVISION 4214 WEST WESTMINSTER AVENUE 10 P. O. BOX 636 • SANTA ANA, CALIFORNIA SUB-CONTRACTOR'S AGREEMENT THIS AGREEMENT, made and entered into this 13th day of Au-9aSt 1962 , by and between B.C. Deane whose address is P.O. Box_B, Huntington Beach,. California _- _ _ --California, hereinafter referred to as the CONTRACTOR, and Plumbing Contractors, Inc., Sanitary Division, hereinafter referred to as the SUBCONTRACTOR, WITNESSETH: 1. SUBCONTRACTOR will furnish all labor, material and equipment to install complete according to plans and speci- fications, the following, approximately: WATER TRACT 4741 755' 12" A.C. Water main @ 5.25 per ft. 3963 .75 1430' 8" A.C. Water main @ 3.40 per ft. 4:862.00 790' 6" A.C. Water main @ 2.55 per ft. 1,989.00 516' 4" A.C. Water main @ 2.20 per ft. 19135•20 4 Fire Hydrants (Complete) @ 410.00 each 1,640.00 2 2" Blowoffs @ 135.00 each 270.00 5 8", Gate valves & Boxes @ 155.00 'each 775.00 2 6" Gate valves & Boxes @ 115.00 each 230.00 2 4" Gate valves & Boxes ! 100.00 each 200.00 67 3/4" Copper water services @ 32.50 each 2,1$7.50 67 3/4 x 5/$ Meter & Boxes @ 37.00 each $19 2 12. 0 • 95 Subject to change upon approval of plans. All footage is to be measured upon completion. All permits, inspection and engineering fees are to be paid by Contractor. The above price does not include any resurfacing. 2. Contractor agrees to repave said surface within a two week period after ditches have been backfilled and flooded, paving to conform to County, City, or State specifications. Failure of Contractor to repave said surface will cause said Contractor to be liable to Subcontractor at a price of $1.00 per square foot, should Subcontractor elect to repave, upon notice duly given to Contractor. 3. This agreement shall be considered as void should the water lines be installed before the sewer lines, or order to commence work not given within thirty days. 4. PAYMENT Contractor agrees to pay 90% of the total price when ditches are backfilled and flooded, the remaining 10% upon com- pletion. 5. INSURANCE: The Subcontractor shall maintain in full force and effect, compensation insurance and comprehensive liability insurance, Subcontractor also agrees to furnish Contractor with certificates of insurance upon request. 6. BOND: Should the Contractor require a bond, Subcontractor shall furnish said bond and the contractor agrees to pay the premium, which amount shall not exceed I V2% of the total amount of the contract. 7. ATTORNEY FEES: If suit be brought by either party to compel performance under this contract, the prevailing party shall be entitled to the reasonable amount the court awards for attorney fees and court costs. CONTRACTOR: SUBCONTRACTOR: PLUMBING CONTRACTORS, INC. SANITARY DIVISION By By pENN1S PRINTERS A STATIONERS.INC• E. A. MOLOCZNIK PLUMBING CONTRACTORS, INC., SANITA" DIVISION 4214 WEST WESTMINSTER AVENUE P. O. BOX 536 SANTA ANA, CALIFORNIA SUB-CONTRACTOR'S AGREEMENT THIS AGREEMENT, made and entered into this 1 th day of__AU&U§t 1962 , by and between B.C. Deane — P.O. Box E Huntington Beach, California whose address is_—___._-__ _ � _ California, hereinafter referred to as the CONTRACTOR, and Plumbing Contractors, Inc., Sanitary Division, hereinafter referred to as the SUBCONTRACTOR, WITNESSETH: 1. SUBCONTRACTOR will furnish all labor, material and equipment to install complete according to plans and speci- fications, the following, approximately: WATER TRACT 4742 1890' 12" A.C. Water Main @ 5.25 Per ft. 9,922•55 1151' 8" A.C. Water Main @ 3 .40 Per ft. 3,913 .40 1393 ' 6" AC Water Main @ 2.55 Per ft. 3 ,552.15 25$' 4" A.C. Water Main @ 2.20 Per ft. 567.60 7 Fire Hydrants Complete @ 410.00 Ea ch 2,870.00 1 2" Bloxoff @ 135.00 each 135.00 3 12" Gate valves do Boxes@255.00 each 765.00 4 8" Gate valves do Boxes @ 155.00 each 620.00 2 6" Gate valves & Boxes @ 115.00 each 230.00 1 4" Gate vales do Boxea @ 100.00 each 100.00 75 3/4" Copper services @ 32.00 each 2,437.50 75 3/4 x 5/8 Meters & Boxes @ 37.50 each 2,812.50 _ W27,925.70 Subject to change upon approval of plans. All footage is to be measured upon completion. All permits, inspection and engineering fees-are to be paid by Contractor. The above price .does not include any resurfacing. 2. Contractor agrees to repave said surface within a two week period after ditches have been backfilled and flooded, paving to conform to County, City, or State specifications. Failure of Contractor to repave said surface will cause said Contractor to be liable to Subcontractor at a price of $1.00 per square foot, should Subcontractor elect to repave, upon notice duly given to Contractor. 3. This agreement small be considered as void should the water lines be installed before the sewer lines, or order to commence work not given within thirty days. 4. PAYMENT Contractor agrees to pay 90% of the total price when ditches are backfilled and flooded, the remaining 10% upon com- pletion. 5. INSURANCE: The Subcontractor shall maintain in full force and effect, compensation insurance and comprehensive liability insurance, Subcontractor also agrees to furnish Contractor with certificates of insurance upon request. 6. BOND: Should the Contractor require a bond, Subcontractor shall furnish said bond and the contractor agrees to pay the premium, which amount shall not exceed 11/2% of the total amount of the contract. 7. ATTORNEY FEES: If suit be brought by either party to compel performance under this contract, the prevailing party shall be entitled to the reasonable amount the court awards.for attorney fees and court costs. CONTRACTOR: SUBCONTRACTOR: PLUMBING CONTRACTORS, INC. . SANITARY-DIVISION /� '€ A. M ZNIK BY -- � BY - PENNIS PRINTERS O STATIONERS.ING• E.A. MOLOUNIK __- PLUM III feCONTRACTORS, INC.. SANITI ' DIVISION 4214 WEST WESTMINSTER AVENUE 1 P. O. BOX 536 • SANTA ANA, CALIFORNIA SUB-CONTRACTOR'S AGREEMENT THIS AGREEMENT, made and entered into this 13th day of—.A_gust 1_962 , by and between B.C. Deane P.O. Box E, Huntington Beach, California whose address is __. ___-- _California, hereinafter referred to as the CONTRACTOR, and Plumbing Contractors, Inc., Sanitary Division, hereinafter referred to as the SUBCONTRACTOR, WITNESSETH: 1. SUBCONTRACTOR will furnish all labor, material and equipment to install complete according to plans and speci- fications, the following, approximately: W1TER TRACT 4339 1946' 8" A.C. Water main @ 3.40 per ft. 6,616.40 15461. 6" A.C. Water main @ 2.55 per Rt. 3 ,942.30 I Fire Hydrants (Complete) @ 410.00 each 2,870.00 4 8" Gate valves & Boxes 0 155.00 each 620.00 3 ' 6" Gate valves & Boxes @ 115.00 each 345.00 1 8" Hot tap @ 325.00 each 325.00 2 6" Hot taps @ 275.00 each 550.00 82 3/4" Cop,,PPer services @ 32.50 each 29665.00 $2 3/4 x 57 Meters & Boxes @ 37.50 each 0 .00 *21t008-70 Subject to change upon approval of plans. All footage is to be measured upon completion. All permits, inspection and engineering fees are to be paid by Contractor. The above price does not include any resurfacing. 2. Contractor agrees to repave said surface within a two week period after ditches have been backfilled and flooded, paving to conform to County, City, or State specifications. Failure of Contractor to repave said surface will cause said Contractor to be liable to Subcontractor at a price of $1.00 per square foot, should Subcontractor elect to repave, upon notice duly given to Contractor. 3. This agreement shall be considered as void should the water lines be installed before the sewer lines, or order to commence work not given within thirty days. 4. PAYMENT Contractor agrees to pay 90% of the total price when ditches are backfilled and flooded, the remaining 10% upon com- pletion. 5. INSURANCE: The Subcontractor shall maintain in full force and effect, compensation insurance and comprehensive liability insurance, Subcontractor also agrees to furnish Contractor with certificates of insurance upon request. 6. BOND: Should the Contractor require it bond, Subcontractor shall furnish said bond and the contractor agrees to pay the premium, which amount shall not exceed It/2% of the total amount of the contract. 7. ATTORNEY FEES: If suit be brought by either party to compel performance under this contract, the prevailing party shall be entitled to the reasonable amount the court awards for attorney fees and court costs. CONTRACTOR: SUBCONTRACTOR: PLUMBING CONTRACTORS, INC. SANITARY DIVISION By By }' pENNIS PRINTERS d STATIONERS.INC. E A. MOLOCZNIK PLUMBINr ^.ONTRACTORS, INC.. SANITA►" DIVISION 4214 WEST WESTMINSTER AVENUE P. O. BOX 536 • SANTA ANA, CALIFORNIA SUB-CONTRACTOR'S AGREEMENT t THIS AGREEMENT, made and entered into this---1st_. .—day ofJune 1962 by and between B. C. Deane 1�5c �_..Box-�---------------- — whose address is— Huntington Beach, Calif.— —_—_ _ _ —California, hereinafter referred to as the CONTRACTOR, and Plumbing Contractors, Inc., Sanitary Division, hereinafter referred to as the SUBCONTRACTOR, WITNESSETH: 1. SUBCONTRACTOR will furnish all labor, material and equipment to install complete according to plans and speci- fications, the following, approximately: WATER, Tract 4284 980, 12" A.C. ® 5.00 per ft. 4900.00 2055' 8" A.C. ® 3.30 per ft. 6781.50 610' 6" A.C. @ 2.45 per ft. 1494.50 6 Fire Hydrants (complete ) ® 395.00 2370.00 1 1211 Gate Valves & Boxes ® 255.00 ea. 255.00 3 8" Gate Valves & Boxes-4 155.00 ea. 465.00 1 Blowoffs ® 135.00 ea. 135.00 79 3/4" x 5/8" Meters & Boxes 0 32.50 ea. .'2567.50 79 3/4" Copper Services ® 32.50 ea. 256Z 50 Extending water mains across Adams ® lL571.54 S23 ;107.54 Subject to change upon approval of plans All footage is to be measured upon completion. All permits, inspection and engineering fees are to be paid by Contractor. The above price does not include any resurfacing. 2. Contractor agrees to repave said,surface within a two week period after ditches have been backfilled and flooded, paving to conform to County, City, or State specifications. Failure of Contractor to repave said surface will cause said Contractor to be liable to Subcontractor at a price of $1.00 per square foot, should Subcontractor elect to repave, upon notice duly given to Contractor. 3. This agreement shall be considered- as- void should the water lines be installed before the sewer lines, or order to commence .work not given within thirty days. 4. PAYMENT Contractor agrees to pay 90% of the total price when ditches are backfilled and flooded, the remaining 10% upon com- pletion. 5. INSURANCE: The Subcontractor shall maintain in full force and effect, compensation insurance and comprehensive liability insurance, Subcontractor also agrees to furnish` Contractor with certificates of insurance upon request. 6. BOND: Should the Contractor require a bond, Subcontractor shall furnish said bond and the contractor agrees to pay the premium, which amount shall not exceed 11/2% of the total amount of the contract. 7. ATTORNEY FEES: If suit' be brought by either party to compel performance under this contract, the prevailing party shall be entitled to the reasonable amount the court awards for attorney fees and court costs. CONTRACTOR: SUBCONTRACTOR: PLUMBING CONTRACTORS, INC. SANITARY DIVISION By — By DENNIS PRINTERS&STATIONERS.INC. E.A.V&OCZN I K J.it TkiY DIVISION > >4xTi > il Al l"L B, 0. Deane P• 0 Bog R H,,Atington Beach, Calif. January 27 1 iieforence: Water, Tract 4495 Gentlemon: UO propo©c to furnioh all labor, natorial., and oquip=nt to inrital.l ooapleto, accordin,..; to plans and opecificationc, the follmArl;, opproxir-.tolys 10501 12" Transite 0 5.00 per ft. 5250.00 470' 8" Transits 0 3.30 per ft. 1551.00 1344' 6" Transits 0 2.45 per ft. 3292.80 4 Fire Hydrants (complete) 0 395:00 ea. 1500.00 2 12" Gate Valve & Boxes Q 255.00 ea. 510.00 1 8" Gate Valve & Boxes 0 155.00 ea. 155.00 2 6" Gate Valve & Boa 0 115.00 ea. 230.00 2 Blowoffs 0 135.00 ea. 270.00 66 3/4" Copper Services & Meters m 65.00 ea. 2 0.00� All is to be r c:a.ouxed i.,.pon completion, all peZrAta inapoetion and oil-) t,o^rslr fees, oars to be paid by y-ou. This cotir ato bil or contract d000 not iiiel do any sho Gnncral Contractor will ro-p vo said ourfaac} w tili:n a t;ro wc,31i ��;.`;i OCi � coxi-fon.Ii nG to County qwj c i"ica,t ona r or vto gill xcsurfuco cx. at a Arise of �1,00 per ocivar6 foot, to be paid by tho Oenorral Conti ac to L 2210 ?:,�^ wc,:; On '.� ,> cot�-:} tc bid-2c�.rc void after t li:-tY 3m, and aro void if the au tor 1.._nc _ _no to.11c d ;,e�oro the s%."or. Cotmaction will' bo obtm3aoQ flood n;'. Fayncsrt; in -LI3 b;_' J.ir' o, "'Op %-Iho 1 cl i-tche o woo backfillod and floodod, tho ,ACC; ; i, e- M _ . .._ _ _., �_. .._ .. ._ _. ._ ?LUi.:BIITG Cl:1II'1,ACTJ11-, 11TCO1U-Uit11,= Rhr-JBLIC SUPPLY COMPANY i I 1 I i c i i I j LET REPUBLIC SUPPLY YOU! , REIMBURSEMENT AUNT THIS AMEWM, dated this _„ day of , 1962; 1w and BETWEEN CITY OF HUNTINGTON BEACH, a municipal corporation hereinafter for conven.- ience referred to as, CITY HUII�ER W I T N E S S E T H: WHMASs Builder has filed with the City Engineer of the City of Huntington Beach for the eztention at a -sewer main and connection thereto for4l=e ■rrrrr.■.■w.■.�`rrrr■i■ +�■.�+�rrw�rr■� WHEREAS, Builder has entered into an agreement with the City of Huntington, Beach relating to performing the pecessary work in the construction of said serer line; and VPHEREB►S, Builder has agreed, at.his own cost and expense to construct and build said off-site sewer fooility all in conformity with the plans, specifications and provisions as approved by the City Engineer; and WHMWj the construction of said Bawer line shall be in conformity with the Huntington Beach Ordinance Code, more particularly Chapter 36 re- lating to power, and at the completion of said construction and upon acceptance by the City Engineer as being An full conformity xith the p3ans and specifica- tions approved t7 said City.Engineer# shall be dedicated by the Builder to the City of Huntington Beach; anal Ze WHEREAS, the Builder shall be entitled under said sections of the Huntington Beach Ordinance Code, after such construction and dedication of said sewer facility to refunds from connections by others to said sewer facility; NOW THEREFORE, in consideration of the premises and the agreements herein contained, the parties agree as follows: 1. That upon completion of the construction of the facility hereinafter described by the Builder to the full satisfaction of the City Engineer and on its dedication to the City of Huntington Beach, Builder shall be entitled to refund from connection fees received by the City of Huntington Beach for connections made to said hereinafter described facility in accordance with the provisions of Chapter 36 of the Huntington Beach Ordinance Code. 2. The facility constructed by Builder and for which refunds are hereby agreed to be paid to Builder is described as follower se �86 ®G9 (%lti ieq ie �cJ eery 4s T�s��ll Q 3. Builder does hereby acknowledge that he has received a refund in the form of a credit in the'amount of � G. O d . .bV waiver of connection fees. 49 That the coast to the Builder for the construction of said facility is the am of 5. The refund to be paid to the Builder under this Agreement is as follows: loop Total Job Cost of Facility Total Amount Refundable under Z3 7, 9 O Chapter 36 leas: Refund credited by waiver of ¢rG.Ga fee on connection to lot Net Refundable /or- 7�G 2. +► •: 6. No refund payment shall be made by the Clerk of the City of Huntington Beach to Builder until the City Engineer shall have certified, in writing, to the City Clerk that Builder is entitled to a refund for a specific connection lowing previously been made to this particular facility in accordance with Chapter 36 and the City has received the fee for such covnnection. Dateds CITr OF HONTINGTON BEACH A municipal corporation, HY City C rk BUIIaE$ BY nt secM $Y rY 3. STATE OF CALIFORNIA } ss COUNTY OF ORANGE ) On this day of , 1962s before may a Notary urc, in a 'For-said County. and State, personam appeared ROBERT U. LAMBERT, known to me to be the Mayor, and PAUL C. JONES, known to me to be the City Clerk of the City of Huntington Beach, a municipal corporation, the corporation that executed the within instrument and acknowledged to me that they executed said instrument on behalf of such municipal corporation. STATE OF CAWFORNIA ) $a COUNTY OF CWQE On this day of 1962, before may a Notary Public, in and o�said County and to ee, persona appeared . known to me to be the rre-ddint and known to me to be the Seeretary-Treasurer of the corporation that execute the within instrument and acknowledged to me that they executed said instrument on behalf of such corporation. 40 •_,. -'L REIMMEMW AGREEMENT THIS AGREEBENT, dated this day of s 2962, tV and BETWEEN CITY OIL HUNTINGTON BEACH, a municipal corporation hereinafter for conven— ience referred to as, CITY 7 . BUIIVEA W I T N E S S E T Hs WHMASj, Builder has tiled with the City Engineer of the City of Huntington Beach for the extentionof a -sewe/r� main and/connection thereto for w�p /� �e rs lives a /��a�6arrP�O`� r rr�� - � 14:f r �rrrr�rr�r�Yr�i . WI Builder bas entered into an agreement with the City of Huntington Beach relating to performing the necessary work in the construction of said sewer.line; and WHEREAS, Builder has agreed, at his own cost and expense to construct and build said off—site sewer facility all in conformity with the planes specifications and provisions as approved by the City Engineer; and WHMEAS, the construction of said severer line shall be in conformity with the Huntington Beach Ordinance Code, move particularly Chapter 36 re— lating to sewer, and at the completion of said construction and upon acceptance try the City Engineer as bsiha-In full conformity v th the plans and speoifica— tions approved by said City.Engineer, abash be dedicated by the Builder to the City of Huntington Beach; and L IMEREASjo the Builder shall be entitled under said sections of the Huntington Beach Ordinance Code, after such construction and dedication of said sever facility to refunds from connections by others to said sewer facility; NOW THEREFORE, in consideration of the premises and the agreements herein contained, the parties agree as follows: 1. That upon completion of the construction of the' facility hereinafter described by the Builder to the Full satisfaction of the City Engineer and on its dedication to the City of Huntington Beachs Builder shall be entitled to refund from connection fees received by the City of Huntington Beach for connections made to said hereinafter described facility in accordance with the provisions of Chapter 36 of the Huntington Beach Ordinance Code. 2. . The facility constructed by Builder and for whioh refunds are hereby agreed to be paid to Builder is described as fo].loaa: ,5 ter® atf�o��[ �'� ���stG✓cG' 3. Builder does hereby ackncwledge that he has received a refund in the form of a credit in the amount of /S O.00 by waiver rrr,r. of connection fees. 4• That the cost to the Builder for the construction of said .? L -s'G, 2 O facility is the sum of 5. The refund to be paid to the Builder under this Agreement is as follows: Total. Job Cost of Facility Total Amount Refundable under Chapter 36 Lass: Refund credited by waiver of -.- /�f V•elU fee on connection to lot d Not Refundable 7 el. 03 2. 6, No refund paywrit shall be made by the Clerk .of the City of Huntington Beach to Builder until the City Engineer shall have certified, in writing, to the City Clerk that Builder is entitled to a refund for a specific connection having previously been made to this particular facility in accordance with Chapter 36 and the City has received the, fee for mch connection. Dated: , CITY OF HUNTINGTON BEACH A municipal corporation, By or BY City Clerk BUILDER By rmildent 8y Secretary 30 STATE OF CALIFORNIA ) ss COUNTY OF ORANGE } On this day of , 1962, before me, a Notary uric, in an for said County and State, personals appeared ROBERT M. IAMBERT, known to me to be the Mayor, and PAUL C. JONES, known to me to be the City Clerk of the City of Huntington Beach, a municipal corporation, the corporation that executed the within instrument and acknowledged to me that they executed said instrument on behalf of such municipal corporation. STATE OF CALIFORNIA ) COUNTY OF MANGE ) ss On this day or 1962, before me, a Notary Public, In and o'r s ad County and personally appeared . known to me to be the resident and known to me to be 'the Sec retary-Treasurer of the corporation that executed the within instrument and acknowledged to me that they executed said instrument on behalf of such corporation. 40 October 5, 1962 AGREEMENT This agreement entered into between the city of Huntington Beach and �lercules Construction Co. for the construction of Sewer Main in Alabama St. between Quincy and Nashville. It is agreed by both parties that sewer shall be constructed by Harco Construction Co. 716 N. Rose St. , Anaheim, Calif. and that proposal and contract dated 10-4-62 in the amount of $4,545.40 is complete and correct as to City Specifications. It is further agreed that upon final inspection of Sewer work,payment of $ 4545.40 is to be made as follows: City of Huntington Beach $ 2,441 .07 Hercules Construction Co. 2, 104.33 _�yrrX City of Huntington Beach Hercul nst uct' Co. By &OPOSAL and CONTRA HARCO CONSTRUCTION COMPANY 716 North Rose S~t. Anaheim Calls Harold M.: Schmitz - owner KEystone 5-8278 Date October l+l lg 62 To Hercules Construction Co. Santa Ana' Calif. Tele hone KI 7`70�+' m 1104 ,E.,, 17th._,- St., p c Dear sir:' Refs. installation of sewers in Alabama Ave. 9 Huntington Beach. o WE propose to furnish all materials and perform all labor necessary to complete the following: n 91+7-Lin._.Ft:. of 8'' V.C_.P. @ . - $2.95__ per lin. ft. _ - -_ 2$793• _ o O1 120 Lin. Ft. of " V.C.P. 1. per lin. ft. • 00 C Two (2) standard. manholes @ $300,.00 each. - 00. Cn 00 m One tie-in to existing manhole on Alabama LIItdP - 2 M V-4 One tie-in and street crossing at Alabama & Quincpy a00,_00 o 4 Total contract price S 39993 mH N Barricades.-•r.-: .•:*.*.a .0 m totals j02 . co 95 _ 'o ADDER. ITEMSa` t. 3051,• • c — m o GRAN TOTALS w All of the above work to be completed in a substantial and workmanlike manner aceordin to standard practices for the sum of four thousand five hundre forty Do,,. ($1•I�2 ve Lars. an or y cents CD , Payments to be ma e 4i c HARCO CONSTRUCTION CO. in accordance with 0 .o your pay schedule row as the work progresses. * a to the value of ninety cent 90 %) of all work completed. The entire A4 c amount of contract to be paid within f 4,_ days after completion. to ,o Any alteration or deviation from the above specifications involving extra cost of material or labor .040 will only be executed upon written orders for same,.and will become extra charge ov the sum men- c M 4 tioned in this contract. All agreements must-be made in writin m o Res , m' � Z41 /�foots p By a o d : SC Z - er ge to be measured upon com letlom All permits, inspection and engineering fee's� HARM U0V&X-K be paid by you. 716 North Rose. St. Anaheim This estimate bid or contract does not Include ADDRESS w -any resurfacing. KEystone 5-8278 0 - - TELEPHONE Z ACCEPTANCE You are hereby authorized to.furnish all materials and labor required to complete the work mentioned in the above proposal, for which agree to pay the amou% mentioned in said pro sal, and according to the terms thereof. T2� Teo cJo ACCEPTED �A footage to be measured upon completlom Date All permits, inspection and engineering fee's% , 19 be paid by-you. PROPOSAL—Su8 CONTRACTOR—WOLCOTTS FORM 564—REVISED 3-61' This estimate bid or contract does not IncItift any resurfacing. PROPOSAL and CONTRACT 'RCO COTTSTRIUCTION CO. 14AP10 1Ar4CRFD1 CO. 16 Nortli Rose St . v Anaheim, California PM Date September 13 To ' Hercules Construction Co, ATTENTION: Ralph Jensen 1101+ East 17 th St. Santa Ana Calif. — Telephone Kimberly .7_-.7D�4 Dear Sir: Ref: Alabama Ave. sewer improvement in Huntin.-rton Beach .3 We propose to furnish all materials and perform all labor necessary to complete the following: - or S2.79A (5/ dZ IJ5y9!±21 lin ft- nf ll I.C.P. C S2 � i 3 12 0 lin. ft. of 41, V.C.P. a A1 ,50 per ft. . . . . . IS0-00 three (3) standard M_H_ Is 310n.nn anch - - - - - -S goo-W One (1) tie-in to exist. M.R. @ Lump sum. . . . . . . . . ., 120.00 -2- 51,991 .65 --0 Cost of harricades. . . . . . 3K299 Total se eaee -$4if NOTE: In tee surface water ig Annniintered dUring construction, an additional $6.00 per ton for roc 4-:60jo-'a used will be charged. All of the above work to be completed in a substantial and workmanlike manner according to standard practices for the sum of As noted above 1+,023.61-) Payments to be made HARCO CONSTRUCT.1T.T .CO. as the work progresses to the value of n i ne ty f i ve — percent 95 %) of all work completed. Tle;entire amount of contract to be paid within FIVA (5) days after completion. Any alteration or deviation from the above specifications involving extra cost of material or labor will only be executed upon written orders for same, and will become an extra charge over the sum men- tioned in this contract. All agreements must be made in writing. Respectful miffed, -jF A pemft, B.B.A. Harco Const. Co. be paid tv , ot hXka 73:6 ?fo!r tit Rese ,,Qj A P;Rhp n;;IJ Ibis estirriatc wij W cmul". W MUMIft Keystone -8278 ACCEPTANCE You are hereby authorized to furnish all materials and labor required to complete the work mentioned in the above proposal, for which agree to pay the amount mentioned in said proposal, and according to the team thereof. ACCEPTED Date 19 MOPOSAL—Gue C(WTftACT0#1'-W*LC0TTG rover 564—REVIGED 3-61 PLUMBIN(VONTRACTORS, INC., SANIT� DIVISION 4214 WEST WESTMINSTER AVENUE P. 0. BOX 536 • SANTA ANA, CALIFORNIA SUB-CONTRACTOR'S AGREEMENT THIS AGREEMENT, made and entered into this 19th _._day of.---_ ._ July _ , by and between _-- — oust & Home Dev, Co. ------_— —__-- — whose address is____ 1z681 Blael.-thorn St. Garden Grove _ -_ _California, hereinafter referred to as the CONTRACTOR, and Plumbing Contractors, Inc., Sanitary Division, hereinafter referred to as the SUBCONTRACTOR, WITNESSETH: 1. SUBCONTRACTOR will furnish all labor, material and equipment to install complete according to plans and speci- fications, the following, approximately: t N.P.L. df tract 4242 to existing cross at Heil Ave. goof 12 A.C. Water gain @ 5.75 per ft. $4600.00 1 12" Gate Valve & Box C 365.00 ea. 365.00 1 6" Gate Valve & Box 130.00 ea. 130.00 1 Dire Hydrant Q 220.00 ea. 220.00 1 12x6 To* t3_ 120.00 ea 120.00 All footage is to be measured upon completion. All permits, inspection and engineering fees are to be paid by Contractor. The above price does not include any resurfacing. 2. Contractor agrees to repave said surface within a two week period after ditches have been backfilled and flooded, paving to conform to County, City, or State specifications. Failure of Contractor to repave said surface will cause said Contractor to be liable to Subcontractor at a price of $1.00 per square foot, should Subcontractor elect to repave, upon notice duly given to Contractor. 3. This agreement shall be considered as void should the water lines be installed before the sewer lines, or order to commence work not given within thirty days. 4. PAYMENT Contractor agrees to pay 90% of the total price when ditches are backfilled and flooded, the remaining 10 jo upon com- pletion. 5. INSURANCE: The Subcontractor shall maintain in full force and effect, compensation insurance and comprehensive liability insurance, Subcontractor also agrees to furnish Contractor with certificates of insurance upon request. 6. BOND: Should the Contractor require a bond, Subcontractor shall furnish said bond and the contractor agrees to pay the premium, which amount shall not exceed 1t/2% of the total amount of the contract. 7. ATTORNEY FEES: If suit be brought by either party to compel performance under this contract, the prevailing party shall be entitled to the reasonable amount the court awards for attorney fees and court costs. CONTRACTOR: SUBCONTRACTOR: PLUMBING CONTRACTORS, INC. House & Home Dev. Co. - Owner SANITARY DIVISION B ------ DENNIS PRINTERS 4 STATIONERS.INC. 62,IY4-r U ar�r�pnwZ ... M122 JM+*rMw►4-t�aK to .4,prii 19 r 19w ,n,vncs"m we wmm maw we ft"ft+ gar on wa M ML wt Now" aar rw ••� .• Sst>rK Pam �w�11UR - a_ - _ '�- _ —_ -srrY� _— -i�b/n�YilY■YI Yti1 YYTr YIYYI����r�Y�r�1��1�� 13.S1• 8" Trumd to per Pt. 3,65 b 1 fire Hrdrmar .00 e-• :mto Ysl wee A BMW 0 !i. �► _, 3 8" 450 ids G *a. 60,00 l�•O .00 8" T" 2:00 00 x 6" Too 1 b" late Valve a pox 1 00 1.1:)• 15" 'Itool iMelag Bere 0 per M moo AuW i -<...,�w�r.Yrr...-...w...�Y�..-.,w - - -- - - - �.r..■��rr.�1�Y�.Yi..rr•n .�.r.'�" {� JU 5 SAWTAIM Mom !SLOW ON • 1iWL wtf TWATMOON 1 iMKIrMiP MWMW WAM r W SOW o�11IIC�� VO .2raftw Doom imam Off.ddto 19. 1962 "a"a"own MOW tm aw www w uw wo as 0%so MON" memo" mot gum AW~ «srtir'ar14MeT±f6 Y:�ir^i�R�MIi►Y#lrYMrt+'aMc +R/rtMt�Y 1360 all "raft"" S A per fto 3 6i65 -1 � Im ,Q0 2 80 Gat valves & zo�i`*n o ems= 16:VYAA 00 3 S~ 154 � ` *at 6000 o 80 a 34 OD 1 so 1 6" "l"e 00 I 6" `kito Ts w A B" U5*00 i17• 160 'Aml CaaiAS Rom o per f% moo �L4�97.65 Ift'sefte DOOM Associates C March 6. 1969 "t"Site Water Traot 4027 -0.3, lubor., As- ftwmi" 0 3*65 per ft. 67;ia*-65 2 ft"-1111� , 0 23 * ea 300 . 4 9 07 "a & 'boxes @ 3.65,,00 oa, 3 Do 601.me,IQ OD a&. 41,1 �11* 0 06-17*00 va" ' '*00 .2 8. :K 6 T`64- 0 0 *00 $a* 9 6* ftu' ' It il A Boxes 0 345, ,110* 16* '0 25 00 Pot ft 2 AP Alp OV 19 loll to thasp vPCm Svprova, of p2mak A-U footaac in to bo noamwed upon cool aplotft,oLi, pamitsj, inopoction and enaineerinum foon ctre ,to be paid by yoL,, bid mr, S contract, dGes, not include any svxfaoin,- Mac G -- pavo pai,rl w—fac-c", ro M onora--1 Cox-tt-e-:wtor will ro within a trio wok period,, conforms n,3 to Coun�y --pocif-J..cations v or wo. will L t resurfaeo sum at a price of ' 1.00 per t-lqu, fo D c to be pald by the Gericnall The pricos' on this estimate bid are Void' ,I-ftcx t"Imil—V dayo, Omd 'axo -iloid if the crater lino in inctallod before tho, 'SlIeWol"n Conpaction will be ob,415aimp(l 1p Ill floodina. Pay,,iont is to Sac ra-ado 9(Y,-' whon di- chao vwc baolr i1110d and flooded, 'It-01 x, rr-ly.w,illir 101,7,� ugon .emple-tion. PLl i -ITRO lC) ACTRS I11Ctjl. llcl?oczm�, GRREME BORNE ASSOCIATES June 4, 1962 Mr. James R. Wheeler Engineer, City of Huntington Beach Huntington Beach, California Re: Tract 4027 Sewer in Ellis Street Dear Mr, Wheeler We are attaching hereto copies of invoices received from Plumbing Contractors, Inc.; John Toups, Consulting Civil Engineer; and Santa Ana Blue Print Co. for the installation of the sewer and in in Ellis Avenue from the east side of Beach Boulevard to the west border of Tract 4027. It is our understanding that the moneys advanced by us for this work is reimbursable as other property owners or developers tie into this sewer main. Following are the costs involved: Plumbing Contractors, Inc. 03,666.00 John •Toups, Consulting Civil Engineer Drafting 71.25 Field Work 182.25 Prints 12.96 Bond (based on installation contract) 73.32 Total #4,005.78 Preparation of the appropriate agreement covering this work would be greatly appreciated. Yours very truly, Graeme D Associates GSD:1t \ encl. 1731 SOUTH EUCLID AVENUE ANAHEIM, CALIFORNIA PROSPECT 6-4141 INVOICE SANITATION DIVISION N° 118 P.O.BOX 536 • 4214 WEST WESTMINSTER BCULEVARD SANTA ANA, CAUFORN1A JEFF¢R/ON A.1135 SEWERS, WATER AND HOUSE CONNECTIONS TO Graeme Doane Associates Joe NO. 1731 S" Euclid Ave. Tw►cr No. 4 2 Anaheim, Calif. Off--Site sewer DATE INVOICES NOT PAID WITHIN FIFTEEN DAYS BEAR INTEREST AT THE RATE OF 1%, PER MONTH QUANTITY DESCRIPTION PRICE AMOUNT 8281 811 Wedgelock 0 per ft. 3.25 2691.00 3 Manholes ® ea. 325.00 9_75.00 $3666.00 JOHN TOUPS CONSULTING CIVIL ENGINEER z 1 6 29 W . SEVENTEENTH S T. S A N T A A NA K I 7 •6 7 6 8 1 >S 61 W. COMMONWEALTH FU LLERTON LA 6-337 B February 5, 1962 Ref Tract 4027 Graeme Doane 1731 South Euclid Anaheim, California STATEMENT Engineering Services January 1962, Off-Site Sewers Drafting, Office Work 7 1/2 hrs. at $9.50 $71 .25 4 JOHN TOUPS CONSULTING CIVIL ENGINEER 1 6 2 9 W . SEVENTEENTH S T. S A N T A A NA K I 7- 6 7 8 5 1561 W. COMMONWEALTH FULLERTON LA 6-3378 May 14, 196 2 Ref Tract 4027 Off-Site Sewers Graeme Doane Associates 1731 South Euclid Avenue Anaheim, California STATEMENT Balance due 2/5/62 $ 71 . 25 Engineering Services April Survey, 3-►nan 5 1/2 hrs. at $22.00 $ 121 .00 Survey, 2-man 3 1/2 hrs. at $17.50 61.25 182.25 Prepaid expenses, invoice enclosed 5.02 Balance Due $ 258.52 (-Santa (Ana Mlue "f dint Co. 924 WEST FOU STREET SANTA ANA, CALIF. fEUF4[L A f8f8w TEL[P N KIM6ERLY 2-0590 KIMGfRLY 3.4701 1 x Architectural } Complete Engineering JO���d �`,� !t�t- �,,.� Reproduction Service Surveying 16-29 W. 17 I H �,+ 1=T Supplies & Equipment SANTA ANA, C.ALIFORrdA Lithographic Printing GATE 196.;,YOUR ORDER NO. WHEN WANTED OUR INVOICE N0. NOW MANY I NOW MANY TOTAL KIND TOUR RQIERENC[ NUMBUR I+ �TII PHOTOSTATS AMOUNT TwACINOG PwINTG NurG[R O/ PRINTS on To s[ GENT O/[ACN Of•wINTG GOUN» EtMt 664[r ! r�roAL CMARGEt WANTED DEECRI►TION OF ORIGINAL• GLACfG WN1711 2179 Sao vs1 aaoQ� dGcf� --- -� SPECIAL. INSTRUCTIONS STATE SALES TAX 0 9 9 tr 9 T T tr 0 T (Sart--i c4na .!Blue Tii. - , Co. 924 WEST FOURTH STREET SANTA ANA, CALIF. Kau"n&Itsm TELEPHONE KIMBERLY 2-0390 • KIMwERLY 3-4701 Architectural Complete Engineering Reproduction Service Surveying ZZY; I Supplies 6 Equipment r Lithographic Printing DATE 3 _ 19 G Z YOUR ORDER NO. WHEN WANTED OUR INVOICE NO. NOw rwrr1rOw r�rY Torw� KIND •Ou" RaIQRa NC[ NuMRIR ItaPn) PHOTOSTATS AMOUNT Tw.CIrN I ►w�MT• Nurwaw OF PRINT/ on TO EE p fy► i •iNwL CMARGRD WENT Or EACH on►wINTw WANT[O 0198CRIPTION OF ORIGINALS wouro+ w�4Gwe I wN�Ta •�aE w �---� SPECIAL, INSTRUCTIONS STATE SALES TAX (Santa Ana Mlue Tf tint Co. 934 WEST FOURTH STREET SANTA ANA, CALIF. R[urT[L a asa1E TELEPHONE KIM.[ALY 2.0590 • KIM6[uLY 3-4701 Architectural ^ Complete Engineering / Reproduction Service Surveying Supplies t Equipment Lithographic Printing OA -.19_...._ YOUR ORDER NO. WHEN WA ITED ro1R INVOICE NO. NOW MANY NOw MANY TOTAL KIND YOUR REFERENCE NUMsaR inpWnl PHOTOSTATS AMOUNT TRACING. PRI"To nuMAa• I OF PRINTS OR TO.[ IWalla i Ettlr 1 /INAL CHARGED aaNT Of BACH or PRINTS WANTED DESCRIPTION OF ORIGINALS eouNo+ SLACKS WNITa 1 silt ;�7 �""� I � SPECIAL, INSTRUCTIONS J ! ' r.,ciJ�a/ (, STATE SALES TAX �/ W SO 924 -ST FOURTH STREET SANTA ANA, CA REurm&Essen TELEPHONE KIMBERLY 2-0590 • KIMBERLY 01 Architectural _ Complete Engineering JOH N MI. TOUTS) Reproduction Service Surveying 10'29 W. 17 t H STR ET SAN i A ANA CALIFO}ii,,IIA Supplies & Equipment � Lithographic Printing DAT OLE YOUR ORDER NO. WHEN WANTED OUR INVOICE NO._ wow MANY I NOW MANY TOTAL KIND YOUR REFERENCE NUMSIR ��Di PHOTOSTATS TRACIwo• rRlwrB wurRBR OF FRINT7 on TO*[ A14OUNT E#rt► R>R>>tYt i rINAL CHARGED *BRAT Or EACH or PRINT• WANTED DESCRIPTION OF ORIGINALS buwO'; �LACR.( wHIrE I SIZE 1 o .1✓ boy -I SPECIAL INSTRUCTIONS f_ �` = ' '_.V - STATE SALES TAX 17 .13 cart. Arta JO- lue �Ri) ' Co. 924 WEST FOURTH STREET SANTA ANA, CALIF. I, ..I, — IlEureEL a Esaa T[L[PRONE KIMBERLY 2.0590 KIMBERLY 3-4701 Architectural Complete Engineering Reproduction Service Surveying Supplies & Equipment Lithographic Printing DATE— —1194L201YOUR ORDER NO. WHEN WANTED OUR INVOICE No. NOW WANT i wow wwwr I TOTAL KIND YOUR Rt�tRtNCE NUMOtR �� �A; PHOTOSTATS TRACINGS PRINTS wuwasm OF PRINTS on To•t I � AMOUNT • C ' E CMAROQD •Ewr � or EACH o•PRINTS �uw I WANTED DdSCRIPTION OF ORIOINALO I o" GLwcKa I WAITSIT& I� SIZE slZa -�-�-�--�----ice-� ---� ; . � . � • _j -)I---i� -- .I s SPECIA INSTRUCTIONS STATE SALES TAX PRiN TI NG F,orr. a Business Ca,o to a Catalo= —BLAC% and WH!TE cr FUL'_ CO:.OR �o (S,.,ta Arta glue Ta- ` - it Co. 924 WEST FOURTH 9TREETIKItSANTA ANA, CALIF. awrraawoaa TELEPHONE 547-8461 n � Architectural .- �,.� s -c.; rZ_-.��� Complete Engineering Reproduction Service Surveying Supplies a Equipment Lithographic Printing DATE 1 OUR ORDER NO. WHEN WANTED OUR IAVOICE NO.-7 T NOW MANY HOW MANY TOTAL KIND prints PHOTOSTATS TRACINGS PRINTS NUMBER OF PRINTS Description of Originals t AMICUINT o be 1 r— Final CHANORD SENT EACH OF PRINTS WANTED bound Blacks Whites rSize 2-1 y Y PE iA TR t Ns �•- STATE SALES TAX 077 . Y�. I REMURSE"IENT AGIR LEI?' THIS AGREEMMIT. cued this !jth day of June, 1962, by and BETWEEN CI S. OFi3Vldl Jl511.'itl r C113 municipal corporation • herzinafter for co aven— ieme referred to as, CITY MnISON WOOD., hereinafter for convenience referred to as, BUILDER W I T N E S S E T H:, 17HEREAASs Builder has filed *:ith the City Engineer of the City of Huntington Beach for the extention of a sewer main and connection the:eto for parcels 1p 2 and 3 of Division of Land DV 156. WORE.AS9 .elder has entered into ar aj Ate?"agreement with the City of Huntington Beach -relating to performing, the necessary work in the construction of said sewer line and its connection-,to said pa=els la 2 and 3 of Division of Land DV, 1569 and WHEMAS, Builder has ag-Leed9 at his own cost and expense to construct and build said off-site sewer facility all in conformity with the plans, specifications and provisions as approved by the City Engineer; and WOMEAS, the construction of said sevrer line shall be in conformity with the Huntington Beach Ordinance Code, moz-; particularly ChaptE�' 36 re- lating to s"wer, and at the conpletion-ol' sa.i;I const:caction and upon acceptance by the.City Engineer as bring in full conx'o-nmity with the plans and specifica- tions approved by said City En "r, shall be dedicated.,by the Builder to the City of Huntington Beach: and l� 4'[TiEREASI the Builder shall be entitled under said sections of the Huntington Beach Ordinance Code, after such construction and' dedication of said sewer facility to refunds from connections by others to said sewer facility; NOff THEREFORE, -in consideration of the premises and the agreements herein contained, the parties agree as follows:- 1. That upon completion of the construction of the facility hereinafter described by the Builder to the full satisfaction of the City Engineer and on its dedication to the City of Huntington Beach, Builder shall be entitled to refund from-:connection fees received by the City of Huntington Beach for connections made to said hereinafter described facility in accordance with the provisions of chapter-36 of the Huntington Beach Ordinance Code. 2. The facility constructed by Builder and for which refunds are hereby agreed to be/paiidd to Builder iss described as follows: Construction of a sewer line from existin suer C�o' o✓� re-wpl— 0_�o on Uti0j Avenue north 318 feet in Florida ZStreets 3. Builder does hereby acknoctledge that he has received a refund in the form of a credit in the amount of $J`/7 d v — •� 4. That the cost to the Builder for the construction of said facility is the sum of $2,000900. 5. The refund to be paid to the Milder under this Agreement is as follows: Total Job Cost of Facility $ 20000.00 Total Amount Refundable under 1.9800.00 Chapter 36j3 Less: Refund credited by miver of tl fee on connection to lot 309.00 Not Refundable. 13491.00 2s 6. No refund paymnt shall be made by the Clerk of the City of Huntington Beach to Builder until the City-Engineer shall have certified, in writing, to the City Clerk tram. Builder is entitled to a refund for a specific connection having previously been made to this particular facility in accordance with Chapter 36 and the City has received the fee for such connection. Dated: June 0. 1962. CITY OF HUNTINGTON BEACH, a :municipal corporation, BY Mayor ATTEST: City Clerk CITY DAWSON & WOCD, By ._ -- President B Secretary SUBDIVIDER 3. MATE OF CALIFORNIA ) ss COUNTY OR ORANGE ) On this day of , 1962, before Me, , a Notary bl c, in and for said County and State, person&2 -appeare ROBERT M. IAMEERT, known to me to be the Mayor, and PAUL C. JONES9 known to me to be the City Clerk of the -City of Huntington Beach, a municipal corporation, the corporation that executed the within instrument and acknowledged tome that they executed said instrument on behalf of such municipal-corporation, STATE OF CALIFORNIA ) ss COUNTY OF ORANGE } On this day of , 1962, before me, a Notary Public9 in and for said County.and State, personally appeared , known to me to be the P;;sident and 9 known to me to be the 13ecretary Treasurer of the corporation that executed the within instrument and acknowledged to me that they executed said instr mnt on behalf of such corporation, PLUMBING CONTRACTORS, INC., SANITAR IVISION 4214 WEST WESTMINSTER AVENUE P. 0. BOX 536 • SANTA ANA, CALIFORNIA SUB-CONTRACTOR'S AGREEMENT THIS AGREEMENT, made and entered into this 19th day of--__--.--July by and between Rome Dev- Co. -__—_-- whose address is 12-681 B1aci thorn St. Garden Grove — —__— -California, hereinafter referred to as the CONTRACTOR, and Plumbing Contractors, Inc., Sanitary Division, hereinafter referred to as the SUBCONTRACTOR, WITNESSETH: 1. SUBCONTRACTOR will furnish all labor, material and equipment to install complete according to plans and speci- fications, the following, approximately: N.P.L. of tract 4242 to existing cross at Heil Ave. (toot 12 A.C. water fain 0 5.75 per fte $4600.00 1 12" Gate Valve & Box @ 365.00 ea. 365.00 1 6" Gate Valve & Box 4 130.00 ea. 130.00 1 Fire Hydrant 1 220.00 ea. 220.00 1 12X6 Tee 4 120.00 ea 120.00 All footage is to be measured upon completion. All permits, inspection and engineering fees are to be paid by Contractor. The above price does not include any resurfacing. 2. Contractor agrees to repave said surface within a two week period after ditches have been backfilled and flooded, paving to conform to County, City, or State specifications. Failure of Contractor to repave said surface will cause said Contractor to be liable to Subcontractor at a price of $1.00 per square foot, should Subcontractor elect to repave, upon notice duly given to Contractor. 3. This agreement shall be considered as void should the water lines be installed before the sewer lines, or order to commence work not given within thirty days. 4. PAYMENT Contractor agrees to pay 90% of the total price when ditches are backfilled and flooded, the remaining 10% upon com- pletion. S. INSURANCE: The Subcontractor shall maintain in full force and effect, compensation insurance and comprehensive liability insurance, Subcontractor also agrees to furnish Contractor with certificates of insurance upon request. 6. BOND: Should the Contractor require a bond, Subcontractor shall furnish said bond and the contractor agrees to pay the premium, which amount shall not exceed 11/2% of the total amount of the contract. 7. ATTORNEY FEES: If suit be brought by either party to compel performance under this contract, the prevailing party shall be entitled to the reasonable amount the court awards for attorney fees and court costs. CONTRACTOR: SUBCONTRACTOR: PLUMBING CONTRACTORS, INC. House & Home Dev. Co. - Owner SANITARY DIVISION BY --- -- BY — DENNIS PRINTERS 4 STATIONERS.INC. REIMBURSEWM AGREEMENT THIS At3REEMENT dated this zr*da of Yv`�� ' 15W# by and : .......... Y BETWEEN CITY OF HUNTINGTON BEACH, a municipal corporation hereinafter for conven- ience referred to asp CITY BUILDER SIT I T N E S S E T H: :YHEREASp Builder has filed with the City Engineer of the City of Huntington Beach for the_extention of a sewer main and cpmetion 6.40 thereto for �� 7 'AHEMS, Builder has entered into an agreement with the City of Huntington Beach relating to performing; the necessary work in the construction of said sewer line; and WHEREAS, Builder has agreed, at his own cost and expense to construct and build said off-site sewer facility all in conformity with the plansp specifications and provisions as approved by the City Engineer; and NHEREAS, the construction of said sewer line shall be in conformity with the Huntington Beach Ordinance Code, more particularly Chapter 36 re- lating to sewers and at the completion of said construction and upon acceptance bar the City Engineer as being-in full conformity with the plans and specifica- tions approved by said City Engineer,, shall be dedicated by the Builder to the City of Huntington Beach; and to y J .NHEMAS, the Builder shall be entitled under said sections of the Huntington Beach Ordinance Code, after such construction and dedication of said sewer facility to refunds from comlections by others to said sewer facility; r NOW THEREFORE, in consideration of the pmaises and the agreements herein contained, the parties agree as follows: 1. That Won completion of the construction of the facility hereinafter described by the Builder to the full satisfaction of the. City Engineer and on its dedication to the City of Huntington Beach, Builder shall be entitled to refund from connection fees received by' the City of Huntington Beach for connections made to said hereinafter described facility in accordance with the provisions of Chapter 36 of the Huntington Beach Ordinance Carle. 2. The facility constructed by Builder and for which refunds are hereby agreed to be paid to Builder is described as follows: � 3. Builder does henty acknowledge that he has received a refund in the form of a credit in the amount of $_„1�� �� by waiver of connection fees. 4. That the cost to the Builder For the construction of said facility is the no of $ 5. The refund to be paid to the Builder under this Agreement is as follower Total Job Cost of Facility Total Amount Refundable under Chapter 36 Less: Refund credited by waiver of ���.. 7 6/ fee on connection to lot _ Net Refundable -3 72 ol/ 2. rl 6. No refund payment shall be made by the Clerk of the City of Huntington Beach to Builder until the City EngLueer shall have certified, in eritingp to the City Clark that Builder is entitled to a refund fora specific connection having previously been made to this particular facility in accordance with Chapter 36 and the City has received the fee for such connection. Da ted: . CITY OF HUNTINGTON BEACH A nuicipal corporation B3►' r BY City Clerk SUMER . re nt Meta ry 3. STATE OF CALIFORNIA ss COUNTY OF ORANGE ) On this day of , 1962, before me, , a Notary, in a or said aounty and State, personaiv appea ROBLRT M. LAMBERT,, known to.me to be the Mayor# and PAUL C. JONES, known to me to be the City Clerk of the City of Huntington Beach, a municipal corporation, the corporation that executed the within instrument and acknowledged to me that they executed said instrument on behalf of such municipal corporation* STATE Of CALIFORNIA ) } as COM= OF ORANGE ) On this - day of ...w. '_.�,..., 1962, before me, a Notary Public, in and o�sa3d County ana State, personal'my appeared known to me to be the President and own to me to be the Secretary-Treasurer of the corporation that executed the within instrument and acknowledged to me that they executed said instrument on behalf of such corporation. �o RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF HUNTINGTON BEACH AUTHORIZING THE EXPENDITURE OF MONEY FROM THE FU1.10Dv WHEREAS,.the City Council of the City of Huntington Beach has adapted a Budget for the Fiscal Year / /- Lby Ordinance No. and WHEREAS, Section 7 of said Ordinance No.Xis 3 provides the procedure for authorizing expenditures from the several Special Funds mentioned in said Section , and WHEREAS, the i/V and the City Administrator have recommended an expenditure, and. 91HEREAS, the City Council hereby approves said reccmendation, BE IT. THEREFORE RESOLVED at an expenditure in the amount of ^- r dollars is hereby authorized to be made from the —re ki e-l� Fund. payable to /�iriT/n�c� oiv ,F�.S� �TAlE� . .��vc. for 1 I PLANNING ZONING 9211.39 SECTIONAL DISTRICT MAP 23-5-II :DALE .,Ei 40701 Afl[N CITY OF --- - - - - - ��ro=a�:ExD YDx E[xTE: — AI-N DfxERAL MR- L I,TRCT HUNTINGTON BEACH ADOPT • 1,1960 OI_, ,r•, eua LY R )EN PLANNIN ION RESOLUTION 0 9 LE FAN Ext DpiRKT CITY C - OINI�DILE-NO�TSB�--S� —©C011 Mrv'BBlIx Di R i ORANGE COUNTY, CALIFORNIA °MENDED JANUARY .11 61 ORD Oil 60 OR �"`"T Dµ\yF OR D T. LIANENDED JULY S,(9gl I ORD.N0.gDS __ L E MEN D NOVEMBER 6,RJ61 ORD.N0.8T6 R-3 L-0 NBLnRL[ ZY RElO[xtf OUTR%i AMENDED BY ZONE CASE p 3;�'C. �.�-�G _ Iox,roA.wT,ns.oz,lso,zlz VI _ _-- III^^ ( -" /I/��• ^6UFFIX LEGEW `bo AS GDD.TED 1-11 B AVE — EDINGER (SMELT2Efl) v 3V �LJ J ' Cz Aly, I\FL lorl� = I 1, 1, ..f Y T E'1 G 1 f C 2 R CI }I M yQrs� ALDRICN { Ft5 LINE 4ln%NWIN,W-9E:- STARK ST 27.IIy R3 AI-x AI-X M I NE x 1e„ L gT a/Ef I y FL 17R3 MI � - FLa6•�j /7FI\ MC DONALD sT u �• RIN LNf TRACT NDl:E — Fc /3I7 - - '--15,7� r. h43FL.QI—X c-FL.9,9`/ ALNAl,6fl. f/a5,ao J AI—X --� 4 YE DANUBE I RI I OR RI u RI 9 0 RI RI W� fiEIN' DR �s 3 RI RI A I-X RI RI J RI DON ~ L' ' MI RI Oq MI Q C 2 of q o - L. RNINE `t O' AI-x R1 P,,* AI-x A I—X F AI_K RI - In AI-X Cs-A. MI Cs-• 0. C. F. c o AI-X C6-1 3 Z AI—X MI MI MI = Y W J m AI MI M I AI-X W U U; AI—X MI WA,x�Mlx .YE ,W WARNER IWINTERSOURO) - AVE x ` I I j I I i { ;/,t• I I I ! i i I I I I ,� ;\, '� I •f , � I I I II I � 1 ti• I j I I 'Ij � � � i � i I i ! I j NI I /Y I � � 1 l l;;•' ' � ' I I I y`1--_I-� ry ..._ ii O� I i I I I I I •T' A � � I I r� �?L � .......... + I I I I I i i I I I I +' .�• I I I. ENGINEERING DEPART0,MT CITY Or HUNTINGAON BEACH MPJORANDUIV Date To From F �^ Subject Signed `T Coniftur-tion Com#any 2610 E.CARSON ST. 70-257 HIGHWAY 111 LAKEWOOD,CALIF. P.O.BOX 1223 PH.421-6493 PALM SPRINGS,CALIF. PH.325-3107 Ap r i 1 23, 1964 Lakewood, California City of Huntington Beach Engineering Department Huntington Beach, California Attention: Hr. H. E. Hartge Deputy Director of Public Works Subject: Tract 3733 Reference: Your letter of December 20, 1963 Gentlemen: With reference to your letter of December 20, 1964, please advise if the refund agreement has been completed. Your cooperation in this .matter will be greatly appreciated. 7 Ver rut y yours, 52�� Bernard Sol on BSIMI rmm SPEED LETTER ® . TO Johri=•Mandrel FROM NIILLET, KING & ASSOCIATES F • City of Huntington Beach 1518 W. Commonwealth Ave. P. 0, Box 190 Fullerton, California SUBJECT Unit n'_&•Unit TV .i848 TRojan 1-3440 -FOLD MESSAGE DATE October 16 1962 ' 'Enclosed- are- one.-copy each of the. Bond Estimate on Units Ill. and IV of Tract No. 3848. Below are listed the acreage-of each- tract in each unit,, 3848 3.897 acs. 4092 - 4.775 acs. 4458 - 3.145 acs. 4453 5.566 acs. 459 S 6� n s 4454 A.28A ars 4460 4..821 acs. 4455 - 4.833 acs. 4461 4.458 aes 4456 5.263 aes - 4462 - 4.326 acs. 4457 - 3.182 acs. SIGNED JACK KTNG/rab REPLY DATE 19 -FOLD SIGNED G Lne FORM 44-902 3—PARTS RETAIN WHITE COPY, RETURN PINK COPY: PRODUCT OF WILSON JONES CO.©1961 `. / :SPEED LETTERS S•_iY �` av n FROM ,fin.�fl4ldifITCI TO, . ..z. b: _•.�. '(�. --�.� SUBJECTUnit —FOLD E S S A G E DATE QCt4ber 16 19sp,— ��-� a • 58�8 .3 3.897 aca� 409Z _ 4�T?5 srs. . 4458 :. 3*145 W$4- 5.566 ads: _ 445 5���-�- 4454 —•. 3483 tom: j J ✓ "so 4.821 &ca* 4455 4:835 ass. � �.r4d) 4462 .4.826 sea* 4457 SIGNED3`82 s s-b REPLY DATE 19 tA v SIGNED -•- -Grylia FORM 44-902 s—]`Hers RETAIN WHITE COPY, RETURN PINK COPY . y PRODUCT OF WILSON JONES CO.©199I �- SHEET 1.OF 2 "SEEM 125 Lots Tract No:.s 3848 & 4458" thru '4462 25.91 Acres 1.- 3" P.M. over -10" Rock Base 26,986 s.f. X 0.258, 6,422.67 2. - 2" �P.M.' over 6" Rock Base 156,275 s.f. X -'6 159 24,847.73 3. Concrete Curb &•Gutter (8" C.F. ) 41029 1.f. X 1.42 5,719.76 4.. Concrete- Curb & Gutter (6'r C.P. . 4,658 l.f. X 1.42 61585.96 5. 5t Conc. Curb in ")V Gutter Returns 126 1.f: X 1.20 151.20 6. Concrete "X" Gutter 1,523 s.f. X 0.72 11096.56 7. -Concrete Sidewalk 31,431 s.f.. X 0•.275 8,643.53 8: Concrete Driveway Approach 13,000 s.f. X 0.43 5,590.60 -9. •Std `Guard Panel 30 loft. X 4.50 135.00 10. Street -Signs 9 only. X 35.00 315.00 31. Stop Signs. - 1 only X 25.00 25.00 12.: Concrete' Block Wall 6' High 794 l.f. X 3.25 21580.50 15. , Excavation_ 15,00 c.y. X 0.40 6,000.00 14.. Sewer . . A. $".. V.C.P.-Sever-� 21044 l.f. X '2.15 4139.4.60 B.. 4" V..C.P. Sewer House Connections 5-, l.f: X 1.40 5,439.00 C. :Manholes 6 only X 200.00 11200.00 D. Lampholes 1 only X 100.00 100.00 1.5. Water A. 8" Tranaite Water Mains 1,713 l.f. X 4.00 6.1852.00 B. 6"• Transite Water Mains 2,648 1.f. X 3.00 71944.00 C. ' Fire Hydrants 5 only X 400.00 -2;000.00 D. Services & Meters 125 only X 85.00 1CQ625.00 16 • Drainage A. Cone. Box Culverts 2 only 'X 350.00 700.00 V. Parkway Trees 145 only X 5.00 725.00 18.. Street Lights 32. only X 161.00 5,152.00 19. : Engineering 125 lots X 103.00 120875..00 TOTAL $ 126,119.51 ti SHEET 2 OF 2 SHEETS Tract Nos. ,3848 & 4458 thrg,462 City Fees (Cash Deposits) 1. Sewer Fee 25.91 X.• $ 300.00 $ 7,773.00 2, Water Fee 25.01 • . X 150.00 3,886.50 3. Park- Fed 125 Lots .X 50.00 6,250.00 4.. Checking Fee 125 Lots X 275.00 'S., Inspection Fee 3 y6 X 126,119.51 3,783.58 6. Drainage Assessment 25.91 - % 310.00 8002.10 Total Cash Deposits $300000.18 Bond Amount 1260119.51 TOTAL COST $156,119.69 Monument Bond is $1,000.00 + } ' pact 1,7 . 4 402 ,4 '4455 'tbrU 4467 *21,C- 0a Aare o i'� .. 51t PAII c o 3 tY`:Rca I Base 72.- 01.1 s.f, X 0;.23e � �L7�52�,R t7 2» 211, p*M..,.d'vot`,vl, Reek MxB07 F,, x o. atr.PaR �a£1F3"y Paveta�t• 2,32o S.i',. ait' .' Ci4�rIG.r te (;1at�b �'t '4'rLi i ,`l�r '' � fl f..Pa ).' �j JS lw . 1,.44 } 3 p ` .Ml Curb ttsr }. 7`j 015 1.f o X. 1.42 1.0,81.3 a 30 CijA` X," Guttet-. e`turns ' C 61 w.x. 1. Q' m 20-. t:• �L"t�Y'4 ' � 'irtr Cs`t3te 7 y 71? s F .w X ©.7u� a Cq et lde i lk 48j.$64 s.T X 0, 2 13 413T4 o CtiCrste Dlveway Approach 1],7.52 set:. fX o,43 at) .3t iC). Std. C u d Friel `` .; 3 7 • '. X 4,5(} 1,5 .�rQ •11. .5t��e� igz�� ... .20 only X• .(34 ?{3 . 12. t 'Oi ... 2 oa3 y 2 .OQFQ.Cl(? 1' V y`t ey . 1L'�"!°�iG� ULuA . $ ��r High} .f 1,yT31 1 w :a ¢ 3�2�:,x rt 5�{a15.45, �• =�.�c:e��s.�3Qr�' } - 1,7J�'�15 Cw�;. � d.�+�, �J'��..l'.�.o��+ . Over 1 .. :Sewer- g.0,6nmtt ons, 3,697 1: '. 1.40` ,175.:90 5 G. fia tiles ]:4 ©ttly X Zoo 00 A Iitt .Ti4fio.te..Wa :Maims . f 1j,120 Z •. X . . 7.? 8' 80,00 B. �, `.Tr rs te.;Water Mal 1y44�:�.�'. 1�' 4;Q(} �j7�G�`aoo 5�r �r.a s to Water Ma xis 4,'676 •1.,f4 X. V3.t3Q '14.it3 S.O :. Fire Hydx�arits w 9 only, X 49©bo ,3,Goo.00 E,` Sept d,es .:Met ers !It or l y X' ''$5+.()'0' g�; W 605.00 1:7. xane A. 2�tt i .C.P. {i250 D).> 41' 1 X 11.5t1; :4` sdl R.o ol'a (1 U•.. ; Sp;C Dl ` 2S.s3i4f 24= 4€5.•1-f '50 y 7.C5 f . 1t1 atdh as ns 2 03 ly X 90o00 00 E. ' cat 'SUIS 2 .anly-X 900,06 i'. Csa o a.Boy o ilvexts 3 Q ly X 135gj QC1' C'. "'Oi -let Gtrietur(es to. F.-C. .0 nxae ,1 =dazly X l,090 0o 3 8.• �''�,la�ts'. k. 1.51 oy X t $ Qd ' .75 A0 .► x61 ©o a 4 y 699,QQ Do:. ✓- i e ma`s - k • _ �'` �` � •� - l � �- fit f Ir .. 'k � t I �e r• - , 7. f C• . � � i .F FJ i 1•�k i ' I t -y y 1 F s - c s- _ � r . SST 3 OF 3 S ETS Tract No. 4092 & 4493 thru 4457 City Fees: (.Cash Deposits) I. Sever Fee 26.902 .Aares R $ 300.00 $ 8,070.60 20 Water Fee 26.902 Acres R 150.00 4,035:30 3.. Park-:Fee. , 113 Lots 50.00 5,650.00 4'. . Checking Fee 113 Lots-. + 6 X 25.00 263r00 5. Ins.Bection Fee 3% :. X 197,215.18- 51978.23- 6.• . Drainage Assessment 26.902 Acres ` " X 310..00 Total Cash Deposits -520,356.75 Bond"Amounti ".t2 TOTAL COST : 2290551.93 Monixment Bond $904.DO �/ ! �'�' ��y��i �/ �'��� t ...5.��j �� � r -�'"d�`�.- �`�� �.. I CIP..r+ o w g I���CI l G� 11 Z ! I. A U y r Ale L rr1- �� All ! irk mob► � 10 -G a` 11.0O c_ 4 0 G L ( �y4r Ave- 6.b, C- �C S I er30 a /6D , ,. 1 �� o� ihr � 310 , Mp. �oN 1 �5.Sl3CQ 3.10 170 .off .s l A. C o �,1,� `ids . F. � s s, IDS 18,c�� + , cr , C� 6 s.�� lCo 3U. (o0 � � �rq�1 ;00 4 4, G,nU � 3 C) 7 8 I � ti4, zo -70 , , C)0 � 7 7 3, ao 3, �(o,�s o ! J¢ iv-►z , ? 3, s8 c�� 0�2 , id lz j1l. 000 ,oa � I $00 i ( �► 8 ij 4 7 7 , DO 7 O. 1ob od , .ell " f I ' S 5, `7 �, 1 ; , o 5 c� lU , vo � � �� � '10I ,va ,o� b �� i t .,8 Z i t o ! v . '774, )4 fc) - -- �� � I� S 8► UO 7 � 0 l/ 3• SD I 1� �0 I LOD p 'oa,vo � � 4! �� 3, 8 1 4. O 7 I Z 07 . 0 v.. �q;z1s� �8 � 9 �:-oo ) . .. CHANGE ORDER X JBCONTRACTORS , ;>"q& S404ed P. O. BOX "F" HUNTINGTON BEACH, CALIFORNIA LExington 6-2555 Date 2 Subcontract.Agreement n C. O. No. ........ .........to Purchase Order t] No...........j..................................... To: Name of Job: Change Ordered by: Description of Change: , • �Cc.GAh� lrri Change in Subcontract Price: Decrease $ Increase $ By JOB OFFICE COPY I A E� I 1 can LOS ANGELES HUNTINGTON BEACH EXECUTIVE OFFICES - 2894 ROWENA AVENUE. -LOS ANGELES 39. CALIFORNIA. NORMANDY 3-9291 REPLY TO - 8441 INDIANAPOLI.S AVE., P.O. BOX F., HUNTINGTON BEACH. CALIFORNIA. LExINGTON 6-2551 September 1, 1961 i t City .of Huntington Beach Civic' Center M Huntington Beach, California r Attention: Engineering Department Gentlemen: As we have discussed, there will be a reimbursement .agreement between ,the. City and Pacific Sands for the installation of the twelve inch offsite water line. At your convenience, we would appreciate receipt of this agreement to make our file complete. Yours very truly, PACIFIC SANDS 'Jam F. JD/py � B. C. DEANE CONTRACTING COMPANY - M. J. B R O C K & SONS. INC. MEMO TO _ DATE FROM zL �O HOWARD SUPPLY COMPANY STEEL DISTRIBUTORS Pipe —Valves —Fittings —Shop Supplies Rubber—Abrasives — Fastners —Pumps —Rigging 5125 Santa Fe Ave. • Los Angeles, 58 • LUdlow 8-1281 II II