HomeMy WebLinkAboutReclassification of Walnut Avenue Between Third Street and M do REQUEST FOR CITY COUNCIL ACTION Date: June 6, 1994 Submitted to: Honorable Mayor and City Council APPROVED BY CITY COUIVCI Submitted by: Michael T. Uberuaga, City Administrator Prepared by: Luis F. Sandoval, Director, Public Works Department Cr7 cLF= x Subject: Reclassification of Walnut Avenue between Third Street and Main Street aw 7/s/9 y a^� � Consistent with Council Policy`.' [ X ] Yes [ ] New Policy or Exception Statement of Issue, Recommendation, Analysis, Funding Source, Alternative Actions, Attachments STATEMENT OF ISSUE: Walnut Avenue between First Street and Sixth Street is currently classified as a secondary arterial on the adopted Circulation Element and the Orange County Master Plan of Arterial Highways. Walnut Avenue between Third Street and Sixth Street should be reclassified as a collector street. RECOMMENDED COUNCH,ACTION: 1. Direct staff to proceed with the process of reclassifying Walnut Avenue between Third Street and Sixth Street from a secondary arterial to a collector street on the City's Circulation Plan of Arterial Streets and Highways and the Orange County Master Plan of Arterial Highways. 2. Receive and file this report. ANALYSIS: In 1988, the City hired Greer and Associates to complete a traffic circulation study of the Downtown Specific Plan Area in association with the Environmental Impact Report No. 89-4 (Second Block West Facade Improvement Demonstration Project). At the time of the traffic circulation study, approximately 1,000,000 - 1,500,000 square feet of commercial, office, and restaurant floor space was anticipated to be constructed and ultimately occupied within the Downtown Specific Plan Area (DSPA). As a part of the anticipated circulation system improvements in the DSPA, Walnut Avenue was anticipated to be a four lane secondary arterial between First Street and Sixth Street (please see Attached Circulation Plan of Arterial Streets and Highways). Walnut Avenue between First j Street and Beach Boulevard (which is now know as Pacific View Avenue) is classified as a primary arterial. All Walnut Avenue becomes Hamilton Avenue as one travels east across Huntington Beach. Hamilton Avenue is a primary arterial with one of the three existing bridges crossing the Santa Ana River south of Interstate 405. Hamilton Avenue becomes Victoria Avenue in Costa Mesa, extending easterly across Costa Mesa to State Route 55 (the Newport Freeway). Victoria Avenue has direct access to the Newport Freeway via on and off ramps. The traffic analysis performed for EIR 89-4 anticipated an arterial street system utilizing Walnut Avenue between First Street and Sixth Street as an alternative route to Pacific Coast Highway (PCH) during periods of traffic congestion on PCH. This conceptual circulation system was patterned after Glenneyre Street in Laguna Beach, which parallels PCH. It should be noted that the type of existing development in Laguna Beach and Huntington Beach adjacent to PCH are markedly different, thus it is staff's opinion that the analogy between Glenneyre Street and Walnut Avenue is inappropriate and incorrect. The current anticipated amount of commercial, office, and restaurant square footage to be constructed and occupied is 500,000 square feet. This amount of available/anticipated floor space is between one-half to one-third of the floor space anticipated when the traffic analysis was performed. The net result is one-half to one-third of the anticipated traffic volumes on streets in the DSPA. Last but not least is the practical consideration of pedestrian traffic along the Main Street corridor. The intersection of Main Street and Walnut Avenue is arguably the second - busiest intersection, from a pedestrian traffic standpoint, in Huntington Beach (Main Street at PCH is likely the busiest intersection for pedestrian traffic):-It is staff's considered opinion that a four lane arterial street crossing Main Street at Walnut Avenue will not function efficiently and will likely be the site of many auto/pedestrian accidents. If Walnut Avenue is classified as a secondary arterial street between First Street and Third Street, easy access to the Main Promenade Parking Structure will be insured. It is very likely that, in the future, visitors to the Downtown area will utilize Walnut Avenue/Pacific View Avenue/Hamilton Avenue to get to the parking structure from Beach Boulevard and the Newport Freeway. FUNDING SOURCE: No funding source is required for this action. ENVIRONMENTAL STATUS: Pursuant to the California Environmental Quality Act §15378, this request for direction from City Council is not a classified as a project at this time. If the segment of Walnut Avenue under consideration is to be removed from the Circulation Plan of Arterial Streets and Highways and the Orange County Master Plan of Arterial Highways, the proposed reclassification will be subject to environmental review. ALTERNATIVE ACTIONS: 1. Provide staff with direction regarding the Council's desired classification of arterial status for Walnut Avenue between Third Street and Sixth Street. I ATTACHMENTS: Current Adopted Huntington Breach Circulation Plan of Arterial Streets and Highways MTU:LFS:REE:JDO:jdo . �/ N AMENDMENTS tWEI,T,111�67ERCIRCULATION PLAN OF ARTERIAL PLANNING CITYOJMM6310N --CO-OL- --- FDATE RESOLUTION DATE RESOLUTION ._ STREETS A.ND HIGHWAYS NUMBER NUMBER10-17-Te12363-6-79 I243 32P 4728 \� ADOPTED BY CITY COUNCIL e-2-e3 1310 6-4-84 5385 RESOLUTION NO.4368—DEC 12,1976 sys-e4 13zz 6-res 53e5 � �� 120-se 13" e-7.89 6053 LEGEND: re-Ho 609e BOLSA nv� -- FREEWAY STREET CAPACITY ARGOSY_ \��� MAJOR 45,000 PRIMARY 30,000 MCFADDEN I pV E. I 3 SECONDARY 20,000 NTEq NOTE: _ EDINGER V� AVE SOLID LINES INDICATE EXISTING'RIGHT OF WAY NOT NECESSARILY ULTIMATE RIGHT OF WAY o DASHED LINES INDICATE AREAS WHERE NO RIGHT OF WAY EXISTS a NEI � m I V WARNER a u \.e j AVE �♦ o I 9 a TAL q? W TALBERT I %\�, •ELLIS �� . \ ' AVE. AVE `� ' /• GARFIELD DTP L.. __ _. .. ._ r \� \� YORKTOWN AV / 2 m ADAMS I AVE // •� Ct. l' ` INDIANAPOLIS AV e � \ ATLANTA � AV I � i �r- ® O " `f HAYILT 011 AV CITY OF 3 � qo �1 a HUNTINGTON BEACH f ZBANNING \ 4 ORANGE COUNTY CALIFORNIA i PAUL E. COOK AND ASSOCIATES June 6, 1994 RECEIVE ND MADE A PART OF THE RECORD AT Honorable Mayor and City Council 6� 4-9L�ktJ—M,EETING City of Huntington Beach ITEM NO. 14 —5 2000 Main Street OFFICE OF THE CITY dtERK Huntington Beach, CA 92648 CONNIE BROCKWA°Y. Re: Reclassification of Walnut Avenue between Third Street and Main.Street, City Council Agenda Item No. F-5 Dear Honorable Mayor and City Council, We represent the owners of the property at 126 Main Street on the southwest corner of Main Street and Walnut Avenue known as the old Standard Market. It came to our attention today that the subject item is on the City Council agenda for June 6, 1994 as Item No. F-5. It was our understanding that this matter was continued from your May 25th meeting to June 20, 1994. Although we agree with City staff s recommendation on this item, we are unable on such short notice to arrange for our clients to be present when you discuss this issue which is critical to their efforts to redevelop this property. We are respectfully requesting that you continue this matter to your June 20, 1994 meeting as planned. cerely, Paul E. Cook ichard A. Harlow cc: Michael Uberuaga, City Administrator Connie Brockway, City Clerk P-5- 211 Main Street Huntington Beach, California 92648 (714) 960-8298 PAUL ■ . COOK AND ASSOCIATES C C= r � July 8, 1994 c _ v. .t: Honorable Mayor and City Council City of Huntington Beach , 2000 Main Street Huntington Beach, CA 92648 Re: Reclassification of Walnut Avenue between Third Street and Main Street Dear Honorable Mayor and City Council, We represent the owners of the property at 126 Main Street on the southwest corner of Main Street and Walnut Avenue known as the old Standard Market. We are herein requesting on behalf of our client that the subject matter, which was to be considered at your July 11th meeting, be continued to August 1, 1994. A continuance will allow consideration of this important item by the full City Council. Also, our clients can be present on August 1st when you discuss this issue which is critical to their efforts to redevelop this property. Sincerely, Paul E. Cook ichAHarlow cc: Michael Uberuaga, City Administrator Connie Brockway, City Clerk 211 Main Street Huntington Beach, California 92648 (714) 960-8298 o ;DE+ LOPM Y,o REQUEST FOR T AGE, ACTION ED 94-18 Date: May 16, 1994 Submitted to: Honorable Chairman and Redevelopment Agency Members Submitted by: Michael T. Uberuaga, Executive Directo cz- Prepared by: Barbara A. Kaiser, Redevelopment Director Subject: Amendment to Owner Participation Agreement for 126 Main Street Main-Pier Redevelopment Project Area - Consistent with Council Policy? [XI Yes [ J New Policy or Exception O Statement of Issue, Recommendation, Analysis, Funding Source, Alternative Actions, Attachments `ru -311—V 9 �� �T Dyl!/ /?t/ � lOrJ1 PcCYII QJ f`Oi� pnd Statement of Issue: v- �p�t Us?� ,�i�s��> xa— On February 6, 1989, the Redevelopment Agency entered into an Owner Participation Agreement with the property owners of 126 Main Street for the rehabilitation of their building. At this time, the property owners are requesting their Owner Participation Agreement be amended. Recommendation: 1) Direct staff to negotiate an.amendment to the existing Owner Participation Agreement. 2) Direct staff to process a revised Precise Plan of Street Alignment reducing the ultimate right of way for Walnut Avenue between Main and Third streets from eighty to seventy feet. 3) . Direct staff to prepare an amendment for Agency consideration by no later than August 1, 1994. 4) Direct the City Attorney to concurrently continue its prosecution for code violations. s 1 Analysis: On February 6, 1989, the Redevelopment Agency entered into an Owner Participation Agreement with the Adel and Mohammed Zeidan for the rehabilitation of their building located at 126 Main Street (formerly the Standard Market). That Agreement called for the Agency to provide a Rehabilitation Grant in the amount of $83,625 (without the participation of California Resorts). If California Resorts were to participate, as originally envisioned five years ago, they would have contributed an additional $62,500, providing for a maximum grant total of $146,125. California Resorts has since sold their interest in the adjacent Pierside Pavilion complex, and stated that they have no intention of contributing to this project. History: Summer of 1989 - The participants determined that it is was not economically feasible to rehabilitate their existing structure. To qualify as a rehabilitation, they would be required to maintain their existing non-reinforced masonry walls. The participants concluded that the expense of shoring up these walls during construction would be cost prohibitive. City staff then informed the participants that if they demolished and built new, they would be required to dedicate 10 feet on Walnut Avenue and 5 feet on Main Street to comply with the adopted ultimate rights of way, just as the new surrounding developments have done. Fall 1989 - The participants also did not find the option of providing street dedications feasible, and proposed an alternative option. This third option entailed California Resorts purchasing the two, 25 foot lots owned by a third party, located between the Zeidan's parcels and California Resorts property (site map attached). The proposal would have California Resorts acquire the third-party parcel, and sell 10 feet of it to the Zeidan's at a discounted price (subsidized by the Agency), to make up for the 10 feet lost on Walnut Avenue. California Resorts' architects would design the entire remaining 225 feet of frontage on Main Street so its facade was compatible with the design of the newly constructed Pierside Pavilion development. Agency staff conceptually agreed to the proposal, and committed to supporting it if the participants could agree upon an economically feasible land deal with the third-party parcel owners. After several months of unsuccessful good faith efforts to negotiate for the purchase of the third party parcel, the participants concluded that this option too, was not economically viable. On December 19, 1989, a fire occurred at the subject property, and the participants relocated to a new location for the Standard Market operation. They eventually moved their market (now called Ocean Pacific) to the 200 block of Main Street in the Oceanview Promenade project. 2 w � / Prosecution for Dangerous Building - Beginning in December of 1990, the city's Community Development Director began Noticing the property owners of the potential danger their building posed. He directed them to submit plans for either repairing or demolishing the structure in a timely fashion. Further Notices were sent on; March 15, 1991, January 9, 1992, and a "Final Notice" was issued on March 26, 1992. This Final Notice informed them to either submit drawings to repair the building or to pull a demolition permit within 30 days. The property owners did not perform, as ordered. The matter was referred to the City Attorney's office for further action. The Zeidan's were arraigned on Thursday, June 25, 1992, at West Orange County Municipal Court for violation of Huntington Beach Municipal Code, Section 17.12.010 and Uniform Code for Abatement of Dangerous Buildings, Section 302. The court granted a Disposition and Reset scheduled for July 23, 1992. Since that time, there have been at least six additional court appearances, and each time the Zeidan's have successfully obtained an extension. Their next court date is scheduled for June 9, 1994. If the Agency authorizes staff to initiate negotiations as recommended, the City Attorney Office will concurrently prosecute since the existing building poses ongoing exposure to the public. Notification of OPA Default - On October 16, 1992, Agency staff informed the participants that they were in default of their OPA with the Agency. The participants did not respond. On January 8, 1993, staff again notified the participants of their default, and enclosed a draft of a staff report requesting the Redevelopment Agency to take the appropriate actions to terminate their OPA. This Request for Action was never agendized. To date, the primary obstacle that keeps the participants from moving forward with construction of the new building is the requirement to dedicate 10 feet of their 50 foot parcel for widening Walnut Avenue. Recently, however, the participants contracted a traffic engineer to prepare a report which illustrates that with down scaling the development downtown, Walnut Avenue need not be ultimately widened to 80 feet in this location. (Report Attached). Preliminary indications from our Public Works Department is staff concurrence. The location of the participants' property is located at a key corner (Main Street and Walnut Avenue) in the heart of our downtown redevelopment efforts. It is, for this reason, that staff would like to make one last good-faith effort to negotiate a mutually acceptable amendment to the Zeidan's OPA. Hopefully, it will allow them to remove this dangerous and unsightly structure, and promptly rebuild a structure that will complement the surrounding new developments. Funding Source: None required as a result of this action. 3 Alternative Action: 1) Direct Participant to comply with the original OPA and/or Participant to terminate the OPA. Attachments: 1) Staff Report dated February 6, 1989. (w/OPA) 2) Assessor's Parcel Map. 3) Traffic Report dated May 5, 1994 MTU/BAK/KBB:ls zeidan 4 f 1 June`?3, 1994 Jo Christian-Craig 121 Main St. Huntington Beach, CA 82648 Dear Mr. Uberuaga, City Staff and City Council members, I am writing to you as a concerned.downtown retail business person regarding the S$andard Market / Zeidan Project which will soon be brought before you again for consideration. I am informed that the major project hold-up is the City's demand for a _10 fi. dedication on the Walnut Ave. side of their property. This amounts to a great loss of property value and a major loss to the uniformity and safety of that portion of the Main St. business disc icy. 1. Main St. at Walnut Ave. would be misaligned (the Lane property - Main St. at 'J1'alnut Ave. and the Worthy property at 6th St. and Walnut Ave. will not be new projects requiring dedication and realignment thus ending the widening on one side of Main St. 2. This misalignment would be a visual blight. 3. This misalignment would create an even more unsafe Intersection than .exists now. If you have any doubt contact Crescent City who created a secondary traffic corridor parallel to PCH. 4. Widening Walnut Ave. at the Main St. corner would create a fast lane just at the entry / exit of the underground parking structure. Currently, a much better situation exists allowing autos to move right out of the traffic flow as they enter traveling east on Walnut Ave. 6. Dedication of 10 ft. would create a financial hardship that would, in my opinion, make the project unfeasible and unprofitable. You are asking them to relinOUish the"equivalent of one entire retail space - forever. This is neither . rea istic. nor fair, especially considering previous development incentives given in Main - Pier Project areas. 6. This is a key project to completing a positive downtown business climate. -'his must be completed soon. Until then, we are all disadvantaged businesses. ! believe my opinion represents the majority of businesses and property owners in the ,,Zain - Pier Project area. Sincerely, 7! Jo Christian-Craig , r> �.,.. < , vvz CD PAUL E. COOK AND ASSOCIATES TRAFFIC AND TRANSPORTATION ENGINEERING I i July 5, 1994 Honorable Mayor and City Council City of Huntington Beach 2000 Main Street Huntington Beach, CA 92648 Re: Reclassification of Walnut Avenue between Third Street and Main Street Dear Honorable Mayor and City Council, During discussions with some of you on the subject matter, concern was expressed with what may appear to be a "bottleneck" where southbound Walnut Avenue south of Main Street widens by 10 feet south of the old Standard Market. I have prepared the attached sketch which shows how that widened portion in front of the Pierside Pavilion can be used as a right turn lane into the Pierside Pavilion parking structure thus removing the appearance of a "bottleneck". Sincerely, Paul E. Cook cc: Michael Uberuaga, City Administrator Connie Brockway, City Clerk 4: Bob Eichblatt, City Engineer Jim Otterson, Traffic Engineer 211 Main Street Huntington Beach, California 92648 (714) 960-8298 � 4 MAIN STREET STOP w Q : u z L �C/) ALLEY �D a , U Z QO cl) � W � as � �u PARKING ENTRANCE THIRD STREET sTVP