HomeMy WebLinkAboutFY 2011-2012 Sewer Service Charge Performance Audit - Suspen Council/Agency Meeting Held:
Deferred/Continued to:
'*App vet ❑ Conditionally Approved ❑ Denied �. Cifji Ier s Sig Lure
Council Meeting Date: August 20, 2012 Department ID Number: PW 12-051
CITY OF HUNTINGTON BEACH
REQUEST FOR CITY COUNCIL ACTION
SUBMITTED TO: Honorable Mayor and City Council Members
SUBMITTED BY: Fred A. Wilson, City Manager
PREPARED BY: Travis K. Hopkins, PE, Director of Public Works
SUBJECT: Accept the Sewer Service Charge Performance Audit for Fiscal Year
2011-2012 and suspend the annual Consumer Price Index (CPI)
adjustment of the Sewer Service Rates for Fiscal Year 2012-2013
Statement of Issue: Section 14.54.060 of the Huntington Beach Municipal Code (HBMC)
requires the City Council to establish sewer service charges by ordinance. Chapter 14.55 of
the HBMC requires specific amounts of the charges and the formula for modifying the
charges. Staff is recommending that the adjustment of charges be suspended for Fiscal
Year 2012/13. The Sewer Service Charge Annual Performance Audit is presented to the
City Council as required by Section 14.54.070.
Financial Impact: Sewer Service Fund (511) revenue for FY 2012/13 is estimated at
$11,023,600 if the Consumer Price Index (CPI) adjustment is made to the sewer service fee
and $10,850,000 if the adjustment is suspended for the fiscal year.
Recommended Action: Motion to:
A) Accept the Sewer Service Charge Performance Audit for Fiscal Year 2011-12 as
presented; and,
B) Suspend the Annual Consumer Price Index (CPI) Adjustment of the Sewer Service Rates
for Fiscal Year 2012-13.
Alternative Action(s):
A) Do not accept the Sewer Service Charge Performance Audit and direct staff to make
specific modifications.
B) Direct staff to prepare an Ordinance to amend the Sewer Service Rate by the percentage
change in the Consumer Price Index as noted in Chapter 14.55 of the Municipal Code for
Council adoption at a later date.
HB -79- Item 9. - I
REQUEST FOR COUNCIL ACTION
MEETING DATE: 8/20/2012 DEPARTMENT ID NUMBER: PW 12-051
Analysis: The Sewer Service Fund is designated solely for facilities and resources relating
to the rehabilitation, replacement, repair and maintenance of City-owned sewers and lift
stations. This is in accordance with the California Health and Safety Code Section 5470, and
is included as Chapter 14.54 in the HBMC. Section 14.54.070 Annual Program Review of
the HBMC requires an annual review and performance audit of the Sewer Service Fund by
the Public Works Commission. The audit was presented to the Commission at the July 18,
2012, regular meeting. Per the Municipal Code, the City Council shall receive at a regularly
scheduled meeting the recommendations of the Public Works Commission concerning fees,
rates and charges proposed to be modified or added to the sewer service user charge.
In accordance with Section 14.55.030 Annual CPIU Adjustments, each Sewer Service User
Charge shall be adjusted to reflect the annual percentage adjustment in Consumer Price
Index for all Urban Consumers (CPIU) in Los Angeles, Orange and Riverside Counties
established by the U.S. Bureau of Labor Statistics, available as of July 1, 2011. The CPIU
for the month of May 2011 reflects an annual increase of 1.6%.
As noted in the Annual Audit, a Sewer Lateral Program was added effective January 3, 2008,
and the sewer service charge was increased to cover the expense. The program transferred
the responsibility to the City for sewer lateral repairs within the City-owned right-of-way.
Initially, the cost of the program exceeded the additional revenue generated by the
adjustment to the sewer service user charge. Fiscal Year 2011/12 is the fourth year of the
program and the Utilities Division has realized a significant reduction in the costs to the
program. Staff projects expenditures of $385,000 for the program in Fiscal Year 2011/12,
down from $2,221,870 in the first full year of the program. As a result, the Public Works
Commission recommends that the Consumer Price Index (CPI) adjustment required by the
Municipal Code be suspended for Fiscal Year 2012/13 and that staff monitor the volume of
repairs and costs/revenue requirements thereof. The Consumer Price Index (CPI)
adjustment was also suspended the previous fiscal year. Suspension of the CPI adjustment
would result in an estimated $173,600 in revenues not being realized.
Public Works Commission Action: The Public Works Commission reviewed the Sewer
Service Charge Annual Performance Audit and the Sewer Service User Charge Annual
Adjustment on July 18, 2012. By a vote of 5-0-2 (O'Connell, Spencer absent) the
Commission recommended that the report be forwarded to City Council for approval and that
Council suspend the rate adjustment for Fiscal Year 2012/13.
Environmental Status: Not Applicable
Strategic Plan Goal: Improve long-term financial sustainability
Attachment(s):
1. Sewer Service Fund Annual Performance Audit
Item 9. - 2 FIB -80-
ATTACHMENT # 1
iin -xi- Item 9. - 3
City of Huntington Beach
Public Works Department
Sewer Service Fund Performance Audit
Review of Fiscal Year 2011112
Introduction
On September 4, 2001, the Huntington Beach City Council adopted a Sewer Service
User Charge and created the Sewer Service Fund. The Sewer Service Fund revenue is
designated solely for the rehabilitation, replacement, repair and maintenance of City-
owned sewers and lift stations. This is in accordance with the California Health and
Safety Code Section 5470, and is included in the ordinance that adds Chapter 14.54 to
the Huntington Beach Municipal Code. The ordinance established the Huntington
Beach Public Works Commission as both the oversight committee and the final appeals
board.
The Sewer Service Fund shall be subject to an annual review and performance audit by
the Public Works Commission. The information presented in this report complies with
Section 14.54.070 Annual Program Review. In addition, the City Council shall receive,
at a regularly scheduled meeting, the recommendations of the Public Works
Commission concerning fees, rates and charges proposed to be modified or added to
the sewer service user charge. A public hearing on proposed charges will be held
annually in conjunction with the City's annual budget process and hearing.
Program Overview
Scheduled maintenance projects and minor emergency repairs will be completed
within the allotted budget.
r Capital improvements including lift station design and construction work and the
sewer lining program.
�= The Municipal Code states that the Consumer Price Index for Urban Consumers
(CPIU) that is available July 1 shall be used to calculate adjustments to sewer
service rates.
A Sewer Lateral Program was added effective January 3, 2008, and the sewer
service charge was adjusted to cover the expense. The program transferred the
responsibility to the City for sewer lateral repairs within the City-owned right-of-
way. Initially, the cost of the program exceeded the additional revenue
generated by the adjustment to the sewer service user charge. Fiscal year
2011/12 marks the fourth full year of the program and the Utilities Division has
realized decreasing costs for the sewer lateral program.
July 2012 - 1 -
Item 9. - 4 xB -82-
Closed Circuit Television Inspection and cleaning of sewer mains.
➢ Therefore, the overall budget is estimated to be neutral and it is recommended
that the Consumer Price Index (CPI) adjustment required by the Municipal Code
be suspended for Fiscal Year 2012/13 and that staff monitor the volume of
repairs and costs thereof.
Review of 2011/12 Budget
Personnel and operating expenditures account for approximately forty-five percent
(45%) of the 2011/12 Sewer Service Fund budget and are directed toward preventative
and routine maintenance. The budget includes salaries and benefits, sewer line
maintenance, lift station services, manhole upgrades, the sewer lateral program and
cost allocation charges to the General Fund. The balance of the expense budget is
earmarked for capital equipment replacement and capital projects, including slip lining,
pipeline rehabilitation, lift station replacement and capital equipment replacement. In
general, the Sewer Maintenance Section of the Utilities Division expends the operating
and equipment replacement budgets, and the Engineering Division is responsible for
the implementation of capital projects.
Lift Stations: Construction of the Ranger Lift Station at Adams was completed this year.
The Algonquin Lift Station and Force Main Project construction contract will be awarded
this year with construction being completed in FY 2012/2013.
Sewer Lining: A construction contract for this year's Sewer Lining Project in the amount
of$100,000 will be awarded by the end of this fiscal year.
Warner Avenue Gravity Sewer (WAGS): This project has been delayed due to the
unforeseen involvement of the Coastal Commission. The resulting necessity of certain
permits/easements has hampered the initial time frame of this project but it appears to
be back on schedule-albeit delayed.
CCTV Inspection: Sewer lines are inspected through the use of Closed Circuit
Television inspection with specific focus during this time period on the Pavement
Management Program area in Zone 4.
Warner Avenue at Rotterdam: In April 2012, a large void was discovered underneath
the roadway at Warner Avenue just east of Beach Boulevard. An excavation depth
greater than 20 feet was required to successfully replace a damaged manhole structure
as well as to complete the repair of a City sewer line at the OCSD trunk line system
point of connection. This was a large scale, unanticipated project with extensive
material and labor charges involved.
July 2012 -2-
HB -83- Item 9. - 5
Maintenance Activities : Current and projected year-end totals for various maintenance
activities are presented below.
Sewer Line Maintenance
Routine cleaning of 882,867 linear feet of sewer pipe, projected to be 1,300,000
linear feet by year-end.
r Removal of 25,850 pounds of debris/grit, projected to be 30,000 pounds of debris
removed by year-end.
Clean 225 enhanced cleaning areas (areas of sewer line maintained from two
times to twelve times per year).
Fats, Oils and Grease (FOG) program has cleaned 284,816 linear feet of sewer
line around food service establishments and other areas with high grease
concentrations.
r Fats, Oils and Grease program removed 3,650 pounds of grease from sewer
lines around food service establishments and other areas with high grease
concentrations; projected to be 4,250 pounds removed by year-end.
Fats, Oils, Grease program will inspect 46 food service establishments' sewer
lateral sewer lines by year-end.
r Cleaned 66,350 linear feet of arterial sewer lines; projected to be 80,000 linear
feet by year-end.
y Applied root control to 16,518 linear feet of sewer line.
Lateral sewer line repair program received 384 concerns for repair, resolved 189
concerns, and completed 113 lateral point repairs.
r Inspected via Closed Circuit Television (CCTV) 191,084 lineal feet of residential
mains; projected to complete 300,000 lineal feet by year-end
Y Projected to complete 50,000 lineal feet of CCTV inspection of arterial main lines
by year-end.
Manhole Maintenance
r Cleaned and inspected 8,302 manholes.
r Approximately 20 manholes projected to be repaired and recoated by year-end.
v Sprayed insecticide for roaches in 130 manholes.
Removed and replaced 20 manhole rings.
Sewer Lift Station Maintenance
r' 27 lift stations inspected three times a week and cleaned every two months.
y 236 check valves cleaned; projected to be 336 by year-end.
12 sewer pumps taken apart and rebuilt with new parts as needed. 3 of these
are submersible which involves higher maintenance costs.
Replaced 1 lift station sump pump.
r Primary and secondary telemetry system components utilized to measure wet
well sewage elevations were replaced at all 27 stations. SCADA controllers were
also replaced at each station.
23 sewer wet wells cleaned.
July 2012 -3 -
Item 9. - 6 HB -84-
Replaced 1 check valve and 3 gate valves
Emergency Response
r 19 Sanitary Sewer Overflows to date (9 private, 10 City).
y 13 power outages requiring the use of generators to power the lift stations.
137 service requests from the public during business hours.
92 after hours lift station alarms and failures.
125 after hour call outs for miscellaneous sewer related problems.
y 9 emergency sewer line point repairs.
Sewer Lateral Program
Under the Sewer Lateral Program, the City assumes responsibility for the repair of all
sewer laterals from the City-owned sewer main through the public right-of-way to the
private property line. The property owner remains responsible for all costs of repair and
maintenance of that portion of the sewer lateral on private property. This program is
response driven as all work orders are generated in response to calls from residents.
Expenditures on the Sewer Lateral Program have decreased significantly since the
program was initiated in Fiscal Year 2008/09.
[Y ..' 21 1
Expenditures $2,221,870.58 $1,334,680.34 1 $451,494.46 1 $385,000*
*Fiscal Year 2011/12 Expenditures are projected
Staff has budgeted for the Sewer Lateral Program based on the expenditures in the first
two years of the program. However, expenditures in Fiscal Year 2010/11 and Fiscal
Year 2011/12 indicate that a more conservative budget could be adopted for this
program.
July 2012 -4-
HB -85- Item 9. - 7
Sewer Service Fund Budget
FY 2011112 Projected Expenditures
Personnel Original Budget Revised Budget Projected
Salaries, Permanent $1,900,590 $1,900,590 $1,600,000
Salaries, Temporary $65,000 $65,000 $60,000
Salaries, Overtime $80,000 $80,000 $185,000
Benefits $944,749 $944,749 $868,000
Total Personnel $2,9901,339 $2,990,339, $2,713,000'
Operating
Utilities $140,000 $140,000 $140,000
Equipment and Supplies $109,350 $109,350 $100,000
Repairs and Maintenance $1,842,000 $1,976,613 $1,700,000
Conferences and Training $4,000 $4,250 $4,000
Professional Services $115,000 $482,131 $482,131
Rental Expense $3,500 $3,500 $3,500
Interdepartmental Charges $1,173,376 $1,173,376 $1,173,376
Expense Allowance $6,300 $6,300 $6,300
Other Expenses $75,000 $75,300 $75,000
Total Operating $3,468,526 $3,970,820 $4,'q 37"
Capital
Equipment $110,000 $161,243 $62,891
Total Capital ;. , $110,000 $161,243, ; $62,891-
CIP
Improvements $7,800,000 $13,715,663 $1,400,000
Total CIP ': = $7,910,000 $13,886,906 $1462,891
Total $14,368,865 $20,868,066 $7,860,198
Be nin Baance 10%'110,1 .
, . . e. ,
Actual Revenues FY10/11 $10,747,014
Actual Expenditures FY 10/11 ($6,338,323)
Unreserved Funds Available 10/1/2011 $20,878,691
-Beginning Balance 10/1/2011 $20,678,691
Projected Revenues FY 11/12 $10,850,000
Projected Expenditures FY 11/12 ($7,860,198)
Unreserved Funds Available $23,868,493
ProlectedBeginrung'Balance 1OI,112012 $23;8Ii84
July 2012 -s -
Item 9. - 8 xB -86-
Revenue Detail
Source FY10/11 FY 11/12
Actual Projected
Customer Charges $10,390,137 $10,700,000
Interest $256,856 $250,000
Other $175,196 $100,000
Total $10,820,190 $10,850,000
Proposed FY 2012113 Budget
Sewer Service User Charge Adjustments
In accordance with Section 14.55.030 Annual CPIU Adjustments, each Sewer Service
User Charge shall be adjusted to reflect the annual percentage adjustment in Consumer
Price Index for all Urban Consumers (CPIU) in Los Angeles, Orange and Riverside
Counties established by the U.S. Bureau of Labor Statistics and available as of July 1 of
each year. The purpose for annual adjustment of the rates is to ensure that the
revenues continue to fully fund the needs of the program.
To accommodate the billing system, all service charge rates are calculated to four
decimal places, and charged on a daily factor. The daily factor converts the monthly
charge based on a 365-day year. This is a modification from the initially adopted rate
schedule. The customer's bill reflects a charge based on the number of days between
meter readings. A resolution was adopted by the City Council to authorize the daily rate
methodology.
The percentage adjustment in the CPIU available as of July 1, 2012 for the month of
May reflects an annual increase of 1.6%. Normally, this percentage would be
calculated and included as the recommended adjustment to the Sewer Service User
Charge effective October 1, 2012. However, as noted in the Program Overview, staff is
recommending that the annual adjustment, in this case an increase, be suspended for
Fiscal Year 2012/13 so that staff may continue to monitor the sewer lateral program and
the revenue requirements and costs thereof. Staff is implementing an aggressive
Closed Circuit Television (CCTV) inspection program of the sewer mains located on the
City's arterial and high traffic streets to identify defects before they become a major
problem. The CCTV programs should be accomplished within the current funding levels
of the Sewer Fund. The following table shows the 1.6% increase. For purposes of
comparison, the rates represent a monthly charge.
July 2012 -6-
HB -87- Item 9. - 9
Effect of CPI Adjustment on Current Sewer Service Charge
. Current With CPh
Customer Category Charge Type Unite Charge Increase
m
Residential: Single-family & Flat rate for all customers in per unit $10.6923 $10.8634
townhouses with individual category per
meters month
Apartment: All apartments, Flat rate for all customers in per unit $8.8693 $9.0112
mobile homes and townhouses category per
served by common meters month
Regular Flat rate amount per Equivalent per EDU $12.4089 $12.6074
Commercial/Industrial: Most Dwelling Unit (EDU). EDU per
businesses, including private refers to either (1)the capacity of month
schools a customer's water meter in
comparison to a standard 3/4 inch
meter, or (2)the number of
tenant units that receive water
service through the water meter,
whichever is greater
High-Consumption Flat rate per hundred cubic feet per CCF $2.3219 $2.3591
Commercial/Industrial: (CCF) of estimated sewer per year
Businesses with high water discharge
consumption relative to their
meter size
Public Schools: All public K-8 Flat rate per student per year High $3.4150 $3.4696
and high school districts with with a different rate per student School
schools in the City for K-8 and for high schools per ADA
per year
ADA-Average Daily Attendance
K-8 $2.1991 $2.2343
per ADA
per year
July 2012 -7-
Item 9. - 10 xB -88-
Sewer Service Fund Budget
FY 2012113 Proposed
Personnel
Salaries, Permanent $1,799,217
Salaries, Temporary $65,000
Regular Overtime $80,000
Benefits $898,654
Total Personnel $2,842,871
Operating
Utilities $140,000
Supplies $105,350
Repairs and Maintenance $1,842,000
Conferences and Training $4,000
Professional Services $165,000
Rental Expense $3,500
Cost Allocation $1,208,577
Auto Allowance $6,300
Contingency $75,000
Total Operating $3,549,727
Capital
Equip, GeneralNehicles $250,000
Total Capital , '. $250,000
CIP
Lift Station $1,700,000
Slip Lining $250,000
Sewer Replacement Project $200,000
Total CIP $2,400,000
TOTAL $8,792,598
Revenue Detail FY 12113
Customer Charges $10,350,000
Interest $180,000
Reimbursements $116,000
Total $10,596,000
July 2012 -8-
HB -89- Item 9. - I I
Sewer Service Fund Projected Balance Sheet
Beginning Balance 10/1/2012 $23,868,493
Projected Revenues FY 12/13 $10,596,000
Proposed Expenditures FY 12/13 ($8,792,598)
Beginning Balance 10/1/2013 $25,671,895
Capital Projects FY 2012/13
Lift Stations: Construction is planned in 2012/13 for the Algonquin/Boardwalk Lift
Station. Design work is in progress for the Trinidad lift station, with construction
tentatively scheduled to begin by the fall of 2013. Design work is also anticipated to
begin on the Edgewater Lift Station later in the fiscal year.
Sewer Lining: Sewer lining in the amount of $250,000 is programmed in FY 2012/13. A
lining project is bid once a sufficient number of sewer defects are identified as part of
the CCTV inspection program.
Warner Avenue Gravity Sewer (WAGS): The WAGS project will eliminate Lift Station
"B" and replace Lift Station "C" in addition to constructing a new gravity sewer main at
Pacific Coast Highway and Warner Avenue. This project has been delayed due to the
unforeseen involvement of the Coastal Commission. The resulting necessity of certain
permits/easements has hampered the initial time frame of this project but it appears to
be back on schedule-albeit delayed.
Sewer Replacement Project: Design work will begin in Fiscal Year 2012-13 for
replacing approximately 5,000 lineal feet of existing sewer main in Beach Boulevard.
July 2012 -9_
Item 9. - 12 HB -90-