HomeMy WebLinkAboutFY 2012-2013 Sewer Service Charge Performance Audit Accepted Dept.ID PW 13-053 Page 1 of 2
^ n Meeting Date:8119/2013
CITY OF HUNTINGTON BEACH
REQUEST FOR CITY COUNCIL ACTION
MEETING DATE: 8/19/2013
SUBMITTED TO: Honorable Mayor and City Council Members
SUBMITTED BY: Fred A. Wilson, City Manager
PREPARED BY: Travis K. Hopkins, PE, Director of Public Works
SUBJECT: Accept the Sewer Service Charge Performance Audit for Fiscal Year 2012-2013
and suspend the annual Consumer Price Index (CPI) adjustment of the Sewer
Service Rates for Fiscal Year 2013-14
Statement of Issue: Section 14.54.060 of the Huntington Beach Municipal Code (HBMC) requires
the City Council to establish sewer service charges by ordinance. Chapter 14.55 of the HBMC
establishes the formula for modifying the charges and codifies an annual increase based on the
Consumer Price Index (CPI) increase available in July. Staff is recommending that the adjustment
of charges be suspended for Fiscal Year 2013-14. The Sewer Service Charge Annual
Performance Audit is presented to the City Council as required by HBMC Section 14.54.070.
Financial Impact: Sewer Service Fund (511) revenue for Fiscal Year 2013-14 is estimated at
$10,699,000 if the CPI adjustment is made to the sewer service charge and $10,580,000 if the
adjustment is suspended for the fiscal year.
Recommended Action:
A) Accept the Sewer Service Charge Performance Audit for Fiscal Year 2012-13 as presented;
and,
B) Suspend the Annual Consumer Price Index (CPI) Adjustment of the Sewer Rates for Fiscal
Year 2013-14.
Alternative Action(s):
1) Do not accept the Sewer Service Charge Performance Audit and direct staff to make specific
modifications.
2) Direct staff to prepare an Ordinance to amend the Sewer Service Rate by the percentage
change in the CPI as noted in HBMC Chapter 14.55 for adoption at a later date.
Analysis: The Sewer Service Fund is designated solely for facilities and resources relating to the
rehabilitation, replacement, repair and maintenance of City-owned sewers and lift-stations. This is
in accordance with California Health and Safety Code Section 5470, and is included as Chapter
14.54 in the HBMC. Section 14.54.070 Annual Program Review of the HBMC requires an annual
review and performance audit of the Sewer Service Fund by the Public Works Commission. The
audit was presented to the Commission at the July 17, 2013, regular meeting. Per the Municipal
Code, the City Council shall receive at a regularly scheduled meeting the recommendations of the
Public Works Commission concerning fees, rates and charges proposed to be modified or added to
the Sewer Service User Charge.
Item 6. - I HB -76-
Dept. ID PW 13-053 Page 2 of 2
Meeting Date:8/19/2013
In accordance with Section 14.55.030 Annual CPIU Adjustments, each Sewer Service User Charge
shall be adjusted to reflect the annual percentage adjustment in the Consumer Price Index for all
Urban Consumers (CPIU) in Los Angeles, Orange and Riverside Counties established by the U.S.
Bureau of Labor Statistics, available as of July 1, 2013. The CPIU for the Month of May 2013
reflects an annual increase of 1.0%.
Staff is recommending that the annual adjustment be suspended for Fiscal Year 2013-14 so that
staff may continue to monitor the sewer lateral program and the revenue requirements and costs
thereof. In addition, staff is implementing an aggressive Closed Circuit Television (CCTV)
inspection program of the sewer mains located on the City's arterial and high traffic streets to
identify and address pipeline and manhole defects before they become a major problem. The
CCTV program and associated repairs should be accomplished within the current funding levels of
the Sewer Fund.
Additionally, the City is currently reviewing its reserve policy for major funds, including the Sewer
Service Fund. It is recommended that no action be taken on changing the rate structure until the
City Council has had the opportunity to review the reserve policy.
Public Works Commission Action: The Public Works Commission reviewed the Sewer Service
Charge Annual Performance Audit and the Sewer Service User Charge Annual Adjustment on July
17, 2013. By a vote of 6-0-1 (Hart absent), the Commission recommended that the report be
forwarded to City Council for approval and that the Council suspend the rate adjustment for Fiscal
Year 2013-14.
Environmental Status: Not Applicable
Strategic Plan Goal:
Improve the City's infrastructure
Attachment(s):
1. Fiscal Year 2012-13 Sewer Service Charge Annual Performance Audit
HB -77- Item 6. - 2
ATTACHMENT # 1
City of Huntington Beach
Public Works Department
Sewer Service Fund Performance Audit
Review of Fiscal Year 2012113
Introduction
On September 4, 2001, the Huntington Beach City Council adopted a Sewer Service
User Charge and created the Sewer Service Fund. The Sewer Service Fund revenue is
designated solely for the rehabilitation, replacement, repair and maintenance of City-
owned sewers and lift stations. This is in accordance with the California Health and
Safety Code Section 5470, and is included in the ordinance that adds Chapter 14.54 to
the Huntington Beach Municipal Code. The ordinance established the Huntington
Beach Public Works Commission as both the oversight committee and the final appeals
board.
The Sewer Service Fund shall be subject to an annual review and performance audit by
the Public Works Commission. The information presented in this report complies with
Section 14.54.070 Annual Program Review. In addition, the City Council shall receive,
at a regularly scheduled meeting, the recommendations of the Public Works
Commission concerning fees, rates and charges proposed to be modified or added to
the sewer service user charge. A public hearing on proposed charges will be held
annually in conjunction with the City's annual budget process and hearing.
Program Overview
Scheduled maintenance projects and minor emergency repairs will be completed
within the allotted budget.
r Capital improvements including lift station design and construction work and the
sewer lining program.
y= The Municipal Code states that the Consumer Price Index for Urban Consumers
(CPIU) that is available July 1 shall be used to calculate adjustments to sewer
service rates.
➢ A Sewer Lateral Program was added effective January 3, 2008, and the sewer
service charge was adjusted to cover the projected expenses. The program
transferred the responsibility to the City for sewer lateral repairs within the City-
owned right-of-way. Initially, the cost of the program exceeded the additional
revenue generated by the adjustment to the sewer service user charge. Costs
for this program have decreased significantly since its inception.
July 2013 - 1 -
HB -79- Item 6. - 4
Closed Circuit Television Inspection and cleaning of sewer mains.
➢ Therefore, the overall budget is estimated to be neutral and it is recommended
that the Consumer Price Index (CPI) adjustment required by the Municipal Code
be suspended for Fiscal Year 2013/14 and that staff monitor the volume of
repairs and costs thereof.
Review of 2012/13 Budget
Personnel and operating expenditures account for approximately forty-five percent
(45%) of the 2012/13 Sewer Service Fund budget and are directed toward preventative
and routine maintenance. The budget includes salaries and benefits, sewer line
maintenance, lift station services, manhole upgrades, the sewer lateral program and
cost allocation charges to the General Fund. The balance of the expense budget is
earmarked for capital equipment replacement and capital projects, including slip lining,
pipeline rehabilitation, Closed Circuit Television (CCTV) monitoring of lines, lift station
replacement and capital equipment replacement. In general, the Sewer Maintenance
Section of the Utilities Division expends the operating and equipment replacement
budgets, and the Engineering Division is responsible for the implementation of capital
projects.
Lift Stations: Construction of the Algonquin Lift Station and Force Main Project at
Boardwalk was completed this year. Design of the Trinidad Lift Station at Edinger will
be substantially completed this Fiscal Year with a construction contract anticipated for
award in FY 2013-2014.
Sewer Lining: A construction contract for this year's Sewer Lining Project in the amount
of$250,000 will be awarded by the end of this fiscal year.
Warner Avenue Gravity Sewer (WAGS) (CC-1370) The 100% construction plans for
this project were recently completed and currently, the project is out to bid with award of
a construction contract anticipated prior to the end of this Fiscal Year.
Sewer Replacement Project: Design for the replacement of a portion of the sewer line
in Beach Boulevard between Ellis and Slater is currently underway. Funding for
construction is proposed in the FY 2013-14 budget.
CCTV Inspection: The sewer system is inspected through the use of Closed Circuit
Television inspection. A contractor was employed during this time period to video
inspect portions of the sewer system's main transmission/collection lines located in the
City's arterial and high traffic volume streets. City crews video inspect the residential
and low traffic volume streets.
July 2013 -2_
Item 6. - 5 HB -80-
Maintenance Activities : Current and projected year-end totals for various maintenance
activities are presented below.
Sewer Line Maintenance
Routine cleaning of 1,058,256 linear feet of sewer pipe, projected to be
1,400,000 linear feet by year-end.
➢ Routine cleaning of 8,150 pounds of debris/grit.
Clean 225 enhanced cleaning areas (areas of sewer line maintained from two
times to twelve times per year).
Fats, Oils and Grease (FOG) program has cleaned 10,209 linear feet of sewer
line around food service establishments and other areas with high grease
concentrations.
➢ Applied root control to 13,153 linear feet of sewer line.
Lateral sewer line repair program received 189 requests for repair, resolved 189
concerns.
Inspected via Closed Circuit Television (CCTV) and cleaned 102,334 lineal feet
of residential mains
➢ Inspected via Closed Circuit Television 52,000 lineal feet of arterial main lines.
Manhole Maintenance
➢ Cleaned and inspected 9,956 manholes.
Repaired and recoated approximately 25 manholes.
➢ Sprayed insecticide for roaches in 130 manholes.
Sewer Lift Station Maintenance
➢ Inspected 27 lift stations three times a week and cleaned every two months.
Cleaned 236 check valves; projected to be 336 by year-end.
Disassembled and rebuilt 6 sewer pumps; projected to be nine by year-end.
Replaced 1 lift station sump pump.
➢ Replaced 4 transducers.
➢ Replaced 1 mulittrode controller.
Cleaned 27 sewer wet wells; projected to be 32 by year end.
Replaced 2 gate valves.
Replaced two blower motors.
➢ Replaced 37 cannon emergency electrical plugs.
Emergency Response
13 Sanitary Sewer Overflows (SSO) to date
13 power outages requiring the use of generators to power the lift stations.
137 service requests from the public during business hours.
➢ 45 after hours lift station alarms and failures.
➢ 125 after hour call outs for miscellaneous sewer related problems.
14 emergency sewer line point repairs.
July 2013 -3-
HB -81- Item 6. - 6
Sewer Lateral Program
Under the Sewer Lateral Program, the City assumes responsibility for the repair of all
sewer laterals from the City-owned sewer main through the public right-of-way to the
private property line. The property owner remains responsible for all costs of repair and
maintenance of that portion of the sewer lateral on private property. This program is
response driven as all work orders are generated in response to calls from residents
and businesses. Expenditures on the Sewer Lateral Program have decreased
significantly since the program was initiated in Fiscal Year 2008/09.
Expenditures $2,221,870.58 $1,334,680.34 $573,732.26 $603,814.52 $363.045.75
*Fiscal Year 2012/13 Expenditures are projected
Staff had previously budgeted for the Sewer Lateral Program based on the expenditures
in the first two years of the program. However, expenditures over the past three years
have indicated that staff can reduce the budget for this program. Nonetheless, staff is
still proposing maintaining the same budget level as the previous fiscal year as we
continue to monitor this program.
July 2013 -4-
Item 6. - 7 HB -82-
Sewer Service Fund Budget
FY 2012113 Projected Expenditures
Personnel Original Budget Revised Budget Projected
Salaries, Permanent $1,799,217 $1,799,217 $1,547,011
Salaries, Temporary $65,000 $65,000 $ 67,679
Salaries, Overtime $80,000 $80,000 $ 93,808
Benefits $898,102 $901,503 $ 880,278
Total Personnel , $2,842,319r $2,845;720, $2`588,776
Operating
Utilities $140,000 $140,000 $118,994
Equipment and Supplies $105,530 $105,350 $67,663
Repairs and Maintenance $1,842,000 $1,976,613 $770,461
Conferences and Training $4,000 $4,250 $1,520
Professional Services $165,000 $482,131 $459,656
Rental Expense $3,500 $3,500 $3,500
Interdepartmental Charges $1,208,577 $1,208,577 $1,208,577
Expense Allowance $6,300 $6,300 $6,300
Other Expenses $75,000 $75,300 $20,000
Total Operating $3,549 9g74 $4,002,021,,, $2;656,671
Capital
Equipment $250,000 $263,056 $211,144
Total XCapetal �. $250,000 „° $263056 „ ` $211,1�44
CIP
Improvements $2,150,000 $14,239,272 $2,569,175
Total CIP e n '$2;F150;000 $-14,239,272 E $2;y 69,175T`
Total $8,792,226 $21,350,069 $8,025,766
Actual Revenues FY11/12 $11,748,517
Actual Expenditures FY 11/12 ($7,623,092)
Unreserved Funds Available 10/1/2012 $25,121,987
Be `nnin . Balance 10/1/2012 „°. $25;1,2--,,
g 9
Projected Revenues FY 12/13 $12,725,957
Projected Expenditures FY 12/13 ($8,025,766)
Unreserved Funds Available 10/1/2012 $29,822,178
Pro ected'.Be irrnn rBa ar1� 10�11201 29;8 78
.. ._=g 9 u.... A
July 2013 -5 -
HB -83- Item 6. - 8
Revenue Detail
Source FY 11/12 FY 12/13
Actual Projected
Customer Charges $10,606,657 $10,953,195
Interest $199,400 $180,000
Settlements 850,000.00 1,500,000.00
Other $92,459.61 $92,762
Total $11,748,517 $12,725,957
Proposed FY 2013/14 Budget
Sewer Service User Charge Adjustments
In accordance with Section 14.55.030 Annual CPIU Adjustments, each Sewer Service
User Charge shall be adjusted to reflect the annual percentage adjustment in Consumer
Price Index for all Urban Consumers (CPIU) in Los Angeles, Orange and Riverside
Counties established by the U.S. Bureau of Labor Statistics and available as of July 1 of
each year. The purpose for annual adjustment of the rates is to ensure that the
revenues continue to fully fund the needs of the program.
To accommodate the billing system, all service charge rates are calculated to four
decimal places, and charged on a daily factor. The daily factor converts the monthly
charge based on a 365-day year. This is a modification from the initially adopted rate
schedule. The customer's bill reflects a charge based on the number of days between
meter readings. A resolution was adopted by the City Council to authorize the daily rate
methodology.
The percentage adjustment in the CPIU available as of July 1, 2013 for the month of
May reflects an annual increase of 1.0%. Normally, this percentage would be
calculated and included as the recommended adjustment to the Sewer Service User
Charge effective October 1, 2013. However, as noted in the Program Overview, staff is
recommending that the annual adjustment, in this case an increase, be suspended for
Fiscal Year 2013/14 so that staff may continue to monitor the sewer lateral program and
the revenue requirements and costs thereof. Staff is continuing an aggressive Closed
Circuit Television (CCTV) inspection program of the sewer mains located on the City's
arterial and high traffic streets to identify defects before they become a major problem.
The CCTV programs should be accomplished within the current funding levels of the
Sewer Fund. The following table shows the 1.0% increase. For purposes of
comparison, the rates represent a monthly charge.
July 2013 -6-
Item 6. - 9 HB -84-
Effect of CPe Adjustment on Current Sewer Service Charge
�_
Current WWI,41
,
R �ss01
oe�n 'rt' o Charge Type Unit' C ha rge Increase
9
Residential: Single-family & Flat rate for all customers in per unit $10.6923 $10.7992
townhouses with individual category per
meters month
Apartment: All apartments, Flat rate for all customers in per unit $8.8693 $8.9580
mobile homes and townhouses category per
served by common meters month
Regular Flat rate amount per Equivalent per EDU $12.4089 $12.5330
Commercial/Industrial: Most Dwelling Unit (EDU). EDU per
businesses, including private refers to either (1)the capacity of month
schools a customer's water meter in
comparison to a standard 3/4 inch
meter, or (2) the number of
tenant units that receive water
service through the water meter,
whichever is greater
High-Consumption Flat rate per hundred cubic feet per CCF $2.3219 $2.3451
Commercial/Industrial: (CCF) of estimated sewer per year
Businesses with high water discharge
consumption relative to their
meter size
Public Schools: All public K-8 Flat rate per student per year High $3.4150 $3.4492
and high school districts with with a different rate per student School
schools in the City for K-8 and for high schools per ADA
per year
ADA-Average Daily Attendance
K-8 $2.1991 $2.2211
per ADA
per year
July 2013 -7-
HB -85- Item 6. - 10
Sewer Service Fund Budget
FY 2013114 Proposed
Personnel
Salaries, Permanent $1,701,136
Salaries, Temporary $65,000
Regular Overtime $80,000
Benefits $987,089
Total Personnel
emu. $2,833,225_.
Operating
Utilities $140,000
Supplies $165,350
Repairs and Maintenance $1,483,000
Conferences and Training $4,000
Professional Services $125,000
Rental Expense $3,500
Cost Allocation $1,244,834
Auto Allowance $5,800
Contingency $75,000
-Total 'O eratin I. :y$3,24fi,484
Capital
Equip, General/Vehicles $569,880
Total.Ca ital; $569;880
=
CIP (new)
Lift Station (Trinidad) $1,700,000
Lift Station Design (Edgewater) $400,000
Sewer Lining (CCTV) $250,000
Sewer Replacement Project (new) $400,000
Sewer Replacement Project cont. $1,855,000
Total CIPo. $4605,000`
TOTAL $11,254,589
Revenue Detail FY 13114
Customer Charges $10,300,000
Interest $180,000
Reimbursements $110,000
Total $10,580,000
July 2013 -8-
Item 6. - 11 HB -86-
Sewer Service Fund Projected Balance Sheet
Beginning Balance 101112013 $29,822,178
Projected Revenues FY 13114 $10,580,000
Proposed Expenditures FY 13114 ($11,254,589)
Projected Beginning Balance 10/1/2014 $29,147,589
Capital Projects FY 2013/14
Lift Stations: Construction is planned in 2013114 for the Trinidad Lift Station. Design
work is budgeted for the Edgewater Lift Station, with construction tentatively scheduled
to begin in Fiscal Year 2014/15.
Sewer Lining: Sewer lining in the amount of $250,000 is programmed in FY 2013114. A
lining project is bid once a sufficient number of sewer defects are identified as part of
the CCTV inspection program.
Sewer Replacement Project: Construction funding for replacement of a portion of the
sewer line in Beach Boulevard between Ellis and Slater is proposed for the FY 2013/14
budget.
Sewer Main Replacements: Funding is being budgeted for potential sewer main
replacements in the amount of $400,000 in preparation of increased development along
the Beach/Edinger Corridor.
July 2013 -9-
xB -87- Item 6. - 12