Loading...
HomeMy WebLinkAboutSewer Service Fund Performance Audit Review of Fiscal Year 2 (8) Council/Agency Meeting Held:_ Deferred/Continued to: ) ,Ap oved ❑ Conditionally Approved ElDenied Cfy Cle 's Sign re -7 Council Meeting Date: August 15, 2011 Department ID Number: PW 11-051 CITY OF HUNTINGTON BEACH REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Fred A. Wilson, City Manager PREPARED BY: Travis K. Hopkins, PE, Director of Public Works SUBJECT: Accept the Sewer Service Charge Performance Audit and suspend the annual Consumer Price Index (CPI) adjustment of the Sewer Service Rates Statement of Issue: Section 14.54.060 of the Huntington Beach Municipal Code (HBMC) requires the City Council to establish sewer service charges by ordinance. Chapter 14.55 of the HBMC establishes the specific amounts of the charges and the formula for modifying the charges. Staff is recommending that the adjustment to the charges be suspended for Fiscal Year 2011/12. The Sewer Service Charge Annual Performance Audit is presented to the City Council as required by Section 14.54.070 Annual Program Review. Financial Impact: Sewer Service Fund (511) revenue for FY 2011/12 is estimated at $11.2 million if the Consumer Price Index (CPI) adjustment is made to the sewer service fee and $10.9 million if the adjustment is suspended for the fiscal year. Recommended Action: Motion to: A) Accept the Sewer Service Charge Performance Audit as presented; and, B) Suspend the annual Consumer Price Index (CPI) adjustment of the Sewer Service Rates. Alternative Action(s): A) Do not accept the Sewer Service Charge Performance Audit and direct staff to make specific modifications. B) Direct staff to prepare an Ordinance to amend the Sewer Service Rate by the percentage change in the Consumer Price Index as noted in Chapter 14.55 of the Municipal Code for Council adoption at a later date. Item 14. - I xB -266- REQUEST FOR COUNCIL ACTION MEETING DATE: 8/15/2011 DEPARTMENT ID NUMBER: PW 11-051 Analysis: The Sewer Service Fund is designated solely for facilities and resources relating to the rehabilitation, replacement, repair, and maintenance of City-owned sewers and lift stations. This is in accordance with the California Health and Safety Code Section 5470, and is included as Chapter 14.54 in the HBMC. Section 14.54.070 Annual Program Review of the HBMC requires an annual review and performance audit of the Sewer Service Fund by the Public Works Commission. The audit was presented to the Commission at the July 20, 2011 regular meeting. Per the Municipal Code, the City Council shall receive at a regularly scheduled meeting, the recommendations of the Public Works Commission concerning fees, rates and charges proposed to be modified or added to the sewer service user charge. In accordance with Section 14.55.030 Annual CPIU Adjustments, each Sewer Service User Charge shall be adjusted to reflect the annual percentage adjustment in Consumer Price Index for all Urban Consumers (CPIU) in Los Angeles, Orange and Riverside Counties established by the U.S. Bureau of Labor Statistics, available as of July 1 of each year. The CPIU available as of July 1, 2011, for the month of May 2011, reflects an annual increase of 3.1%. As noted in the Annual Audit, a Sewer Lateral Program was added effective January 3, 2008, and the sewer service charge was increased to cover the expense. The program transferred the responsibility to the City for sewer lateral repairs within the City-owned right-of-way. Initially, the cost of the program exceeded the additional revenue generated by the adjustment to the sewer service user charge. Fiscal year 2010/11 marks the third full year of the program and the Utilities Division has realized a drastically decreased number of requests for sewer lateral repairs. Staff projects that the total number of repairs for FY 2010/11 will be less than half of each of the last two fiscal years. Therefore, the Public Works Commission recommends that the Consumer Price Index (CPI) adjustment required by the Municipal Code be suspended for Fiscal Year 2011/12 and that staff monitor the volume of repairs and costs/revenue requirements thereof. Public Works Commission Action: The Public Works Commission reviewed the Sewer Service Charge Annual Performance Audit and the Sewer Service User Charge Annual Adjustment on July 20, 2011. By a vote of 6-1-0, the Commission recommended the report be forwarded to City Council and recommended City Council suspend the rate adjustment for Fiscal Year 2011/12. Environmental Status: Not Applicable. Strategic Plan Goal: Maintain, improve and obtain funding for infrastructure and equipment Attachment(s): ® - 'ip 1. Sewer Service Fund Annual Performance Audit xB -267- Item 14. - 2 ATTAC H M E N T # 1 City of Huntington Beach Public Works Department Sewer Service Fund Performance Audit Re view of Fiscal Year 2010-11 Introduction On September 4, 2001, the Huntington Beach City Council adopted a Sewer Service Charge and created the Sewer Service Fund. The Sewer Service Fund revenue is designated solely for the rehabilitation, replacement, repair and maintenance of City- owned sewers and lift stations. This is in accordance with the California Health and Safety Code Section 5470, and is included in the ordinance that adds Chapter 14.54 to the Huntington Beach Municipal Code. The ordinance established the Huntington Beach Public Works Commission as both the oversight committee and the final appeals board. The Sewer Service Fund shall be subject to an annual review and performance audit by the Public Works Commission. The information presented in this report complies with Section 14.54.070 Annual Program Review. In addition, the City Council shall receive, at a regularly scheduled meeting, the recommendations of the Public Works Commission concerning fees, rates and charges proposed to be modified or added to the sewer service user charge. A public hearing on proposed charges will be held annually in conjunction with the City's annual budget process and hearing. Program Overview ➢ Scheduled maintenance projects and minor emergency repairs will be completed within the allotted budget. ➢ Capital improvements included lift station design and construction work and the sewer lining program. ➢ The Municipal Code states that the Consumer Price Index for Urban Consumers (CPIU) that is available July 1 shall be used to calculate adjustments to sewer service rates. ➢ A Sewer Lateral Program was added effective January 3, 2008, and the sewer service charge was adjusted to cover the expense. The program transferred the responsibility to the City for sewer lateral repairs within the City-owned right-of- way. Initially, the cost of the program exceeded the additional revenue generated by the adjustment to the sewer service user charge. Fiscal year 2010- 11 marks the third full year of the program and the Utilities Division has realized a drastically decreased number of sewer lateral repairs. In fact, staff projects that July 2011 - 1 - xB -269- Item 14. - 4 the total number of repairs for FY 2010-11 will be less than half of each of the last two fiscal years. Therefore, it is recommended that the Consumer Price Index (CPI) adjustment required by the Municipal Code be suspended for Fiscal Year 2011-12 and that staff monitor the volume of repairs and costs thereof. Review of 2010-11 Budget Personnel and operating expenditures account for approximately forty-five percent (45%) of the 2010-11 Sewer Service Fund budget and are directed toward preventative and routine maintenance. The budget includes salaries, sewer line maintenance, lift station services, manhole upgrades, the sewer lateral program and cost allocation charges to the General Fund. The balance of the expense budget is earmarked for capital equipment replacement and capital projects, including slip lining, pipeline rehabilitation, lift station replacements and capital equipment replacements. In general, the sewer maintenance section of the Utilities Division expends the operating and equipment replacement budgets, and the Engineering Division is responsible for the implementation of capital projects. Lift Stations: Construction of the Oceanhill Sewer Project was completed this year. The Adams/Ranger lift station construction contract will be awarded this year with construction being completed in FY 2011-12. Design of the Algonquin/Boardwalk lift station began this year. Sewer Lining: A construction contract for this year's Sewer Lining Project in the amount of $100,000 will be awarded by the end of this fiscal year. Warner Avenue Gravity Sewer (WAGS): Design began this fiscal year with scheduled completion by the end of the fiscal year. Maintenance Activities : Current and projected year-end totals for various maintenance activities are presented below. Sewer Line Maintenance ➢ Routine cleaning of 1,248,642 linear feet of sewer pipe, projected to be 1,550,000 linear feet by year-end. ➢ Removal of 5,050 pounds of debris/grit, projected to be 11,000 pounds of debris removed by year-end. ➢ Approximately 46 pounds of debris removed per mile of sewer line. ➢ Cleaned 196 chronic trouble spots/areas of sewer line from twice to twelve times per year. ➢ Fats, Oils and Grease program has cleaned 302,122 linear feet of sewer line around food service establishments and other areas with high grease concentrations; projected to be 320,000 linear feet by year-end. ➢ Fats, Oils and Grease program removed 5,500 pounds of grease from sewer lines around food service establishments and other areas with high grease concentrations; projected to be 6,100 pounds removed by year-end. July 2011 -2 - Item 14. - 5 HB -270- ➢ Cleaned 59,955 linear feet of arterial sewer lines; projected to be 81,200 linear feet by year end. ➢ Applied root control to 3,094 linear feet of sewer line. ➢ Lateral sewer line repair program received 158 concerns for repair, resolved 378 concerns, projected to be 172 by year end. Manhole Maintenance ➢ Clean and inspect 6,976 manholes ➢ Sprayed insecticide for roaches in 106 manholes. Sewer Lift Station Maintenance ➢ 28 Lift Stations inspected three times a week and cleaned every two months ➢ 302 Check valves cleaned projected to be 336 by year-end. ➢ 4 sewer pumps taken apart and rebuilt with new parts as needed ➢ Replaced 4 lift station sump pumps. ➢ Replaced 2 transducers and 1 station controller. ➢ Replaced two 32 HP motors. ➢ 23 Sewer wet wells cleaned. ➢ Paint the interior walls and plumbing/piping of 6 sewer lift stations. ➢ Replaced 2 check valves and 2 gate valves Emergency Response ➢ 11 sewer spills to date (6 private, 5 City). ➢ 11 power outages requiring the use of generators to power the lift stations. ➢ 126 service requests from the public during business hours. ➢ 61 after hours lift station alarms and failures. ➢ 20 after hour police call outs for miscellaneous sewer related problems. ➢ Made 4 emergency sewer line point repairs. July 2011 -3 - xB -27 1- Item 14. -,6 Sewer Service Fund Budget FY 2010/11 Projected Expenditures Personnel Original Budget Revised Budget Projected Salaries, Permanent $1,801,601 $1,801,601 $1,200,000 Salaries, Temporary $60,000 $60,000 $48,000 Salaries, Overtime $78,000 $78,000 $140,000 Benefits $782,362 $782,362 $640,000 Total Personnel $2,721,964 $2,721,964 $2,028,000 Operating Utilities $168,800 $166,154 $130,000 Equipment and Supplies $84,005 $84,005 $65,000 Repairs and Maintenance $1,883,600 $1,993,901 $1,010,000 Conferences and Training $3,900 $4,150 $3,000 Professional Services $100,000 $353,769 $250,000 Rental Expense $3,000 $3,000 $2,500 Interdepartmental Charges $1,139,200 $1,139,200 $1,139,200 Expense Allowance $6,300 $6,300 $4,000 Other Expenses $75,000 $97,688 $90,000 Total Operating $3,463,805 $3,848,167 $2,693,700 Capital Equipment $428,000 $584,825 $530,000 Total Capital $428,000 $584,825 $530,000 CIP Improvements $3,050,000 $6,759,863 $5,590,000 Total CIP $3,050,000 $6,759,863 $5,590,000 Total $9,663,769 $13,914,819 $10,841,700 ;_Be`ginnng Balance 10%1/2009 .___ r _ r$1�1�,865,;000 Actual Revenues FY 09-10 $10,820,000 Actual Expenditures FY 09-10 ($6,215,000) Unreserved Funds Available 10/1/2010 $16,470,000 Beginning Balance 10/1/2010 $16,470,000 Projected Revenues FY 10-11 $10,850,000 Projected Expenditures FY 10-11 ($10,841,700) Unreserved Funds Available $16,478,300 tProjecfed B e ginning Balance,p1t0/1/20.11 " m $16,478,300 July 2011 -4- Item 14. - 7 xB -272- Revenue Detail Source FY09-10 FY 10-11 Actual Projected Customer Charges $10,400,000 $10,550,000 Interest $240,000 $200,000 Other $180,000 $100,000 Total $10,820,000 $10,850,000 Proposed FY 2011-12 Budget Sewer Service Charge Adjustments In accordance with Section 14.55.030 Annual CPIU Adjustments, each Sewer Service User Charge shall be adjusted to reflect the annual percentage adjustment in Consumer Price Index for all Urban Consumers (CPIU) in Los Angeles, Orange and Riverside Counties established by the U.S. Bureau of Labor Statistics and available as of July 1 of each year. The purpose for annual adjustment of the rates is to ensure that the revenues continue to fully fund the needs of the program. To accommodate the billing system, all service charge rates are calculated to four decimal places, and charged on a daily factor. The daily factor converts the monthly charge based on a 365-day year. This is a modification from the initially adopted rate schedule. The customer's bill reflects a charge based on the number of days between meter readings. A resolution was adopted by the City Council to authorize the daily rate methodology. The percentage adjustment in the CPIU available as of July 1, 2011 for the month of May reflects an annual increase of 3.1%. Normally, this percentage would be calculated and included as the recommended adjustment to the Sewer Service User Charge effective October 1, 2011. However, as noted in the Program Overview, staff is recommending that the annual adjustment, in this case an increase, be suspended for Fiscal Year 2011-12 so that staff may monitor the sewer lateral program and the revenue requirements and costs thereof. The following table shows the 3.1% increase. For purposes of comparison, the rates represent a monthly charge. July 2011 -5 - xB -273- Item 14. - 8 Effect of CPI Adjustment on Current Sewer Service Charge Current CPI Customer Category ' Charge Type Unit Charge Increase Residential: Single-family & $10.6923 $11.0238 townhouses with individual Flat rate for all customers in per unit meters category per month Apartment: All apartments, per unit $8.8693 $9.1442 mobile homes and townhouses Flat rate for all customers in served by common meters category per month Regular Flat rate amount per Equivalent per EDU $12.4089 $12.7936 Commercial/Industrial: Most Dwelling Unit (EDU). EDU per businesses, including private refers to either (1)the capacity of month schools a customer's water meter in comparison to a standard 1/4 inch meter, or (2) the number of tenant units that receive water service through the water meter, whichever is greater High-Consumption $2.3219 $2.3929 Commercial/Industrial: Flat rate per hundred cubic feet Businesses with high water (CCF) of estimated sewer per CCF consumption relative to their discharge per year meter size Public Schools: All public K-8 High $3.4150 $3.5209 and high school districts with Flat rate per student per year School schools in the City with a different rate per student per ADA for K-8 and for high schools per year ADA-Average Daily Attendance K-8 $2.1991 $2.2673 per ADA per year July 2011 -6- Item 14. - 9 xB -274- Sewer Service Fund Budget FY 2011112 Proposed Personnel Salaries, Permanent $1,380,000 Salaries, Temporary $65,000 Regular Overtime $80,000 Benefits $550,000 Total Personnel $2,075,000 Operating Utilities $140,000 Supplies $109,350 Repairs and Maintenance $1,842,000 Conferences and Training $4,000 Professional Services $115,000 Rental Expense $3,500 Cost Allocation $1,175,000 Auto Allowance $6,300 Contingency $75,000 Total Operating $3,470,150 Capital Equip, General/Vehicles $110,000 Total Capital $110,000 CIP Lift Station $1,700,000 Slip Lining $100,000 WAGS Design/Construction $6,000,000 Total CIP $7,800,000 TOTAL $13,455,150 Revenue Detail FY 11-12 Customer Charges $10,850,000 Interest $250,000 Reimbursements $110,000 Total $11,210,000 July 2011 -7- xB -275- Item 14. - 10 Sewer Service Fund Projected Balance Sheet Beginning Balance 10/1/2011 $16,478,300 Projected Revenues FY 11-12 $11,210,000 Proposed Expenditures FY 11-12 ($13,455,150) Beginning Balance 10/1/2012 $14,233,150 Capital Projects FY 2011-12 Lift Stations: Construction is planned in 2011-12 for the Algonquin/Boardwalk lift station. Design work is planned for the Trinidad lift station. Sewer Lining: Sewer lining in the amount of $100,000 is programmed in FY 2011-12. A lining project is bid once a sufficient number of sewer defects are identified as part of the CCTV inspection program. Warner Avenue Gravity Sewer (WAGS): Design is expected to be completed, with construction started in FY 2011-12, pending necessary entitlements. July 2011 -8- Item 14. - I 1 xB -276-