HomeMy WebLinkAboutWater Budget Study - Supplemental Communication - Study Sess 11/7/2011
WATER BUDGET STUDY
City Council
City of Huntington Beach
November 7, 2011
(01 I FC
FIIIN'IA,
co�uLw,Ts.wc.
RK
M
IOF
Agenda
• Water Enterprise Challenges
• Water Rate Evolution
• Benefits and Challenges of Water Budget
Rate Structure
• Preliminary Usage Analysis
• Revenue Stability and Pricing
• Rate Structure Comparison
rev 7, ao�/
11/7/2011
Water Enterprise - Current
Challenges
• New Regulatory Requirements
SB x7-7:20%reduction by 2020
• Increased Volatility of Water Supply and Demand
Weather
Economy
Regulatory
MWD Allocation&Conservation Program
• Funding of Urban Runoff/Stormwater Program and Future Master
Plan Projects
• Increased Pressure for Conservation Rate Structure
Orange County Grand Jury Report
California Urban Water Conservation Council
tGw4Yiv+l1.K
Water Management Challenges
Given these challenges, how will your agency
address these concerns?
The key is o develop . Conservation
Structure that
1. Ensures compliance with new regulatory
requirements by aggressively promoting
supplyconservation and efficient water use
2. Equitably allocates water
objectives3. Enhances revenue stability
4. Meets the agency's goals,
RK
2
11/7/2011
Conservation Rate Structure
Which customer classes should have
conservation rate structures?
Important to Assign Value to
End-uses of Water
Sanitary/ Economic Recreational Outdoor
Health& Safety Aesthetic
Necessary Use Discretionary Use
Least Water Most Water
R�
3
11/7/2011
Proposed Guiding Principles for
the Study
if rec uctlons are needed, an emphasis
will be to target inefficient use, focusing
first on outdoor aesthetic water, then
recreational usage. Only in severe
circumstances should water be reduced
for economic activities and sanitary /
heath and safety.
RVC
l Which Customer Classes Should
Have Conservation Rate
Structure?
Given the objectives and end-use valuation
outlined, RFC recommends:
This study focus on Dedicated Landscape,
Single Family and Multi Family
Business, Industrial and Institutional will be
examined at Phase II
RFC
4
11/7/2011
Water Rate Structure Evolution
Flat Rate:$xx/month regardless of usage
Pros: Revenue stability,easy to understand
Cons: Inequitable, no conservation signal,
not affordable for essential use
M.
Water Rate Structure Evolution
City of Huntington Beach uniform Rate:$xx/hcf
current water rates @ Pros:Revenue stability,administrative ease,
1.76 hcf easy to understand
Cons:Weak conservation, not affordable for
essential use
RFC
5
u/7/zoii
Ile, Water Rate Structure Evolution
seenm.e
Winter
01 .
��
Behavior Seasonal Rate:$xxx/hcf in Summer,
Change $ x/hcf in Winter
Pros:Promote water conservation in the
summer,easy to administer
Cons:Revenue instability, not affordable for
ss
essential use
IRS
Water Rate Structure Evolution
e
SeasonalRate
b to zo 30 ao so
quantity
Behavior
Change Inclining Tiered Rate— Inclining Tiered Rate:
Pros:Promote conservation,affordable for
essential use,easy to administer,easy to
understand
Cons:Penalize large users
IRM
u/7/zo11
Water Rate Structure Evolution
Seasonal Rate
Behavior
Change IncliningTiered Rate Water Budget Tiered Rate:
Pros:Promote water efficiency,equitable,
affordable for essential use,drought
allocation tool,revenue stability
Cons:High administrative cost,harder to
OF, understand
What Is a Water Budget?
"Water budget rate is an increasing block rate structure in which the
block definition is different for each customer based on an efficient level
of water use by that customer."
Source: American Water Works Association Journal,May 2008,Volume 100,Number 5
RM
7
11/7/2011
Conservation & Efficiency
Water Water
Conservation Efficiency
• Reducing water usage • Reducing water waste
• Rules and regulations • Target driven
• Restricting water use • Appropriate water use
Conservation Rate Structures
INCLINING BLOCK WATER BUDGET
Pros Pros
+Provides water efficiency targets
+Easy to administer Addresses equity concerns for
+Sends clear conservation signal large families/lots
+Addresses affordability for basic +Properly allocates drought
needs penalty rates
+Addresses affordability for basic
Cons needs
-Targets larger water users Cons
• High use=wasteful use
-Equity concerns -Higher administrative costs
• How is efficiency defined?
• Penalizes large families/lots • Billing system update required
• Exacerbated during drought • Proactive Public outreach
pricing • Increases staff for customer
service
8
11/7/2011
Water Budget Allocation
• Two components:
1. Indoor Budget, which is determined by
household size and gallons per capita per day
(gpcd)
4 persons per household * 55 gpcd * days of service
Waiver allows for approved additional needs and/or
additional occupancy
2. Outdoor Budget, which is determined by
landscape area estimate and weather
RK
Preliminary Usage Analysis Summary
Single Family 76% 24% -1,800 acre ft `13,900 acre ft
Multi Family 64% 35% -1,500 acre ft -6,300 acre ft
Irrigation 51% 49% -1,000 acre ft -2,800 acre ft
Sri .
^18%of potential water usage
RKreduction
9
ii/7/zoli
Enhancing Revenue Stability and
Affordability
Collect the remaining fixed costs from
usage in the lower tiers
Customers who are above their allocation
will be asked to reduce their consumption
The rate structure is aligned with the goal of
meeting SBx7-7 compliance
Customers who are efficient will see a
reduction in their bills
RFC
Cz
Tiered Price Justification &
Prop 218
Rationality is required on the differences
in tiered prices
Tiered prices are typically based on the
following:
Water supply cost
Urban run off
Conservation program
Water Master Plan Study
Peaking cost associated with capital could be
allocated to the higher tiers
RFC
10
11/7/2011
Tiered Rate Components
Tier 1 Blended groundwater No delivery cost for Less revenue offset
and imported water affordability
Tier 2 Blended groundwater Delivery cost Peaking cost
and imported water
Tier 3 Blended groundwater Delivery cost Conservation
and imported water Stormwater
Peaking cost
Tier Marginal cost of water No delivery cost to Conservation
enhancerevenue Stormwater
stability Peaking cost
RX
I
Case Study:
El Toro Water District (ETWD)
FY r ,
Supply
Tiers Rates Water Delie Conservation Offset Total
Tier 1 $1.89 $1.86 ($0.06) $1.80
Tier $1.89 $1.86 $0.34 $2.20
Tier $1.89 $3.80 $0.34 $0.24 $4.38
Tier $1.89 $5.70 $0.24 $5.94
RX
nv.s...mz.x
11
11/7/2011
Outcomes of Water Budget: ETWD
%of Bilk CUSTOMER IMPACTS
SFR+MFR♦IRR
70% I
_60%
50%
40%
30%
20%10% 6% 4% 6% 4% S% 6% e"
0% v
$6o $2 $5 $10 S15 $25 $50 >550
$change in Bills
62%of the customers will see a reduction in their bill
1 07„
Costs to Implement a Water Budget
Rate Structure
If the City adopts a Water Budget Rate
Structure, the following costs will be
incurred:
Costs associated with a new billing system
Costs associated with additional staff necessary
for implementing and administering the
program
Water Budget rate structure that does not allow for appeal
process on the allocation factors;or
• Example:City of San Clemente
Water Budget that allows for an appeal process on the allocation
factors
• Example: Irvine Ranch WD
12
11/7/2011
19, Rate Structure Comparison
Promoting Efficiency
Admin Cost/Implementation yyl 1 1
Cost
Customer Understanding * **
Funding Mechanism for 1 1
Conservation<tormwate CIP
Equity/Affordability * **
Drought Management Tool/
SB x7-7
MWDOC Agencies
R .� Best= *"
Next Steps
• Step 1
Develop the associated tiered rates and determine the
customer impacts
Determine the cost associated with changing the Billing
System and meeting staffing level requirements
Conduct a City Council Workshop to evaluate different rate
structures and present the costs associated with
implementation
• Step 2
Implement the new Billing System and then conduct Prop
218 notice
• Step 3
Conduct Public Hearing meeting on adopting the Water
Budget Rate Structure
13
ii/7/zoii
City Council Direction
• Should the City continue to evaluate
Water Budget Rate Structure?
Develop the associated tiered rates and
determine the customer impacts
Conduct a Billing System assessment
Determine the staffing levels needed to
support the Water Budget Rate Structure
Discussion
10,
r F
14