Loading...
HomeMy WebLinkAboutWater Master Plan and Financial Plan Presentation - Study Se 1/16/2013 I '011, CITY OF HUNTINGTON BEACH WATER MASTER PLAN (WMP) & FINANCIAL PLAN (FP) DECEMBER,2012 PREPARED BY: PSOMAS(PRIMARY CONSULTANT) ID MODELING(HYDRAULIC MODELING SUSCONSULTANT) RAFTELIS FINANCIAL CONSULTANTS(FINANCIAL SUBCONSULTANT) Niii Overview I, Purpose o City Characteristics and Projected Growth I• Water Demand I, Water Supply and Reliability Storage and Emergency Supply I, Water Transmission and Distribution System Modeling Capital Improvement Program Financial Plan kftm - SUPPLEMENTAL COMMUNICATION Meeting bete; Agenda Item No. c (��SiOnJ � 1/16/2013 Purpose Purpose of Water Master Plan (WMP) o Last updated in 2005 Evaluates future water system needs for 2010 to 203 5 (City growth, water demands, water supply and reliability, water quality, water storage, emergency water supply, and water system distribution) Purpose of Financial Plan (FP) Evaluate costs of remaining projects Scheduling and funding of remaining projects Scenario with desalination N City Characteristics & Projected Growth 17,234 Acres, only 2.2% (376 acres vacant) Beach-Edinger Corridors Specific Plan and the Downtown Area Specific Plan 210,000 204,831 205,000 200,000 195,000 190,963 190,000 185,000 180,000 1 M 2010 Projected Population 2010 Actual Population 2 1/16/2013 Water Demand Trend 5 Year Average Demand of 2035 Projected Demand 33.711 AFY(20.892 gpm) 34.657 AFY(21,479 gpm) 37,000 \ 45 36,0m 40 �aamran 35,000 35 �. —Water_ _v____________ 30 Product 34,000 NIL __ ._______ __________ e ti 33,000 25 p w �E F 31,000 15 a 3 3°,000 21468 AFY — 10 - (1 _ 8,263gpm) _ 28000 I ' ' , , ' 0 ' , ' 0 1996 1997 1998 1%9 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Year Target Goal Per Governor 20/20 Mai - 30,052 AFY(18,624 gpm) Maximum Day Demand J l Maximum Day Demand Considers peak summer _ demand Use of hydraulic model Use industry criteria, fire, etc. i 1 3 1/16/2013 Supply Capacity 100000 >4 Tlfll05 93.090 90.000 — 80.000 MC)"C' - fi0.000 } 50.000 Q.000 30.000 21.09 20.000 13 263 10.M -- - -- —_ .etMma warm •knpnn wnn 0 2010Awra9e Day 2035 fteme0 M Jmpm supply Demand(9pm) Average Dry Uwtln fmm Demand(gpm) Wells,Imports.& Boosters(gpm) Reservoir Capacity 20 a s0 0 30 20 10 0 perrrryer(M0) Peck(M0) Springdale(MD) FGWards Hill(MD) Cumm sh w. Storage Gwent Vwdn(MO) With southeast ' Ikservar lMq 4 1/16/2013 Emergency Storage Capacity �- CM of Hentmeton Beach Win hOUt Soetheut Ree,"Oir(20150emancl L2 With 50Utheast R..,(201S demand) L6 pneentlenh to i001 Cm of Mmtmetan Beaep Survev Ciryofphoenn 1.9 Cry of Tucson 2.6 Cry of Anaheim 0.5 Cryof Pomona 1.5 Cry Of AEUH 0.6 Palmdale Water Ontad _ 2.1 karleFPUOhcem. L5 CIIv of sa Garden ni Grin, LI 0.5 City of Gartlen Grove Ll City of lnllgv.4 IA City o1 Santa Ana 0.4 CRY of"I.thome 0.7 Average of 1.1 days Cry of TOrranva 0.7 City of San Me, 0.4 Clay Water China 0.6 Cm of Sacramento 2.1 from Pitbinhe i Water blaster Plain _- Imrc Ranch Water d"It LB M istram Beuh water Oiatntt-199) 0.5 ofTwim-2" 0.6 of Wetimm3ter-IMi 0.3 I.Walley Water Oistnct 2.0 of Ontano 1.0 Next Steps Complete Remaining WMP Projects Well Assessment Study 5 1/16/2013 Projects Completed Since 2005 3.5 miles of Transmission Mains Beach Blvd - 1 ,1 50 LF of 12-inch Chlorination Upgrades for Well #13 Energy Backup System for Well #6, 9, & 10 Corrosion Protection for 2 miles of 42-inch Main Corrosion Protection for 3.5 miles of 30-inch Main Fire Protection Improvements -620 LF of 12-inch Cast Iron Main Replacement (-26,400 LF) bobw - CIPs Remaining (—$38 million) Is Beach Blvd - 1 ,400 LF of 1 2-inch Corrosion Protection 2.5 miles of 36-inch Main Permanent Wellhead Facilities for Well #1 3 Southeast Reservoir and Booster Pump Station Southeast Reservoir Transmission Main (4 miles) Fire Protection Improvements (700 LF of 8 and 12-inch) Cast Iron Main Replacement (2,000 LF Remaining) Well #1 Re-Drill iftwasaw 1/16/2013 Financial Plan Beginning Balance & Revenues Water Master Plan Water Fund CIP With Southeast Reservoir/Booster Expense Without Southeast Reservoir/Booster Expense bftaftm Beginning Balance & Revenues Water Master Plan Fund Beginning balance for the Water Master Plan Fund is $27.6M for FY 2012 � Revenues for FY 2012 Project Connection Fees: $200K Interest Income: $300K Water Fund Beginning balance for the Water Fund is $35.9M for FY 2012 1/16/2013 Project Fund Balance (W/SE Reservoir Expense Chart 3:Water Master Plan Fund a sso szo vo so S6 million at 0% $10 million at 2% "Uts %3034 "lass WAIa r,"V Nests ry3019 WM30 �FnEna BelBnC¢ —MmOehnce PMRBBYnc¢ Assumes Southeast Reservoir/Booster Constructed from 2018 Assumes cost to rise 3.5% annually Assumes Water Fund will cover the $1 3 million i hortfall in the Water Master Plan Fund Project Fund Balance (W/O SE Reservoir Expense Chart 3:Water Master Plan Fund a sso 8 5_5 S Slo s" i0 $5 50 FY301! FY 3019 tt301a fY$O16 FY301] FY 301a fY3019 FYSOM =EnalnFBaw,ce 4Nn Balance ► Assumes Southeast Reservoir/Booster Built by others as a desalination project ► Assumes cost to rise 3.5% annually ► Assumes Water Master Plan Fund will have $ 10.5 million surplus, and can be combined ith Water Fund (W/City Council Approval) 8 1/16/2013 Next Steps (After Adoption of the WMP) Reserve Policy Conservation Rate (Tiered) & Implementation Plan Billing System Development Customer Service Water Master Plan & Financial Plan Discussion Q.., THANK YOU C 9