Loading...
HomeMy WebLinkAboutWater Wells 3A and 5 - Opening of Newly Operational Water We1000,10. Department Sp lights njent xs Deped November 19,2001 Water Wed s Back -ground • Water Wells allow the City to produce its own water at a cost savings of $9 million per year • Water Master Plan for Huntington Beach calls for additional water production capacity for the city CITY W HUNT INGT OH 'BEACH, CA 2001 NOV I q A 80. 1 C), Water WeU Water Wells are The City owns and maintained and operates the Water operated by the Wells to access its X. Water Division of the groundwater Public Works reserves Department �lt� � y�y��n;w� Car�"i G� 1 ►.- • Wells 3A and 5 bring the total number of water production wells to eight • Master -planned needs call for a total of 10 wells to meet demand over the next 20 years Water Well 5 • City received check from SCE $8,631 t` • Installation of electric motors 'E .Environmental pricinq credits program 75% of City water comes from City - operated ground water wells City is required to purchase 25% of its water supply from Metropolitan Water District [MWD] City well water is higher quality than water purchased from MWD City well water is produced at one-third the cost of purchased water Water Wells • Dedication of Wells 3A and 5 held November 8 • Both sites are fully operational 2 • • . ... .. .... :a f. F Thank you