Loading...
HomeMy WebLinkAboutAdopt Resolution No. 2016-46 authorizing the adoption of a C6/23/2016 Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach Project Name: Adams Avenue Traffic Signal Synchronization and FUND NAME ...... --' ,,,1? RCENT } `eSTIMAT O COST .PR6 CTSLI:COST :. � i", �., Communication Fouioment Uoorades Other 2.68 $5,000 $5,000 Annual Maintenance Project Limits: From Beach Boulevard to City Boundary (Multi AQMD 97.32 $181,495 $181,495 Jurisdictional) Project Number: 13-OCTA-TSP-3663 $186,495 $186,495 Type of work (Tow): Systems Management TOW Description: Communications intertie between agency and Caltrans to manage traffic Project Description: Provide operational and infrastructure improvements. E $57,600 $0 $0 $0 $0 $0 $0 $57,600 $57,600 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $123,895 $0 $0 $0 $0 $0 $0 $123,895 $123,895 x i&M Zo $0 $5,000 $0 $0 $0 $0 $0 $5,000 $5,000 $181,495 $5,000 $0 $0 $0 $0 $0 $186,495 $ 186,495 Vi E Agency: Huntington Beach Project Name: Arterial Rehabilitation Project Limits: Heil Ave (Edwards -Springdale), Atlanta Ave (Delaware -Beach), and Indianpolis Ave Project Number: /Beach -Magnolia) Type of work (Tow): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Rehabilitate Artrerial's Heil Avenue, Atlanta Avenue, and Indianapolis Avenue %j /40 maERCS t�fp y General Fund 22.73 $1,000,000 $1,000,000 M2 Fairshare 45.45 $2,000,000 $2,000,000 Other 27.27 $1,200,000 $1,200,000 Infrastructure Fund Prop 42 4.55 $200,000 $200,000 $4,400,000 $4,400,000 $50,000 $0 $0 $0 $0 $0 $0 $50,000 $50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,350,000 $0 $0 $0 $0 $0 $0 $4,350,000 $4,350,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,400,000 $0 $0 $0 $0 $0 $0 $4,400,000 $ 4,400,000 I CAD /2016 t 01� Agency: Huntington Beach Project Name: Arterial Rehabilitation Gothard Street and Center Avenue Project Limits: Gothard St. (Edinger to McFadden) and Center Ave. (Gothard to Railroad Tracks) Project Number: Type of work (Tow): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Rehabilitate Pavement including replacement of concrete and addition of ramps. This project was an amendment to FY 15/16 CIP. E $0 $0 R $0 $0 C/I $1,400,000 $0 &M $0 $0 $1,400,000 $0 i Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 / i6ilb NAME. " „. Gas Tax 100.00 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Agency: Huntington Beach Project Name: Arterial Rehabilitation: Adams Ave (Beach to Newland) and Atlanta Ave (Beach To Newland) Project Limits: Adams Avenue (Beach to Newland) and Atlanta Avenue (Beach To Newland) Project Number: Type of work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Pavement rehabilitation for two arterial segments including replacement of concrete and trees. This project is a carryover from FY 15/16 CIP. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,400,000 $1,400,000 $0 $0 $0 $0 $0 $0 $0 $0 $1,400,000 $ 1,400,000 UNii NAME :" ..' " .98TIMATED aost • C� _ b CI T. with:' M2 Fairshare 70.73 $0 $0 Other 0.00 $0 $0 Regional Surface Transportation Grant (RSTP) $0 $0 .. v .. ....: y Ah".. :, / �Y'... "::' , /, ',,'', r! /„ ,./ ..Sn�.. .. •�i„..,:w� .. „•?% /il:.,�°.w, E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 2 6/23 22016 Agency: Huntington Beach Project Name: Atlanta Avenue Widenina Project Limits: Atlanta Avenue (Huntington St. to Delaware St.) Project Number: 15-HBCH-ACE-3770 Type of work (TOW): Road Widening TOW Description: Add 1 lane to existing roadway in project limits Project Description: This project will widen the south side of Atlanta Avenue. This project is carryover from FY 15/16 CIP. Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 TI u • �{;'iy.yeµ M2 ACE 75.00 $0 $0 General Fund 25.00 $0 $0 25% Match to previously approved M2 ACE $0 $0 IE $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 I&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 Agency: Huntington Beach Project Name: Bridae Preventative Maitenance Project Limits: Magnolia Street and Brookhurst Street Bridge at Pacific Coast Hiahwav Project Number: Type of work [TOW): Road Maintenance TOW Description: Bridge Project Description: Provide Design and Construction of City Bridges including Roadway. This project was included as an amendment to FY 15/16 CIP. r ; 'PUI4i`f11Aik .. Gas Tax 16.94 $708,329 $708,329 M2 Fairshare 1.08 $45,000 $45,000 Other 72.74 $3,040,931 $3,040,931 Water Fund Prop 42 9.24 $386,273 $386,273 $4,180,533 $4,180,533 3 E $924,533 $0 $0 $0 $0 $0 $0 $924,533 $924,533 R $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,256,000 $0 $0 $0 $0 $0 $0 $3,256,000 $3,256,000 :M $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,180,533 $0 $0 $0 $0 $0 $0 $4,180,533 $ 4,180,533 CN /2016 01 t Agency: Huntington Beach Project Name: Brookhurst Street and Adams Avenue Intersection Improvement Project Limits: Intersection of Brookhurst Street and Adams Avenue Project Number: 11-HBCH-ICE-3526 (Engineering) Type of work (TOW): Intersection TOW Description: Add through and right turn lanes to intersection Project Description: Add through lanes and right turn pockets to intersection to improve traffic flow and reduce congestion. Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 s Z / = yr NI; ,as Tax 1.19 $84,604 $87,590 42ICE 3.57 $253,809 $262,769 11-HBCH-ICE-3526 Infunded 95.23 $6,761,587 $7,000,274 $7,100,000 $7,350,633 4 $0 $0 $0 $0 $0 $0 $0 $0 $0 IE R $0 $2,900,000 $0 $0 $0 $0 $0 $2,900,000 $2,963,800 C/I $0 $0 $4,200,000 $0 $0 $0 $0 $4,200,000 $4,386,833 i&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,900,000 $4,200,000 $0 $0 $0 $0 $7,100,000 $ 7,350,633 00 i Agency: Huntington Beach Project Name: Brookhurst Street Svnchronization Project Limits: Garfield Avenue to Pacific Coast Highway Project Number: 16-OCTA-TSP-3794 Type of Work (TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Provide operational and infrastructure improvements. This is a corridor project managed by OCTA and funding reflets planned improvements within Huntington Beach only. ,,: „ „ r 11' ,,.._..r. F:, ti sir E $0 rF $0 r tl $0 $0 .... .. , .::, -= $0 $0 22 $0 it , ,,,. F,, ': UP $0 +.M`rrs"z, , r .: l///fix ;. .; •.y:. , • ! j; a*... 7,7777 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $833,490 $0 $0 $0 $0 $833,490 $870,567 O&M $0 $0 $0 $5,000 $5,000 $0 $0 $10.000 $10,000 $0 $0 $833,490 $5,000 $5,000 $0 $0 $843,490 $ 880,567 1 6/23/2016 Agency: Huntington Beach Project Name: Bushard/Adams Water Qualitv Proiect Project Limits: Frontage median on Bushard and Adams Project Number: 14-HBCH-ECP-3732 Type of work (TOW): Environmental Cleanup Tow Description: Irrigation system retrofits to reduce runoff Project Description: Retrofit asphalt frontage medians on Bushard Street and Adams Avenue with bio-retention swales for water quality. Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 FUND' 1i . STIMATED COST llpw jaC'CEt1. rE i N ... Gas Tax 35.28 $25,403 $25,403 General Fund 6.58 $4,739 $4,739 M2 ECP Tier II 58.14 $41,858 $41,858 $72,000 $72,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 (E R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 i&M $12,000 $12,000 $12.000 $12,000 $12,000 $12,000 $0 $72,000 $72,000 $12,000 $12,000 $12,000 $12,000 $12,000 $12,000 $0 $72,000 $ 72,000 Agency: Huntington Beach Project Name: Concrete ReDlacements Project Limits: Citywide '; is .... ESTIMATED COST PROD CTEp } htDTES General Fund 100.00 $1,250,000 $1,306,223 $1,250,000 $1,306,223 E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 r-+ 1 $250,000 $250,000 $250,000 $250,000 $250,000 $0 $0 $1,250,000 $1,306,223 CD :M $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $250,000 $250,000 $250,000 $250,000 $0 $0 $1,250,000 $ 1,306,223 5 i-� C—D /2016 Agency: Huntington Beach Project Name: Edinaer Avenue Traffic Sianal Svnchronization Project Limits: Edinger Avenue from Bolsa Chica Street to State Route-55 Project Number: 12-OCTA-TSP-3625 Type of work (TOW): Systems Management TOW Description: Communications intertie between agencies to manage traffic Project Description: Provide operational and infrastructure improvements (multijurisdictional project including Caltrans, Westminster, Fountain Valley, and Santa Ana) City work includes signal timing and traffic signal interconnect cable. 0. f/i y 10��i19 %�%/ E $0 $0 $0 R $0 $0 $0 C/I $0 $0 $0 I&M $2,142 $0 $0 $2,142 $0 $0 O Agency: Huntington Beach Project Name: Edinaer Avenue Widenina Project Limits: South Side of Edinger Avenue from Beach Boulevard to Parkside Lane Project Number: Type of work (TOW): Road Widening TOW Description: Widen width of existing traffic lanes Project Description: Extend the Right Turn Lane on Southside of Edinger Avenue. This project was an amendment to the FY 15/16 CIP. Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 �ESTIM1lTi 4 ,�1, /€ IttNr}-NJiMI b €f;3T -._ .' t�fYdJ .r r ` , �<:�$li�:'�„ '+ M2 TSSP 77.94 $1,669 $1,669 OCTA anticipated expenditures AQMD 22.06 $473 $473 AQMD $2,142 $2,142 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,142 $2,142 $0 $0 $0 $0 $2,142 $ 2,142 ti FUND NAME PIv�tD � �STIMATSb dd* PROJNMC*6 J ....... it Impact Fees 100.00 $600,000 $600,000 $600,000 $600,000 z aiiai�yiarii 15 7. , < 2112� 22123 ,,.: ' �. �,"� ���%� ',�� t. . ,�' a„ Tt°� E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $600,000 $0 $0 $0 $0 $0 $0 $600,000 $600,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $600,000 $0 $0 $0 $0 $0 $0 $600,000 $ 600,000 6 6/23/2016 Measure M 7 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach 111 Project Name: First Street Diversion t �? AI6AE � # .471MA1 ,. ... i i p �a _ ..tv r .. /// .. .. General Fund 100.00 $7,548 $7,548 Project Limits: First Street near Pacific Coast Highway $7,548 $7,548 Project Number: 12-HBCH-ECP-3621 Type of work (TOW): Environmental Cleanup Tow Description: Runoff Diversion Project Description: Design and install a SCADA system and flow weir for the First Street Urban Runoff Discharge Permit with OCSD to protect water qualiity of City and Pacific Ocean. $0 $0 $0 $0 $0 $0 $0 $0 $0 IE R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 '&M $1,258 $1,258 $1,258 $1,258 $1,258 $1,258 $0 $7,548 $7,548 $1,258 $1,258 $1,258 $1,258 $1,258 $1,258 $0 $7,548 $ 7,548 i Agency: Huntington Beach Project Name: General Street Maintenance for Public Works Project Limits: Citywide Project Number: Type of Work (TOW): Pedestrian TOW Description: Reconstruction or rehabilitation of sidewalk Project Description: Annual maintenance work for concrete, potholes and failed asphalt, O&M of traffic signals, replacement of striping and signage, including engineering and inspection as needed on an annual basis. This Work was added as an amendment to FY 15/16 CIP. �k_: ESTIMATED G4$T: ; P6_..,;''.. M2 Fairshare 100.00 $9,800,000 $10,471,045 $9,800,000 $10,471,045 IE $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 e~-F $1,400,000 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $9,800,000 $10,471,045 a$1,400,000 :M $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $9,800,000 $ 10,471,045 /2016 t N Agency: Huntington Beach Project Name: Goldenwest Street Traffic Signal Synchronization and Communication Enuioment Unarades Project Limits: Goldenwest St. from State Route 22 to Pacific Coast Hiahwav Project Number: 11-OCTA-TSP-3554 Type of work (TOW): Traffic Signals TOW Description: Coordinate signals within project limits Project Description: Provide operational and infrastructure upgrades including signal timing and installation of fiber optic cable along Goldenwest Street. Multijurisdictional project includes Caltrans and City of Westminster. Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 iww////u,.STtBtIATt t.bS,' • ( ili ,.u. , ., _ti��k•.r 42 TSSP 78.02 $2,539 $2,539 QMD 21.98 $715 $715 $3,254 $3,254 8 $0 $0 $0 $0 $0 $0 $0 $0 $0 IE R $0 $0 $0 $0 $0 $0 $0 $0 $0 CA $0 $0 $0 $0 $0 $0 $0 $0 $0 i&M $3,254 $0 $0 $0 $0 $0 $0 $3,254 $3,254 $3,254 $0 $0 $0 $0 $0 $0 $3,254 $ 3,254 [J Agency: Huntington Beach Project Name: Huntington Beach Catch Basin Retrofit Project tJNn NAj1([ ' . ORON `• r.. " / o tiMnt>w"b twins °.:mitts ,... ;. General Fund 100.00 $30,000 $30,000 Project Limits: City-wide $30,000 $30,000 Project Number: 14-HBCH-ECP-3742 Type of work (TOW): Environmental Cleanup TOW Description: Catchment Retrofit Project Description: Retrofit 84 existing catch basins with Bio Clean Round Curb Inlet Filters. „ .. --12 221i :,< xis,7,r r,� '"?:�'%�%fir ,a x °. ' : �., ,. , ,;..., �' „ , ,i i. .,.� .. E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $0 $30,000 $30,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $0 $30,000 $ 30,000 1 6/23/2016 Agency: Huntington Beach Project Name: Huntington Beach Northwest Catch Basin Retrofit Proiect Project Limits: City-wide in Northwest Part of City Project Number: 13-HBCH-ECP-3687 Type of work (TOW): Environmental Cleanup Tow Description: Catchment Retrofit Project Description: Retrofit 126 existing catch basins with Bio Clean Round Curb Inlet Filters and Skimmer Box. Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 SUN NA g PERCENT ESTIMATED 66k FrRojEc`r i1 General Fund 100.00 $30,000 $30,000 $30,000 $30,000 E $0 $0 $0 $0 $0 $0 $0 $0 $0 IE R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 &M $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $0 $30,000 $30,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $0 $30,000 $ 30,000 W i Agency: Huntington Beach Project Name: Huntinaton Harbour Marina Trash Skimmers Project Limits: Various Locations within Huntington Harbour Project Number: Type of work (TOW): Environmental Cleanup TOW Description: Marina Trash Skimmer Project Description: Marian Trash Skimmers will be installed in various locations FUND NAME PE CENT„ ;,,,,. ESTIMATED PROJEC General Fund 12.50 $12,186 $12,186 Other 12.50 $12,186 $12,186 Donations County Unfunded 75.00 $73,118 $73,118 $97,490 $97,490 IE $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 e~-r CD $97,490 $0 $0 $0 $0 $0 $0 $97,490 $97,490 :M $0 $0 $0 $0 0 $0 $0 $0 $0 $97,490 $0 $0 $0 $0 $0 $0 $97,490 $ 97,490 1 /2016 G� t Agency: Huntington Beach Project Name: Maonolia Street Svnchronization Project Limits: from Garfield Avenue to Pacific Coast Highway Project Number: 16-CTA-TSP-3795 Type of work (TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Provide operational and infrastructure improvements Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 ', FI t+1t Nam. y RCENT'', ...' E5TIMATEb COST PROJECTED CQ�T.. `::\iWES.. General Fund 1.36 $10,000 $10,439 M2 TSSP 71.42 $524,364 $547,372 AQMD 27.21 $199,789 $208,555 $734,153 $766,366 $0 $0 $0 $0 $0 $0 $0 $0 $0 IE R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $724,153 $0 $0 $0 $0 $724,153 $756,366 &M tz $0 $0 $0 $5,000 $5,000 $0 $0 $10,000 $10,000 $0 $0 $724,153 $5,000 $5,000 $0 $0 $734,153 $ 766,366 i Agency: Huntington Beach Project Name: McFadden/Edwards and Heil/Algonquin Catch Basin Retrofit Protect Project Limits: City-wide Project Number: 11-HBCH-ECP-3573 Type of work (TOW): Environmental Cleanup TOW Description: Automatic Retractable Screen and other debris screens or inserts Project Description: Provide maintenance for catch basin screens. NA �,- ' ' � Ft1Nn PERCENT . 01"TED t OST PROJECTEiS SST - N� ;,% General Fund 100.00 $30,450 $30,450 $30,450 $30,450 10 / o E / $0 $0 $0 $0 $0 $p .. 22123 - $0 it �tt �� / f?i`C!'E3C�+ S . � •-! $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $5,075 $5,075 $5,075 $5,075 $5,075 $5,075 $0 $30,450 $30,450 $5,075 $5,075 $5,075 $5,075 $5,075 $5,075 $0 $30,450 $ 30,450 F-623172016 Agency: Huntington Beach Project Name: Nichols Street Rehabilitation Project Limits: Slater Avenue to Warner Avenue Project Number: Type of work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Rehabilitate asphalt pavement including sidewalk and curb and gutter removal. This project was added as as an Amendment to FY 15/16 CIP. Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 . 0 NAME :. #��tCENT ' ESTIMATED COST, <;,, P1t4lECTEi} ' . Gas Tax 100.00 $735,000 $735,000 $735,000 $735,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 IE R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $735,000 $0 $0 $0 $0 $0 $0 $735,000 $735,000 I&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $735,000 $0 $0 $0 $0 $0 $0 $735,000 $ 735,000 t, i Agency: Huntington beacn Project Name: Rehabilitation of Residential Tree Petition Proiects Project Limits: Typically one to three Residential Streets 0 :STMATED COST s ST JTES U Gas Tax 100.00 $2,025,000 $2,085,276 $2,025,000 $2,085,276 E $25,000 $25,000 $25,000 $25,000 $0 $0 $0 $0 $0 $0 CD $575,000 $450,000 $450,000 $450,000 $0 '1 :M $0 $0 $0 $0 $0 $600,000 $475,000 $476,000 $475,000 $0 t $0 $0 $0 $0 $0 22/2 „ $0 $0 $0 $0 $0 $100,000 $100,000 $0 $0 $1,925,000 $1,985,276 $0 $0 $2,025,000 $ 2,085,276 /2016 t Agency: Huntington Beach Project Name: Residential Curb Ramp Proiect Project Limits: Ramps to be installed throughout City Project Number: Type of Work (TOW): Pedestrian TOW Description: Installation of ADA access ramps Project Description: Install ADA Access Ramps . This is an annual project that will install Ramps at locations where we are providing an overlay to adjacent street. This project was an amendment to FY 15/16 CIP. Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 UNUSTIMATED COST PROJECTS - CRT S, / DBG 100.00 $1,861,810 $1,991,226 ias Tax 0.00 $0 $0 $1,861,810 $1,991,226 W, E $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $35,000 $35,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $206,810 $270,000 $270,000 $270,000 $270,000 $270,000 $270,000 $1,826,810 $1,956,226 &M $0 $0 $0 $0 $0 $0 $0 $0 $0 $211,810 $275,000 $275,000 $275,000 $275,000 $275,000 $275,000 $1,861,810 $ 1,991,226 i Agency: Huntington Beach Project Name: Residential Overlav Project Limits: Citywide Project Number: Type of Work (TOW): Road Maintenance TOW Description: Rehabilitation of roadway Project Description: Provide cold mill and overlay of various streets throughout Huntington Beach. This annual project will provide street overlay rehabiliation based on the PIMP ratings. This project was an amendment to FY 15/16 CIP. %: �( 21 i ...' •,': g. li % .,, 22123 tititdtt ib`e iJ% `t Z. E $10,006 $10,000 $10,000 $10,000 $10,000 $0 $0 $50,000 $50,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $2,270,000 $2,090,000 $2,090,000 $2,090,000 $2,090,000 $0 $0 $10,630,000 $11,100,027 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,280,000 $2,100,000 $2,100,000 $2,100,000 $2,100,000 $0 $0 $10,680,000 $ 11,150,027 6/23/2016 Measure M 13 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach Project Name: Signal Modification at Goldenwest Street and Heil Avenue Project i-imits: Intersection of Goldenwest Street and Heil Avenue Project Number: Type of Work (TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Install left turn arrows at intersection including interconnect conduit and cable on Goldenwest from Heil Ave. to Warner Ave. This project is a carryover from previous year FY 15116 CIP. UND NAME PERCI T `.l „ a �STIIiMA7�f� �`�$� , ,,,��26}�E�i�D � 'fl $ 3eneral Fund 89.97 $0 $0 tSIP 10.03 $0 $0 $0 $0 E $0 $0 $0 $0 .... $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 '&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 Agency: Huntington Beach% Project Name: Signal Modification at Gothard St/Talbert Ave, NC1;1111i1tE y..•', �12CW1i ?,. < •:� $'iI 0fA1'0 CAST. ., . Gothard St/Heil Ave and Springdale St/McFadden Gas Tax 10.00 $0 $0 Project Limits: kOrsections of Gothard/Talbert, Gothard/Heil, and HSIP 90.00 $0 $0 Snringdale/McFadden Project Number: $0 $0 Type of Work (TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Add left turn signals and interconnect condiuti and cable. This project is a carryover from previous FY 15/16 CIP. IE $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 CD $0 $0 $0 $0 $0 $0 $0 $0 $0 :M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 J Agency: Huntington Beach Project Name: Traffic Channelization Modifications Project Limits: Main Street and Ellis Avenue Project Number: Type of Work (TOW): Traffic Signals TOW Description: Replace and upgrade traffic signals and equipment Project Description: Median island modification along with removal of traffic signal Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 i �i 1 t#NES.Nf4$AE i/ .:, ESTIMATED twGS�3i C�iit tJ�C1 ,as Tax 100.00 $240,000 $240,000 $240,000 $240,000 14 E $60,000 $0 $0 $0 $0 $0 $0 $60,000 $60,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $180,000 $0 $0 $0 $0 $0 $0 $180,000 $180,000 i&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $240,000 $0 $0 $0 $0 $0 $0 $240,000 $ 240,000 00 Agency: Huntington Beach nti y- -. Project Name: Traffic Signal Modification at Brookhurst Street & FUND NAME. . PERCE,, iESTtMATED COST PROJECTED COS- Indianoolis Avenue Prop 42 100.00 $60,000 $60,000 Project Limits: Intersection of Brookhurst Street and Indianapolis $60,000 $60,000 Avenue Project Number: Type of work (TOW): Traffic Signals TOW Description: Replace and upgrade traffic signals and equipment Project Description: Replace conduit, wiring and signal heads at intersection c J1 17115 G/r1i ii , r 1 i %/ / //i 21123 . ,,, N.'Y ., ,K" ...," _ IF, E $5,000 $0 $0 $0 $0 $0 $0 $5,000 $5,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $55,000 $0 $0 $0 $0 $0 $0 $55,000 $55,000 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $60,000 $0 $0 $0 $0 $0 $0 $60,000 $ 60,000 6/23/2016 Measure M 15 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach Project Name: Traffic Signal Modification at Gothard Street and Center Avenue Project Limits: Intersectoin of Gothard Avenue and Center Avenue Project Number: Type of Work (TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Install north/south left turn arrows and installation of interconnect conduit along Gothard between McFadden and Edinger. This project is a carryover from previous FY 15/16 CIP. a o }./�cG�{ G�YiwfiT ;as Tax 10.02 $0 $0 SIP 89.98 $0 $0 $0 $0 IE $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 i&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 i Agency: Huntington Beach Project Name: Traffic Signal Modification at Gothard Street and Slater Avenue Project Limits: Intersection of Gothard Street and Slater Avenue Project Number: Type of Work (TOW): Traffic Signals TOW Description: Interconnect traffic signals to improve coordination and communication Project Description: Install left turn arrows and interconnect conduit and cable on Slater Ave, from Goldwenwest to Gothard. This project is a carryover from previous FY 15/16 CIP. k,,,,t? 11 li /' " / 11RONT', tiTIMATED COST PRSi;1 1� , ,NOTES " ,... ,,,. ;as Tax 10.02 $0 $0 ISIP 89.98 $0 $0 $0 $0 IE $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 e~t $0 $0 $0 $0 $0 $0 $0 $0 $0 :M $0 $0 $0 $0 $0 $0 $0 $0 $0 (7� $0 $0 $0 $0 gp $0 $0 $0 $ o /2016 t Agency: Huntington Beach Project Name: Traffic Signal Modification at Main Street and Florida StrP.et Project Limits: Intersection of Main Street and Florida Street Project Number: Type of Work (TOW): Traffic Signals TOW Description: Replace and upgrade traffic signals and equipment Project Description: Replace poles, conduit wiring and signal heads at intersection O O Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/201Tthrough 2022/2023 ESTIMATED COST PROJECtid,' Prop 42 100.00 $265,000 $265,000 $265,000 $265,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $265,000 $0 $0 $0 $0 $0 $0 $265,000 $265,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $265,000 $0 $0 $0 $0 $0 $0 $265,000 $ 265,000 Agency: Huntington Beach Project Name: Traffic Signal Modification at Newland Street and Slater Avenue Project Limits: Intersection of Newalnd Street Project Number: Type of Work (TOW): Traffic Signals TOW Description: Interconnect traffic signals to Improve coordination and communication Project Description: Install left turn arrows and traffic signal controller and service for pedestrian signal. This project is a carryover from FY 15/16 CIP. a, g FUND NAME PERCENT ESTIMATED COST • PROJECTED COST ., = NOTE& Gas Tax 10.00 $0 $0 HSIP 90.00 $0 $0 $0 $0 16 ii011111 4 E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 C/I $0 $0 $0 $0 $0 $0 $0 $0 $0 O&M $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 6/23/2016 Measure M 17 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 Agency: Huntington Beach Project Name: Traffic Signal Modification at Nichols Lane and Warner Avenue Project Limits: Intersection of Nichols Lane and Warner Avenue Project Number: Type of work (TOWS: Traffic Signals TOW Description: Replace and upgrade traffic signals and equipment Project Description: Replace conduit, wiring and signal heads 'rop 42 100.00 $70,000 $71,430 $70,000 $71,430 E $5,000 $0 $0 $0 $0 $0 $0 $5,000 $5,000 R $0 $0 $0 $0 $0 $0 $0 $0 $0 ^/I $0 $65,000 $0 $0 $0 $0 $0 $65,000 $66,430 &M $0 $0 $0 $0 $0 $0 $0 $0 $0 ' . $5,000 $65,000 $0 $0 $0 $0 $0 $70,000 $ 71,430 O i Agency: Huntington Beach Project Name: Utica Bicycle Boulevard from Main Street to Beach Boulevard Project Limits: Utica Avenue from Main Street to Beach Boulevard Project Number: Type of Work (TOW): Bikeways TOW Description: Widening of existing bike route Project Description: Construct improvements to create a "Bicycle Boulevard", where bicycling is empasized over motor vehicle use. Project includes a new traffic signal, curb bulb -outs, signing & striping improvements. This project is a carryover from previous FY 15/16 CIP. $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $ 0 /2016 NAgency: Huntington Beach Project Name: Warner Avenue Traffic Signal Synchronization and Commimication Enuioment Unarade Project Limits: Warner Avenue from Pacific Coast Hwy to Red Hill Avenue Project Number: 11-OCTA-TSP-3558 Type of Work (TOW): Traffic Signals TOW Description: Coordinate signals within project limits Project Description: Provide operational and infrastructure upgrades including signal timing and installation of fiber optic along Warner Avenue. Multijurisdictional project includes Caltrans and Cities of Fountain Valley, Santa Ana and Tustin. Measure M Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2016/2017 through 2022/2023 4TNE , NO RCEN7 ESTIMATED COST PROJECTED CE35T ..►C)i !,a. 02TSSP 79.17 $1,330 $1,330 OCTA anticipated expenditures 1QMD 20.83 $350 $350 $1,680 $1,680 E $0 $0 $0 $0 $0 $0 $0 $0 $0 R $0 $0 $0 $0 $0 $0 $0 $0 $0 ^/I $0 $0 $0 $0 $0 $0 $0 $0 $0 i&M $1,680 $0 $0 $0 $0 $0 $0 $1,680 $1,680 ' . $1,680 $0 $0 $0 $0 $0 $0 $1,680 $ 1,680 0 IJ 18 ATTACHMENT A i TMnspoyqntlon lnvestmGM� Approved by voters on November 7, 2006 ORANGE COUNTY LOCAL TRANSPORTATION AUTHORITY 550 South Main Street P.O. Box 14184 Orange, CA 92863-1584 (714) 560-5066 www.octa. net I a Updated March 14, 2016 Item 6. - 36 HB -116- Table of Contents Introduction..................................................... ........ ......... .............2 Overview.................................................. ..... .................. .............3 Freeway Projects Overview.................. ............................... ........... ................. ............... ........ ..............5 Orange County Freeway Projects Map.. ...... — ................... --- ...... .......... ...6 1-5 Santa Ana Freeway Interchange Improvements ...........................7 1-5 Santa Ana/San Diego Freeway Improvements .............................8 SR-22 Garden Grove Freeway Access Improvements .............................9 SR-55 Costa Mesa Freeway Improvements............._.................................9 SR-57 Orange Freeway Improvements ....... ............... — ... ......................... 10 SR-91 Riverside Freeway Improvements .............................................11 1-405 San Diego Freeway Improvements .....-- ......... ......................13 1605 Freeway Access Improvements 15 i Freeway Service Patrol 15 Item 6. - 38 HB -118- �x v - e \. The Renewed Measure M Transportation Investment Freeways Plan is a 30-year, $11.8 billion program designed to Relieving congestion on the Riverside/Artesia reduce traffic congestion, strengthen our economy Freeway (SR-91) is the centerpiece of the freeway and improve our quality of life by upgrading program, and will include new lanes, new key freeways, fixing major freeway interchanges, interchanges, and new bridges. Other major projects maintaining streets and roads, synchronizing traffic will make substantial improvements on Interstate signals countywide, building a visionary rail transit 5 (I-5) in southern Orange County and the San system, and protecting our environment from the oily Diego Freeway (I-405) in western Orange County street runoff that pollutes Orange County beaches. The notorious Orange Crush —the intersection of The Transportation Investment Plan is focused solely the I-5, the Garden Grove Freeway (SR-22) and the on improving the transportation system and includes Orange Freeway (SR-57) near Angel Stadium —will tough taxpayer safeguards, including a Taxpayer ' be improved and upgraded. Under the Plan, major Oversight Committee, required annual audits, traffic chokepoints on almost every Orange County and regular, public reports on project progress. freeway will be remedied. Improving Orange County freeways will be the greatest investment The Renewed Measure M Transportation Investment in the Renewed Measure M program: Forty - Plan must be reviewed annually, in public session, three percent of net revenues, or $4.871 billion, and every ten years a detailed review of the Plan will be invested in new freeway construction. must take place. If changing circumstances require the voter -approved plan to be changed, those Streets and Roads changes must be taken to the voters for approval. More than 6,500 lane miles of aging streets and roads will need repair, rejuvenation and improvement. City streets and county roads need to be maintained regularly and potholes have to be filled quickly. Thirty-two percent of net revenue from the Renewed Measure M Transportation Investment Plan, or $3.625 billion, will be devoted to fixing potholes, improving intersections, synchronizing traffic signals countywide, and making the existing countywide network of streets and roads safer and more efficient. 3 I i I I i Hs -119- Item 6. - 39 "9 I i� � it P�� i I�� t i�� •' `.�. Cx - � ., it i Public Transit program, or $118.6 million over 30 years, will As Orange County continues to grow, building a pay for annual, independent audits, taxpayer visionary rail transportation system that is safe, safeguards, an independent Taxpayer Oversight clean and convenient, uses and preserves existing Committee assigned to watchdog government rights -of -way, and, over time, provides high-speed spending, and a full, public disclosure of all Renewed connections both inside and outside of Orange Measure M expenditures. A detailed review of the County, is a long term goal. Twenty-five percent program must be conducted every ten years and, of the net revenue from Renewed Measure M, or if needed, major changes in the investment plan $2.83 billion, will be dedicated to transit programs must be brought before Orange County voters for countywide. About twenty percent, or $2.24 billion, approval. Taxpayers will receive an annual report will be dedicated to creating a new countywide detailing the Renewed Measure M expenditures. high capacity transit system anchored on the Additionally, as required by law, an estimated one existing, successful Metrolink and Amtrak rail line, and a half percent of the sales taxes generated, or and about five percent, or $591 million, will be $178 million over 30 years, must be paid to the used to enhance senior transportation programs California State Board of Equalization for collecting and provide targeted, safe localized bus service. the one-half cent sales tax that funds the Renewed Measure M Transportation Investment Plan. Environmental Cleanup Every day, more than 70 million gallons of oily In this pamphlet, every specific project, program, pollution, litter, and dirty contaminants wash off and safeguard included in the Renewed Measure streets, roads, and freeways and pour onto Orange M Transportation Investment Plan is explained. County waterways and beaches. When it rains, the Similar details will be provided to every Orange transportation -generated beach and ocean pollution County voter if the measure is placed on the ballot. increases tenfold. Under the plan, two percent of the gross Renewed Measure M Transportation Investment Plan, or $237 million, will be dedicated to protecting Orange County beaches from this transportation -generated pollution (sometimes called "urban runoff') while improving ocean water quality. Taxpayer Safeguards and Audits When new transportation dollars are approved, they should go for transportation and transportation purposes alone. No bait -and -switch. No using transportation dollars for other purposes. The original Measure M went solely for transportation purposes. The Renewed Measure M must be just as airtight. One percent of the gross Measure M Item 6. - 40 HB -120- K- Z � pi a Rom... 3 Every day, traffic backs up somewhere on the near Angel Stadium —is in need of a major face lift. Orange County freeway system. And, every day, And the intersection of Interstate 5 and the Costa freeway traffic seems to get a little worse. Mesa Freeway (SR-55) is also slated for major repair. In the past decade, Orange County has made major Pays Big Dividends strides in re -building our aging freeway system. Local investment in freeways also. pays big dividends But there is still an enormous amount of work in the search for other needed freeway dollars. that needs to be done to make the freeway system Because of state and federal matching rules, Orange work well. You see the need for improvement every County's local investment in freeway projects acts time you drive.on an Orange County freeway. ; as a magnet for state and federal transportation dollars —pulling more freeway construction Forty-three percent of net revenues from the dollars into the county and allowing more traffic - Renewed Measure M Transportation Investment Plan reducing freeway projects to be built sooner. is dedicated to improving Orange County freeways, the largest portion of the 30-year transportation plan. Innovative Environmental Mitigation A minimum of $243.5 million will be available, SR-91 is the Centerpiece subject to a Master Agreement, to provide for Making the troubled Riverside/Artesia Freeway comprehensive, rather than piecemeal, mitigation of (SR-91) work again is the centerpiece of the the environmental impacts of freeway improvements. Renewed Measure M Freeway program. The fix Using a proactive, innovative approach, the on the SR-91 will require new lanes, new bridges, Master Agreement negotiated between the Orange new overpasses, and, in the Santa Ana Canyon County Local Transportation Authority and portion of the freeway, a diversion of drivers to the state and federal resource agencies will provide Foothill Corridor (SR-241) so the rest of the Orange higher -value environmental benefits such as County freeway system can work more effectively. habitat protection, wildlife corridors and resource preservation in exchange for streamlined project And there's more to the freeway program than the approvals for the freeway program as a whole. fix of SR-91—much more. More than $1 billion is earmarked for Interstate 5 in South County. Freeway projects will also be planned, designed More than $800 million is slated to upgrade the and constructed with consideration for their San Diego Freeway (1-405) between Irvine and aesthetic, historic and environmental impacts the Los Angeles County line. Another significant on nearby properties and communities using investment is planned on the congested Costa such elements as parkway style designs, locally Mesa Freeway (SR-55). And needed projects native landscaping, sound reduction and aesthetic designed to relieve traffic chokepoints are planned treatments that complement the surroundings. for almost every Orange County freeway. 1 To make any freeway system work, bottlenecks at interchanges also have to be fixed. The notorious Orange Crush Interchange —where the Santa Ana Freeway (1-5) meets the Orange Freeway (SR-57) and the Garden Grove Freeway (SR-22) in a traffic tangle r» " HB -121- Item 6. - 41 Item 6. - 42 HB -122- HB -123- Item 6. - 43 Item 6. - 44 H B -124- Project Garden Grove Freeway (SR-22) Access Improvements Description: Construct interchange improvements at Euclid Street, Brookhurst Street and Harbor Boulevard to reduce freeway and street congestion near these interchanges. Specific improvements will be subject to approved plans developed in cooperation with local jurisdictions and affected communities. Regional plans also include the construction of new freeway -to -freeway carpool ramps to the SR-22/1-405 interchange, and improvements to the local interchange at Magnolia Avenue using federal and state funds. Cost: The estimated cost to improve the SR-22 interchanges is $120.0 million. Project 0 Costa Mesa Freeway (SR-55) Improvements Description: Add new lanes to SR-55 between Garden Grove Freeway (SR-22) and the San Diego Freeway (I-405), generally within existing right-of-way, including merging lanes between interchanges to smooth traffic flow. This project also provides for freeway operational improvements for the portion of SR-55 between SR-91 and SR-22. The project will generally be constructed within the existing right-of-way. Specific improvements will be subject to approved plans developed in cooperation with local jurisdictions and affected communities. The project will increase freeway capacity and reduce congestion. This freeway carries about 295,000 vehicles on a daily basis. This volume is expected to increase by nearly 13 percent, bringing it up to 332,000 vehicles per day in the future. In addition to the projects described above, regional plans also include a new street overcrossing and carpool ramps at Alton Avenue using federal and state funds. Cost: The estimated cost for these SR-55 improvements is $366.0 million. HB -125- Item 6. - 45 10 Project Orange Freeway (SR-57) Improvements Description: Build a new northbound lane between Orangewood Avenue and lambert Road. Other projects include improvements to the Lambert interchange and the addition of a northbound truck climbing lane between Lambert and Tonner Canyon Road. The improvements will be designed and Y coordinated specifically to reduce congestion at SR-57/SR-91 interchange. These improvements s �, will be made generally within existing right -of- way. Specific improvements will be subject to approved plans developed in cooperation with Y local jurisdictions and affected communities. The project will increase freeway capacity and reduce` congestion. The daily traffic volume on this freeway is about 315,000 vehicles. By 2030, this volume will s increase by 15 percent, bringing it up to 363,000 i vehicles per day. In addition to the project described �p ; above, regional plans include new carpool ramps Cerritos federal funds. at Avenue using and state Cost: The implement t �� estimated cost to SR-57 improvements is $258.7 million. a AV Item 6. - 46 H B -126- xs -127- Item 6. - 47 Project 0 Riverside Freeway (SR-91) Improvements from Costa Mesa Freeway (SR-55) to the Orange/ Riverside County Line Description: This project adds capacity on SR-91 beginning at SR-55 and extending to I-15 in Riverside County. The first priority will be to improve the segment of SR-91 east of SR-241. The goal is to provide up to four new lanes of capacity between SR-241 and Riverside County Line by making best use of available freeway property, adding reversible lanes, building elevated sections and improving connections to SR-241. These projects would be constructed in conjunction with similar coordinated improvements in Riverside County extending to I-15 and provide a continuous set of improvements between SR-241 and I-15. The portion of improvements in Riverside County will be paid for from other sources. Specific improvements will be subject to approved plans developed in cooperation with local jurisdictions and affected communities. This project also includes improvements to the segment of SR-91 between SR-241 and SR-55. The concept is to generally add one new lane in each direction and improve the interchanges. Today, this freeway carries about 314,000 vehicles every day. This volume is expected to increase by 36 percent, bringing it up to 426,000 vehicles by 2030. Cost: The estimated cost for these improvements to the SR-91 is $352.0 million. Item 6. - 48 HB -128- Project cost estimate amended on November 9, 2012. Project 0 San Diego Freeway (1405) Improvements between the 1-605 Freeway in Los Alamitos area and Costa Mesa Freeway (SR-55) Description: Add new lanes to the San Diego Freeway between I-605 and SR-55, generally within the existing right- of-way. The project will make best use of available freeway property, update interchanges and widen all local overcrossings according to city and regional master plans. The improvements will be coordinated with other planned 1-405 improvements in the 1-405/SR-22/1-605 interchange area to the north and 1-405/SR-73 improvements to the south. The improvements will adhere to recommendations of the Interstate 405 Major Investment Study (as adopted by the Orange County Transportation Authority Board of Directors on October 14, 2005) and will be developed in cooperation with local jurisdictions and affected communities. Today, 1-405 carries about 430,000 vehicles daily. The volume is expected to increase by nearly 23 percent, bringing it up to 528,000 vehicles daily by 2030. The project will increase freeway capacity and reduce congestion. Near -term regional plans also include the improvements to the 1-405/SR-73 interchange as well as a new carpool interchange at Bear Street using federal and state funds. Cost: The estimated cost for these improvements to the I-405 is $1,072.8 million. Project cost estimate amended on Novem - - HB -129- Item 6. - 49 14 Project San Diego Freeway (1-405) Improvements between Costa Mesa Freeway (SR-55) and Santa Ana Freeway (1-5) Description: Add new lanes to the freeway from SR-55 to the I-5. The project will also improve chokepoints at interchanges and add merging lanes near on/ off ramps such as Lake Forest Drive, Irvine Center Drive and SR-133 to improve the overall freeway operations in the 1-405/I-5 El Toro "Y" area. The projects will generally be constructed within the existing right-of-way. Specific improvements will be subject to approved plans developed in cooperation with local jurisdictions and affected communities. This segment of the freeway carries 354,000 vehicles a day. This number will increase by nearly 13 percent, bringing it up to 401,000 vehicles per day by 2030. The project will increase freeway capacity and reduce congestion. In addition to the projects described above, regional plans include a new carpool interchange at Von Karman Avenue using federal and state funds. Cost: The estimated cost for these improvements to the 1-405 is $319.7 million. Item 6. - 50 FIB -130- Project 0 1-605 Freeway Access Improvements Description: Improve freeway access and arterial connection to I-605 serving the communities of Los Alamitos and Cypress. The project will be coordinated with other planned improvements along SR-22 and I-405. Specific improvements will be subject to approved plans developed in cooperation with local jurisdictions and affected communities. Regional plans also include the addition of new freeway -to -freeway carpool ramps to the I-405/ I-605 interchange using federal and state funds. This improvement will connect to interchange improvements at I-405 and SR-22 as well as new freeway lanes between I-405 and I-605. Cost: The estimated cost to make these I-605 interchange improvements is $20.0 million. Project 0 Freeway Service Patrol Description: The Freeway Service Patrol (FSP) provides competitively bid, privately contracted tow truck service for motorists with disabled vehicles on the freeway system. This service helps stranded motorists and quickly clears disabled vehicles out of the freeway lanes to minimize congestion caused by vehicles blocking traffic and passing motorists rubbernecking. CuTrently Freeway Service Patrol is available on Orange County freeways Monday through Friday during peak commuting hours. This project would assure that this basic level of service could be continued through 2041. As demand and congestion levels increase, this project would also permit service hours to be extended throughout the day and into the weekend. Cost: The estimated cost to support the Freeway Service Patrol Program for thirty years beyond 2011 is $150.0 million. HB -131- Item 6. - 51 r / Orange County has more than 6,500 lane miles Renewed Measure M provides financial incentives of aging streets and roads, many of which are in for traffic improvements that cross city and need of repair, rejuvenation and improvement. county lines, providing a seamless, county - Intersections need to be widened, traffic lights wide transportation system that's friendly to need to be synchronized, and potholes need to regional commuters and fair to local residents. be filled. And, in many cases, to make Orange County's transportation system work smoothly, we Better Cooperation need to add additional lanes to existing streets. To place a higher priority on cooperative, collaborative regional decision -making, Renewed Thirty-two percent of net revenues from the Measure M creates incentives that encourage traffic Renewed Measure M Transportation Investment lights to be coordinated across jurisdictional lines, Plan is dedicated to maintaining streets, major street improvements to be better coordinated fixing potholes, improving intersections and on a regional basis, and street repair programs to be widening city streets and county roads. a high priority countywide. To receive Measure M funding, cities and the county have to cooperate. Making the System Work Making the existing system of streets and roads The Streets and Roads program in Renewed work better —by identifying spot intersection Measure M involves shared responsibilities —local improvements, filling potholes, repaving worn- cities and the county set their local priorities out streets —is the basis of making a countywide within a competitive, regional framework that transportation system work. That basis has to be the rewards cooperation, honors best practices, and first priority. But to operate a successful, countywide encourages government agencies to work together. system of streets and roads, we need more: street widenings and traffic signals synchronized countywide. And there's more. Pedestrian safety near local schools needs to be improved. Traffic flow must be smoothed. Street repairs must be made sooner. And, perhaps most importantly, cities and the county must work together —collaboratively —to find simple, low-cost traffic solutions. Item 6. - 52 HB -132- HB -133- Item 6. - 53 Project 0 Regional Capacity Program Description: This program, in combination with local matching funds, provides a funding source to complete the Orange County Master Plan of Arterial Highways (MPAH). The program also provides for intersection improvements and other projects to help improve street operations and reduce congestion. The program allocates funds through a competitive process and targets projects that help traffic the most by considering factors such as degree of congestion relief, cost effectiveness, project readiness, etc. Local jurisdictions must provide a dollar -for -dollar match to qualify for funding, but can be rewarded with lower match requirements if they give priority to other key objectives, such as better road maintenance and regional signal synchronization. Roughly 1,000 miles of new street lanes remain to be completed, mostly in the form of widening existing streets to their ultimate planned width. Completion of the system will result in a more even traffic flow and efficient system. Another element of this program is funding for construction of railroad over or underpass grade separations where high volume streets are impacted by freight trains along the Burlington Northern Santa Fe railroad in northern Orange County. Cost: The estimated cost for these street improvement projects is $1,132.8 million. Item 6. - 54 HB -134- HB -135- Item 6. - 55 Project 0 Local Fair Share Program Description: This element of the program will provide flexible funding to help cities and the County of Orange keep up with the rising cost of repairing the aging street system. In addition, cities can use these funds for other local transportation needs such as residential street projects, traffic and pedestrian safety near schools, signal priority for emergency vehicles, etc. This program is intended to augment, rather than replace, existing transportation expenditures and therefore cities must meet the following requirements to receive the funds. 1. Continue to invest General Fund monies (or other local discretionary monies) for transportation and annually increase this commitment to keep pace with inflation. 2. Agree to use Measure M funds for transportation purposes only, subject to full repayment and a loss of funding eligibility for five years for any misuse. 3. Agree to separate accounting for Measure M funds and annual reporting on actual Measure M expenditures. 4. Develop and maintain a Pavement Management Program to ensure timely street maintenance and submit regular public reports on the condition of streets. 5. Annually submit a six -year Capital Improvement Program and commit to spend Measure M funds within three years of receipt. 6. Agree to assess traffic impacts of new development and require that new development pay a fair share of any necessary transportation improvements. 7. Agree to plan, build and operate major streets consistent with the countywide Master Plan of Arterial Highways to ensure efficient traffic flow across city boundaries. 8. Participate in Traffic Forums with neighboring jurisdictions to facilitate the implementation and maintenance of traffic signal synchronization programs and projects. This requires cities to balance local traffic policies with neighboring cities —for selected streets —to promote more efficient traffic circulation overall. 9. Agree to consider land use planning strategies that are transit -friendly, support alternative transportation modes including bike and pedestrian access and reduce reliance on the automobile. The funds under this program are distributed to cities and the County of Orange by formula once the cities have fulfilled the above requirements. The formula will account for population, street mileage and amount of sales tax collected in each jurisdiction. Cost: The estimated cost for this program for thirty years is $2,039.1 million. Item 6. - 56 HB -136- . 71 Building streets, roads and freeways helps fix The new, localized transit programs will bring today's traffic problems. Building a visionary transit competition to local transportation planning, system that is safe, clean and convenient focuses creating a marketplace of transportation ideas where on Orange County's transportation future. the best ideas emerge and compete for funding. The plan is to encourage civic entrepreneurship and Twenty-five percent of net revenues from the stimulate private involvement and investment. Renewed Measure M Transportation Investment Plan is allocated towards building and improving Transit Investment Criteria rail and bus transportation in Orange County. The guiding principles for all transit investments Approximately twenty percent of the Renewed are value, safety, convenience and reliability. Each Measure M funds is allocated to developing a creative local transit vision will be evaluated against clear countywide transit program and five percent of criteria, such as congestion relief, cost-effectiveness, the revenues will be used to enhance programs for readiness, connectivity, and a sound operating plan. senior citizens and for targeted, localized bus service. All transit expenditures must be consistent with In terms of bus services, more specialized transit the safeguards and audit provisions of the Plan. services, including improved van services and reduced fares for senior citizens and people with A New Transit Vision disabilities, will be provided. Safety at key bus stops The key element of the Renewed Measure M transit will be improved. And a network of community - program is improving the 100-year old Santa Fe based, mini -bus services will be developed in rail line, known today as the Los Angeles/San areas outside of the central county rail corridor. Diego (LOSSAN) rail corridor, through the heart of the county. Then, by using this well -established, operational commuter rail system as a platform for future growth, existing rail stations will be developed into regional transportation hubs that can serve as regional transportation gateways or the centerpiece 3 of local transportation services. A series of new, well - coordinated, flexible transportation systems, each one customized to the unique transportation vision the station serves, will be developed. Creativity and good financial sense will be encouraged. Partnerships will be promoted. Transportation solutions for each transportation hub can range from monorails to local mini -bus systems to new technologies. Fresh thinking will be rewarded. HB -137- Item 6. - 57 Item 6. - 58 HB -138- Project 0 High Frequency Metrolink Service Description: This project will increase rail services within the county and provide frequent Metrolink service north of Fullerton to Los Angeles. The project will provide for track improvements, more trains, and other related needs to accommodate the expanded service. This project is designed to build on the successes of Metrolink and complement service expansion made possible by the current Measure M. The service will include upgraded stations and added parking capacity; safety improvements and quiet zones along the tracks; and frequent shuttle service and other means, to move arriving passengers to nearby destinations. The project also includes funding for improving grade crossings and constructing over or underpasses at high volume arterial streets that cross the Metrolink tracks. Cost: The estimated cost of capital and operations is $1,129.8 million. Project Transit Extensions to Metrolink Description: Frequent service in the Metrolink corridor provides a high capacity transit system linking communities within the central core of Orange County. This project will establish a competitive program for local jurisdictions to broaden the reach of the rail system to other activity centers and communities. Proposals for extensions must be developed and supported by local jurisdictions and will be evaluated against well-defined and well-known criteria as follows: • Traffic congestion relief • Project readiness, with priority given to projects that can be implemented within the first five years of the Plan • Local funding commitments and the availability of right-of-way • Proven ability to attract other financial partners, both public and private • Cost-effectiveness • Proximity to jobs and population centers • Regional as well as local benefits • Ease and simplicity of connections • Compatible, approved land uses • Safe and modern technology • A sound, long-term operating plan This project shall not be used to fund transit routes that are not directly connected to or that would be redundant to the core rail service on the Metrolink corridor. The emphasis shall be on expanding access to the core rail system and on establishing connections to communities and major activity centers that are not immediately adjacent to the Metrolink corridor. It is intended that multiple transit projects be funded through "-eject R cost estimate amended on Decemh 1113.139_ Item 6. - 59 a competitive process and no single project may be awarded all of the funds under this program. These connections may include a variety of transit technologies such as conventional bus, bus rapid transit or high capacity rail transit systems as long as they can be fully integrated and provide seamless transition for the users. Cost: The estimated cost to implement this program over thirty years is $1,000.0 million. Project 0 Convert Metrolink Station(s) to Regional Gateways that Connect Orange County with High -Speed Rail Systems Description: This program will provide the local improvements that are necessary to connect planned future high-speed rail systems to stations on the Orange County Metrolink route. The State of California is currently planning a high-speed rail system linking northern and southern California. One line is planned to terminate in Orange County. In addition, several magnetic levitation (MAGLEV) systems that would connect Orange County to Los Angeles and San Bernardino Counties, including a link from Anaheim to Ontario airport, are also being planned or proposed by other agencies. Cost: The estimated Measure M share of the cost for these regional centers and connections is $57.9 million. Project 0 Expand Mobility Choices for Seniors and Persons with Disabilities Description: This project will provide services and programs to meet the growing transportation needs of seniors and persons with disabilities as follows: One and forty-seven hundredths percent (1.47%) of net revenues will stabilize fares and provide fare discounts for bus services, specialized ACCESS services and future rail services One percent of net revenues will be available to continue and expand local community van service for seniors through the existing Senior Mobility Program One percent will supplement existing countywide senior non -emergency medical transportation services Over the next 30 years, the population age 65 and over is projected to increase by 93 percent. Demand for transit and specialized transportation services for seniors and persons with disabilities is expected to increase proportionately. Cost: The estimated cost to provide these programs over 30 years is $392.8 million. Item 6. - 60 D--:--4 'r Ind U cost estimates amended on December 14, 2015. HB -140- Project 0 Community Based Transit/Circulators Description: This project will establish a competitive program for local jurisdictions to develop local bus transit services such as community based circulators, shuttles and bus trolleys that complement regional bus and rail services, and meet needs in areas not adequately served by regional transit. Projects will need to meet performance criteria for ridership, connection to bus and rail services, and financial viability to be considered for funding. All projects must be competitively bid, and they cannot duplicate or compete with existing transit services. Cost: The estimated cost of this project is $226.5 million. Project 0 Safe Transit Stops Description: This project provides for passenger amenities at 100 busiest transit stops across the County. The stops will be designed to ease transfer between bus lines and provide passenger amenities such as improved shelters, lighting, current information on bus and train timetables and arrival times, and transit ticket vending machines. Cost: The estimated cost of this project is $25.0 million. ier MENa Item 6. - 61 h- 26 , \ i i ga Every day, more than 70 million gallons of oily The environmental cleanup program is designed to pollution, litter, and dirty contamination washes supplement, not supplant, existing transportation - off streets, roads and freeways and pours onto related water quality programs. This clean-up Orange County waterways and beaches. When program must improve, and not replace, existing it rains, the transportation -generated pollution pollution reduction efforts by cities, the county, increases tenfold, contributing to the increasing and special districts. Funds will be awarded number of beach closures and environmental to the highest priority programs that improve hazards along the Orange County coast. water quality, keep our beaches and streets clean,. and reduce transportation -generated pollution Prior to allocation of funds for freeway, street and along Orange County's scenic coastline. transit projects, two percent of gross revenues from the Renewed Measure M Transportation Investment Plan is set aside to protect Orange County beaches from transportation -generated pollution (sometimes called "urban runoff') and improving ocean water quality. Countywide Competitive Program Measure M Environmental Cleanup funds will be used on a countywide, competitive basis to meet federal Clean Water Act standards for controlling transportation -generated pollution by funding nationally recognized Best Management Practices, such as catch basins with state-of- the-art biofiltration systems; or special roadside j landscaping systems called bioswales that filter oil runoff from streets, roads and freeways. II i i i Aw Item 6. - 62 HB -142- Project 0 Environmental Cleanup Description: Implement street and highway related water quality improvement programs and projects that will assist Orange County cities, the County of Orange and special districts to meet federal Clean Water Act standards for urban runoff. The Environmental Cleanup monies may be used for water quality improvements related to both existing and new transportation infrastructure, including capital and operations improvements such as: • Catch basin screens, filters and inserts • Roadside bioswales and biofiltration channels • Wetlands protection and restoration • Continuous Deflective Separation (CDS) units • Maintenance of catch basins and bioswales • Other street -related "Best Management Practices" for capturing and treating urban runoff This program is intended to augment, not replace existing transportation related water quality expenditures and to emphasize high -impact capital improvements over local operations and maintenance costs. In addition, all new freeway, street and transit capital projects will include water quality mitigation as part of project scope and cost. 27 The Environmental Cleanup program is subject to the following requirements: • Development of a comprehensive countywide capital improvement program for transportation related water quality improvements • A competitive grant process to award funds to the highest priority, most cost-effective projects • A matching requirement to leverage other federal, state and local funds for water quality improvements • A maintenance of effort requirement to ensure that funds augment, not replace existing water quality programs • Annual reporting on actual expenditures and an assessment of the water quality benefits provided • A strict limit on administrative costs and a requirement to spend funds within three years of receipt • Penalties for misuse of any of the Environmental Cleanup funds Cost: The estimated cost for the Environmental Cleanup program is $237.2 million. In addition it is estimated that new freeway, road and transit projects funded by the Renewed Measure M Transportation Investment Plan will include more than $165 million for mitigating water quality impacts. HB -143- Item 6. - 63 N \ 3. OR When new transportation dollars are approved, Back to the Voters they should go for transportation and transportation Of course, over the next 30 years, things will change. alone. No bait -and -switch. No using transportation Minor adjustments can be made by a 2/3 vote of the dollars for other purposes. The original Taxpayer Oversight Committee and a 2/3 vote of Measure M went solely for transportation. The the Orange County Local Transportation Authority Renewed Measure M will be just as airtight. Board of Directors. Major changes must be taken back to voters for authorization. And, every ten And there will be no hidden costs in the program. years, and more frequently if necessary, the Orange County Local Transportation Authority must Prior to allocation of funds for freeway, street and conduct a thorough examination of the Renewed transit projects, one percent of gross revenues from Measure M Investment Plan and determine if the Renewed Measure M Transportation Investment major changes should be submitted to the voters. Plans is set aside for audits, safeguards, and taxpayer protection. By state law, one and one half percent of There are other important taxpayer safeguards, the gross sales taxes generated by Measure M must be all designed to insure the integrity of the voter - paid to the California State Board of Equalization for authorized plans. But each is focused on one collecting the countywide one-half percent sales tax goal: guaranteeing that new transportation that funds the Transportation Investment Program. dollars are devoted to solving Orange County's traffic problems and that no transportation Special Trust Fund dollars are diverted to anything else. I To guarantee transportation dollars are used for transportation purposes, all funds must be kept in a special trust fund. An independent, outside audit of this fund will protect against cheaters who try to use the transportation funds for purposes other than specified transportation uses. A severe punishment will disqualify any agency that cheats from receiving Measure M funds for a five-year period. The annual audits, and annual reports detailing project progress, will be sent to Orange County taxpayers every year and will be reviewed in public session by a special Taxpayer Oversight Committee that can raise fiscal issues, ask tough questions, and must independently certify, on an annual basis, that transportation dollars have been spent strictly according to the Renewed Measure M Investment Plan. 40� Item 6. - 64 HB -144- Taxpayer Safeguards and Audits Description: Implement and maintain strict taxpayer safeguards to ensure that the Renewed Measure M Transportation Investment Plan is delivered as promised. Restrict administrative costs to one percent (1%) of total tax revenues and state collection of the tax as prescribed in state law [currently one -and -one-half (1.5%) percent]. Administration of the Transportation Investment Plan and all spending is subject to the following specific safeguards and requirements: Oversight • All spending is subject to an annual independent audit • Spending decisions must be annually reviewed and certified by an independent Taxpayer Oversight Committee • An annual report on spending and progress in implementing the Plan must be submitted to taxpayers Integrity of the Plan • No changes to the Plan can be made without review and approval by 2/3 vote of the Taxpayer Oversight Committee • Major changes to the Plan such as deleting a project or shifting projects among major spending categories (Freeways, Streets & Roads, Transit, Environmental Cleanup) must be ratified by a majority of voters • The Plan must be subject at least every ten years to public review and assessment of progress in delivery, public support and changed circumstances. Any significant proposed changes to the Plan must be approved by the Taxpayer Oversight Committee and ratified by a majority of voters. Fund Accounting • All tax revenues and interest earned must be deposited and maintained in a separate trust fund. Local jurisdictions that receive allocations must also maintain them in a separate fund. • All entities receiving tax funds must report annually on expenditures and progress in implementing projects • At any time, at its discretion, the Taxpayer Oversight Committee may conduct independent reviews or audits of the spending of tax funds • The elected Auditor/Controller of Orange County must annually certify that spending is in accordance with the Plan Spending Requirements • Local jurisdictions receiving funds must abide by specific eligibility and spending requirements detailed in the Streets & Roads and Environmental Cleanup components of the Plan • Funds must be used only for transportation purposes described in the Plan. The penalty for misspending is full repayment and loss of funding eligibility for a period of five years. • No funds may be used to replace private developer funding committed to any project or improvement • Funds shall augment, not replace existing funds • Every effort shall be made to maximize matching state and federal transportation dollars HB -145- Item 6. - 65 Item 6. - 66 HB -146- I-5 Santa Ana Freeway Interchange Improvements 0 $470.0 I-5 Santa Ana/San Diego Freeway Improvements ' 1,185.2 SR-22 Garden Grove Freeway Access Improvements 120.0 SR-55 Costa Mesa Freeway Improvements Aft V 366.0 SR-57 Orange Freeway Improvements 258.7 SR-91 Riverside Freeway Improvements 908.7* I-405 San Diego Freeway Improvements Aft Aft 1,392.5* I-605 Freeway Access Improvements Alft 20.0 All Freeway Service Patrol W 150.0 reets & Roads Regional Capacity Program Aft • $1,132.8 Regional Traffic Signal Synchronization Programoft 453.1 Local Fair Share Program ' 2,039.1 Projects High Frequency Metrolink Service $1,129.8* Transit Extensions to Metrolink Aft V 1,000.0 Metrolink Gateways 0 57.9* Expand Mobility Choices for Seniors and Persons with Disabilities 392.8* Community Based Transit/Circulators 0 226.5 Safe Transit Stops Cleanup 0 25.0 Clean Up Highway and Street Runoff that Pollutes Beaches AVA I W $237.2 Collect Sales Taxes (State charges required by law) I I $178.0 Oversight and Annual Audits 118.6 *AStPrick nnt— project estimates that have been amender' ' 1-113 -147- Item 6. - 67