HomeMy WebLinkAboutApprove the City's Park Playground Equipment Replacement Pri City of Huntington Beach File #: 18-488 MEETING DATE: 11/19/2018 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Fred A. Wilson, City Manager PREPARED BY: Chris Slama, Interim Director of Community Services Subject: Approve the City's Park Playground Equipment Replacement Priority List Statement of Issue: Based on a recommendation by the Playground Equipment & Park Maintenance Committee, the Community Services Commission has approved a playground equipment replacement priority list. City Council is being asked to approve the priority list based upon the Community Services Commission recommendation. Financial Impact: No specific funding source is being identified at this time. Funding sources will be identified through future budget processes, available grant funds or donations. Recommended Action: Approve the City's park playground equipment replacement priority list, with an emphasis on playgrounds surfaced with a combination of rubberized material and sand whenever possible, and apply for applicable grants and other funding sources. Alternative Action(s): Do not approve the recommended action and direct staff accordingly. Analysis: Currently, there are 77 parks in the City's park system consisting of active, passive, and open space uses. Of the 77 parks, a total of 65 include tot lots with a total of 450 play units. Play units range from individual structures, group structures and/or swings. The play units are designed to meet all safety standards as established by the Consumer Product Safety Commission (CPSC) and accessibility requirements per Americans with Disabilities Act (ADA). The life expectancy of play units per industry estimations is an average of 15 years. The Parks, Trees and Landscape (PTL) Division of Public Works inspects the units for safety on a regular basis and makes repairs when City of Huntington Beach Page 1 of 3 Printed on 11/15/2018 powered by Leoistar," File #: 18-488 MEETING DATE: 11/19/2018 possible. Within the past few years, several parks have received new units through grant funds, such as Harbour View and Newland Parks, which now have play units that are in good condition. Other parks such as Clegg-Stacey and Edison Parks have recently received new units due to the failing condition of the previous units. However, at remaining parks, many of the play units are coming to the end of their life expectancy and some units will no longer be able to be repaired. The majority of parks received new equipment utilizing State Park bond funds with the last major replacement efforts occurring in the late 1990's and early 2000's. The replacements were completed as major projects and, in both cases, the equipment replacement was conducted based upon a priority ranking approved by the Commission. Due to the volume of parks and play units, the Community Services Commission (CSC) approved recommending review of a playground equipment inventory list to the Playground Equipment & Park Maintenance Committee (PE&PMC) at the October 11, 2017, CSC meeting. The PE&PMC met several times to discuss PTL's process on inspecting each park and the condition of the play equipment. The rating sheets from PTL's inspections provided detailed information on which play equipment needs attention, whether or not the playground meets ADA requirements for access to the play equipment, as well as an overall rating of poor, fair, and good (Attachment 1). Based on this information, the PE&PMC directed staff to create a priority list based on which parks did not meet ADA requirements, parks that are in poor condition, and parks that are of high-use. In an effort to control costs, the Committee recommended that partial rubber surfacing be installed when possible as opposed to full rubber surfacing at the playgrounds. The Committee felt that having partial sand and partial rubber surfacing allowed for different play options for park users. The j PE&PMC also requested staff to provide an estimated cost breakdown for each park to include the cost of new rubber surfacing to meet ADA requirements, as well as the neighborhood park standard amenities: one swing set, one unit for the 2-5 year old age group, and one unit for the 5-12 year old age group. Committee members also toured a playground inspection with PTL to get a better understanding on the process and requirements for a playground to meet ADA standards. At the September 27, 2018. PE&PMC meeting, staff presented to the committee a park playground equipment replacement priority list and packet that included information on each park's condition and estimated cost breakdown for replacement (Attachments 2 and 3). Should new equipment and partial rubberized surfacing be installed at all 27 parks listed as priority, the total estimated cost would be $3,262,174. Please note that previous playground equipment replacement projects have been phased over several years based on availability of funds. Based on the information provided, the PE&PMC made the recommendation for Commission to approve the park playground equipment replacement priority list as presented. Environmental Status: The establishment of a park playground equipment replacement priority list is exempt pursuant to Section 15061(b)(3) of the CEQA Guidelines, which exempts projects where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the City of Huntington Beach Page 2 of 3 Printed on 11/15/2018 powered by LegisiarT� J File #: 18-488 MEETING DATE: 11/19/2018 environment. Strategic Plan Goal: Enhance and maintain infrastructure Attachment(s): 1. Park Playground Inventory List 2. Park Playground Equipment Replacement Priority List 3. Park Playground Information Sheets City of Huntington Beach Page 3 of 3 Printed on 11/15/2018 powered by LegistarT'1 PARK PLAYGROUND INVENTORY LIST Park 2-5 years 5-12 years Surfacing Swings Freestanding Missing Equipment Overall Ratfng Comments Amberleaf 2002 2002 S8nd Fair Arevalos X 5and X Fair Baca 2002 2002 Combo X Swings Poor PIP needs a lot of patching- Bauer 2012 2012. Full X X Fair Beach Playground 2018 2018 Full X X Good Bolsa View 2008 2008 Combo X Fair Booster X Cornbo X Poor Burke 2008 2008 Combo X Fair Bushard X Sand X Fair Carr X X Combo X Fair Central Park-Dag Park 7008 20OR Full X Fair Central Park-Lower Lake 2008 2008 Combo Poor Central Park-Slater X Comhn X Bucket.swing Poor Central Park Upper-Picnic Shelters 2008 2008 Combo X Poor Circle-View 2002 Sand Fair Clegg-Stacey X X Cornbo X Good College View 2008 2008 Combo X lair Conrad Maintained by HDA Discovery Well 2002 2002 Full X Fair Drew X Sand X Fair Eader 2008 7008 Cornbo X X Poor 2-5 years sand;5-12 years combo Edison 2008 2017 Combo X Poor Franklin X X Sand Soon to be rc developed Gibbs X X Full Fair PIP needs to be patched Gisler 2008 2008 Combo X Fair Glen View 2002 Sand X 48"slide Fair Golden View 2008 2008 Combo X 36"curved slide(2-5( Fair Greer X X Combo X X Fair(Mix)Gone(2-515-12( 2-5,5-12 5and Harbour View 2014 2014 Full Goad Haven View X Sand Fair Hawes 2008 2008 Combo X Fair Helme 2008 2008 Combo X 48"tube slide Fair Hope View 7008 Combo X Fair Irby 2008 2008 Combo X Fair Lake 2008 2008 Combo X X Fair Lake View 2002 2002 Combo Fair 2-5 years combo;5-12 sand Iamb 2015 2015 Full X Good Langenbeck X Sand X Fair 35"slide bracket not compliant Lark Vlew 2008 Combo X Rivets Fair Swings need rubber surfacing LeBard X X Sand X Fair Linear Park(Sunset( X X Combo Swings Fair Manning 2008 2008 Combo X Fair Marina 2008 Combo X Fair Marine View 2002 Sand X Good Mccallen X X Wood chips X Maintained by Boys&Girls Club Moffett 2008 2008 Combo x Fair Murdy 2008 2008 Combo X Good Newland Park(East) X X Sand X Fair Newland Park(West) X X Combo X Good Multiple rivets, challenge walk,double lighting slide missing 9akview X X Combo X handle Poor PIP needs patching Pattinson X X Full 2 5 Fair;5-12 Poor Perry 2008 2008 Combo X Fair Peter Green X X Full x x Missing steering wheel Fair PIP needs to be replaced Pleasant View 2002 2002 Sand X Fair Robinwood 2002 2002 Sand x Fair 4'oval tube need to be replaced Swing hangers and hardware need to Schroeder 2002 2002 Sand X 4'oval tube Fair be replaced Play structure needs to he removed Scabridge 2008 Sand X Poor ASAP Seely 2008 2008 Combo x Fair 36"slide bracket not compliant;2 5 Sand;.5-12 combo Sowers 2008 2008 Full X 48"tube slide Fair Sports Complex(North) X Full Fair Sports Complex(South) x Combo Fair Sun View x X Combo 2 5 Fair;5 12 Poor 36"wide slide non compliant bracket Talbert 2008 2008 Combo X Fair 2-5 combo;5-12 sand Tarbox X Full Fair lerry 2008 2008 Combo X Fair Small PIP patch by swings Trinidad 2008 Combo Wardlow 2002 2002 Sand X Fair Weider 2008 2008 Combo X Transfer station,rivets Fair 36"slide bracket not compliant Worthy 2017 2017 Full X X Good STAFF RECOMMENDED PARK PLAYGROUND & EQUIPMENT REPLACEMENT PRIORITY LIST PARK CONDITION NON ADA ADA MISSING PARTS Oak View` Poor - 2-5, 5-12, swings Slated for removal Seabridge* Poor Swings All play units removed HCP Lower Lake* Poor - Swings All play units removed Edison*' Poor 2-5, 5-12, swings - Swing seats Eaderl Poor 2-5, swings 5-12 Large swing seats Bushard Fair 5-12, swings - Circle View Fair 5-12 - Drew Fair 5-12, swings - Glen View Fair 5-12, swings - Haven View Fair 5-12 - Langenbeck Fair 5-12, swings - LeBard Farr 2-5, 5-12, swings - Swing seats Newland East Fair 2-5, 5-12, swings - Swing seats Pleasant View Fair 2-5, 5-12, swings - Robinwood Fair 2-5, 5-12, swings - Schroeder2 Fair 2-5, 5-12, swings - Marine View2 Good 2-5, 5-12, swings - Arevalos Fair 5-12 Swings Lake View2 Fair 5-12 2-5 Entire swing unit Sun View Poor(5-12) 5-12 2-5 Seely Fair 2-5, swings 5-12 Talbertz Fair 5-12, swings 2-5 Perry Fair Swings 2-5, 5-12 Booster Poor - 5-12, swings HCP Picnic Shelters* Poor 5-12, swings 2-5 HCP Slater* Poor - 2-5, 5-12, swings Pattinson* Poor(5-12) - 5-12 * HIGH-USE PARK EMPTY PLAY AREA 1. Empty Node Within Tot Lot 2.Separate Play Area - No Equipment Oak View 17261 Oak Lane Condition: POOR High Use: Yes ADA: Yes ISSUES: • Rubber surfacing needs patching. • Approach steps, transfer stations, hand rails, stairs, climbers rusted and corroded beyond repair • Slides cracked • Hanger clamps broken • Multiple missing rivets • All plastic worn with graffiti/etching _ f u Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $.40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (950 SF) $2 9,184 Full (5,521 SF) $169,605 TOTAL COST FOR EQUIPMENT & SURFACING Partial $137,284 Full $2 77,705 Seabridge 16252 Countess Drive Condition: POOR High Use: Yes ISSUES: • ADA: No. Needs rubber surfacing. • All play units have been removed � 4 x t }. a x Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (660 SF) $2 0,2 7 5 Full (5,565 SF) $170,959 TOTAL COST FOR EQUIPMENT & SURFACING Partial $128,3 75 Full $279,059 HCP Lower Lake 18000 Goldenwest St. Condition: POOR High Use: Yes ADA: Yes ISSUES: • All play units have been removed . tip`"^^•,+.�. �� � Y Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (921 SF) $28,293 Full (4,157 SF) $12 7,70 3 TOTAL COST FOR EQUIPMENT & SURFACING Partial $136,393 Full $235,803 Edison 21377 Magnolia St. Condition: POOR High Use: Yes ADA: Partial ISSUES: • Rubber surfacing needed for older units. • Steps and slides rusted and cracked. • Bucket swings and hardware damaged. • Crawl tube flange warped. W; k j: � f r o i i 4 W P Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (890 SO $2 7,340 Full (4,567 SF) $140,298 TOTAL COST FOR EQUIPMENT & SURFACING Partial $135,440 Full $248,398 Eader 9281 Banning Ave. Condition: POOR High Use: No ADA: Partial ISSUES: • Rubber Surfacing: Needed at 2-5 unit. • Railings, steps, platforms rusted. • Tube slides cracked and vandalized. • Bucket swings and hardward damaged. { s w s . 4 a f� z Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (953 SF) $29,276 Full (8,536 SF) $262,225 TOTAL COST FOR EQUIPMENT & SURFACING Partial $13 7,3 76 Full $370,325 Bushard 9691 Warburton Drive Condition:POOR High Use: No ISSUES: • ADA: No. Need rubber surfacing. • All swing hardware need to be replaced. • Transfer station rusted/corroded. • 36" wide slide cracked. E; Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (327 SF) $10,045 Full (1,928 SF) $59,228 TOTAL COST FOR EQUIPMENT & SURFACING Partial $118,145 Full $167,328 Circle View 15720 Willett Lane Condition: Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • Steps rusted/exposed metal. • 72" corckscrew exposed footing. x •T Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (139 SF) $4,270 Full (1,725 SF) $52,992 TOTAL COST FOR EQUIPMENT & SURFACING Partial $112,3 70 Full $161,092 Drew 20252 Cape Cottage Lane Condition: Fair High Use:No ISSUES: • ADA: No. Needs rubber surfacing. • Transfer station rusted/corroded. • 36" wide slide cracked. • 360 slide exposed footing. y x �\ vj s . g Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (406 SF) $12,472 Full (2,414 SF) $74,158 TOTAL COST FOR EQUIPMENT & SURFACING Partial $120,5 72 Full $182,258 Glen View 6721 Glen Drive Condition: Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • All belt swings and hardware need to be replaced. • 48" slide missing. Estimated Costs to Replace Existing Playground Equipment Incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (357 SF) $10,967 Full (1,978 SF) $60,764 TOTAL COST FOR EQUIPMENT & SURFACING Partial $119,067 Full $168,864 Haven View 16041 Waikiki Lane Condition: Fair High Use:No ISSUES: • ADA: No. Needs rubber surfacing. • 48" tube slide and 36" wide glide slide needs to be replaced. s . I a +r - Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (208 SF) $6,389 Full (4,520 SF) $138,854 TOTAL COST FOR EQUIPMENT & SURFACING Partial $114,489 Full $246,954 Langenbeck 8721 Suncoral Drive Condition: Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • 360 slide cracked at base. • Swings need to be replaced. • Slide pole railing is rusted. • 48" tube slide cracked. • 36, slide bracket is non compliant. r a f c A. y s Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (300 SO $9,216 Full (2,624 SO $80,609 TOTAL COST FOR EQUIPMENT & SURFACING Partial $117,316 Full $188,709 LeBard 20461 Craimer Lane Condition: Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • 36" slide, 48" slide cracked. • Transfer stations, slide pole railing and climber rusted and corroded. 3 h Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (565 SF) $17,356 Full (8,696 SF) $267,141 TOTAL COST FOR EQUIPMENT & SURFACING Partial $12 5,456 Full $375,241 Newland East 19702 Topeka Lane Condition: Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • 36" slide cracked and rusted. • Transfer station rusted and corroded. r� 15 t; xa a c- g S s ! . N r Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (376 SF) $11,550 Full (6,129 SF) $188,282 TOTAL COST FOR EQUIPMENT & SURFACING Partial $119,650 Full $296,382 Pleasant View 16650 Landau Lane Condition: Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • 4' oval crawl tube damaged with etching. • Beanstalk climber bent and rusted. • Tic tac toe damaged panel. • 48" and 36" slides cracked. • Transfer station rusted. a ,t Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (437 SF) $13,424 Full (7,005 SF) $215,193 TOTAL COST FOR EQUIPMENT & SURFACING Partial $121,524 Full $323,293 Robinwood 5180 McFadden Avenue Condition: Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • Transfer station rusted and cracked. • All hardware on swing set needs to be replaced. i i t f alll Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (375 SF) $11,520 Full (5,224 SF) $160,481 TOTAL COST FOR EQUIPMENT & SURFACING Partial $119,620 Full $268,581 Schroeder 6231 Cornell Drive Condition: Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • Deck rusted. • 36"/48" slides and approach steps cracked. • All hardware on swing set needs to be replaced. k e f _ IIII f Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (774 SF) $23,777 Full (4,932 SF) $151,511 TOTAL COST FOR EQUIPMENT & SURFACING Partial $131,877 Full $2 59,611 Marine View 17442 Frans Lane Condition: Good High Use:No ISSUES: • ADA: No. Needs rubber surfacing. • 36" slide, 48" slide cracked. • Transfer stations, slide pole railing and climber rusted and corroded. t a Sb ' a 9 Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (539 SF) $16,558 Full (5,516 SF) $169,451 TOTAL COST FOR EQUIPMENT & SURFACING Partial $124,658 Full $277,551 Arevalos 10441 Shalom Drive Condition: Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • Transfer stations rusted and corroded. �r la i ri%♦ - - w =a. Y w�* AW Estimated Costs to Replace Existing Playground Equipment Incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (123 SO $3,778 Full (885 SO 527,187 TOTAL COST FOR EQUIPMENT & SURFACING Partial $111,878 Full $135,287 Lake View 17461 Zeider Lane Condition: Fair High Use: No ADA: Partial ISSUES: • Rubber Surfacing: Needed at 5-12 unit. • 36" and 48" slides cracked/damaged. • Transfer station and stair railing rusted. it 3 Y 4 ,I I {a t _ a III 1Mil +C.4:-"" Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (516 SF) $15,851 Full (7,786 SF) $239,203 TOTAL COST FOR EQUIPMENT & SURFACING Partial $123,951 Full $34 7,303 Sun View 16192 Sher Lane Condition: Poor High Use: No ADA: Partial ISSUES: • Rubber Surfacing: Needed at 5-12 unit. • 36" and 48" slides burned, cracked and damaged. • Steps and surfaces are worn, chipped and etched. • Approach steps rusted. i Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (400 SO $12,288 Full (2,295 SO $70,502 TOTAL COST FOR EQUIPMENT & SURFACING Partial $120,388 Full $178,602 Seely 8711 Surfcrest Drive Condition: Fair High Use: No ADA: Partial ISSUES: • Rubber Surfacing: Needed at 2-5 unit. 5-12 needs patching. • Railing rusted. • 48" slide cracked. a mt i • r i w 4. ai a, Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (542 SF) $16,650 Full (4,587 SF) $140,912 TOTAL COST FOR EQUIPMENT & SURFACING Partial $124,750 Full $249,012 Talbert 19222 Magnolia Street Condition: Fair High Use: No ADA: Partial ISSUES: • Rubber Surfacing: Needed for combo unit. • 48" tube slide cracked. • 36" steps, pipe wall barriers and transfer stations rusted. X. I Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (587 SF) $18,032 Full (5,121 SF) $157,317 TOTAL COST FOR EQUIPMENT & SURFACING Partial $126,132 Full $265,417 Perry 8152 Deauville Drive Condition: Fair High Use: No ADA: Partial ISSUES: • Rubber Surfacing: Needed for swings. • Transfer station rusted and broken coating. • 36" and 48" slides cracked and damaged. �y r Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (958 SF) $29,429 Full (6,426 SO $197,406 TOTAL COST FOR EQUIPMENT & SURFACING Partial $13 7,529 Full $305,506 Booster 16861 Baruna Lane Condition: POOR High Use: No ADA: Yes ISSUES: • Rubber Surfacing: Cracked and uneven from tree roots. • Transfer station and chain climber rusted and broken coating. • 36" and 60" slides cracked and damaged. • Hardware (nuts and bolts) rusted and corroded. .z Aft i I Is � o w y a Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (1,022 SF) $31,395 Full (2,343 SF) $71,976 TOTAL COST FOR EQUIPMENT & SURFACING Partial $139,495 Full $180,076 HCP Picnic Shelters 18000 Goldenwest St. Condition: POOR High Use: Yes ADA: Yes ISSUES: • Leaf climber chipped. • Platform, hand rails transfer station, approach step, barrier railings rusted. • 9', 36" and 48" slides rusted. s Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (536 SF) $16,465 Full (3,753 SF) $115,292 TOTAL COST FOR EQUIPMENT & SURFACING Partial $124,565 Full $223,392 HCP Slater 18000 Goldenwest St. Condition: POOR High Use: Yes ADA: Yes ISSUES: • Steps, 48" and double slides cracked. • Stair railing, transfer station and approach steps rusted. r- J ")ii[lmiilll r m Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (839 SF) $25,774 Full (3,744 SF) $115,015 TOTAL COST FOR EQUIPMENT & SURFACING Partial $133,874 Full $223,115 Pattinson 6200 Palm Avenue Condition: POOR High Use: Yes ADA: Yes ISSUES: • Rubber Surfacing: Needs patching throughout • Platforms, 36" deck, chains and attachment points rusted. • Plastic steps needs to be replaced. • Large tube slide cracked. Am I� ? f f l r s � h v i' Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial N/A Full (6,432 SF) $197,591 TOTAL COST FOR EQUIPMENT & SURFACING Partial N/A Full $305,691