File #: 18-036 MEETING DATE: 6/4/2018
REQUEST FOR CITY COUNCIL ACTION
SUBMITTED TO: Honorable Mayor and City Council Members
SUBMITTED BY: Fred A. Wilson, City Manager
PREPARED BY: Travis K. Hopkins, PE, Director of Public Works
Subject:
Accept the Sewer Service Fund Performance Audit for Fiscal Year 2017-18
Statement of Issue:
The Sewer Service Fund Annual Performance Audit is presented to the City Council as required by
HBMC Section 14.54.070.
Financial Impact:
Not Applicable
Recommended Action:
Accept the Sewer Service Fund Annual Performance Audit for Fiscal Year 2017-18
Alternative Action(s):
Do not accept the Sewer Service Fund Annual Performance Audit for Fiscal Year 2017-18 and direct
staff to make specific modifications.
Analysis:
The Sewer Service Fund is designated solely for facilities and resources relating to the rehabilitation,
replacement, repair and maintenance of City-owned sewers and lift stations. This is in accordance
with California Health and Safety Code Section 5470, and is included as Chapter 14.54 in the HBMC.
Section 14.54.070 Annual Program Review of the HBMC requires an annual review and performance
audit of the Sewer Service Fund by the Public Works Commission. The audit was presented to the
Commission at the May 16, 2018, meeting. The Commission voted to recommend that that the City
Council receive and file the Sewer Service Fund Performance Audit in accordance with HBMC
Section 14.54.070 for Fiscal Year 2017/18. The report has been amended to reflect the final audited
figures as reflected in the FY 2016-17 Comprehensive Annual Financial Report.
Per the aforementioned section of the HBMC, "the City Council shall receive, at a regularly scheduled
meeting, the recommendations of the Public Works Commission concerning fees, rates and charges
proposed to be modified or added to the Sewer Service User Charge." The public hearing
addressing the proposed changes to both the water and sewer service charges was held on March
19, 2018. The City Council adopted the Sewer Service User Charges at the April 2, 2018 regular
City of Huntington Beach Page 1 of 2 Printed on 5/31/2018
powe ea cy Legis4a `l
File #: 18-036 MEETING DATE: 6/4/2018
meeting.
Environmental Status:
Not applicable
Strategic Plan Goal:
Enhance and maintain infrastructure
Attachment(s):
1. Fiscal Year 2017-18 Sewer Service Fund Performance Audit
City of Huntington Beach Page 2 of 2 Printed on 5/31/2018
p;3we+0 bit�E;:ji9i83""rn
City of Huntington Beach
Public Works Department
Sewer Service Fund Performance Audit
Review of Fiscal Year 2017118
Introduction
On September 4, 2001, the Huntington Beach City Council adopted a Sewer Service
User Charge and created the Sewer Service Fund. The Sewer Service Fund revenue is
designated solely for the rehabilitation, replacement, repair and maintenance of City-
owned sewers and lift stations. This is in accordance with the California Health and
Safety Code Section 5470, and is included in the ordinance that adds Chapter 14.54 to
the Huntington Beach Municipal Code. The ordinance established the Huntington
Beach Public Works Commission as both the oversight committee and the final appeals
board.
The Sewer Service Fund shall be subject to an annual review and performance audit by
the Public Works Commission. The information presented in this report complies with
Section 14.54.070 Annual Program Review. In addition, the City Council shall receive,
at a regularly scheduled meeting, the recommendations of the Public Works
Commission concerning fees, rates and charges proposed to be modified or added to
the sewer service user charge. A public hearing on proposed charges was held in April
as part of a Proposition 218 protest hearing to reaffirm the current rate adjustment
structure.
Program Overview
➢ Scheduled maintenance projects and minor emergency repairs will be completed
within the allotted budget.
y Closed Circuit Television (CCTV) Inspection and cleaning of sewer mains.
r Operations and maintenance of the City's 27 sewer lift stations.
➢ Capital improvements including lift station design and construction work and the
sewer lining program.
➢ A Sewer Lateral Program was added effective January 3, 2008, and the sewer
service charge was adjusted to cover the projected expenses. The program
transferred the responsibility to the City for sewer lateral repairs within the City-
owned right-of-way. Initially, the cost of the program exceeded the additional
revenue generated by the adjustment to the sewer service user charge. Costs
for this program have decreased significantly since its inception.
May 2018 - 1 -
-37-
➢ The City Council adopted a reserve policy for enterprise funds in FY 14/15. The
reserve policy for the Sewer Service Funds states that the City will maintain a
reserve equal to the sum of the following:
o Operations and Maintenance: Thirty-three percent (33%) of the adopted
annual budget to ensure adequate working capital for operating expenses.
This amount is $2.6 million.
o Capital Improvement Program (CIP): One-hundred percent (100%) of the
average annual planned Capital Improvement Program for the following
five years. This amount is $2.65 million.
o Emergency: an amount equal to the estimated cost, as determined by the
City Engineer, to replace one sewer lift station. This amount is $3.3
million.
o The total reserve would amount to $8.55 million.
➢ The Municipal Code states that the Consumer Price Index for Urban Consumers
(CPIU) in Los Angeles, Orange, Riverside Counties established by the Bureau of
Labor Statistics for the year over year for the month of November shall be used
to calculate adjustments to sewer service rates. This was amended by City
Council in April 2017 due to the change in the City's fiscal year.
Review of Fiscal Year 2017/18
Fiscal Year 2017/18 is only nine months due to the change from an October 1-
September 30 fiscal year to a July 1-June 30 fiscal year. Personnel and operating
expenditures account for approximately seventy percent (70%) of the Fiscal Year
2017/18 Sewer Service Fund budget and are directed toward preventative and routine
maintenance. The budget includes salaries and benefits, sewer line maintenance,
CCTV pipeline and lateral inspection, lift station services, manhole upgrades, the sewer
lateral program and cost allocation charges to the City's General Fund. The balance of
the expense budget is earmarked for capital equipment replacement and capital
projects, including slip lining, pipeline rehabilitation, and lift station replacement. In
general, the Sewer Maintenance Section of the Utilities Division expends the operating
and equipment replacement budgets, and the Engineering Division is responsible for
the implementation of capital projects.
Sewer Lift Station: A construction contract for the Edgewater Sewer Lift Station was
awarded with construction to begin before the end of FY 2017/18.
Maintenance Activities: Totals for various maintenance activities are presented below.
CCTV Inspection: The sewer system is inspected through the use of Closed Circuit
Television inspection. A contractor was employed during this last fiscal year to video
inspect portions of the sewer system's main collection lines located in the City's
May2018 -2-
-38-
arterial and high traffic volume streets. City crews video inspect the sewer mains
located in residential areas and low traffic volume streets.
Sewer Line Maintenance
Routine cleaning of 377,743 linear feet of sewer pipe.
Removal of 3,125 pounds of debris/grit during routine cleaning.
Cleaned 225 enhanced cleaning areas (areas of sewer line cleaned from two
times to twelve times per year) for a total of 322,870 linear feet through June.
The Fats, Oils and Grease (FOG) program has cleaned 7,400 linear feet of
sewer line around food service establishments and other areas with high grease
concentrations.
➢ Sewer lateral repair program received and resolved 141 requests for repair to
date.
➢ Inspected via Closed Circuit Television (CCTV) 86,071 linear feet of residential
sewer lines and arterial mains.
Manhole Maintenance
➢ Cleaned and inspected 1,925 manholes.
Repaired and recoated 7 manholes.
➢ Sprayed insecticide for roaches in 250 manholes.
➢ Projected installation of 20 Smart covers at various locations.
Sewer Lift Station Maintenance
➢ Inspected 27 lift stations three times a week and cleaned each station every two
months.
➢ Cleaned and inspected the check valves at 24 sewer lift stations for a total of 54
separate check valves.
Cleaned 28 wet wells.
Replaced 1 check valve.
➢ Replaced 3 gate valves.
Disassembled and rebuilt 1 sewer pump.
➢ Cleaned 51 sewer lift station wet wells.
Replaced 2 transducers.
➢ Replaced 4 motors.
➢ Replaced 1 impeller.
May 2018 -3-
-39-
Sewer Lateral Program
Under the Sewer Lateral Program, the City assumed responsibility for the repair of all
sewer laterals from the City-owned sewer main through the public right-of-way to the
private property line. The property owner remains responsible for all costs of repair and
maintenance of that portion of the sewer lateral on private property. This program is
response driven as all work orders are generated in response to calls from residents
and businesses. Expenditures on the Sewer Lateral Program have decreased
significantly since the program was initiated in Fiscal Year 2008/09.
Staff had previously budgeted for the Sewer Lateral Program based on the expenditures
in the first two years of the program. However, following reductions in calls after the first
three fiscal years of the program, staff reduced the budget. As a response based
program, demand is unpredictable.
Sewer Lateral Expenditures
$2,500,000
$2,000,000
3
i
$1,500,000 __.___ _ _________.____.._______ ......_.
I
3
$1,000,000
$500,000 — — --
3
$0 ...,..... ... _....._ ........
2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18*
*FY 17/18 Expenditures are projected for the nine month fiscal year
May 2018 -4-
-40-
Projected FY 2017118 Expenditures
Original
Personnel Budget Revised Budget* Projected
Salaries, Permanent $2,117,425 $1,588,069 $1,313,173
Salaries, Temporary $45,000 $33,750 $11,533
Salaries, Overtime $100,000 $100,000 $85,330
Benefits $1,335,488 $1,001,513 $872,847
Total Personnel $3,597,913 $2723,332 $2,282,883
Operating
Utilities $130,800 $98,300 $78,304
Equipment and Supplies $324,200 $317,173 $128,871
Repairs and Maintenance $1,690,000 $1,315,730 $705,038
Conferences and
Training $21,500 $22,254 $29,757
Professional Services $250,000 $501,948 $171,172
Rental Expense $5,000 $7,000 $0
Interdepartmental
Charges $1,721,100 $1,240,686 $1,240,686
Expense Allowance $5,800 $4,350 $4,350
Total Operating $4,148,400 $3,507,441 $2,358,178
Capital
Vehicles $0 $130,226 $129,924
Total Capital $0 $130,226 $129,924
CIP
Improvements $1,580,000 $4,749,150 $480,194
Total CIP $1,580,000 $4,749,150 $480,194
Total $9,326,313 $11,110,149 $5,251,179
"Revised budget prorated due to shortened fiscal year; carry-over encumbrances from prior fiscal year
also included in revised budget
May2018 -5-
-41-
FY 2017118 Projected Revenues
Source FY 16/17 FY 17/18
Actual Projected
Customer Charges $10,836,845 $8,450,000
Interest $85,067 $304,772
Other $17,504 $32,467
Total $10,939,416 $8,787,239
Projected FY 2017118 Fund Balance
Beginning Balance 10/1/2017 $18,275,807
Projected Revenues FY 17/18 $8,787,239
Projected Expenditures FY 17/18 ($5,251,179)
Projected End Balance 6/30/2018 $21,811,867
Proposed FY 2018/19 Budget
Sewer Service User Charge Adjustments
In accordance with Section 14.55.030 Annual CPIU Adjustments, each Sewer Service
User Charge shall be adjusted to reflect the annual percentage adjustment in Consumer
Price Index for all Urban Consumers (CPIU) in Los Angeles, Orange and Riverside
Counties established by the U.S. Bureau of Labor Statistics for the year over year
change in the month of November. The purpose for annual adjustment of the rates is to
ensure that the revenues continue to fully fund the needs of the program.
To accommodate the billing system, all service charge rates are calculated to four
decimal places, and charged on a daily factor. The daily factor converts the monthly
charge based on a 365-day year. This is a modification from the initially adopted rate
schedule. The customer's bill reflects a charge based on the number of days between
meter readings. A resolution was adopted by the City Council to authorize the daily rate
methodology.
The percentage adjustment in the CPIU for November 2017 was 3.6%. This
percentage adjustment was adopted by the City Council at a public hearing in April
May2018 -6-
-42-
2018. The City Council also discontinued the high consumption commercial/industrial
category, moving those customers into regular commercial industrial, due to the
difficulty of administering those accounts and the small number of those customers.
The following table shows the 3.6% increase. For purposes of comparison, the rates
represent a monthly charge.
Effect of CPI Adjustment on Current Sewer Service Charge
Current With CPI
Customer Category Charge Type Unit Charge Increase
Residential: Single-family & Flat rate for all customers in per unit $10.9596 $11.3541
townhouses with individual category per
meters month
Apartment: All apartments, Flat rate for all customers in per unit $9.0910 $9.4183
mobile homes and townhouses category per
served by common meters month
Regular Flat rate amount per Equivalent per EDU $12.7191 $13.1770
Commercial/Industrial: Most Dwelling Unit(EDU). EDU per
businesses, including private refers to either(1) the capacity of month
schools a customer's water meter in
comparison to a standard % inch
meter, or(2) the number of
tenant units that receive water
service through the water meter,
whichever is greater
High-Consumption Flat rate per hundred cubic feet per CCF $2.3799 discontinued
Commercial/Industrial: (CCF) of estimated sewer per year
Businesses with high water discharge
consumption relative to their
meter size
Public Schools: All public K-8 Flat rate per student per year High $3.5004 $3.6264
and high school districts with with a different rate per student School
schools in the City for K-8 and for high schools per ADA
per year
ADA-Average Daily Attendance K-8 $2.2541 $2.3352
per ADA
per year
May2018 -7-
-43-
FY 2018119 Proposed Budget
Personnel
Salaries, Permanent $2,012,367
Salaries, Temporary $55,450
Regular Overtime $82,500
Benefits $1,311,194
Total Personnel $3,461,511
Operating
Utilities $110,000
Supplies $348,350
Repairs and Maintenance $1,753,000
Conferences and Training $24,000
Professional Services $250,000
Rental Expense $3,500
Cost Allocation $1,772,723
Auto Allowance $5,800
Total Operating $4,267,373
CIP (new)
Lift Station (Saybrook) $1,000,000
Sewer Lining $500,000
Residential Zone Maintenance $30,000
Total CIP $1,530,000
TOTAL $9,258,884
FY 2018119 Proposed Revenue
Customer Charges $11,417,250
Interest $180,000
Other $20,000
Total $11,617,250
May2018 -8-
-44-
FY 2018119 Projected Fund Balance
Projected Beginning Balance 7/1/2018 $21,811,867
Projected Revenues FY 18/19 $11,617,250
Proposed Expenditures FY 18/19 ($9,258,884)
Anticipated Carry-Over Expenses ($2,820,625)
Projected End Balance 6/30/2019 $21,319,608
FY 2018119 Capital Projects
Lift Stations: A construction contract for the Slater Lift Station will be awarded. Funds
for the design of the Saybrook Lift Station are included in the budget request.
Sewer Lining: Sewer lining in the amount of$500,000 is programmed in FY 2018/19. A
lining project is bid once a sufficient number of sewer defects are identified as part of
the CCTV inspection program.
May2018 -9-