Loading...
HomeMy WebLinkAboutStudy Session #1 - Public Works Department FY 2019/2020 Capi CITY OF HUNTINGTON BEACH Su ity � PUBLIC WORKS DEPARTMENT FY 2019/2020 SUPPLEMENTAL CAPITAL I M PROVEM ENT PROGRAM (CI P) t 1 e p 1 COMMUNICATION MOGi 1Date: Agenda _ R a m K `x- p�,_t�e�. Ell J_._. ...... ,:,.: TREE .. 7 MAINTENANCE Ana � F s s F } a" lk ORMt Ib IN Su ity 18/19 SUCCESSESfint iL° STRATEGIC PLAN GOAL �N INFRASTRUCTURE�N NATIONAL PUBLIC WORKS WEEK ii: Su .. OPEN HOUSE AT SURF CITY NIGHTS H SERVING WITH PRIDE-SINCE 1909 HUNTINGTON BEACH PUBLIC WORKS DEPARTMENT r , w •� - x �" untingtoa6exchcx,So -��^u �� C�1Y otw :,, r 1 18/19 ACCOMPLISHMENTS PARKS & BEACHES Central Park Improvements � Parking Lot at Shipley Pathways ' rrigation Sports Complex Turf Replacement Beach Showers Replacement 18/19 ACCOMPLISHMENTS STREETS Rehab 4 miles of arterials - = Heil/Slater/Indianapolis Atlanta/Edinger underway Award Algonquin/Delaware/Edinger s _ Zone 1 (Done), 6 (Underway) Overlay 15 miles of residential _ streets Slurry 14 miles of residential streets - ' y - - ---- azr, New ADA ramps 18/19 ACCOMPLISHMENTS ' SEWER Edgewater LS under construction WATER Well 9 Treatment project ,f CAPITAL IMPROVEMENT PROGRAM (CIP) II : Approximately $50M in New Projects • DRAINAGE / WATER QUALITY SEWER • FACILITIES STREETS AND �� �► NEIGHBORHOOD TRANSPORTATION ' PARKS AND BEACHES WAT E R k%"s FY 19/20 CIP BUDGET II: Budget New Appropriations: $49.91VI Continuing Appropriations: 2.5M Total $52.41VI Funding sources include: General Fund Enterprise Funds (Water and Sewer) S clal Revenue Funds (Measure M, Gas Tax, Prop 42, RMRA, AQMD. Park) Grants (Federal. State, & OCTA) Bonds (Preliminary Estimate $20M for PD Modernization Project) Su 'ity H Bcxh' 1 DM RMRA Park Funds Water Funds 7% 8% Gas Tax/Prop 42 9% 7% Infrastructure Funci. 6% Sewer Fund 10% Measure M 3% Grants/Other 50% ity FACILITIES AND FLEET I N FRASTRUCTU RE II: 825 Pieces of Fleet Inventory 11 Fuel Islands � � with 19 Dispensers � dr. 16 Underground Fuel Tanks 300+ Facilities/Structures 11 FACILITIES $22.8M Downtown Fiber Expansion Project $765k PD Building Renovation $20M Central Library Tabby Theater Imp. $50k Central Library Main Theater Imp. $90k Lake Fire Station Renovation $1 .5M PTL Yard Asbestos Abatement $250k 1 NEIGHBORHOOD INFRASTRUCTURE 316 Miles of Residential Streets 33 Miles of Alleys (HB to Yosemite) �` '-- 632 Miles of Sidewalk/Parkway (HB to Provo Utah) NEIGHBORHOOD $4.2M II : Residential Overlay-Zone 9 $3. 1 M Residential Curb Ramp—Zone 9 $800k Glen Mar Frontage Landscape $50k Concrete Replacement $250k Before After T PARKS AND BEACHES $4. 5M Bartlett Park Improvements $350k ' Lake Park Improvements $600k Playground Equipment Improvements $580k Sports Complex Turf Fields $240k Central Park Restrooms $350k Murdy & Edison Comm. Center Imp. $2 M Blufftop Railing Replacement $100k Central Park Improvements $250k City Boat Docks Rehabilitation $50k SEWER INFRASTRUCTURE Su� ity `• II. 52,000 ,' Service Laterals :=, ° . � iphons a CCTV Sewer Mains �P ' `�,. ''�'� .fit"►:` ~+� 27 Lift Stations 2.3 Miles of Force 7,678 Manholes 360 Miles of Pipelines Mains All sewage delivered to OCSD 16 SEWER IMPROVEMENTS $5 .OM = Sewer Lift Station Improvements $4 . OM Saybrook LS Sewer Lining — Various Locations $ 1 . OM `f Se' er Lift Station Sewer Lining . 17 STREET INFRASTRUCTURE II: . Y 200 Miles of Sidewalk and Parkways (HB to San Luis Obispo) 100 Miles of Arterial Streets r (HB to Ventura) 494301000 SF of AC Parking Lot STREETS & TRANSPORTATION $9.4M II: v r Arterial Rehabilitation $5. 1 M Slater, Atlanta, Newland, Graham, Atlanta, Garfield, Talbert, & Brookhurst Bridge Rehabilitation $3.5M Admiralty Bridge Arterial Rehab — Before Arterial Rehab — After +i. 1 Si STREETS & TRANSPORTATION (CONT.) -71 CandWim M PMW Su How are we doing? �W41 DID YeGood (75-85) ar Nor nlrl 2018 "MEN Expect Condition to improve due to new SB1/RMRA (Gas Tax) Fiscal Y S4 5M MPAH.$2 5M Local TRANSPORTATION INFRASTRUCTURE 143 Signalized I 3,765 Park, Parking Lot, and Intersections Street Lights 78 Miles of Bike Lanes 19 Miles of Bike/Pedestrian Paths 21 ROADWAY INFRASTRUCTURE II: 100 Miles of 440 W, 33 Miles of Alleys Arterial Streets (HB to Ventura) _ =_ 316 Miles of Residential f Streets (HB to Bishop) 4,430,000 SF of AC Parking Lot STREETS & TRANSPORTATION (CONY.) Downtown Street Lighting $592k Warner/Graham TS Mod . $180k Warner/Nichols TS Mod. $15k WATER INFRASTRUCTURE !�= 4 Reservoirs 10 Wells (8 Active) 55 MG Storage = 3 MWD Import Connections 611 Miles of Large &Tr -- +�-- - Distribution Mains --�i �, 3 Zone 1 Boosters ,. .► ` ��. �� 2 Zone 2 Boosters . ..i r / 24 WATERINFRASTRUCTURE h« > .-MEW" W11 , , Pr- 53,091 Meter Connections 17,749 20 Miles of Shared Control Valves Transmission Mains (OC-9, OC-35 and OC-44) 3 Emergency Connections 5,801 (Fountain Valley, Seal Public Hydrants Beach, Westminster) 25 WATER IMPROVEMENTS $4.OM u: OC44 Slip Line Project $ 1 .4M Water Main Replacements $2.2M Water Distribution Imp. (Design) $ 100k Well 6 Treatment (Design) $250k Peck Reservoir Replac. (resign) $20k Reservoir Seismic Imp. (Design) $20k Reservoir Security Imp. (resign) $50k UNFUNDED/DEFERRED PROJECTS USING GENERAL FUNDS $6.4M in new projects requesting General Fund submitted $3. 1 M Funded $140M in deferred projects Drainage $15M Streets and Facilities $107M Transportation $4M Alleys/Concrete $12M Parks/Beaches $2.5M PUBLIC WORKS COMMISSION -moo March 20 PWC recommended CC approve the FY 19/20 CIP Additional recommendation to include a shooting range in the Police Modernization Project THANK YOU II: QUESTIONS? V 4' VIIIII Ill III!,I"' JAJ. 1111111111 l WIll 111111111111isII Ill Ali I k 1 ,,