HomeMy WebLinkAboutElecnor Belco Electric, Inc. - 2019-05-20 (2),61= .,�. City of Huntington Beach File #: 19-381 MEETING DATE: 5/20/2019 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Lori Ann Farrell Harrison, Interim City Manager PREPARED BY: Travis K. Hopkins, PE, Director of Public Works Subiect: Accept bid and authorize execution of a construction contract with Elecnor Belco Electric, Inc. in the amount of $320,055 for the traffic signal modification at the intersection of Gothard Street and Center Avenue - CC-1489; and, appropriate Traffic Impact funds for construction and authorize change orders not to exceed 15 percent Statement of Issue: On November 8, 2018, bids were opened for the traffic signal modification at the intersection of Gothard Street and Center Avenue. City Council action is requested to award the contract to Elecnor Belco Electric, Inc., the lowest responsive and responsible bidder. Financial Impact: The total estimated project cost is $531,154. Grant funds expenditures to date total $1,781 and matching fund expenditures to date total $1,299. Funds in the amount of $459,573 are available in HSIP Grant account 99590003.82700. Funds in the amount of $23,292 are available in Gas Tax account 20790046.82600 for a portion of the City's match. For the remaining match, staff is requesting an appropriation of $45,209 from the undesignated Traffic Impact Fee (TIF) fund balance to account 20690007.82700. The additional funds over the construction contract costs will be used for city -furnished equipment purchases and costs not reimbursable through the grant program. Recommended Action: A) Accept the lowest responsive and responsible bid submitted by Elecnor Belco Electric, Inc. in the amount of $320,055; and, B) Appropriate $45,209 from the undesignated Traffic Impact Fee fund balance to Traffic Impact Fee account 20690007.82700; and, C) Authorize the Mayor and City Clerk to execute a construction contract in a form approved by the City Attorney; and, City of Huntington Beach Page 1 of 4 Printed on 5/15/2019 ,V_ . a371 Le .',starT File #: 19-381 MEETING DATE: 5/20/2019 D) Authorize the Director of Public Works to execute change orders not to exceed a total of 15 percent of the contract construction costs or $48,008. Alternative Action(s): Reject all bids and provide staff with alternative direction. Analysis: The City applied for grant funding for a traffic signal modification under the federal Highway Safety Improvement Program (HSIP). The intersection of Gothard Street and Center Avenue was identified for the installation of north -south left turn arrows based on the recent collision history. The grant application was approved and engineering and construction funds were subsequently approved. The project was included in the FY 2018/19 Capital Improvement Program as a continuing project. Due to construction cost increases and the significant increase in material costs, especially steel products, the originally budgeted funds are not adequate to complete construction. The federal funding commitment increased by $103,854 to a total of $461,354, and additional local funding is needed to fully fund the improvements. The improvements at the intersection of Gothard Street and Center Avenue include replacement of most major traffic signal components, the addition of left turn arrows for northbound and southbound traffic, the reconstruction of curb ramps, the reconstruction of the Golden West College driveway to provide for pedestrian accessibility, and the installation of traffic signal interconnect cable along Gothard Street from McFadden Avenue to Edinger Avenue and along Center Avenue from Gothard Street to the traffic signal at One Pacific Plaza. A complete set of plans and specifications are available for review at the Public Works counter during normal business hours. Bids were opened on November 8, 2018, and are listed in ascending order: Bidder Submitted Bid 1 Elecnor Belco Electric, Inc. $320,055.00 2 Alfaro Communications Construction, Inc. $321,995.00 3 California Professional Engineering, Inc. $342,409.35 4 STL Landscape $343,749.00 5 Dynalectric $357,321.00 6 International Line Builders $386,760.00 7 Calpromax Engineering, Inc. $398,560.00 8 ISturgeon Electric $422,358.72 9 IDBX, Inc. $426,495.00 City of Huntington Beach Page 2 of 4 Printed on 5/15/2019 powereA LegistarTP File #: 19-381 MEETING DATE: 5/20/2019 The total estimated cost of this project is $531,154 which includes the City's direct purchase of all major equipment which is estimated at approximately $110,000. This practice ensures consistency of equipment among the traffic signals and street lighting maintained by the City. Direct purchase also provides the added benefit of reduced costs to the City due to elimination of contractor mark-ups, typically in excess of 20 percent on this type of equipment. Estimated Construction Costs Bid $320,055 15% construction contingency $48,008 City furnished equipment $110,000 Construction administration/material testing $53,091 Total $531,1.54 Federal grant funds totaling approximately $461,354 are anticipated to be received with a total of $69,800 of Gas Tax and TIF funds required to provide the grant matching funds and to fund the items ineligible for federal reimbursement. These ineligible items include some of the construction. Funding Summary Grant funds available $459,573 Grant funds encumbered or spent to date $1,781 Matching funds expended to date $1,299 Match available $23,292 Match appropriation required $45,209 Total estimated project cost $531,154 Staff is requesting that the Director of Public Works be given authorization to approve change orders on this project up to 15 percent of the construction cost rather than the standard 10 percent. The request equates approximately to the typical 10 percent contingency based on the total of the construction contract and the materials purchased by the City. This authorization will provide the added flexibility needed to complete a typical construction project yet still be consistent with the intent of the 10 percent limit. Public Works Commission Action: The Public Works commission recommended this project on May 16, 2018, by a vote of 4-0-3 (Carr, Mulvihill and Stanford absent). Environmental Status: This project is categorically exempt pursuant to the California Environmental Quality Act, Section 15303 (c). Strategic Plan Goal: Enhance and maintain infrastructure City of Huntington Beach Page 3 of 4 Printed on 5/15/2019 powereA LegistarT� File #: 19-381 MEETING DATE: 5/20/2019 Attachment(s): 1. Project Location Map. City of Huntington Beach Page 4 of 4 Printed on 5/15/2019 powereA4 , Legistar- Q� S V BOLSA AVE. c0 V) V) U) Q Mc FADDEN AVE. U EDINGER z N N AVE. J p OHEIL Q N � cn bi 0 Q > AVE. m m0� cn m m � Q � z = J Q N m WARNER bi W .o AVE. PACIFIC SLATER AVE. c� Q w m A TALBERT AVE. ELLIS AVE. > GARFIELD m s�. OCEAN V) V) RKTOWN AVE. V) 405 ADAMS AVE. INDIANAPOLIS AVE. Y o ¢ 0 0 TLANTA Q oz = AVE. m V)U � �w z HAMILTON m m AVE. y�'Jir BANNING • AVE.71 CITY OF HUNTINGTON BEACH VICINITY MAP GOTHARD STREET AND CENTER AVENUE ATTACHMENT 1 41 EflW /- /D/®✓/ii' PIJ8 - ) b I ll he 16// F/I? SECTION A 1 %5%l�? NOTICE INVITING SEALED BIDS for the construction of Traffic Signal Modification on Gothard St at Center Ave, and Interconnect Conduit Installation on Gothard St from Edinger Ave to McFadden Ave and on Center Ave from Gothard St to Huntington Village Dr. CC No. 1489 HSIPL-5181 (182) in the CITY OF HUNTINGTON BEACH PUBLIC NOTICE IS HEREBY GIVEN that the CITY OF HUNTINGTON BEACH, as AGENCY, invites sealed bids for the above stated projects and will receive such bids in the office of the City Clerk, Second Floor, 2000 Main Street, Huntington Beach, California 92648, up to the hour of 2:00 P.M. on November 8t1, 2018. Bids will be publicly opened in the Council Chambers unless otherwise posted. Copies of the Plans, Specifications, and contract documents are available from the Office of the Director of Public Works, 2000 Main Street, Huntington Beach, CA 92648, upon payment of a $20.00 nonrefundable fee if picked up, or payment of a $35.00 nonrefundable fee if sent by UPS ground delivery (bidder shall pay additional costs for special delivery). Plans, Specifications, and contract documents can be downloaded free on AGENCY website at: http://www.huntingtonbeachca.gov/government/departments/public works/Bids/ Open website, then click on "Current Advertised Projects" tab. This is a Davis -Bacon project and the Federal Regulations will be enforced. Any contract entered into pursuant to this notice will incorporate the provisions of the Federal Labor Standards, which are on file at the office of the Director of Public Works, 2000 Main Street, Huntington Beach, CA 92648. The AGENCY will deduct 5% retention from all progress payments. The Contractor may substitute an escrow holder surety of equal value to the retention in accordance with the provisions of the Public Contract Code, Section 10263. The Contractor shall be beneficial owner of the surety and shall receive any interest thereon. The AGENCY hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. No bid shall be considered unless it is prepared on the approved Proposal forms in conformance with the Instructions to Bidders as determined by the AGENCY. The bid must be accompanied by a certified check, cashier's check, or bidder's bond made payable to the AGENCY for an amount no less than 10% of the amount bid. The successful bidder shall be licensed in accordance with provisions of the Business and Professions Code and shall possess a State Contractor's License Class A at the time of the bid opening. The successful Contractor and his subcontractors will be required to possess business licenses from the AGENCY. All extension of unit prices will be subject to verification by the AGENCY. In case of a variation between the unit price and the extension, the unit price will govern. Project Description: The project consists primarily of modifying a traffic signal to provide left turn arrows, the reconstruction of an existing driveway and the installation of traffic signal interconnect conduit and cable. The contract shall allow the Contractor 60 working days to complete the contract. The Project Disadvantage Business Enterprises (DBE) goal is 14% The AGENCY reserves the right to reject any or all bids, to waive any irregularity and to take all bids under advisement for a maximum period of 60 days. BY ORDER of the CITY COUNCIL of the CITY OF HUNTINGTON BEACH, CALIFORNIA, the 4th day of June 2018, by Resolution No. 2018-34. Attest: /s/ Robin Estanislau CITY CLERK OF THE CITY OF HUNTINGTON BEACH Switzer, Donna From: David Ward <daward@scng.com> Sent: Thursday, October 04, 2018 10:39 AM To: Switzer, Donna Cc: Velasco, Fernando Subject: Re: NISB CC- 1489 Good morning Donna. Here is your first proof. Ad#11183960 Run Date 10/11, 10/18, 10/25 Cost $846 PROOF SECTION A NOTICE INVITING SEALED BIDS for the construction of Traffic Signal Modification on Gothard St at Center Avge,, and Interconnect Conduit Installation on Gothard St from Edinger Ave to McFadden Ave and on Center Ave from Gothard St to HuntingtonNo. illca Dr. 14 HSIPL-5181 (182) in the CITY OF HUNTINGTON BEACH PUBLIC NOTICE IS HEREBY GIVEN that the CITY OF HUN- T INGTON BEACH, as AGENCY, invites sealed bids for the above stated projects and will receive such bids in the office of the City Clerk, Second Floor, 2000.Main Street, Huntington Beach, California 92648, up to the hour of 2:00 PA,. on November 8th, 2016. Bids will be publicly opened in the Council Chambers unless otherwise posted. Copies of the Plans, Specifications, and contract documents are available from the Office of the Director of Public Works, 2000 .Viain Street, Huntington Beach, CA 92648, upon payment of a $20.00 nonrefundable fee if picked up, or payment of a $35.00 nonrefundable fee if sent by U PS ground delivery {bidder shall pay additional costs for special delivery}. Plans, Specifications, and contract documents can be downloaded free on AGENCY website at: http r':`www.huntinatonbeachc ggwaovernment;deoartments�public wor s, b�, - Open website, then click on "Current Advertised Proiects" tab. This is a Davis -Bacon proiect and the Federal Regulations will be en- forced. Any contract entered into pursuant to this notice will incorpo- rate the provisions of the Federal Labor Standards which are on file at the office of the Director of Public Works, 2000 Wain Street, Hun- tington Beach, CA 92648. The AGENCY will deduct 5% retention from all progress payments. The Contractor may substitute an escrow holder surety of equal value to the retention in accordance with the provisions of the Public Con- tract Code, Section 10263, The Contractor shall be beneficial owner of the surety and shall receive any interest thereon. The AGENCY hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in re- sponse to this notice and will not be discriminated against on the ba- sis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. No bid shall be con- sidered unless it is prepared on the approved Proposal forms in con- formance with the Instructions to Bidders as determined by the AGENCY. The bid must be accompanied by a certified check, cash- ier's check, or bidder's bond made payable to the AGENCY for an amount no less than 10°b of the amount bid. The successful bidder shall be licensed in accordance with provisions of the Business and Professions Code and shall possess a State Contractor's License Class A at the time of the bid opening. The successful Contractor and his subcontractors will be required to possess business licenses from the AGENCY. All extension of unit prices will be subject to verification by the AGENCY. In case of a variation between the unit price and the extension, the unit price will govern. Prolect Description: The proiect consists primarily of modi- ling a traffic signal to provide left turn arrows the recon- ruction of an a sting driveway and the installation of traffic signal Interconnect conduit and cable. The contract shall allow the Contractor 60 working days to complete the contract. The Project Disadvantage Business Enterprises ;DBE? goal is 14% The AGENCY reserves the right to reject any or all bids, to waive any irregularity and to take all bids under advisement for a maxi- mum period of 60 days. BY ORDER of the C IT" C04LQC IL of the CITY OF HUNTINGTON BE2 3H. CALI FORN IA, the day of June ZOii, by Resolution No. Attest; st Robin Estanislau CIT"CLERKOF THE CITY OF HUNTINGTON BEACH Published: Huntington Beach Wave Oct 11, 18, 25, 2018 11183960 David Ward Legal Advertising Rep 2190 S. Towne Centre PI. Anaheim, CA 92806 714-796-6764 daward@scng.com PLEASE NOTE THE E-MAIL ADDRESS HAS CHANGED SOUTHEnn CALIF0nnIA NEWS GROUP On Mon, Oct 1, 2018 at 2:11 PM Switzer, Donna <Donna.Switzer@surfcity-hb.org> wrote: Hi David, Please publish the attached NISB for CC-1489 three times, on October 11`h, 18th and the 25`h. Thank you so much and have a great week! DaV,na.SWXt er Deputy City Clerk City of Huntington Beach 2000 Main Street Huntington Beach, CA 92648 (714)3 74-1649 Donna. Switzerksurfcity-hb. org CITY OF HUNTINGTON BEACH PROJECT NAME: Traffic Signal Improvements at the intersection of Gotl CC#: CC-1489 BID OPENING DATE: 11/8/2018 TIME & LOCATION: 2PM, 2nd Floor, Clerk's Office ENGINEER'S ESTIMATE: $310,000.00 BIDS SUBMITTED (AS READ AT OPENING) BIDDER'S NAME FINAL RANK APPARENT BID AMOUNT ELECNOR BELCO ELECTRIC, INC. 320,055.ou INTERNATIONAL LINE BUILDERS PTM GENERAL ENGINEERING SERVICES, INC. DBX, INC. 2 JFL ELECTRIC; INC. EXCEL PAVING CALPROMAX ENGINEERING INC. 3 V DYNALECTRIC32 SELECT ELECTRIC INC CALIFORNIA PROFESSIONAL ENGINEERING, INC. 2 I E GENERAL ENGINEERING, INC. ALFARO COMMUNICATIONS CONSTRUCTION, INC ,_ 0` PTS 05172018 Version 15—CC 1489 RECEIVED RECEIVED 2818 NOY —8 Pej 11%glov —8 PM 2: 00 CITY CLEO! Co IT Y C L Ei—i K r' CITY OF CITY OF c=) 1 T 1,14 G T 0 0, 9 ia T$ T I N! G T 0 IN r? F U") > 00 uj CD sa '�71�-(u �;�n��,l m�ifiu�h�,�s M-1 �n�°�Y'C�crn����-'I- C�rn�l.u.i-�' (�'lSt� l 1 �h �� cM.J PL- 's (q) IS2) < CD 62 CD'on-�