HomeMy WebLinkAboutCity Manager's Report - Ascon Landfill Site Update and AES H 1 1 • ASCON LANDFILL SITE UPDATE CURRLNTLY: • CLEAN-UP EFFORTS HAVE STOPPED • CHECKLIST OF ENHANCED MITIGATION MEASURES UNDERWAY PRIOR TO RESTARTING REMEDIATION WORK. • AIR MONITORING CONTINUES: CURRENT TESTING HAS NOT FOUND ANY CHEMICAL LEVELS THAT PRESENT A PUBLIC HEALTH CONCERN. • DTSC COMPLETED REVIEW TO DETERMINE ANY OFF-SITE SOIL OR GROUNDWATER CONTAMINANT IMPACTS: RESULTS CONFIRM THAT CONTAMINATION IS CONTAINED WITHIN THE SITE BOUNDARY AND NO OFF-SITE SOIL OR GROUNDWATER IMPACTS HAVE BEEN DETECTED OR ANTICIPATED. ASCON LANDFILL SITE UPDATE NEXT STEPS BY DTSC & ASCOP Installation of 16 foot tall barrier fence is nearing completion along Hamilton Ave. and Magnolia Street. Ascon placed the off-site air monitoring trailers planned at 2 locations in the community + Edison Park+ Edison High School + Eader Elementary School. Investigation of feasibility of tenting or enclosure of excavation areas. Will provide updated information on the enhancements and project schedule in the next two weeks. DTSC will host a public meeting before restart of remediation work. • NEXT STEPS BY CITY: City of Huntington Beach to contracted with Third Party Technical Advisor for city, school, and community assistance. The Consultant will start review of available data and project information. ASCON LANDFILL SITE UPDATE HOW TO FIND OUT MORE INFORMATION • VISIT THE PROJECT WEB PAGE AT: HTTPS://ASCONHB.COM/ • SIGN-UP FOR EMAIL UPDATES ON THE WEB PAGE. • REVIEW PROJECT STATUS UPDATES AND FREQUENTLY ASKED QUESTIONS nN THE WEBPA(77E PUBLIC HOTLINE FOR NON-EMERGENCY INFORMATION: (714) 388-1825 • HB RESIDENTS CAN ALWAYS CON i ACT THE CI i Y PUBLIC INF�)RMATION OFFICE FOR ASSISTANCE OR IF QUESTIONS ARE NOT BEING ANSWERED: (714) 536-5577 AES Huntington Beach Energy Project Update ► HUNTINGTON BEACH ENERGY PROJECT IS THE MODERNIZATION OF THE AES HUNTINGTON BEACH ELECTRICITY GENERATING STATION. ► CURRENTLY THE PROJECT IS 95% COMPLETE AND STARTING THE COMMISSIONING AND START-UP PHASE. DURING THIS PHASE THE "FIRST FIRE" OF THE PLANT AND STEAM BLOWS WILL OCCUR. STEAM RELEASED WILL BE VISIBLE ON SITE AND A LOUD HISSING SOUND WILL OCCUR. THIS OPERATION WILL ONLY OCCUR BETWEEN THE HOURS OF 8:00 AM AND 6:00 PM AND IS ANTICIPATED TO TAKE ONE TO TWO WEEKS. 1 1 • AES Huntington Beach Energy Project Update ► HOW TO FIND OUT MORE INFORMATION • VISIT THE PROJECT WEB PAGE AT: HTTP://WWW.RENEWAESHUNTINGTON .COM • SIGN-UP FOR EMAIL UPDATES ON THE WEB PAGE. • REVIEW PROJECT STATUS UPDATES AND FREQUENTLY ASKED QUESTIONS ON THE WEBPAGE PUBLIC HOTLINE FOR NON-EMERGENCY INFORMATION: (888) 372-5633 SEND QUESTIONS BY EMAIL: TALK@RENEWAESHUNTINGTON.COM