HomeMy WebLinkAboutCity Manager's Report - Ascon Landfill Site Update and AES E ASCON LANDFILL SITE UPDATE CUR RLN-1LT': • CLEAN-UP EFFORTS HAVE STOPPED. • CHECKLIST OF ENHANCED MITIGATION MEASURES UNDERWAY PRIOR TO RESTARTING REMEDIATION WORK. • AIR MONITORING CONTINUES: CURRENT TESTING HAS NOT FOUND ANY CHEMICAL LEVELS THAT PRESENT A PUBLIC HEALTH CONCERN. • DTSC COMPLETED REVIEW TO DETERMINE ANY OFF-SITE SOIL OR GROUNDWATER CONTAMINANT IMPACTS: RESULTS CONFIRM THAT CONTAMINATION IS CONTAINED WITHIN THE SITE BOUNDARY AND NO OFF-SITE SOIL OR GROUNDWATER IMPACTS HAVE BEEN DETECTED OR ANTICIPATED. ASCON LANDFILL SITE UPDATE NEXT STEPS BY DTSC & ASCC` Construction of a water hydrant water line on Magnolia will continue this week. This will include a temporary traffic lane closure on the west side of the street. Installation of 16 foot tall barrier fence along Hamilton Avenue and Magnolia Street is completed with the exception of two areas The area near the corner of Magnolia and Hamilton. Ascon is preparing a plan for approval from DTSC for the required excavation and installation of the barrier. Small area on Magnolia which will be completed when water hydrant is completed. Ascon placed the off-site air monitoring trailers at Edison Park,Edison High School,Eader Elementary School,plus 2 locations in the community. Investigation of the feasibility of tenting or enclosure of excavation areas. DTSC will host a public meeting before restart of remediation work. NEXT STEPS BY (-ITV: City of Huntington Beach contracted with a Third Party Technical Advisor for city,school,and community assistance. The consultant is developing a schedule to meet with residents starting in late January and February. ASCON LANDFILL SITE UPDATE HOW TO FIND OUT MORE INFORMATION • VISIT THE PROJECT WEB PAGE AT: HTTPS://ASCONHB.COM/ • SIGN-UP FOR EMAIL UPDATES ON THE V LB PAGE. • REVIEW PROJECT STATUS UPDATES AND FREQUENTLY ASKED QUESTIONS ON THE WEBPAC;F. • PUBLIC HOTLINE FOR NON-EMERGENCY INFORMATION: (714) 388-1825 • HB RESIDENTS CAN ALWAYS CONTACT Y PUBLIC INFORMATI(-;: 4 OFFICE FOR ASSISTANCE OR IF QUESTIONS ARE NOT BEING ANSWERED: (714) 536-5577. AES Huntington Beach Energy Project Update MAGNOLIA STREET FLOODING: FLOODING OF MAGNOLIA STREET AND NEAR THE MAGNOLIA TANK FARM PROPERTY REPORTED ON FRIDAY DECEMBER 13TH AT ABOUT 3:00 PM CITY STAFF RESPONDED AND FOUND THE AES CONTRACTOR KIEWIT WAS PUMPING WATER TO THE TO THE SLOPE ALONG MAGNOLIA CITY STAFF WORKED WITH THE CONTRACTOR TO CEASE PUMPING WATER ONTO THE SLOPE. THE CITY ISSUED A CITATION IN VIOLATION OF THE STORM WATER POLLUTION PREVENTION PLAN AND NOTIFIED THE SANTA ANA REGIONAL WATER QUALITY CONTROL BOARD OF THE VIOLATION. AES Huntington Beach Energy Project Update ► HOW TO FIND OUT MORE INFORMATION • VISIT THE PROJECT WEB PAGE AT: HTTP://WWW.RENEWAESHUNTINGTON .COM • SIGN-UP FOR EMAIL UPDATES ON THE WEB PAGE. • REVIEW PROJECT STATUS UPDATES AND FREQUENTLY ASKED QUESTIONS ON THE WEBPAGE PUBLIC HOTLINE FOR NON-EMERGENCY INFORMATION: (888) 372-5633 SEND QUESTIONS BY EMAIL: TALK@RENEWAESHUNTINGTON.COM