HomeMy WebLinkAboutCity Manager's Report - Item No. 14, File 20-1351 - Ascon La 1 1 ASCON LANDFILL SITE UPDATE CURRENTLY: • CLEAN-UP EFFORTS HAVE STOPPED. • CHECKLIST OF ENHANCED MITIGATION MEASURES UNDFRWAY PRIOR TO RESTARTING REMEDIATION WORK, • AIR MONITORING CONTINUES: CURRENT TESTING HAS NOT FOUND ANY CHEMICAL LEVELS THAT PRFSENI A Pt1BLIC HEALTH CONCERN, • DTSC COMPLETED REVIEW 10 DETERMINE ANY OFF-SITE SOIL OR GROUNDWATER CONTAMINANT IMPACTS: RESULTS CONFIRM THAT CONTAMINATION IS CONTAINED W11 HIN THE SITE BOUNDARY AND NO OFF-SITE SOIL OR GROUNDWATER IMPACTS HAVE BEEN DETECTED OR ANTICIPATED, ASCON LANDFILL SITE UPDATE Connection of the fire hydrant installed on Magnolia Street in December to an onsite water tower.In a related activity,large water storage tanks onsite will be removed from the Site. There will be continued inspection and maintenance of stormwater management measures. Installation of 16 foot tall barrier fence along Hamilton Avenue and Magnolia Street is completed with the exception of two areas • ihr, ,i i n,a tI—corn,cf[.1 I wl li„ a),)r-r� `nn. As.. , cl)(irlvq a pl r I f rr r aal from DISC for the r;a i jtlr.n and n,tull�'4.r f' ;I,,,i A, • Sir ,I v it '(1 a,lia M is 1rv11,,! ,,.j ,„h4n .v,r�,,J,rr t pi Air quality monitoring continues,both on the Ascon site and at offsite community locations. Investigation of the feasibility of tenting or enclosure of excavation areas. DISC will host a public meeting before restart of remedidtion work NEXT STEPS BY CITY: City of Huntington Beach contracted with a Third Party Technical Advisor for city,school,and community assistance. The consultant is developing a schedule to meet with residents starting in late January and February. f � ASCON LANDFILL SITE UPDATE HOW TO FIND OUT MORE INFORMAII(,'-! • VISIT THE PROJECT WEB PACjI HTTPS://ASCONHB.COM/ • SIGN-UP FOR EMAIL. UPDATES ON THE WF5 • REVIEW PROJECT STATUS UPDATES AND I ICYQUE-NILY ASKED QUESTIONS ON THE WEBPA.CE, PUBLIC HOTLINE FOR NON-EMERGENCY INFORMATION: (714) 388-1825 • HB RESIDENTS CAN ALWAYS ,, ` I,,. � f PUBLIC INFORMATION OFFICE FOR ASSISTANCE OR IF QUESTIONS ARE NOl BEING ANSWERED: (714) 536-5577. AES Huntington Beach Energy Project Update MAGNOLIA STREET FLOODING: • FLOODING OF MAGNOLIA STREET AND NEAR THE MAGNOLIA TANK FARM PROPERTY REPORTED ON FRIDAY DECEMBER 13TH AT ABOUT 3:00 PM CITY STAFF RESPONDED AND FOUND THE AES CONTRACTOR KIEWIT WAS PUMPING WATER TO THE TO THE SLOPE ALONG MAGNOLIA CITY STAFF WORKED WITH THE CONTRACTOR TO CEASE PUMPING WATER ONTO THE SLOPE. • THE CITY ISSUED A CITATION IN VIOLATION OF THE STORM WATER POLLUTION PREVENTION PLAN AND NOTIFIED THE SANTA ANA REGIONAL WATER QUALITY CONTROL BOARD OF THE VIOLATION. 1 1 AES Huntington Beach Energy Project lJdate r HOW TO FIND OUT MORE INFORMATION • VISIT THE PROJECT WEB PAGE AT: HTTP://WWW.RENEWAESHUNTINGTON .COM • SIGN-UP FOR EMAIL UPDATES ON THE WEB PAGE. • REVIEW PROJECT STATUS UPDATES AND FREQUENTLY ASKED QUESTIONS ON THE WEBPAGE • PUBLIC HOTLINE FOR NON-EMERGENCY INFORMATION: (888) 372-5633 • SEND QUESTIONS BY EMAIL: TALKC�RENEWAESHUNTINGTON.COM