HomeMy WebLinkAboutCity Manager Report - Ascon Landfill Site Update 2/18/2020
ASCON LANDFILL SITE UPDATE
CURRENTLY:
• CLEAN-UP EFFORTS HAVE STOPPED.
• CHECKLIST OF ENHANCED MITIGATION MEASURES UNDERWAY PRIOR TO
RESTARTING REMEDIATION WORK.
• DTSC WILL HOLD A COMMUNITY MEETING PRIOR TO THE RESTARTING OF
REMEDIATION WORK.
STORMWATER MANAGEMENT
NEXT STEPS BY DTSC & ASCON:
• Continue to monitor and inspect Stormwater Management Measures to
maintain compliant with Stormwater Permit.
• Site Inspected February 6th by the City
• On February 10'h, an Updated Stormwater Pollution Prevention Plan and recent
Stormwater Sampling results were submitted by Ascon to the State of California
Water Resources Control Board stormwater online reporting system(SMARTS).
• Visit ASCONHB.com for more detailed Information.
SUPPLEMENTAL
COMMUNICATION
AgOrKIIIIII nit Rio.
1
2/18/2020
STORMWATER MANAGEMENT
NEXT STEPS BY DTSC & ASCON:
• Continue to monitor and msoect Stormwater Management Measures to maintain
compliant with Stormv) m °
Site Inspected Februi � eH "� ', m "" `"•."'� .».� �"°
• On February loth, an y
Stormwater Somplinc (r/
Resources Control BC
Visit ASCON HB.com I
F6 Faar Harrier Fence Te "SWwm. 6Mxwd Air Q.Wdy Enlw,xrd Sr°rmrratar
m ,s ..«.. .., 4aetaq MrngemeM and
.c,..r,.:n. w.w.•.q>,,..mro .. ac.M.r«:...r.e.,.�. lAonlbrMp
... ,..,.«-.,g,. •.-_< -n �.r .verer�nxen.epra «.,+=r,:vaw.�.�.w«rwe
_..,.ue« _arv.. amps.•v5.ae.:.w.px•es av mK...».,,�aw:r•+wer!r er.q.,ww.,w.r:
m ..,....�.�p*a.,-,+v .•aawe..r,.s•.rs .•,rt+.a...+=e..�..n.a+...r
AIR QUALITY
NEXT STEPS BY DTSC & ASCON:
• Air Quality Monitoring,both On-Site and at Off-Site Community Locations.
Vandalized Air Monitoring Trailer replaced at Eader Elementary School/Banning
Branch Library site February 11 th.
• All Data is Posted on the ASCON Website and California Department of Toxic
Substances Control(DISC)website,Envirostor
• ASCONHB.COM
• www.envirostor.dtsc.ca.gov.
2
2/18/2020
AIRO 1� 1A I ITY
ASconH.*r9lon 8"Ch r ..,�..,,. :m:M.'gwY®.ty
NEXT STEPS E
• Air Qu Actively Monitoring Air Quality
• Al
S
Onsite VOC
• h Monitoring Results
AIR QUALITY
sue, M.M, �� a . .• , , A r.� ,.Q
NEXT STEPS BY
Air Mtart€toeing Apptoar,i, .
Av mmitairyn <w�rp•t�M IW4 wy.m•�;+•nOaAvw bentim�x i�w'�mtd
• Air Qua
• All EIN
Sub
>
s
ww-�xr d.M_�.�«x ,,.Rwsw..a«ova.•«.rw+s,w•,eaaa < �. �,�,�•,
httpITL
3
2/18/2020
ASCON LANDFILL SITE UPDATE
NEXT STEPS BY DTSC & ASCON:
Maintenance Improvements to Pit F Tent foundation.
Weed abatement will be conducted as needed.
Investigation of the feasibility of tenting or enclosure of excavation areas
continues with DTSC,AQMD and ASCON.
ASCONHB.COM
TECHNICAL ADVISOR
• NEXT STEPS BY CITY:
• City of Huntington Beach contracted with a Third Party Technical Advisor
Facebook Live Event with questions answered by the Third Party Technical
Advisor.
February 27'h from 6:30 to 7:00 pm on the City of Huntington Beach Public
Information Facebook page
4
2/18/2020
ASCON LANDFILL SITE UPDATE
HOW TO FIND OUT MORE INFORMATION:
• HTTPS://ASCONHB.COM/
• SIGN-UP FOR EMAIL UPDATES ON THE WEB PAGE.
• PUBLIC HOTLINE FOR NON-EMERGENCY INFORMATION: (714) 388-1825
5