Loading...
HomeMy WebLinkAboutCity Manager's Report - AsconLandfill Site Update - 2/3/2020 � � 1 ASCON LANDFILL SITE UPDATE CURRENTLY: CLEAN-UP EFFORTS HAVE STOPPED. CHECKLIST OF ENHANCED MITIGATION MEASURES UNDERWAY PRIOR TO RESTARTING REMEDIATION WORK. LAST WEEK ASCON WAS PERFORMING MAINTENANCE TO THE SOUTHEAST DENTATION BASINS AS PART OF THE STORMWATER MANAGEMENT. THIS WAS DONE USING AN EXCAVATOR AND A FRONT END LOADER. THE MAINTENANCE INCLUDED: Removal of vegetation Removal of stone and gravel near the detention basin stand pipe. DTSC and the City Responded to concerns of the performance of the work. Improved notification concerning the work will be provided by Ascon going forward. ASCON LANDFILL SITE UPDATE rIEXT STEPS BY DTSC&.ASCCN: ASCON to work with DTSC un the plans and approval to rori ulele the 16 tnot tall barrier fend cilortd Han ril l,,ri Avnnue and MatTnolla;treel. Nolifi<ation will be pi( irlcd print I , wr tk breind heforrr The air quality monitoring equipment located near Eader Elementary School was vandalized. Ascon is replacing the equipment,repairing the trailer,and testing the new equipment. Once completed the air monitoring will resume at Eader Elementary. The air monitoring on site as well as the other off site community locations are operational and continue to monitor. Ascon will replace the existing cover of excavated materials in the Southwest Zone. Weed abatement will be conducted as needed. Stormwater will be pumped from areas onsite to other areas within the site as part of the stormwater management. itivusiiciali,m of the feasibility of terrtirnj or enclosure of excavation areas continues with[)N_ AreMD and ASCOfs. DTSC will host o publir rrn efina before io it lrt if iemediafiori work F T STTpc[?v(-'Ty. City of Huntington Beach contracted with a Third Party Technical Advisor for city,school,and community assistance. The consultant is developing a schedule to meetings available for residents starting in late February. ASCON LANDFILL SITE UPDATE HOW TO FIND OUT MORE INFORMATION: • VISIT THE PROJECT WEB PAGE AT: HTTPS://ASCONHB.COM/ • SIGN-UP FOR EMAIL UPDATES ON THE WEB PAGE. • REVIEW PROJECT STATUS UPDATES AND FREQUENTLY ASKED QUESTIONS ON THE WEBPAGF. PUBLIC HOTLINE FOR NON-EMERGENCY INFORMATION: (714) 388-1825 • HB RESIDENTS CAN ALWAYS CONTACT THE CITY PUBLIC INFORMATION OFFICE FOR ASSISTANCE OR IF QUESTIONS ARE NOT BEING ANSWERED: (714) 536-5577. AES Huntington Beach Energy Project Update MAGNOLIA STREET FLOODING: FLOODING OF MAGNOLIA STREET AND NEAR THE MAGNOLIA TANK FARM PROPERTY REPORTED ON FRIDAY DECEMBER 13TH AT ABOUT 3:00 PM CITY STAFF RESPONDED AND FOUND THE AES CONTRACTOR KIEWIT WAS PUMPING WATER TO THE TO THE SLOPE ALONG MAGNOLIA CITY STAFF WORKED WITH THE CONTRACTOR TO CEASE PUMPING WATER ONTO THE SLOPE. THE CITY ISSUED A CITATION IN VIOLATION OF THE STORM WATER POLLUTION PREVENTION PLAN AND NOTIFIED THE SANTA ANA REGIONAL WATER QUALITY CONTROL BOARD OF THE VIOLATION. 1 1 AES Huntington Beach Energy Project Update ► HOW TO FIND OUT MORE INFORMATION • VISIT THE PROJECT WEB PAGE AT: HTTP://WWW.RENEWAESHUNTINGTON .COM • SIGN-UP FOR EMAIL UPDATES ON THE WEB PAGE. • REVIEW PROJECT STATUS UPDATES AND FREQUENTLY ASKED QUESTIONS ON THE WEBPAGE • PUBLIC HOTLINE fOR NON-EMERGENCY INFORMATION: (888) 372-5633 • SEND QUESTIONS BY EMAIL: TALKC�RENEWAESHUNTINGTON.COM