ASCON LANDFILL SITE UPDATE
CURRENTLY:
CLEAN-UP EFFORTS HAVE STOPPED.
CHECKLIST OF ENHANCED MITIGATION MEASURES UNDERWAY PRIOR TO
RESTARTING REMEDIATION WORK.
LAST WEEK ASCON WAS PERFORMING MAINTENANCE TO THE SOUTHEAST
DENTATION BASINS AS PART OF THE STORMWATER MANAGEMENT. THIS WAS
DONE USING AN EXCAVATOR AND A FRONT END LOADER. THE MAINTENANCE
INCLUDED:
Removal of vegetation
Removal of stone and gravel near the detention basin stand pipe.
DTSC and the City Responded to concerns of the performance of the work.
Improved notification concerning the work will be provided by Ascon going
forward.
ASCON LANDFILL SITE UPDATE
rIEXT STEPS BY DTSC&.ASCCN:
ASCON to work with DTSC un the plans and approval to rori ulele the 16 tnot tall barrier fend
cilortd Han ril l,,ri Avnnue and MatTnolla;treel. Nolifi<ation will be pi( irlcd print I , wr tk breind heforrr
The air quality monitoring equipment located near Eader Elementary School was vandalized. Ascon is
replacing the equipment,repairing the trailer,and testing the new equipment. Once completed the air
monitoring will resume at Eader Elementary. The air monitoring on site as well as the other off site community
locations are operational and continue to monitor.
Ascon will replace the existing cover of excavated materials in the Southwest Zone.
Weed abatement will be conducted as needed.
Stormwater will be pumped from areas onsite to other areas within the site as part of the stormwater
management.
itivusiiciali,m of the feasibility of terrtirnj or enclosure of excavation areas continues with[)N_ AreMD and
ASCOfs.
DTSC will host o publir rrn efina before io it lrt if iemediafiori work
F T STTpc[?v(-'Ty.
City of Huntington Beach contracted with a Third Party Technical Advisor for city,school,and community
assistance. The consultant is developing a schedule to meetings available for residents starting in late
February.
ASCON LANDFILL SITE UPDATE
HOW TO FIND OUT MORE INFORMATION:
• VISIT THE PROJECT WEB PAGE AT: HTTPS://ASCONHB.COM/
• SIGN-UP FOR EMAIL UPDATES ON THE WEB PAGE.
• REVIEW PROJECT STATUS UPDATES AND FREQUENTLY ASKED QUESTIONS
ON THE WEBPAGF.
PUBLIC HOTLINE FOR NON-EMERGENCY INFORMATION: (714) 388-1825
• HB RESIDENTS CAN ALWAYS CONTACT THE CITY PUBLIC INFORMATION
OFFICE FOR ASSISTANCE OR IF QUESTIONS ARE NOT BEING ANSWERED:
(714) 536-5577.
AES Huntington Beach Energy
Project Update
MAGNOLIA STREET FLOODING:
FLOODING OF MAGNOLIA STREET AND NEAR THE MAGNOLIA TANK FARM
PROPERTY REPORTED ON FRIDAY DECEMBER 13TH AT ABOUT 3:00 PM
CITY STAFF RESPONDED AND FOUND THE AES CONTRACTOR KIEWIT WAS
PUMPING WATER TO THE TO THE SLOPE ALONG MAGNOLIA
CITY STAFF WORKED WITH THE CONTRACTOR TO CEASE PUMPING WATER
ONTO THE SLOPE.
THE CITY ISSUED A CITATION IN VIOLATION OF THE STORM WATER
POLLUTION PREVENTION PLAN AND NOTIFIED THE SANTA ANA REGIONAL
WATER QUALITY CONTROL BOARD OF THE VIOLATION.
1 1
AES Huntington Beach Energy
Project Update
► HOW TO FIND OUT MORE INFORMATION
• VISIT THE PROJECT WEB PAGE AT:
HTTP://WWW.RENEWAESHUNTINGTON .COM
• SIGN-UP FOR EMAIL UPDATES ON THE WEB PAGE.
• REVIEW PROJECT STATUS UPDATES AND FREQUENTLY ASKED QUESTIONS
ON THE WEBPAGE
• PUBLIC HOTLINE fOR NON-EMERGENCY INFORMATION: (888) 372-5633
• SEND QUESTIONS BY EMAIL: TALKC�RENEWAESHUNTINGTON.COM