Loading...
HomeMy WebLinkAboutAscon Landfill Site Update City of Huntington Beach File #: 20-1485 MEETING DATE: 4/20/2020 Ascon Landfill Site Update City of Huntington Beach Page 1 of 1 Printed on 4/15/2020 powered by LegistarT" ASCON LANDFILL SITE UPDATE SLOPE FAILURE CONCERN ► CURRENT STATUS ►TIMELINE Clean-up efforts-Stopped since June December 31, 2019-ASCON identified tension cracks on the berm along Hamilton ASCON is pursuing tenting/enclosure permits and work plan February 6, 2020-Additional tension cracks identified approval • Estimated medium to high risk of slope failure DTSC & ASCON have evaluated tension cracks on the February-April 2020 DTSC and ASCON evaluated options to repair northwest berm and alleviate slope failure. April 2, 2020-Online community forum on emergency repair work Proceeding with emergency repair work as of today April 10, 2020-DTSC provided approval letter for ASCON to proceed Outlined strict conditions for all repair work to mitigate any impacts to the community SLOPE FAILURE CONCERN TENSION CRACKS IDENTIFIED All WWI UI a i r EMERGENCY REPAIR WORK EMERGENCY REPAIR WORK ► RISK & SAFETY CONCERNS ► If berm cracks are not addressed... ► Moving forward with Managed �, • Contaminated material could enter Hamilton Avenue Slope Excavation to stabilize and flatten the berm • Could result in uncontrolled release of VOCs, odors & dust ► Outreach has included: r • Emergency response would be needed ► 10,000 mailed postcards • Rains increase chances of failure ► Online community forum ► Outreach letter ► Updated website & social media EMERGENCY REPAIR WORK EMERGENCY REPAIR WORK ► EXCAVATION RATE ► ADDED SAFETY MEASURES Closely managed by DTSC Allowing only 50 cubic yards per day to start Limiting daily amount of excavation allowed to be performed After 3 days, if there is demonstrated odor control and no issues arise,the excavation rate can be increased by an additional 25 Added dust and odor controls-Foam suppressants, yards misting sprays, soil, and plastic covering This can continue up to a maximum rate of 200 cubic yards / Air monitoring and sampling of the site day g p g Rate can also be stopped or decreased if issue arises Must stop excavation if odors cannot be controlled ► IN COMPARISON... DTSC committed to having staff on site at all times during ► Last year's excavation late was 2,000 cubic yards/day when work is conducted HOW TO STAY INFORMED QUESTIONS OR CONCERNS ? • HTTPS:�'A4t"�N�f�a,�,t9�,,�;'��. ► DTSC Project Manager ► Safouh Sayed. 714-484 ` • Sign-up for weekly a-mail updates ► DTSC Public Participation Supervisor E-mail: ► Maya Akula, 714-484-5410, Public hotline for non-emergency information: (714) 388-1825 ► South Coast Air Quality Monitoring District jSCAQMD) ► Air Quality and Dust Monitoring Questions Stay Informed ► 1 800 CUT-SMOG (1-800 288 iv64) Ascon Huntington Beachsubscribe for email updates ► Ascon Project Contacts A safer,cleaner future for the community sIc,NMt uv ► Hotline:714-388-1825 ► Email: