ASCON LANDFILL SITE UPDATE NORTH BERM REPAIR COMPLETE
►TIMELINE
Po. CURRENT STATUS December31, 2019 and February 6, 2020-ASCON icl,:ntified tension
cracks on the berm along Hamilton
Clean-up efforts-Stopped since June February-April 2020 DTSC and ASCON evaluated -tions to repair
• ASCON is pursuing tenting/enclosure permits ana ,vork plan and alleviate slope failure. ,
approval April 2, 2020-Online community forum on emergency r arr work,
ASCON Completed the Hamilton Berm Emergency Repair. April 10, 2020-DTSC'provided approval letter for ASCON n pip„
• Outlined strict conditions for all repair work to mitigate any impacts to the
The work started on April 21 It and completed on May 8"'. community
April 20, 2020-ASCON commenced the Managed Excavation of the
Hamilton Berm under oversight of DTSC
May 8,2020- Managed Excavation Completed.
NORTH BERM LOCATION CURRENT SITE ACTIVITES
Ascon Landfill Site Slope Inspection ► Week of May 1 8ih
NW Berm Geotechnical Observations on Dec 31,2019 DeIiiubilizuliun of the North Bern repair equipsiet't:u d water filled
barriers on Hamilton Ave.
The managed excavation was conducted with air�i ality monitoring
in the work zone,at the perimeter of Ascon,and at locations in the
community.There were no offsite public health impacts detected.
Ascon continues to work with SCAQMD on permitting c ; lit project
Y on the feasibility of tenting areas of the Site during exca/u;lui word:
-- Continued field activity at Ascon To maintain the Site. Including dust
/ control,weed abatement,vector control,Stormwater protections
l and 24 hour site security.
fr,
Continued Air monitoring and sampling of on-site and off-site stations
with results posted on DTSC's Enviorstor and on AsconHB.org.
HOW TO STAY INFORMED QUESTIONS OR CONCERNS?
• ,�,TQ� „� ► DTSC Project Manager
Sign-up for weekly a-mail updates ► safouh Sayed, 71a-a8a-Sa78.__
► DTSC Public Participation Supervisor
• E-mail:
► Maya P,kula.714-484-Salb,
• Public hotline for non-emergency information: (714)388-1825 ► South Coast Air Quality Monitoring District fSCAQMD�
► Air Quality and Dust Monitoring Questions
IN
Stay Informed
► 1-800CUT-SMOG (1-800-288-76ba)
Ascon Huntington BeachPlease subsuribe for email updates ► Ascon Project Contacts
A safer,cleaner future for the community
9GN ME UP ► Hotline:714-388-1825
► Email: