Loading...
HomeMy WebLinkAboutCity Manager's Report - Ascon Landfill Site Update - 5/18/20 J City of Huntington Beach DEB )t999 T \ J File #: 20-1487 MEETING DATE: 5/18/2020 Ascon Landfill Site Update City of Huntington Beach Page 1 of 1 Printed on 5/13/2020 powered1A Legistar— ASCON LANDFILL SITE UPDATE NORTH BERM REPAIR COMPLETE ►TIMELINE Po. CURRENT STATUS December31, 2019 and February 6, 2020-ASCON icl,:ntified tension cracks on the berm along Hamilton Clean-up efforts-Stopped since June February-April 2020 DTSC and ASCON evaluated -tions to repair • ASCON is pursuing tenting/enclosure permits ana ,vork plan and alleviate slope failure. , approval April 2, 2020-Online community forum on emergency r arr work, ASCON Completed the Hamilton Berm Emergency Repair. April 10, 2020-DTSC'provided approval letter for ASCON n pip„ • Outlined strict conditions for all repair work to mitigate any impacts to the The work started on April 21 It and completed on May 8"'. community April 20, 2020-ASCON commenced the Managed Excavation of the Hamilton Berm under oversight of DTSC May 8,2020- Managed Excavation Completed. NORTH BERM LOCATION CURRENT SITE ACTIVITES Ascon Landfill Site Slope Inspection ► Week of May 1 8ih NW Berm Geotechnical Observations on Dec 31,2019 DeIiiubilizuliun of the North Bern repair equipsiet't:u d water filled barriers on Hamilton Ave. The managed excavation was conducted with air�i ality monitoring in the work zone,at the perimeter of Ascon,and at locations in the community.There were no offsite public health impacts detected. Ascon continues to work with SCAQMD on permitting c ; lit project Y on the feasibility of tenting areas of the Site during exca/u;lui word: -- Continued field activity at Ascon To maintain the Site. Including dust / control,weed abatement,vector control,Stormwater protections l and 24 hour site security. fr, Continued Air monitoring and sampling of on-site and off-site stations with results posted on DTSC's Enviorstor and on AsconHB.org. HOW TO STAY INFORMED QUESTIONS OR CONCERNS? • ,�,TQ� „� ► DTSC Project Manager Sign-up for weekly a-mail updates ► safouh Sayed, 71a-a8a-Sa78.__ ► DTSC Public Participation Supervisor • E-mail: ► Maya P,kula.714-484-Salb, • Public hotline for non-emergency information: (714)388-1825 ► South Coast Air Quality Monitoring District fSCAQMD� ► Air Quality and Dust Monitoring Questions IN Stay Informed ► 1-800CUT-SMOG (1-800-288-76ba) Ascon Huntington BeachPlease subsuribe for email updates ► Ascon Project Contacts A safer,cleaner future for the community 9GN ME UP ► Hotline:714-388-1825 ► Email: