Loading...
HomeMy WebLinkAboutOrange County Transportation Authority (OCTA) - 2020-10-29 &/LL ` c>~JuZ MMOV157D 7-0 City of Huntington Beach File #: 21-587 MEETING DATE: 9/7/2021 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Oliver Chi, City Manager PREPARED BY: Sean Crumby, Director of Public Works Subject: Approve and authorize the execution of Letter Amendment No. 1 to Memorandum of Understanding No. C-0-2441 with Orange County Transportation Authority (OCTA) for "Pilot Regional Signal Performance Measure Project" - Time Extension Statement of Issue: On September 8, 2020, the City Council approved a Memorandum of Understanding (MOU) with the Orange County Transportation Authority (OCTA) to install traffic signal monitoring software along Brookhurst Street as a component of the Brookhurst Street Regional Traffic Signal Synchronization project. This MOU expired on June 30, 2021. As the evaluation efforts are not complete, OCTA has submitted to the City for approval, Letter Amendment No. 1, will extend this agreement to March 31, 2022. Financial Impact: The Orange County Transportation Authority will be responsible for all project costs. There is no financial impact to the City. Recommended Action: Approve and authorize the Transportation Manager to execute "Letter Amendment No. 1 to Memorandum of Understanding No. C-0-2441 for 'Pilot Regional Signal Performance Measure Project' - Time Extension." Alternative Action(s): Deny approval and terminate participation in this project. Analysis: On November 6, 2017, the City Council approved a Cooperative Agreement with the Orange County Transportation Authority (OCTA) to participate in the Brookhurst Street Regional Traffic Signal Synchronization Program project. This project provided operational and infrastructure improvements along Brookhurst Street from Fullerton to Huntington Beach. The construction and signal timing activities are complete and the project is currently in the operation and maintenance phase. As part City of Huntington Beach Page 1 of 2 Printed on 9,112021 'Ift .r. File #: 21-587 MEETING DATE: 9/7/2021 of the operation and maintenance tasks on this project, the City of Huntington Beach approved the installation of monitoring software at each of the signalized intersections with this data remotely transmitted to OCTA. The City Council approved a Memorandum of Understanding with OCTA approving the installation of this monitoring software on September 8, 2020 with an agreement end date of June 30, 2021. As the evaluation efforts are not complete, OCTA has submitted to the City for approval, Letter Amendment No. 1 , will extend this agreement to March 31, 2022. Public Works Commission Action: Not required. Environmental Status: Any environmental analyses will be processed by OCTA. Strategic Plan Goal: Infrastructure & Parks Attachment(sl: 1. Letter Amendment No. 1 to Memorandum of Understanding No. C-0-2441 for "Pilot Regional Signal Performance Measure Project' - Time Extension 2. Memorandum of Understanding No. C-0-2441 between Orange County Transportation Authority and the city of Huntington Beach for the Pilot Regional Signal Performance Measure Project. City of Huntington Beach Page 2 of 2 Printed on 9/1/2021 ac vere186 Lea,staP. i OCTA Sent Via Email June 11, 2021 AFUAMD AG&JVES Bob Stachelski amrgPCwety Transportation Manager, Department of Public Works A "d"A" City of Huntington Beach Locat TrenspWetbn 2000 Main Street Aatrontr Huntington Beach, CA 92648 Senke Authontl tw Foewey En,.Wo ba Subject: Letter Amendment No. 1 to Memorandum of C..WMt T,enwo,.tbn Understanding No. C-0-2441 for"Pilot Regional Signal S&Yke Agl y Performance Measure Project"—Time Extension Ca�yeffbn Menapomenr Apeiwy Dear Bob Stachelski: This letter serves as the Orange County Transportation Authority's (Authority) notice to the City of Huntington Beach that pursuant to ARTICLE 4, MUTUAL RESPONSIBILITIES OF PARTIES of subject Memorandum of Understanding (MOU) No. C-0-2441, the Authority hereby extends the term of the MOU for an additional nine (9) months, from July 1, 2021 through March 31, 2022. With respect to such exercise of "Time Extension," this letter shall have the effect of an amendment to the MOU. No other changes are made by this letter to MOU No. C-0-2441, and as hereby modified, the provisions of the MOU remain in full force and effect. This Amendment is effective July 1, 2021. Accepted and Agreed r Georgia Martinez ob Stachelski Department Manager, Transportation Manager Contracts and Procurement Orange County Transportation Authority City of Huntington /Beach Date Date APPROVED AS TO FORM By; ICNAEI E-GATES CITY O CM F UNTINGTONrBEACH Orange Cotmty Transportation Authon;y 550 SwUi M.a'n Street/P.O.Box 14164/Orange/California 92863-1584/(!t 4)560-OCTA(6282) Ma M OCTA AFFILIATED AGENCIES September 27, 2021 Orange County Transa D1sm'ct Local i}ansoortatlon City of Huntington Beach Aethorty Robin Estanislau SeNwe Auahorirv;or 2000 Main Street, 2nd Floor Freeway Emergencies Huntington Beach, CA 92648 Consolloateo Transporat,on Sevlce Agency Subject: Fully Executed Amendment No. 1 to Cooperative Agreement Congestion Management No. C-3-1845 Agency Dear Mr. Estanislau: Enclosed is a fully executed copy of the "Letter Amendment No. 1 to Memorandum of Understanding No. C-0-2441 for 'Pilot Regional Signal Performance Measure Project' — Time Extension" approved by the Huntington Beach City Council and by Orange County Transportation Authortiy on September 7, 2021. If you have any questions or comments, please contact the undersigned at (714) 560-5642 or kignacio octa.net. Sincerely, Kevin Ignacio Contracts Administration and Materials Management, Intern Enclosure Orange County Transportation Authority 550 South Main Street/PO.Box 14184/Orange/California 92863-1584/(714)560-OCTA(6282) City of Huntington Beach 2000 Main Street ♦ Huntington Beach, CA 92648 (714) 536-5227 ♦ w..,-vv.huntingtonbeachca.gov U,ff09. Office of the City Clerk Robin Estanislau, City Clerk September 14, 2021 Orange County Transportation Authority Contract Administration and Materials Management Attn: Kevin Ignacio 600 South Main Street PO Box 14184 Orange, CA 92863-1584 Dear Mr. Ignacio: Enclosed is a partially executed copy of the "Letter Amendment No. 1 to Memorandum of Understanding No. C-0-2441 for "Pilot Regional Signal Performance Measure Project' — Time Extension" approved by the Huntington Beach City Council on September 7, 2021, Upon complete execution, please provide us with a copy of the fully executed agreement. Please mail the Agreement to: Robin Estanislau City Clerk 2000 Main Street, 21d Floor Huntington Beach CA 92648 Your attention to this matter is greatly appreciated. Sincere Robin Estanislau, CIVIC City Clerk RE:ds Enclosure Sister Cities: Anjo, Japan • Waitakere, New Zealand I MEMORANDUM OF UNDERSTANDING NO. C-0-2441 2 BETWEEN 3 ORANGE COUNTY TRANSPORTATION AUTHORITY 4 AND THE CITY OF HUNTINGTON BEACH 5 FOR 6 THE PILOT REGIONAL SIGNAL PERFORMANCE MEASURE PROJECT 7 The following Memorandum of Understanding (hereinafter, "MOU") is effective this 29th day 8 of October , 2020 (Effective Date) between the Orange County Transportation Authority, 550 9 South Main Street, P.O. Box 14184, Orange California 92863-1584, a public corporation of the State of 10 California(herein referred to as"OCTA"), and the City of Huntington Beach, 2000 Main Street, Huntington 11 Beach California 92648, a municipal corporation duly organized and existing under the constitution and 12 laws of the State of California (hereinafter referred to as, "CITY'), each individually known as "PARTY" 13 and collectively known as"PARTIES"with regard to the following matters: 14 WHEREAS, on April 1, 2019, OCTA entered into an agreement with Iteris, Inc. (ITERIS), for 15 procurement Of a proprietary signal performance measure platform, and 16 WHEREAS,the ITERIS proprietary signal performance measure platform is known as Iteris SPM 17 (hereinafter referred to as"SPM"); and 18 WHEREAS, OCTA and CITY agree to the implementation of the SPM Project (hereinafter, 19 "PROJECT ) as a pilot signal performance measure platform for the region to evaluate; and 20 WHEREAS, CITY has indicated their desire to connect their traffic signals listed in Attachment A 21 (hereinafter referred to as"CITY TRAFFIC SIGNALS") to the SPM; and 22 WHEREAS, use of SPM requires traffic signal controllers to meet the Advanced Transportation 23 Controllers (ATC) specifications, as listed in Attachment B, and requires that a communication link be 24 established between a remote location and CITY TRAFFIC SIGNALS; and 25 ! 26 Page 1 of 7 188 i MEMORANDUM OF UNDERSTANDING AGREEMENT NO. C-0-2441 PILOT SIGNAL PERFORMANCE MEASURE PROJECT i 1 /WHEREAS, an internet portal hosting the SPM data of the CITY TRAFFIC SIGNALS is required for 2 OCTA and CITY to monitor the signal performance from a remote location (hereinafter referred to as 3 "ACCESS'); and 4 WHEREAS, CITY signal performance data (hereinafter referred to as "DATA") includes Real 5 Time Traffic Signal Data,Traffic Signal Timing Plan, and any other traffic signal data provided to ITERIS 6 by CITY under this MOU; and. 7 WHEREAS, CITY is responsible for its jurisdictional portion of the operation and maintenance of 8 CITY TRAFFIC SIGNALS; and 9 WHEREAS, OCTA and CITY have previously cooperated, and will continue to cooperate, in 10 carrying out traffic signal synchronization and other Intelligent Transportation Systems (ITS) 11 improvements on the CITY TRAFFIC SIGNALS; and 12 WHEREAS, OCTA and CITY wish to make the DATA that is being collected along CITY TRAFFIC 13 SIGNALS through the SPM platform available for the purposes of traffic signal coordination and 14 maintenance operations; and 15 WHEREAS, this exchange of information will facilitate the optimization of traffic signal 16 synchronization as well as the ability to provide a multi-jurisdictional coordinated response to traffic 17 congestion. 18 NOW, THEREFORE, in consideration of the mutual benefits to be derived by OCTA and CITY 19 and the promises herein contained, it is hereby agreed as follows: 20 ARTICLE 1. COMPLETE AGREEMENT: 21 This MOU, including all exhibits and documents incorporated herein and made applicable by 22 reference, constitutes the complete and exclusive statement of the terms and conditions of the MOU 23 between OCTA and CITY concerning the PROJECT and supersedes all prior representations, 24 understandings and communications between the parties. The above-referenced Recitals are true and 25 correct and are incorporated by reference herein. The invalidity in whole or part of any term or condition 26 of this MOU shall not affect the validity of other term(s) or condition(s). Page 2 of 7 189 MEMORANDUM OF UNDERSTANDING AGREEMENT NO. C-0-2441 PILOT SIGNAL PERFORMANCE MEASURE PROJECT i 1 ARTICLE 2. RESPONSIBILITIES OF OCTA: 2 OCTA agrees to the following responsibilities for PROJECT: 3 1. To configure and install SPM at CITY designated workstations for CITY TRAFFIC SIGNALS 4 to enable operations with SPM at no cost to CITY. 5 2. To provide ACCESS to CITY for its use to monitor the performance of CITY TRAFFIC 6 SIGNALS with the installation to be completed at no cost to CITY. 7 3. To accept responsibility for and to maintain in good condition the SPM platform tool installed 8 at CITY workstation. 9 ARTICLE 3. RESPONSIBILITIES OF CITY: 10 CITY agrees to the following responsibilities for PROJECT: 11 1. To be solely responsible for maintaining the timing for CITY TRAFFIC SIGNALS to promote 12 coordinated traffic operations, multi-jurisdictional cooperation, and improve arterial traffic 13 conditions. 14 2. To inform OCTA of new traffic signal installations and any traffic signal modifications, which 15 would materially affect performance metrics in SPM. 16 3. To accept responsibility for and to maintain in good condition appropriate traffic signal 17 controllers for PROJECT. 18 4. To accept full and complete ownership of, responsibility for, and to maintain in good condition 19 and, at CITY expense, communication at CITY TRAFFIC SIGNALS. 20 5. To allow all CITY DATA provided through SPM to be made available to any authorized public 21 CITY approved by OCTA and the owning CITY for the purpose of traffic signal coordination 22 and other traffic management related evaluations. 23 6. To accept responsibility for and to maintain in good condition the workstation operating the 24 SPM platform and ensure that it is not altered. 25 7. To provide access to the SPM workstation at no cost to OCTA, to install SPM and for the 26 platform upgrades and maintenance. Page 3 of 7 190 MEMORANDUM OF UNDERSTANDING AGREEMENT NO. C-0-2441 PILOT SIGNAL PERFORMANCE MEASURE PROJECT 1 ARTICLE 4. MUTUAL RESPONSIBILITIES OF PARTIES: 2 OCTA and CITY agree to the following mutual responsibilities for PROJECT: 3 1. Nothing in this MOU shall be construed to make CITY a party to or have any liability under 4 the SPM agreement. 5 2. Nothing in this MOU shall be construed as changing the role of CITY in operating and 6 maintaining the traffic signals and signal systems, such as a traffic control system, within 7 CITY'sjurisdiction. 8 3. CITY is responsible to maintaining the ITERIS issued limited-term license required to operate 9 and maintain SPM. 10 4. OCTA is responsible for managing user access to the regional pilot SPM hosted by ITERIS. 11 5. CITY shall be solely responsible for detecting and correcting malfunctions of CITY TRAFFIC 12 SIGNALS identified by SPM. 13 6. To work together in good faith, using reasonable efforts to resolve any unforeseen issues 14 and disputes arising out of the performance of this MOU. 15 7. This MOU may only be modified or amended upon written mutual consent. All 16 modifications, amendments, changes and revisions of this MOU in whole or part, and from 17 time to time, shall be binding upon CITY. 18 8. This MOU shall be governed by all applicable federal, state and local laws. CITY warrants 19 that in the performance of this MOU, CITY shall comply with all applicable federal, state 20 and local laws, statutes and ordinances and all lawful orders, rules and regulations 21 promulgated there under. 22 9. CITY shall indemnify, defend, and hold harmless OCTA, its officers, directors, employees 23 and agents from and against any and all claims (including attorneys' fees and reasonable 24 expenses for litigation or settlement) for any loss, costs, penalties, fines, damages, bodily 25 injuries, including death, damage to or loss of use of property, arising out of, resulting from, 26 or in connection with the performance of CITY, its officers, directors, employees, agents, Page 4 of 7 191 MEMORANDUM OF UNDERSTANDING AGREEMENT NO. C-0-2441 PILOT SIGNAL PERFORMANCE MEASURE PROJECT 1 subconsultants or suppliers under the MOU. Notwithstanding the foregoing,such obligation 2 to defend, hold harmless, and indemnify OCTA, its officers, directors, employees and 3 agents shall not apply to such claims or liabilities arising from the sole or active negligence 4 or willful misconduct of OCTA. 5 10. OCTA shall indemnify, defend, and hold harmless CITY, its officers, directors, employees 6 and agents from and against any and all claims (including attorneys' fees and reasonable 7 expenses for litigation or settlement) for any loss, costs, penalties, fines, damages, bodily 8 injuries, including death, damage to or loss of use of property, arising out of, resulting from, 9 or in connection with the performance of OCTA, its officers, directors, employees, agents, 10 subconsultants or suppliers under the MOU. Notwithstanding the foregoing, such obligation 11 to defend, hold harmless,and indemnify CITY, its officers, directors, employees and agents 12 shall not apply to such claims or liabilities arising from the sole or active negligence or 13 willful misconduct of CITY. 14 11. Indemnification obligations of this MOU shall survive its expiration or termination. 15 12. Either Party shall be excused from performing its obligations under this MOU during the 16 time and to the extent that it is prevented from performing by an unforeseeable cause 17 beyond its control, including but not limited to: any incidence of fire, flood; acts of God; 18 commandeering of material, products, plants or facilities by federal, state or local 19 government; national fuel shortage; pandemic; or a material act or omission by any other 20 Party; when satisfactory evidence of such cause is presented to the other agencies, and 21 provided further such nonperformance is unforeseeable, beyond the control and is not due 22 to the fault or negligence of the Party not performing. 23 13,This MOU shall continue in full force and effect through June 30, 2021, unless terminated 24 earlier by OCTA or CITY. Termination by either Party may occur at any time,with or without 25 cause, and be effective immediately 26 14. The term of this MOU may only be extended upon mutual written consent by both Parties. Page 5 of 7 192 MEMORANDUM OF UNDERSTANDING AGREEMENT NO. C-0-2441 PILOT SIGNAL PERFORMANCE MEASURE PROJECT 1 ARTICLE 5. IT IS MUTUALLY UNDERSTOOD AND AGREED: 2 All notices hereunder and communications regarding the interpretation of the terms of this MOU, 3 or changes thereto, shall be effected by delivery of said notices in person or by depositing said notices in 4 the U.S. mail, registered, or certified mail and addressed as follows: 5 To CITY: To OCTA: 6 City of Huntington Beach Orange County Transportation Authority 7 2000 Main Street 550 S. Main Street 8 Huntington Beach, CA 92648 P.O. Box 14184 9 Orange, California 92863-1584 10 Attention: Bob Stachelski Attention: Yvette Crowder 11 Transportation Manager Senior Contract Administrator 12 Department of Public Works (714) 560 -5616, ycrowder@octa.net 13 (714) 536-5523, bstachelski@surfcity-hb.org Alicia Yang: Project Manager 14 (714) 560-5362, ayang@octa.net 15 / 16 / 17 / 18 1 19 / 20 I 21 / 22 / 23 / 24 1 25 / 26 I Page 6 of 7 193 MEMORANDUM OF UNDERSTANDING AGREEMENT NO. C-0-2441 PILOT SIGNAL PERFORMANCE MEASURE PROJECT' 1 IN WITNESS WHEREOF,the Parties hereto have caused this MOU No. C-0-2441 to be executed 2 as of the date of the last signature below. 3 CITY OF HUNTINGTON EAC ORANGE COUNTY TRANSPORTATION AUTHORITY 4 1 / 5 By By: 6 S Crumby Pia Veesapen Directo�r(o Public�WJo�rks Manager, Contracts and Procurement 7 Dated: /� Dated: 10 l 2 01 /2D 8 9 ATTEST: APPROVED AS TO FORM: 10 11 y; 12 By. g !i. 13 CRobin4EVs sla es M. Donich ity Cie General Counsel 14 Dated: Dated: Aof 15 16 APPROVED AS TO FORM 17 18 By: — _ 19 Q:11vlichael E. Gates City Attorney 20 21 22 Dated: 23 24 25 26 Page 7 of 7 194 MEMORANDUM OF UNDERSTANDING AGREEMENT NO. C-0-2441 ATTACHMENT A—CITY TRAFFIC SIGNALS ID Location 12 Brookhurst Street @ Garfield Avenue 38 Brookhurst Street @ Yorktown Avenue 135 Brookhurst Street @ Beachmont Plaza 3 Brookhurst Street @ Adams Avenue 37 I Brookhurst Street @ Indianapolis Avenue 34 Brookhurst Street @ Atlanta Avenue 18 Brookhurst Street @ Hamilton Avenue 84 Brookhurst Street @ Banning Avenue 85 Brookhurst Street @ Bushard Street Page 1 of 1 195 MEMORANDUM OF UNDERSTANDING AGREEMENT NO.C-0-2441 ATTACHMENT B—ADVANCED TRANSPORTATION CONTROLLERS SPECIFICATIONS The Signal Performance Measure(SPM)Service is a cloud-based data and software service that shall allow the agency easy access to performance measures and visualizations derived from high-resolution data that is extracted from field-located signal controllers. Signal Controller Data The SPM Service shall have the capability of collecting,storing,and analyzing high-resolution(10 Hz)signal controller data from controllers that log this data in the industry-standard format. This list of controllers includes: • Siemens o M50 Linux& M60 ATV • ECOM v3.52+ • NTCIP v4.53+ • Econolite o Cobalt—Any version o ASC3 NEMA—v2.50+&OS 1.14.03+ 0 2070 with 1C CPU Module—v32.50+ • IntelightMaxtime—v1.7.0+ • McCain ATC Omni eX1.6+ • Peek ATC Greenwave—v03.05.0528+ • Trafficware 980ATC v76.10+ Data Acquisition and Transmission The following is required for data acquisition and transmission: • List of controller IP addresses and port numbers • Outbound access from the SPM data collection server to field controllers via port 161 (UDP) or other designated port. This access shall be used to identify the controller firmware version via SNMP. • Outbound access from the SPM data collection server to the field controllers(typically via port 22 for SFTP data transfer, port 21 for FTP data transfer,or other ports as designated by the controller manufacturer or agency). • Access from the SPM data collection server to a designated IP address (to be supplied to the agency by vendor)to the agency via Port 443 (TCP)for transfer of high-resolution data logs from the SPM data collection server to the SPM cloud hosted environment Service Setup Requirements To support the SPM service, the vendor shall acquire detector layouts and assignments in the signal controller.These shall be obtained from agency drawings, if available, orotherwise shall be obtained from the Advanced Traffic Management System (ATMS) or by field visits. The vendor shall perform set-up of the detector layouts and assignments within the SPM software tool. Page 1 of 1 196 19APRio✓ED 7-® , City of Huntington Beach File #: 20-1829 MEETING DATE: 9/8/2020 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Oliver Chi, City Manager PREPARED BY: Sean Crumby, Director of Public Works Subiect: Approve and authorize execution of a Memorandum of Understanding (MOU) with the Orange County Transportation Authority (OCTA) for the Pilot Regional Signal Performance Measure Project Statement of Issue: The Orange County Transportation Authority (OCTA) has submitted a Memorandum of Understanding (MOU) to the City of Huntington Beach to implement a traffic signal monitoring program for the City's signals along Brookhurst Street. This MOU clarifies the roles and responsibilities of the OCTA and the City with respect to the installation and operation of this monitoring system. Financial Impact: The Orange County Transportation Authority will be responsible for all project costs. There is no financial impact to the City. Recommended Action: Approve and authorize the Director of Public Works and City Clerk to execute "Memorandum of Understanding No. C-0-2441 Between Orange County Transportation Authority and the City of Huntington Beach for The Pilot Regional Signal Performance Measure Project." Alternative Action(s): Deny approval of the project and forgo participation in this project. Analysis: On March 2, 2018, the City Council approved a Cooperative Agreement with the Orange County Transportation Authority to participate in the Brookhurst Street Regional Traffic Signal Synchronization Project. This project provided operational and infrastructure improvements along City of Huntington Beach Page 1 of 2 Printed on 9/2/2020 powere4 /LegistarTM File #: 20-1829 MEETING DATE: 9/8/2020 Brookhurst Street from Fullerton to Huntington Beach. As the construction and initial retiming activities are complete, the project is moving into the operation and maintenance phase. As part of OCTA's management of this project, they have recommended implementing a monitoring system at each of the corridor's traffic signals in order that the traffic signal operational data can be remotely transmitted to OCTA. The cost of implementation and operation of this monitoring system will be the responsibility of OCTA. This agreement generally gives permission for OCTA to monitor the output from the City's traffic signals, and confirms that the City will continue to maintain the traffic signal system, as it ordinarily would regardless of this program. The City will also be given access to software so that City staff can also monitor the traffic signal output. This monitoring agreement will terminate on June 21, 2021, unless extended with mutual consent of both OCTA and the City. Public Works Commission Action: Not required. Environmental Status: No impact with approval of the agreement. The study is categorically exempt from CEQA. Strategic Plan Goal: Enhance and maintain infrastructure Attachment(s): 1. Project Location Map 2. Memorandum of Understanding No. C-0-2441 between Orange County Transportation Authority and the City of Huntington Beach for The Pilot Regional Signal Performance Measure Project City of Huntington Beach Page 2 of 2 Printed on 9/2/2020 powere29y LegistarT1 0 9ti Q`Pc~i� BOLSA AVE. NCO Mc FADDEN AVE. bi EDINGER z �' V) AVE, z �J p �HEIL a z � ¢ AVE. m >- OU N -J O Ln 0 Li N a m WARNER �`' o AVE. SLATER IAVE. m 405 ,0 TALBERT AVE. '9� PACIFIC ELLIS AVE. GARFIELD AVE. N N N U' F- COg� YORKTOWN AVE. z NA'�� ADAMS ¢ AVE. OQ9 %K w j INDIA OLIS AVE. x OCEAN 9� o x O ANTA Z i AVE. x O to U Q � m HAM LTON AVE. yG BANNING •• AVE. ROJECT LOCATION NTS CITY OF HUNTINGTON BEACH * PUBLIC WORKS PROJECT LOCATION - BROOKHURST STREET 253 I MEMORANDUM OF UNDERSTANDING NO. C-0-2441 2 BETWEEN 3 ORANGE COUNTY TRANSPORTATION AUTHORITY 4 AND THE CITY OF HUNTINGTON BEACH 5 FOR 6 THE PILOT REGIONAL SIGNAL PERFORMANCE MEASURE PROJECT 7 The following Memorandum of Understanding (hereinafter, "MOU") is effective this 29th day 8 of October , 2020 (Effective Date) between the Orange County Transportation Authority, 550 9 South Main Street, P.O. Box 14184, Orange California 92863-1584, a public corporation of the State of 10 California(herein referred to as"OCTA"),and the City of Huntington Beach,2000 Main Street, Huntington 11 Beach California 92648, a municipal corporation duly organized and existing under the constitution and 12 laws of the State of California (hereinafter referred to as, "CITY'), each individually known as "PARTY" 13 and collectively known as"PARTIES`with regard to the following matters: 14 WHEREAS, on April 1, 2019, OCTA entered into an agreement with Iteris, Inc. (ITERIS), for 15 procurement of a proprietary signal performance measure platform; and 16 WHEREAS,the ITERIS proprietary signal performance measure platform is known as Iteris SPM 17 (hereinafter referred to as"SPM"); and 18 WHEREAS, OCTA and CITY agree to the implementation of the SPM Project (hereinafter, 19 "PROJECT')as a pilot signal performance measure platform for the region to evaluate; and 20 WHEREAS, CITY has indicated their desire to connect their traffic signals listed in Attachment A 21 (hereinafter referred to as"CITY TRAFFIC SIGNALS")to the SPM; and 22 WHEREAS, use of SPM requires traffic signal controllers to meet the Advanced Transportation 23 Controllers (ATC) specifications, as listed in Attachment B, and requires that a communication link be 24 established between a remote location and CITY TRAFFIC SIGNALS; and 25 I 26 Page 1 of 7 MEMORANDUM OF UNDERSTANDING AGREEMENT NO. C-0-2441 PILOT SIGNAL PERFORMANCE MEASURE PROJECT 1 /WHEREAS, an internet portal hosting the SPM data of the CITY TRAFFIC SIGNALS is required for 2 OCTA and CITY to monitor the signal performance from a remote location(hereinafter referred to as 3 "ACCESS'); and 4 WHEREAS, CITY signal performance data (hereinafter referred to as "DATA") includes Real 5 Time Traffic Signal Data,Traffic Signal Timing Plan, and any other traffic signal data provided to ITERIS I 6 by CITY under this MOU; and. 7 WHEREAS, CITY is responsible for its jurisdictional portion of the operation and maintenance of 8 CITY TRAFFIC SIGNALS; and 9 WHEREAS, OCTA and CITY have previously cooperated, and will continue to cooperate, in 10 carrying out traffic signal synchronization and other Intelligent Transportation Systems (ITS) 11 improvements on the CITY TRAFFIC SIGNALS; and 12 WHEREAS,OCTA and CITY wish to make the DATA that is being collected along CITY TRAFFIC 13 SIGNALS through the SPM platform available for the purposes of traffic signal coordination and 14 maintenance operations; and 15 WHEREAS, this exchange of information will facilitate the optimization of traffic signal 16 synchronization as well as the ability to provide a multi-jurisdictional coordinated response to traffic 17 congestion. F 18 NOW, THEREFORE, in consideration of the mutual benefits to be derived by OCTA and CITY 19 and the promises herein contained, it is hereby agreed as follows: 20 ARTICLE 1. COMPLETE AGREEMENT: i 21 This MOU, including all exhibits and documents incorporated herein and made applicable by 22 reference, constitutes the complete and exclusive statement of the terms and conditions of the MOU E 23 between OCTA and CITY concerning the PROJECT and supersedes all prior representations, 24 understandings and communications between the parties. The above-referenced Recitals are true and 25 correct and are incorporated by reference herein. The invalidity in whole or part of any term or condition j i 26 of this MOU shall not affect the validity of other term(s) or condition(s). Page 2 of 7 i MEMORANDUM OF UNDERSTANDING AGREEMENT NO.C-0-2441 PILOT SIGNAL PERFORMANCE MEASURE PROJECT j i 1 ARTICLE 2. RESPONSIBILITIES OF OCTA: 2 OCTA agrees to the following responsibilities for PROJECT: 3 1. To configure and install SPM at CITY designated workstations for CITY TRAFFIC SIGNALS i Y 4 to enable operations with SPM at no cost to CITY. 5 2. To provide ACCESS to CITY for its use to monitor the performance of CITY TRAFFIC I 6 SIGNALS with the installation to be completed at no cost to CITY. 7 3. To accept responsibility for and to maintain in good condition the SPM platform tool installed 8 at CITY workstation. 9 ARTICLE 3. RESPONSIBILITIES OF CITY: 10 CITY agrees to the following responsibilities for PROJECT: 11 1. To be solely responsible for maintaining the timing for CITY TRAFFIC SIGNALS to promote 12 coordinated traffic operations, multi-jurisdictional cooperation, and improve arterial traffic 13 conditions. 14 2. To inform OCTA of new traffic signal installations and any traffic signal modifications, which 15 would materially affect performance metrics in SPM. 16 3. To accept responsibility for and to maintain in good condition appropriate traffic signal 17 controllers for PROJECT. 18 4. To accept full and complete ownership of, responsibility for, and to maintain in good condition 19 and,at CITY expense, communication at CITY TRAFFIC SIGNALS. 20 5. To allow all CITY DATA provided through SPM to be made available to any authorized public 21 CITY approved by OCTA and the owning CITY for the purpose of traffic signal coordination 22 and other traffic management related evaluations. 23 6. To accept responsibility for and to maintain in good condition the workstation operating the 24 SPM platform and ensure that it is not altered. 25 7. To provide access to the SPM workstation at no cost to OCTA, to install SPM and for the 26 platform upgrades and maintenance. Page 3 of 7 MEMORANDUM OF UNDERSTANDING AGREEMENT NO. C-0-2441 PILOT SIGNAL PERFORMANCE MEASURE PROJECT 1 ARTICLE 4. MUTUAL RESPONSIBILITIES OF PARTIES: 2 OCTA and CITY agree to the following mutual responsibilities for PROJECT: 3 1. Nothing in this MOU shall be construed to make CITY a party to or have any liability under 4 the SPM agreement. 5 2. Nothing in this MOU shall be construed as changing the role of CITY in operating and 6 maintaining the traffic signals and signal systems, such as a traffic control system, within 7 CITY's jurisdiction. 8 3. CITY is responsible to maintaining the ITERIS issued limited-term license required to operate 9 and maintain SPM. 10 4. OCTA is responsible for managing user access to the regional pilot SPM hosted by ITERIS. 11 5. CITY shall be solely responsible for detecting and correcting malfunctions of CITY TRAFFIC 12 SIGNALS identified by SPM. 13 6. To work together in good faith, using reasonable efforts to resolve any unforeseen issues 14 and disputes arising out of the performance of this MOU. 15 7. This MOU may only be modified or amended upon written mutual consent. All 16 modifications, amendments, changes and revisions of this MOU in whole or part, and from 17 time to time, shall be binding upon CITY. 18 8. This MOU shall be governed by all applicable federal, state and local laws. CITY warrants 19 that in the performance of this MOU, CITY shall comply with all applicable federal, state 20 and local laws, statutes and ordinances and all lawful orders, rules and regulations 21 promulgated there under. 22 9. CITY shall indemnify, defend, and hold harmless OCTA, its officers, directors, employees 23 and agents from and against any and all claims (including attorneys'fees and reasonable 24 expenses for litigation or settlement)for any loss, costs, penalties, fines, damages, bodily 25 injuries, including death, damage to or loss of use of property, arising out of, resulting from, 26 or in connection with the performance of CITY, its officers, directors, employees, agents, Page 4 of 7 MEMORANDUM OF UNDERSTANDING AGREEMENT NO. C-0-2441 PILOT SIGNAL PERFORMANCE MEASURE PROJECT a 1 subconsultants or suppliers under the MOU.Notwithstanding the foregoing,such obligation 2 to defend, hold harmless, and indemnify OCTA, its officers, directors, employees and 3 agents shall not apply to such claims or liabilities arising from the sole or active negligence 4 or willful misconduct of OCTA. i 5 10. OCTA shall indemnify, defend, and hold harmless CITY, its officers, directors, employees 6 and agents from and against any and all claims (including attorneys'fees and reasonable fi 7 expenses for litigation or settlement)for any loss, costs, penalties, fines, damages, bodily 8 injuries, including death,damage to or loss of use of property,arising out of, resulting from, 9 or in connection with the performance of OCTA, its officers, directors, employees, agents, 10 subconsultants or suppliers under the MOU. Notwithstanding the foregoing,such obligation 11 to defend, hold harmless,and indemnify CITY, its officers,directors,employees and agents 12 shall not apply to such claims or liabilities arising from the sole or active negligence or 13 willful misconduct of CITY. 14 11. Indemnification obligations of this MOU shall survive its expiration or termination. 15 12. Either Party shall be excused from performing its obligations under this MOU during the 16 time and to the extent that it is prevented from performing by an unforeseeable cause 17 beyond its control, including but not limited to: any incidence of fire, flood; acts of God; 18 commandeering of material, products, plants or facilities by federal, state or local 19 government; national fuel shortage; pandemic; or a material act or omission by any other 20 Party; when satisfactory evidence of such cause is presented to the other agencies, and 21 provided further such nonperformance is unforeseeable, beyond the control and is not due 22 to the fault or negligence of the Party not performing. 23 13.This MOU shall continue in full force and effect through June 30, 2021, unless terminated 24 earlier by OCTA or CITY. Termination by either Party may occur at any time,with or without 25 cause, and be effective immediately 26 14. The term of this MOU may only be extended upon mutual written consent by both Parties. Page 5 of 7 MEMORANDUM OF UNDERSTANDING AGREEMENT NO. C-0-2441 PILOT SIGNAL PERFORMANCE MEASURE PROJECT 1 ARTICLE 5. IT IS MUTUALLY UNDERSTOOD AND AGREED: 2 All notices hereunder and communications regarding the interpretation of the terms of this MOU, 3 or changes thereto, shall be effected by delivery of said notices in person or by depositing said notices in 4 the U.S. mail, registered, or certified mail and addressed as follows: 5 To CITY: To OCTA: 6 City of Huntington Beach Orange County Transportation Authority 7 2000 Main Street 550 S. Main Street 8 Huntington Beach, CA 92648 P.O. Box 14184 9 Orange, California 92863-1584 10 Attention: Bob Stachelski Attention: Yvette Crowder 11 Transportation Manager Senior Contract Administrator 12 Department of Public Works (714) 560-5616,ycrowder@octa.net 13 (714) 536-5523, bstachelski@surfcity-hb.org Alicia Yang: Project Manager 14 (714) 560-5362, ayang@octa.net 15 / 16 / 17 / 18 / 19 / 20 / 21 / 22 / 23 / 24 / 25 / 26 / Page 6of7 MEMORANDUM OF UNDERSTANDING AGREEMENT NO. C-0-2441 PILOT SIGNAL PERFORMANCE MEASURE PROJECT 1 IN WITNESS WHEREOF,the Parties hereto have caused this MOU No. C-0-2441 to be executed 2 as of the date of the last signature below. 3 CITY OF HUNTINGTON ORANGE COUNTY TRANSPORTATION AUTHORITY 4 5 By By; -'qv /� 6 Sgg� umby Pia Veesapen Director o Public Works Manager, Contracts and Procurement 7 /2 01 Dated: ` /�J Dated: b 8 9 ATTEST: APPROVED AS TO FORM: 10 11 12 Alt ; robin Es Isla es M. Donich 13 City Clef eneral Counsel 14 Dated: Dated: 15 16 APPROVED AS TO FORM 17 18 By: �: r _ 19 -Michael E. Gates City Attorney 20 21 22 Dated: 23 24 25 �26 Page 7 of 7 MEMORANDUM OF UNDERSTANDING AGREEMENT NO.C-0-2441 ATTACHMENT A—CITY TRAFFIC SIGNALS ID Location 12 Brookhurst Street @ Garfield Avenue 38 Brookhurst Street @ Yorktown Avenue 135 Brookhurst Street @ Beachmont Plaza 3 Brookhurst Street @ Adams Avenue 37 Brookhurst Street @ Indianapolis Avenue 34 Brookhurst Street @ Atlanta Avenue 18 Brookhurst Street @ Hamilton Avenue 84 Brookhurst Street @ Banning Avenue 85 Brookhurst Street @ Bushard Street Page 1 of 1 MEMORANDUM OF UNDERSTANDING AGREEMENT NO.C-0-2441 ATTACHMENT B—ADVANCED TRANSPORTATION CONTROLLERS SPECIFICATIONS The Signal Performance Measure(SPM)Service is a cloud-based data and software service that shall allow the agency easy access to performance measures and visualizations derived from high-resolution data that is extracted from field-located signal controllers. Signal Controller Data The SPM Service shall have the capability of collecting,storing,and analyzing high-resolution(10 Hz)signal controller data from controllers that log this data in the industry-standard format.This list of controllers includes: • Siemens o M50 Linux&M60 ATV ■ ECOM v3.52+ ■ NTCIP v4.53+ • Econolite o Cobalt—Any version o ASC3 N EMA—v2.50+&OS 1.14.03+ 0 2070 with 1C CPU Module—v32.50+ • Intelight Maxtime—v1.7.0+ • McCain ATC Omni eX1.6+ • Peek ATC Greenwave—v03.05.0528+ • Trafficware 980ATC v76.10+ Data Acquisition and Transmission The following is required for data acquisition and transmission: • List of controller IP addresses and port numbers • Outbound access from the SPM data collection server to field controllers via port 161 (UDP) or other designated port. This access shall be used to identify the controller firmware version via SNMP. • Outbound access from the SPM data collection server to the field controllers(typically via port 22 for SFTP data transfer,port 21 for FTP data transfer,or other ports as designated by the controller manufacturer or agency). • Access from the SPM data collection server to a designated IP address (to be supplied to the agency by vendor)to the agency via Port 443 (TCP)for transfer of high-resolution data logs from the SPM data collection server to the SPM cloud hosted environment Service Setup Requirements To support the SPM service, the vendor shall acquire detector layouts and assignments in the signal controller.These shall be obtained from agency drawings,if available,or otherwise shall be obtained from the Advanced Traffic Management System (ATMS) or by field visits. The vendor shall perform set-up of the detector layouts and assignments within the SPM software tool. Page 1 of 1 City of Huntington Beach 2000 Main Street ♦ Huntington Beach, CA 92648 (714) 536-5227 ♦ www.huntingtonbeachca.gov Office of the City Clerk Robin Estanislau, City Clerk September 15, 2020 Orange County Transportation Authority Attn: Yvette Crowder, Senior Contract Administrator 550 South Main Street PO Box 14184 Orange, CA 92863-1584 Dear Ms. Crowder: Enclosed is a partially executed original of the "Memorandum of Understanding No. C- 0-2441 between Orange County Transportation Authority and the City of Huntington Beach for the Pilot Regional Signal Performance Measure Project" approved by the Huntington Beach City Council on September 8, 2020. Upon complete execution, please return a copy of the fully executed agreement to us. Please mail the Agreement to: Robin Estanislau City Clerk 2000 Main Street, 2"d Floor Huntington Beach CA 92648 Your attention to this matter is greatly appreciated. Sincerely, Robin Estanislau, CIVIC City Clerk RE:ds Enclosures Sister Cities: Anjo, Japan ♦ Waitakere, New Zealand