Loading...
HomeMy WebLinkAboutAscon Landfill Site Update (11) City of Huntington Beach File #: 21-048 MEETING DATE: 1/19/2021 Ascon Landfill Site Update City of Huntington Beach Page 1 of 1 Printed on 1/13/2021 poweredt4 LegistarTM 1/20/2021 ASCON po CURRENT STATUS Clean-up efforts stopped since June 2019 ASCON is pursuing tenting/enclosure permits and work plan approval prior to continuing remediation work Site Maintenance will continue including: Weed Abatement, vector control inspections, Stormwater management measures, dust control measures, and application of soil sealant. Continued Air monitoring and sampling of on-site and off-site stations with results posted on DTSC's Enviorstor and on AsconHB.org. Continue 24 houronsite security. JANUARY 2021 DTSC WORK NOTICE DrwV=t•fTcP&Sr8•b iii;Cai•I-CLrpw"stoprolesthepeopleoommunbesandrnxorvnerdofCar<ornatrarhartnt�irmcaaby dearrig w mrierrwialed sip,erk"g haradua*w*iars and oxrpetrg tede.dopnerddsakr prtdd Odor Assessment Field Investigation Ascon Landfill Site 21641 Magnolia Street, Huntington Beach, California The Department of Toxic Substances Control(DTSC)has approved a site-wide odor assessment at the Ascon Landfill Site The purpose of the assessment is to identify areas of the Site that may have the potential to generate odor during future cleanup work at Ascon The assessment work will begin in mid-January 2021 and vnll consist of collecting and analyzing soil and soil vapor samples in the areas of the Site that are planned for future excavation. The onsite and oftsite air monitoring,since January 2019, has shown that air quality data has been below health-protective screening levels SUPPLEMENIAL COMMUNICATION Date: I q -2/ Agenda hem No.; .--. ODOR ASSESSMENT FIELD INVESTIGATION Establish a grid on the site and collect soil vapor samples over future excavation areas. ► Conduct soil vapor analysis to identify areas with the potential to generate odor during future cleanup work ► Develop best management practices to minimize odor during future remediation ► Anticipated to take 3 months to perform. Technical Advisor ► A third party technical advisor is available to the community to help review the technical aspects of the environmental cleanup. ► Andrew Cherene - HDR Engineering 1 1 HOW TO STAY INFORMED HTTPS//ASCONHB.COM Sign-up for weekly e-mail updates E-mail: Public hotline for non-emergency information: (714) 388-1825 Stay Informed Ascon Huntington Beach Please subscribe for email updates. A safer,cleaner future for the community SIGN ME UP QUESTIONS OR CONCERNS ? ► DTSC Project Manager ► Safouh Sayed, 714-484-5478, ► DTSC Public Participation Supervisor ► Jessica Anderson, 714-484-5416, ► South Coast Air Quality Monitoring District (SCAQMD). ► Air Quality and Dust Monitoring Questions P. 1-800-CUT-SMOG (1-800-288-7664) ► Ascon Project Contacts ► Hotline: 714-388-1825 ► Email: