Loading...
HomeMy WebLinkAboutAscon Project Update City of Huntington Beach File #: 21-354 MEETING DATE: 4/19/2021 Ascon Project Update City of Huntington Beach Page 1 of 1 Printed on 4/15/2021 ooweredl� Legistar° • 4/19/2021 Huntington Beach Ascon Landfill Site Update City Council Meeting April 19, 2021 • I. Ascon Landfill Site Update • Project and Site Status -Site Clean-up Efforts have been stopped since June 2019 as required by DTSC - Site Maintenance will continue including Weed Abatement,vector control inspections, Stormwater management measures, dust control measures, and application of soil sealant. -Continued Air monitoring and sampling of on-site and off-site stations with results posted on DTSC's Enworstor and on AsconHB.org. -Ascon Continues to develop overall site remediation plan and testing of canopy technologies. •Ascon is conducting an Odor Assessment Field Investigation •Conduct soil vapor analysis to identify areas with potential to . generate odor during the future clean-up •Completion of Odor Analysis the end of July 2021 COMMUNICATION MeftV Date: yI1A��09'l • 1 Agends ram No., I 35L1 • 4/19/2021 Ascon Landfill Site Update • Pit F Remediation Set to Resume in mid-June • Remediation will occur within the existing tent on site with air treatment system to operate continuously until work is complete - Expected to lake 3 months to complete • DTSC to perform Public Outreach and Education over the next month • - Distribution of Public Notification and Pit F FAQ sheet ` - information Mailed to 13,000 address located within one-mile radius of the project along with all required entities - DSTC/Ascon Coordinated with Edison High School to provide information to all parents and students - DTSC provide emails from project update email lists. Ascon Landfill Site Update • Pit F Remediation Set to Resume in mid-June(Cont.) • DTSC to perform Public Outreach and Education over the next month - Public Outreach Meeting to take place: •Date:May 6"2021 •Time:6:00 pm to 8:00 pm •Where:https://bit.ty/3d95AwU • Phone Line:(699)900-6833 •Webinar ID:882-4636-7707 •All information related to this effort will also be posted to the DSTC EnvioStor website: • https://www.envirostor.dtsc.ca.gov/public/ • 2 • 4/19/2021 Ascon Landfill Site Update • Ascon to introduce opt-in Community Alert System- AsconAlert -Community opt-in program to project project information and community details --�� •Technical Advisor Available for Questions from the Public - A third party technical advisor is available to the community to review the technical aspects of the environmental cleanup. -Andrew Cherene-HDR Engineering -HbtechnicaladvisorttPhdrinc.com Ascon Project Information Contacts • Department of Toxic Substances Control (DTSC) > DTSC Project Manager -Safouh5ayed-714-484-5478 -Safouh.Saved@dtsc.ca.gov >DTSC EnviroStor web Site -h"ps://www-envirostor.dtsc.ca.gov/public/ •South Coast Air Quality Monitoring District(SCAQMD) >Air Quality and Dust Monitoring Questions 1-800-CUT-SMOG (1-800-288-7664) •Ascon Project Contacts >Public Hotline for non-emergency information:714-388-1825 >Visit the Website: HTTPS//AsconHB.co >Sign up for weekly project e-mail updates HTTPS//AsconHB.com >Email:Info@AsconHB.com • 3 • 4/19/2021 Huntington Beach Ascon Landfill Site Update City Council Meeting April 19, 2021 • J. IIIMtIMfiON RCM • 4