Loading...
HomeMy WebLinkAboutPsomas - 2021-06-01 (3) City of Huntington Beach File #: 21-392 MEETING DATE: 6/1/2021 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Oliver Chi, City Manager PREPARED BY: Sean Crumby, Director of Public Works Subject: Approve and authorize execution of Professional Services Contracts for On-Call Civil Engineering, Surveying, and Consulting Services with Ardurra Group, BKF Engineers, RAK Development dba Kreuzer Consulting Group, Psomas and Stantec Consulting Services, Inc. Statement of Issue: The Public Works Department requires on-call civil engineering, surveying, and consulting services for as-needed support staff to assist with the design and construction of the capital improvement projects, which are identified in the annual Capital Improvement Program (CIP). Financial Impact: The City adopted Fiscal Year (FY) 2020/21 and proposed FY 2021/22 CIP Budgets total $24.5 million and $39 3 million, respectively, for approved projects citywide. Each approved CIP project has a budget containing sufficient funding for design, environmental, engineering, construction, project management, and other required costs. The five (5) recommended civil engineering contracts, totaling $5.0 million, will be funded within each project's individual CIP budget, as needed. As such, no additional funding is required by this action. Recommended Action: A) Approve and authorize the Mayor and City Clerk to execute $1,000,000 "Professional Services Contract Between the City of Huntington Beach and Ardurra Group for On-Call Civil Engineering, Surveying, and Professional Consulting Services," and, l.4e OCp ," & )�� B) Approve and authorize the Mayor and City Clerk to execute $1,000,000 "Professional Services Contract Between the City of Huntington Beach and BKF Engineers for On-Call Civil Engineering, Surveying, and Professional Consulting Services;" and, A4t; 1L J�Zb C) Approve and authorize the Mayor and City Clerk to execute $1,000,000 "Professional Services Contract Between the City of Huntington Beach and Kreuzer Consulting Group for On-Call Civil Engineering, Surveying, and Professional Consulting Services," and, NY"— city of Hmtrgton Bad Pepe 1 or 3 / Printed on 5/262021 File #: 21-392 MEETING DATE: 6/1/2021 D) Approve and authorize the Mayor and City Clerk to execute $1,000,000 "Professional Services Contract Between the City of Huntington Beach and Psomas for On-Call Civil Engineering, Surveying, and Professional Consulting Services" and, E) Approve and authorize the Mayor and City Clerk to execute $1,000,000 "Professional Services Contract Between the City of Huntington Beach and Stantec Consulting Services, Inc. for On-Call Civil Engineering, Surveying, and Professional Consulting Services." flL% Alternative Actionfs): Do not authorize the contracts and direct staff accordingly. Budgeted capital improvement projects could be delayed until new contracts are approved, Analysis: On February 1, 2021, the City advertised a Request for Qualifications (RFQ) for On-Call Civil Engineering, Surveying, and Professional Consulting Services. Proposals were requested and submitted in compliance with Chapter 3.03 of the Huntington Beach Municipal Code. Twenty-three (23) proposals were received for civil and engineering services. In accordance with qualifications- based selected procurement, per the Federal "Brooks Act," State SB 419, and the City of Huntington Beach Municipal Code Section 3.03 "Professional Services," the Public Works Department established a review board. Each firm stated their engineering category of expertise with their proposal. Proposals were then evaluated and ranked by the review board. The top five (5) firms were selected in each category to increase opportunity for competitive proposals for future projects from qualified on-call consultants. The five (5) contracts recommended for approval are for support staff for civil and design engineering of capital improvement projects. These services have historically been utilized to supplement City staff to meet annual Capital Improvement Program (CIP) goals, as an extension of staff, and/or to provide required expertise for unique projects. It is anticipated that these services will be required based on past years. Each project is evaluated on a case-by-case basis to determine if these as- needed contract services are necessary. The City's CIP is approximately $24.5 million in Fiscal Year (FY) 2020/21. In addition, the proposed FY 2021122 CIP totals $39.3 million in new projects. Typical design and construction support cost from the use of consultants on a CIP project can vary between ten to twenty percent (10-20%) of total costs for a CIP project. Therefore, it is practical to conservatively assume minimum annual consultant costs would be around $3 million to the City for total CIP projects, or approximately $9 million over the next three (3) years. Civil engineering, surveying, and consulting services are typically required for streets, alleys, parking lots, and other related CIP projects. Therefore, these consultants were selected to meet projected workload over the next three years with a total contract limit of $5 million. The proposed contract amounts are a not-to-exceed amount for a three-year terns, with no guarantee of work. Funding for any and all of these contract services is only through City Council authorization in the budget approval process. Environmental Status: Not applicable. City of Huntington Beath Page 2 of 3 Prnted on 5/262021 File #: 21-392 MEETING DATE: 6/1/2021 Strategic Plan Goal: Infrastructure & Parks Attachment(s): 1. Professional Services Contract between the City of Huntington Beach and Ardurra Group for On-Call Civil Engineering, Surveying, and Consulting Services 2. Professional Services Contract between the City of Huntington Beach and BKF Engineers for On-Call Civil Engineering, Surveying, and Consulting Services 3. Professional Services Contract between the City of Huntington Beach and Kreuzer Consulting Group for On-Call Civil Engineering, Surveying, and Consulting Services 4. Professional Services Contract between the City of Huntington Beach and Psomas for On-Call Civil Engineering, Surveying, and Consulting Services 5. Professional Services Contract between the City of Huntington Beach and Stantec for On-Call Civil Engineering, Surveying, and Consulting Services 6. Professional Services Award Analysis City of Huntington Beach Page 3 of 3 Printed on 5262021 nuwere24q Legiatar" PROFESSIONAL SERVICES CONTRACT BETWEEN THE CITY OF HUNTINGTON BEACH AND PSOMAS FOR ON-CALL, CIVIL ENGINEERING. SURVEYING R PROFF'SS1ONAL CONSULTING SERVICES THIS AGREEMENT (°Agreement") is made and entered into by and between the City of Huntington Beach, a municipal corporation of the State of California. hereinafter referred to as "CITY." and PSOMAS, hereinafter referred to as "CONSULTANT." WHEREAS. CITY desires to engage the services of a consultant to provide on-call civil engineering, surveying and professional consulting services; and Pursuant to documentation on file in the office of the City Clerk. the provisions of the Huntington Beach Municipal Code, Chapter 3.03, relating to procurement of professional service contracts have been complied Nvith; and CONSULTANT has been selected to perform these services. NOW. THEREFORE, it is agreed by CITY and CONSULTANT as follows: I. SCOPE OP SERVICES CONSULTANT shall provide all services as described in Exhibit "A," which is attached hereto and incorporated into this Agreement by this reference. These services shall sometimes hereinafter be referred to as the "PROJECT." CONSULTANT hereby designates Andrew Nickerson. P.E. who shall represent it and be its sole contact and agent in all consultations with CITY during the performance of this Agreement. 2. CITY STAFF ASSISTANCE CITY shall assign a staff coordinator to work directly with CONSULTANT in the performance of this Agreement. 21-9707n54816 1 of I I 3. TERM, TIME OF PERFORMANCE Time is of the essence of this Agreement. The services of CONSULTANT are to commence on 1J( AZ., / , 20�71 (the "Commencement Date"). This Agreement shall automatically terminate three (3) years from the Commencement Date, unless extended or sooner terminated as provided herein. All tasks specified in Exhibit "A" shall be completed no later than one year from the Commencement Date. The time for performance of the tasks identified in Exhibit "A" are generally to be shown in Exhibit "A." This schedule may be amended to benefit the PROJECT if mutually agreed to in writing by CITY and CONSULTANT. In the event the Commencement Date precedes the Effective Date, CONSULTANT shall be bound by all terms and conditions as provided herein. 4. COMPENSATION In consideration of the performance of the services described herein, CITY agrees to pay CONSULTANT on a time and materials basis at the rates specified in Exhibit "B," which is attached hereto and incorporated by reference into this Agreement, a fee, including all costs and expenses, not to exceed One Million Dollars ($1,000,000.00). 5. EXTRA WORK In the event CITY requires additional services not included in Exhibit "A" or changes in the scope of services described in Exhibit "A," CONSULTANT will undertake such work only after receiving written authorization from CITY. Additional compensation for such extra work shall be allowed only if the prior written approval of CITY is obtained. 6. METHOD OF PAYMENT CONSULTANT shall be paid pursuant to the terms of Exhibit "B." 21-9707454916 2 of I I 7. DISPOSITION OF PLANS. ESTIMATES AND OTHER DOCUMENTS CONSULTANT agrees that title to all materials prepared hereunder, including. without limitation, all original drawings, designs, reports, both field and office notices, calculations. computer code, language, data or programs, maps, memoranda. letters and other documents, shall belong to CITY, and CONSULTANT shall turn these materials over to CITY upon expiration or termination of this Agreement or upon PROJECT completion. whichever shall occur first. These materials max, be used by CITY as it sees fit. 8. 1-101-D HARIv1LESS A. CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless CITY. its officers, elected or appointed officials. employees, agents and volunteers from and against any and all claims, damages, losses, expenses, judgments, demands and defense costs (including. without limitation, costs and Ices of litigation of every nature or liability of any kind or nature) arising out of or in connection with CONSULTANT's (or CONS ULTANI's subcontractors, if any) negligent (or alleged negligent) performance of this Agreement or its failure to comply with an of its obligations contained in this Agreement by CONSULTANT, its officers, agents or y employees except such loss or damage which was caused by the sole negligence or willful misconduct of CITY. CONSULTANT will conduct all defense at its sole cost and expense and CITY shall approve selection of CONSULTANT's counsel. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as limitation upon the amount of indemnification to be provided by CONSULTANT. B. To the extent that CONSULTANT performs "Design Professional Services' within the meaning of' Civil Code Section 2782.8, then the following Hold Harmless provision applies in place Of subsection A above: 2 1-9707/254816 .i Of 11 "CONSULTANT hereby agrees to protect. defend. indenmify and hold harmless CITY and its officers, elected or appointed officials, employees, agents and volunteers, from and against any and all claims. damages, losses, expenses, demands and defense costs (including. without limitation, costs and t'ccs of litigation of' every nature or liability of any kind or nature) to the extent that the claims against CONSULTANT arise out of'. pertain to, or relate to the negligence, recklessness, or willful misconduct of CONSULTANT. In no event shall the cost to defend charged to CONSULTANT exceed CONSULTANT's proportionate percentage of' fault. However, notwithstanding the previous sentence, in the event one or more other defendants to the claims and/or litigation is unable to pay its share of defense costs due to bankruptcy or dissolution of the business. CONSULTANT shall meet and confer with CITY and other defendants regarding unpaid defense costs. The duty to indemnifw, including the duty and the cost to defend, is limited as provided in California Civil Code Section 2782.8. C. Regardless of whether subparagraph A\ or B applies, CITY shall be reimbursed by CONSULTANT for all costs and attorney's fees incurred by CITY in entorcing this obligation. This indemnity shall apply to all claims and liability regardless of' whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by CONSUL:fANf. 9. PRO. iSSIONAL LIABILITY INSURAN'CG CONSULTANT shall obtain and furnish to CITY a processional liability insurance police cowering the work performed by it hereunder. This policy shall provide coverage for CONSULTANT'S professional liability in an amount not less than One Million Dollars (SI,000,000.00) per occurrence and in the aggregate. The above-mentioned insurance shall not contain a self-insured retention without the express .written consent of CITY; however an insurance 21-9707r54816 4 of' I 1 police "deductible" of Ten Thousand Dollars (510,000.00) or less is permitted. A claims-made policy shall be acceptable i1 the policy further provides that: A. The policy retroactive date coincides with or precedes the initiation of the scope of work (including subsequent policies purchased as renewals or replacements). B. CONSULTANT shall notify CITY of circumstances or incidents that might give rise to future claims. CONSULTANT will make every effort to maintain similar insurance during the required extended period of coverage following PROJECT completion. If' insurance is terminated for anv reason. CONSULTANT agrees to purchase an extended reporting provision of at least two (2) Years to report claims arising from work performed in connection with this Agreement. If CONSULTANT tails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the CITY with required proof that insurance has been procured and is in force and paid for, the CITY shall have the right, at the CITY's election, to forthwith terminate this Agreement. Such termination shall not effect Consultant's right to be paid for its time and materials expended prior to notification ol'termination. CONSULTANT waives the right to receive compensation and agrees to indemnify the CITY for any work performed prior to approval of insurance by the CITY. 10. CERTIFICATE OF INSURANCE Prior to commencing performance of the work hereunder, CONSULTANT shall furnish to CITY a certificate of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverage as required by this Agreement: the certificate shall: A. provide the name and policy number of each carrier and policy; E. state that the policy is currently in force; and 21-e707n_�4816 5 of I I C. shall promise that such police shall not be suspended. voided or canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice; however, ten (10) days' prior written notice in the event of cancellation for nonpayment ol'premium. CONSULTANT shall maintain the foregoing insurance coverage in force until the Nvork Linder this Agreement is fully completed and accepted by CITY. The requirement for carrying the foregoing insurance coverage shall not derogate from CONSULTANT'S defense, hold harmless and indemnification obligations as set forth in this Agreement. CITY or its representative shall at all times have the right to demand the original or a copy of the policy of insurance. CONSULTANT shall pay, in a prompt and timely manner, the premiums on the insurance hereinabove required. 11. 1ND91 13 E NDENT CONTRACTOR CONSULTANT is, and shall be, acting at all times in the performance of this Agreement as an independent contractor herein and not as an employee of CITY. CONSULTANT shall secure at its own cost and expense, and be responsible for any and all payment of all taxes. social security. state disability insurance compensation, unemployment compensation and other payroll deductions for CONSULTANT and its officers. agents and employees and all business licenses. if any, in connection with the PROJECT and/or the services to be performed hereunder. 12. TERIMINATION OF AGREFME-NT All work required hereunder shall be performed in a good and workmanlike manner. CITY may terminate CONSULTANT's services hereunder at any time with or without cause. and whether or not the PROJECT is full- complete. Any termination of this Agreement by CITY shall be made in writing, notice of which shall be delivered to CONSULTANT as provided herein. In the 21-970-,P54816 6 of l 1 event of termination, all finished and unfinished documents. exhibits, report, and evidence shall. at the option of CITY, become its property and shall be promptly delivered to it by CONSULTANT. I I ASSIGNMENT AND DELEGATION This Agreenent is a personal service contract and the work hereunder shall not be assigned. delegated or subcontracted by CONSULTANT to any other person or entity without the prior express written consent of CITY. If an assignment, delegation or subcontract is approved. all approved assignees, delegates and subconsultants must satisfy the insurance requirements as set forth in Sections 9 and 10 hereinabove. 14. COPYRIGHTS/PATENTS CITY shall own all rights to any patent or copyright on any work. item or material produced as a result of this Agreement. 15. CITY EMPLOYEES AND OFFICIALS CONSULTANT shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of CITY shall have any financial interest in this Agreement in violation of the applicable provisions of the California Government Code. 16. NO'I'ICGS Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONSULTANT's agent (as designated in Section I hereinabove) or to CITY as the situation shall warrant. or by enclosing the same in a scaled envelope, postage prepaid. and depositing the same in the United States Postal Service, to the addresses specified below. CITY and CONSULTANT may designate different addresses to which subsequent notices. certificates or other communications will be sent by notifying the other party via personal delivery. a reputable overnight carrier or U. S. certified mail-return receipt requested: 21-9707/254816 7 of' I I TO CITY: TO CONSULTANT: City of Huntington Beach Psomas ATTN: Chris Tanio AT"I'N: Andrew Nickerson. 11.E. 2000 Main Street 555 South Plower Street, Suite 4300 Huntington Beach, CA 92648 Los Angeles. CA 90071 17. CONSENT When CITY's consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be a consent/approval to any subsequent occurrence of the same or any other transaction or event. 18. MODIFICATION No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties. 19. SECTION HEADINGS The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of'reference only and are not representative of matters included or excluded from such provisions, and do not interpret, define. limit or describe. or construe the intent of the parties or affect the construction or interpretation ofany provision of'this Agreement. 20. INTERPRE-TATION OF "1l-IIS AGREEMENT The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties. If any provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here. As used in this Agreement, the masculine or 21-9707253316 8 of I 1 neuter gender and singular or plural number shall be deemed to include the other whenever the context so indicates or requires. Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law. ordinance or regulation contrary to which the parties have no right to contract. then the latter shall prevail, and the provision of this Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law. 21. DUPLICATE ORIGINAL The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each ol'which so executed shall. irrespective ol'the date of'its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it. 22. IMMIGRATION CONSULTANT shall be responsible for full compliance with the immigration and naturalization laws of' the United States and shall, in particular, comply with the provisions of the United States Code regarding employment verification. 23. LEGAL SERVICES SUBCONTRACTING PROHIBITED CONSULTANT and CITY agree that CITY is not liable for payment of any subcontractor work involving legal services. and that such legal services are expressly outside the scope of services contemplated hereunder. CONSULTANT understands that pursuant to Hunthikron Beach CYry Charter Section 309, the City Attorney is the exclusive legal counsel for CITY: and CITY shall not be liable for payment of any legal services expenses incurred by CON SU LTA Nf. 21-9707n_5481e 9 0f 1 1 24. ArfoRNEY'S FEES In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorneys fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the nonprevailing party. 25. SURVIVAL Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement. shall so survive. 26. GOVERNING LAW This Agreement shall be governed and construed in accordance with the laws of the State of California. 27. SIGNATORIES Each undersigned represents and warrants that its signature hereinbeloxv has the power, authority and right to bind their respective parties to each of the terms of this Agreement. and shall indemnify CITY full\, for any injuries or damages to CITY in the event that such authority or power is not. in fact, held by the signatory or is withdrawn. 28. LN-flRi n, The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm's length negotiation, and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements. promises, agreements or warranties. oral or otherwise. have been made by that party or anvone acting on that party's behalf. which are not embodied in this Agreement, and that that party has not executed this Agreement in reliance on any representation. inducement, promise. agreement, warranty. fact or circumstance not expressly set forth in this 21-9707R5-1816 10 of I I Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof. 29. EFFECTIVE DATE This Agreement shall be effective on the date of its approval by the City Council. This Agreement shall expire when terminated as provided herein. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers. CONSULTANT, CITY OF HUNTINGTON BEACH, a PSOMAS municipal co lion of the State of Califo is 'By_ RRlEF N�FTAW print name ITS: /circle one)Chairman/Prcside�tt President City Clerk //SAND INITIA AN PPROV By:-�'�t/ fCCO , CHAO wXJ304 Director of Public Works print name ITS: (circle o<5C7cre hief Financial OtTiccr/Asst. Secretary-Treasurer njzr�)�ED- : City Manager APPROVID AS TMRM: try Attorney �{(` 21.9707254816 1 I of I I EXHIBIT "A" A. STATE.,%9ENT OF WORK: (Narrative of work to be performed) CONSULTANT shall provide consulting services on an' as- needed' basis for projects to be determined during the term of the agreement. During the term of the agreement, CITY may elect to solicit proposals from CONSULTANT. CITY shall issue task order for each project based upon the scope of services, work schedule, and fee proposal submitted to CITY for its review and approval. B. CONSULTANT'S DUTIES AND RESPONSIBILITIES: CONSULTANT'S duties and responsibilities shall be per CONSULTANT'S Statement of Qualification (Exhibit A), consistent with the City of Huntington Beach Request far Qualifications for On Call Civil Engineering Consulting Services. Upon award, and the contract period; if CONSULTANT chooses to assign different personnel to the project, CONSULTANT must submit the names and qualifications of these staff to CITY for approval before commencing work. C. CITY'S DUTIES AND RESPONSIBILITIES: 1. Furnish scope of work request for each project. 2. Furnish construction plans and specifications to the CONSULTANT. D. WORK PROGRAM/PROJECT SCHEDULE: A project schedule will be developed for each project assigned by City. EXHIBIT A 462 PSOMAS i t�. . . 1946-2021 �. •+��.�. 71 7 ON - CALL CIVIL ENGINEERING , SURVEYING AND PROFESSIONAL CONSULTING SERVICES Service Category: Civil Engineering City of Huntington Beach March 22,2021 463 i ON Table of Contents Section A: Cover Letter 1 Section B: Vendor Application Form Not part of page limit Section C: Pre-Qualification Form (Exhibit A) Not part of page limit Section D: Civil Engineering 2 Firm Qualifications 2 Staffing 9 Understanding and Methodology 10 Resumes R.1-R.IS Professional License Certificates Not part of page limit PS 0MAS % 464 i • Balancing:he%a::ral and Bail:Envronrnant March 22, 2021 Submitted via PlanetBids Jennifer Anderson City of Huntington Beach 2000 Main Street Huntington Beach, CA 92648-0190 Section A I Cover Letter: On-Call Civil Engineering, Surveying and Professional Consulting Services Dear Ms. Anderson: Psomas sincerely appreciates the opportunity to provide engineering services to the City of Huntington Beach (City) for civil engineering, surveying, and consulting services as a trusted on-call consultant. In reviewing the attached proposal, the City will find a team that is prepared to undertake rehabilitation and reconstruction of various on- and off-street infrastructure projects within the City's right-of-way.With thoughtful approach, state-of-the-art tools, and responsive professionals being proposed, we believe the City will find a partnership with Psomas to be mutually rewarding on your upcoming capital improvement projects. Over the past five years, we have completed similar on- and off-street improvement projects that are described in detail beginning on Page 3. These representative projects demonstrate the competencies of our team in assisting the City anticipated as complete similar projects, as well as the technical and managerial skills of the key professionals who are proposed for the City's contract. Our approach and methodology, which is found beginning on Page 10, has been tailored to the projects that are part of this contract. Psomas acknowledges receipt of Addendum 1, dated March 2, 2021. We stand ready to work with City staff and look forward to entering into a contract soon. Should you have any questions concerning our proposal, please do not hesitate to contact me. Sincerely, r,. P S O M A S 3 Hutton Cenue Drrva "Suite 300 Arief israftali/PE, TE, EE, RSPI, ENV SP Santa Ana,CA927o7, .7 Tel 714.731.7373 Contract Manager Fax 714.54-.6883 / w�w:.psomas.00m '11 465, �i ; /,r � � /�/,EN:DOR�AP jPLI;C�/o�►T jON j �� RM ��i!�� REQUEST FOR PROPOSAL VENDOR APPLICATION FOICNI TYP17 017 APPLICAN"r: ❑ NEW 0 CURRENT VENDOR Legal Contractual Name of Corporation: Psomas Contact Person for Agreement: Andrew Nickerson, PE Corporate Mailing Address: 555 South Flower Street, Suite 4300 City, State and Lip Code: Los Angeles. CA 90071 E-NIail Address: andrew.nickerson@psomas.com Phone: 213.223.1512 Fax: 213.223.1444 Contact Person for Proposals: Arief Naftali, PE Title: Project Manager E-iNlail Address: arief,naPali@psomas.com Business Telephone: 714.481.7956 Business Pas: 714.545,8883 Is your business: (check one) ❑ NON PROFIT CORPORATION © FOR PROFIT CORPORATION Is your business: (check one) [Lj CORPORATION ❑ umi-rED LIABILITY PARTNERSHIP ❑ INDIVIDUAL ❑ SOLE PROPRIETORSHIP ❑ PARTNERSHIP ❑ UNINCORPORATED ASSOCIATION I of? P S O M A S City of Huntington Beactg66/ On-Call Civil Engineering,Surveying and Professional Consulting Services / Names & Titles of Corporate Board Members (Also list Names & Titles of persons with written authorization/resolution to sign contracts) \'allies 'Title Phone See Attached Federal Tax Identification Number: 95-2863554 City of Huntington Beach Business License Number: A1528i4 (If none, %°ou must obtain a Huntington Beach Business License upon award of contract.) City of luntington Beach Business License Expiration Date: License renewed on 3/4/21 pending receipt 2 of P S O M A S City of Huntington eeacN7,/ On-Call Civil Engineering,Surveying and Professional Consulting.Services/ - UNANIMOUS WRITTEN CONSENT OF THE BOARD OF DIRECTORS OF ['SOMAS. a California corporation. March 2. 2021 THE UNDERSIGNED. beine all of the members of the Board of Directors of Psomas, a California corporation (the "Corporation"), hereby adopt the following resolutions without a meeting as of the date set forth above, pursuant to Section 307(b) of the General Corporation Law of California- RESOLVED that the following, being the Officers of the Corporation. be and hereby are authorized to execute any and all documents required to conduct the business of the Corporation. including, but not limited to contracts. leases and certifications: IT IS FURTHER RESOLVED that any one sienature of the Officers listed herein shall be sufficient to bind the Corporation: STE VE_ MARGARONI ['resident and Chic f Executive Officer NICK TARDITTI Chicf Financial Officer, Treasurer.Assistant Sccretary CHAD WILSON Vice President. Secretary CRAIG AHRENS Vice President ALEJANDRO ANGEL Vice ['resident BRETT 13ARN'I-TT Vice President JOSEPI I BARTORELLI Vice President REGINA BEENi Vice President STEVEN REIN Vice President JOSEPH L. BOYLE Vice President SCOTT BRYANT Vice President 13RIAN E. BULLOCK Vice President AGUSTIN CIIANG Vice President JE-.EFRE_Y CHESS Vice President MARCIA CARRILLO Vice President MATTHER' D. CLARK Vice President MICHAEL J. CREI[AN Vice President SARAI-I CURRAN Vice President CI IRIS DAVENPORT Vice President AMY DA\' Vice President WILLIAM ESTEPA Vice President ROSE FISTROVIC Vice President PETER FITZPATRICK Vice President DAN FORGEY \'ice President JEFF GILLIS Vice President ERNEST GOMEZ Vice President CRAIG GOOCII Vice ['resident DANN'IE B. GREEN Vice ['resident 'EIN90TIW G. IIAYES Vice ['resident GREGORY A. HELMER Vice President ALIA IIOKUKI Vice ['resident JIM IIUNTER Vice President ROBERT J. IANNARINO Vice President RICHARD IMAN Vice President JERENIN' JOIINSON Vice President ANN JOHNSTON Vice President GLENN LAJOIE Vice President / VIN'CENT LUNGARI Vice President JENNIFER MARKS Vice President FRANK MARTIN Vice President DENNIS MEYER Vice President PSOMAS City of Huntington Beacta68,! ' On-Call Civil Engineering,Surveying and Professional Consulting S rvices - Unanimous Written Consent of the Board of Directors of Psomas March 2. 2021 Paec 2 DAVID A. iMORIT% Vice President AR117F NAFTALI Vice ]'resident ANDREW NICKI?RSON Vice President ED O'11RIFN Vice ]'resident TRAVIS PERRY Vice ]'resident TOM PILARSK1 Vice President ,MICHAEL R. REDIG Vice ]'resident TERESITA REUI'PER Vice President SCOT"I' ROCKS Vice ]'resident SEAM SAMSI?L Vice President JAVIER SAUNDERS Vice President GARY S K R E L Vice President SEAN SMITII Vice President Tl IEO SNIITII Vice President RICHARD M. SULLIVAN Vice President MICHAEL D. SWAN Vice President ROBERT J.TALAFUS Vice President KEVIN T.I IJORNTON Vice President BYRON G. TOB Y,JR. Vice President RF_U13I N TOLI NIINO Vice President ALYSEN WI ILAN'D Vice President DONALD LEE \VFIITELEY Vice President CAROLINE YON"FIi7_ Vice President This Unanimous Written Consent shall be filed with the Minutes of the proceedings of the Board of Directors. and the actions taken hereby shall have the same force and effect as if'taken at a mcetin_ duly called and held. Rvan E. McLean David A. Moritz Matthew D. Clark Mike L.ucki Ann Johnston Steve Nlawaroni Alejandro An=el Byron Tobev Donald Lee Whiteley P S O M A 5 City of Huntington Beach On-Call Civil Engineering,Surveying and Professional Consulting Services69 � � PRE. QUALFFICATIO S FORM EXHIBIT A: PRE-QUALIFICATION FORM ON-CALL CIVIL, SURVEYING S PROFESSIONAL CONSULTING SERVICES 'l(Initial) Consultant is willing to execute the Agreement as drafted (See Appendix B). A[nitial) Consultant is able to provide the insurance as required (See Appendix C). Finn Name: Psomas [:inn Address: 5 Hutton Centre Drive, Suite 300, Santa Ana, CA 92707 Signature: ,��'j r '"`C r`,-^ Dale: March 22, 2021 i i , PSOMAS City of Huntington Beacl�70/" On-Call Civil Engineering,Surveying and Professional Consulting,Services/.' - , . CIVIL ENGINEERING% FIRM QUALIFICATIONS provide constructability review services from the Firm Profile contractor's vantage points on plan sets. Such a service enables the team to deliver ahigh-quality, Dedicated to balancing the natural and built yet fiscally practical set of plans, specifications and environment for nearly 75 years, Psomas has estimates that not only meet the City's objectives, provided sustainably engineered solutions to public but are also optimized for adherence to budget. and private clients worldwide. The cornerstone Our construction management staff also weighin of Psomas'approach is to focus on our clients' and provide expert opinions as part of the team's long-term needs and then guide strategic growth construction administration services,which is also to meet those needs. an added value of the Psomas Team. Psomas is a California corporation and our core strength is our multi-disciplinary teams of experts who produce award-winning projects for our clients through innovation,creativity and cutting-edge technical expertise. As a full-service consulting firm,we help our clients create value and deliver complex projects. The markets we serve include any project within the public domain, including water,sewage, and stormwater treatment and transmission; renewable energy; underground utilities; roads and bridges; site development; and vENVIRONMENTAL community facilities. AtQ 'f t In proposing to assist the City through this Psomas has a proven track record of meeting contract,Psomas'engineering and survey teams established schedules and is fully committing our are supported by two other related groups: key personnel based on their current workload. Environmental Planning,and Construction With more than 150 staff in our Santa Ana office, Management. Every on- and off-street we have professional resources from all disciplines improvement project requires the processing available to support this commitment. and approval of environmental documentation. Project Experience and References Having this expertise within the team allows Psomas to offer a more cost-effective,integrated Provided on the following pages are project planning service to the City on said projects. descriptions highlighting Psomas'experience Our construction management team is also well providing similar services. Each project integrated into the team. In fact,they often description includes a reference whom we encourage the City to contact. P S O M A S City of Huntington Beacf7t 2 On-Call Civil Engineering.Surveying and Professional Consulting Services Cameo Highlands Street Reconstruction Newport Beach, CA I City of Newport Beach RELEVANCE TO THIS CONTRACT • Orange County agency . ADA and drainage improvements e Roadway reconstruction Psomas was retained to lead a multi-disciplined team to develop a plan for street reconstruction within the Cameo Highlands neighborhood in the City of Newport Beach. Psomas provided civil PROJECT DATES REFERENCE August 2019 to February 2021 Andy Tran engineering, surveying,and project management Sen.o,Gve Engmeer 949.644.331S services for development of the street and ADA KEY PERSONNEL atran@newportbeachca.gov Steven Saine improvements,ensuring proper drainage is Senior project Engineer ehle maintained,and providing wet utility mapping and Christopher get P B tY PP $ Survey manager horizontal control of the project. OC Parking Lots for Strands Beach Parking Lot and CarbonRegional Orange County, CA I Orange County Public Works RELEVANCE TO THIS CONTRACT ` • Orange County agency • ADA accessibility and improvement . Parking lot rehabilitation Psomas provided engineering and surveying W1 I services to assess pavement condition and apply appropriate treatments to achieve the longest design life relative to cost for Carbon Canyon Regional PROJECT DATES REFERENCE Park and Strands Beach Parkin Lots.A Pavement January 2021 to December 2021 Anthony Ty,PE $ (estimated) Civil Engineering Assistant Evaluation and Repair Recommendations Report 714 6678800 anthony tylaocpw.ocgov mm was prepared to provide options on pavement KEY PERSONNEL Andrew Nickerson rehabilitation. Psomas'services included aerial pnnupa in.Cna•ge Ion Cretu surveying,design surveying,pavement repair plans, project manager grading and drainage plans,signing and striping plans,erosion control plans,and construction phasing plans,specifications, and cost estimate. P S O M A S City of Huntington Beacfg72 3 On-Call Civil Engineering.Surveying and Professional Consulting Services Colima • . . . Rehabilitation Whittier, CA I City of Whittier RELEVANCE TO THIS CONTRACT • Los Angeles County agency Road rehabilitation The City of Whittier seeks to reconstruct Colima Road between Mar Vista Street and Lambert Street, a distance of approximately 1.5 miles. Psomas is providing civil and traffic engineering PROJECT DATES REFERENCE design for development of roadway plans,curb October 2020 to May 2021 Bobby Ghaemi ramp reconstruction details, signing-striping KEY PERSONNEL plans, temporary traffic control plans and Arief Naftali Technical Manage- encroachment permit with Caltrans District 7. Includes preparation of Engineer's Estimate and Special Provision and support during construction. Hyperion Avenue/Glendale Boulevard Intersection . . Los Angeles, CA I Cky of Los Angeles RELEVANCE TO THIS CONTRACT ADA and on-street parking improvements e Roadway/intersection improvements with drainage component Traffic engineering improvements Psomas provided civil engineering services for Intersection Improvements funded by LA Metro's Call for Projects. Services included traffic queuing analysis, on-street parking considerations, PROJECT DATES REFERENCE August 2018 to Present Andrew Asfour design of exclusive turn lanes to alleviate Project Manager KEY PERSONNEL 21 queuing and traffic congestion, Class II Bike Arief Naftali andrew drew.asfoaslour(dlauty.org lanes, new crosswalk to facilitate safe pedestrian Project Manager P Env'ronmen[al Documentation Andrew Nickerson Norman Mundy passage across Glendale Boulevard,traffic signal Principal-in-Charge 213485s737 improvements, and improving the drainage system Jennifer Marks Norman Mundyolacity.org Environmental Project and infiltration basin at four major intersections Manager within the Silver Lake and Atwater neighborhoods In Los Angeles. P S O M A S City of Huntington Beacg73 4 On-Call Civil Engineering,Surveying and Professional Consulting Services Complete Program • Los Angeles, CA I Client: City of Los Angeles RELEVANCE TO THIS CONTRACT - e Curb ramps and ADA improvements _t 1 e Drainage and sustainability improvements e Roadway resurfacing and rehabilitation The Complete Streets Program incorporates pavement resurfacing, sidewalk repairs,concrete PROJECT DATES REFERENCE bus pads, street trees,Vision Zero, and Green Street May 2017 to August 2020 City of Los Angeles Julie Sauter,PE infrastructure into a combined project to extend KEY PERSONNEL Deputy City Engineer Arief Naftali 213.847.2230 the service life and,more importantly,enhance Traffic Engineer julie.sauterOlacity.org pedestrian and traffic safety.This task order is Andrew Nickerson principal-in-Charge the first of the program,consisting of six street Linda Luu corridors totaling 22 miles.The project scope project Engineer Christopher Riehle includes more than 600 curb ramps to be replaced Office Surveyor Ion Cratu and damaged sidewalks to be repaired. Technical Manager Marine Avenue and Liberty Manhattan Beach, CA I City of Manhattan Beach RELEVANCE TO THIS CONTRACT a Street rehabilitation on arterial and local streets • ADA and curb ramp reconstruction e Signing/striping and traffic engineering -" Psomas provided design of final construction plans, PS&E,and ADA accessibility improvements. Psomas not only provided solutions to rehabilitate the existing pavement,but also designed critical pedestrian accessibility improvements by upgrading PROJECT DATES REFERENCE 3une 2017 to February 2020 Man/lrto Estepa curb ramps to meet current ADA requirements, Associate Engineer 310.802.532S refreshing striping,and restoring impacted KEY PERSONNEL mestepa#citymb.info Arlef Naftali traffic signal loops at necessary intersections. project Manager The$1.6 million project budget was split between Andrew Nickerson prinupa Lin-Charge Proposition C funding for Marine Avenue and Measure R Local funds for Liberty Village. P S O M A S City of Huntington Beactd74 5 On-Call Civil Engineering,Surveying and Professional Consulting Services BoulevardCrenshaw Rehabilitation (182nd Street to • .e Beach Boulevard) Torrance, CA I City of Torrance RELEVANCE TO THIS CONTRACT • Roadway rehabilitation of an arterial street • Traffic engineering work • NPDES and SWPPP requirements -�- Psomas provided engineering and surveying services for rehabilitation of Crenshaw Boulevard. The projects construction budget was$3,200,000, PROJECT DATES REFERENCE not including construction management and September 2018 to July 2020 Justin Gatza nods inspection.The pavement within the project o KEY PERSONNEL 19atza(¢tornrranceca.gov limits is deteriorated and required rehabilitation Arief Naftali by cost-effective and strategic method(s). project Manager Andrew Nickerson Services included a design topographic survey; Principal-in-Charge utility research and notification,potholing, and coordination;base sheets; traffic index calculations;pavement evaluation review/design;roadway rehabilitation plan and profile; traffic signal medication plans; traffic control and staging plans;quantity calculations and cost estimate;and project specifications. Orange Costa Mesa, CA I California Construction Authority RELEVANCE TO THIS CONTRACT • Aerial mapping • Design and topographic survey Psomas provided a topographic survey of the entire 150-acre OC Fair g Event Center property. Project management included establishment of project survey control and oversight of topographic survey of the complete site.Topographic survey included PROJECT DATES REFERENCE February 2019 to April 2019 Tyler Phillips quantities and types of parking spaces on surface Projects and Planning Liaison 714708JS83 parking areas in the site. Aerial mapping collected KEY PERSONNEL Tphillips(socfair.com Christopher Riehle all visible features for roadway,utilities,and Surrey Manager cultural items in support of conventional ground survey. DTM breaklines and mass points supplemented select planimetric features for triangulation of a surface model creating the one-foot contours for the entire site. P S O M A S City of Huntington Seacfg75 6 On-Call Civil Engineering.Surveying and Professional Consulting Services On-Call Long Beach, CA I Port of long Beach RELEVANCE TO THIS CONTRACT .e. i, Aerial and topographic surveys . Design surveys Psomas is providing land surveying services including preliminary design surveys, right-of-way engineering,geospatial, construction staking, layout,as-built surveys, and control surveys. Services include establishing and maintaining PROTECT DATES REFERENCE survey control; documenting the location and type 2016 to Present Kimberly Holtz,PLS Director of Survey Division of existing structures and utilities; construction 562 2837271 KEY PERSONNEL kim.holtl@polb.com staking;calculation of earthwork qualities; final as- Christopher Riehl* Project Manager built surveys;boundary surveys; Records of Survey; corner records, preparation of easements,dedications, and leases; preliminary design surveys; 3D Laser Scanning Surveys; aerial surveys; topographic surveys;and photogrammetry. Key Personnel Information Matrix ARIEF NAFTALI A PR03ECT MANAGER I Sweatt"Far This Coarwam PE .. ... .. ...:._ :,c. TE .ST,afic EngmeeaCAs2296 Pubbc Works oackgrouno EE .. 6'Electncal Engineer/UI1570 a Multi-disciplined engineering expertise Ms . .;</Crvnl Engineering,Transportation Engineering/ a More than five years of experience as a Contract 'ornia state University.Long Beach Manager on similar on-call projects SS ':13civil Engineer ng/California state Polytechnic - .ersty,Pomona Anef Naftali has 21 years of hands-on professional experience in design and management of various road.traffic,civil,site,and highway projects serving multiple local and regional agencies m Southern California,including Caltrans.Arief is adept in roadway infrastructure.site development,active transportation,traffic engineering,outdoor electrical,and transportation planning projects.delivering improvement needs to local and regional communities alike.Anefs project portfolio encompasses a full range of projects starting from planning and design through construction ANDREW NICKERSON.PE,QSD/QSP,ENV SP 28 diPE 119971Professional Engineer/Civ,<A 456808 a Extensive site development and roadway experience MS 11996/Civil Engineering.Transportation/University of a Pecent experience in multimodal engineering projects California.Irvine a Expertise in multi agency permitting and balancing a 11992/Civil Engineering/Columbia university multiple stakeholder interests BA 11991/Physics/College of the Holy Cross Andrew Nickerson has 28 years of experience providing design support,management,and oversight of roadway improvement projects throughout Southern California.His experience has involved the full spectrum of services required for this contract,including the preparation and QA/QC oversight of RFI responses through full Public Works Plans.This is backed by years of design and oversight of ADA compliance,utility coordination,stormwater and water quality Best Management Practices IBM Ps),permitting,and agency coordination. PSOMAS City of Huntington 9eectJ78 7 On-Call Civil Engineering,Surveying and Professional Consulting Services Key Personnel Information Matrix (Continued) CARRIE DAVIS 25 QAftC MMAGEP Relevant Strengths For This Contract PE . . , ,.;oral EngmeedG. :461840 a Significant experience in Orange County BS v:l Engineenng/Cahforn,a State University. a Roadway and fre rwayffnterchange expertise a,ramento a Strong multi-stakeholdef engagement experience Carrie Davis has more than 25 years of experience primarily in Orange County where she has successfully managed and designed dozens of local arterial highway,interchange,and multi-use trail improvement projects.Her expertise ranges from preparing preliminary studies to developing the final construction PSBE for highway,local street.and multi use trail improvement projects.She has a strong understanding of Caltrans policies and procedures,environmental planning and permitting,and those of County and local agencies. LINDA LUU,PE.QSD/QSP,ENV SP 11 o • PE _ ' _- • =.•eosive experience with roadway and ADA BS 12009/Cvii EngineenngiCaidorn:a State Polytec— improvements University,Pomona • On.and off-street improvement experience • Planning to engineering expertise Linda Luu has 11 years of experience across multiple markets for design and design-build projects Her prior experience employed with public agencies acquainted her with program funding and public works rehabilitation projects.Project responsibilities include all aspects of a project from start to finish contract-proposal support,entitlement support,civil site design plans.specifications and estimates IPSBEI, permitting,and field engineering duties. ION CRETU.PE.QSD/QSP.ENV SP.LEED AP BD•C,ND 22 OFF-STREET IMPROVEMENTS Relevant Strengths For This Contract PE 12007,Professional EngkneeriC:v,liCA ri • Multi-agency and private development experience OS I1995,'Forest Engineenng/Transylvan a university of • On-and off-street improvements Bresov Pomanra • Roadway and ADA improvement expertise Ion Cretu has 22 years of civil engineering experience.He has experience in design of on-and offsite improvements for projects.Ion provides civil engineering for the design of mo'h-budd•ro ca-cusps 'n adda:cn to design,Ion a.' - r - - "ration for production and municipal processing. STEVEN NAINE,PE,Qs 32 . • WI!S11989/Civil EngineenngiUn:versity of California,evires • Extensive drainage and stormwater experience • Planning to engineering expertise Steve Baire has 32 years of experience in civil engineering design for all types of projects including public works,commercial,industrial, institutional,and high density and single-family residential projects His design tasks have included street,storm drain,grading,sewer, water and site design Steven has specialized experience in hydrology and hydraulic studies,water and sewer system analysis,storm water pollution prevention plans,and water quality management plans.He is proficient using various computer programs and mentoring other engineers to provide finished plans and reports.Additional skills include survey mapping,legal descriptions.topographic and staking -a'.culations,tentative maps,agency research and processing,planning studies,and CADD customizing and modeling. P S O M A S City of Huntington Beacfa77 8 On-Call Civil Engineering,Surveying and Professional Consulting Services Key Personnel Information Matrix (Continued) CHRISTOPHER RIEHLE - 19 SURVEYING SERVICES Rflf�mnt Stirtrigths F.,This Contract PLS 12018/Professional Land SurveyodCA 99453 a All-around expertise in survey services K 12002/Ceography CIS Minot/Cahforn,a Scare a CPS and geospatial experience Polytechnic University.Pomona a Multi-agency experience in Southern California .ears of experience in a wide array of survey and mapping disciplines,including boundary analysis,topographic . .. .,,and review of parcel maps.final maps and Records of Survey,lot line adjustments,legal description preparation, analysis and mapping of rights-of-way and easements.ALTA/NSPS Land Title Surveys,and extensive CPS post-processing and geodetic control network establishment throughout California and Nevada 7EKKIF[R MARKS 22 0III 11999INatural Resources,Planning.and Interpretation/ a Seasoned Project Manager with experience throughout Humboldt State University Orange and Los Angeles counties e Regularly interfaces with public agencies,private developers,key stakeholders,and interested public a Skilled at public presentations and community workshops related to the environmental process Jennifer Marks is a Senior Project Manager with over 22 years of experience in environmental documentation and analysis Consistent with CEQA and NEPA.Jennifer's career has focused on a wide variety of projects,including mixed use.residential,office,and resort developments;specific plan and general plan analyses;transportation infrastructure:and various utility infrastructure projects.She has prepared environmental documentation and supplemental information to meet specific agency requirements.including those for the fallowing agencies.Caltrans;State Water Resources Control Board.U.S.Bureau of Reclamation,U.5.Environmental Protection Agency;U.S. Army Corps of Engineers:U.S.Fish and Wildlife Service;California Department of Fish and Wildlife;various local planning and development departments:and private developers. STAFFING The City will require a team with the exact skills Staffing is key to a successful project and an and expertise to provide the services necessary to integral part of our quality management program. complete the City's projects in a timely manner and Our fundamental approach is to assemble the within your budget. Psomas'key to success with best-qualified team to match your project the City will be our responsiveness, understanding requirements. of the City's needs, familiarity with local and Not only is it important to have ample resources, regional standards and guidelines, and our but it is also critical the City work with a team who understanding of the community. truly understands how to manage this project. Psomas commits that,upon award and throughout The Psomas Team will be led by Arief Naftali,PE, the duration of the contract,if Psomas desires to assign different personnel to the project, TEr EE'RSPt,ENV SP,a known and trusted Project Manager with extensive experience in delivering Psomas agrees to submit names and qualifications including information as listed in the RFP to the services for similar projects. City for approval before they begin work. PSOMAS City of Huntington Eteac47B 9 On-Call Civil Engineering,Surveying and Professional Consulting Services Organization Chart orange asterisk(•)are considered key and are included in the Personnel Information Matrix on The Organization Chart below identifies our the previous pages. Project Manager who will also be the single point of contact for the Civil Engineering category. The Resumes Organization Chart delineates the Psomas Team, Resumes and copies of all pertinent licenses for their roles,and lines of communication. Personnel proposed staff are provided at the end of the identified in the Organization Chart with an proposal. p RD]ECT MANAGER 'Andrew Nickerson, 'Reuben Tolentino, 'Carrie Davis,. 'Arief Naftali, 'Christopher Riehle,Pis 'Linda Luu, 'Ion Cretu,PE 'Steven Baine, E Unnifer Marks 'As a current Contract Manager for a neighboring city,Long Beach,Reuben Tolentino will assist Andrew Nickerson in serving asthe City's alternate communication link to the Psomas Team on matters involving contract and assignment management. UNDERSTANDING AND METHODOLOGY Approach to Work Program 2. Final engineering work,which will result in a complete Plans, Specifications,and Psomas proposes to complete the City's Estimates package improvement projects based on the following workflow: 3. Bidding and Construction Phase services, where Psomas can assist the City as requested during t. Preliminary engineering work,which construction of proposed improvement projects. usually culminates in a Preliminary Design, Technical Memorandum, Study or Report with At the beginning of each project, the Psomas Preliminary Construction Cost Estimates Team will initiate a project meeting with the City, review the proposed scope of work,and integrate the requirements and objectives of the identified P S O M A S City of Huntington Bach_, 10 On-Call Civil Engineering,Surveying and Professional Consulting Services� project.The kick-off meeting will include Psomas Psomas offers cutting-edge technological means team members, City staff, and other affected in fulfilling field topographic survey data which parties and agencies, and will provide the forum to consist of the following: identify clear lines of communication and review Geospatial the final scope, schedule, milestones and other pertinent project details. For 75 years, Psomas has maintained a reputation The kick-off meeting is often followed by a for being a technological leader in the survey industry, and the Psomas Mobile Mapping System field visit to the project site to review existing and terrestrial laser scanners reflect the latest conditions and determine all of the issues that may cutting-edge scanning technology of today's be affected by the proposed improvements. scanning services. The Psomas Mobile Mapping Task 1 — Research and Data Collection System is a truck-mounted twin-sensor LiDAR (Light Detection and Ranging) scanning system In addition to the field review, any preliminary collecting over one million points per second, while plans, studies, and reports that may exist regarding traveling at traffic speeds up to 65 miles per hour. the project or project area will be researched and Utilizing overlapping passes, mobile scanning can obtained from the City, County and pertinent local provide fast, high-resolution, 3D data collection for utility providers- Available site infrastructure the "design-level" mapping of tunnels, roadways, will be collected. Such data may include right-of- railways, waterways, and utility corridors. Once way maps, as-built plans, preliminary planning the raw scan data is collected, specialized software or studies, hydrology/hydraulic calculations incorporates the independent"point clouds' into in the case of drainage improvements, utility a single registered geo-referenced "point cloud" plans, and other data.Additionally, Psomas will Finally, standard CADD drawings and other client- review relevant design considerations for existing specific deliverables can be "extracted" from this conditions, and assess deficiencies and the need for coordinated cloud of survey point data-When corrective action. coupled with appropriate project planning and the Task 2 — Topographic Survey and Base Mapright expertise, mobile and terrestrial scanning improves job safety, while still providing accurate, Psomas will perform survey of the project site productive, and cost-effective survey deliverables. under the direction of a professional land surveyor The Psomas 3D Static Laser Scanting system is a or civil engineer properly registered in the State non-intrusive method of rapidly collecting detailed of California.This survey will consist of a field and accurate as-built data. based on cutting-edge topographic survey and cross-sectional survey. The technology, 3D Laser Scanning uses a narrow laser survey information will produce a Topographic beam to sweep across an object, so that hundreds Base Map at appropriate scale with all elevations of thousands of closely spaced measurements , tied to City/County benchmark(s). can be taken in a matter of minutes. When j. these scanned measurements are displayed on a computer screen, a dense representation, or"point. i P S O M A S City of Huntington Beacq80��� On-Call Civil Engineering,Surveying and Professional Consulting Services - , cloud;' of the target results can then be viewed and of testing to gather information and characterize navigated much like a 3D model.This method of subsurface soil for purposes of trench excavations, data collection offers a broad variety of additional bedding, backfill materials, and slopes and benefits including: site detail that exceeds the embankment construction. level that can be attained by conventional survey methods; optimal data collection for bridges and Task 4 — Environmental overhead utilities; integration with high-resolution With the support of our in-house Environmental photography for a thorough and complete data Services Team, Psomas will prepare pertinent set,; ability to work in daylight or at night; indoors environmental documentation to meet the or outdoors; non-interference with ongoing requirements of CEQA and NEPA for federally operations or construction activities; and increased funded projects. The team will submit safety for survey field crews, other contractors, and environmental findings to Caltrans' Environmental the public. section, subject to the approval of City Council. Subsurface Utility Engineering Technical studies to the project will be prepared. Excavation is a dangerous component of many For qualified projects, Psomas staff typically construction projects, leading to an increased risk provides a project description and graphic, as of injuries taking place on the job site if ignored. well as fills out the City's Environmental/Project Thus, utility detection is crucial to ensure the Information Form and a Notice of Exemption success of the job without facing injury risks. The for City staff to process. Public meetings and Psomas Team has over 35 years of experience workshops may be part of the environmental providing underground utility detection services process and documentation. including standard utility detection, underground Task 5 — Utility Notii ication, Research, pipe locating, assessment and inspection, concrete and Mapping scanning and survey grade mapping services. Our utility detection team uses the most innovative Psomas will perform a detailed utility investigation tracing equipment to locate underground utility of the project site. This will include a request lines and markup the areas prior to or in lieu of through Dig Alert and an investigation of available excavation. We offer multiple reporting options, records for data needed to avoid design conflicts. from marks on the ground to an AutoCAD drawing Available plans from the City's Public Works that details all underground utilities to suit our Department will also be obtained. Notices will Clients' needs. be sent out to utility companies known to be present within the project limits requesting utility Task 3 — Geotechnical Investigation locations,atlas maps and plans. A project log of all Working with the City-assigned geotechnical utilities will be generated showing the status of subconsultant. Psomas will perform soil testing each information request. The log will be updated which may include bearing, trench/backfill during the life of the project. ' constraints, groundwater presence, and other types P S O M A S City of Huntington Beac 12 �8L On-Call Civil Engineering,Surveying and Professional Consulting,5ervices Psomas' full-service Subsurface Utility Engineering Projects Involving Parking Lots Or (SUE) team will pothole and locate utilities that are Like Off-Street Facilities. Parks or active deemed to be critical and may be impacted by the transportation facilities, accessibility, safety and proposed underground construction. Considering connectivities are paramount considerations. the gravity nature of either a storm drain or Often, preliminary engineering consists of sewer pipeline, the importance of utility conflict alternative alignments, layouts that are designed detection and resolution cannot be overstated. to optimize and encourage usage of the facilities Upon completion and approval of Preliminary once constructed. Proximity of crossings, access Engineering work (prior to Draft submittal), a roads and safety/security are weighed at this stage second utility notice with preliminary plans will where enhancements, which could include security be sent, requesting verification of facilities and lighting, high visibility crosswalks, and sight required coordination of anticipated relocation or distance corrections by way of parking restrictions, protection of existing facilities. Final improvement are proposed. A few practical considerations in a plans will be transmitted to all utility companies Parking lot/ADA-related design apply, as shown whose facilities are within the project site, below: informing them of the anticipated bidding period, Locate ADA stalls with the shortest path of anticipated construction schedule, and proposed travel to facility/building. timeframe of any relocation required of them. . Review the number of stalls required per City of Huntington Beach's Municipal Code. Task 6 — Preliminary Engineering Consider ratio of ADA stalls to the number of Street Rehabilitation and Reconstruction total parking spaces per ADA Table 208.2. Projects. Preliminary engineering would often For instance, a 1-to-6 ratio of required ADA van involve the vetting of rehabilitation alternatives stalls to regular ADA stalls is typically required. based on desired pavement design life, which . Running slopes generally need to be flatter than is typically 20 years. Recommended pavement <5%and no more than 2%cross-slope, which is sections are a function of traffic loading, existing required for ADA compatibility. pavement and subgrade conditions, and available budget. It is fitting for preliminary cost estimates Storm Drain/Drainage Projects. Psomas to be included to determine whether or not a recommends preparation of a Preliminary mitigation measure fulfills what the City would Drainage Study(PDS)where consensus on key like to accomplish, while balancing it with other design elements is typically reached. The PUS improvement needs such as curb/gutter, sidewalk typically consists of geometric approval drawings, replacements, curb ramp reconstruction, and a review of utility constraints and possible potential safety improvements considered. relocations, alternative pipe materials/construction methods(pre-cast versus cast-in-place), and costs for various alternatives. j. P S O M A S City of Huntington Beachh'/, 13 On-Call Civil Engineering.Surveying and Professional Consulting Services8, - In relation to water quality, the City of Huntington Based on the approved Preliminary Engineering, Beach is required to comply with the prevailing utility research, base mapping, and topographic Municipal NPDES Storm Water Permit, which is survey prepared during the preliminary part of the Santa Ana Regional Board. Preliminary engineering phase, Psomas will prepare plans, and Final Water Quality Management Plan (WQMP) profiles and details for a proposed improvement and SWPPP requirements per said permit will project and any utility line relocations. PSRE be followed. packages will be prepared for submittal to the City at Draft, Final Draft, and Final (t00%)completion Task 7 — Construction Document levels. Depending on project improvements at Preparation Phase hand, the PS&E package may include the following: Final design will commence upon approval of . Tide Sheet including Index Map Preliminary Engineering by the City. Changes or . Typical Section and/or Details additions required as a result of the preliminary Street Plans and Profiles design review will be incorporated into the final design as deemed necessary. Final calculations o Grading and Drainage Plans (for parking and studies will also be performed and completed, lot/ADA projects) and `preferred' alternative alignments, structures, . Signal/Striping and Geometric Plans materials will be developed. Details Sheets(including curb ramp details) As part of the Construction Document PSRE . Construction Staging and Traffic Control Plans package, final construction plans and details will . Water Quality Management Plan, as applicable be prepared which will show all of the proposed Storm Water Pollution Prevention Plan, improvements to successfully complete projects. as applicable The plans will be concise and constructible showing the disposition of all existing facilities At Psomas, we pride ourselves on producing within the project area and limits of all proposed biddable, constructible plans for our clients. improvements so the project can be bid and We have 75 years of experience in producing plan constructed with a minimal number of questions/ sets that include every detail needed to do just that. requests for information. Base plans of the project Special Provisions site will be prepared at the appropriate scale and final plans can be provided to the City digitally. Psomas will also prepare special provisions Base plans will display existing topographic to be incorporated into the boilerplate project features and accumulated data, including pipe specifications provided by the City, which are stationing, rights-of-way, surface features, assumed to provide the notice inviting bids, pertinent street or other reference alignment instructions to bidders, bidder's information, stationing, and existing utilities. agreement, bond and insurance forms, general conditions, and other applicable information. Final specifications, including special provisions i and references to supplement the Standard PSOMAS City of Huntington 6ea%. 14 . On-Call Civil Engineering,Surveying and Professional Consulting,Services,- i Specifications for Public Works Construction Task 8 — Project Meetings and Coordination (Green Book) and/or the Caltrans Standard Specifications, will be prepared and will include Depending on the sire and complexity of the Federal provisions, as required. project, Psomas strives to meet with project stakeholders on a regular basis to provide project Technical specifications may include dewatering status reports, updated schedules, and a list of requirements. Standard specifications including outstanding issues and coordination required. The those of Los Angeles County's Gray Book and project status reports will identify the status of others will be included, as needed. Standard plans, tasks, possible issues, and proposed solutions. special permitting requirements, potholing and geotechnical reports, and a sample contract, will be Task 9 — Bidding and Construction provided in the Appendix. Phase Services A final construction quantity estimate and Assistance will be provided to City staff during bid schedule will be incorporated into the construction bidding, including review and contract documents and an Estimate of Probable recommendation for approval of addenda and Construction Costs will be submitted. The final clarification to the plans and specifications- Our design package will then be submitted to the City proposed Project Manager will typically attend the and appropriate agencies for review and approval. pre-bid meetings, respond to RFIs and addenda, and assist in bid evaluation- Psomas can also attend Calculation Backups pre-construction meetings with the construction As required, Psomas will submit calculation contractor and will be available to answer any backups pertinent to a PS&E submittal that may questions that may arise. Our project team will include hydrology, drainage, curb return, profile review shop drawings and material submittals and sight distance calculations. and make comments and recommendations as Opinion on Probable Cost required. Informal field investigations, including (Engineer's Estimates) the marking of removal areas, will be performed. Our project team will be available on short notice Psomas will furnish an accompanying Opinion for on-site reviews of construction. on Probable Cost (also known as an Engineer's Estimate) for bidding and construction. Based upon red-lined as-builts furnished by the Appropriate labor and material unit costs, recent City/Contractor, Psomas will revise the original bids and available databases such as Caltrans' construction drawings to reflect "Record Drawing" Construction Cost Data will be used. It is important conditions and furnish final drawings in the the estimate resembles how bid items are to be format requested by the City. organized to facilitate construction bidding and tabulation and final bid analysis for award. P S O M A S City of Huntington 0eacl.4/15 On-Call Civil Engineering,Surveying and Professional Consulting.Services Arief Naftali, PE, TE, EE. PSP1, ENV SP Project Manager Arief Naftali is a licensed civil,traffic,and electrical,engineer in California with 20 years of hands-on professional experience in the design and management of various road,traffic,civil,site, highway,and engineering projects serving multiple local and regional agencies in Southern California, including Caltrans.Arief is adept in roadway infrastructure.site development,active transportation, traffic engineering,outdoor electrical, and transportation planning projects,delivering improvement needs to REGISTRATION local and regional communities alike.Arief's project portfolio encompasses a full 2016/Electrical Engineer/ range of projects starting from planning and design,through construction. CA u21570 Experience 20051'raffic Engineer/ CA#2296 City of Laguna Beach,Catalina Street Permanent Roundabout- Laguna 2003/Professional Engineer/ Beach, CA: Project Manager for the development of a set of construction documents for Civil/CA 964286 converting an existing,temporary,single-lane roundabout at the junction of Catalina Road Safety Professional Street, Los Robles,and El Camino Del Mar to a permanent,single-lane roundabout with Level 1 a center,landscaped island. Improvements include curb extensions,curb ramps,signage, EDUCATION striping,pavement markings,crosswalks at all five approaches,landscaping,and lighting in parkway areas and at the center of the island.Arief is responsible for the project 2004/MS/Civil Engineering management and day-to-day design of the project.Also in charge of subconsultant (Transportation Engineering)/California State management with a local landscape architect. University,Long Beach City of Anaheim/Walt Disney Company, Manchester Avenue Widening 2001/MA/Organizational -Anaheim, CA: Project,Manager for developing the PS&L for improving Manchester Management/Azusa Pacific Avenue including a new sidewalk,landscaping,street lighting, water meter and irrigation University system,8-foot-high fence and footing,erosion control,temporary traffic control,and 1999/BS/Civil Engineering/ new driveway. California State Polytechnic unlvers;ty, Pomona Marine Avenue and Liberty Village Improvement Projects- Manhattan Beach, CA: Project Manager for the design of pavement rehabilitation and ADA CERTIFICATION accessibility improvements on Marine Avenue between Sepulveda Boulevard and Envision Sustainability Aviation Boulevard,and in Liberty Village. Psomas is designing the final construction Professional/Institute for plans,specifications,and estimates(PS&E)as well as critical pedestrian accessibility Sustainable Infrastructure improvements by upgrading curb ramps to meet current ADA requirements, PROFESSIONAL refreshing striping,and restoring impacted traffic signal loops at necessary AFFILIATIONS intersections.Arief is responsible for managing the design team and budget to make sure the projects stay within the Proposition C and Measure R funding constraints, American Public Works Association and keeping the project on track to meet the aggressive six-month schedule. . Institute of Crenshaw Boulevard Rehabilitation (182nd Street to Redondo Beach Transportation Engineers Boulevard) -City of Torrance. CA: Project Manager for rehabilitation of Crenshaw Boulevard, from 182nd Street to Redondo Beach Boulevard,a multi-lane roadway with center turn lanes and parking lanes.The pavement within the project limits is deteriorated and required rehabilitation by cost-effective and strategic method(s), which included a combination of one or more of the following: localized repairs ("dig outs"),grind/overlay,and reconstruction. Other improvements consisted of: replacement of displaced curbs,gutters,and sidewalk;signing and striping,landscape improvements,and traffic signal modifications.Within the project limits there are P S O M A S City of Huntington Beacfj85 R-1 On-Call Civil Engineering,Surveying and Professional Consulting Services Arief Naftali two(2)signalized intersections that where upgraded.The project's construction budget is S3,200,00o, not including construction management and inspection. Psomas Continued Team services included a design topographic survey; utility research and notification, potholing,and coordination;base sheets; traffic index calculations,pavement evaluation review/design; roadway rehabilitation plan and profile; traffic signal medication plans; traffic control and staging plans; quantity calculations and cost estimate; and project specifications. City of Dana Point, Town Center at Pacific Coast Highway and Del Prado- Dana Point, CA:Traffic Engineer for the Dana Point downtown revitalization project that converted the roadway at Pacific Coast Highway(PCH)and Del Prado from one-way to two-way. Psomas designed signal modifications for nine intersections in the Dana Point Town Center and conducted a planning-level analysis to provide all direct property access via alleys in the Town Center.The design enhanced the pedestrian experience by widening sidewalks while retaining on-street parking; reflects the unique coastal environment;and created stronger linkages to the natural features along the bluff and other destinations such as the.Marina.The project required right-of-way improvements to return PCH to two-way operations, traffic signalization,striping and signing modifications,new bus stops,several landscaped medians,a new storm drain system, and road widening. Glendale-Hyperion Complex of Bridges Improvement Project - Los Angeles, CA:Traffic Engineer for the Project Report(PR)and Plans,Specifications, and Estimate(PS&E) for rehabilitation of this complex of six bridges. Improvements include widening the Glendale Boulevard bridges; realigning the I-5 northbound off- and on-ramps and Los Angeles River bike path;adding a median barrier on the Hyperion Avenue Viaduct, designing retaining walls, traffic signals,drainage system improvements,and infiltration basins;and improving pedestrian facilities including the Red Car pedestrian bridge and the Sunnynook pedestrian loop trail.The project involved coordination with various stakeholders and the use of various agency standards such as Caltrans, City of Los Angeles, FHWA,and AASN'ro. Complete Streets Program (TOS 38) - Los Angeles, CA:Traffic Engineer in support of HNTB for the PS&E preparation of the City's Complete Street Program intended to implement Vision Zero and green infrastructure elements and rehabilitate of 22 miles of roadway. Surveying services included developing a design survey base map that notes the centerline and resultant street rights-of-way of the various streets established from found monumentation. Colima Road Rehabilitation - City of Whittier, CA: Traffic Engineer for reconstruction of Colima Road between Mar Vista Street and Lambert Street,a distance of 1.5 miles. Provided civil and traffic engineering design services that included development of roadway plans, curb ramp reconstruction details,signing- striping plans, temporary traffic control plans and encroachment permit with Caltrans District 7. Preparation of Engineer's Estimate and Special Provision and support was provided during construction. i P S O M A S City of Huntington Beac l�66 R.2 On-Call Civil Engineering,Surveying and Professional ConsultingService5 - ' Andrew Nickerson. PE, QSD/QSP, ENV SP Principal-in-Charge Andrew Nickerson has 29 years of experience providing design support,management, and oversight of roadway improvement projects throughout Southern California. His experience has involved the full spectrum of services required for these projects, r including the preparation and QA/QC oversight of RFI responses through full Public Works Plans.This is backed by years of design and oversight of ADA compliance, utility "I ;� R•-�'. coordination, stormwater and water quality Best Management Practices(BMPs), permitting,and agency coordination. REGISTRATION 19971 Professional Engineer/ Experience Civil/CA#56808 Orange County Parking Lots, Strands Beach Parking Lot/Carbon Canyon EDUCATION Regional Park, Orange County Public Works- Orange County, CA: Principal-in- 1996/MS/civil Engineering. Charge for assessment of pavement condition and application of appropriate treatment Transportation/university of type to the facility in order to achieve the longest design life relative to cost for Carbon California.Irvine Canyon Park and Strands Beach Parking Lots. A Pavement Evaluation and Repair 1992/BS/Civil Engineering/ Recommendations Report to provide options on pavement rehabilitation for several Columbia University types of pavement failure.Through several detailed meetings with County staff, 1991/BA/Physics/College evaluated alternatives and associated construction costs. Managed redesign of existing of Holy Cross,Worcester, access ramps and sidewalks throughout the park to bring them up to current ADA Massachusetts standards. Many of the ramps straddled two jurisdictions so coordination between two CERTIFICATIONS agencies was required. 2013/Envision Sustainability Catalina Street Permanent Roundabout - City of Laguna Beach, CA: Professional/Institute for Principal-in-Charge for the development of a set of construction documents for Sustainable Infrastructure converting an existing,temporary,single-lane roundabout at the junction of Catalina 2011/Qualified SWPPP Street,Los Robles,and El Camino Del Mar to a permanent,single-lane roundabout Developer/Practitioner with a center,landscaped island. Improvements include curb extensions,curb ramps, signage, striping,pavement markings,crosswalks at all five approaches,landscaping, PROFESSIONAL and lighting in parkway areas and at the center of the island. AFFILIATIONS American Society of Civil Glendale-Hyperion Complex of Bridges Improvement Project- Los Angeles, Engineers,Los Angeles CA: Principal-in-Charge for the Project Report and PPS&E for rehabilitation of this Section complex of six bridges. Improvements include widening Glendale Boulevard bridges; e American Council of realigning the 1-5 northbound off-and on-ramps and LA River bike path;adding a Engineering Companies, median barrier on the Hyperion Avenue Viaduct,designing retaining walls,traffic Los Angeles County signals,drainage system improvements, and infiltration basins; and improving Chapter pedestrian facilities including the Red Car pedestrian bridge and the Sunnynook pedestrian loop trail.The project involved coordination with various stakeholders and the use of various agency standards such as Caltrans,City of Los Angeles, FHWA,and AASHTO. Marine Avenue and Liberty Village Improvement Projects-Manhattan Beach. CA:Principal-in-Charge for design of pavement rehabilitation and ADA accessibility improvements on Marine Avenue between Sepulveda Boulevard and Aviation Boulevard,and in Liberty Village. Psomas is designing final construction PS&E,as well as critical pedestrian accessibility improvements by upgrading curb ramps to meet current ADA requirements,refreshing striping,and restoring impacted traffic signal loops at necessary intersections. PSOMAS City of Huntington Beac487 R.3 On-Call Civil Engineering,Surveying and Professional Consulting Services Reuben Tolentino, CCM, DBIA, ENV SP Client Liaison Reuben Tolentino has 22 years of experience in providing construction management and inspection services. His experience includes management of staff and consultants, project management,construction management and inspection,constructability review,value engineering,construction documents and specifications,claim dispute resolution,contract administration,community outreach,bidding assistance,project controls,and scheduling review for both the public and private sectors. EDUCATION 1997/BArch/Architecture/ Experience California State Polytechnic On-Call Construction Management and Project Management-City of Long University,Pomona Beach, CA: Program Manager overseeing project/construction management,and CERTIFICATIONS Inspection of various CIP Projects citywide Including projects with various roadway and facilities improvements.Tenant improvements include structural repairs;bathroom Certified Construction Manager/Construction remodeling;community room upgrades,circulation counters,carpet,paint,electrical Management Association of and mechanical upgrades,demolition,asbestos and lead abatement,sustainability America upgrades,landscape and irrigation,parking lot and ADA upgrades,and playground Envision Sustainability rehabilitation projects. Professional/Institute for Sustainable Infrastructure On-Call Project Management and Construction Management Services- City of Huntington Beach,CA:Project Manager providing the City and its various Designated Design-Build departments with program,project and construction management services.Since Professional/Design-Build Institute of America the start of this contract in 2013,Psomas has provided services for Labor Compliance Services for Adams Avenue and Atlanta Avenue Street Rehabilitation Projects, PROFESSIONAL and Labor Compliance Services for Edinger Avenue and Warner Avenue Street AFFILIATIONS Rehabilitation Projects. • American Public Works Association,Southern On-Call Project and Program Management Services-County of Orange, CA: California Chapter Project Manager for estimating and scheduling support,cost control,document . Construction control,and management of information to ensure timely and cost-effective capital Management Association and/or maintenance-repair projects.Project management tasks included support of America,Southern services,building repairs or building physical makeup that meet aesthetic,functional, California Chapter structural,and safety factors for the construction or repair of any type of building r Design-Build Institute of component,or any aspect of a building or structure;and ensuring that these items America meet applicable codes and standards. Katella Avenue Smart Street Improvements-City of Anaheim, CA:Project Director to provide construction management and inspection services during construction of the$4 million Katella Avenue Smart Street Improvements project.The project was located along Katella Avenue in Anaheim,between South Humor Drive and South 9th Street,and included construction at the major intersection of Katella Avenue and Euclid Avenue.Work included the inspection of new traffic signal lights and loops installation,roadway reconstruction,AC paving and re-paving,installation of storm drains,construction of a drainage channel,block sound wall,and new sidewalks/curbs and gutters.The team also monitored contractor compliance with the storm water pollution prevention program(SWPPP). P S O M A S City of Huntington Beacfa88 R.4 On-Call Civil Engineering,Surveying and Profess,onal Consulting Services Carrie Davis PE QA/QC Manager Carrie Davis has 25 years of experience primarily in Orange County where she has successfully managed and designed dozens of local arterial highway,interchange, and multi-use trail improvement projects. Her expertise ranges from preparing preliminary studies to developing the final construction PS&E for highway,local street,and multi-use trail improvement projects.She has a strong understanding of Caltrans policies and procedures,environmental planning and permitting,and those of County and local agencies. REGISTRATION 2001/Profess,onal Engineer/ Experience Civil/CA 061840 Oso Creek Multi-Use Trail Preliminary Design and P58E - City of Laguna EDUCATION Niguel, CA: Project Manager for preliminary and final design services for the Oso Creek Multi-Use Trail along the western edge of Forbes Road between its northern BS/Civil Engineering/ terminus and the Metrolink Commuter Rail Transit Station to the south.The project Californiastate university. Sacramento consisted of a bicycle/maintenance access road with an adjacent pedestrian/equestrian S trail between Forbes Road and Oso Creek Channel.They City's Gateway Specific Plan includes redevelopment of the Forbes Road District into a more pedestrian friendly,Transit Oriented Development.The Oso Creek Multi-Use Trail provides direct connections from the recently constructed multi-family developments to the Metrolink Station.Additional improvements to Forbes Road included a road diet and water quality treatment facilities including pervious asphalt in interlocking pavers, bioretention/biofiltration parkways,and an under-drain system. I-S/Crown Valley Parkway Corridor PSBE-City of Laguna Niguel,CA:Design Manager for coordinating the multi-disciplined design team along with the several project stakeholders and affected property owners on this multi-phased project. A combined project Initiation Document and project approval and environmental document(PA/ED)was prepared,followed by PS&E for major capacity and operational improvements as part of the I-5/Crown Valley Parkway Corridor Improvement project.The improvements lengthened the existing right-turn lane approach to the southbound I-5 on-ramp and added an additional lane through the northbound I-5 on-ramp intersection.Locally initiated by the cities of Laguna Niguel and Mission Viejo and supported by OCTA and Caltrans through multiple funding sources,the 1-5/ Crown Valley Parkway Interchange is a model of planning,programming,design and construction of a regionally significant transportation project. Bridge-Class Culvert Replacement,Caltrans D-1212AI69S T0f11 -Laguna Beach, CA:As Project Manager,oversaw development of PS&E for replacement of a too-year old culvert which crosses a very busy portion of Pacific Coast Highway in downtown Laguna Beach.The project involves close collaboration with Caltrans to develop constructable solutions for replacement.Advanced locating methods were utilized,such as ground penetrating radar to better understand likely conflicts around an aging facility with limited as-built Information.The design team had to work with significant constraints to develop the PS&E package,including many utility crossings, hazardous materials found in the surrounding soils,City requirements to maintain traffic through the often congested roadway,and site restrictions that did not allow surveyors to accurately locate the existing facility. PSOMAS City of Huntington Beacfa89 11.5 On-Call Civil Engineering.Surveying and Professional Consulting Services Carrie Davis I-S/La Novia Interchange PEER and Plans, Specifications, and Estimate -City of San Juan Capistrano, CA: As Design Manager,led the project across all disciplines Continued to deliver the first roundabout on the State Highway System in District 12. One of the most challenging aspects of this four-legged roundabout project was consideration of the steep grade on La Novia on the approach to the intersection. Detailed profile and contour grading plans were prepared to flatten the intersection to the 4% maximum grade allowed by Caltrans. ,Ms. Davis worked with designers to prepare Technical Specifications, DSDD,and PEER during PS&E. She also led PDT and other meetings with the client and Caltrans. Culver Drive Widening and Realignment Plans, Specifications, and Estimate -City of Irvine, CA: As Project Manager, led the multi-disciplined design team for improvements to Culver Drive from Campus Drive to Bonita Canyon Drive. Improvements included the complete removal and reconstruction of the existing two-lane roadway by shifting the centerline and re-profiling the roadway to construct a new four-lane arterial with a raised median and a separate Class I meandering bike path.Temporary Construction Easements were required for the 96 residential properties that abut the project. Existing property walls were removed and reconstructed with sound walls (masonry block or plexi-glass)as required to mitigate noise and visual impacts. Unique design features of the project included water quality swales,a subterranean storm water detention facility,lowering the roadway to increase the stopping sight distance over a crest vertical curve,acoustical analysis and sound barrier design, landscaping, utility relocation and protection,and right-of-way acquisition services for 96 private properties. P S O M A S City of Huntington Beacfa901R:6�' On-Call Civil Engineering.Surveying and Professional Consulting Services i Linda Luu. PE, QSD/QSP, ENV SP On-Street Improvements s Linda Luu has 11 years of experience across multiple markets.She has built her career with design and design-build projects in water quality,chemical demilitarization, nuclear plants,environmental rehabilitation/remediation,street improvements and private development. Her prior experience employed with public agencies acquainted her with program funding and public works rehabilitation projects. Project responsibilities includes all aspects of a project from start to end - proposal support, REGISTRATION entitlement support, civil site design,plans,specifications and estimates(PS&E), permitting,and field engineering duties. Linda is a Qualified SWPPP Developer and 2014/Professional Engineer/ Practitioner, Envision Sustainability Professional,and a licensed Professional Engineer Civil/CA#83274 in the State of California. Linda currently serves on the Board of Directors for the EDUCATION American Society of Civil Engineers, Metropolitan Los Angeles Branch,and previously for the Los Angeles Younger Member Forum. 2009/BS/Civil Engineering/ California State Polytechnic University.Pomona Experience CERTIFICATIONS City of Los Angeles, Complete Streets Program (TOS 38) - Los Angeles, CA: Project Engineer for Plans,Specifications,and Estimate preparation of the Envision Sustainability Professional/Institute for City's Complete Street Program intended to implement Vision Zero and green Sustainable Infrastructure/ infrastructure elements and rehabilitate of 22 miles of roadway. Meticulous planning #11728 and management were needed to coordinate with multiple design teams,disciplines, Qualified SWPPP Developer/ and City departments to achieve the City's goals,objectives,and aggressive schedule. Practitioner/State Water Surveying services include developing a Design Survey Base Map that notes the Resources Control Board centerline and resultant street rights of way of the various streets established Safety Assessment Program/ from found monumentation.Mapping included the location of all surface visible California Governor's office improvements,including utilities,driveways,curbs, flowlines,and ramps over 22 miles of Emergency Services/ of roadway.The street centerlines of 22 miles of roadway were established by field v89029 survey and Right of Way was based on Los Angeles County Assessor's Maps and/or PROFESSIONAL underlying maps of record. AFFILIATIONS Glendale-Hyperion Complex of Bridges Improvement Project - Los Angeles, American Society of Civil CA: Project Engineer for the Project Report(PR)and PS&E for rehabilitation of this Engineers, Los Angeles complex of six bridges. improvements include widening the Glendale Boulevard Branch bridges; realigning the I-s northbound off- and on-ramps and Los Angeles River bike path;adding a median barrier on the Hyperion Avenue Viaduct,designing retaining walls,traffic signals,drainage system improvements,and infiltration basins; and improving pedestrian facilities including the Red Car pedestrian bridge and the Sunnynook pedestrian loop trail.The project involved coordination with various stakeholders and the use of various agency standards such as Caltrans,City of Los Angeles, FHWA,and AASHTO. Cumulus Media - Los Angeles, CA: Design Engineer for this signature mixed-use project at the corner of La Cienega Boulevard and Jefferson Boulevard. Psomas provided entitlements,surveying and mapping,and full-service civil engineering for the entire project. Linda was the lead civil designer for site utility layout,grading and drainage including building podium grading,grease interceptor design,low impact development using drywells,and on-site traffic striping.She managed civil design and permitting in the right-of-way comprising of new public sewer mainline extension,median island modifications, new sidewalk,curb ramps,curb and gutter, P S O M A S City of Huntington Beactagt R.7 On-Call Civil Engineering,Surveying and Professional Consulting Services Linda Luu and revocable permit. Part of her responsibility was to also work with LADOT to determine substitute mitigations in order to resolve the traffic mitigation measures Continued recommended in the EIR. Linda also oversaw the permitting for traffic signal and street lighting design, private driveway name establishment,and off-site mitigation measures through Caltrans and the B-Permit process while working alongside the design build client team. Alameda Square Garage (Right-of-Way DTLA Parking Structure and Campus Development) - Los Angeles, CA: Project Engineer for civil engineering services for this 10-level,4,000 space parking structure to serve right-of-way DTLA,a mixed- use project that will be home to approximately two million SF of buildings across thirty acres of gardens and walkable streets. Provided civil engineering design for the renovation of the six-building campus including new utility connections,stormwater management design, and site grading for each building as it is being renovated and converted into creative office space.This work included the creation of a new signalized intersection through the City of Los Angeles B-permit plan process. First at Broadway Civic Center Park - Los Angeles, CA: Project Engineer for civil engineering services related to the Civic Center Park located at First Street and Broadway in Downtown Los Angeles. Services include preliminary engineering, grading and drainage plan, wet utility plan,water quality plan, Storm Water Quality Management Plan, horizontal control,striping, and signage plan,and engineering support. East San Fernando Valley Transit Corridor Project (LA Metro) - San Fernando Valley, CA: Staff'ream on this project consisting of preliminary engineering and supporting the development of technical documents for design-build(D-B) procurement, D-B bid support and design services during construction.The East San Fernando Valley(ESFV)Light Rail Line is a 9.2-mile high capacity transit route connecting the Metro Orange Line in Van Nuys to the Metrolink Sylmar/San Fernando Station, one of the busiest thoroughfares in the San Fernando Valley,which includes 17 stations and an Operations and Maintenance facility through a mix of shared corridor with Union Pacific and Metrolink and street running guideway. Psomas is providing utility engineering design, topographic surveying,and right of way engineering services for the Los Angeles County Metropolitan Transportation Authority on the ESFV Transit Corridor project,located in San Fernando Valley, Los Angeles County. Rise Hollywood - Hollywood, CA: Project Engineer for this$110 million,7-story, mixed-used development with two levels of subterranean parking on an existing 2-acre lot at 1331 N.Cahuenga Boulevard.Services include civil engineering and entitlement assistance along with on-site civil scope and off-site design through the City of LA B-permit process. In order to create one contiguous project site,a street vacation was pursued to remove a portion of the existing Homewood Avenue.This work also included the re-route of approximately 650-ft and hydraulic analysis of an existing 24-inch storm drain around the project site to facilitate the street vacation. Linda coordinated the necessary pot-holing activity with the contractor to properly design and reroute the new storm drain through a congested section of Cahuenga Boulevard and Fountain Avenue.She also led the effort to clear the necessary critical path items including utility relocation design or abandonment,building easements, and street tree removal permit.while the street vacation was being processed, Linda spearheaded the task to obtain a revocable permit which allowed for street demolition , and building construction within Homewood Ave.This revocable permit was necessary, to prevent construction delays which was key to continue project funding. i' P S O M A S City of Huntington Beactg92,R:8 On-Call Civil Engineering,Surveying and Professional Consulting.Services Ion Cretu, PE Off-Street Improvements Ion Cretu has more than 22 years of civil engineering experience. He has experience in design of on-and off-site improvements for projects. Ion provides civil engineering for the design of multi-building campuses. In addition to design,Ion also provides coordination for production and City of Los Angeles processing. Experience REGISTRATION 2007/Profess,onal Engineer/ Orange County Parking Lots, Strands Beach Parking Lot/Carbon Canyon Civil/CA u71513 Regional Park, Orange County Public Works -Orange County, CA: Project Manager to assess pavement condition and apply appropriate treatment type to the EDUCATION facility in order to achieve the longest design life relative to cost for Carbon Canyon 199S/BS/Forest Engineering/ Park and Strands Beach Parking Lots. Prepared a Pavement Evaluation and Repair Transylvania University of Recommendations Report to provide options on pavement rehabilitation for several Brasov,Romania types of pavement failure.Through several detailed meetings with County staff, evaluated alternatives and associated construction costs. Managed redesign of existing CERTIFICATIONS access ramps and sidewalks throughout the park to bring them up to current ADA Qualified SWPPP Developer standards.Many of the ramps straddled two jurisdictions so coordination between two and Practitioner/California agencies was required. Stormwater Quality Association Complete Streets Program (TOS 38) - Los Angeles, CA:Technical Manager in Envision Sustainability support of HNTB for the PS&E preparation of the City's Complete Street Program Professional/Institute for intended to implement Vision Zero and green infrastructure elements and rehabilitate Sustainable Infrastructure of 22 miles of roadway.Meticulous planning and management were needed to LEED AP BD•C/U.S.Green coordinate with multiple design teams,disciplines,and City departments to achieve Building Council the City's goals,objectives,and aggressive schedule.Surveying services include LEED-ND/U.S.Green developing a design survey base map that notes the centerline and resultant street Building Council rights-of-way of the various streets established from found monumentation. PROFESSIONAL Beverly Hills Office Project - Beverly Hills, CA: Project Engineer for civil AFFILIATION engineering and survey services for the new two-story office building, approximately . American Society of Coil 24,000 SF,located in the City of Beverly Hills.The owner's development plan called for Engineers a custom office building including parking spaces to be located below grade. Project is evaluating LEED certifications Baldwin Hills Crenshaw Plaza Mall Renovation - Baldwin Hills, CA: Project Engineer for survey and engineering services including construction staking, parking lot layout,precise grading,drainage and paving plans for this 660,000 SF project. This project received the 2012 Los Angeles Architectural Award from the Los Angeles Business Council for Community Impact Transformational Development Award. Ion provided civil engineering services including parking lot layout,precise grading, drainage and paving plans,and coordination with the Department of Water and Power. El Segundo Corporate Campus-El Segundo,CA:Project Engineer for this mixed-use project located on a 46.5-acre site in the northeast portion of the City of El Segundo. Recently submitted for a LEED Silver certification,this project consists of commercial buildings, hotel, soccer field,fire station, parking facilities,and a central park. P S O M A S City of Huntington Beac�93 R.9 On-Call Civil Engineering,Surveying and Professional Consulting Services Ion Cretu 9900 Wilshire Boulevard - Beverly Hills, CA: Project Engineer providing civil engineering services for this collection of more than 200luxury condominium Continued residences comprising 13- and 15-story residential buildings, public and private gardens, water features,and a retail component designed by Richard Aleier K Partners. Raytheon Campus - El Segundo, CA: Project Engineer for civil engineering infrastructure and master planning services for the existing Raytheon property in El Segundo. Services included new public and private roadway,storm drain, sewer, water, technical EIR reports,and other infrastructure requirements.The proposed project involves construction of new of buildings for office and commercial uses which would total approximately 2,200,000 SF.Site development would also include surface parking and a private street with public utility easements. Development and construction of this program would be multi-phased. The technical reports consisted of a Sewer Area Study, Water Study,and Drainage Study. Courtyard by Marriott at Sth Street and Colorado Avenue - Santa Monica, CA: Project Engineer for civil engineering services for the design development of a stormwater treatment concept to treat and infiltrate stormwater tributary to the proposed hotel. The 136-room hotel is a six-story building with two levels of underground parking.Tasks included preliminary grading and utility plans,erosion control plan,stormwater pollution prevention plan (SWPPP), construction support, LEED support,and streetscape improvement plan. Hampton Inn and Suites (501 Colorado Avenue) - Santa Monica, CA: Project Engineer for civil engineering services for the design development of a stormwater treatment concept to treat and infiltrate stormwater tributary to the proposed hotel.The 143-room hotel is a six-story building with two levels of underground parking.Tasks included preliminary grading and utility plans, erosion control plan, stormwater pollution prevention plan (SWPPP),construction support,LEED support, and streetscape improvement plan. Glendale Adventist Medical Center-Glendale,CA:Project Engineer for producing civil design and construction documents for the Glendale Adventist Medical Center. Services included design of roadway ingress and egress,utility design,phasing,and grading and drainage for the addition of an acute care tower to the existing hospital complex.The project also required design for the addition of a five-story, above-grade and three below-grade facility with the main entrance drive through at the ground level utilizing a podium grading scheme. P S O M A S City of Huntington Beactt 94R.lo ' On-Call Civil Engineering,Surveying and Professional Consulting.Services / , Steven Baine. PE Stormwater (NPDES, WQMP, SWPPP) Steve Baine has over 30 years of experience and provides civil engineering designs for all types of land development projects including commercial,industrial, institutional, high density and single-family residential and public improvements. His design tasks have included street,storm drain,grading,sewer,water and site design. He is also a proactive consultant to the client,architect,engineers,construction manager, contractor and other consultants.He has specialized experience in hydrology and hydraulic studies,water and sewer system analysis,storm water pollution prevention REGISTRATION Plans,and water quality management plans. He is proficient using various computer programs and mentoring other engineers to provide finished plans and reports. t Civil/CA ofesswnal Engineer/ Additional skills include survey mapping,le al descriptions,topographic and stakin Civil/CA tt51327 Y g PB calculations,tentative maps,agency research and processing,planning studies and EDUCATION CADD customizing and modeling. 1909/BS/Civil Engineering/ University of California, Experience Irvine Cameo Highlands Street Reconstruction- City of Newport Beach, CA: Senior CERTIFICATIONS Project Engineer to develop a plan for street reconstruction within the Cameo Envision Sustainability Highlands neighborhood in the City of Newport Beach. Psomas provided civil Professional/Institute for engineering,surveying,and project management services for development of the Sustainable Infrastructure street and ADA improvements,ensuring proper drainage is maintained,and providing Qualified SWPPP Developer/ wet utility mapping and horizontal control of the project. Stormwater Multiple Application and Report Lake Forest Sports Park - Lake Forest, CA: Project Engineer for grading and Tracking System drainage studies of the proposed sports park.The studies were performed in order to prepare the boundary for the proposed park and assist in developing the park site PROFESSIONAL plan. Legal exhibits and descriptions were prepared showing the park boundary and AFFILIATIONS the environmentally protected areas(County parcels)that would be swapped between . Institute for the the City of Lake Forest and County of Orange.Psomas'services for the park design Advancement of included developing the preliminary alignment and profile of Rancho Parkway,on-site Engineering road alignment,public water system design, storm drain design,water quality design, . American Society of coordination with all utility purveyors and coordinating landscape improvements. Civil Engineers,Orange Final design included providing schematic,design development and precise grading, County Branch drainage, paving and utility plans;sewer,water and storm drain plans;hydrology and hydraulic studies; horizontal control plans;erosion control plans; topographic field and boundary surveys; construction quantities and cost estimates;NPDES permit and SWPPP; Water Quality Management Plan, and construction administration and bidding support. 15th Street/Balboa Boulevard Revitalization - Newport Beach, CA: Senior Project Engineer for development of a plan for reconstruction of 15th Street from West Oceanfront to Newport Bay.The project's scope included a new signalized intersection at Balboa Boulevard and 15th Street, reconfiguration of 15th street parking layout, striping,drainage,sidewalks, curbs,and landscaping improvements;construction of curb extensions and expanded median planters along Balboa Boulevard from 12th Street to 21st Street;vehicular turnaround design studies;and construction quantity estimates,bid schedules,and project specifications. Psomas was the lead consultant on this project and provided project management and design coordination with the City of Newport Beach, landscape architect and traffic engineer. P S O M A S City of Huntington Beacfa95 R.11 On-Call Civil Engineering,Surveying and Professional Consulting Services Steven Baine Mission Viejo Medical Office Center- Mission Viejo, CA: Project Engineer for civil site engineering services for R'CA Real Estate plans to develop a 100,000 SF, three-story Continued medical office building with a five-level parking structure for a minimum of 5oo cars. The site is located between The Shops of Mission Viejo ring road and Medical Center Drive on a site that has approximately 50 to 55 feet of grade difference between the two roadways. Psomas'services included providing Final Conceptual Grading and Utility Plan, Preliminary Hydrology and Hydraulic Studies, Preliminary Water Quality Management Plan,Conceptual Street Improvement Plan,and Tentative Parcel Map. Irvine Spectrum 5 - Phase 2- Irvine, CA: Project Engineer responsible for providing engineering services for expansion of the Spectrum Entertainment Center. The expansion includes addition of two three-story parking structures and the relocation of associated infrastructure. Each of these new structures provides an additional 500 parking stalls to accommodate the traffic anticipated with the expansion to the retail development.'the project's scope of work included reviewing the composite utility as-built base map required to generate system designs for schematic water, sewer, and storm drain.The preliminary design consisted of a grading study and drainage plan. 'rhe final scope of work included a precise grading plan,a storm drain improvement plans,a drainage report,an erosion control plan, a horizontal control plan,an underground fire line plan,and the coordination of dry utilities. Irvine Spectrum 5 - Phase 2 - Irvine, CA: Project Engineer responsible for providing engineering services for expansion of the Spectrum Entertainment Center.The expansion includes addition of two three-story parking structures and the relocation of associated infrastructure. Each of these new structures provides an additional 500 parking stalls to accommodate the traffic anticipated with the expansion to the retail development.The project's scope of work included reviewing the composite utility as-built base map required to generate system designs for schematic water, sewer,and storm drain.The preliminary design consisted of a grading study and drainage plan.The final scope of work included a precise grading plan,a storm drain improvement plans,a drainage report,an erosion control plan,a horizontal control plan,an underground fire line plan,and the coordination of dry utilities. As-Needed Engineering Design and Support Services, Water Resources- Los Angeles, CA: Project Engineer for the grading design to the County's Water Resources Division(%VRD) Facilities Group. Project types under this four-year contract are comprised of grading, drainage,and small dam design. Psonias'scope of work also included conducting geotechnical borings and analysis, hydrology analysis, preparing design plans that address grading, ingress/egress, drainage, fencing,and landscaping. The final desired outcome is an updated ultimate fill plan and/or the development of interim fill plans for LADWP's 16 active Sediment Placement Sites(SPS),evaluating possible new SPS locations and improving capacities of existing debris basins. City of Los Angeles, Staff Augmentation for Design Support & Construction Engineering (TOS 111) - Los Angeles, CA: Senior Project Engineer for street widening and storm drain improvements for Magnolia Boulevard in the City of Los Angeles. Provided street and storm drain improvements between Vineland Boulevard and Cahuenga Boulevard(approximately 2,700 feet/0.5 miles),and an extension of the existing 60-inch storm drain between Cartwright Avenue and Satsuma Avenue (approximately 1,300 feet).The design scope for this project included plan and profile sheets;sidewalk,driveway and curb ramp details; storm drain main and lateral profiles;street flow, catch basin and storm drain hydraulic calculations; signage and striping;and traffic signal design; cost estimating and specifications. Psomas was the lead consultant on this project,and provided project management and design coordination with the City of Los Angeles Bureau of Engineering and Department of Transportation. , P S O M A S City of Huntington Beacf R.12 On-Call Civil Engineering,Surveying and Professional Consulting.Services Christopher Riehle, PLS Surveying Services Chris Riehle has 19 years of experience in a wide array of survey and mapping disciplines,including ALTA/NSPS Land Title Surveys,boundary analysis,topographic mapping,preparation and review of parcel maps,final maps and Records of Survey, lot line adjustments,legal description preparation,analysis and mapping of rights-of- way and easements,and extensive GPS post-processing and geodetic control network establishment throughout California and Nevada. REGISTRATION 2016/CA/Professional Land Experience Surveyor/9453 Orange County Fair and Event Center,California Construction Authority- EDUCATION Costa Mesa,CA:Survey Manager for topographic survey of the entire 150-acre 2002/sS/Geography,CIS OC Fair&Events Center property in Costa Mesa.Project management included Minor/California State establishment of project survey control using a combination of GPS and conventional Polytechnic University, survey methods and oversight of topographic survey of the complete site consisting Pomona of compilation of aerial mapping and design-level ground survey. Design-level topographic survey included detailed data collection of all light towers,wires,cables, PROFESSIONAL AFFILIATION$ g and surface-visible indications of utilities above and below round,including,but not limited to,manholes,catch basins,valves,vaults,and indications of electrical,sewer, California Land Surveyors phone,and other subterranean uses. Topographic survey also included quantities Association and types of parking spaces on surface parking areas in the site. Aerial Mapping r American Council of collected all visible features for roadway,utilities,and cultural items in support of the Engineering Companies conventional ground survey. DTM breaklines and mass points supplemented select Women's Transportation planimetric features for triangulation of a surface model and ultimately the creation Seminar,Orange County of the 1'contours for the entire site. Chapter On-Call Surveying Services, Orange County Public Works-Orange County, CA: Survey Manager to provide professional land surveying services on an as-needed basis to support the development,construction,improvement,and maintenance of existing and/or future projects.Scope of services includes records research,horizontal control,record of survey and corder record preparation procedures,global navigation satellite system surveys,cross-sections/scour study surveys,topographic surveys, terrestrial laser scanning,construction staking,right-of-way engineering,subsidence and deformation monitoring surveys,hydrographic surveys,unmanned aerial surveys, ALTA surveys,mobile LiDAR data collection,boundary surveys,and training. Cameo Highlands street Reconstruction-City of Newport Beach,CA:Office Surveyor for development of a plan for street reconstruction within the Cameo Highlands neighborhood in the City of Newport Beach.The project's scope consists of reconstructing the existing asphalt roadway,reconstructing deteriorated concrete flatwork,completing ADA improvements in the project limits,adjusting utilities to grade,installing street signs,and pavement striping.Psomas is providing civil engineering,surveying,and project management services for development of the street and ADA improvements,ensuring proper drainage is maintained,and providing wet utility mapping and horizontal control of the project. P S O M A S City of Huntington Beacg97R.13 On-Call Civil Engineering,Surveying and Professional Consulting Services Christopher Riehle 1.405 Program Management- Orange County, CA: Project Surveyor for survey services in support of the Parsons Program Management team's 30-percent design Continued plans for this 16-mile project.The project will add a general purpose lane and two express lanes in each direction, improve all exits and entrances to the freeway, and upgrade over 19 bridges.As part of the PMC team, Psomas is responsible for establishing project controls, pre-and post-construction Records of Survey, legal descriptions and plats,appraisal maps, design and drainage surveys, and monument preservation. 1-5 Improvements from Alicia Parkway to El Toro Road (Segment 3) - Orange County, CA: Office Surveyor for two 3-mile corridor segments from SR-93 and the 1-5 interchange north of El Toro Road. Processed GPS,level and conventional survey data; and computed boundaries,analyzed deeds, record maps,and survey monuments to determine right-of-way and parcel boundaries. Integrated aerial mapping, LiDAR mobile mapping and conventional surveying of the topography for design purposes. Filed a Record of Survey for monument preservation and acquisitions for legal descriptions for Caltrans. Complete Streets Program (TOS 38) - Los Angeles, CA: Office Surveyor in support of HNTB for the PSKE preparation of the City's Complete Street Program intended to implement Vision Zero and green infrastructure elements and rehabilitate of 22 miles of roadway.Surveying services included developing a design survey base map that notes the centerline and resultant street rights-of-way of the various streets established from found monumentation. Mapping included the location of all surface visible improvements, including utilities,driveways, curbs, flowlines,and ramps over 22 miles of roadway.The street centerlines of 22 miles of roadway were established by field survey and right-of-way was based on Los Angeles County Assessor's maps and/or underlying maps of record. SR-91 Corridor Improvement, Riverside County Transportation Commission - Corona, CA: Project Surveyor for surveying and mapping services for construction of two tolled express lanes and a general purpose lane from the Orange County line to I-15,and a general purpose lane to Pierce Street. Services included boundary analysis for right-of-way,easement acquisitions overseeing land net resolutions, preparation of site-specific safety plans and traffic safety and control plans,legal descriptions and plats,and appraisal exhibit preparation. Deliverables were prepared in MicroStation using In Roads for calculations and closures. i� ;i PSOMAS City of Huntington Beacl§9eR.14 On-Call Civil Engineering.Surveying and Professional Consulting Services Jennifer Marks Environmental Planning Jennifer Marks is a Senior Project Manager with 22 years of experience in environmental documentation and analysis consistent with CEQA and NEPA.Jennifer's career has focused on a wide variety of projects,including mixed-use, residential, office,and resort developments;specific plan and general plan analyses;transportation infrastructure;and various utility infrastructure projects.Through her project work, Jennifer has developed strong working relationships with agency personnel,County and City staff,private developers,and a variety of specialty consultants. EDUCATION C 1999iBSi Natural Resources, Experience Planning and Interpretation/ Tustin Avenue and La Palma Avenue Roadway Improvements Initial Humboldt State University Study/Mitigated Negative Declaration-Anaheim, CA: Project Manager for PROFESSIONAL environmental documentation for this project,which involved the widening of Tustin AFFILIATIONS Avenue and La Palma Avenue to accommodate lane additions and restriping.The . American Society of Civil project implemented mitigation for additional traffic expected from Kaiser Hospital Engineers and required coordination with Caltrans to obtain an encroachment permit. . Environmental and Water Glendale-Hyperion Complex of Bridges Improvement Project- Los Resources Institute Angeles,CA: Environmental Project Manger for the Project Report(PR)and Plans, Specifications,and Estimate(PS$E)for rehabilitation of this complex of six bridges. Improvements include widening the Glendale Boulevard bridges;realigning the I-5 northbound off-and on-ramps and Los Angeles River bike path;adding a median barrier on the Hyperion Avenue Viaduct,designing retaining walls,traffic signals, drainage system improvements,and infiltration basins;and improving pedestrian facilities including the Red Car pedestrian bridge and the Sunnynook pedestrian loop trail.The project involved coordination with various stakeholders and the use of various agency standards such as Caltrans,City of Los Angeles, FHWA,and AASHTO. Lincoln Bridge Multi-Modal Improvements-Los Angeles,CA:Environmental Lead for preparation of an environmental Impact report and environmental assessment to improve circulation and safety along Lincoln Boulevard.The project proposes roadway modifications,installation of sidewalks and protected bicycle lanes, and implementation of complete streets Lincoln Boulevard. Vereda Bikeway Underpass Preliminary Environmental Study-San Juan Capistrano,CA:Assistant Project Manager for preparation of a Preliminary Environmental Study(PES)for the construction of a new undercrossing of the Los Angeles,San Diego(LOSSAN)Rail Corridor for the Vereda(San Juan Creek)trail crossing,ultimately connecting the eastern City limits of San Juan Capistrano with Doheny State Beach. Brookhurst Street Improvements Project Environmental Documentation -Anaheim, CA:Project Manager for preparation of separate documents pursuant to CEQA and NEPA.The project will provide an additional travel lane,bikeways, sidewalks,and landscaped areas.Jennifer prepared the IS/MND for the project,which was approved in by the City of Anaheim in 2013.She also managed the preparation of an Environmental Assessment and Finding of No Significant Impact and all related and required technical studies for Caltrans review and approval pursuant to NEPA and Caltrans requirements.Jennifer served as the primary contact with Caltrans staff throughout the duration of the project. P S O M A S City of Huntington BeacYgggR.15 On-Call Civil Engineering,Surveying and Professional Consulting Services Professional License Certificates Arief Naftali Linda Luu =_ BOARD FOR PROFESSIONAL ENGINEERS,LAND BOARD FOR PROFESSIONAL ENGINEERS,LAND G 11 SURVEYORS,AND GEOLOGISTS EI��I SURVEYORS.AND GEOLOGISTS LICENSING DETAILS FOR N286 LICENSING DETAILS FOR 83224 BOARD FOR PROFESSIONAL ENGINEERS,LAND SURVEYORS,AND GEOLOGISTS Ion Cretu. DE LICENSING DETAILS FOR:2296 BOARD FOR PROFESSIONAL ENGINEERS,LAND V"— A 1 1 5URVEYORS,AND GEOLOGISTS B� — IIOEN51N0 DETAILS FOR:]161] BOARD FOR PROFESSIONAL ENGINEERS,LAND ,.r:7— o ''I SURVEYORS.AND GEOLOGISTS LICENSING DETAILS FOR 21570 Steven Baine. PE Andrew Nickerson,PE — BOARD FOR PROFESSIONAL ENGINEERS,LAND SURVEYORS,ANO GEOLOGISTS BOARD FOR PROFESSIONAL ENGINEERS,LAND SU R VEYORS,AND GEOLOGISTS LICENSING DETAILS FOR:61]2] LICENSING DETAILS FOR 5690E Carrie Davis = Christopher Riehle,PLS BOARD FOR PROFESSIONAL ENGINEERS.LAND .E�' BOARD FOR PROFESSIONAL ENGINEERS.LAND SURVEYORS,AND GEOLOGISTS IT SURVEYORS.AND GEOLOGISTS LICENSING DETAILS FOR.91"0 LICENSING DETAILS FOR N65 P S O M A S City of Huntington Beac'RpQ On-Call Civil Engineering,Surveying and Professional Consulting Services 5 Hutton Centre Drive Suite 300 Santa Ana,CA 92707 714.751.7373 Phone 714.545.8883 Fax www.Psomas.com 501 E\HIBIT "B" Payment Schedule (Hourly Payment) A. 1-lourly Rate CONSULTANT'S fees for such services shall be based upon the folloWine hourly rate and cost schedule: B. Travel Charges for time during travel are not reimbursable. C. Billing I . All billing shall be done monthiv in fifteen (15) minute increments and matched to an appropriate breakdown 01 the time that was taken to perform that work and who performed it. 2. Each month's bill should include a total to date. That total should provide, at a glance, the total fees and costs incurred to date for the project. 3. A copy of memoranda, letters, reports, calculations and other documentation prepared by CONSULTANT may be required to be submitted to CITY to demonstrate progress toward completion of'tasks. In the event CITY rejects or has comments on any such product, CITY shall identify specific requirements for satisfactory completion. 4- CONSULTANT shall submit to CITY an invoice for each monthly payment duc. Such invoice shall: A) Reference this Agreement; B) Describe the services performed; C) Show the total amount of the payment clue; D) Include a certification by a principal member of CONS ULTANT's firm that the work has been performed in accordance with the provisions of this Agrcement: and E) For all payments include an estimate of the percentage of work completed. Upon submission of any such invoice, if CITY is satisfied that CONSULTANT is making satisfactory progress toward completion of tasks in accordance with this Agreement, CITY shall approve the invoice. in which event payment shall be made within thirty (30) days of receipt of the invoice by CITY. Such approval shall not be unreasonably withheld. If CITY does not approve an invoice. CITY shall notifv CONSULTANT in writing of the reasons firr non-approval and the schedule of performance set forth in Exhibit "A" may at the option of CITY be suspended until the parties agree that past performance by CONSULTANT is in. or has been brought into compliance. or until this Agreement has expired or is terminated as provided herein. I Exhibit 13 502 Anv billings for extra work or additional services authorized in advance and in writing by CITY shall be invoiced separately to CITY. Such invoice shall contain all of' the information required above, and in addition shall list the hours expended and hourly rate charged for such time. Such invoices shall be approved by CITY if the work performed is in accordance with the extra work or additional services requested, and it' CITY is satisfied that the statement ot' hOtn'S worked and costs incurred is accurate. Such approval shall not be unreasonably withheld. Any dispute between the parties concerning payment of such an invoice shall be treated as separate and apart from the ongoing performance ol'the remainder of this Agreement. Exhibit B 503 EXHIBIT B PSOP9e4S Rate Schedule Rates are fixed for years June 2021 to June 2024 Project Director/Principal-In-Charge...........$290 SUE Manager.......................................................$215 Project Manager/QAQC Manager....................$260 GIS Technician....................................................$172 Project Manager lI.............................................$245 GIS Manager........................................................$262 Assistant Project Manager...............................$225 Senior CAD Technician......................................$180 Project Engineer/Traffic Engineer.................$210 CAD Technician...................................................$150 Civil Engineering Designer..............................S155 Land Use Entitlement Manager.......................$275 Assistant Civil Designer....................................$135 ADA Compliance/Access Specialist.................$220 Design Engineer I...............................................$125 Environmental Project Manager.....................$225 Design Engineer II........................I....................$140 Biological Resources Manager.........................$225 Construction Survey Manager........................S250 Planner..................................................................$190 Design Survey Manager....................................$225 Engineering Assistant, Intern..........................$105 Project Surveyor.................................................$195 Project Assistant/Administration...................$120 • Standard computer and technology costs are • Survey and other specialty equipment will be incorporated into these hourly rates,as well as charged at a per unit per day rate. direct labor,overhead, fringe benefits and fee. • A shift which commences after 2:oopm or • Races include miscellaneous related costs: before 4:00am,during any 24-hour period, vehicle,cell phone, digital camera,and commencing at 12:01am is subject to a standard tools and equipment.All other direct 12.5 percent differential. expenses will be billed at cost. • Expert witness testimony is two times the • Overtime will be charged at 135 percent of the normal rate. regular hourly rate.Sundays and holidays will • Per Diem is calculated at current State be charged at 170 percent of the regular Department of Transportation rates hourly rate. (or other appropriate agency rates). Reimbursables Mileage at$0.56 per mile for 2021(or current IRS allowable rate)and parking expenses incurred by office employees are charged at cost. Prints, plots,messenger service,subsistence,air travel,and other direct expenses will be charged at cost plus ten percent.The services of outside consultants will be charged at cost with no markup. Surveying Senpices One-Person Survey Party.................................$230 Three-Person Survey Party.............................$460 Two-Person Survey Party.................................$340 Field Supervisor................................................. $185 Survey Equipment Rates:$250.00 per day- 3D Laser Scanner(Static)— $5,000 per day- 3D Laser Scanner (Mobile Mapping System)—Standard computer and technology costs are incorporated into the hourly rates shown above. SUEand CCTV Senices One-Person SUE Crew.......................................$210 Two-Person CCTV Crew...................................$320 Two-Person SUE Crew......................................$320 SUE/CCTV Field Supervisor............................. $205 Hourly rates for field survey parties include normal usage of field equipment and are fully equipped rates. Special equipment and other costs will be charged at additional cost with no mark-up. 504 dltxl44 : f': - _ rj %MVIEJ PAVEMENT ENGINEERING 2021 - 2024 SCHEDULE OF CHARGES PROFESSIONAL SERVICES Document Preparation and Project Services S 97.00/hour CAD/GIS Design Engineer $ 118.00/hour Staff Engineer or Geologist S 152.00/hour Senior Staff Engineer or Geologist S 175,00[hour Project Engineer or Geologist S 195.00/hour Senior Engineer or Geologist S 230.00/hour Associate Engineer or Geologist S 245.00/hour Principal/Director $270.00/hour FIELD INSPECTION & TESTING SERVICES Staff Engineering Technician S 105.00/hour* • Services provided under direct supervision of a Senior Engineering Technician Senior Engineering Technician $ 118.00/hour• • Inspections for soils/grading,asphalt,concrete,batch plants,piles/caissons,etc. • Certifications by ACI,ICC,Caltrans,local jurisdictions,etc. Registered Special Inspector(No 4-hour minimum) $ 118.00/hour• • Certifications by ACI,]CC,Caltrans, local jurisdictions,etc. • Reinforced concrete, Post-Tension,Masonry, Welding, Bolling,Fireproofing Instrumentation Engineer S 150.00/hour • Slope inclinometer and Piezometer monitoring • Manometer for floor-level surveys • Stormwater turbidity&pH meter • Groundwater monitoring-pressure transducer,datalogger,water chemistq meter,etc. • Pipeline video camera for drains,wells,etc. Engineering Seismological Technician(includes 3-channel seismograph) S 150.00/hour • Blast vibration monitoring • Construction vibration&:noise monitoring(pile driving,drilling,demolition,etc.) *Notes: (1) Rates include vehicle,nuclear density gauge,and equipment for testing,inspection,and sampling. (2) No 4-hour minimum charges apply. (3) Ovenime is charged at 1.5 times the base rate. Overtime is defined as time worked on the project in excess of 8 hours per day and all time on Saturdays,Sundays,and holidays, (4) Additional hourly surcharge for Prevailing Wage projects for Field Personnel per CA Labor Code§1720,el seq. Add$27.001hour LABORATORY TESTING SERVICES Laboratory Testing S 122.00/hour (For special materials testing and laboratory costs on a per-test basis,see GA4U's Laboratory Fee Schedule) OTHER CHARGES Outside Services Cost+ IS% Reimbursables&Reprographics Cost 505 T2 Utility Engineers Rate Schedule - HB On-Call - 2021-2024 Subsurface tility Engineering Services Services Bill Rate Overtime Prevailing Prevailing Unit Wa a Wage OT Pothole Under Natural Ground $632.00 $720.00 $720.00 $1,075.00 1 per hole Pothole Under Paving/Concrete $735.00 $845.00 $900.00 $1,435.00 per hole Pothole Exceeding 6.99 feet in Depth $110.00 $130.00 $135.00 $175.00 per foot Vacuum Excavation Truck, Crew and Equipment $350.00 $415.00 $445.00 $535.00 per hour Utility Designating & Investigation Underground $0.96 $1.20 $1.20 $1.55 per foot Utility Designating & Investigation Overhead $0.47 $0.61 $0.61 S0.78 per foot Utility Designating 2 Man Crew and Equipment $290.00 $370.00 $350.00 $460.00 perhour Utility Designating 1 Man Crew and Equipment $205.00 $230.00 $220.00 $275.00 perhour Concrete/Asphalt Coring, Slurry Backfilfing $215.00 I $215.00 $235.00 perhour Survey-2 Man Crew and Equipment $265.00 $360.00 $290.00 $340.00 per hour Survey- 1 Man Crew and Equipment $190.00 $360.00 $200.00 $230.00 1 per hour Senior Project Manager $215.00 NA NA NA per hour Project Engineer S195.00 NA NA NA per hour Project Surveyor $195.00 NA NA NA per hour Project Manager $150.00 NA NA NA per hour SUE Manager I S130.00 NA NA NA per hour CADD Supervisor I $125.00 NA I NA NA per hour SUE Supervisor $95.00 $140.00 $125.00 $170.00 per hour SUE Technician III $95.00 $125.00 $125.00 5170.00 per hour SUE Technician II $80.00 $120.00 $125.00 $i70.00 per hour SUE Technician 1 $75.00 $110.00 $125.00 $170.00 per hour CADD Technician $90.00 $135.00 NA NA per hour Administrative Support $80.00 $120.00 NA NA per hour Expenses Per Diem GSA rates Encroachment and Traffic Permits actual cost Traffic Control Plans -Engineer Stamped $725 per sheet Subcontractors-Asphalt, Traffic Control, Ect. cost plus 10% Miscellaneous Expenses cost plus 10% 506 PROFESSIONAL SERVICES CONTRACT BETWEEN THE CITY OF I IUNTINGTON BEACH AND FOR Table of Contents 1 Scope of Services.....................................................................................................I 2 City Staff Assistancc................................................................................................2 3 Term: Mime of Performance.....................................................................................2 4 Compensation ..........................................................................................................2 5 Extra Work...............................................................................................................2 6 Method of Payment..................................................................................................3 7 Disposition of Plans. Estimates and Other Documents ............................................ 8 Hold Harmless .........................................................................................................3 9 Professional Liability Insurance.............................................................................4 10 Certificate of Insurance............................................................................................5 11 Independent Contractor............................................................................................6 12 Termination of Aurecment.......................................................................................6 13 Assignment and Delegation..............................................................._.....................6 14 Copyrights/Patents...................................................................................................7 15 City Employees and Officials..................................................................................7 16 Notices.........................................................................................7 17 Consent ....................................................................................................................8 18 Modification.............................................................................................................8 19 Section I-leadines .....................................................................................................8 20 Interpretation of this Agrecment..............................................................................8 21 Duplicate Original....................................................................................................9 22 Immigration...............................................................................................................9 23 Le,,,al Services Subcontracting Prohibited................................................................9 24 Attorncv's Fees..........................................................................................................10 25 Survival .....................................................................................................................10 26 Governing Law .........................................................................................................10 27 Signatories.........................................................................................................._.....10 28 Fntiretv......................................................................................................................10 29 Effective Date.................................................................................1 I ACO CERTIFICATE OF LIABILITY INSURANCE nATE(""°°"Y") L� sn 3na21 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the pollcy(les) must be endorsed. It SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain pollclos may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsemont(s). PRODUCER Co TA T Dealey,Renton&Associates PRONE e Karin Thorp FAX 3697 Mt. Diablo Blvd, Suite 230 v_m F 510.465-3090 (A�C.Nm:510.452-2183 Lafayette CA 94549 nou_R`Eys Des4gnPraCers®AssuredPartitem.com -_ INSUREUSj AFPOROING COVERAGE NAICI INSURER A:XL Specie yInsurance Co. 37885 INSUNEU PSCWAS INSURERS: PSOMAS — 555 South Flower Street, Suite 4300 INSURER C Los Angeles CA 90071 INSURER D: INSURLR C INSURER F: COVERAGES CERTIFICATE NUMBER: 1318759636 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE.INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALI. THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TMLIs IaRI POLICYEFF POLICY E%P LTR iYPC OF INSURANCE POLICY NUMBER WDWYYYY MVDOATYY LL4HS COMMERCIAL GENERAL LIARIUTY EACI OCCU RENNCE S (AIMS MADE ❑OCCUR C ORTEpAU RE orarcml s _ MED EXP me erwn S PERSONAL O AOV INJURY s GENT.AGGREGAT E LIMIT ^I APPLIES PER: GENERAL AGGREGATE $ POLICY❑JECT F-1 TOO PROm)CTS-CQMPIOP AGG I$ OTHER $ AUTOMOBILELIASIUTY -LIMIT $ fee acddmll "AUTO BODILY INJURY IN Person) S ALL O'.v AUIOs RED ULED AUTOS SCHETJ BODILY INJURY(Pur mckan) S NON ONNED PROPERTY OAANOE haRED AUTOS _ AUTOS .(tJLledeOaD $ UMBRELLA LIAO OCCUR CACTI OCCURRENCE 5 EXCESS LOS CLAIMS-MADIP FP O ED AS TO FORM AGGREGATE S BED RErENTIOM S WORKERS COMPENSATION PER O1W AND EMPLOYERS•wBILITY YIN M�CH EL E. GATES ANYPROPRIEIDIWMTNERUXECUIIVE F.L.EACH ACCIDENT s OfFICERAIEMBER E%CLUOEOT ❑ NI ITY ATTORNEY ---- tMendIUMIhNHl CIT OF HU TINGTON BEACH FL.OiAFASE.FA FMMDYE. s I Ze,doecrpeundx c IP110NOFOPERATIONS1dQ w E.L.DISEASE-POLICY LIMIT S A ProloaNlXW IImEN Y OMM67W I011 512 0 2 0 MNIS2021 Percent $1.000.00e Chime Made Amwei A00reptle Sl,000.eoo DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(ACORD 101,AddWmul Rem"MI Schedule,may be attached it more apace Is rewired) 2HUN013100,On-Call Civil Engineering,Surveying A Professional Censuitlng Services. CERTIFICATE HOLDER CANCELLATION 30 Day Notice of Cancellation SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City Of Huntington Beach ACCORDANCE WITH THE POLICY PROVISIONS. Attn: Chris Tania. Public Works Dept. 2000 Main Street AU ORIZED REPRESENTATIVE Huntington Beach CA 92646 Vi..l%rw.J'h In ®1988.2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD POLICY NUMBER: GL5268212 COMMERCIAL GENERAL LIABILITY CG 20 37 12 19 Omotr2.021 04/01n022 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: . COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) _ Or Organization(s) Location And.Description Of Completed Operations i ANY PERSON OR ORGANIZATION PER THE CONTRACT OR AGREEMENT. WHOM YOU BECOME OBLIGATED TO INCLUDE AS AN ADDITIONAL INSURED / AS A RESULT OF ANY CONTRACT OR AGREEMENT YOU HAVE ENTERED INTO. _ Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II - Who Is An Insured is amended to B. With respect to the insurance afforded to these include as an additional insured the personls) or additional insureds, the following is added to organization(s) shown in the Schedule, but only Section III - Limits Of Insurance: with respect to liability for "bodily injury" or If coverage provided to the additional insured is "property damage" caused, in whole or in part, required by a contract or agreement, the most by "your work" at the location designated and we will pay on behalf of the additional insured described in the Schedule of this endorsement is the amount of insurance: performed for that additional insured and included in the "products-completed operations 1. Required by the contract or agreement; or hazard". 2. Available under the applicable limits of However: insurance; 1. The insurance afforded to such additional whichever is loss. insured only applies to the extent permitted This endorsement shall not increase the by law; and applicable limits of insurance. 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. CG 20 37 12 19 0 Insurance Services Office, Inc., 2018 Page 1 of 1 This endorsement,effective 12:01 a.m.,10/15/2020 forms apart of Policy No. DPR9965760 I Issued to PSOMAS by XL Specially Insurance Comoeny. THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. POLICY CANCELLATION—NOTICE TO DESIGNATED ENTITIES This endorsement modifies insurance provided under the following: PROFESSIONAL, ENVIRONMENTAL AND NETWORK SECURITY LIABILITY POLICY—ARCHITECTS, CONSULTANTS AND ENGINEERS Section XI. OTHER CONDITIONS, Paragraph A. Cancellation is amended by the addition of the following: In the event that the Company cancels this Policy for any statutorily permitted reason other than non- payment of premium, the Company agrees to provide t ir;y(30)days' notice of cancellation of this Policy to any entity with whom the NAMED INSURED agreed in a written contract or agreement would be provided with notice of cancellation of this Policy, provided that: 1. The Company receives, at least fifteen (15) days prior to the date of cancellation, a written request from the NAMED INSURED to provide notice of cancellation to entities designated by the NAMED INSURED to receive such notice and; 2. The written request includes the name and address of each person or entity designated by the NAMED INSURED to receive such notice. This endorsement does not apply to non-renewal of the Policy,cancellation at the INSURED'S request,or to cancellation of the Policy for non-payment of premium to the Company or to a premium finance company authorized to cancel the Policy. Furthermore, nothing contained in this endorsement shall be construed to provide any rights under the Policy to the entities receiving notice of cancellation pursuant to this endorsement, nor shall this endorsement amend or alter the effective dale of cancellation stated in the cancellation notice issued to the NAMED INSURED. All other terms and conditions of the Policy remain unchanged. LDD 452 1116 Page 1 of 1 9/222020 5:07:30 PM Q 2016 X.L.America, Inc. All Rights Reserved. May not be copled without permission. Bidder's List for Civil Engineering and Surveying - 2021 Company Name Phone Ardurra Group 949-677-0391 Aztec Engineering 714-599-2255 BKF Engineers 949-526-8478 Civil Works Engineers 714-966-9060 ERSC 909-890-1255 GHD Inc 949-585-5224 Hartzog and Crabill 714-731-9455 Hunsaker and Associates 949-583-1010 Infrastructure Engineers 714-940-0100 JMC2 310-241-6550 KPFF Consulting 949-252-1022 Mark Thomas and Company 805-701-9427 Merrell Johnson Engineering 760-240-8000 Michael Baker 949-330-4145 NV5 Inc 949-585-0477 Psomas 714-751-7373 Quantum Consulting 310-891-3994 RAK Development dba Kreuzer Consulting Group 714-656-0160 Stantec Consulting 949-923-6962 Sustura Inc 714-465-3157 Tait and Associates 714-560-8200 Tetra Tech 951-662-0788 WG Zimmerman 714-799-1700 507 PROFESSIONAL SERVICE AWARD ANALYSIS SERVICE: On-Call Civil Engineering SERVICE DESCRIPTION: Engineering support for City's annual Capital Improvement Program projects. VENDOR: Psomas OVERALL RANKING: 5 out of 23 SUBJECT MATTER EXPERTS/RATERS: 1. Principal Civil Engineer 2. Senior Civil Engineer 3. Contract Administrator I. MINIMUM QUALIFICATIONS REVIEW Written Proposal Score: Ave. of 77 Psomas—Minimum Qualifications Review Total Weighted Maximum Criteria Score Score Proposal Clarity 9 10 Qualifications 18 20 Staffing 20 20 Understanding and Methodology 10 15 References and Background 10 10 Interview 10 15 Total 77 100 II. DUE DILIGENCE REVIEW Psomas—Summary of Review • Capable of delivering a variety of civil engineering projects Psomas— Pricing • low end from $105/hr • High end to 5290/hr for Principal 396 City of Huntington Beach 2000 Main Street ♦ Huntington Beach, CA 92648 (714) 536-5227 ♦ wNNNiv.huntingtonbeachca.gov Office of the City Clerk Robin Estanislau, Cite Clerk June 14, 2021 Psomas Attn: Andrew Nickerson, P.E. 555 South Flower Street, Suite 4300 Los Angeles, CA 90071 Dear Mr. Nickerson: Enclosed is a copy of the "Professional Services Agreement between the City of Huntington Beach and Psomas for On-Call Development Review Engineering and Professional Consulting Services" approved by the Huntington Beach City Council on June 1, 2021. Sincerely, Robin Estanislau, CIVIC City Clerk RE:ds Enclosure Sister Cities: Anjo, Japan • Waitakere, New Zealand