HI3 Current Focus
Bicycle and Pedestrian Facilities
® Transportation Options
Mobility Plan Preparation
FY 2021/22
Citywide Mobility Project
Update
SUPPLEMENTAL
COMMUNFCATtON
M9WV Doh: /?/"D,;L/
AOWWG mm rim. a
1
9/7/2021
Delaware Street
Utica Bike Boulevard Bike Lanes
Bicycle connection as a shared a Design to reallocate extra a
user of the roadway wide street to.
Beach Boulevard to Main Street East Keep curb adjacent,on street
West parking
Creates pass thru Alabama to Lake ProvMe buffered bike lanes
New traffic signal at Lake and t txa Encourage reduced trawl speeds
Funded in prior budget years yy for amox
i',�' Developing options for
Design complete-grant
intersection treatments
authorization with Caltrans '+
Construction bidding end of Expectation
year, (pending permitting)with
work in early 2022 _ + �
•r
1
9/7/2021
Goldenwest St. Protected Bike Lane Shipley to Shore Path
Central Park to PCH portion l2.75 Completing efforts to
miles) create continuous public
Modify striping to provide buffered or path from Edwards/Ellis tO kfoiw Cnna
protected bike lane near PCH Ecological
Reserve
W Private property r,
negotiations
Anticipate opening by end
Current Bike lanes of 2021
3
9/7/2021
Ilb
Blufftop Park - Beach Path —
Rail replacement element starting construction 9/14/2021 �'
Path Improvements under design 1 _
I �
Path concept:
Provide separated portions of path for bike use and pedestrians •''--' 'a
Substantial pavement improvement and widening of path
Enhanced'uossmg cone'treatments Path r•�/
Sidewalk on Pacific Coast Highway - ' f railing l il m i n
widening r u m
Landscaping improvements final
Lodge pole
railing
4
9/7/2021
Talbert Channel
Multi-Use Trail - Micro-Transit Service - Circuit
Orange County Flood Control July 12,2021 Service kick-off in designated area centered on downtown
performing r visitor area.
channel maintenance south of Garfield) Service demand has steadily increased
t ounty moving forward with channel will ;I
replacements
City beginning puolK outreach effort
City initiating Coastal and Emvonmental review
process
City developing"design elemems preparation t
for potential funding opportunnies/grants
f
5
9/7/2021
Questions & Comments
6
• 9/13/2021
Huntington Beach
Ascon Landfill Site Update
City Council Meeting
September 7, 2021
•
w«,nc.tr� ■•d
Ascon Landfill Site Update
• Pit F Remediation has been successfully completed
•The excavation and removal of waste from Pit F started at the
beginning of July and was completed on August 27th.
•The demobilization of the tent structure and associated
equipment will continue through September. .t -
•Telemetry air monitoring for Pit F will continue through the
demobilization period.
r
COMMUNICATION
Meeting Date. 7, 1
.agenda Um No.`
• 9/13/2021
Ascon Landfill Site Update
• Project and Site Status
- The overall Site Cleanup Efforts nave been stopped since June 2019 as
required by DTSC
- Site Maintenance will continue including:Weed Abatement,vector
control inspections, Stormwater management measures,dust control ".
measures,and application of soil sealant.
s
-Continued Air monitoring and sampling of on-site and off-site stations _ +
with results posted on DTSC's Enviorstor and on AsconHB.org.
-Ascon Continues to develop overall site remediation plan and testing ,?. • y � „
of canopy technologies. f I•��'�zsy .+'
•Ascon is conducting an Odor Assessment Field Investigation • •''`! - �
• Conduct soil vapor analysis to identify areas with potential to
generate odor during the future clean-up �.
•Completion of Odor Analysis is complete and has been submitted to
DTSC.
Ascon Landfill Site Update
*Cod•RED ��,.T,.�.
•Ascon opt-in Community Alert System-AsconAlert
-Community opt-in program for project information and community
alerts
•Technical Advisor Available for Questions from the Public •- _
i
- A thud party technical advisor is available to the community to
review the technical aspects of the environmental cleanup. _
-Andrew Cherene-HDR Engineering
-HbtechnicaladvisorPhdrinc.com
i
- 1
• 2
• 9/13/2021
Ascon Project Information Contacts
• Department of Toxic Substances Control (DTSC)
>DTSC Project Manager
-SafouhSayed-714-484-5478 -Safouh.Sayed@dtsc.ca.rtov
>DTSC EnviroStor Web Site
-https://www.envirostor.dtsc.ca.gov/public/
•South Coast Air Quality Monitoring District(SCAQMD)
>Air Quality and Dust Monitoring Questions
-1-900-CUT-SMOG (1400-288-7664)
•Ascon Project Contacts
>Public Hotline for non-emergency information:714-398-1825
>Visit the Website:HTTPS//AsconHB.com
>Sign up for weekly project e-mail updates HTTPS//AxonHB.com
>Email:info@AsconHB.com
Huntington Beach
Ascon Landfill Site Update
City Council Meeting
September 7, 2021
•
•wrmcror. uncr
• 3