HomeMy WebLinkAboutCity Manager's Report - City Mobility Projects Update and As City of Huntington Beach File #: 21-651 MEETING DATE: 9/7/2021 City Mobility Projects Update City of Huntington Beach Page 1 of 1 Printed on 9/1/2021 powereo3q Lepatar`° 9/7/2021 HI3 Current Focus Bicycle and Pedestrian Facilities ® Transportation Options Mobility Plan Preparation FY 2021/22 Citywide Mobility Project Update SUPPLEMENTAL COMMUNFCATtON M9WV Doh: /?/"D,;L/ AOWWG mm rim. a 1 9/7/2021 Delaware Street Utica Bike Boulevard Bike Lanes Bicycle connection as a shared a Design to reallocate extra a user of the roadway wide street to. Beach Boulevard to Main Street East Keep curb adjacent,on street West parking Creates pass thru Alabama to Lake ProvMe buffered bike lanes New traffic signal at Lake and t txa Encourage reduced trawl speeds Funded in prior budget years yy for amox i',�' Developing options for Design complete-grant intersection treatments authorization with Caltrans '+ Construction bidding end of Expectation year, (pending permitting)with work in early 2022 _ + � •r 1 9/7/2021 Goldenwest St. Protected Bike Lane Shipley to Shore Path Central Park to PCH portion l2.75 Completing efforts to miles) create continuous public Modify striping to provide buffered or path from Edwards/Ellis tO kfoiw Cnna protected bike lane near PCH Ecological Reserve W Private property r, negotiations Anticipate opening by end Current Bike lanes of 2021 3 9/7/2021 Ilb Blufftop Park - Beach Path — Rail replacement element starting construction 9/14/2021 �' Path Improvements under design 1 _ I � Path concept: Provide separated portions of path for bike use and pedestrians •''--' 'a Substantial pavement improvement and widening of path Enhanced'uossmg cone'treatments Path r•�/ Sidewalk on Pacific Coast Highway - ' f railing l il m i n widening r u m Landscaping improvements final Lodge pole railing 4 9/7/2021 Talbert Channel Multi-Use Trail - Micro-Transit Service - Circuit Orange County Flood Control July 12,2021 Service kick-off in designated area centered on downtown performing r visitor area. channel maintenance south of Garfield) Service demand has steadily increased t ounty moving forward with channel will ;I replacements City beginning puolK outreach effort City initiating Coastal and Emvonmental review process City developing"design elemems preparation t for potential funding opportunnies/grants f 5 9/7/2021 Questions & Comments 6 • 9/13/2021 Huntington Beach Ascon Landfill Site Update City Council Meeting September 7, 2021 • w«,nc.tr� ■•d Ascon Landfill Site Update • Pit F Remediation has been successfully completed •The excavation and removal of waste from Pit F started at the beginning of July and was completed on August 27th. •The demobilization of the tent structure and associated equipment will continue through September. .t - •Telemetry air monitoring for Pit F will continue through the demobilization period. r COMMUNICATION Meeting Date. 7, 1 .agenda Um No.` • 9/13/2021 Ascon Landfill Site Update • Project and Site Status - The overall Site Cleanup Efforts nave been stopped since June 2019 as required by DTSC - Site Maintenance will continue including:Weed Abatement,vector control inspections, Stormwater management measures,dust control ". measures,and application of soil sealant. s -Continued Air monitoring and sampling of on-site and off-site stations _ + with results posted on DTSC's Enviorstor and on AsconHB.org. -Ascon Continues to develop overall site remediation plan and testing ,?. • y � „ of canopy technologies. f I•��'�zsy .+' •Ascon is conducting an Odor Assessment Field Investigation • •''`! - � • Conduct soil vapor analysis to identify areas with potential to generate odor during the future clean-up �. •Completion of Odor Analysis is complete and has been submitted to DTSC. Ascon Landfill Site Update *Cod•RED ��,.T,.�. •Ascon opt-in Community Alert System-AsconAlert -Community opt-in program for project information and community alerts •Technical Advisor Available for Questions from the Public •- _ i - A thud party technical advisor is available to the community to review the technical aspects of the environmental cleanup. _ -Andrew Cherene-HDR Engineering -HbtechnicaladvisorPhdrinc.com i - 1 • 2 • 9/13/2021 Ascon Project Information Contacts • Department of Toxic Substances Control (DTSC) >DTSC Project Manager -SafouhSayed-714-484-5478 -Safouh.Sayed@dtsc.ca.rtov >DTSC EnviroStor Web Site -https://www.envirostor.dtsc.ca.gov/public/ •South Coast Air Quality Monitoring District(SCAQMD) >Air Quality and Dust Monitoring Questions -1-900-CUT-SMOG (1400-288-7664) •Ascon Project Contacts >Public Hotline for non-emergency information:714-398-1825 >Visit the Website:HTTPS//AsconHB.com >Sign up for weekly project e-mail updates HTTPS//AxonHB.com >Email:info@AsconHB.com Huntington Beach Ascon Landfill Site Update City Council Meeting September 7, 2021 • •wrmcror. uncr • 3