File #: 21-845 MEETING DATE: 12/21/2021
REQUEST FOR CITY COUNCIL ACTION
SUBMITTED TO: Honorable Mayor and City Council Members
SUBMITTED BY: Oliver Chi, City Manager
PREPARED BY: Sean Crumby, Director of Public Works
Subject:
Approve and authorize execution of Professional Services Contracts for On-Call Materials
Testing and Engineering Services with AESCO, Inc., QMU Geotechnical, Inc., Leighton
Consulting, Inc., Ninyo & Moore Geotechnical & Environmental Sciences Consultants, and
Twining, Inc.
Statement of Issue:
The Public Works Department requires professional materials testing, inspection, and engineering
services on an on-call or as needed basis to support staff for construction of capital improvement
projects.
Financial Impact:
The City's adopted FY 2021/22 Capital Improvement Program (CIP) Budget totals $39.3 million for
approved projects citywide. Each approved CIP project has a budget containing sufficient funding for
design, environmental, engineering, construction, project management and other required costs. The
five (5) recommended materials testing contracts, totaling $3.0 million, will be funded within each
project's individual CIP budget, as needed. As such, no additional funding is required by this action.
Recommended Action:
A) Approve and authorize the Mayor and City Clerk to execute $600,000 "Professional Services
Contract Between the City of Huntington Beach and AESCO, Inc., for On-Call Material Testing and
Engineering Services;" and,
B)_Approve and authorize the Mayor and City Clerk to execute $600,000 "Professional Services
Contract Between the City of Huntington Beach and GMU Geotechnical, Inc. for On-Call Material
Testing and Engineering Services;" and,
C) Approve and authorize the Mayor and City Clerk to execute $600,000 "Professional Services
Contract Between the City of Huntington Beach and Leighton Consulting, Inc., for On-Call Material
Testing and Engineering Services"; and,
City of Huntington Beach Page 1 of 3 Printed ons1211512021
Powered%Leg,star"'
File #: 21-845 MEETING DATE: 12/21/2021
D) Approve and authorize the Mayor and City Clerk to execute $600,000 "Professional Services
Contract Between the City of Huntington Beach and Ninyo & Moore for On-Call Material Testing and
Engineering Services;" and,
j� E) Approve and authorize the Mayor and City Clerk to execute $600,000 "Professional Services
Contract Between the City of Huntington Beach and Twining, Inc., for On-Call Material Testing and
Engineering Services."
Alternative Action(s):
Do not authorize the contracts and direct staff with an alternate action. Construction of budgeted
Capital Projects could be delayed until new contracts are approved.
Analysis:
On July 12, 2021, the City advertised a Request for Proposal ("RFP") for On-Call Construction
Material Testing Services. Proposals were requested and submitted in compliance with Chapter 3.03
of the Huntington Beach Municipal Code. Twenty (20) proposals were received for On-Call
Construction Material Testing Services. In accordance with qualifications-based selected
procurement per the Federal "Brooks Act," State SB 419, and the City of Huntington Beach Municipal
Code Section 3.03 "Professional Services," the Public Works Department established a review board.
Each firm stated their engineering category of expertise with their proposal. Proposals were then
evaluated and ranked by a review board established by the Public Works Department. The top five
(5) firms were selected in each category to increase opportunity for competitive proposals for future
projects from qualified on-call consultants.
The five (5) contracts recommended in this request for council action (RCA) are for support staff for
the construction of a wide variety of non-State/Federally-funded capital improvement projects. These
services have historically been utilized to supplement City staff to meet annual CIP goals, as an
extension of staff, and/or to provide required expertise for unique projects. It is anticipated that these
services will be required based on past years. Each project is evaluated on a case by case basis to
determine if these as-needed contract services are necessary.
The City's Capital Improvement Program ("CIP") in Fiscal Year 2021122 totals $39.3 million in new
projects. Typical design and construction support cost from the use of consultants on a CIP project
can vary between ten to twenty percent (10-20%) of total costs for a CIP project. Therefore, it is
practical to conservatively assume minimum annual construction consultant costs would be around
$3 million to the City for total CIP projects or approximately $9 million over the next three (3) years.
Professional construction materials testing and engineering services are typically required for most
CIP projects, including streets and transportation, water, sewer, stormwater, parks and beaches, and
facility improvement projects. Therefore, these consultants were selected to meet projected
workload over the next three years with a total contract limit of $3 million. The proposed contract
amounts are a not-to-exceed amount for a three-year term, with no guarantee of work. Funding for
any and all of these contract services is only through City Council authorization in the budget
approval process.
Environmental Status:
City of Huntington Beach Page 2 of 3 Pnnted on 12/152021
p .erecR4 Legistar"
File #: 21-845 MEETING DATE: 12/21/2021
Not applicable
Strategic Plan Goal:
Infrastructure & Parks
Attachment(s):
1 . Professional Services Contract between the City of Huntington Beach and AESCO, Inc., for
On-Call Materials Testing and Engineering Services.
2. Professional Services Contract between the City of Huntington Beach and GMU Geotechnical,
Inc., for On-Call Materials Testing and Engineering Services.
3. Professional Services Contract between the City of Huntington Beach and Leighton
Consulting, Inc., for On-Call Materials Testing and Engineering Services.
4. Professional Services Contract between the City of Huntington Beach and Ninyo & Moore for
On-Call Materials Testing and Engineering Services.
5. Professional Services Contract between the City of Huntington Beach and Twining, Inc., for
On-Call Materials Testing and Engineering Services.
6. Professional Services Award Analysis
City of Huntington Beach Page 3 of 3 Printed on 1 211 5/2 0 2 1
nowereo95 Legistar"
PROFESSIONAL SERVICES CONTRACT BETWEEN
I'HF. CITY OF HUNTINGTON BEACH AND
GMU GEOTECHNICAL, INC.
FOR
ON CALL MATERIAL TESTING AND ENGINEERING SERVICES
THIS AGREEMENT ("Agreement") is made and entered into by and between the City of
Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as
"CITY," and GMU GEOTECHNICAL, INC., hereinafter referred to as "CONSULTANT."
WHEREAS, CITY desires to engage the services of a consultant to provide On-Call
Material 'resting and Engineering Services; and
Pursuant to documentation on file in the office of the City Clerk, the provisions of the
Huntington Beach Municipal Code, Chapter 3.03, relating to procurement of professional service
contracts have been complied with-. and
CONSUL;TANT has been selected to perform these services;
NOW, THEREFORE, it is agreed by CITY and CONSULTANT as follows:
1. SCOPE OF SERVICES
CONSULTANT shall provide all services as described in Exhibit "A," which is
attached hereto and incorporated into this Agreement by this reference. These services shall
sometimes hereinafter be referred to as the "PROJECT."
CONSULTANT hereby designates Greg Silver, who shall represent it and be its sole
contact and agent in all consultations with CITY during the performance of this Agreement.
1 CITY STAFF ASSISTANCE
CITY shall assign a staff coordinator to work directly with CONSULTANT in the
performance of this Agreement.
21-10613Q70338 I of 11
5119-204082
3. TERM TIME OF PERFORMANCE
Time is of the essence of this Agreement. The services of CONSULTANT arc to
commence on December 21 , 2021 (the "Commencement Date"). This Agreement
shall automatically terminate three (3) years from the Commencement Date, unless extended or
sooner terminated as provided herein. All tasks specified in Exhibit "A" shall be completed no
later than (3) three years from the Commencement Date. The time for performance of the tasks
identified in Exhibit "A" are generally to be shown in Exhibit "A." This schedule may be
amended to benefit the PROJECT if mutually agreed to in writing by CITY and CONSULTANT.
In the event the Commencement Date precedes the Effective Date, CONSULTANT
shall be bound by all terms and conditions as provided herein.
4. COMPENSATION
In consideration of the performance of the services described herein, CITY agrees to
pay CONSULTANT on a time and materials basis at the rates specified in Exhibit "Q," which is
attached hereto and incorporated by reference into this Agreement, a fee, including all costs and
expenses, not to exceed Six Hundred Thousand Dollars ($600,000.00).
5. EXTRA WORK
In the event CITY requires additional services not included in Exhibit "A" or
changes in the scope of services described in Exhibit "A," CONSULTANT will undertake such
work only after receiving written authorization from CITY. Additional compensation for such extra
work shall be allowed only if the prior written approval of CITY is obtained.
6. METHOD OF PAYMENT
CONSULTANT shall be paid pursuant to the terms of Exhibit "B."
21-10613270338 2 of 11
5/19-2G4032
7. DISPOSITION OF PLANS ESTIMATES AND OTHER DOCUMENTS
CONSULTANT agrees that title to all materials prepared hereunder, including,
without limitation, all original drawings, designs, reports, both field and office notices, calculations,
computer code, language, data or programs, maps, memoranda, letters and other documents. shall
belong to CITY, and CONSULTANT shall turn these materials over to CITY upon expiration or
termination of this Agreement or upon PROJECT completion, whichever shall occur first. These
materials may be used by CITY as it sees fit.
8. HOLD HARMLESS
A. CONSULTANT hereby agrees to protect, defend, indemnify and hold
harmless CITY, its officers, elected or appointed officials, employees, agents and volunteers from
and against any and all claims, damages, losses, expenses, judgments, demands and defense costs
(including, without limitation, costs and fees of litigation of every nature or liability of any kind or
nature) arising out of or in connection with CONSULTANT's (or CONSULTANT's subcontractors,
if any) negligent (or alleged negligent) performance of this Agreement or its failure to comply with
any of its obligations contained in this Agreement by CONSULTANT, its officers, agents or
employees except such loss or damage which was caused by the sole negligence or willful
misconduct of CITY. CONSULTANT will conduct all defense at its sole cost and expense and
CITY shall approve selection of CONSULTANT's counsel. This indemnity shall apply to all
claims and liability regardless of whether any insurance policies are applicable. The policy limits
do not act as limitation upon the amount of indemnification to be provided by CONSULTANT.
B. TO the extent that CONSULTANT performs "Design Professional Services" within
the meaning of Civil Code Section 2782.8, then the following Hold Harmless provision applies in
place of subsection A above:
21-1061Y270338 3 of 11
5119-204082
"CONSULTANT hereby agrees to protect, defend, indemnify and hold harmless
CITY and its officers, elected or appointed officials, employees, agents and volunteers, from and
against any and all claims, damages, losses, expenses, demands and defense costs (including,
without limitation, costs and fees of litigation of every nature or liability of any kind or nature) to
the extent that the claims against CONSULTANT arise out of, pertain to, or relate to the negligence,
recklessness, or willful misconduct of CONSULTANT. In no event shall the cost to defend charged
to CONSULTANT exceed CONSULTANI 's proportionate percentage of fault. However,
notwithstanding the previous sentence, in the event one or more other defendants to the claims
and/or litigation is unable to pay its share of defense costs due to bankruptcy or dissolution of the
business, CONSULTANT shall meet and confer with CITY and other defendants regarding unpaid
defense costs. The duty to indemnify, including the duty and the cost to defend, is limited as
provided in California Civil Code Section 2782.8.
C. Regardless of whether subparagraph A or 13 applies, CITY shall be reimbursed by
CONSULTANT for all costs and attorney's fees incurred by CITY in enforcing this obligation.
This indemnity shall apply to all claims and liability regardless of whether any insurance policies
are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be
provided by CONSULTANT.
9. PROFESSIONAL LIABILITY INSURANCE
CONSULTANT shall obtain and furnish to CITY a professional liability insurance
Policy covering the work performed by it hereunder- This policy shall provide coverage for
CONSULTANT's professional liability in an amount not less than One Million Dollars
($1,000,000.00) per occurrence and in the aggregate. The above-mentioned insurance shall not
contain a self-insured retention without the express written consent of CITY; however an insurance
21-10613270338 4 of 11
5/19-204082
policy "deductible" of "fen Thousand Dollars ($10,000.00) or less is pernitted. A claims-made
policy shall be acceptable if the policy further provides that:
A. The policy retroactive date coincides with or precedes the initiation of the
scope of work (including subsequent policies purchased as renewals or
replacements).
B. CONSULTANT shall notify CITY of circumstances or incidents that might
give rise to future claims.
CONSULTANT will make every effort to maintain similar insurance during the
required extended period of coverage following PROJECT completion. If insurance is terminated
for any reason, CONSULTANT agrees to purchase an extended reporting provision of at least two
(2) years to report claims arising from work performed in connection with this Agreement.
If CONSULTANT fails or refuses to produce or maintain the insurance required by
this section or fails or refuses to furnish the CITY with required proof that insurance has been
procured and is in force and paid for, the CITY shall have the right, at the CITY's election, to
forthwith terminate this Agreement. Such termination shall not effect Consultant's right to be paid
for its time and materials expended prior to notification of termination. CONSULTANT waives the
right to receive compensation and agrees to indenmify the CITY for any work performed prior to
approval of insurance by the CITY.
10. CERTIFICATE OF INSURANCE
Prior to commencing performance of the work hereunder, CONSULTANT shall
furnish to CITY a certificate of insurance subject to approval of the City Attorney evidencing the
foregoing insurance coverage as required by this Agreement; the certificate shall:
A. provide the name and policy number of each carrier and policy;
B. state that the policy is currently in force: and
21-10613rz70338 5 of 11
5/19-204082
C. shall promise that such policy shall not be suspended, voided or canceled by
either party, reduced in coverage or in limits except after thirty (30) days'
prior written notice; however, ten (10) days' prior written notice in the event
of cancellation for nonpayment of premium.
CONSULTANT shall maintain the foregoing insurance coverage in force until the
work under this Agreement is fully completed and accepted by CrTY.
The requirement for carrying the foregoing insurance coverage shall not derogate
from CONSULTANT's defense, hold harmless and indemnification obligations as set forth in this
Agreement. CITY or its representative shall at all times have the right to demand the original or a
copy of the policy of insurance. CONSULTANTr shall pay, in a prompt and timely manner, the
premiums on the insurance hereinabove required.
11. INDEPENDENT CONTRACTOR
CONSULTANT is, and shall be, acting at all times in the performance of this
Agreement as an independent contractor herein and not as an employee of CITY. CONSULTANT
shall secure at its own cost and expense, and be responsible for any and all payment of all taxes,
social security, state disability insurance compensation, unemployment compensation and other
payroll deductions for CONSULTANT and its officers, agents and employees and all business
licenses, if any, in connection with the PROJECT and/or the services to be performed hereunder.
12. TERMINATION OF AGREEMENT
All work required hereunder shall be performed in a good and workmanlike manner.
CITY may terminate CONS ULTANT's services hereunder at any time with or without cause, and
whether or not the PROJECT- is fully complete. Any termination of this Agreement by CITY shall
be made in writing, notice of which shall be delivered to CONSULTANT as provided herein. In the
21-10613R70338 6 of 11
5119-204082
event of termination. all finished and unfinished documents, exhibits, report, and evidence shall, at
the option of CITY, become its property and shall be promptly delivered to it by CONSULTANT.
l3. ASSIGNMENT AND DELEGATION
This Agreement is a personal service contract and the work hereunder shall not be
assigned, delegated or subcontracted by CONSULTANT to any other person or entity without the
prior express written consent of CITY. If an assignment, delegation or subcontract is approved, all
approved assignees, delegates and subconsultants must satisfy the insurance requirements as set
forth in Sections 9 and 10 hereinabove.
14. COPYRIGHTS/PATENTS
CITY shall own all rights to any patent or copyright on any work, item or material
produced as a result of this Agreement.
15. CITY EMPLOYEES AND OFFICIALS
CONSULTANT shall employ no CITY official nor any regular CITY employee in
the work performed pursuant to this Agreement. No officer or employee of CITY shall have any
financial interest in this Agreement in violation of the applicable provisions of the California
Government Code.
16. NOTICES
Any notices, certificates, or other communications hereunder shall be given either by
personal delivery to CONSULTANT's agent (as designated in Section 1 hereinabove) or to CITY as
the situation shall warrant, or by enclosing the same in a scaled envelope, postage prepaid, and
depositing the same in the United States Postal Service, to the addresses specified below. CITY and
CONSULTANT may designate different addresses to which subsequent notices, certificates or
other communications will be sent by notifying the other party via personal delivery, a reputable
overnight carrier or U. S. certified mail-return receipt requested:
21.10613270338 7 of 11
5/19-204082
TO CITY: TO CONSULTANT`.
City of Huntington Beach GMU GEOTECHNICAL, INC.
ATTN: Joseph Dale ATTN: Greg Silver
2000 Main Street 23241 Arroyo Vista
Huntington Beach, CA 92648 Rancho Santa Margarita, CA 92688
17. CONSENT
When CITY's consent/approval is required under this Agreement, its
consent/approval for one transaction or event shall not be deemed to be a consent/approval to any
subsequent occurrence of the same or any other transaction or event.
18. MODIFICATION
No waiver or modification of any language in this Agreement shall be valid unless in
writing and duly executed by both parties.
19. SUCTION HEADINGS
'file titles, captions, section, paragraph and subject headings, and descriptive phrases
at the beginning of the various sections in this Agreement are merely descriptive and are included
solely for convenience of reference only and are not representative of matters included or excluded
from such provisions, and do not interpret, define, limit or describe, or construe the intent of the
parties or affect the construction or interpretation of any provision of this Agreement.
20. INTERPRETATION OF THIS AGREEMENT
The language of all parts of this Agreement shall in all cases be construed as a
whole, according to its fair meaning, and not strictly for or against any of the parties. If any
provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be
unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining
covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent
upon any other unless so expressly provided here. As used in this Agreement, the masculine or
21-10613270338 8 of 11
5119-20.4082
neuter gender and singular or plural number shall be deemed to include the other whenever the
context so indicates or requires. Nothing contained herein shall be construed so as to require the
commission of any act contrary to law, and wherever there is any conflict between any provision
contained herein and any present or future statute, law, ordinance or regulation contrary to which
the parties have no right to contract, then the latter shall prevail, and the provision of this
Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to
bring it within the requirements of the law.
21. DUPLICATE ORIGINAL
The original of this Agreement and one or more copies hereto have been prepared
and signed in counterparts as duplicate originals, each of which so executed shall, irrespective of the
date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed
an original instrument as against any party who has signed it.
22. IMMIGRATION
CONSULTANT shall be responsible for full compliance with the immigration and
naturalization laws of the United States and shall, in particular, comply with the provisions of the
United States Code regarding employment verification.
23. LEGAL SERVICES SUBCONTRAM.ING PROHIBITED
CONSULTANT and CITY agree that CITY is not liable for payment of any
subcontractor work involving legal services, and that such legal services are expressly outside the
scope of services contemplated hereunder. CONSULTANT understands that pursuant to
11unlingion Beach Ciry Charter Section 309, the City Attorney is the exclusive legal counsel for
CITY; and CITY shall not be liable for payment of any legal services expenses incurred by
CONSULTANT.
21-10613270338 9 of I I
5/19-204082
24. ATTORNEY'S PEES
In the event suit is brought by either party to construe, interpret and/or enforce the
terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear
its own attorneys fees, such that the prevailing party shall not be entitled to recover its attorney's
fees from the nonprevailing party.
25. SURVIVAL
Terms and conditions of this Agreement, which by their sense and context survive
the expiration or termination of this Agreement, shall so survive.
26. GOVERNING LAW
"]'his Agreement shall be governed and construed in accordance with the laws of the
State of California.
27. SIGNATORIES
Each undersigned represents and warrants that its signature hereinbelow has the
power. authority and right to bind their respective parties to each of'the terms of this Agreement,
and shall indemnify CITY fully for any injuries or damages to CITY in the event that such authority
or power is not, in fact, held by the signatory or is withdrawn.
28. ENTIRETY
The parties acknowledge and agree that they are entering into this Agreement freely
and voluntarily following extensive arm's length negotiation, and that each has had the opportunity
to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and
agree that no representations, inducements, promises, agreements or warranties, oral or otherwise,
have been made by that party or anyone acting on that party's behalf, which are not embodied in this
Agreement, and that that party has not executed this Agreement in reliance on any representation,
inducement, promise, agreement, warranty, fact or circumstance not expressly set forth in this
21-10613270338 10 of 11
5119-204082
Agreement. This Agreement, and the attached exhibits, contain the entire agreement between the
parties respecting the subject matter of this Agreement, and supersede all prior understandings and
agreements whether oral or in writing between the parties respecting the subject matter hereof.
29. EFFECTIVE DATE
This Agreement shall be effective on the date of its approval by the City Council.
This Agreement shall expire when terminated as provided herein.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by
and through their authorized officers.
CONSULTANT, CITY OF HUNTINGTON BEACH,a
GMU GEOTECHNIC L, INC. municipal corporation of the State of
Cali is
By: or
G
r e ^'
ITS: (circle o Chaim residentNice President City Clerk it
AND INITIATE PROVE
By.
irector of Public Works
rint name
ITS: (circle one)Secretar hicf Financial Officer .
Secretary-Treasurer IE E ND A PKUV�:
City Manager
APPROVED AS
Attorney v
21-106131270338 11 of I1
5119-204082
EXHIBIT "A"
A. STATI-MENT OF WORK: (Narrative of work to be performed)
CONSULTANT shall provide consulting services on an "as-needed" basis for projects to be
determined during the term of the agreement. During the term of the agreement, CITY may elect to
solicit proposals from CONSULTANT. CITY" shall issue task order for each project based upon the
scope of services, work schedule, and fee proposal submitted to CITY for its review and approval.
13. CONSULTANT'S DUTIES AND RESPONSIBILITIES:
CONSULTANT'S duties and responsibilities shall be per CONSULTANT'S Statement of
Qualification (Exhibit A), consistent with the City of Huntington Beach Request for Qualifications
for On Call Materials Testing and Engineering Consulting Services. Upon award, and the contract
period, the CONSULTANT can choose to assign different personnel to the project. CONSULTANT
must submit the names and qualifications of these staff to CITY for approval before commencing
work.
C. CITY'S DUTIES AND RESPONSIBILITIES:
I. Furnish scope of work request for each project.
2. Furnish construction plans and specifications to the CONSULTANT
D. WORK PROGRAM/PROJECT SCHEDULE:
A project schedule will be developed for each project assigned by CITY.
EAHIBIT A
EXHIBIT A
Public Works Department.CITY OF IIUNtINGtON REACI1
Proposal, On-Cull Construction ,tlaterials Testing and Inspection.Services
A. COVER LETTER
Prepared For: Public Works Department August 17. 2021
CITY OF 1IUNTINCTON 13EACH
7701 Taylor Drive
Huntington Reach, CA 92648 GMU Proposal P-21205
Prepared By: GIN11-1 pavement Engineering (GMU)
23241 Arroyo Vista
Rancho Santa Nlarearita. CA 92688
(949) 888-6513 `
Subject: Proposal for On-Call Construction Nlaterials Tcsting and Inspection
Services. City ol'I luntington Beach
Reference: City of' Huntington Beach. "Request for proposal For On-Call Construction
Materials Testing and Inspection Services". JUIy 12, 2021.
Dear Public Works Department:
GMU Pavement Engineering (EMU) is pleased to submit our proposal to provide on-call
construction materials testing and inspection scrviccs in response to the referenced RFP.
Gi`11J is a Small Business Enterprise (SBE) with over 30 gars of experience providing
services as an on-call construction materials testing and inspection, pavement engineering,
and geotechnical engineering firm for numerous Orange County, Cities and public agencies.
We have been in business for over 53 years and serve a variety of clients who have come to rely
on GNIU for high-qualitg1. cost-effective. and reliable service. In addition. GMU's stall' and
laboratory- arc certified by Caltrans. ANVI.., and DSA. allowing GMU to provide the proposed
services in I'ull compliance with state and federal project funding requirements.
Our on-call construction materials testing and inspection experience includes the duties listed in
the RI-T. as summarized below.
Aueust 17.2021 11 GiU Proposal P-21205
Public Works Department,CITY OF HUNTINGTON BEACH
Proposal,On-Call Construction.Materials Testing and lnspecrion Sen•ices
• All testing as required by the Caltrans Standard Specifications and the Project Special
Provisions. Any required sampling and testing shall be done by personnel and laboratory
with the appropriate accreditation for the testing and sampling designated to be performed.
This testing will include, but is not limited to:
o Field density testing in accordance with ASTM D2922 or ASTM D1556, and
laboratory density testing in accordance with ASTM D 1557 or Caltrans CTM 216.
o Concrete sampling and slump testing by an ACI-Certified technician.
o Concrete compression testing per ASTM C39 for bridge structural concrete.
• Maintain records of all testing and sampling in permanent project files,with testing records
including applicable methods and procedures used. Test results will be provided including
whether the results conform or fail to conform to specified requirements and will be signed
by an authorized laboratory testing representative. Non-conforming test results will be
provided to the City within twenty-four hours.
• Maintaining a"rework items" list that does not comply with the Contract to be provided to
the City and Contractor.
• Providing Project Certification to the City upon completion of the project, including all
non-conforming materials and materials accepted at reduced pay factors. The Certification
will be signed by a licensed Geotechnical Engineer.
Given our history, background,and technical expertise, we believe GMU offers many advantages
that will ultimately benefit the City. We appreciate the opportunity to provide this proposal and
look forward to opportunities to work with the City of Huntington Beach.
Respectfully submitted,
y
er, M. ., PE, GE Ro Sch to mp, c., E
O Di for of Pavement Engin ring
ineeri4rt rschlierkamp@gmugeo.com QPoresstoltr
gsilver@gmugeo.com � P (949) 546-0017 -direct
(949) 546-0080-direct GE 23M
V C81529
Of CEO '4 or CAUL
August 17,2021 iii GMU Proposal P-21205
Public Works Department, CITY OF HUNTINGTON BEACH
Proposal, On-Call Construction Materials Testing and Inspection.Services
B. VENDOR APPLICATION FORIN7
REQUEST FOR PROPOSAL
VENDOR APPLICATION FORM
TYPE OF APPLICANT: ® NEW ❑ CURRENT VENDOR
Legal Contractual Name of Corporation: GMU Geotechnical,Inc.
Contact Person for Agreement:_ Greg Silver,President/CEO
Corporate Mailing Address: 23241 Arroyo Vista
City,State and Zip Code: Rancho Santa Margarita,CA 92688
E-Mail Address:_gsiiver@gnmgeo.com
Phone: (949)888-6513 Fax:_(949)888-1380
Contact Person for Proposals: Roger Schlierkamp
Title: Director of Pavement Engineering_ E-Mail Address: rschlierkamp@gmugeo.com
Business Telephone: (949)888-6513 Business Fax: (949)888-1380
Is your business:(check one)
❑ NON PROFIT CORPORATION Q FOR PROFIT CORPORATION
Is your business:(check one)
® CORPORATION ❑ LIMITED LIABILITY PARTNERSHIP
❑ INDIVIDUAL ❑ SOLE PROPRIETORSHIP
❑ PARTNERSHIP ❑ UNINCORPORATED ASSOCIATION
I of2
August 17.2021 iv GMU Proposal P-21205
Public Works Department. CITY OF HUNTINGTON BEACH
Proposal. On-Call Construction dlateriols Testing and Inspection.Services
;`lames&Titles of Corporate Board Members
(Also list Names&Titles of persons with written authorization/resolution to sign contracts)
Names Title Phone
Greg Silver President/CEO (949)546-0080
Michael MoscroP Vice-President6ecretary (249)546-0018
Aron Taylor Vice President/CFO (949)546-0016
Federal Tar Identification Number: 330359134
City of Huntington Beach Business License Number:
(If none,you mast obtain a Huntington Beach Business License upon award of contract.)
City of Huntington Beach Business License Expiration Date:
2 of
August 17. 2021 v GMU Proposal 11-21205
Public Works Department,CITY OF HUNTINGTON BEACH
Proposal,On-Call Construction Materials Testing and Inspection Services
C. PRE-QUALIFICATION FORM
PRE-QUALIFICATION FORM
ON-CALL MATERIAL TESTING&INSPECTION SERVICES
SERVICE CATEGORY PROPOSING? Y/N
circle
A. Material Testing&Inspection Yes No
provided the items below are acceptable and/or clarified
41)Consultant is willing to execute the Agreement as drafted,(See Appendix B).
a )Consultant is able to provide the insurance as required(See Appendix Q.
Firm Name: GMU Geotechavcal,Inc
Firm Address: 23241 AWQv Vista,Rancho Santa Margarita,CA 92688
Signature: Date: August 1.7,2021
Gr4W
Agreement Section 8.C.-Need clarification with regards to implications,other contract language and
current California civil codes.
Agreement Section 9.-GMU has a$2 Million/52 Million professional liability policy with a$25,000
effective deductible;a$10,000 deductible is not offered Note that GMU has been in business for over
50 years and has;not encountered this issue previously.
August 17,2021 vi GMU Proposal P-21205
Public Works Department.CITY OF HUN PINGTON BEACII
Proposal, On-Call Gmstru tion aaterials Testing and Inspection Services
1). SERVICE CATEGORY
FIRNI QUALIFICATIONS
1. SU.M.HARYOFCAPABILITIES
GiMU is a Small Business Enterprise (SBE) with over 51) rears of experience in Southern
California. Previously known as Gol'fman. NlcCormick & Urban. Inc.. GMU was founded in 1967.
Our office is located in Rancho Santa ilargarita. Orange COn11tV, California, only half an hour
awav from the City of Huntington Beach. Our staff consists of highly qualified professional
engineers, professional geologists. and engineering technicians with experience in nearly all
aspects of construction requiring materials testing and inspection. Gi1gU is qualified to provide all
services listed in the RFP.
GNIU has provided on-call services to public agencies for over 30 years. and currently provides
on-call services to the following agencies:
• City of Aliso Viejo • City of Mission Viejo
• City of Anaheim • City of Newport Beach
• City of Buena Nark • City of Rancho Santa Margarita
• City of Chino Hills • City of San Clemente
• City of Dana Point • City of San Juan Capistrano
• City of Carden Grove • County of Orange
• Ciry of Irvine • Trabuco Canvon Water District
• City of Laguna Niguel • Moulton Niguel Water District
• City of Lake Forest • Santa Margarita Water District
A select list of GMU's services is presented in this Section, and includes services needed to
accomplish the City's requested Scope of Work.
August 17. 2021 1 GNIU Proposal 11-2120>
Public works Department. CITY OF HUNTINCTON BEACH
Proposal. Orr-Cull Construction AlateriaA Testing and Arcpectian Services
Construction N7aterials Testing and Inspection
G\1U has dedicated public works acceptance-testing(AT)soils/geotechnical. pavement. and plant
inspectors with experience ranging from 10-30 years. Our technicians. inspectors. and laboratory
personnel are experienced and prepared to perform all the tasks listed within the RFP's scope of
work for this item, in accordance with Caltrans' procedures and the City's requirements. A select
list of services G\9U provides in this regard is provided below.
Gcotechnical (Soils)
Services include observation and testing of' the following by Caltrans-certified geotechnical
cngincerine technicians:
• Grrdina observation • Removal observations
• Compaction testing • Roadway subgrade
• Fill moisture control • Trench backfill
• Subdrain placement • Undesirable subgrade soil mitigation
Special Inspection
Services include observation and testing of the following by GNItYs [CC-certified inspectors:
• Concrete • Post-tensioned concrete
• Reinforcing steel and embedded • Masonry
items • Drilled-in anchors
• Structural steel erection and welding_ • Fireproofing
• High strength bolting • Non-shrink grout
Pavement Testing and Inspection
Services include the following by G\gU's Caltrans-certified inspectors:
• Subgrade and a_eregate base • Flot-mix asphalt placement and
material compaction compaction
Au dust 17.2021 2 GMU Proposal 11-21205
Public Works Department.CITY OF MINTING"PON 13EACII
Proposal, On-Call Construction blalerials Testing and Hecpecrion Servimv
• In-place density of hot-mix asphalt. • Segregation
base. and subgrade using a nuclear • Aggregate and asphalt binder
gauge temperatures
• Pavement coring and testing • Continuous lcedine of aggregates
• Loose mix and compaction and proper ageregate feeder gate
temperatures operation
• Lilt thickness • Equipment calibrations. including
• Environmental conditions scales
assessment Batch or drum plant inspection and
• Equipment workin..� order testing:
verification o Sand equivalent
• Joint construction o Crushed particles
• CC13lCTIt/emulsi0n content o Pine aggregate specific
• \fixing, temperatures and time gravity and absorption
• IMix uniformity and adequate mixing o LA rattler
• Aggregate storage conditions o Fine aggregate angularity
In addition to the above materials testing and inspection capabilities. GMU can provide pavement
services to the City that are unique to GMU. The following flowchart illustrates our pavement
engineering, inspection, and testing capabilities and our typical approach for each hype of
pavement project, including pavement design. While pavement design is not included in the scope
of the RPP. GMU's design capabilities often are useful during construction to mitigate
unanticipated problems that may arise during the project.
August 17,2021 3 GMU Proposal 1'-21205
Public Works Department, OF HUNTINGTON
Proposal,On-Call Construction Materials Testing and Inspection Services
PAVEMENT
ENGINEEPING
Psvemenl \IanaRemeet 1':n rnu•m 6vdualiun�
August 17.
Plain i I'\1P Pavement Conctructiun
!'ru/:rr-!.reel Srwlr n' Omen anon-anJ=fes[inR
1 rroarA-I• , !',nYmOA F.ral+mlr ink!IksrXr+
-,,Le+Gurr. It+nlgrling,K &•Kmen1-bj+r•riJir Yarem... '+ .rLn l��rrrtmr.l'rugn nn.rrnf
1 Siuriri_o1i1m.5Yudr Rrprir Rrrrxumrrukan,r;, .:nrvrrnn f'nnryrliwrcr lr vrn¢
(X'Tr\certificdpa.ement thvamrpmhcnsisac�periaxi
inspetton and preparation induJc,Je,igning anJ testing
of Pa�emenl parcmrm mpain including
comrolivaal ud iaamatne _(altnas-certifinl Fa>ZiaterieR
\lanaRement Plan maleriab such a,AC - ARIIN/ 7 echaiciac with an aseragc of 211
Hepons cnmpritc pJ.enxnl.lull-Jeph >tan ul csl+critncc.perlimming
reclamation lFDRl.cull mc's dcd pasemem amuruction ohscnation.
.\C,pas ing nwu:ga.grids/ umpling.anJ Jen+it+ testing
gune+tik,, liter-minl'umcd AC.
+loin oats lcnmcmiowl.
ruht+crireJ.anJ rest cleJ),and nwrc
'I'�trieal.\onroaeY:
•I'slabli+h or 1�pJatt Cih's
RoaJw a. Vcnuul.lmcnlon
•Rt�irw:mJ t'pdalt ol'Cit)S I\rascal \nnmach:
Maintrnancc K RehahilitalMm •Ncarrds Rc,camh.mJ I>tmumcm 1.rascal \nnroacA:
HisUrn
Hr�Icw •Rat sew anJ pru�iJc rccununrnJanun. �„�
•1'asemcnt Cunditiun Imle� •I'a+cmrnl surfire( oaJitina +pecification update.prior m mlruine
I P(715un c)s 4:v,snxnl!including lYll am+lnlctiun RFl"+
•Iludgct ticiavio Anal)si. .Von-rk,irucli.t lc,tinglVhl �. •Rc+icw pa�cmrnt•mlatrJ cabmitraL.
including"cumnt IunJing". inchnling fdliaR ae'rytAt +uhmincJ h) ('omrJclnr anJ attend pre-
'target 1'(1".unfundcJ haeAlu�. delkclomtler(FN DI.nnJ grtrun.l- nmstnnlxm martingc
forecavcJ P('I.anJ mum pcnclroting raJar l(:PRI •CJltran.-cenilieJ pa�emem anJ x.i6
•Pasrment\lanagcmcm I'la" •I'a,emcm cerieRvMrtings nr mnerial testiaR latwraloq fire t�ulwtin�
ReprrL including nnasum in-place[hickncssc,.crJck material+li+r+pecilication armpliar.ec a+
nrunmxndations li.r Jcpth+.esaluatt and ndlctit well a+ lur pa.emcnt c+aluatxms
repair.)mmmrnl n pes +n11,UrtJl'l'IIIatCnLl]rand a+ndilnms •1'iul report pmpamd u,+ummariic all
schcduks,anJ IunJing nccJ+
•1'erlimming analr sis dr+dnpiog dailica.licld Jcnsih LL•>I insults IaMrrJton
cnndusk�ns,anJ pro.iJing prJtl seal. rrnJls,anJ technician cenilicatKms
castalliutiw.and inmo ali.r irtcluJing rcpnns compliant with IcJerJll.
pa.cmcm repair recommeadatiaa• 1'wxkJ pnrjecl rcyuimnxms 1(1:\P Intingl
in a repun liumat •Prepar<final V:\rcporta summarising ulrt
•\lap.measure.:utd yuantil) h.calin•I dailice.late rc+ults Rth ccrlilicatiano.anJ
:\C repair area+lil+Imtcg)insnkcss nwrrc
patch rep'Jlhl
2021 ... 1
Public Works Department, CITY OF IIUiNTINGTOiN BEACII
Proposal. On-Call Cwtviructinn Materials Teving and Inspection Services
SUPPORTING SERVICES
Review and Approval ol'Construction Materials Submittals
GMU stafTwill perform reviews ofconstruction materials submittals as required.
Multi-certified Technicians
Many Of'our public works inspectors are multi-certified as geotechnical engineering technicians.
special inspectors,and pavement inspectors. This enables GMU to have I technician complete all
required inspections. where other firms require 2-3 dillercm people to handle all required
inspections. This will result in significant cost savings and a reduction in time spent
scheduling by City staff. Certifications for our technicians and inspectors are included in
Appendix A.
Lab Support/Testing
All Of oar technicians are supported by our in-house laboratory. GMU offers comprehensive soils
and aggregate testing. pavement testing,and materials testing. Our lab is certified by the County
of Orange, Caltrans, AMRL, and DSA, making GMU in full compliance for all state and
federally funded projects.
Laboratory test results will be reviewed and provided to the City, including: crigincering
evaluation/support ol'those test results.Testino and sampling will be performed in accordance with
the City's Quality Assurance Plan (QAP), ifapplicable. A summary table ofour laboratory testing
capabilities (pavement and soil) is provided in Appendix B.
Project Examples
Examples Of GMU projects similar to those anticipated for the City are provided in Appendix C.
Au'Ius1 17, 2021 5 GMU Proposal P-21205
Public Works Department.CITY OF HUNTINGTON BEACH
Proposal,On-Call Constracdon Alarerials Testing and Inspecdon Services
2. KEY PERSONNEL AND SUBCONTRACTORS
The following individuals are GMU's key staff that will be providing services on projects with the
City. Resumes with additional information for these individuals are contained in Appendix D.
Management Contact
• Greg Silver, M.Sc., PE, GE, President/CEO
• E-mail: gsilver(a»¢mu¢eo.com
• Office: (949) 888-6513
• Cell: (949)633-0617 R1,
• Mr. Silver's responsibilities for this on-call agreement will include general oversight and
technical engineering input on project complexities. Mr. Silver has over 30 years of
experience providing geotechnical engineering oversight on public agency projects similar
to those within Huntington Beach.
Project Manager
Pavement Engineering and Materials Testing/Inspection
• Roger Schlierkamp. M.Sc.. PE. Director of Pavement
Engineering
• E-mail: rschlierkampLagmugeo.com
• Office: (949) 888-6513
• Cell: (949)300-2158
• Mr. Schlierkamp's responsibilities for this on-call agreement will include day-today
management of all projects, as well as providing technical oversight for materials testing,
inspection, and pavement projects. If needed, Mr. Schlierkamp can provide engineering
response to issues that arise during construction.
The referenced RFP requests a list of subcontractors. GMU's staffing plan does not include
subcontracted staff. If use of a subcontractor is necessary,this information will be provided to the
City prior to beginning work on the project.
August 17.2021 6 GMU Proposal P-21205
Public works Department. CITY OF HUNTINGTON 13EACIi
Propnsrd, Orr-Call Construction Materials Teeing rend Impection Sendces
3. PUBLICAGENCYREFERENCES
GMU has provided on-call materials testing and inspection services to municipalities and
governing agencies for over 30 vcars. The following references are clients to whom services
similar to the referenced RPP have been provided within the past 7 years. A list of specific projects
for each of these clients can be provided upon rcyucst.
• David A. Webb. Public Works/Director. Cite of Newport Beach
100 Civic Center
Newport Beach. CA 92660
(949) 644-3329
dawcbbnnewportbeac hca.gov
2009-cnrrew: ova-cull geotechnical Services including public works construction.
ob.servaliwa, mcuerials testing, uncl inspection. Primary GMU Project cilancr ,erS: Roteer
,Schlierkamp and Greg Silver.
• Shaun Pelletier. Director of Public Works. Cite of Aliso ViC10
12 .1ournev. Suite 100
Aliso Viejo. CA 92656
(949) 425-2533
spel let iernaycity.org,
2016-current: on-call geotechnical .cervices including public works construction.
observwion, materials testing, and Aaspeciian. Primary GNIU Projecl rManuger: Roger
,Schlerkcmrp.
• Mark Uphus. Senior Civil Engineer. City of Garden Grove
11222 Acacia Parkway
Garden Grove. CA 92840
(714) 74 1-5 191
marku(c�.L,'1,1ciIV.ore
2020-current: on-call gewechnical services incliudbaz public mucks consnactiun,
ob.servaiion. materials testing. and inspection. Primary G,t4(j Project SJcrnaQer: Rater
Schlierkamp.
August 17.2021 7 GMU Proposal P-21205
Public Works Department.CITY OF HUNTINGTON BEACH
Proposal, On-Call Consnucdon Materials Testing and lnspecdon Senices
4. SYNOPSIS OF QUALIFICATIONS AND BENEFIT
GMU's on-call service specializes in rapid response and reducing City Staffs time coordinating
inspections. In addition. GMU is the only geotechnical/materials testing firm with a dedicated
Pavement engineering department. Our over 30 years' of experience with public agencies means
GMU is capable of performing any and all materials testing and inspection tasks the City will
request, and is also capable of handling any unforeseen issues during Public Works projects to
minimize project schedule and budget issues.
S. RESUMES
Resumes for key personnel discussed in this proposal are attached as Appendix A.
PREFERRED STAFFING
GMU's organizational chart for the City of Huntington Beach's on-call services is provided below.
The key personnel listed is not anticipated to change through the life of the agreement.
OversightPrimary Contact and
Greg Silver.NI.Sc_PE,GE
-7
ConstructPavement
Director of Pavement Engineering Materials Testing
Roger Schlierkamp.%I-Sc..PE
Director of Pa%cment Engineering
Engineers and Geologists
Caltrans Certified
Pavement Technicians Certified Engineering Tectinician,
and lahoralnr% Special Inspectors
and Laboratory
August 17. 1011 s GMU Proposal P-21205
Public Works Department.CITY OF 11UN IM.—I'ON BEACI1
Proposed, Ott-Call Construction Materials Teming and Inspection Services
UNDERSTANDING AND i\IETIIODOLOGY SECTION
Based on our review of the referenced RFP and our experience providing on-call services to
numerous public agencics. we anticipate services required may include:
• Construction Observations
• Inspcction. including Gcotechnical and Registered Special Inspection
• Field \Materials Testing
• Laboratory Materials Testing
• Geotechnical or Pavement Design/Engineering During Construction
• Emergency Response (24/7)
Below is a discussion of ho\y GMU will provide these services to the City that will best benefit
the City.
APPROACH
Our approach to the execution, implementation. and managcment of all of our services has been
well-established over GNIU's long history of providing these hypes of'services on an on-call basis.
We have developed a streamlined approach to managing projects and budgets. yielding cost
savin_s and reducing management time for City Stall'.
For a typical Public Works project. GMU will assign a Project Manager who will be the primary
contact for the duration of the project. This project Manager will handle all needs ol,the Cite For
this project. including scheduling field personnel, submittal review, project tracking. invoicing,
and any other tasks that may arise. In order to streamline the project for City Staff. the single GMU
contact will also provide all testing results and handle any issues that may come up during the
project, allowing the City to only have to make one phone call or send one email.
GMU is prepared to provide adequate staff and allocate the appropriate number ol'hours to provide
services to the City in order to accomplish the City's goals for each project. A project schedule
can be provided on a per-project basis, at the City's request.
August 17. 2021 9 G\1U Proposal P-21205
Public works Department.CITY OF II UNT INGTON [IF ACII
Proposal, On-Call Construction Materials Testing and Inspection Services
GMU's ability to address challenges, provide solutions, and use established as well as innovative
methods and strategies for managing projects, personnel. and communication with City Staff. is
based on our years of experience providing on-call services to public agencies. In addition. GNIU
is known for:
• The responsiveness ofour staff.
• Our comprehensive services.
• Ability to expect the unexpected. based on our experience.
• Tendency to over-communicate.
• Prioritize workloads and manage staff such that all projects receive adequate support.
• Longevity and collaborative team approach of GMIJ staff, resulting in streamlined and
comprehensive service.
QUALITY CONTROL/QUALITY ASSURANCE: (QA/QC)
GMU has established an internal system to monitor all projects on an on-going basis for schedule
and budget constraints. Our Principals maintain involvement in both management and technical
aspects of all projects to minimize schedule delays and avoid buduct overruns. Tasks are assigned
to appropriate staff, and internal status meetings are conducted frequently to ensure projects are
completed on time and within budget. Invoicing for projects is completed monthly, at minimum.
with frequent oversight and review by Principals.
']'he same system discussed above is also utilized to provide QA/QC over the technical aspects of
our work, including oversight and review by Principals. In addition, frequent project status
meetings and collaboration assist us in providing cost-effective solutions to problems by exploiting
the skills and experience of all GMU professionals.
Our Field personnel report on a daily basis to project management, providing status updates of task
progress and discussion of any problems or delays encountered. In addition, our technicians are
certified by Caltrans. ICC. ACL and various agencies as Deputy Inspectors. Laboratory personnel.
procedures. and equipment are certified by County of Orange, Caltrans. AiNIRL, and DSA. GNIU
August 17.2021 10 GMU Proposal 13-21205
Public works Oeparlment.CITY OP IIUNTINCI'ON BEACII
Proposal. On-Call Construction 11arericds Te ing and Inspection Services
is full- capable of providing our services that will satisfy the City's Quality Assurance Program
and the current standard of practice in the industry.
In addition to the above abilities. GIMU's staff holds internal mcctinas twice weekly to discuss
on-going and upcoming projects to ensure that adequate and appropriate stalTare assigned to each
project to meet deadlines and provide outstanding service.
E. RATE SHEET
Our Ratc Sheet is provided as a separate file per the requirements of the RI P. It should be noted
that the Rate Sheet is our Pee Schedule for on-call services described in the RI-P.
August 17. 2021 11 GMU Proposal 11-21205
Appendix A
Certifications
�' ►II 1
V 1�1 V
SAD TL-0113. CALTRANS ACCREDITATION LABORATORY INSPECTION REPORT
STATE OF CALIFORNIA
DEPARTMENT OF
TRANSPORTATION
CALTRANS ACCREDITATION LABORATORY INSPECTION REPORT
Expiration Date:2022-03-11 A certified Independent Assurance(IA)visited this
Inspected By:Brandt Houchen laboratory on 2021-03-03
IA No.: 117
Phone:916-203-7992 Only the equipment to be used on Caltrans Construction
RSP#: 104 projects and/or local construction projects on the
File:Material Category 500 National Highway System was checked for qualification.
Laboratory:GMU Geotechnical Inc. At the time of Caltrans Accreditation, this laboratory had
all necessary equipment to perform the test methods
Address:23241 Arroyo Vista Rancho Santa indicated below.
Margarita CA, 92688
Lab QC Mgr.:Mike Moscrop Testing personnel shall be Caltrans Qualified and
E-mail:mmoscrop@gmugeo.com possess a current Caltrans Certification Form TL-0111
Telephone:949-888-6513 or AASHTO Proficiency Form TL-0115 prior to
Fax #.:949-888-1380 performing any sampling or testing.
CT 105 CT 106 CT 125 ADMIX CT 125 AGG CT 125 BIT
CT 125 CEM CT 125 GEN CT 125 HMA CT 201 CT 202
CT 204 CT 205 CT 206 CT 207 CT 209
CT 216 CT 217 CT 226 CT 227 CT 231
CT 301 CT 304 CT 308 CT 309 CT 366
CT 375 CT 382 CT 504 CT 518 CT 533
CT 539 CT 540 CT 541 CT 556 CT 557
A visual check was performed and documents provided as necessary for the following items:
J Facility Safety Manual V Copies of current applicable test procedures
Laboratory Procedures Manual V Calibration and service documentation
J Laboratory Quality Control Manual V Calibration stickers affixed to test equipment
,/ Proper test equipment (dated within the 12 months)
On 2021-03-03 , this laboratory was Caltrans Qualified by.
Brandt Houchen IA 117
(Printed name of IA person) (Signature of IA person)
Please verify lab accreditation by visiting SIAD website: https:/Isia.dot.ra.gov/
Page 1/1
CERTIFICATEOF AmLwCAN AsbUCIATION
STATr min-wwr • . -
"ATIUN Or r-CiAiu
AASH O ACCREDITATION AASH D
A C C R E D I T E O
GMU Geotechnical , Inc .
III
Rancho Santa Margarita, California, USA
has demonstrated proficiency for the testing of construction materials and has conformed to the requirements established in
AASHTO R 18 and the AASHTO Accreditation policies established by the AASHTO Committee on Materials and Pavements.
The scope of accreditation can be viewed on the Directory of AASHTO Accredited Laboratories (aashtoresource.org).
66 Tymon, Moe Jamshidi
AASHTO Executive Director AASHTO COMP Chair
Ll This certificate was generated on 03/11/2020 at 6 11 PM Eastern Time. Please confirm the current accreditation status of this laboratory at
aashtoresource.org/aapYaccreditation-directory
SCOPE OF AAS HTO ACCREDITATION FOR :
GMU Geotechnical, Inc.
AASH O in Rancho Santa Margarita, California. USA
ACC Rc 01T CO
Quality Management System
Standard: Accredited Since:
R18 Establishing and Implementing a Quality System for Construction Materials Testing Laboratories 07/02/2015
D3666 (Aggregate,Minmr,�m iequuements fcr Agencies 1 estng and Inspecting Road and Pavwq Nalcnals , lr' ;i
D3740(SA Minimum Requirement for Agencin Engaged in Tn*V of Soil and Rock as Used in Engineering Design and Construction 10/07/2019
E329 (Aggregate) Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction _�yr 16_' .1
E329(Sol) Standard SWOCMlon for Agencies Engaged in the Tw"NOW IMPKIlon of Metty"Used In Construction 10/07/2019
Page 1 of 4
This certificate was generated on 03/11/2020 at 6 11 PM Eastern Time. Please confirm the current accreditation status of this laboratory at
aashtoresource.org/aaplaccrLditation-directory
SCOPE OF AASHTO ACCREDITATION FOR :
GMU Geotechnical. Inc.
aasH o in Rancho Santa Margarita, California. USA
ED
Soil
Standard: Accredited Since:
R58 Dry Preparation of Disturbed Sal and Soil Aggregate Samples for Test 0911 912 01 7
R74 'Net Preparation of Disturbed Sod Samples for Test 09r16,2017
T88 Parkle Stre Nii lyais of Sob by HydrornetK 07/02/2015
T89 Determining the Liquid Limit of Soils(Atterberg Limits) 07/02/2015
TD0 PYtlie LW W of Sole(AOerba ig Limb) 07/02/2015
T99 The Moisture-Density Relations of Soils Using a 5.5 lb[2.5 kg] Rammer and a 12 in. 1305 mm] Drop 09/19/2017
[400 Spla*%Gravity of Sala 07/022015
T134 Moisture-Density Relations of Sod-Cement Mixtures 07/02/2015
Ift Moisture-Density Relations of Soils Using a 10lb[4.54 kg]Rammer and an 18 in.[457 min[Drop 07/02/2015
T190 Resistance R-Value and Expansion Pressure of Compacted Soils 07/02/2015
PbS Direct Shear Test of Sods Under Consolidated Drained Conditions 07A=015
eT.,265 Laboratory Determination of Moisture Content of Sods 09/19/2017
pr310 In-Place Density and Moisture Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth) 07/022015
0421 Dry Preparation of Disturbed Soil and Sod Aggregate Sarnplrs tw I es' 09/19/2017
D422 Particle Size Analysis of Soils by Hydrometer 0711=015
D558 Moisture-Density Relations of Sod-Cement Mixtures 0710212015
D6W The Moisture-Density Relations of Soils Using a 5.5lb[2.5 kg[Rammer and a 12 in.[305 mm] Drop 09/102017
D854 Specific Gravity of Soils 09/1 912 0 1 7
D1557 MoleWrwOensdy ReMiions of Soils Using a 10Ib[4.54 kg]Rammer and an 18 in.[457 min] Drop 07/0212015
D2216 Laboratory Determination of Moisture Content of Soils 09/1 912 01 7
02844 Resistance R-Value and Expansion Pressure of Compacted Soils 07/0212015
D3080 Direct Shear Test of Soils Under Consolidated Drained Conditions 07/02/2015
D4318 Determining the Liquid Limit of Soils(Atterberg Limits) 07/022015
Page 2 of 4
This certificate was generated on 0311112020 at 6 11 PM Eastern Time. Please confirm the current accreditation status of this laboratory at
aashtoresou rre.org/aap/accred itatlon-di rectory
SCOPE OF AASHTO ACCREDITATION FOR :
GMU Geotechnical, Inc.
AASH r07 in Rancho Santa Margarita. California. USA
A c R co I-ED
Soil (Continued)
Standard: Accredited Since:
D4318 Plastic Limn of Soils(Atterberg Limits) 07/02/2015
D69381n-Place Density and MOiStWe Content of Soil and Sod-Aggregate by N,Aear 6lethuds i_Shallow Depth) -
Page 3 of 4
This certificate was generated on 03/11/2020 at 6 11 PM Eastern Time. Please confirm the current accreditation status of this laboratory at
aashtoresource.org/aap/accreditation-directory
SCOPE OF AAS HTO ACCREDITATION FOR :
GMU Geotechnical, Inc.
AASH ❑ in Rancho Santa Margarita, California. USA
A c R co I T E D
Aggregate
Standard: Accredited Since:
R76 Reducing Samples of Aggregate to Testing Size 07/02/2015
T'1 Materials Finer Than 75-pm(No.200)Sieve in Mineral Aggregates by Wash,.; 07/02/2015
T27 OkAm 07/02/2015
T84 Specific Gravity(Relative Density)and Absorption of Fine Aggregate 0 7/0212 01 5
T85 AWON' 07/0212015
T210 Aggregate Durability Index 07/02/2015
T255 TotelMoishire OBJIWM17
C117 Materials Finer Than 75yim(No.200)Sieve in Mineral Aggregates by Washing 07/02/2015
C 127 Specific Gravity and Adt 07102=15
C128 Specific Gravity (Relative Density)and Absorption of Fine Aggregate 07/02/2015
C138 Fine and 07/0212015
C 566 Total Moisture Content of Aggregate by Drying 0911 9/2 0 1 7
C702 Reducing Samples of Aggregate to Testing Size 07/02/2015
D3744 Aggregate Durability Index 07/02/2015
Page 4 of 4
This certificate was generated on 03/11/2020 at 6 11 PM Eastern Time. Please confirm the current accreditation status of this laboratory at
aashtoresource.org/aaplaccreditation-directory
Division of the
State Architect 1102 memo.Street. Suite 981100 1 916445.8100
3521
Sacramento. CA 95811 1 916.445.3521
w .dsa.dgs.ca.gov
July 23, 2020
Matthew Farrington
GMU Geotechnical
23241 Arroyo Vista
Rancho Santa Margarita, CA 92688
NOTICE OF RENEWAL OF ACCEPTANCE - LEA 310
Dear Mr. Farrington:
This letter is to inform you of the renewal of acceptance by the Division of the State
Architect (DSA) of the facility referenced above into the Laboratory Evaluation and
Acceptance (LEA) program.
The referenced facility may provide the construction material testing and inspection
services indicated on the attached list for projects under the jurisdiction of the DSA,
which includes public schools (grades K-12 and community colleges) and State-owned
or leased essential service buildings. LEA information for your facility will be posted on
the DSA website (www.app.dgs.ca.gov/tracker/apptovedLabs,aspx).
Please take time to review this correspondence with members of your staff that might
be unfamiliar with our requirements.
This acceptance is valid until September 15, 2023 and is contingent on continued
compliance with the following LEA program requirements.
1. Michael Moscrop (RCE# 56787) is the approved full-time engineering manager
responsible for the testing and inspection services listed on the enclosed. You must
notify the DSA prior to any change in engineering managerial responsibility.
2a.The facility shall continue to receive biennial assessments by AASHTO Materials
Reference Laboratory (AMRL) and the Cement and Concrete Reference Laboratory
(CCRL) as applicable to the services offered at the facility. Future reports and
evidence of corrective action shall be submitted to the DSA.
2b.The facility shall maintain current participation in AMRL and CCRL proficiency
sample programs (PSP). Future PSP reports and explanations of any low ratings
shall be submitted to the DSA.
3. If the subject laboratory has granted DSA "Specifier' privileges with AMRL, written
reports do not need to be sent to the DSA.
4. The facility shall maintain all test equipment and records in accordance with
applicable, current American Society for Testing and Materials (ASTM) standards.
1102 O Street Suite 5200 1515 Clay Street.Suite 1201 700 ri.Alameca SL,Suite 5.500 10920 Via Frontera.Suite
Saaamento CA 95811 Oakland CA 94612 Los Angeles. CA 90012 San Diego.CA 92127
r 916 445.8730 r 510.622 3101 r 213.897.3995 r 858.674 5400
Matthew Farrington -2- July 23, 2020
GMU Geotechnical
5. The facility shall provide laboratory and field testing personnel who are adequately
trained, supervised and currently certified as required by the latest ASTM or other
recognized standards.
6. Masonry inspectors assigned to projects under DSA jurisdiction shall have passed
DSA's masonry inspector examination and be specifically approved for each project
by the DSA field engineer.
7. Welding inspectors assigned to projects under DSA jurisdiction shall hold current
American Welding Society (AWS) Certified Welding Inspector(CWI) or Senior CWI
certification and be specifically approved for each project by the DSA field engineer.
8. The facility's Nondestructive Testing (NDT) program shall be supervised by an
individual currently certified by the American Society for Nondestructive Testing
(ASNT) as NDT Level III in applicable methods. Such certification shall have been
obtained through ASNT by testing, not by employer or self-certification.
9. The facility's NDT written practice and procedures shall conform to the requirements
of ANSI/ASNT CP-189, 2006, and be approved by the supervising Level III. All NDT
technicians assigned to projects under DSA jurisdiction shall hold current Level II or
greater certification, in accordance with the requirements of CP-189.
10. The laboratory facility shall provide test, inspection and verified reports in
accordance with the requirements of the 2019 California Building Standards
Administrative Code (CBC) Title 24, Part 1. Report format shall comply with LEA
Program requirements and applicable ASTM standards.
11 . The physical location of the facility, including but not limited to laboratory equipment
and personnel, shall not change without prior notification to the DSA.
Please be aware that failure to comply with any of the requirements of the LEA Program
may result in this acceptance being revoked. A facility with a revoked acceptance may
be reinstated when it demonstrates all deficiencies cited by the DSA have been
corrected. Fees may be charged.
If you wish to continue DSA acceptance beyond your current expiration date, you must
submit a renewal application package at least 30 days prior to that date. The
application (DSA form 100-PRE) and detailed instructions outlining submittal
requirements can be downloaded from the DSA website
(http://www,dgs.ca.gov/dsa/Forms.aspx) . When we have received all required
information, we will schedule an on-site evaluation of your facility.
Thank you for participating in the Division of the State Architect's LEA program. Should
you have any questions regarding the LEA program requirements please feel free to
contact me at (916) 445-2193 or e-mail me at eric.france@dgs.ca.gov.
Sincerely.
Eric H. France
Division of the State Architect
Laboratory Evaluation and Acceptance Program
Enclosure:
GMU Geotechnical LEA 310
TESTING SERVICES INSPECTION SERVICES
ACCEPTED ACCEPTED
Earthwork/Lab Earthwork/Field Earthwork
SoilI Z Soil Compaction Fill Placement
A regale N Foundation
Asphalt Concrete N Caissons/Piles
Reinforcing Steel Reinforcing Steel
Re-Bar Tension and Bend Weldin
Multi-Wire Strand
Lj Chemical Analysis Concrete
Batch Plant
Concrete ❑ Re-Bar and Concrete Sampling
Makin /Curing Specimens Pre-Stressed Concrete
Drilled Cores/ Beams Shotcrete
Compressive Strength Fiber Reinforced Concrete
Len th Change Epoxy injection
Flexural Strength Reinforced Gypsum
Lightweight Concrete Post Installed Anchors
Mix Design Review
❑ Splitting Tensile Masonry
Post Installed Anchors ❑ Batch Plant
Lj Torque I Lj Proof Load W Masonry Placement
Post Installed Anchors
Masonry
Lj Makin /Curing Specimens Structural Metals
❑ Grout Compressive Strength ❑ Welding
Prism Compressive Stre h H. h Strength Bolting
Unit Com r. Strength Q Ab lion —Spray-Applied Fireprocifina
Lj Dimensions Masonry Shear
❑ Drying Shrinkage
Other Inspection Services:
Metals/Lab Metals/Field-N.D.T
Structural Steel Liquid Penetrant
-EfTension Magnetic Particle
Bend Ultrasonic
❑ Density of SFRM
High Strength Molt ❑ Radiographic
Tension Other Tests:
❑ Hardness
El Charpy V- Notch
Roofing
❑ Tiles ❑ Buin-U
Approved by: - Date_July-23,2020
Division of the State Architect LEA Acceptance for GMU Geotechnical LEA# 310 is effective
until September 15, 2023.
1102 0 Street, Suite 5100 Sacramento, California 95811 (916)445-8100
SIAD TL-0111. CT CERTIFICATION
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
Ronald Allen
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 125 AGG 2022-03-03 Brandt Houchen Lab 1
CT 125 GEN 2022-03-03 Brandt Houchen Lab 1
CT 125 HMA 2022-03-03 Brandt Houchen Lab 1
CT 231 2022-05-12 Brandt Houchen Lab 1
CT 375 2022-03-03 Brandt Houchen Lab 1
Lab 1 GMU Geotechnical Inc..23241 Arroyo Vista, Rancho Santa Margarita
2?u- IyleLtz-� Brandt Houchen Al 117
Certified Independent Assurance (IA)
Date issued. 08/04/2021
Tester to 05006
Note This certificate is valid as long as the Tester complies with applicable requirements in Caltrans Independent
Assurance Program Manual.
Please verity tester certifications by visiting the SIAD websde at https.Usia.dot.ca.gov/
Page 1/1
SIAD TL-0111 CT CERTIFICATION
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
Lucie Anderson
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 125 ADMIX 2022-09-06 Ashley Shaw Lab 1
CT 125 AGG 2022-09-06 Afsaneh Ostovar Lab 1
CT 125 BIT 2022-09-06 Ashley Shaw Lab 1
CT 125 CEM 2022-MO6 Ashley Shaw Lab 1
CT 125 GEN 2022-09-06 Ashley Shaw Lab 1
CT 125 HMA 2022-09-06 Afsaneh Ostovar Lab 1
CT 231 2023-05-12 Brandt Houchen Lab 1
CT 375 2023-05-12 Brandt Houchen Lab 1
Lab 1 GMU Geotechnical Inc.,23241 Arroyo Vista, Rancho Santa Margarita
Brandt Houchen IA 117
Certified Independent Assurance (IA)
Dale issued. 0 8104/2 0 2 1
Tester ID. 01360
Note: This certificate is valid as long as the Tester complies with applicable requirements in Caltrans Independent
Assurance Program Manual.
Please verity tester certifications by visiting the SIAD website at hftps/Isla.dot.ca.gov/
Page 1/1
SIAD TL-0111, CT CERTIFICATION
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
Jonathan Basalla
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 125 AGG 2023-03-03 Brandt Houchen (No lab)
CT 125 CEM 2023-03-03 Brandt Houchen Lab 1
CT 125 GEN 2023-03-03 Brandt Houchen Lab 1
CT 125 HMA 2023-03-03 Brandt Houchen (No lab)
CT 231 2023-03-03 Brandt Houchen Lab 1
CT 375 2023-03-03 Brandt Houchen Lab 1
Lab 1 GMU Geotechnical Inc., 23241 Arroyo Vista, Rancho Santa Margarita
No Lab: Laboratory associated with the tester is not accredited to perform the test method identified. Testers must be
associated with an accredited laboratory.
�2G�LL ¢rL Brandt Houchen IA 117
Certified Independent Assurance (IA)
Date issued. 03/22/2021
Tesler ID. 01361
Note: This certificate is valid as long as the Tester complies with applicable requirements in Caltrans Independent
Assurance Program Manual.
Please verify tester certifications by visiting the SIAD websde at https:FJsia.dot ra.govl
Page 1/1
I III I �
INTERNATIONAL CODE COUNCIL
r
JONATHAN BASALLA
The International Code Council attests that the individual named on this certificate has satisfactorily
demonstrated knowledge as required by the International Code Council by successfully completing the prescribed
written examination based on codes and standards then in effect,and is hereby issued this certification as:
Reinforced Concrete Special Inspector =
Given this day of October 3, 2017
-- Certificate No.8202644 � r
0%a 4
M Dwayne Garriss Dominic Sims
President, Board of Directors Chief Executive Officer
INTFRNATIONAL
CODE COUNCIL
County of Orange
OC Public works
Development Se(vice s
RFI IS-M D SPFX IAL I.%PECIL)R
DASALI.A.JoNA71LAN
Uspec'tor At SPINS-000207
The mdmdud nowd abo�c is abariud to e"•�the,pm-W
mpecmm hued 4 the nn' ottlik Od m the
impure.m of the C'amety o(Omg.
Vrl/a L6 bl!1 to 12 31 Ztl:l
�lato�ryjeitd�rard cet�ett:Wtrd
Budding ewi&L County of Orange
SIADTL-0111 CTCERTIFICATION
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
Norman Biehn
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 125 AGG 2022-09-06 Afsaneh Ostovar Lab I
CT 231 2021-09-06 Afsaneh Ostovar Lab I
CT 541 2021-09-06 Afsaneh Ostovar Lab I
Lah I:GMIJ Geotechnical Inc., 23241 Arroyo Vista, Rancho Santa Margarita
(A�xw CQ
tried Independent Assurance(IA)
Date issued: 1 0/1 720 19
Note:This certificate is valid as long as the Tester
complies with applicable requirements in Caltrans'
Independent Assurance Program Manual.
Please verify tester certification by visiting SIAD website: hops:/Isia.dot.ca.gov/
Page I/I
ACI Concrete Field Testing Technician -
Grade
NORMAN L BIEHN
Certification ID 400992779
Expires on: 03/17/2023
Gci Verify at CheckACI.org
COUNCU IINTERNATIONAL
IRW
OD
Norman an
,ram; http://verify.iccSafe.00g/�.��;
❑` � I (IIIII IIIII I III IIIII IIIII IIIII IIIII IIII IIII
Scan for Status � Q 8 6 011
A
s1Ao n-0111:CT CERTIFICATION
TL-0111 LNE Verson
CALIFORNIA DEPARTMENT OF TRANSPORTATION
Presents this
CERTIFICATE
to l*
Norman Biehn ca/&V/W
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 504 2023-03.17 Biplab Bhattacharya Lab 1
CT 518 2023-03-17 Biplab Bhattacharya Lab 1
CT 539 2023-03-17 Biplab Bhattacharya Lab 1
CT 540 2023-03-17 Biplab Bhattacharya Lab 1
CT 543 2023-03-17 Biplab Bhattacharya (No lab)
CT 556 2023-03.17 Biplab Bhattacharya Lab 1
CT 557 2023-03-17 Biplab Bhattacharya Lab 1
Lab 1: GMU Geotechnical Inc., 23241 Arroyo Vista, Rancho Santa Margarita
sip[a sk"4" skattAcl YA. IA#125
Certified Independent Assurance (IA)
Date of download: 08/16/2018
Note: This certificate is valid as long as the Tester
complies with applicable requirements in Caltrans'
Independent Assurance Program Manual.
PsyeLl
SIAD TL-0111: CT CERTIFICATION
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
Jacques Brosseau
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 504 2025-01-18 Jackie Treat Lab 1
CT 518 2025-01-18 Jackie Treat Lab 1
CT 539 2025-01-18 Jackie Treat Lab 1
CT 540 2025-01-18 Jackie Treat Lab 1
CT 543 2025-01-18 Jackie Treat (No lab)
CT 556 2025-01-18 Jackie Treat Lab 1
CT 557 2025-01-18 Jackie Treat Lab 1
Lab 1 GMU Geolechnical Inc., 23241 Arroyo Vista, Rancho Santa Margarita
No Lab: Laboratory associated with the tester is not accredited to perform the lest method identified Testers must be
associated with an accredited laboratory
131
Certified Independent Assur nce(IA)
Date issued. 06/17/2020
Tester ID. 01363
Note. This certificate is valid as long as the Tester complies with applicable requirements in Caltrans Independent
Assurance Program Manual.
Please verify tester certifications by visiting the SIAD website at https://sia.dotca.gov/
Page 1/1
SIAD TL-011 I.CT CERTIFICATION
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
Jacques Brosseau
who is certified to perforni the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 375 2021.09.06 Afsaneh Ostovar Lab I
Lab I: MU Geotechnical Inc.,23241 Arroyo Vista, Rancho Santa Margarita
e ified Independent Assurance(IA)
to issued: 1 011 7/2 0 1 9
Note:This certificate is valid as long as the Tester
complies with applicable requirements in Caitrans'
Independent Assurance Program Manual.
Please verify tester certification by visiting SIAD website: Mips://sia.dot.ca.gov/
Page 1/1
Verified Candidate AAA
Customer Name:
M
Jacques 8rosseau
11
SM as 1 Account Number:
ust 8203955
Certifications:
Expires:
❑3 13
06/03/2022 Reinforced Concrete Special
h= 1:4 7acques 9rosseau Inspector
L ilia a -,A
r�xr Y
Search Again
SIAD TL-0111: CT CERTIFICATION
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
Joshua Cuda
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 125 AGG 2023-03-03 Brandt Houchen (No lab)
CT 125 CEM 2023.03-03 Brandt Houchen Lab 1
CT 125 GEN 2023-03-03 Brandt Houchen Lab 1
CT 125 HMA 2023-03-03 Brandt Houchen (No lab)
CT 231 2023-03-03 Brandt Houchen Lab 1
CT 375 2023-03-03 Brandt Houchen Lab 1
CT 504 2024-01-19 Jasdeep Sandhu Lab 1
CT 518 2024-01-19 Jasdeep Sandhu Lab 1
CT 539 2024-01-19 Jasdeep Sandhu Lab 1
CT 540 2024-01-19 Jasdeep Sandhu Lab 1
CT 543 2024-01-19 Jasdeep Sandhu (No lab)
CT 556 2024-01-19 Jasdeep Sandhu Lab
CT 557 2024-01-19 Jasdeep Sandhu Lab 1
Lab 1: GMU Geotechnical Inc., 23241 Arroyo Vista, Rancho Santa Margarita
No Lab: Laboratory associated with the tester is not accredited to perform the test method identified. Testers must be
associated with an accredited laboratory.
Brandt Houchen IA 117
Certified Independent Assurance (IA)
Date issued. 03/22/2021
Tester ID: 01364
Note: This certificate is valid as long as the Tester complies with applicable requirements in Caltrans Independent
Assurance Program Manual.
Please verify tester certifications by visiting the SIAD website at https://sia.dot.ca.gov/
Page 111
SIAD TL-011 1:CT CERTIFICA IIUN
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
Joshua Cuda
who is certified to perform the following tests:
Test Method Expiration Date to Responsible Associated Laboratory
CT 375 2021-09-06 Atsaneh Cktovar Lab I
Lab I: GMU Geotechnical Inc.,232411 Arroyo Vista, Rancho Santa Margarita
qqk �f!(GC�lA7
t ied Independent Assurance(IA)
IllAte issued: 10/172019
Note: This certificate is valid as long as the Tester
complies with applicable requirements in Caltrans'
Independent Assurance Program Manual.
Please verify tester certification by visiting SIAD website: https:/isia.dot.ca.gov!
Page I/I /A
SAID TL-0111: CT CERTIFICATION
CALIFORNIA DEPARTMENT
- OF TRANSPORTATION
Presents this CERTIFICATE to
Royce Gould
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 125 ADMIX 2022-03-10 Ashley Shaw Lab 1
CT 125 AGG 2023-03-03 Brandt Houchen (No lab)
CT 125 BIT 2022-03-10 Ashley Shaw Lab 1
CT 125 CEM 2023-03-03 Brandt Houchen Lab 1
CT 125 GEN 2023-03-03 Brandt Houchen Lab 1
CT 125 HMA 2023-03-03 Brandt Houchen (No lab)
CT 231 2022-03-10 Ashley Shaw Lab 1
CT 375 2023-03-03 Brandt Houchen Lab 1
CT 504 2024-01-19 Jasdeep Sandhu Lab 1
CT 518 2024-01-19 Jasdeep Sandhu Lab 1
CT 539 2024-01-19 Jasdeep Sandhu Lab 1
CT 540 2024-01-19 Jasdeep Sandhu Lab 1
CT 543 2024-01-19 Jasdeep Sandhu (No lab)
CT 556 2024-01-19 Jasdeep Sandhu Lab 1
CT 557 2024-01-19 Jasdeep Sandhu Lab 1
Lab 1 GMU Geotechnical Inc.. 23241 Arroyo Vista, Rancho Santa Margarita
No Lab Laboratory associated with the tester is not accredited to perform the test method identified. Testers must be
associated with an accredited laboratory.
�u�yyQry Brandt Houchen IA 117
Certified Independent Assurance (IA)
Date issued. 03/22/2021
Tester ID- 01367
Note. This certificate is valid as long as the Tester complies with applicable requirements in Caltrans Independent
Assurance Program Manual.
Please verity tester certifications by visiting the SAIDwebsde at htlps.//sia.dot.ca.gov/
Page 1/1
SIAD TL-0111:CT CERTIFICATION
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
Russell Price
who is certified to perform the following tests:
Test Method Expiration Date 1A Responsible Associated Laboratory
CT 125 ADMIX 2022-03-10 Ashley Shaw Lab 1
CT 125 AGG 2023-03-03 Brandt Houchen (No lab)
CT 125 BIT 2022-03-10 Ashley Shaw Lab 1
CT 125 CEM 2023-03-03 Brandt Houchen Lab 1
CT 125 GEN 2023-03-03 Brandt Houchen Lab 1
CT 125 HMA 2023-03-03 Brandt Houchen (No lab)
CT 231 2022-03-10 Ashley Shaw Lab 1
CT 375 2023-03-03 Brandt Houchen Lab 1
Lab 1. GMU Geotechnical Inc.,23241 Arroyo Vista, Rancho Santa Margarita
No Lab: Laboratory associated with the tester is not accredited to perform the test method identified. Testers must be
associated with an accredited laboratory.
Certified Independent Assurance(IA)
Date issued:03/22/2021
Tester ID: 01368
Note: This certificate is valid as long as the Tester complies with applicable requirements in Caltrans Independent
Assurance Program Manual.
Please verify tester certifications by visiting the SIAD website at https://sia.dot.ca.gov/
Page 1/1
APPROVAL OF SPECIAL INSPECTOR
Re0issv No Expires Issuanc,,Fee
I CINTERNATIONAL 1421 7/1/2018 S8000
ODE Inspection AO nimlrata
COUNCIL
Tne bearer of this Cemf r *u a thoraw to act at the City of
I,oi,as a Special Inspector of
�. Asphalt i Reinforced Concrete I Masonry I •��
httP://ver(ry.icoab.pq/ Post Tension
of _ ii■� �■ U Russell Price
23241 Arroyo Vista
Rancho Santa Margarita CA 92688
Sgnawre
County of Orange
OC Public Works
OC Planning
REGISTERED SPECIAL.INSPECTOR
PRICE, RUSSELL
inspector#2035
The individual moot above is authorized to perform the special
inspections listed on the revered of this card•in the unincorpo-
rated areas of the(County of(range.
Yxld from 7,1 R016 hr fijW-GI7
ACI Concrete Field Testing Technician -
Grade
RUSSELL PRICE
Certification ID#01002326
Expires on: 06/14/2019
C; ceruh<..t" Verify at GheckACLorg
hiternational Code Council International Code Council
500 New Jersey Avenue. NW 500 New Jersey Avenue, NW
Washington, DC 20001 Washington, DC 20001
INIi RNA'IUhk MIEaW11a4U
COO(Cme" cm couKir
The individual named hereon is CERTIFIED in the The individual named hereon is CERTIFIED in the
categories shown having been so certified pursuant to categories shown,having been so certified pursuant to
successful completion of the prescribed written successful completion of the prescribed written
examinalions. examinations.
APPROVAL OF SPECIAL INSPECTOR
Reeyster No. Expires. Issuance Fee:
ICCINTERNATIONAL 1421 7112018 $8000
11
Inspection Adnunostratw
Ina NCIL*
. C
t The bearer of Nu Cemficate rs authorized to aG in the City of
Irvine as a Special inspector of.
RLIssell Price Asphalt 1 Reinforced Concrete I Masonry/ m s�
}. Port Tension ��]
+�.
Russell Puce
23241 Arroyo Vista
Rancho Santa Margarda CA 92688
Signature
REINFORCED CONCRETE
MASONRY
PRESTRESSED CONCRETE
Building Official,County of Orange
For information regarding the certification criteria of ACI
programs,or to verify the validity of this card,contact:
The American Concrete Institute
PO Boa 9094
Farmington Rifts,MI 49333-9094
248/848-3790
FAX 248/848-3793
www.ACICertification.org
This card is the property of the American Concrete Institute.
Unauthorized repreductlon or misuse of this
card may result In legal action.
Ruasail A Price-U72795 Russell A Price.8072795
Prestressed Convele SPeual InapeQw-Fxp.06121/2016 RenfwOcl Con".Special Insl'e -Exp.0821MJa
Structural Masonry Specal Inspector-Exp.OW 12016
SIAO TL-0111 CT CERTIFICATION
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
Scott Seabold
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 125 AGG 2023-03-03 Brandt Houchen (No lab)
CT 125 CEM 2023-03-03 Brandt Houchen Lab 1
CT 125 GEN 2023-03-03 Brandt Houchen Lab 1
CT 125 HMA 2023.03-03 Brandt Houchen (No lab)
CT 231 2023-03-03 Brandt Houchen Lab 1
CT 375 2023-03-03 Brandt Houchen Lab 1
Lab 1 GMU Geotechnical Inc.. 23241 Arroyo Vista. Rancho Santa Margarita
No Lab. Laboratory associated with the tester is not accredited to perform the test method identified. Testers must be
associated with an accredited laboratory
�3Qyy Brandt Houchen IA 117
Certified Independent Assurance (IA)
Date issued. 03/22/2021
Tester to: 01370
Note This certificate is valid as long as the Tester complies with applicable requirements in Caltrans Independent
Assurance Program Manual.
Please verity tester certifications by visiting the SIAD website at https://sia.dot ca.gov/
Page 1/1
ACI Concrete Field Testing Technician -
Grade
SCOTT E SEABOLD
Certification ID#01234858
EzpirBs on: 07/29/2022
f c Cuf Wkwirx Verify at CheckACI.org
297. 7/1/2018 510.0
The Deter M To C.rehcab 4 au"M. a j 10 ar.: r.,,i
as a Sa .::yxa .t
hw D,mng
:�. S4AhoIc L-�J"
SIAD TL-0111 CT CERTIFICATION
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
Jade Sill
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 125 ADMIX 2022-03-10 Ashley Shaw Lab 1
CT 125 AGG 2022-03-10 Ashley Shaw Lab 1
CT 125 BIT 2022-03-10 Ashley Shaw Lab 1
CT 125 CEM 2022-03-10 Ashley Shaw Lab 1
CT 125 GEN 2022-03-10 Ashley Shaw Lab 1
CT 125 HMA 2022-03-10 Ashley Shaw Lab 1
CT 231 2022-03-10 Ashley Shaw Lab 1
CT 375 2023-03-03 Brandt Houchen Lab 1
Lab 1 GMU Geotechnical Inc., 23241 Arroyo Vista, Rancho Santa Margarita
� 1rQyL Brandt Houchen IA 117
Certified Independent Assurance (IA)
Date issued. 0 312 212 02 1
Tester ID'. 01371
Note. This certificate is valid as long as the Tester complies with applicable requirements in Caltrans Independent
Assurance Program Manual.
Please verify tester certifications by visiting the SAD website at https://sia.dol.ca.gov/
Page 111
County of Orange
OC Public Works
De ve lopuw nt Service s
REGISTERED SPECIAL MPUMR
SILL,JADE
Inspector p SPtM4100201
The mdis idual named abmx is ambanred to pufartn thespecial
tospetirms fisted nn the nme of this u-nd.in the
tmtttmrpmated arcs of the Cmtaty of Omni!
\Id trm IM1]L'ltn1231 _`RI
Rrinfnnvd,no Ie
T�
Budding OPficaL County ofOrange
SIAD TL-0111:CT CERTIFICATION
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
John Strauss
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 125 AGG 2022-07-20 Ashley Shaw (No lab)
CT 231 2022-07-20 Ashley Shaw Lab 1
CT 375 2023-03-03 Brandt Houchen Lab 1
CT 504 2024-08-03 Sarbpt Grewal Lab 1
CT 518 2024-08-03 Sarbjit Grewal Lab 1
CT 533 2022-03-10 Ashley Shaw Lab 1
CT 539 2024-08-03 Sarbjit Grewal Lab 1
CT 540 2024-08-03 Sarbjit Grewal Lab 1
CT 541 2022-03-10 Ashley Shaw Lab 1
CT 543 2024-08-03 Sarbjit Grewal (No lab)
CT 556 2024-08-03 Sarbjit Grewal Lab 1
CT 557 2024-08-03 Sarbjit Grewal Lab 1
Lab 1 GMU Geotechnical Inc., 23241 Arroyo Vista. Rancho Santa Margarita
No Lab: Laboratory associated with the tester is not accredited to perform the test method identified. Testers must be
associated with an accredited laboratory.
Brandt Houchen IA 117
Certified Independent Assurance(IA)
Date issued: 03/22/2021
Tester ID: 01372
Note. This certificate is valid as long as the Tester complies with applicable requirements in Caltrans Independent
Assurance Program Manual
Please verify tester certifications by visiting the SIAD websde at https Hsia dot ca gov/
Page 1/1
SIAD n-011 I:Cr CERWICAMN
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
John Strauss
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 504 2024-08-03 Sarbjit Grewal Lab I
CT 518 2024-08-03 Sarbjit Grewal Lab I
CT 539 2024-08-03 Sarbjit Grewal Lab I
CT 540 2024-08-03 Sarbjit Grewal Lab I
CT543 2024-08-03 Sarbj it Grewal (No lab)
CT 556 2024-08-03 Sarbjit Grewal Lab I
CT 557 2024-08-03 Sarbjit Grewal Lab I
Lab 1:GMU Geotechnical Inc.,23241 Arroyo Vista,Rancho Santa Margarita
No Lab: Laboratory associated with the tester is not accredited to perform the test method identified. Testers must
be associated with an accredited laboratory.
&yr j/t Grewal I.A. 131
Certified Independent Assurance 0AI
Date issued: 09/16 2019
Note:This certificate is valid as long as the Tester
complies with applicable requirements in Caltrans'
Independent Assurance Program Manual.
Please verify tester certification by visiting SIAD website: https://sia.dol.ca.gov/
Page 1/1
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
John Villarraga
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 105 2021-04-27 Biplab Bhattacharya Lab 1
CT 106 2116-04-06 Ashley Shaw Lab 1
CT 125 AGG 2021-04-27 Biplab Bhattacharya Lab 1
CT 201 2021-04-27 Biplab Bhattacharya Lab 1
CT 202 2021-04-27 Biplab Bhattacharya Lab 1
CT 204 2022-03-10 Ashley Shaw Lab 1
CT 205 2021-04-27 Biplab Bhattacharya Lab 1
CT 206 2022-03-10 Ashley Shaw Lab 1
CT 207 2022-03-10 Ashley Shaw Lab 1
CT 209 2022-03-10 Ashley Shaw Lab 1
CT 216 2021-04-27 Biplab Bhattacharya Lab 1
CT 217 2021-04-27 Biplab Bhattacharya Lab 1
CT 226 2021-04-27 Biplab Bhattacharya Lab 1
CT 227 2021-04-27 Biplab Bhanacharya Lab 1
CT 229 2021-04-27 Biplab Bhattacharya (No lab)
CT 301 2022-03-10 Ashley Shaw Lab 1
CT 304 2022-03-10 Ashley Shaw Lab 1
CT 308 2022-03-10 Ashley Shaw Lab 1
CT 309 2022-03-10 Ashley Shaw Lab 1
CT 366 2022-03-10 Ashley Shaw Lab 1
CT 370 2022-03-10 Ashley Shaw (No lab)
CT 382 2022-03-10 Ashley Shaw Lab 1
Lab 1: GMU Geotechnical Inc., 23241 Arroyo Vista, Rancho Santa Margarita
No Lab: Laboratory associated with the tester is not accredited to perform the test method identified. Testers must be
associated with an accredited laboratory.
P_. I
SI,AO TL-0115. AASHTO PROFICIENCY
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
John Villarraga
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
AASHTO T84 2022-03-10 Ashley Shaw (No lab)
AASHTO T85 2022-03-10 Ashley Shaw (No lab)
No Lab: Laboratory associated with the tester is not accredited to perform the test method identified. Testers must be
associated with an accredited laboratory.
l, iLe R r
Certified Independent Assuran (IA)
Date issued: 0 3/1 912 0 2 0
Tester ID: 01373
Note: This certificate is valid as long as the Tester
complies with applicable requirements in Caltrans'
Independent Assurance Program Manual.
SIAD TL-0111:CT CERTIFICATION
CALIFORNIA DEPARTMENT
OF TRANSPORTATION
Presents this CERTIFICATE to
John Villarraga
who is certified to perform the following tests:
Test Method Expiration Date IA Responsible Associated Laboratory
CT 105 2024-03-19 Sarblit Grewal Lab 1
CT 125 AGG 2024-03-19 Sarblit Grewal Lab 1
CT 201 2024-03-19 Sarblit Grewal Lab 1
CT 202 2024-03-19 Sarbjit Grewal Lab 1
CT 205 2024-03-19 Sarblit Grewal Lab 1
CT 216 2024-03-19 Sarbjit Grewal Lab 1
CT 217 2024-03-19 Sarblit Grewal Lab 1
CT 226 2024-03-19 Sarbjit Grewal Lab 1
CT 227 2024-03-19 Sarbjit Grewal Lab 1
CT 229 2024-03-19 Sarbjit Grewal (No lab)
Lab 1: GMU Geolechnical Inc , 23241 Arroyo Vista, Rancho Santa Margarita
No Lab: Laboratory associated with the [ester is not accredited to perform the lest method identified. Testers must be
associated with an accredited laboratory131
Certified Indent Assurance (IA)
Date issued: 03/2212021
Tester ID 01373
Note. This certificate is valid as long as the Tester complies with applicable requirements in Caltrans Independent
Assurance Program Manual
Please verify tester certifications by visiting the SAID website at httpss F7sia dot ca gov/
Page 1/1
i STATE
LONG BEACH UNIVERSITY i
The College of Engineering
National Center for Transportation, Green Technology, and Education (TransGET)
Presents this Certificate of Completion
to
I I
First name John
Last Name Villarraga
I I
i Company jvillarraga@gmugeo.com i
I I
who completed Soil &Aggregate module with results in written and practical exam as follows
I I
I Test Method Written Exam Practical Exam
I Score% Pass/Fail Pass/Fail
CT 105 100% Pass N/A i
i CT 125 AGG 80% Pass Pass i
i CT 201 90% Pass Pass i
i CT 202 100% Pass Pass i
CT 205 100% Pass Pass i
CT 216 90% Pass Pass i
i CT 217 80% Pass Pass i
i CT 226 100% Pass Pass i
CT 227 100% Pass Pass
CT 229 100% Pass Pass
I I
Date: March 19, 2021
TransGET Director: Dr. Shadi Saadeh
I I
I I
I I
I This certificate of completion does not replace Caltrans Certfication and is used for your record.To get I
Caltrans Certificate please visit SIAD (h"ps://sia.dot.ca.gov/index.php) i
Appendix B
Laboratory Testing Capabilities
0 " 11
V1'V1V
r►II 1
VI-IV Pavement Laboratory Testing Capabilities
PAVEMENT
ENGINEERING
('slimes ASTM AASHTO Pavement Laboratory Tests
382 D6307 T308 Percent Asphalt Binder Content(Ignition Oven)
382 132172 Percent Asphalt Binder Content(Chemical)
202 D6307/5444 T27/30 Percent Asphalt Binder Content and Gradation(Ignition Oven)
202 D2172/3444 727/30 Percent Asphalt Binder Content and Gradation(Chemical)
308C D2726 T166 Bulk Specific Gravity of Lab Prepared Specimens(3 replicates,SSD)
308A DI 198 1275 Bulk Specific Gravity of Lab Prepared Specimens(3 replicates,wax)
308C D2726 T166 Bulk Specific Gravity of Cored Specimens(each core,SSD)
308A DI 188 T275 Bulk Specific Gravity of Cored Specimens(each core,wax)
370 D1461 T329 Mix Moisture Content
304/366 D1 56011 56 1 T246247 Hveem Stability(S-Value)
304,308A DI560 T246 Hveem Maximum Density(3 replicates)
D6926 - Marshall Maximum Density(4 inches,3 replicates,SSD)
D5591 Marshall Maximum Density(6 inches.3 replicates.SSD)
• D6925 T312 Superpave Gyratory Compacted Specimen(4 inches. I replicate.SSD)
D6925 T312 Superpave Gyratory Compacted Specimen(6 inches, I replicate,SSD)
309 D2041 T209 Theoretical Maximum Specific Gravity(rice)
LP-9 D2172 - Reclaimed Asphalt Pavement Evaluation(chemical and ignition,3 replicates)
382 D6307 T308 Asphalt Binder Content Correction Factor(2 replicates,includes mixing)
D3910 - wet Track Abrasion'rest for Slurry Seals(2 Replicates)
D244 - Emulsion and Residual Asphalt Binder Content
T324 Hamburg Wheel Track(4 replicates.2(racks.up to 25.000 passes)
371 D4867 T283 Resistance of Compacted Bituminous Mixture to Moisture Induced Damage
371 D4967 T283 Each additional I'rceze-thaw cycle
371 D4867 T283 Additional 200/6 if mixing is required.
Cakmes ASTM AASHTO Pavement Mix Designs(excludes RAP or agg,qualify testing)
367 MS-2 I(yeem Asphalt Mix Design
- MS-2 Marshall Asphalt Mix Design
SP-2 Superpave Asphalt Mix Design
367 MS-21SP-2 Mix designs with asphalt rubber binder
367 MS-2/SP-2 Mix designs with warm-mix asphalt technology or other additiycs
LP-8 CT LP-8 Cold Recycled AC Mix Design(includes crushing of AC cons)
PCA Soil-Cement Mix Design(with subgrade,agg base.AC,or combination)*
NLA Soil-Lime Mix Design(with subgradc.agg base,or combination)•
'Cost assumes wetdn-testing not required.
Cakmes ASTM AASHTO Aggregate Quality Tests
202 C136 T27 Sieve Analysis-Combined Sample(w/wash)
202 C136 T27 Sieve Analysis-Fine Aggregates
202 C136 127 Sievc Analysis-Coarse Aggregates
205 D5821 TP 61 Crushed Particle Percentage(Coarse Aggregate Angularity 1
206 C127 T85 Coarse Aggregate Specific Gravity and Absorption
207 C128 T84 Fine Aggregate Specific Gravity and Absorption
211 C131 T96 Los Angeles Rattler(Abrasion)
214 C88 TI04 Soundness by Sodium Sulfate
217 D2419 T176 Sand Equivalent(3 replicates)
227 C142 TI12 Cleanness Value of Coarse Aggregate
229 D3744 7240 Durability Index
234 C1252 T304 Fine Aggregate Angularity (Uncompacted Void Content)
235 D4791 - Flat and Elongated Particles of Coarse Aggregates
301 D2844 T190 Resistance Value(R-Value)
301 D2844 T190 Resistance Value I RA alue w/oversized correction)
I of 2
Atom ,, '
VI I Soil and Aggregate Testing Capabilities
V
Calemaa ASTM AASH III Identification and Index Properties
226 D2216 T265 Moisture C ontent of Sod or Rock
D2937 - Moisture Content and Density (6 inch tube or rings)
132937 Moisture Content& Iknsit%IShcllw tube or requires cutting)
204 D4319 T89,T90 Atterbcrg Limits
204 D4319 T89,T90 Atterbcrg Limits(W'ct Prepmmion)
204 D4318 T89,T90 Single PotmlNon-plastic
227 - - Fcst for Evaluating Cleanness of Coarsc Aggregates
229 D3744 T240 Aggregate Durability Index
202 CI36 T27 Particle Site Analysis - Full Sieve(3/4-mi to mmus No.200)
203 D422 T88 - Hydromew only
203 13422 T88 - Sieve&liydrometa
0I140 TII - No.200 wash only
209 D954 TIIIO Specific Gravity of Soil
207 C129 T84 Fine Aggregates Specific Gravity and Absorption
206 CI27 T85 Coarse,Aggregates Specific Gravity and Absorption
- CI252 T304 Clncompacled Void Content of Fine Aggregates
205 D5821 - Dacrrnining the percentage of Fractured Particles in Coarse
211 CI31 T96 Abramon lest 13% Lox Angeles Machine
D4791 - Ilat and I[longated Panicles
214 C88 T104 Soundness hx Sodium Sulfate
217 D2419 T176 Sand Equivalent
Caltme ASFM AASHTO Soil Cliembtry
643 PH
613 - - Minimum Resistwo. (minimum of 3 prints)
417 - - Sulfate Content- Iurb)dimetrre
422 - - Chloride C'onlem
Curtis teat Suite(pH.Resistivih.Chloride.Sulfatel
CaRran ASTM AASt1TO Sh"r Strength
D3090 T236 Direct Shear t3 points)
D30M T236 Residual Shear(price per pass after shear)
- - Remolding Shear or hand trimming of specimens 13 point),
132166 T208 Unconfined Compression 13 Samples)
Caki ar ASTM AASHTO Compardw and Maximum Density
301 D2844 T190 R-Value
301 D2844 T190 R-Value with lhersur C'ormUcin
- D698 - Maximum Dcrtsny and Optimum Moisture,standard effon
- 131557 TISO Maximum Iknsny and Optimum Moisture,modified effort
216 - - Cal-216 Maximurii Density and(Optimum Moisture
• D1557 TI80 Check Point
D4718 T224 Correction of Soils with Oversize Particles
DI633 - C-omprtssive Strength of Molded Soil-Cement Cylinders. Remold cost per point
Break+Capping(per pomo
D559 - Wetting and[hying Compacted SoilCcmen(Mixtures.2 Samples 1 I cement%)
12 Cycles 48 Hours per Cycle
D5102 - (''nconfined Compressive Strength of Lime I reared Soils and Aggregates
Compaction of 4 Samples per each%of lime
- - - Break Sample
• - Break Sample+Capping
D558 TI34 Moisture-Density l Cnu Wnght)Relations of Soil-Cement Mixtures
Samplo with addrtwcs added(cement,lime,emulsion)
CaWaas ASTM AASHTO Coasolidatioa and Swell
D2435 TZ 16 Consolidation Vlathod.%with time-deformation readings on two kind morcmcrtu
(8 loading iner s✓water up to hies(&unloading with Seam vs P cane)
D2435 T216 Time Reading and Curve per mcrernent
D48_''9 - Expansion Index of Sods
D4546 - Sweil Coltap�e I eel-Method A(Your or more identical stimmensl.C'osi per point
- - - Up to 10 kradmgrunloadmg saturation mcrerliRits w/o none curves
D4546 - Single Load SweWCollapsc lest-Method It Cost per paint
D4546 - Swell/Collapse Test-Metihsd C
Caanas ASTM AASHTO Hydnefic Tesh
220 D2434 T2I5 Permrabhv of Granular Sods(minoWrd constant head maximum 6'&arn i cell)
2 01 2
Appendix C
Project Profiles
�' ►II 1
V 1�1 V
t\ ®l F
VI'IV
PAVEMENT
ENGINEERING
2020 Various Streets Reconstruction Project
City of Garden Grove Highlights
GMU provided pa%cment reconstruction observation and ' withith ce reclamation (FDR)
w cemmee nt treatment
testing services for the City of Garden Grove's 2020 ■ Recycling
Various Arterial Streets Reconstruction Project. Street ■ Construction observation and
reconstruction primarily consisted of performing full- testing
depth reclamation with cement treatment (FDR-C), ■ Quality-assurance consulting
following Standard Specifications for Public Works a Mix design testing and
Construction (SSPWC or Greenbook) requirements. recommendations
■ Field and plant testing and
Prior to construction,GMU assisted the City by reviewing inspection
the City's "block cracking mitigation procedures" testing Date
program, as well as advised on topics such as quality ■ August 2020 to January 2021
assurance testing requirements and mix design laboratory
tests. GMU Key Staff
Roger Schlierkamp, MSc, PF..
During construction, GMU perform observation and Director of Pavement
testing services, including sampling materials for cement Engineering
stabilized pulverized base (CSPB) mix design
development per the project requirements.Various cement References
contents were tested,and recommendations were provided ' Mark eer,71 Senior Civil
Engineer, 4-741-5191,
for the CSPB mix design. In addition to CSPB material marku@ggcity.org
testing, GMU also performed field and plant inspection of ■ Nick Hsieh, PE, 714-741-5190,
asphalt concrete (AC) and asphalt rubberized hot mix nhsieh@ggcity.org
(ARHM) materials.
fr.rtr wn wur
I �
=v
I.00A2101 LAI ..fiart,.,..
Left: GMU Senior Engineering Technician sampling pulverized material for CSPB mix design testing on
Brookhurst Boulevard in Garden Grove, California.
Right: Project Location Map, various street segments included Euclid Street, Brookhurst and more.
23241 Arroyo Vista
Rancho Santa Margarita I CA 92688
9498886513 1 FX 949.8881380 1 wvnv.gmugeocom
r\/1 1
VIWIV
PAVEMENT
ENGINEERING
City of Aliso Viejo
Alicia Parkway Pavement Rehabilitation Highlights
the Alicia Parkway Pavement Rehabilitation Project ■ Construction observation and
consisted of performing concrete replacement at various ■ testing services
Mix design reviews
locations, 3-inch-thick pavement cold milling, 1-inch-thick ■ Field observation and testing
AC leveling course, and 2-inch-thick ARHM overlay. The ■ Laboratory testing
AC and ARHM mixtures utilized fiber-reinforcement for ■ Fiber-reinforced AC mixture
improved reflective cracking resistance.
GMU reviewed material submittals and performed pavement Date
materials observation and testing services for this project. ■ January 2020
Observation and testing services included monitoring
excavation depth,measuring compaction of AC and ARHM Reference
materials, and performing laboratory testing of the various ■ Quang Le,PE,Associate
construction materials collected during construction. Engineer
■ Shaun Pelletier, PE,City
Localized areas of the ARHM overlay were measured to Engineer
have less than 95%relative compaction,primarily due to low
temperatures. GMU assisted the City in determining the GMU Key Staff
limits of the areas with less than 95% relative compaction • Roger Schlierkamp, MSc, PE
and corrective action recommendations.
o
W 4a��_-
.10
•�Ratsv3•r
1 •� •YINYYYfid'-
�
�( tf}--8 $ •YSaIYlTiilYr
b ¢I�S�T�P :� � '.�-� . are{ •�rl-{t�}}.�1I.
a!■,
:
UNDO —
� ...®,..,dro. rW o.ryrrrr■Y ltr, 1-z=
.ac.■a o■a•.nn
-
aw..weswn.ns'
A�npVnp
Photo 1: Field Density Test Location Map, showing compaction testing
locations and areas of low compaction.
23241 Arroyo Vista
Rancho Santa Margarita I CA 92688
ho 2513 1 FX.949.88a1380 I wwwgmugeo.com
r►II 1
VI'IV
PAVEMENT
E NC I N EE RI NC
City of Mission Viejo
Trabuco Rd & Marguerite Pkwy Pavement Highlights
Rehabilitation l ou,truction observation and
testing services
the I rabuco Rd & Marguerite Pkwy Pavement ■ Mix design reviews
Rehabilitation Project consisted of replacing existing PCC ■ Field observation and testing
curb & gutters, sidewalks• driveways, crack sealing, cold N Laboratory testing
ARHM mixture
planning and construction of a 1.5-inch-thick ARHM
overlay.
Date
GMU reviewed material submittals and performed pavement ■ March—June 2018
materials observation and testing services for this project.
Observation and testing services included monitoring Refenonce
excavation depth, measuring compaction of AC and ARHM ■ Rich Schlesinger,City Engineer
materials, and performing laboratory testing of the various
construction materials collected during construction. GMU Key Staff
Roger Schlierkamp,MSc.PE
Localized areas of the ARHM overlay were measured to ■ Gregory Silver, Msc, PE,GE
have less than 95%relative compaction,primarily due to low
temperatures. GMU assisted the City in determining the
limits of the areas with less than 95% relative compaction
and corrective action recommendations.
'W;r
s
�1V1I.9�/,—•—
tillcsial�ag�:-
- -- �9its�;ly$tYRiE.
f�4 f_��• •!. - -'�..�-s-�' Mgt- 1- •�pautrunvn�
e�
i Oa ...-.`.' �. . s�Y pnYyTrl�■ie 1���`
ft
— r
ate. ss
wn
Photo 1: Field Density Test Location Map, showing compaction testing
locations and areas of low compaction.
23241 Arroyo Vista
Santa Margarita I CA 92688
"?1380 1 wwwgmugeomm
Appendix D
Key Staff Resumes
0" UI 1
VI'vIV
GREGORY SILVER, M.Sc., PE, GE J400 u
President/CEO %a Fwr,V
PROFESSION SUMMARY OF EXPERIENCE & QUALIFICATIONS
Geotechnical Engineer Mr. Silver has over 31 years of progressively responsible
Civil Engineer engineering and management experience in a wide variety
of geotechnical engineering projects. He has worked
REGISTRATIONS successfully for and with industrial, residential, and
Registered Civil Engineer- commercial developers, master community planners, and
State of California governmental agencies. He has extensive experience in
Registered Geotechnical landslide evaluation and remediation design, geotechnical
Engineer-State of California instrumentation, residential and commercial development.
Registered Civil Engineer- public works projects, municipality consultation.
State of Nevada mechanically stabilized earth walls, and forensic projects.
Registered Civil Engineer- In addition,he has served as an expert witness in regards to
State of Utah numerous geotechnical issues over the last 25 years. Over
the period of 1988 to 1997, Mr. Silver was City
EDUCATION Geotechnical Engineer for numerous cities throughout
M.S. Civil Engineering Southern California. Currently, Mr. Silver serves as
(Geotechnical Engineering)- President and Principal Engineer of GMU. Mr. Silver is a
California State University, past president of CalGeo, - a 100 member firm statewide
Long Beach organization. Selected types of projects representative of
B.A. Geological Sciences Mr. Silver's experience are listed below:
(Geophysics)-
University of California at • Commercial Development Projects
Santa Barbara • High-rise Structures
• Landslides
PROFESSIONAL EXPERIENCE. . Residential Development Projects/Master Planned
GMU Geotechnical, Inc. Communities
(1997-Present) a Major Roadways
President, Principal Engineer, a Bridges
Rancho Santa Margarita,California . Water Resource Projects
Bing Yen& Associates. Inc.
(1988-1997) Dewatering Projects
Project Engineer to • Miscellaneous Public Works Projects
Associate/Manager of Municipal • Govemment/Civic Centers
Services, Irvine,California • Sportsparks
G.C. Masterman& Associates. Inc. • Mechanically Stabilized Earth(MSE)Walls
(1984-1986) • Soil Nail Walls
Technician to Project Engineer • Geotechnical Instrumentation
Van Nuys.California • Tie-back Slope Reinforcement
• Pavement Engineering and Design
PROFESSIONAL AFFILIATIONS . City Geotechnical Engineer/Consultant
ASCE- Member • Legal Consultation
ACEC-Member • Special Studies
BIA-Member
CalGeo-Past President
23241 Arroyo Vista, Rancho Santa Margarita.CA 92688 1 ph 949 888 6513 1 fax 949 888 1380 1 veb w gmugeo corn
GEOTE,CHNICAL ENGINEERING
CO:NUNIEROAL DE%'EI.oNINteN'r 1'Ro.ncCrS:
• 20/40 Pacifica Office Towers — Irvine. California. Lead Geotechnical Engineer — Two
high-rise office buildings and one 5 story parking structure. Design involved foundation
systems consisting of driven piles and geopiers.
520 Newport Center Drive Officc Tower— Newport Beach. California: Principal-in-charge —
one 20-story high-rise office building and adjacent 6-story parking structurc. Design involved
mat and spread footing loundation design and analyses. shoring design, and permanent
retaining wall design
• 650 Newport Center Drive Office Tower— Newport Beach. California: Principal-in-charge —
one 20-story high-rise office building and nvo adjacent nurlti-story parking structures with up
to 2-story subterranean sections. Design included mat foundation design, spread footing
design, shoring design, and permanent retaining wall design.
200 Spectrum Center Drive Office Tower — Irvine. California- Principal-in-charge — 21 story
office building and one adjacent 6 story parking structures. Design included driven pile
foundation design. spread footing design, shoring design. and permanent retainim" wall
design.
• 400 Spectrum Center Drive Office lower— Irvine. California - Principal-in-charge — one 21
story office building and one adjacent 6-story parking structures with up to 2-stor
subterranean sections. Design included mat foundation design. spread footing design.
shoring design, and permanent retaining wall design.
• Irvine Spectrum iNlarriott Hotel — Irvine, California — Irvine California — Principal-in-chargc
— one 15 stor- hotel buildin; with adjacent 2 story event center. Design included mat
foundation design, spread footing design, and permanent retaining wall design.
• Sand Canyon Business Park — Irvine. California: Principal-in-charge/Lead Geotechnical
Engineer — multi-story campus masonry block buildings on highly expansive soils with
associated parking. walkways. etc. Geotechnical design included innovative partial
mat/partial conventional slab to minimize expansive soil movements.
• Discovery Business Center — Irvine. California: Principal-in-charge/Lead Geotechnical
Engineer — nurlti-story campus masonry block buildings on highly expansive soils with
associated parking. walkways. etc. Geotechnical design included innovative partial
mat/partial conventional slab to minimize expansive soil movements.
• Capitol Group Office Campus — Irvine. California: Lead Geotechnical Engineer — Large
office campus on highly expansive soils. Project involved gcopier and select soil
replacement subgrade improvement strategies.
Gregory P. Siher 2
• Spectrum 5. Spectrum 7. Spectrum I — Irvine. California: Principal Geotcchnical
Lngincering oversight of investigation design and construction.
• Bridgepark Plaza. Nlercantile East. Mercantile West, and Corporate Terrace — Ladcra Ranch.
California: Principal Geotcchnical Engineering oversight of investigation design and
construction.
• University Research Park Office Development - Irvine, California: Principal Gcotechnical
Engineering oversight of investigation design and construction.
L:��ost-toes:
Poppy Trail Landslide - Palos Verdes. California: Lead L--ngineer and Investigator. Detailed
gcotechnical engineering analyses of' landslide that resulted in damage to an existing home
and Poppy Trail Drive. Determined causation and led forensic team to a Icgal settlement.
Developed stabilization plan that involved creating two lots where only had one had existed
before to create an economicalh_- viable repair. Repair consisted of buttress grading,
temporary stabilization measures, dcep-seated and surficial gcogrid stabilization and MSF
walls. GMU performed the geotechnical engineering, civil engineering, structural
engineering and construction management for the project..
• Philemon Landslide — Dana Point, California: lead engineer and Investigator. Detailed
eeotechnical engineering analyses of a deep seated geologically controlled landslide that
resulted in the demolition of several homes. Evaluated and determined causation and
developed innovative and award winning stabilization plan using high strength aggregate
cement slurry. The stabilization approach is documented in a paper published by the ASCE..
Geo-Institute.
• China Cove Slope Stabilization — Newport Beach. CA: Lead engineer and investigator.
Developed aesthetically pleasing soil nail Slope stabilization to mitigate years of surficial
slumping and shallow slumping on slope face. Evaluated and determined geotechnical
characteristics of the failures. developed the repair methodology and developed complete
structural plans for bidding.
• Palos Verdes Drive Roadway Stabilization — Palos Verdes. CA: L.cad engineer and
investigator. Developed 50 year road stabilization plan to protect roadway From adjacent
deep seated landslide movement. Performed geotechnical and structural engineering for the
stabilization plan consisting a mut-tier tic-back wall.
• Sunset Crossing Landslide - Diamond Bar. CA: lead engineer and investigator. Working
with the a Slope remediation contractor. the City and several private landowners, developed
landslide repair for deep seated landslide where several other groups tailed. Repair involved
using tic-backs and multi-tied slot grading.
Gregor, 1'. Silver
• Brancato Landslide — San Jose. California: Lead Engineer — Detailed geotechnical
engineering analysis of large. deep-scaled landslide including shear strength determination.
static and pseudo-static analyses, seismic deformation analyses. and development of
geotechnical mitigation schemes.
• Horseshoe Landslide — Anaheim Hills. California: Lead Investigator — Comprehensive
geological and geotechnical engineering evaluation of re-activated ancient landslide.
Development of remediation scheme consisting of horizontal drains. buttress grading, and
tic-backs.
• Voyager Lane Landslide — Laguna Niguel. California: Lead Investigator — Detailed
evaluation of long-term monitoring data leading to the development of an innovative long-
term repair consisting of a horizontal drain system. a surlace water infiltration mitigation
system, and roadway stabilization and subgrade strengthening.
• Rambla Pacifico Landslide Stabilization - Malibu. California: Project Director on one million
dollar landslide stabilization design. Involved working with I:EMA and OES and within
NEPA/CEQUA guitlClines. y
• Calle Nlontecillo Roadway Stabilization - Agoura Hills. California: Project Director -
Gvaluation and design of roadway slope stabilization. Design. plans, and specifications.
• 13ig Rock Mesa Landslide Area - County of Los Angeles. California: Project Engineer -
Large-scale geotechnical investigation and evaluation, deep dcwatering and horizontal drain
installation, pump tests, and geotechnical instrumentation and monitoring.
N1ontcllano Landslide - Hacienda Heights. California: Project Manager/Engineer - Pump
tests, geotechnical monitoring, and long-term surface drainage improvement design with
plans and specifications.
• Mystic Hills Landslide - Laguna Beach. California: Project Gcotechnical Engineer - Third
party geotechnical evaluation of the stability of an ancient landslide for the City of Laguna
Beach.
• Kanan Milne Road Landslide - Malibu. California: Project Director - Monitoring,
geotechnical evaluation. geological evaluation. remediation design for a I00-loot roadway
embankment tailure.
• Via Istoril Landslide — Laguna Niguel. California — Emergency response to large landslide
which endangered numerous residential structures, emergency geotechnical
recommendations. review of interim and final repairs.
• South Pacing Slone Landslide - Malihu. California: Project Director - Detailed geotechnical
engineering evaluation of an ancient landslide. Investication included specialty laboratory
testing including ring shear testing and x-ray diffraction, two- and three-dimensional stability
analyses. and parametric groundwater and seismic Cvaluation.
Gregon• 1'. Silver 4
• Tract 33410 Slone Failures - A.1101ira Hills. California: Project Director - Detailed
geotechnical evaluation of'one deep-seated and two surficial slope failures. Tasks included
preparation of plans and specifications for repair and expert witness-related consultation.
RESIDENTIAL DEVELOPMENT PROJEC.I'S/MASTER PLANNFD COMMUNITIES:
• SantaluZ — City of San Diego. California. Principal Geotechnical Engineering Oversight —
Project direction and oversight for complex gcotechnical engineering issues including: hard
rock. blasting. rock fills and utility over-excavation.
• Sendero Development — COUntV of Orangc. California: Principal Geotechnical Engineering
Oversight — ['reject direction and oversight for complex geotechnical engineering issues
including: time delayed settlement and resulting solutions involving surcharge and wick
drain design and debris flow evaluation and mitigation and slope stability.
• Banning Ranch Development — Newport Beach. California: Project Director —
Comprehensive geotechnical and fault evaluation study for proposed residential and hotel
develOpnunt. Fault investigation included thousands of lineal tests of fault trench through
the Newport-Inglewood fault Zone.
• Ladcra Ranch Planned-Community Development - Rancho Mission Viejo Company. County
oPOrangc. California: Project Engineer - Geotechnical investigation and design for portions
of major master planned community.
• Crvstal Cove Development — Newport Coast/Countgl of' Orange. California: Principal —
Oversight of' gcotechnical engineering for mass grading, public works improvements. and
residential development.
• Talega Planncd-Community Development — San Clemente. California: Principal — Oversight
of geotechnical engineering for mass grading. public works improvements. and residential
development.
• Rancho Santa Nlargarita Planncd-COmm Lill 11V Development - Rancho Santa \larsarita.
California: Project Lngineer/Manager - Geotechnical investigation. grading and foundation
design, and construction observation for a number of planning areas in a major residential
planned community development.
• F..dgewatcr Development — Chino. California: Project Director — Geotechnical investigation
and design for large residential development area with recreational lake network.
Planning Area 19A Feasibility Studv - Irvine. California: Project Engineer - Geotechnical
investigation to advise on planning-related issues for roadway and general development in a
marsh/soft clay site environment.
Various Foundation Investigations 1984-99 - Singlc-family residences_ large tracts,
commercial/industrial structures and high-rise buildings throughout Los Angeles Count'.
Cregory P. Silver 5
(MAJOR ROADWAYS:
• Ortega Flighwav Widening — County of' Orange/City of San Joan Capistrano: Lead
Geotechnical Ingineer/Principal-in-Charge — Geotechnical investigation and development of
design recommendations.
• City of Irvine/Irvine Industrial Comoanv - Irvine Center Drive. Lake Forest Drive, and Sand
Canyon Boulevard Street Widening - Irvine. California: Principal Geotechnical Engineering
oversight of design and construction.
City of' San Clementeffal"m Associates — Avenida Vista Hermosa. Avenida La Pata.
Avenida Fresas, Avenida Saluda. and Avenida Tal"m — San Clemente, California: Principal
Geotechnical I nuinecring oversight of design and construction.
• La Para Avenuc L?xtension — County of Orange/City of San Juan Capistrano/City of San
Clemente. Calilornia: Principal Geotechnical Gngincering oversight and project management
for planning. FIR and design.
BRIDGES:
• Ortega Brido,e Widenint, — County ol' Orange. California: Project Director — Geotechnical
investigation and development ol'design recommendations for Caltrans bridge.
• Co", Camp Bridges — County of' Orange. California: Project Director — Geotechnical
investigation and development of design recommendations for two bridges crossing ccnnplcx
georechnical environs.
• San Juan G-cek Bridge Widening — County of Orange. California: Project Director —
Geotechnical investigation. detailed ecotechnical evaluation of' seismic retrofit. and
development of widening foundation recommendations.
• Wildlife Grossing Bridge Widening — County of Orange/L.adem. California: Principal
Geotechnical Engineer - Oversee widening project of existing bridge.
• Las Flores Bridec - iNlalibu. California: Project Engineer/\9anagcr - Evaluation ol' bridge
design and alternatives for the City of Nialibu.
• Crown Valle\, Parkway Bridge — County of Orange. California: Lead Geotechnical Engineer
for 238-meter-long. 27-meter-high bridge. Detailed ecotechnical analysis for pile foundation
design, abutment design, and geotechnical input to bedrock scour design.
Oso Parkwav Pedestrian Bridge - County of Orange, California: Project Engineer -
Gcotcchnical design for 65-foot span pedesn-ian bridge.
"A" Street Bridge at Barranca Parkway - Irvine. California: Project Engineer/i�1anagcr -
Gcotechnical investigation and design for new bridge over San Diego G'cck.
Gregory P. Silver 6
• "Los Angeles Avenue Bridec" - Moorpark. California: Project I-ngineer/N-Ianager -
Geotechnical assessment of proposed bridge expansion and retrofit. Development of
preliminary design recommendations.
• Tustin Avenue Bridee Widenine — Anaheim. California: Principal Geotechnical I''m incering
oversight for widening project of existing bridge.
• Washinuton Boulevard Bridge - Los Angeles Count, California: Project Engineer -
Geotechnical investigation and design for seismic retrofit of existing bridge.
WATER RESOURCE PROJECtS:
• I lorno Basin Detention Basin — County of Orange: Project Director — Geotechnical
investigation and design for detention basin, spillwav, bio-filtration system, and sub-drainage
recapture system.
• Oso Creek Geotechnical Scour Study — \Mission Viejo. California: Project Director —
Geotechnical evaluation of insitrl "eotechnical materials for scour evaluation and revetment
study.
• Various Water Lines. Scwcr Lines. Talcum Lift Station. SOUIh Ranch Lift Station. San Juan
Creek Lift Station. and Ladera Zone 2 Reservoir. Talez,a "Lone I Reservoir and Covenant
Hills Reservoir and Lift Station for Santa Margarita Water District - Rancho Santa Margarita.
Las Flores. Coto de Caza. and Ladcra Ranch, California: Principal Geotechnical Engineering
oversight.
• Las Flores Canvon Sedimentation - Debris Flow Study - Malibu. California: Project
Manaucr/I7-ngincer- Geotechnical and geological input for hydraulic analyses.
• Northwood Reservoir - Irvine. California: Project Geotechnical In,,inecr - Evaluation of
foundation design and settlement potential for 45 MG reservoir.
• Hicks Canvon Detention Basin - Irvine, California: Geotechnical Consultant - Geotechnical
anak,sis and design for two lar_e detention basins.
• San Diego Creek Channel Improvements - Irvine. California: Project Managcr/Engineer -
Geotechnical investigation for proposed channel improvements consisting of'soil cement and
"keystone" geogrid-tvpe revetments.
MISCELLANEOUS PUBLIC WORKS PROJECTS:
• Marina Park — City of Newport Beach — Geotechnical Project ivlanager of geotechnical and
Materials Inspections. project involved stone columns for liquefaction remediation, concrete
sheet pile walls with tic-backs and specialty foundation design
• City of Laguna Niguel - Metrolink Station - Laguna Niguel. California: Principal
Geotechnical Engineering oversight for a regional OCTA-funded commuter rail station.
Gregor- P. Siker 7
• BRM Storm Drain Replacement project - Malibu. California: Project \tanager/E..ngineer -
Evaluation of' storm drain pipe design in landslide and erosion prone area following
destruction of system by tire.
• Metro-Rail Vibration Testing - Los Angcles. California: Project Engineer - Geotechnical
exploration and input for vibration study.
• Big Rock Nlesa Dewatering Well Project - Malibu. California: Project Engineer/iAlanager -
Design, plan and specification preparation. installation and construction oversight for six
dewatering wells to 350 feet and four horizontal drains.
• ytontellano Winterization - Hacienda Heights. California: Project Engineer/\Manager -
Desien and construction oversight of'lone-term. multi-vicar landslide winterization.
Pavement Evaluation - Pomona. California: Project Manager/Engineer - Pavement evaluation
for 4000 lineal feet of distressed pavement-
GOVERNMENT/CIVIC CENTERS:
Chino Hills Government Center Complex - Chino Hills, California: Project Director -
Geotechnical investigation. development of recommendations and plans for multi-faceted
government center consisting of multi-story government buildings and a four-story parking
structure.
• Vista Civic Center - Vista. California: Project Director- Development of final geotechnical
design recommendations for Vista Civic Center.
• Laguna Niguel Civic Center - Laguna Niguel. California: Lead Geotechnical Engineer -
Geotechnical design oversight for investigation and design recommendation development.
SPORTSPARKS:
• La Par. Sportspark - La�-'una Niguel. California: Project Director - Geotechnical design for
sportspark complex with synthetic fields. Infiltration design of' subsurface licid drainage
system.
• Chino Hills Sportspark - Chino Hills. California: Project Director - Geotechnical
investigation and design for large sportspark complex with numerous synthetic f iclds.
• Long Beach Sportspark - Long Beach. California: ['to ject Director - Geotechnical
investigation and design for planned regional sportspark in oil fields operation area.
Developed unique design recommendations for proposed facilities to be placed on top of'
buried rubble and debris.
Jarupa Water Park - Jarupa. California: Project Director - Geotechnical investigation and
design for multi-acre water park facility.
Gregory 1'. Silver 8
C:EOTECI NICAL INSTRUMENTATION:
Nlonitoring and evaluation of slope inclinometers and piezometers for various select projects:
• Poppy frail Landslide. Palos Verdes. CA
• Horseshoe Landslide. Anaheim, CA
• Cyprus Shores Landslide. San Clemente. CA
• South Shores Landslide. Rancho Palos Verdes. CA
• La Par Road Movement, Laguna Niguel. CA
• Palos Verdes Drive Roadwav Distress. Palos Verdes Estates, CA
• Canyon Wren Slope/Street Deformation. Aliso Vic_jo. CA
• Philemon Landslide. Dana Point. CA
• Suncrest Landslide. San Jose. CA
• Sierra Road Landslide, San .lose. CA
Ladera Residential Development — Counq' of Orange. California: principal Geotechnical
Engineering Oversight of "real time" monitoring system for electrical towers above
temporary slopes during grading.
• La Paz Road — Laguna Niguel. California: Project Manager — Long-term monitoring of
on-going slope movements. \-tonitoring program enables City of' Laguna Niguel to
incrementally and cost-clrcctiwehv implement roadway stabilization project on an as-needed
basis. Instrumentation includes slope inclinometers. multi-stage piezometers, and survcv.
• Crvstal Cove — Newport Coast. California: Project Director — Loner term evaluation of
surface and subsurface survcv network and slope inclinometers to evaluate deep fill/till slope
performance.
• Oceanside Dewatcrina - Oceanside. California: Project f.;ngineer - Construction overview
and monitorin_, of dewaterine tunnel. horizontal drain. and tie-back installation.
Port of' Los Aneeles, Pier 300 Expansion - POLA. California: project Manager/1ngineer -
Dcsign, installation, and monitoring of' specialty :cotechnical instrumentation for port
expansion.
Bie Rock \,Icsa - Malibu. California: Project Manager/Engineer- Managed monitoring and
dc\watcrin, district consisting of dewatering swells. horizontal drains, slope inclinometers.
piezometers. multi-position extensometer, survey network. and groundwater discharge
analysis.
Callc del Barco - Malibu. California: Project Manager/Engineer - Managed monitoring and
dewatering district consisting of dewatering wells. horizontal drains. slope inclinometers.
piezometers, and crack gauges.
• Malibu Road - fvIalibu. California: project Manager/Engineer - Managed monitoring and
dewatering district consisting, of'piczomctcrs. horizontal drains, and crack gauges.
Gregory I'. Silver 9
Latieo Canvon - Malibu. California: ]'reject Manager/13ngincer - Managed monitoring and
dewatering district consisting of slope inclinometers. piczomcters. horizontal drains.
dewatcring wells. and crack gauges.
• Rambla Pacifieo Landslide - Malibu. California: Project Engineer - Installation and
monitoring of slope inclinometers and multi-stage pneumatic piczometers.
• La Conchita Landslide - Ventura Countv. California: Project Engineer/Manager - Design.
installation, and monitoring of a system of slope inclinometers and multi-stage piezomcters.
• Hone Church - Rancho Bernardo. California: Project linginecr/\9anager - Design,
installation. and monitoring of complex monitoring array consisting of' tiluneters. survc\
network. slope inclinometers, and multi-stage pneumatic piczometers.
DF:WAIBHLNG DESIGN S IN'IAN,u:F:aIEN"r 1'ko.tet rs:
• Dewatering Remediation — Coto de Caza. California: Project Engineer/Manager —
Hydrogeologic modeling and Modeling design of c1cwatering cut-off trench to lower
-roundwatcr below home foundations.
• Dewatering District Oversight (Big Rock. L.atigo Canvon. iNIalibu Road) . Malibu.
California: Project Engineer/Manager — Work included: dewatering district management.
hydrogeologic modelim,. well design and maintenance. horizontal drain design as well as
maintenance and monitoring.
• Montellano Landslide Dewaterim, — Hacienda Heights, California: Project ] ngineer/.Manager
— Pump tests, dccvatering wells design and construction, design and construction oversight of
horizontal drains.
CITY GEOTE(AINICAL ENGINEER/CONSULTANT:
• City of Mission Viejo (2016 — Present) Review of geotcchnical reports. general geotcchnical
consultation. Public works project design and gcotechnical and materials inspection.
• City of Laguna NlgaCI (1997-Present): Review of geotcchnical reports. preparation of
guidelines. public works projects. gcotechnical hazards analysis including testimony in front
of state legislative committees, emergency response and legal consultation.
• City of Newport Beach (2009-Present): Public Works projects including street rehabilitation,
construction observations and testing, marina construction, and Icgal consultation.
• City ot-Chino Hills (1992-97 & 2002-Present): Review of'geotechnical reports, preparation
ofguidelines for report submittal and grading procedure requirements. public works projects.
and general geotcchnical consultation.
• City of Dana Point (2001-2014: 2015-Present): Review of complex geotcchnical projects.
emergency and litigation consultation, and public works projects.
Gregory 1'. Silver 10
• City of Vista (2000-2005): Review of geotechnical reports and general geotechnical
consultation.
City of Rancho Palos Verdes (2004-2006): Alternate member of Gcotechnical Appeals
Board.
City of Malibu (1991-97): Review of'geolcchnical reports, preparation of guidelines. polic%
and standards for report submittal, public works projects, gcotechnical hazards analysis.
emergency response, planning evaluation. legal consultation.
• City of iiMoomark ('1995-97): Review of geotechnical reports, preparation of guidelines,
policy and standards for report submittal.
City of AHOura Hills (1998-97): Review of gcotechnical reports, preparation of guidelines.
policy and standards for report submittal, public works projects. geotechnical hazards
analysis, emergency response, planning evaluation. legal consultation.
• City of Palos Verdes Estates (1992-97): Review of geotechnical reports. preparation of
guidelines, p0lic}1 and standards for report submittal. public works projects, geotechnical
hazards analysis. emergency response. planning evaluation. legal consultation.
• City of Hidden Hills (1992-97): Review of gcotechnical reports. preparation of' guidelines.
police and standards for report submittal.
Additional Gcotechnical Consultation to Cities: Cities of Lake Forest. La Habra I lei<_hts. and
Laguna Beach.
PAVEMENT ENGINEERING AND DESIGN
• City of Irvine Public Works Department — Irvine. California (2012-2014). Principal-in-
Chargc. Various projects including: Irvine Center Drive. Campus Drive. Jamboree
Boulevard, and Jeffrey Road pavement rehabilitations.
• Irvine Industrial Comoanv — Cities of' Irvine and Lake Forest. California (1997-2010).
Principal-in-Change. Various projects including: Irvine Center Drive. Lake Forest Drive.
Bake Parkway. Portola Parkway, and Sand Canvon Boulevard street widening and overlays.
• City of Dana Point _— Dana Point. California (2002-2014). Principal-in-Charge. Various
projects including: Street of the Golden Lantern. Stonehill Drive, Del Obispo Street. Camino
Capistrano. Pacific Coast 1-lighway. Del Prado overlays, and miscellaneous residential street
overlays and slurry seals.
• City of Aliso Vicio — Aliso Viejo. California (2012-2014). Principal-in-Charge. Various
projects including: Aliso Creek Road. Pacific Park Drive. Moulton Parkway- Oso Parkway.
La Par Road overlays.
• City 01' Laguna Niguel — Laguna Niguel. California (2002-2014). Principal-in-Charge.
Various projects including: Street of' the Golden Lantern. Camino del Avion. Niguel Road.
Gregon 1'. Silver I I
Cabot Road. Pasco de las Colinas. Camino Capistrano. Aliso Creek Road. La Paz Road
rehabilitation and overlays. and miscellaneous residential street overlays and slurry seals.
City of Newport Beach — Newport Beach. California (2009-2014). Principal-in-Charge.
Various projects including: Newport Center Drive. Balboa Avenue, River Avenue, Mesa
Drive. Bayside Drive overlays, and miscellaneous residential street overlays and slurry seals.
City of Rancho Santa Margarita — Rancho Santa \Margarita. California (2011-2014).
Principal-in-Charge. Various projects including: Santa Nlargarita Parkway, Antonio
Parkway. Robinson Ranch Road overlays and slurry seals (2006-2014): and miscellaneous
residential street overlays and slurry seals.
• City of Laguna Niguel — Laguna Niguel. California (2002-2014). Principal-in-Charge.
Various projects including: Street of the Golden Lantern. Camino del Avion. Niguel Road.
Cabot Road, Pasco de las Colinas. Camino Capistrano. Aliso Creek Road. La Paz Road
rehabilitation and overlays. and miscellaneous residential street overlays and slurry seals.
• County of' Orange Ortcaa Highwav Widening — San Juan Capistrano.—California (2009-
2011). Principal-in-Charge. Pavement design for Phase I widening of Ortega Flighway
from the City of San Juan Capistrano border to Antonio Parkway. Design involved
pavement rehabilitation of existing roadway and widening of both roadway shoulders.
GEO-STRUCTURAL ENGINEERING
NMEC IANK,At.t.v STABII.1z EU EART11 (MSE) WALLS:
• The Irvine Company Development Areas 2C4 and 5 - County ol- Orange. Newport Coast.
California: Design and construction oversight of numerous Loffcl walls throughout the
Newport Coast development area for The Irvine Company. Wall heights range up to 25 feet
in hei;ht.
• Ladera Development - County of Orange. California: Design and construction oversight of
50-foot-hig-h "Loffcl'-hype NMSL wall at the entrance to the Ladera Development in South
Orange Counq-. The wall was the highest wall permitted in the County of' Orange to date.
Doc to the wall's height. it involved an extensive design and review process. In addition. the
wall was instrumented with slope inclinometers and an array of specially dcsi;ncd survey
points integrated into the block facing. An abstract for a paper describing the wall design
and instrumentation results was accepted to the ASCG GEO-DENVER 2000 Conference.
• Distressed "Keystone" Wall Evaluations — 1) Placentia, California: Forensic evaluation of
distressed "Keystone" wall for Shea Homes. 2) Agoura Hills. California: Forensic evaluation
of distress behind "Keystone" wall for Oaks Christian School. 3) Rancho Bernardo.
California: Comprehensive forensic evaluation of severely distressed "Keystone" Wall at the
Legacyffoshiba development.
• Crystal Cove Access Road - Orange County. California: Design of up to 40-foot-high
''Loffcl''-type MSE wall to support a major access road to a detention basin and recreation
Gregory 1'. Silver 12
area. Special design considerations included: high seismic area. use of select backfill in both
reinforced and retained zones. and erosion protection at the toe of the wall.
• SpeCtrUm 5 Commercial Development Area - Irvine. California: Design and construction
oversight For over 1700 lineal feet of a "Loffel"-type MSE wall.
San Dimas Residential Development (Tract 52717) — San Dimas. California: Development
of design plans and specifications For over 30 VISE walls incorporated into rough grading
plans for a large residential development.
SotLNAILA,Nt)TIe-IiAcK WAt.l.s/St.ons:
China Cove Soil Nail Wall/Slope — Corona Del Mar._ California: Structural and -cotcchnical
design and construction oversight for soil nail wall and slope with `boulderscape" fuing.
Design done to mitigate long-term surficial Failure problem and upgrade the look of a high
profile slope.
Placentia Slope Stabilization— Placentia, California: StrnCltlral design for soil nail wall at the
rear of several homes in residential development. Wall was clesigned to stabilize slope while
minimizing space impacts in rear yard.
City of' Orange I-IOA Tic-back Slone Stabilization — Orange. California: Structural and
gcotechnical design and construction oversight for tic-back slope stabilization project.
Complete design plans and specifications were provided. Geotechnical and special
inspections performed durin, construction. Set-vices also included construction management.
INIASonKv RETAINING WALLS:
• Masonry Wall Design — Sendcro Development of Rancho Mission Viejo. Calilornia:
Complete gcotechnical and structural design for masonry walls for level ground, toe-ol-slope
and top-of'slope conditions. Includes complete structural plans and details. Designs for
miscellaneous structures such as pilasters, monuments also provided.
• Masonry Wall Design — Esencia Development of Rancho Mission Viejo, California:
Complete gcotechnical and structural design for masonry walls for level ground, toe-ol-slope
and top-ol-slope conditions. hicludes complete structural plans and details. Designs for
misccllanCOUS structures such as pilasters. monuments also provided.
CAISSON WALLS:
• Palos Verdes Drive Roadwav Stabilization — Palos Verdes Estates. California: Perfonned
geotechnical and structural design and construction oversight for caisson tic-back wall to
provide lateral support to a portion of' Palos Verdes Drive North. Complete plans and
specifications were developed.
• 13erquist Residence Caisson Supported Retaining Wall — Dana Point. California: Perl'onrted
structural engineering for caisson supported top of slope retaining wall. Complete plans and
specifications were developed.
Gregon 11. Silver 13
LEGAL CONSULTATION
Mr. Silver has provided geotechnical consultation for litigation on a wide varicty of projects for
over 20 years in the States of'California and Nevada. He has been deposed numerous times and
testified in court on a number of occasions. The type of litigation cases that Nlr. Silver has been
involved in include:
• Landslides
• Foundation distress due to espansivc soils and settlement
• Settlement adjacent multi-store building-,s.
• Concrete corrosion/sulline damage
• A-ISI- walls/retaining walls
• Dewaterin0groundwater issues
• Public works fallnrCS
• Site drainage
S13ECIAL STUDIES
Residential Foundation Deterioration Study for the Cities of Lakewood. La Palma, and Cvpress.
California: Stall' Friloineer - Regional evaluation of concrete corrosion performed for CDMG.
Study included: analysis of soil and groundwater conditions, review of construction practice and
code requirements and other geotechnical/geological contributing factors.
RECENT PRO.IECT AWARDS
The following project awards are for projects where Mr. Silver served a primary role in either the
geotechnical engineering design or management of the project.
• Outstanding Gcotcchnical Project —CalGeo 2019
o Inn at the Mission
• Project Awards— ASC13 2018
o Lido (louse Hotel
• Outstanding Geotechnical Project —ASCG 2016
0 Emerald Bay Widening
• Outstanding Structural Lneineering project—ASCII2016
o 400 Spectrum Center Drivc Soil Nail wall
• Project Awards— APWA 2016
o Marina Park
o Oso Creek Multi-use Trail
o La Pata Extension
• GeotechnicalProicctofthe Year— 2016 —OC/LAASC17
o Cow Camp Road Design— Phases I A & 113
• Geotechnical/Structural Project of the Year Award —201 5 — OC/LA ASCE
o 650 Newport Center Drive Office Tower and 670 Newport Center Drive Parking
Structure
• Airport and Ports Award —OC ASCL 201 5
o Marina Park
• Community Improvement Project Award — OC ASCE 201 5
o PCH/Del Prado Bridge and Street Improvements
Gregory 1'. Silver 14
PUBLICATIONS
Sandri. D.. Silver. G.._ Trazo. R.. 2000. "Dcsien. Construction, and iMonitorine of a 14.9M High
Geosvnthetic Reinforced Segmental Retaining Wall in a Seismically Active Region'.
ASCE Geotechnical Special Publication (GSP) "Advances in Transportation and
Geoenvironmental Systems using Gcosynthetics'.
Silver. G. Van Thiel. D.. 2006. -Permanent Deflection and Performance Stttdv of' Drivable
Grass". Published in Stomiwatcr Magazine 2007 and Stormwater Solutions MMagazine —
2008.
Shlemon. Roy J.. Davis. Paul and Silver. Gregory, 2008, "Relative Activity of North Branch
Splays (NBS) of-the Newport-Inglewood Fault Zone. West Newport Oil field. Newport
Beach. California' .
Silver. Gregory. Bates. Lisa. 2013. ''Landslide Stabilization Using High Strength Aggregate-
CCmenl SlUrry". ASCL/Geo Institute 2013 Geo-Congress: Stability and Performance of'
Slopes and Embankments III. Geotechnical Special Publication No. 231.
Bastani. A.. Silver. G.. Atkinson. D.. 2014. -CPT [lased Settlement Prediction Over California
Soft Rock. C PT-14 — 3`d International Symposium on Cone Pcnctrometer'festing.
Bastani. A.. Silver G.. 2017. "CPT Based Settlement Prediction Over California Soft Rock. Stiff
AII«vium and Soft Alluvium Sites — International foundation Congress and Equipment
Expo (IFCEE) 2018.
Gregory P. Silver 15
ROGER W. SCHLIERKAMP, M.Sc., P.E.
Director of Pavement Engineering PAVEMENT lI N E E R I c
PROFESSION SUMMARY OF EXPERIENCE&QUALIFICATIONS
Civil Engineer
Mr. Schlierkamp possesses over I I years of experience in
REGISTRATION pavement engineering and construction projects, such as
Registered Civil Engineer C81529— pavement evaluation/design, pavement condition index
State of California studies, construction observation/testing, specification
development, and mix design development. His experience
EDUCATION includes working with local agencies, private sector clients,
M.S.Civil Engineering civil engineering firms, paving contractors, and pavement
(Pavement/Materials Engineering)- material producers. He has also served as a Quality ControU
University of Nevada,Reno Quality Assurance Manager. His engineering experience
B.S. Civil Engineering includes performing pavement evaluations, developing cost-
University of Nevada,Reno effective pavement repair recommendations, performing
pavement mix designs, and managing testing/observation
PROFESSIONAL EXPERIENCE services of pavement-focused construction projects.
Mr. Schlierkamp's experience as a Quality Control Manager
GMU Geotechnical.Inc. provides him a thorough understanding of various pavement
(2014—Present) construction specifications. His proficiency in both pavement
Director of Pavement Engineering design and construction allows him to support his clients in
Rancho Santa Margarita,California achieving quality and cost-effective pavement solutions.
Mr. Schlierkamp's experience in pavement design and
Twinine. Inc. construction includes:
(2011 —2014)
Pavement Engineer • Pavement engineering evaluation,structural analysis,
Long Beach,California design expert
• Pavement condition index assessments
University of Nevada Reno • Non-destructive testing, including deflection testing
(2009—201 I) &ground-penetrating radar(GPR)testing
Graduate Researcher, Pavement i . Pavement smoothness testing
Materials • Pavement mix designs,including hot-mix asphalt
Reno,Nevada (HMA), rubberized hot-mix asphalt(PH MA),warm-
mix asphalt(WMA)following Marshall, Hveem,and
PROFESSIONAL AFFILIATIONS Superpave design methods,soil-stabilization,and
• California Asphalt Pavement cold recycled asphalt
Association(CaIAPA) • Pavement preservation strategies, including fog seals,
• ASCE Orange County- slurry seals,scrub seals,micro-surfacing seals,and
Engineers without Borders chip seals
• American Society of Civil • Pavement rehabilitation strategies,such as rubberized
Enginecr(ASCE) pavement overlays,cold recycling, full-depth
• AGC reclamation,cement/lime base,and subgrade
• American Public Works stabilization
Association(APWA) • In-depth knowledge of various pavement
• Santiago Canyon College— construction specifications, including Caltrans,
Part Time Instruction Grcenbook,Airport.and Ports.
(Construction Materials) • Quality control i assurance laboratory testing
expertise, including Hveem Stability, Hamburg
Wheel Track, Moisture Susceptibility, Maximum
Density,We[Track Abrasion,and more.
23241 Artoyo Vista.Rancho Santa Marganta,CA 92688 1 ph- 949 888 6513 1 fax 949 Bali 1380 1"t) w gmugeo com
Select Pavement Evaluation and Design Projects —
Local Municipalities and Agencies
• City of Lake Forest — Glenn Ranch Road, January 2021: Pavement evaluation and
design, including deflection testing analysis, coring, lab testing.
• City of Aliso Viejo — 2020 Pavement Evaluation Project, December 2020 to January
2021: Performed pavement corings throughout the City to identify pavement structural
section information to address concerns regarding lack of aggregate base, perform
laboratory testing, and develop conceptual pavement repair recommendations.
• City of Newport Beach — East Coast Highway (MacArthur Boulevard to Newport
Coast Drive), November 2020 to January 2021: Pavement evaluation, including falling
weight deflectometer (FWD or deflection) testing to evaluate the roadway's current
structural capacity and ground-penetrating radar (GPR) testing to evaluate location of
underlying PCC pavement.
• City of Long Beach —Market Street (LA River to Cherry Avenue), December 2020:
Evaluated PCC and AC pavement, developed PCC and AC pavement rehabilitation
recommendations.
• City of Whittier—Colima Road Rehabilitation (Lambert Road to Mar Vista Street),
December 2020: Pavement evaluation and develop pavement reconstruction
recommendations to achieve 20-year design life.
• Orange County Parks — Carbon Canyon Regional Park and Strands Beach Park
Parking Lots,January 2021: Pavement evaluation and design.
• City of Torrance, Plaza Del Amo at Western Mobility Enhancement Project, April
2019: Performed pavement evaluation / design of existing roadway as well as widened
roadway.
• City of Dana Point, FY 18-19 Pavement Maintenance/Repair Project, Winter 2018-
May 2019: Performed pavement surface condition assessments of various streets
throughout City of Dana Point, prioritized streets for maintenance/repair, recommended
maintenance/repair strategies, reviewed/developed pavement-related specifications,
oversaw quality assurance observation/testing services during construction phase.
• City of Newport Beach, Bonita Canyon Drive and Ford Road, March 2019 — June
2019: Performed pavement evaluation consisting of pavement surface condition
assessments, corings, deflection testing, lab testing, analysis, and development of
pavement rehabilitation recommendations.
• City of Newport Beach, Bison Avenue, San Joaquin Hills Road, San Nicolas,
November 2018-May 2019: Performed pavement evaluation consisting of pavement
surface condition assessments, corings, deflection testing, lab testing, analysis, and
development of pavement rehabilitation recommendations.
• City of Torrance,Crenshaw Boulevard Rehabilitation Project,April 2019: Performed
pavement evaluation to develop pavement rehabilitation repair recommendations.
• City of Lake Forest, 2015 to Present: Performed pavement evaluation for various
pavement CIP projects, including Portola Parkway, Dimension Drive, Civic Center Drive,
etc.
• City of Irvine,Jamboree Road (Michelle Drive to RR Tracks) Pavement Evaluation
Project,November 2018: Performed pavement evaluation consisting of deflection testing,
Roger W. Schlierkamp 2
corings, surface condition assessment, laboratory testing, analysis, and development of
pavement rehabilitation repair recommendations.
• City of Santa Fe Springs, Santa Fe Springs and Painter Avenue Pavement
Reconstruction Project, October 2018: Performed pavement evaluation and developed
pavemcnt rcconstruction repair recommendations, including full-depth reconstruction
repair.
• City of Aliso Viejo, Glenwood Terrace Neighborhood Pavement Evaluation Project,
January 2018: Performed pavement evaluation to develop rehabilitation repair
recommendations for the residential neighborhood of Glenwood Terrace.
• City of Santa Fe Springs, "South Residential 1" Pavement Evaluation Project,
October 2017: Performed pavement evaluation and developed pavemcnt reconstruction
repair recommendations, including full-depth reconstruction repair. Provided observation
and testing services during construction phase (April 2019).
• City of San Juan Capistrano 2017 Pavement Evaluation Project, April 2017: AC
pavemcnt cvaluation of different streets throughout the City of San Juan Capistrano.
• City of San Juan Capistrano, Camino Capistrano, -March 2017: AC pavement
evaluation and rehabilitation design.
• City of Stanton Sunshine Village Tract, Concrete Alley, and Cerritos Avenue,
February 2017: AC and PCC pavement cvaluation of neighborhood streets and alleys.
• 'Trabuco Canyon Water District, 2018 Aliso Creek Trail Pavement Repair Project
• Trabuco Canyon Water District, 2018 Mayfair and Raintree Pavement Repair
Project
• "Trabuco Canyon Water District Waste Water 'Treatment Plant Access Road
Pavement Evaluation, April 2017: Pavement reconstruction design.
• Los Patrones Parkway, 2015 to Present: Pavement design of new alignment of Los
Patrones Parkway using cement-treated soil.
• San Gabriel Trench Pavement Value Engineering, Alameda Corridor Fast
Construction Authority, California, August 2016: Developed alternative pavement
recommendations using in-place materials.
• Ocean Boulevard and Poppy Avenue, Newport Beach, California, .tune 2016: PCC
and AC pavement evaluation and reconstruction design.
• Crown Valley Parkway, Laguna Niguel, California, April 2016. AC pavemcnt
evaluation and rehabilitation design.
• Alicia Parkway Slurry Seal Investigation, Laguna Niguel, California, 2014: Slurry seal
cvaluation.
• Irvine Avenue, Newport Beach, California, November 2014: AC pavement evaluation
and rehabilitation design.
• Pavement Reflective Cracking Investigation Project, Mission Viejo, California,
August 2015.
• NlacArthur Boulevard Rehabilitation, Newport Beach, California, September 2015:
AC pavemcnt evaluation and rehabilitation design.
• Palm Avenue Grade Separation Project, San Bernardino, California, July 2015:
Pavement surface distress evaluation.
• Various Streets and Parking Lots, San Juan Capistrano, California, July 2015: AC
pavement evaluation and rcconstruction design of 7 sites.
Roger \V. Scblierkantp 3
• Metro Blue Line Artesia Park N Ride Parking Lot, Compton, California, October
2013: AC pavement evaluation and repair recommendations for recently constructed bus
parking lot.
• Cherry Avenue and Myrtle Street, Long Beach, California, 2013: AC pavement
evaluation and reconstruction design.
• San Antonio Street, Long Beach, California, 2013: PCC pavement evaluation
reconstruction design.
• 190'h Street, Torrance, California, 2013: AC pavement evaluation and rehabilitation
design.
• Pickett Avenue, Garden Grove, California, 2012: AC pavement evaluation and
reconstruction design.
• Alondra Boulevard, Norwalk, California, 2011: AC pavement evaluation and
rehabilitation design.
Select Quality Assurance Testing and Observation Projects
• City of Dana Point - FY 19-20 Annual Roadway Resurfacing Project, Winter 2020:
Pavement construction observation and testing services, including submittal reviews and
engineering support during construction.
• City of Buena Park — FY 20-21 Annual Roadway Resurfacing Project, November
2020: Rubberized Emulsion Aggregate Slurry (REAS) slurry seal observation and testing.
• City of Aliso Viejo — Windsong, Carbrook, and Park Avenue, December 2020-
January 2021: Project involved use of fiber-reinforced AC mixture.
• City of Aliso Viejo—Pacific Park Drive,November-December 2020: Quality assurance
manager. Project involved use of fiber-reinforced rubberized AC mixture.
• City of Rancho Santa Margarita — FY 20-21 Annual Residential Slurry Seal,
November 2020: Periodic observation and testing services of crack repairs and rubberized
polymer-modified slurry (RPMS) seal.
• City of Mission Viejo — 2020 Residential Slurry Seal and Paving Projects, July-
November 2020. Periodic observation and testing services of crack repairs, AC patches,
AC overlay, and rubberized polymer-modified slurry (RPMS) seal.
• City of Mission Viejo — Alicia, Jeronimo, and Marguerite Rehab (CIP 20837),
September-October 2020: Localized AC repairs & ARHM overlay rehabilitation of
arterial streets.
• City of Mission Viejo-FY 2019 Residential Slurry Seal Project(CIP 20838),August-
October 2019: Quality assurance manager for pavement-related materials, including
localized AC repairs and Type I rubberized polymer modified slurry seal.
• City of Mission Viejo - Felipe Road and Olympiad Road Pavement Rehabilitation
Project(CIP 19937),June-July 2018: Localized AC repairs and ARHM overlay quality
assurance observation & testing.
• City of Chino Hills - 2018-19 Slurry Seal Project, June-July 2019: Type I emulsion
aggregate slurry seal (EAS)quality assurance observation & testing.
• City of Rancho Santa Margarita- Las Flores Slurry Seal Project,June 2019: Type 11
emulsion aggregate slurry seal (EAS) quality assurance observation & testing.
• City of Buena Park - 2018-19 Residential Slurry Seal Project, June, 2019: Type I
Rubberized Emulsion Aggregate Slurry (REAS) quality assurance observation & testing.
Roger N. Schlierkamp 4
• City of Newport Beach, MacArthur Boulevard& University Pavement Rehabilitation
Project, April-October 2019.
• City of Dana Point, FY 2018-19 Pavement Maintenance & Repair Project,April 2019.
• City of San ,loan Capistrano, Del Obispo & Ortega Parking Lot Project, N.-lay-June
2019.
• City of Rancho Santa Margarita, FY 2018-19 Slurry Seal Project, January 2019.
• City of Mission Viejo, On-Call Encroachment Permit Inspection Projects, 2017 to
Present: As-needed, various IP projects.
• City of Newport Beach, Aarguerite Avenue and Hospital Road Pavement
Rehabilitation Project, November 2018.
• City of Mission Viejo, FY 2018 Residential Slurry Seal and Overlay Project, October
2018.
• City of Aliso Viejo,Aliso Creek Road Pavement Rehabilitation Project, October 2018.
• City of Laguna Niguel, FY 2017-18 Arterial Pavement Rehabilitation Project,
September 2018.
• City of Mission Viejo, Trabucn Road and Marguerite Parkway Pavement
Rehabilitation Project, .tune 2018: Performed quality assurance observation/testing
services to comply with Federally-funded project requirements.
• City of Mission Viejo, FY 2017 Residential Slurry Seal and Overlay Project, October
2017.
• Los Patrones Parkway (New Alignment), Rancho Mission Viejo, August 2017-
October 2019.
• City of Rancho Santa Margarita, FY 2017-18 Slurry Seal Project, ,June 2018.
• 2017 ARAM and ARHNI Overlay, Laguna Niguel, California, November 2016.
• Aliso Viejo Parkway Pavement Rehabilitation Project, Aliso Viejo, California, .July
2017.
• 2016 AC Repairs Project, Laguna Niguel, California, November 2016.
• Pacific Park Pavement Rehabilitation, Aliso Viejo, California, Novcmher 2016.
• Del Obispo Pavement Rehabilitation, Dana Point, California, October 2016.
• Chino Hills Parkway Pavement Repairs, Chino Hills, California October 2016.
• Susana Road Pavement Reconstruction, County of Los Angeles, Compton,
California, October 2016: Cement-treated base testing/observation.
2016 Various Locations Pavement Repairs Project, San Juan Capistrano, California,
October 2016: AC. AB. subarade, -cogrid, cement-treated materials.
• Irvine Avenue Rehabilitation, Newport Reach, California, Fall/Winter 2016-17: AC,
base, subg_rade, concrete materials.
• 2016 Residential AC Repairs and Slurry Seal Projects, Mission Viejo, California,
September 2016: AC, base, subgrade, slurry seal, tack. and pavement interlayer materials
tcstin�/observation.
• Califla Neighborhood, Santa Margarita Water District, Mission Viejo, California,
Summer 2016: AC trench paving.
• Annual Residential Slurry Seal, Newport Beach, California, Summer 2015.
• Palmia Neighborhood, Santa Margarita Water District, Mission Viejo, California,
Summer 2016: AC trench paving.
• Saint Christopher Neighborhood, Laguna Niguel, California, August 2015.
• 2015-16 Annual Overlay, Rancho Santa Margarita, California, .Juh 2016.
Roger W. Schlierkantp 5
• Los Serranos Infrastructure Improvements,Chino Hills, California, April 2016.
• Peyton Widening, Chino Hills, California, February 2016.
• Reagan and Peterson Park Parking Lot Rehabilitation, Diamond Bar, California,
October 2015.
• Del Prado Phase 2A, Dana Point, California, August, 2015.
• 2014/15 Annual Overlay, Dana Point, California, April 2015.
• 2014/15 Annual Residential Overlay and Slurry Seal Projects, Rancho Santa
Margarita, California, Summer 2015.
• Trabuco/Monroe Intersection Improvements, Irvine, California, February 2015:
Federally-funded project, observation/testing of pavement materials.
• Antonio Parkway Pavement Rehabilitation, Rancho Santa Margarita, Rancho Santa
Margarita, California,July 2014: Observation/testing of pavement materials.
• Canwood Street Phase I Pavement Recycling, Agoura Hills, California 2013: Cold
recycled AC materials observation/testing.
• Main Street, Garfield Avenue, and Springdale Street Pavement Rehabilitation,
Huntington Beach,California, 2013.
• Escalona Road Pavement Rehabilitation, La Mirada,California, 2012.
• Willow Street Rehabilitation, Long Beach, California, 2011.
• Wilcox Avenue Pavement Rehabilitation,Cudahy, California, 2011.
Select Private Street/Parking Lot Pavement Engineering and Evaluations
• 3075 & 3151 Imperial Highway, Brea, California,July 2020: Pavement evaluation and
repair recommendations to meet 10- and 20-year design lives, including full-depth
reclamation with cement treatment.
• Tapatio Foods — Parking Lot Evaluation, July 2020: Evaluation of recently repaved
parking lot, including coring and laboratory compaction testing.
• Irvine Company Office Properties (ICOP), Parking Lot Maintenance and Repair
Projects, 2018 to Present: Performing pavement evaluation, bid document preparation,
bid solicitation, construction management advisory, and construction observation/testing
services for 15+ parking lots maintained by ICOP for FY 2018-19 and FY 20 projects.
• Crystal Cove, Irvine Company, Newport Coast, Newport Beach, California, 2016-
2018.
• UCI Lot 36 Bus Parking Lot, Irvine,California,October 2016.
• UCI California Avenue Parking Lot Study, Irvine, California, March 2016.
• Alcoa Parking Lot Pavement Evaluation, Alcoa Fastening Systems, Industry,
California, February 2015.
• Covey Project,AC Cap Pavement Evaluation, Buena Park, California,January 2016.
• Edwards Life Sciences Parking Lot, Irvine, California, January 2016.
• Class I Bike Trail, Rancho Mission Viejo, Orange County,California, 2015.
• Pepperdine University Pavement Evaluation, Malibu,California, 2013.
• Koll Center Newport Parking Lots,CBRE, Newport Beach, California, 2013.
Roger W. Schlierkamp 6
Select Pavement Mix Designs
• Dove Canyon Homeowners Association — 2020 Pavement Rehabilitation Project:
Developed cement-treatment mix design consisting of existing asphalt concrete,aggregate
base, and subgrade materials.
• Cement Stabilized Pulverized Base Mix Design Development,Leffingwell Road Street
Rehabilitation Project, City of La Mirada: Developed cement-treatment mix design
consisting of existing asphalt concrete, aggregate base, and subgrade materials to satisfy
Greenbook CSPB mix design requirements.
• Cement Stabilized Pulverized Base Mix Design Development, Painter Avenue and
Santa Fe Springs Road Pavement Reconstruction Projects, City of Santa Fe Springs:
Developed two cement-treatment mix designs consisting of existing subgrade materials to
satisfy Greenbook CSPB mix design requirements.
• Cement Stabilized Pulverized Base Mix Design Development, "Residential I"
Pavement Reconstruction Projects, City of Santa Fe Springs: Developed two cement-
treatment mix designs consisting of existing subgrade materials to satisfy Greenbook
CSPB mix design requirements.
• 2018 Greenbook (2018 spec) All American Asphalt, Corona, California, December
2016: Developed AC Hveem mix designs for V2" and%" mixtures.
• 2016 Greenbook (2015 spec) All American Asphalt, Corona, California, December
2016.
• Runway 611-24L Extension Project, Soil-Cement Mix Design, LAX, February 2016.
• Runway 7L-25R Safety Area Improvements, Soil-Cement Mix Design, LAX October
2016.
• Plum Canyon Road Soil-Cement Mix Design,Santa Clarita,California, August 2016.
• 2014 Greenbook (2012 spec) All American Asphalt, Corona, California, December
2014.
• Soil-Cement Mix Design for Corporate Yard Facility, Buena Park, California
December 2014.
• Cold Recycled Asphalt Concrete and Soil-Cement Mix Designs, County of Los
Angeles, California, 2011-2014.
• Thermal Club Racetrack Marshall Mix Design, Skanska, La Quinta, California,
2013.
• As-Needed Mix Designs, Granite Construction Company, Santa Barbara and
Bakersfield, California, 2011-2013.
• Greenbook Mix Designs, All American Asphalt, San Fernando, California, 2012.
• Caltrans Route 405 RHMA Superpave Mix Design, Torrance, California, 2012.
• As-Needed Mix Designs, Griffith Company, Bakersfield, California, 2014.
• Pickett Avenue, Garden Grove,California, 2012.
Select Quality Control Testing/Observation Projects
• Route 5,CT 12-OF96C4 Widening, Flatiron Corporation, 2015-2016.
• Route 405 Sepulveda Pass Widening, Kiewit Construction, Los Angeles, California,
2012-2013.
• Route 5 CT 07-121844 and 07-21594,Security Paving, Los Angeles, California, 2014.
Roger W. Schlierkamp
• Route 710 CT 07-202144, Shimmick Construction, Long Beach, California, 2014.
• Route 65 CT 06-OE0604,Granite Construction, Bakersfield, California, 2011.
• Route 405 CT 07-3Y9404, All American Asphalt, Torrance, California, 2012.
Select Airport and Port Pavement Projects
• Los Angeles World Airports, LAWA Utilities & LAMP Enabling Projects, 2017 to
Present: Providing pavement evaluation and repair recommendations for various parking
lots.
• Runway 6R-24L Extension Project, LAX, February 2016.
• Runway 7L-25R Safety Area Improvements, LAX, October 2016.
• Port of Long Beach Pier E Wharf Phase I Stage 2, Long Beach, California, 2014.
• Taxilane J Improvements, Long Beach Airport, Long Beach, California, 2014.
• Naval Air Weapons Station Runway 14/32, Hal Hays Construction, China Lake,
California, 2013.
Select Pavement/Geotechnical Projects
• Phase 1 Trail Improvements, Southern California Edison Corridor, Buena Park,
October 2016: Decomposed granite path recommendations for vehicular loads, concrete
flatwork, and concrete pavement design.
• UCI Lot 36 Bus Yard, Irvine, California,October 2016: Evaluation of existing parking
lot for use as bus parking lot area, retaining wall geotechnical design, pole foundation
geotechnical design, and concrete flatwork.
• Jamboree and Main Intersection Widening, Irvine, California, February 2016:
Design of new pavements for widening and retaining wall geotechnical design.
• Cerritos Avenue Sidewalk Gap Closure, Anaheim, California, July 2016: Pavement
design, concrete flatwork design, and free-standing wall geotechnical design
recommendations.
Select Homeowner Association Pavement Projects
• Kite Hill Homeowners Association - Community Center Parking Lot,January 2021:
Evaluation and repair recommendations of recent parking lot overlay paving.
• Whisler Ridge Homeowners Association — 2020 Pavement Evaluation, November
2020: Performed evaluation to assess condition of the roadway given its age.
• Dove Canyon Homeowners Association — 2020 Pavement Rehabilitation Project:
Performed pavement evaluation/design, prepared plans/specs, performed construction
management advisory,and managed materials testing/observation during construction.The
repair recommendation implemented on this project saved approximately 40%(—S400k) in
construction costs.
• Groves at Orchard Hills Homeowners Association —2019 sealcoat project: Prepared
plan/specs.
• Northridge Country Community Association — 2019 Pavement Reconstruction
Project,July-October 2019: Prepared plans, specs,and estimates for pavement full-depth
reclamation with cement treatment reconstruction for the 2019 phase of work.
Roger W. Schlierkamp x
• Columbus Grove HOA, Tustin/Irvine, August-September 2019; Evaluation of
pavement seal coat distresses on recently applied seal coating and developing pavement
repair recommendations.
• Rancho Capistrano HOA, July-September 2019: Pavement management plan study of
all streets within HOA.
• Newport Coast Community Association - 2019 Coastal Canyon Parking Lot
Improvement Projects, 2019: Performed pavement evaluation and prepared plans, specs,
and estimates to improve various parking lots managed by Newport Coast Community
Association.
• San Joaquin Hills HOA, FY 2019 Pavement Maintenance and Repair Project.
• Ladera Ranch Maintenance Corporation (LARMAC), Orange County, CA 2017 to
Present: Providing as-needed pavement engineering and construction support services for
streets & parking lots maintained by LARMAC.
• Bay Harbour HOA, 2016 Pavement Rehabilitation Project and 2018 Pavement
Reserve Budget Advisory Services, Long Beach, California.
• Crystal Cove HOA Pavement Rehabilitation Project, Newport Coast, California,
December 2016 to Present: Providing pavement maintenance/repair budget advisory,
maintenance/repair design, and construction support services for each year's pavement
project.
• 2017 Pelican Hill HOA Pavement Rehabilitation Project, Newport Coast, California,
January 2017 to Present: Providing pavement maintenance/repair budget advisory,
maintenance/repair design, and construction support services for each year's pavement
project.
• 2017 Casts Del Sol HOA Pavement Rehabilitation Project, Mission Viejo,California,
July 2017 to Present.
• 2017 Pacifica HOA Pavement Rehabilitation Project, San Clemente, California.
Summer 2016.
• Ritz Cove HOA Vehicular Paver Design and Construction Monitoring, Dana Point,
California,July 2015.
• 2014 Niguel Shores HOA Seal Coating Project. Dana Point, California, 2014.
• 2015-16 Pavement Rehabilitation Project, Montego HOA, Rancho San Clemente,
California, Summer 2016.
• 2016 Pavement Rehabilitation Project, Bay Harbour HOA, Long Beach, California,
Summer 2016.
• 2016 Pavement Reconstruction Project, Northridge County Community Association
(Porter Ranch), Northridge, California, April 2016.
Select Pavement Management Plan (PMP) Projects
• City of Chino Hills— 2021 Citywide Pavement Management Plan Updates, January
2021 to Present: Helping the City re-establish an up-to-date pavement management
system since their last update in 2005. Performing pavement condition index (PCI)
assessment of all city-maintained streets consisting of a total of approximately 193
centerline miles of streets.
• City of Laguna Niguel - 2020, 2022, and 2024 Citywide Pavement Management Plan
Updates, 2020 to Present: Pavement condition index (PCI) assessment of all city-
maintained streets consisting of a total of approximately 141.5 centerline miles of streets
Roger W. Schlierkamp 9
and budget scenario analysis to help optimize the City's pavement maintenance and
rehabilitation schedule and budget (approximately $2M per year typically).
• Crystal Cove Community Association — 2016 to Present: Established a pavement
management inventory in 2016 and performing yearly pavement management plan updates
since to help the community cost-effectively maintain and optimize their roadway network
condition.
• Groves at Orchard Hills Homeowners Association — 2019 to Present: Established a
pavement management inventory in 2019 and performing pavement management plan
updates.
• Casts Del Sol Community Association — 2017 to Present: Established a pavement
management system in 2017 for approximately 22 centerline miles of streets managed by
the HOA with a yearly street improvement budget of approximately $800k to $1.2M per
year. Performing periodic reviews and updates to the community's pavement management
plan each year.
• Lake Forest 11 Master HOA — 2020 to Present: Established a pavement management
system in 2020 for approximately 12 centerline miles of streets managed by the HOA with
a yearly street improvement budget of approximately $I.OM per year. Performing periodic
reviews and updates of the community's pavement management plan each year.
• Emerald Bay Community Association — 2019 to Present: Established a pavement
management system in 2019 for approximately 6 centerline miles of streets managed by
the HOA with a yearly street improvement budget of approximately $300k per year.
Performing periodic reviews and updates of the community's pavement management plan
each year.
• Ocean Ranch HOA — 2014 to Present: Established a pavement management system in
2014 for approximately 5 centerline miles of streets managed by the HOA with a yearly
street improvement budget of approximately$600k per year. Performing periodic reviews
and updates of the community's pavement management plan each year.
Litigation and Expert Witness Testimony Projects
• Can be provided on an as-requested basis due to the nature of these types of projects.
Roger W. Schlierkamp 10
r ►I 1 1
AU A. ZALGHOUT, M.SC. %J, '1a
Senior Staff Pavement Engineer—OCTA Certified Pavement Inspector PAVEMENT
ENGINEERING
PROFESSION SUMMARY OF EXPERIENCE&QUALIFICATIONS
Civil Engineer
Mr.Zalghout possesses over 3 years of experience in pavement
EDUCATION engineering and materials. His areas of expertise include
M.S.Civil Engineering pavement design, management, evaluation, advanced
(Pavement/Materials Engineering)— characterization of asphalt concrete, asphalt sustainability,
Arizona State University,Tempe asphalt reclaiming and recycling, long-term pavement
B.E.Civil Engineering performance prediction,and fiber-reinforced asphalt mixtures.
American University of Beirut, His current work includes performing pavement evaluations /
Beirut,Lebanon designs, developing cost-effective pavement repair
recommendations, performing pavement mix designs, and
PROFESSIONAL EXPERIENCE performing observation services of pavement-focused
GMU Geotechnical. Inc. construction projects. He is currently working on projects for a
(April 2021 —Present) number of local agencies, private sector clients, civil
Senior Staff Pavement Engineer engineering firms, paving contractors, and pavement material
Rancho Santa Margarita,California producers. He has published more than 10 journal articles and
conference proceedings in the top pavement engineering
GMU Geotechnical. Inc. journals and conferences.
(August 2019—April 2021)
Staff Pavement Engineer Mr. Zalghout's experience in pavement design and
Rancho Santa Margarita,California construction includes:
Arizona State Universitv • Pavement Management Plans(PMP)for local Cities and
(2017—2019) HOAs.
Graduate Researcher,Pavement/ • Budget analysis and Maintenance and Rehabilitation
Materials (M&R)planning using PAVER.
Tempe,Arizona • Developing Plans,Specifications,and Engineering
Estimates(PS&E)for pavement related projects.
ACADEMIC AWARDS • Field Data Collection using Manual and Semi-
Automated surveys.
• International Road Federation • Pavement Condition Index(PCI)calculations and
(IRF)Fellowship analysis.
• Ira Fulton Schools of . Falling Weight Deflectometer(FWD)testing and
Engineering Graduate analysis.
Fellowship • SuperPave and Marshall Asphalt Mix designs.
• Holcim Award for best final a Pavement Design using Caltrans.AASHTO 1993 and
year project,American Pavement ME methods.
University of Beirut • Slurry Seal observation and testing.
• Parking lot Pavement Rehabilitation.
PROFESSIONAL AFFILIATIONS • Advanced Material Characterization and laboratory
• International Road Federation Testing: Dynamic Modulus,Flow Number,Tensile
(IRF) Strength Ratio,Uniaxial Fatigue,and C• Fracture Test.
• Asphalt Binder Testing: Rolling Thin Film Oven
• Academy of Pavement Science (RTFO).Pressure Aging Vessel(PAV).Multiple Stress
and Engineering(APSE) Creep and Recovery(MSC'R),Complex Shear Modulus,
• American Society of Civil and Bending Beam Rheomeier(BBR).
Engineers(ASCE)
23241 Arroyo Vista.Rancho Santa Marganta CA 92688 1 ph 949 888.6513 1 fax 949 888 1380 1 web www gmugeo corn
Select Pavement Management Projects
• City of Chino Hills Pavement Management Plan Update(Ongoing)
Performing pavement distress surveys, collecting distress data, performing PAVER
analysis, and recommending Maintenance and Rehabilitation (M&R) strategies.
• Canyon Lake Property Owners Association, Pavement Management Plan
Development (July 2020)
Performed pavement distress surveys, collected distress data, performed PAVER
analysis, and recommended Maintenance and Rehabilitation(M&R)strategies.
• City of Laguna Niguel Pavement Management Plan Update (May 2020)
Performed pavement distress surveys,collected distress data, performed PAVER
analysis, and recommended Maintenance and Rehabilitation(M&R)strategies. Worked
the Pavement Management Plan(PMP) report that was submitted to the Orange County
Transportation Authority (OCTA)to keep the City eligible for Measure M2 funding.
• Casts Del Sol Pavement Management Plan (March 2020)_
Performed pavement distress surveys, collected distress data,performed PAVER
analysis, and recommended Maintenance and Rehabilitation(M&R)strategies.
• FY21 OC Campus Office Parking(February 2020)
Performed network-level pavement study to plan ICOP reserve funding.
• Groves at Orchard Hills HOA Pavement Management Plan (February 2020)
Performed pavement distress surveys, collected distress data, performed PAVER
analysis, and recommended Maintenance and Rehabilitation(M&R)strategies.
Select Pavement Evaluation and Design Projects
• City of Newport Beach- East Coast Highway(November 2020)
Performed pavement evaluation consisting of deflection testing,corings, surface
condition assessment, laboratory testing,analysis, Ground Penetrating Radar(GPR), and
development of pavement rehabilitation repair recommendations.
• Groves at Orchard Hills HOA Year 1 Sealcoat Project(September 2020)
Performed pavement surface condition assessments of various streets throughout the
HOA,prioritized streets for maintenance/repair, recommended maintenance/repair
strategies, reviewed/devcloped pavement-related specifications, oversaw quality
assurance observation/testing services during construction phase.
• Dove Canyon HOA Pavement Improvement Project(July 2020)
Performed pavement surface condition assessments of various streets throughout the
HOA, prioritized streets for maintenance/repair, recommended maintenance/repair
strategies, reviewed/developed pavement-related specifications, oversaw quality
assurance observation/testing services during construction phase.
• Technology Drive Plaza I, ICOP Irvine Company Office Properties Pavement
Assessment(June 2020)
Performed pavement evaluation,bid document preparation, bid solicitation,construction
management advisory, and construction observation/testing services.
• Technology Drive Plaza II, ICOP Irvine Company Office Properties Pavement
Assessment(June 2020)
Performed pavement evaluation,bid document preparation, bid solicitation,construction
management advisory, and construction observation/testing services.
All A. Zalghout 2
• Las Playas Pavement Engineering Services (.June 2020)
Performed pavement surface condition assessmcnts of various streets throughout file
I10A, prioritized streets for maintenance/repair, recommended maintenance/repair
strategics, reviewed/developed pavement-related specifications.
• Newport Coast Community Gates Pavement Improvement Project (April 2020)
Performed pavement surface condition assessments, recommended maintenance/repair
strategics, rcvicwcd/developed pavcmcnt-rclatcd specifications, oversaw quality
assurance observation/testing services during construction.
• 2 Ada Irvine [COP Irvine Company Office Properties Pavement Assessment (April
2020)
Performed pavcmcnt evaluation, bid document preparation, bid solicitation, construction
management advisory, and construction observation/testing services.
• Oak Canyon Irvine [COP Irvine Company Office Properties Pavement Assessment
(April 2020)
Performed pavement evaluation, bid document preparation. bid solicitation, construction
management advisory, and construction observation/testing services.
• Alton/technology Irvine ICOP Irvine Company Office Properties Pavement
Assessment (April 2020)
Performed pavement evaluation, bid document preparation, bid solicitation, construction
managcmcnt advisory, and construction observation/testing services.
• Julian Estates Pavement Evaluation (April 2020)
Performed pavement surface condition assessments of various streets throughout the
community, prioritized streets for maintenance/repair, recommended maintenancc/repair
strategics, reviewed/developed pavement-related specifications.
• Village of Sendero Pavement Evaluation (December 2019)
Performed pavement surface condition assessments of various streets throughout the
community, prioritized streets for maintenancc/repair, recommended maintenance/repair
strategics, rcvicwcd/developed pavcmcnt-rclatcd specifications.
• 2 & 4 Technology, Irvine ICOP Irvine Company Office Properties Pavement
Assessment (November 2019)
Performed pavement evaluation, bid document preparation, bid solicitation, construction
management advisory, and construction observation/testing services.
• Barranca 1 Irvine ICOP Irvine Company Office Properties Pavement Assessment
(November 2019)
performed pavement evaluation, bid document preparation, bid solicitation, construction
managcmcnt advisory, and construction observation/testing services.
• Barranca 11 Irvine ICOP Irvine Company Office Properties Pavement Assessment
(November 2019)
Performed pavement evaluation, bid document preparation, bid solicitation, construction
management advisory, and construction observation/tcsting services.
• San Joaquin Hills Homeowners Association (October 2019)
Performed pavement surface condition assessments of various streets throughout the
HOA, prioritized streets for maintenance/repair, recommended maintenancc/repair
strategics, reviewed/developed pavement-related specifications, oversaw quality
assurance observation/testing services during construction phase.
Ali A. Zalghout 3
• Sand Canyon Business Center Irvine ICOP Irvine Company Office Properties
Pavement Assessment(October 2019)
Performed pavement evaluation, bid document preparation, bid solicitation, construction
management advisory, and construction observation/testing services.
• 5 & 9 Pasteur, Irvine ICOP Irvine Company Office Properties Pavement
Assessment(September 2019)
Performed pavement evaluation, bid document preparation,bid solicitation,construction
management advisory, and construction observation/testing services.
• Discovery Business Park V+VI, Irvine ICOP Irvine Company Office Properties
Pavement Assessment(September 2019)
Performed pavement evaluation, bid document preparation, bid solicitation, construction
management advisory,and construction observation/testing services.
• Discovery Business Park VII ICOP Irvine Company Office Properties Pavement
Assessment(September 2019)
Performed pavement evaluation, bid document preparation, bid solicitation, construction
management advisory, and construction observation/testing services.
• Discovery Business Park VIII+IX ]COP Irvine Company Office Properties
Pavement Assessment (September 2019)
Performed pavement evaluation, bid document preparation,bid solicitation, construction
management advisory, and construction observation/testing services.
• Discovery Business Park X+XII ICOP Irvine Company Office Properties Pavement
Assessment(September 2019)
Performed pavement evaluation,bid document preparation, bid solicitation, construction
management advisory, and construction observation/testing services.
Select Quality Assurance Testing and Observation Projects
• Newport Coast Community Gates Observation and Testing (October 2020)
Performed Quality Control\Quality Assurance (QC\QA)on pavement construction,
tracked quantities, addressed change of orders,and prepared QA report.
• Sand Canyon Business Center Irvine [COP Irvine Company Office Properties
Pavement Assessment (June 2020)
Performed Quality Control \Quality Assurance (QC\QA) on pavement construction,
tracked quantities,addressed change of orders, and prepared QA report.
• San Joaquin Hills Homeowners Association (June 2020)
Performed Quality Control\Quality Assurance (QC\QA) on pavement construction,
tracked quantities,addressed change of orders, and prepared QA report.
• 2, 4, 16, & 18 Technology Irvine ]COP Irvine Company Office Properties Pavement
Assessment(June 2020)
Performed Quality Control\Quality Assurance (QC\QA) on pavement construction,
tracked quantities, addressed change of orders, and prepared QA report.
• City of Dana Point Roadway Resurfacing Project (March 2020)
Performed quality assurance for pavement-related materials, including localized AC
repairs and slurry seal.
• City of Rancho Santa Margarita FY 19-20 Annual Residential Slurry Seai Project
(March 2020)
Performed quality assurance for pavement-related materials, including localized AC
repairs and slurry seal.
Ali A. Zalghout 4
• City of Mission Viejo, FV 2019 Residential Slurry Seal Project-CIP 20838
(September 2019)
Performed quality assurance for pavement-related materials, including localized AC
repairs and Type I rubberized polymer modified slurry seal.
• Columbus Grove HOA,Tustin/Irvine(August 2019)
Selected Journal and Conference Papers
• Gudipudi, P., B.S. Underwood, and Ali Zalghout(2017). "Impact of climate change on
pavement structural performance in the United States," Transportation Parr D: Transport
and Environment. 57,pp. 172-184.
• Kassem, H., N. Saleh, A. Zalghout, and G. Chehab(2018). "Advanced Characterization
of Asphalt Concrete Mixtures Reinforced with Synthetic Fibers,"Journal of Materials in
Civil Engineering, 30(11), 04018307.
• Saleh, N., A. Zalghout, S. Sari Ed Din, and G. Chehab(2019)."Design, Construction,
and Evaluation of Energy-Harvesting Asphalt Pavement Systems,"Journal of Road
Materials and Pavement Design, 1-28.
• Salim, R., A. Gundla, A. Zalghout, S. Underwood, and K. Kaloush (2019). "Relationship
Between Asphalt Binder Parameters and Asphalt Mixture Rutting,"Transportation
Research Record, Journal of Transportation Research Board(TRB).
• Rajib, A. 1., Samicadel, A., Zalghout, A„ Kaloush. K. E., Sharma, B. K.,& Fini, E. H.
(2020). Do all rejuvenators improve asphalt performance?. Road Materials and Pavement
Design, 1-19.
• Zalghout,A., S. Castro,and K. Kaloush (Under Review). "Laboratory and Field
Evaluation of Plant Produced RAP Mixtures in Hot Climate Areas: Case Study from
Phoenix, Arizona,"Journal of Cleaner Production.
• Zalghout,A., N. Saleh, S. Sari Ed Din, and G. Chehab. "The Utilization of Geothermal
Energy for Resilient Asphalt Pavement Structure," Proceedings of The Second European
and Mediterranean Structural Engineering and Construction Conference, Beirut-
Lebanon,July 2018.
• Sari Ad Din, S. A., Saleh, N. F.,Zalghout A. A.,Chehab. G. R., "Thermal Analysis of
Hydronic Asphalt Pavement Systems." Proceedings of the Advances in Materials and
Pavement Performance Prediction Conference, Doha-Qatar, April 2018.
• Kassem, H. A., Chehab, G.R., Saleh, N.F., & Zalghout, A., "Assessment of Fiber
Reinforced HMA and WMA Mixes Using Viscoclastic Continuum Damage Model,"
Proceedings of the Tenth International Conference on the Bearing Capacity of Roads,
Railways, and Airfields, Athens-Greece,June 2017.
Invited Talks
• "City of Phoenix RAP Study,'Arizona Pavement and Materials Conference, Tempe. AZ.
November 2019.
Media Coverage
• Appeared in a documentary about Recycled Asphalt on Arizona PBS. Link:
httos://azt)bs.or¢/catalyst/2019/06/catalyst-reeve led-asphald
Ali A.Zalghout 5
Certifications
• Pavement Inspector Certification. Certified by Orange County Transportation Authority
(OCTA).
• Determining the In-Place Density and Relative Compaction of Hot Mix Asphalt
Pavement Using Nuclear Gages. Certified by California Department of Transportation
(Caltrans).
• Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Using Nuclear Gage. Certified by California Department of Transportation (Caltrans).
Professional Activities and Services
• Vice President, International Road Federation Class of 2018
My role as a vice president of the class is to keep the class connected, organize reunion
meetings, and provide any needed help to the class.
• Volunteer, Arizona Pavements and Materials Conference
Helped in organizational activities during the 14`h and 151h Arizona Pavements and
Materials Conference.
• Journal and Conference Articles Reviewer
o ASCE Journal of Materials in Civil Engineering
o Transportation Research Board (TRB)
o Middle East Society of Asphalt Technologists Conference(MESAT).
• Session Moderator
Moderated the following sessions during the International Road Federation Global R2T
Conferences in Las Vegas:
o TS 6.2: Toward Smart Cities
o TS 1.3: Preserving Road Assets
o TS 1.5: Road Inventory& Inspection
• Staff writer at AUB Outlook news paper
Staff writer, wrote weekly articles for students at AUB
Ali A. Zalghout 6
EXH1131T "B"
Payment Schedule (Hourly Payment)
A. Flourly Rate
CONSULTANT'S lees for such services shall be based upon the following hourly rate and cost
schedule:
SEE. ATTACHED EXHIBIT 13
13. Travel Charges for time during travel are not reimbursable.
C. Billing
I . All billing shall be done monthly in fifteen (15) minute increments and matched to an
appropriate breakdown of the time that was taken to perform that work and who
pertormed it.
2. Each month's bill should include a total to date. That total should provide, at a glance.
the total fees and costs incurred to date for the project.
3. A copy of memoranda, letters, reports, calculations and other documentation prepared
by CONSULTANT may be required to be submitted to CITY to demonstrate progress
toward completion of tasks. In the event CITY rejects or has comments on any such
product. CITY shall identify specific requirements for satisfactory completion.
4. CONSULTANT shall submit to CITY an invoice for each monthly payment due.
Such invoice shall:
A) Reference this Agreement;
13) Describe the services performed;
C) Show the total amount ofthe payment due:
D) Include a certification by a principal member of CONSUL TANT's firm that
the work has been pertormed in accordance with the provisions of this
Agreement; and
E) For all payments include an estimate of the percentage of work completed.
Upon submission of any such invoice. if CITY is satisfied that CONSULTANT is
making satisfactory progress toward completion of tasks in accordance with this
Agreement. CITY shall approve the invoice, in which event payment shall be made
within thirty (30) days of receipt of the invoice by CI 11'. Such approval shall not be
unreasonably withheld. If' CITY does not approve an invoice. CITY shall notify
CONSULTANT in writing of' the reasons for non-approval and the schedule of
performance set forth in Exhibit "A" may at the option of CITY be suspended until
the parties agree that past performance by CONSULTANT is in, or has been brought
into compliance, or until this Agreement has expired or is terminated as provided
herein.
I
Exhibit B
5. Anv billings for extra work or additional services authorized in advance and in writing
by CITY shall be invoiced separately to CITY. Such invoice shall contain all of the
information required above, and in addition shall list the hours expended and hourly
rate charged for such time. Such invoices shall be approved by CITY if the work
performed is in accordance with the extra work or additional services requested, and if
CITY is satisfied that the statement of hours worked and costs incurred is accurate.
Such approval shall not be unreasonably withheld. Any dispute between the parties
concerning payment of such an invoice shall be treated as separate and apart from the
ongoing performance of the remainder of this Agreement.
F..xhibit 13
EXHIBIT B
4"nuI I
VI'VIV
2021 SCHEDULE OF CHARGES
PROFESSIONAL SERVICES
Document Preparation and Project Services $ 97.00/hour
CAD/GIS Design Engineer S I I8.00/hour
Staff Engineer or Geologist $ 152.00/hour
Senior Staff Engineer or Geologist $ 175.00/hour
Project Engineer or Geologist $ 195.00/hour
Senior Engineer or Geologist S 230.00/hour
Associate Engineer or Geologist $245.00/hour
Principal/Director $270.00/hour
FIELD INSPECTION & TESTING SERVICES
Staff Engineering Technician S 105.00/hour*
• Services provided under direct supervision of a Senior Engineering Technician
Senior Engineering Technician S I I8.00/hour*
• Inspections for sails/grading,asphalt,concrete,batch plants,piles/caissons,etc.
• Certifications by ACI,[CC,Calmins, local jurisdictions,etc.
Registered Special Inspector(No 4-hour minimum) $ I I8.00/hour*
• Certifications by ACI,[CC,Caltrans,local jurisdictions,etc.
• Reinforced concrete,Post-Tension,Masonry,Welding,Bolting,Fireproofing
Instrumentation Engineer $ 150.00/hour
• Slope inclinometer and Piezometer monitoring
• Manometer for floor-level surveys
• Storrnwater turbidity&pH meter
• Groundwater monitoring-pressure transducer,datalogger,water chemistry meter,etc.
• Pipeline video camera for drains,wells,etc.
Engineering Seismological Technician(includes 3-channel seismograph) S 150.00/hour
• Blast vibration monitoring
• Construction vibration&noise monitoring(pile driving,drilling,demolition,etc.)
*Notes:
(1) Rates include vehicle,nuclear density gauge,and equipment for testing,inspection,and sampling.
(2) No 4-hour minimum charges apply.
(3) Overtime is charged at 1.5 times the base rate. Overtime is defined as time worked on the project
in excess of 8 hours per day and all time on Saturdays,Sundays,and holidays.
(4) Additional hourly surcharge for Prevailing Wage projects for Field Personnel per
CA Labor Code§1720,ct seq. Add S 27.00/hour
LABORATORY TESTING SERVICES
Laboratory Testing S 122.00/hour
(For special materials resting and laboratory costs on a per-test basis,see GMU's Laboratory Fee Schedule)
OTHER CHARGES
Outside Services Cost+ 15%
Reimbursables&Reprographics Cost
---MON GMUGEOT-01
A`ORO CERTIFICATE OF LIABILITY INSURANCE DA 11131212021
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the pollcy(ies)must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terns and conditions of the policy,certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endomement(s).
PRODUCER License#OE67768 CONTACT Erica Wilson
IDA Insurance Services PPHHOONEE FAX
4370 La Jolla Village Drive AC.No.Ertl:(858)754-0063 50233 IAIC.No):(619)574-6288
Suite 600 E4IIAI
San Diego,CA 92122 ADORJss,Erica.Wilson@ioausa.com
INSURER(S)AFFORDING COVERAGE NAICs
INSURER A RLI Insurance Company 13056
INSURED INSURER B:Interstate Fire & Casualty Company 22829
GMU Geotechnical,Inc. INSURER c:
23241 Arroyo Vista INSURER D:
Rancho Santa Margarita,CA 926M
INSURER E
INSURER F
COVERAGES CERTIFICATE NUMBER: REMION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
1NSR TYPE OF INSURANCE AODL BURR POLICY NUMBER POLICY EFF POLICY EXP L11�3
A X COMMERCML GENERAL LMBILRY 1,000,000
EACH OCCURRENCE _S
CLAIMS-MADE X OCCUR X X PSBODG6783 11/112020 1213112021 DAMAGE
RE�rtDanoel II1,000,000
PREMISX Cont Liab/Sev of Int 10,000
MED E%P(Any are P•�L_ S
PERSONALawvIN1URY S 1,000,000
GENL AGGREGATE LIMIT APPLIES PER GENERAL AGGREGATE 4 2,000,000
POLICY X PrALCC PRODUCTS.CONPAW 2,000,000
OTHER. Deductible 0
A AUTOMOBILE UJUNCRY lCOMBINEDMNE SINGLE UMr S 1,000,000
ll
X ANY AUTO X X PSA0002105 11/112020 1213112021 BODILY INJURY_ptVniorl 6
OVMED SCHEDULED
AUTOS ONLY AUTOS
LyN BODILY INJUpRAYINL4KCMn10:4
X AHUrO Dd ONLY X AUG'Cl DW$N1.WO (PerOPiiWeM) .S
A UMBRELLA DAB X OCCUR EACH OCCURRENCE $ 51000,000
X E%CESSUAe CLAIMS-MADE PSE0002541 11/112020 12/31/2021 AGGREGATE S Sr000,000
DED X RETENTIONS 0
A WORKERS COMPENSATION X PER OTH.
AND EMPLOYERS'DABILMY YIN334i STATUTE _E
ANY PROPRIET01I PARTNERIEXECUTNE X 0 1ANION
OF.ICE^BER E%CLUpED� N NIA EL EACH ACCIpENT.__ —.._ 1,000,000
�It es dexrlbe umNr EL DISEASE-EA EMPLOYEES _ _
DESCRIPTION OF OPERATIONS baba E L DISEASE-POLICY DMIT a 1,000,000
0 Professional Liab. USFOO625420 12131/2020 1213112021 Per Claim 2,000,000
B Ded.:$50K Per Claim USFOO625420 12/31/2020 12/3112021 Aggregate 2,000,000
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Roomms 9cNstluN.miry M&ea Amon specs h m,ulmon 'T
OlptA
Re:On Call Materials Testing and Engineering Services. n I "LOVED AS
City of Huntington Beach is Additional Insured with respect to General and Auto Liability per the attached endorsements as requireC Dy written c
Insurance is Primary and Non-Contributory.Waiver of Subrogation applies to General Liability,Auto Liability and Workers'Compensation.
1E5
30 Days Notice of Cancellation with 10 Days Notice for Non-Payment of Premium in accordance with the policy provisions. BY' MY AFL ORNEY H
A NGTON Be., C
iN OF iINTi
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
City of Huntington Beach AUTHORIZED REPRESENTATIVE
Attn:Keegan Olds,City Hall 1st Floor 4la -
2000 Main Street
Huntington Beach.CA 92646
ACORD 25(2016103) 01998.2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
Named Insured: GMU Geotechnical, Inc. RLI Insurance Company
Policy Number: PSB0005783
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
RLIPack® FOR PROFESSIONALS
BLANKET ADDITIONAL INSURED ENDORSEMENT
This endorsement modifies insurance provided under the following:
BUSINESSOWNERS COVERAGE FORM - SECTION II—LIABILITY
1. C. WHO IS AN INSURED is amended to include as additional insured under this policy must apply on a
an additional insured any person or organization that primary basis, or a primary and non-contributory
you agree in a contract or agreement requiring basis, this insurance is primary to other insurance
insurance to include as an additional insured on this that is available to such additional insured which
policy, but only with respect to liability for 'bodily covers such additional insured as a named insured,
injury", "property damage" or "personal and and we will not share with that other insurance,
advertising injury" caused in whole or in part by you provided that:
or those acting on your behalf: a. The "bodily injury' or "property damage" for
a. In the performance of your ongoing operations; which coverage is sought occurs after you have
b. In connection with premises owned by or rented entered into that contract or agreement,or
to you; or b. The "personal and advertising injury" for which
c. In connection with 'your work" and included coverage is sought arises out of an offense
within the "product-completed operations committed after you have entered into that
hazard". contract or agreement.
2. The insurance provided to the additional insured by 4. The following is added to SECTION III K. 2.
this endorsement is limited as follows: Transfer of Rights of Recovery Against Others to
Us — COMMON POLICY CONDITIONS (BUT
a. This insurance does rot apply on any basis to APPLICABLE TO ONLY TO SECTION II —
any person or organization for which coverage LIABILITY)
as an additional insured specifically is added by We waive any rights of recovery we may have
another endorsement to this policy.
against any person or organization because of
b. This insurance does not apply to the rendering payments we make for "bodily injury", "property
of or failure to render any "professional damage" or "personal and advertising injury' arising
services". out of 'your work' performed by you, or on your
behalf, under a contract or agreement with that
C. This endorsement does not increase any of the person or organization. We waive these rights only
limits of insurance stated in D. Liability And where you have agreed to do so as part of a
Medical Expenses Limits of Insurance. contract or agreement with such person or
3. The following is added to SECTION III H.2. Other organization entered into by you before the "bodily
Insurance — COMMON POLICY CONDITIONS injury"or"property damage"occurs, or the"personal
(BUT APPLICABLE ONLY TO SECTION It — and advertising injury"offense is committed.
LIABILITY)
However, if you specifically agree in a contract or
agreement that the insurance provided to an
ALL OTHER TERMS AND CONDITIONS OF THIS POLICY REMAIN UNCHANGED.
PPB 304 02 12 Page 1 of 1
Named Insured:GMU Geotechnical,Inc. Policy Number:PSA0002105
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
A. Broad Form Named Insured We waive any right of recovery we may have against
The following is added to the SECTION II — any person or organization to the extent required of
LIABILITY Coverage, Paragraph A.1. Who Is An you by a contract executed prior to any 'accident"or
Insured Provision: 'loss", provided that the "accident" or "loss' arises
out of the operations contemplated by such contract.
Any business entity newly acquired or formed by you The waiver applies only to the person or
during the policy period, provided you own fifty organization designated in such contract.
percent (50%)or more of the business entity and the E. Employee Hired Autos
business entity is not separately insured for
Business Auto Coverage. Coverage is extended up 1. The following is added to the SECTION II —
to a maximum of one hundred eighty (180) days LIABILITY COVERAGE, Paragraph A.1. Who
following the acquisition or formation of the business Is An Insured Provision:
entity. An "employee" of yours is an "insured" while
This provision does riot apply to any person or operating an "auto" hired or rented under a
organization for which coverage is excluded by contract or agreement in that "employee's"
endorsement, name, with your permission, while performing
B. Employees As Insureds duties related to the conduct of your business.
The following is added to the SECTION II —
2. Changes In General Conditions:
LIABILITY COVERAGE, Paragraph A.1.Who Is An Paragraph 5.b. of the Other Insurance
Insured Provision: Condition in the BUSINESS AUTO
Any "employee" of yours is an "insured"while using CONDITIONS is deleted and replaced with the
a covered "auto" you don't own, hire or borrow in following:
your business or your personal affairs. b. For Hired Auto Physical Damage Coverage,
C. Blanket Additional Insured the following are deemed to be covered
"autos"you own:
The following is added to the SECTION II —
LIABILITY COVERAGE, Paragraph A.1. Who Is An (1) Any covered "auto" you lease, hire, rent
o
Insured Provision: or borrow; and
Any person or organization that you are required to (2) Any covered "auto" hired or rented by
include as an additional insured on this coverage ,your "employee" under a contract in that
form in a contract or agreement that is executed by individual "employee's" name, with your
you before the "bodily injury" or "property damage" permission, while performing duties
occurs is an "insured" for liability coverage, but oitly related to the conduct of your business.
for damages to which this insurance applies and However, any "auto" that is leased,
only to the extent that person or organization hired, rented or borrowed with a driver is
qualifies as an "insured" under the Who Is An not a covered"auto".
Insured provision contained in SECTION II — F. Fellow Employee Coverage
LIABILITY COVERAGE. SECTION II — LIABILITY COVERAGE, Exclusion
The insurance provided to the additional insured will B.S. does not apply if you have workers
be on a primary and non-contributory basis to the compensation insurance in-farce covering all of your
additional insured's own business auto coverage if employees.
you are required to do so in a contract or agreement G. Auto Loan Lease Gap Coverage
that is executed by you before the "bodily injury" or
'property damage" occurs. SECTION III — PHYSICAL DAMAGE COVERAGE,
D. Blanket Waiver Of Subrogation C. Limit Of Insurance, is amended by the addition
of the following:
The following is added to the SECTION IV — In the event of a total "loss" to a covered "auto"
BUSINESS AUTO CONDITIONS, A. Loss shown in the Schedule of Declarations, we will Pay
Conditions, S. Transfer Of Rights Of Recovery any unpaid amount due on the lease or loan for a
Against Others To Us: covered "auto', less:
PPA 300 03 11
Named Insured: GMU Geolechnical, Inc. Policy Number: PSW0003341
WORKERS'COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 04 03 06
(Ed.04$4)
WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT-CALIFORNIA
We have the right to recover our payments from anyone liable for an injury covered by this policy.We will not enforce our right
against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work
under a written contract that requires you to obtain this agreement from us.)
You must maintain payroll records accurately segregating the remuneration of your employees while engaged in the work
described in the Schedule.
The additional premium for this endorsement shall be %of the California workers'compensation premium otherwise due
on such remuneration.
Schedule
Person or Organization Job Description
All persons or organizations that are parry to a contract that Jobs performed for an person or organization
requires you to obtain this agreement, provided you that you have agreed with in a written contract
executed the contract before the loss to provide this agreement
PROFESSIONAL SERVICE AWARD ANALYSIS
SERVICE: On-Call Construction Management Services
SERVICE DESCRIPTION: Construction and inspection support for City's annual Capital
Improvement Program projects.
VENDOR: AESCO, Inc.
OVERALL RANKING: 1 out of 25
SUBJECT MATTER EXPERTS/RATERS:
1. Senior Civil Engineer 2. Senior Civil Engineer 3. Civil Engineering Assistant
I. MINIMUM QUALIFICATIONS REVIEW
Written Proposal Score: Avg. of 67 out of 70 over 3 Raters listed above
=Vendor#.1'=SMinimuin QuahficaLons Review`, c ..- `�'���y`'"� ��°
ti�*'�1���. CSa�i�_a..w��vr�'�"t °�✓i.�+`� cli.isfir�.a� a.:i
Total Weighted Maximum
Criteria Score Score
Proposal Criteria 67 70
Reference Check 10 10
Interview 15 15
Local Preference Check 5 5
Total .•rt.,`,.3� ,97,_,{ -nk (,` .`�.-:i100'r^^i" :':f
it. DUE DILIGENCE REVIEW
• The city is familiar with AESCO because of their past work history with the city
projects.
i(`AESCO ummary,o eview rr
AESCO has worked with the City of Huntington Beach on past
projects and has performed satisfactory work.
PROFESSIONAL SERVICE AWARD ANALYSIS
SERVICE: On-Call Construction Management Services
SERVICE DESCRIPTION: Construction and inspection support for City's annual Capital
Improvement Program projects.
VENDOR: Leighton Consulting, Inc.
OVERALL RANKING: 2 (Tied) out of 25
SUBJECT MATTER EXPERTS/RATERS:
1. Senior Civil Engineer 2. Senior Civil Engineer 3. Civil Engineering Assistant
I. MINIMUM QUALIFICATIONS REVIEW
• Written Proposal Score: Avg. of 57 out of 70 over 3 Raters listed above
Vendo r#2'—'Mihi mumQualificatwnslR&iew R'�`
�'p�jsr.
Total Weighted Maximum
Criteria Score Score
Proposal Criteria 57 70
Reference Check 10 10
Interview 15 15
Local Preference Check 0 5
Total ,'C,�:.k,1:1.82��"`i.der. a.�p;:y700i;ir; •
IL DUE DILIGENCE REVIEW
• The city is familiar with Leighton Consulting because of their past work history
with the city projects,
iqL�eightontiConsultmg�r+Summary of Review
t YL
• Leighton Consulting has worked with the City of Huntington
Beach on past projects and has performed satisfactory work.
PROFESSIONAL SERVICE AWARD ANALYSIS
SERVICE: On-Call Construction Management Services
SERVICE DESCRIPTION: Construction and inspection support for City's annual Capital
Improvement Program projects.
VENDOR: Ninyo & Moore, Inc.
OVERALL RANKING: 2 (Tied) out of 25
SUBJECT MATTER EXPERTS/RATERS:
1. Senior Civil Engineer 2. Senior Civil Engineer 3. Civil Engineering Assistant
I. MINIMUM QUALIFICATIONS REVIEW
Written Proposal Score: Avg. of 57 out of 70 over 3 Raters listed above
;1Ve6d6r#3.—MmimumtQ6alific6tt6nsReGie`w
Total Weighted Maximum
Criteria Score Score
Proposal Criteria 57 70
Reference Check 10 10
Interview 15 15
Local Preference Check 0 5
Total100,. ' 14
;_"
II. DUE DILIGENCE REVIEW
Ninyo & Moore was picked because of the success in interview and past work
history with similar scope projects. Very well supported firm with a variety of
abilities in materials and inspection support.
Ninyo&^.Moore` Summary of'View�,
t:
Ninyo & Moore has worked successfully with similar scope of
projects similar to the City of Huntington Beach.
PROFESSIONAL SERVICE AWARD ANALYSIS
SERVICE: On-Call Construction Management Services
SERVICE DESCRIPTION: Construction and inspection support for City's annual Capital
Improvement Program projects.
VENDOR: Twining. Inc.
OVERALL RANKING: 2 (Tied) out of 25
SUBJECT MATTER EXPERTS/RATERS:
1. Senior Civil Engineer 2. Senior Civil Engineer 3. Civil Engineering Assistant
I. MINIMUM QUALIFICATIONS REVIEW
Written Proposal Score: Avg. of 57 out of 70 over 3 Raters listed above
Vendor#4-=^Mimnium Qualifications Review '. f j- 7.
Total Weighted 'Maximum
Criteria Score Score
Proposal Criteria 57 70
Reference Check 10 10
Interview 15 15
Local Preference Check 0 5
82f M-.r.,100;.
Total d�' _ _
II. DUE DILIGENCE REVIEW
The city is familiar with Twining because of their past work history with the city
projects.
Twmmg Summary%of Reviewg7 ;i "' ]e r
_ 1e_
• Twining has worked with the City of Huntington Beach on past '
projects and has performed satisfactory work.
PROFESSIONAL SERVICE AWARD ANALYSIS
SERVICE: On-Call Construction Management Services
SERVICE DESCRIPTION: Construction and inspection support for City's annual Capital
Improvement Program projects.
VENDOR: GMU Geotechnical, Inc., Inc.
OVERALL RANKING: 5 out of 25
SUBJECT MATTER EXPERTS/RATERS:
1. Senior Civil Engineer 2. Senior Civil Engineer 3. Civil Engineering Assistant
I. MINIMUM QUALIFICATIONS REVIEW
Written Proposal Score: Avg. of 57 out of 70 over 3 Raters listed above
Vendor#5"—Mirnmum.a65]ificati6ns Review�> .4x, 'ter;
Total Weighted Maximum
Criteria Score Score
Proposal Criteria 57 70
Reference Check 10 10
Interview 12 15
Local Preference Check 0 5
Total ^'79, ., 100y is
It. DUE DILIGENCE REVIEW
GMU Geotechnical, Inc. was picked because of the success in interview and past
work history with similar scope projects, especially in street related work.
GMU Geote'c fin ica1;Tnc Summaryjof Review =7`:
• GMU Geotechnical, Inc. has worked successfully with similar
scope of projects similar to the City of Huntington Beach.
City of Huntington Beach
�' •--`� - 200o Main Street ♦ Huntington Beach, CA 92648
(714) 536-5227 ♦ Ntin,,%v.huntingtonbeachca.gov
�pB,q.❑09 �� Office of the City Clerk
' Robin Estanislau, City Clerk
January 10, 2022
GMU Geotechnical, Inc.
Attn: Greg Silver
23241 Arroyo Vista
Rancho Santa Margarita, CA 92688
Dear Mr. Silver:
Enclosed is a fully executed copy of the "Professional Services Contract between the
City of Huntington Beach and GMU Geotechnical, Inc.for On Call Material Testing and
Engineering Services" approved by the Huntington Beach City Council on December
21, 2021.
Sincerely,
��uuz
Robin Estanislau, CMC
City Clerk
RE:ds
Enclosure
Sister Cities: Anjo, Japan • Waitakere, New Zealand