Loading...
HomeMy WebLinkAbout2022-03-15 Agenda Packet - HybridIN-PERSON PUBLIC PARTICIPATION/ZOOM ACCESS: Members wishing to attend the meeting in person are encouraged to wear a face covering. Assembly Bill 361 (AB 361) authorizes public meetings to take place via teleconference (i.e., virtual using Zoom), or in person if in part, State and Local officials continue to recommend measures to promote social distancing. In addition to this hybrid format, alternate ways to view City Council meetings live or on-demand remain: livestreamed on HBTV Channel 3 (replayed on Wednesday’s at 10:00 a.m. and Thursday’s at 6:00 p.m.); live and archived meetings for on-demand viewing accessed from https://huntingtonbeach.legistar.com/calendar; or, from any Roku, Fire TV or Apple device by downloading the Cablecast Screenweave App and searching for the City of Huntington Beach channel. PUBLIC COMMENTS: Individuals wishing to provide a comment on agendized or non-agendized items, including Study Session, Closed Session, and Public Hearing, may do so in person by completing a Request to Speak form delivered to the City Clerk, or from a virtual location by entering Zoom Webinar ID 971 5413 0528 via computer device, or by phone at (669) 900-6833. The Zoom Webinar can be accessed here: https://huntingtonbeach.zoom.us/j/97154130528. Instructions for those utilizing computer devices to request to speak are provided in each section of the agenda where public comments are accepted. Members of the public unable to personally participate in the meeting but interested in communicating with the City Council on agenda-related items are encouraged to submit a written (supplemental) communication via email at SupplementalComm@Surfcity-hb.org, or City.Council@surfcity-hb.org. Supplemental Communications are public record, and if received by 2:00 PM on the day of the meeting, will be distributed to the City Council prior to consideration of agenda-related items, posted to the City website, and announced, but not read, at the meeting. Communications received following the 2:00 PM deadline will be incorporated into the administrative record. MEETING ASSISTANCE NOTICE: In accordance with the Americans with Disabilities Act, services are available to members of our community who require special assistance to participate in public meetings. If you require special assistance, 48-hour prior notification will enable the City to make reasonable arrangements for an assisted listening device (ALD) for the hearing impaired, American Sign Language interpreters, a reader during the meeting and/or large print agendas. Please contact the City Clerk's Office at (714) 536-5227 for more information. AGENDA City Council/Public Financing Authority Tuesday, March 15, 2022 4:30 PM Study Session / 5:00 PM Closed Session Regular Meeting - 6:00 PM Council Chambers 2000 Main Street Huntington Beach, CA 92648 --or-- Virtual via Zoom Webinar MAYOR AND CITY COUNCIL BARBARA DELGLEIZE, Mayor MIKE POSEY, Mayor Pro Tem RHONDA BOLTON, Councilmember KIM CARR, Councilmember DAN KALMICK, Councilmember NATALIE MOSER, Councilmember ERIK PETERSON, Councilmember STAFF SEAN JOYCE, Interim City Manager MICHAEL E. GATES, City Attorney ROBIN ESTANISLAU, City Clerk ALISA BACKSTROM, City Treasurer 1 AGENDA March 15, 2022City Council/Public Financing Authority 4:30 PM - COUNCIL CHAMBERS CALL TO ORDER ROLL CALL Peterson, Bolton, Posey, Delgleize, Carr, Moser, Kalmick ANNOUNCEMENT OF SUPPLEMENTAL COMMUNICATIONS (Received After Agenda Distribution) PUBLIC COMMENTS PERTAINING TO STUDY SESSION / CLOSED SESSION ITEMS - At approximately 4:30 PM, individuals wishing to provide a comment on item(s) scheduled for Study Session or Closed Session may do so either in person by filling out a Request to Speak form delivered to the City Clerk, via computer through Zoom Webinar ID 971 5413 0528, or Zoom Webinar by phone by calling (669) 900-6833. Once the Mayor opens Public Comments, in-person participants will be called to speak first. Zoom Webinar participants wishing to speak will be provided a 15-minute window to select the “Raise Hand” feature in the Webinar Controls section. Attendees entering the Webinar and requesting to speak by phone can enter *9 to enable the “Raise Hand” feature, followed by the *6 prompt that unmutes their handheld device microphone. Individuals will be prompted to speak when the Clerk announces their name or the last three digits of their phone number. After a virtual speaker concludes their comment, their microphone will be muted but they may remain in Webinar attendance for the duration of the Study Session. All speakers are encouraged, but not required to identify themselves by name. Each speaker may have up to 3 minutes unless the volume of speakers warrants reducing the time allowance. STUDY SESSION 22-1421.Mid-Year Joint Meeting of the Citizen Participation Advisory Board (CPAB) and City Council to review Community Development Block Grant (CDBG) Recommendations 2022-23 Roll Call of the Citizen Participation Advisory Board: Mike Massie, Peter Andres, Gigi Jackson, Parna Ghosh, Macey Lachman RECESS TO CLOSED SESSION CLOSED SESSION 22-2252.CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION. (Paragraph (1) of subdivision (d) of Section 54956.9). Name of case: Bottoms (Mark) v. City of Huntington Beach, et al.; OCSC Case No. Page 1 of 7 2 AGENDA March 15, 2022City Council/Public Financing Authority 30-2021-01196342. 22-2263.CONFERENCE WITH LEGAL COUNSEL - ANTICIPATED LITIGATION. Significant Exposure to Litigation Pursuant to Paragraph (2) of Subdivision (d) of Section 54956.9: Number of Cases: One (1) - Code Four. 6:00 PM – COUNCIL CHAMBERS RECONVENE CITY COUNCIL/PUBLIC FINANCING AUTHORITY MEETING ROLL CALL Peterson, Bolton, Posey, Delgleize, Carr, Moser, Kalmick PLEDGE OF ALLEGIANCE INVOCATION In permitting a nonsectarian invocation, the City does not intend to proselytize or advance any faith or belief. Neither the City nor the City Council endorses any particular religious belief or form of invocation. 22-1784.Jenny Braithwaite with Shepard of the Hills’ Self Help Interfaith Program and member of the Greater Huntington Beach Interfaith Council CLOSED SESSION REPORT BY CITY ATTORNEY AWARDS AND PRESENTATIONS 22-1575.Mayor Delgleize to call on members of the Marina High School Girls Wrestling Team who recently won the 2022 CIF-Southern Section Central Division Championships 22-2246.Mayor Delgleize to call on Edison High School Senior Brayden Boggs who was accepted to the US Merchant Marine Academy in Kings Point, NY 22-2087.Mayor Delgleize to present the Mayor’s HB Excellence Award for the month March to Denise Grushon, Office Assistant II, Department of Public Works Page 2 of 7 3 AGENDA March 15, 2022City Council/Public Financing Authority ANNOUNCEMENT OF SUPPLEMENTAL COMMUNICATIONS (Received After Agenda Distribution) PUBLIC COMMENTS - At approximately 6:00 PM, individuals wishing to provide a comment on agendized or non-agendized items may do so either in person by filling out a Request to Speak form delivered to the City Clerk, via computer through Zoom Webinar ID 971 5413 0528, or Zoom Webinar by phone by calling (669) 900-6833. Once the Mayor opens Public Comments, in-person participants will be called to speak first. Zoom Webinar participants wishing to speak will be provided a 15-minute window to select the “Raise Hand” feature in the Webinar Controls section. Attendees entering the Webinar and requesting to speak by phone can enter *9 to enable the “Raise Hand” feature, followed by the *6 prompt that unmutes their handheld device microphone. Individuals will be prompted to speak when the Clerk announces their name or the last three digits of their phone number. After a virtual speaker concludes their comment, their microphone will be muted but they may remain in Webinar attendance for the duration of the meeting. All speakers are encouraged, but not required to identify themselves by name. Each speaker may have up to 3 minutes unless the volume of speakers warrants reducing the time allowance. While the City Council welcomes public involvement and free speech, it rejects comments from anyone that are discriminatory, defamatory or otherwise not protected speech. Those comments will not inform nor be considered by the City Council and may be cause for the Mayor to interrupt the public speaker. Such public comments will not be consented to or otherwise adopted by the City Council in its discussions and findings for any matter tonight. COUNCIL COMMITTEE - APPOINTMENTS - LIAISON REPORTS, AB 1234 REPORTING, AND OPENNESS IN NEGOTIATIONS DISCLOSURES CITY MANAGER'S REPORT CONSENT CALENDAR 22-1878.Approve and Adopt Minutes A) Approve and adopt the City Council/Public Financing Authority special meeting minutes dated February 4, 2022; and, B) Approve and adopt the City Council/Public Financing Authority regular meeting minutes dated March 1, 2022 Recommended Action: 22-1699.Approve the West Orange County Water Board (WOCWB) proposed budget for Fiscal Year 2022/23 with the City of Huntington Beach amount of $1,036,594 Recommended Action: Page 3 of 7 4 AGENDA March 15, 2022City Council/Public Financing Authority Approve the WOCWB proposed budget for FY 2022/23 with the City of Huntington Beach share being $1,036,594. 22-00210.Reaffirm adoption of Resolution No. 2021-62 finding a proclaimed state of emergency continues to impact the ability to meet safely in person, and allows meetings of the City Council and all City boards, commissions and committees to be conducted remotely as needed in compliance with new Brown Act provisions identified in Assembly Bill 361 Reaffirm Resolution No. 2021-62, “A Resolution of the City Council of the City of Huntington Beach, California, finding that the proclaimed state of emergency continues to impact the ability to meet safely in person.” Recommended Action: 22-02311.Adopt Resolution 2022-01 ordering the Summary Vacation of a Storm Drain Easement at 18431 Beach Boulevard and 18455 Beach Boulevard; and, authorize recordation A) Adopt Resolution 2022-01, “A Resolution of the City Council of the City of Huntington Beach Ordering the Summary Vacation of a Storm Drain Easement on Property Located at 18431 Beach Boulevard and 18455 Beach Boulevard;” and, B) Authorize the Director of Public Works to determine a specific date to instruct the City Clerk to record the said Resolution and attached exhibits with the Orange County Recorder. Recommended Action: 21-66612.Adopt Resolution No. 2022-05 approving the City of Huntington Beach Sewer System Management Plan (SSMP) Update Adopt Resolution No. 2022-05, “A Resolution of the City Council of the City of Huntington Beach Updating the Sewer System Management Plan.” Recommended Action: 22-12813.Accept the lowest responsive and responsible bid, approve appropriation and authorize execution of a construction contract with California Waters Development, Inc., in the amount of $2,665,504.99 for the Central Library Fountain Restoration Project, CC-1630 A) Accept the lowest responsive and responsible bid submitted by California Waters Development., Inc., in the amount of $2,665,504.99; and, Recommended Action: Page 4 of 7 5 AGENDA March 15, 2022City Council/Public Financing Authority B) Appropriate $2,110,430 from the Infrastructure Fund to account 31440005.828 00; and, C) Authorize the Mayor and City Clerk to execute a construction contract in a form approved by the City Attorney. 22-14614.Adopt Resolution No. 2022-04 establishing a pierhead line adjacent to Lots 6 & 7 of Tract 5829 (16850 and 16854 Bayview Drive) Adopt Resolution No. 2022-04, “A Resolution of the City Council of the City of Huntington Beach Establishing a Pierhead Line Adjacent to Tract 5829” which provide a wharfage width of 25 feet adjacent to the subject lots (Attachment 1). Recommended Action: 22-17615.Accept additive alternative bid item #1 for the Fiber Optic Communications project from City Hall to Pier Plaza and authorize execution of a change order contract with project contractor, Elecnor Belco Electric, Inc. (EBE) to accommodate the additive alternative bid item; and, approve appropriation of funds, CC-1621 A) Accept the additive alternative bid item #1 to the lowest responsive and responsible bid submitted by Elecnor Belco Electric, Inc., in the amount of $85,000; and, B) Authorize the Mayor and City Clerk to execute a construction change order contract with Elecnor Belco Electric, Inc. in a form approved by the City Attorney; and, C) Appropriate $110,500 from the Energy Efficiency Fund to account 80787002.82800 to fund this bid item, which includes the lowest responsive and responsive bid amount of $85,000 plus contingency and other administrative expenses. Recommended Action: 22-18416.Approve and authorize execution of contract Amendment No. 1 with Advanced Avant-Garde Corporation for On-Call Grant Writing and Administrative Consulting Services Approve and authorize the Mayor and City Clerk to execute “Amendment No. 1 to Agreement Between the City of Huntington Beach and Advanced Avant-Garde Corporation for On-Call Grant Writing and Administrative Consulting Services” increasing the not-to-exceed amount to $500,000 and extending the contract term one additional year. Recommended Action: 22-21617.Approve and authorize execution of a Service Agreement between Page 5 of 7 6 AGENDA March 15, 2022City Council/Public Financing Authority the City of Huntington Beach and the Huntington Beach Downtown Business Improvement District (HBDBID) for Management and Operation of an Artisan Fair at Huntington Beach Pier Plaza Approve and authorize the Mayor and City Clerk to execute “Service Agreement Between the City of Huntington Beach and the Huntington Beach Downtown Business Improvement District for Management and Operation of the Pier Plaza Artisan Fair.” Recommended Action: 22-21218.Consider adoption of the 2022 City Council Strategic Planning Work Plan Adopt the 2022 City Council Work Plan. Recommended Action: PUBLIC HEARING Individuals wishing to provide a comment on an item scheduled for Public Hearing may do so either in person by filling out a Request to Speak form delivered to the City Clerk, via computer through Zoom Webinar ID 971 5413 0528, or Zoom Webinar by phone by calling (669) 900-6833. Once the Mayor opens Public Comments, in-person participants will be called to speak first. Zoom Webinar participants wishing to speak will be provided a 15-minute window to select the “Raise Hand” feature in the Webinar Controls section. Attendees entering the Webinar and requesting to speak by phone can enter *9 to enable the “Raise Hand” feature, followed by the *6 prompt that unmutes their handheld device microphone. Individuals will be prompted to speak when the Clerk announces their name or the last three digits of their phone number. After a virtual speaker concludes their comment, their microphone will be muted but they may remain in Webinar attendance for the duration of the meeting. All speakers are encouraged, but not required to identify themselves by name. Each speaker may have up to 3 minutes unless the volume of speakers warrants reducing the time allowance. 22-18319.Approve and authorize execution of a Memorandum of Understanding (MOU) between the City and the Huntington Beach Auto Dealers Association extending the Auto Incentive Beach Parking Program for an additional five (5) years A) Open the public hearing and receive written and oral testimony; and, B) Approve and authorize the Mayor and City Clerk to execute a new “Memorandum of Understanding Between the City of Huntington Beach and the Huntington Beach Auto Dealers Association.” Recommended Action: Page 6 of 7 7 AGENDA March 15, 2022City Council/Public Financing Authority ADMINISTRATIVE ITEMS 22-19120.Adopt Resolution No. 2022-09 modifying the salary and benefits for non-represented employees and approve for introduction Ordinance No. 4250 to amend Section 2.76.010 of the Huntington Beach Municipal Code related to exclusions from competitive service; and, authorize appropriation of funds A) Adopt Resolution No. 2022-09, “A Resolution of the City Council and the City of Huntington Beach Modifying Salary and Benefits for Non-Represented Employees;” and, B) Approve for Introduction Ordinance No. 4250, “An Ordinance of the City of Huntington Beach Amending the Huntington Beach Municipal Code by Amending Section 2.76.010 Thereof Related to Exclusions from the Competitive Service;” and, C) Authorize appropriations for all costs related to implementation of Resolution No. 2022-09. Recommended Action: COUNCILMEMBER ITEMS 22-18621.Submitted by Mayor Delgleize - Request for City Council approval of direction to staff to identify methods for improving ongoing maintenance of public restrooms at the 6th Street beach lot Direct staff to identify methods for improving ongoing maintenance of public restrooms at various locations along the beach path and return to the City Council with a program for doing so. Recommended Action: COUNCILMEMBER COMMENTS (Not Agendized) ADJOURNMENT IN MEMORY OF JEREMY AND JOSHUA PAGE The next regularly scheduled meeting of the Huntington Beach City Council/Public Financing Authority is Tuesday, April 5, 2022, at 4:00 PM in the Civic Center Council Chambers, 2000 Main Street, Huntington Beach, California. INTERNET ACCESS TO CITY COUNCIL/PUBLIC FINANCING AUTHORITY AGENDA AND STAFF REPORT MATERIAL IS AVAILABLE PRIOR TO CITY COUNCIL MEETINGS AT http://www.huntingtonbeachca.gov Page 7 of 7 8 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-142 MEETING DATE:3/15/2022 Mid-Year Joint Meeting of the Citizen Participation Advisory Board (CPAB) and City Council to review Community Development Block Grant (CDBG) Recommendations 2022-23 Roll Call of the Citizen Participation Advisory Board: Mike Massie, Peter Andres, Gigi Jackson, Parna Ghosh, Macey Lachman City of Huntington Beach Printed on 3/9/2022Page 1 of 1 powered by Legistar™9 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-225 MEETING DATE:3/15/2022 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION. (Paragraph (1) of subdivision (d) of Section 54956.9). Name of case: Bottoms (Mark) v. City of Huntington Beach, et al.; OCSC Case No. 30-2021-01196342. City of Huntington Beach Printed on 3/9/2022Page 1 of 1 powered by Legistar™10 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-226 MEETING DATE:3/15/2022 CONFERENCE WITH LEGAL COUNSEL - ANTICIPATED LITIGATION. Significant Exposure to Litigation Pursuant to Paragraph (2) of Subdivision (d) of Section 54956.9: Number of Cases: One (1) - Code Four. City of Huntington Beach Printed on 3/9/2022Page 1 of 1 powered by Legistar™11 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-178 MEETING DATE:3/15/2022 Jenny Braithwaite with Shepard of the Hills’ Self Help Interfaith Program and member of the Greater Huntington Beach Interfaith Council City of Huntington Beach Printed on 3/9/2022Page 1 of 1 powered by Legistar™12 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-157 MEETING DATE:3/15/2022 Mayor Delgleize to call on members of the Marina High School Girls Wrestling Team who recently won the 2022 CIF-Southern Section Central Division Championships City of Huntington Beach Printed on 3/9/2022Page 1 of 1 powered by Legistar™13 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-224 MEETING DATE:3/15/2022 Mayor Delgleize to call on Edison High School Senior Brayden Boggs who was accepted to the US Merchant Marine Academy in Kings Point, NY City of Huntington Beach Printed on 3/9/2022Page 1 of 1 powered by Legistar™14 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-208 MEETING DATE:3/15/2022 Mayor Delgleize to present the Mayor’s HB Excellence Award for the month March to Denise Grushon, Office Assistant II, Department of Public Works City of Huntington Beach Printed on 3/9/2022Page 1 of 1 powered by Legistar™15 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-187 MEETING DATE:3/15/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO:Honorable Mayor and City Council Members SUBMITTED BY:Robin Estanislau, CMC, City Clerk PREPARED BY:Robin Estanislau, CMC, City Clerk Subject: Approve and Adopt Minutes Statement of Issue: The City Council/Public Financing Authority special meeting minutes of February 4, 2022 and regular meeting minutes of March 1, 2022, require review and approval. Financial Impact: None. Recommended Action: A) Approve and adopt the City Council/Public Financing Authority special meeting minutes dated February 4, 2022; and, B) Approve and adopt the City Council/Public Financing Authority regular meeting minutes dated March 1, 2022 Alternative Action(s): Do not approve and/or request revision(s). Analysis: None Environmental Status: Non-Applicable Strategic Plan Goal: Non Applicable - Administrative Item Attachment(s): 1. February 4, 2022 CC/PFA special meeting minutes 2. March 1, 2022 CC/PFA regular meeting minutes City of Huntington Beach Printed on 3/9/2022Page 1 of 1 powered by Legistar™16 Minutes City Council/Public Financing Authority Strategic Planning Workshop Friday, February 4, 2022 9:00 AM – Meeting Rooms C & D Huntington Beach Central Library 7111 Talbert Avenue Huntington Beach, California 92648 or Virtual via Zoom Webinar A video recording of this meeting is on file in the Office of the City Clerk, and archived at www.surfcity-hb.org/government/agendas/ CALLED TO ORDER — 9:08 AM ROLL CALL Present: Bolton (arrived 9:23 a.m.), Delgleize, Carr, Moser, and Kalmick Absent: Posey, Peterson Pursuant to City Council Resolution No. 2001-54, Mayor Pro Tem Posey requested, and with no objections, was granted permission to be absent from this meeting. Chief Assistant Attorney Mike Vigliotta attended this meeting in place of City Attorney Michael Gates, who was in trial court. PLEDGE OF ALLEGIANCE — Led by Councilmember Kalmick ANNOUNCEMENT OF SUPPLEMENTAL COMMUNICATIONS (Received After Agenda Distribution) — None PUBLIC COMMENTS (3 Minute Time Limit) — 1 In-Person Speaker; Call-in Speakers via Zoom: None The number [hh:mm:ss] following the speakers' comments indicates their approximate starting time in the archived video located at http://www.surfcity-hb.org/government/agendas. Steve Engel welcomed City Council and Department Heads to Central Park and the Library, and thanked them for their service and the focus on the City's parks by continuing to budget for maintenance and improvements. (00:04:00) ADMINISTRATIVE ITEMS 1. (21-001) Strategic Planning Workshop Held • Opening and Introductions Mayor Delgleize welcomed everyone and stated the purpose of the meeting is to provide an opportunity for Councilmembers and staff in attendance to share successes from the last year as well as planning ideas for the coming year. 17 Council/PFA Strategic Planning Workshop Minutes February 4, 2022 Page 2 of 8 Each Councilmember stated appreciation for this opportunity to review progress made in the past year, and discuss new opportunities for 2022. Assistant City Manager Travis Hopkins stated his appreciation for the opportunity to work with City Council and Department Heads to review strategic goals for 2022. Interim City Manager Sean Joyce noted the enthusiasm and energy which staff responds when addressing the projects directed by Council, and stated his deep appreciation for the services of Facilitator Pat West. Mr. Pat West, CEO of Pat West LLC, introduced himself, congratulated the City Council on their 2021 accomplishments, and introduced his staff member Craig Beck. • Ice Breaker Exercise and Review of Workshop Expectations Facilitator West requested workshop attendees to share with the group the first rock concert they attended. Facilitators West and Beck reviewed the workshop agenda and objectives with Mayor, City Council, other elected officials and City staff. Facilitator West shared unique details about Huntington Beach: 3rd largest city in Orange County; 24th largest in the State; 130th largest in the U. S.; a world-renown Pier; a special-event city; aerospace history; only dog beach in Orange County; preserved historic buildings; great public art; wetlands; a park system which includes a great nature center; huge tourism industry; outdoor lifestyle options; and the world's largest surfboard. Facilitator Craig Beck reviewed the five categories from last year's planning session: Community Engagement Homelessness Response Economic Development and Housing Infrastructure & Parks COVID-19 Response Facilitator Beck stated this workshop would focus on determining if new categories are needed for 2022, and whether there are any new priorities to add to any of the categories. Dahle Bulosan, Chief Financial Officer, presented a PowerPoint communication entitled Fiscal Condition and Outlook, with slides entitled: City Budget & Fiscal Position; City General Fund Budget; and Financial Outlook, and stated inflation will have an impact on the Financial Outlook, and noted that Consumer Price Index (CPI) adjustments are included in the operating cost numbers presented. At 9:56 a.m., Facilitator West called for a 15-minute recess. At 10:14 a.m., the Workshop resumed. Assistant City Manager Travis Hopkins presented a PowerPoint communication entitled 2021 Strategic Plan and Council Initiatives, with slides entitled: 2021 Strategic Priorities and Goals; 2021 Strategic Plan Outcomes; 2021 H-Item Outcomes; Priority: Community Engagement (2); Priority: Homelessness 18 Council/PFA Strategic Planning Workshop Minutes February 4, 2022 Page 3 of 8 Response (2); Priority: Economic Development & Housing (2); Priority: Infrastructure & Parks (2); Priority: COVID-19 Response (2); Other: Fiscal Sustainability & Capital Improvements; and Other: Fiscal Sustainability & Public Safety. Council and staff discussed the City’s current and only rental assistance program, a Tenant-Based Rent Assistance (TBRA) program that uses Community Development Block Grant (CDBG) funds. Staff reported that during COVID-19, the City was awarded approximately $5M from the Federal Government through the County, and over 600 businesses and a number of Huntington Beach non- profits were assisted with those funds. Director Luna-Reynosa confirmed that moving forward there will be an effort to establish a GrowHB loan program with American Rescue Plan Act (ARPA) funds. Discussion on Pension Obligation Bonds noted the very low rate of 2.9%; California Public Employees' Retirement System (CalPERS) has lowered their rate; and CalPERS achieved a 21.3% return this past year. Public Works Director Sean Crumby joined the PowerPoint communication via Zoom for slides entitled: Other: Capital Improvements; 2022 Major CIP Initiatives; 2022 Major CIP Initiatives LA2028 Olympics; 2022 Major CIP Initiatives City Facilities Needs Through DBFOM; 2022 Major CIP Initiatives Healing Center; and 2022 Major CIP Initiatives Other Items. Mayor Delgleize and Director Crumby discussed the Design-Build-Finance-Operate-Maintain (DBFOM) process that will involve awarding an Exclusive Negotiating Agreement (ENA) with a Development Partner, and while initially not needed, $3.4M in American Rescue Plan Act (ARPA) funds are designated for this effort. Discussions continued regarding the Navigation Center and Healing Center, which will require major effort to obtain sustainable income sources. Director Crumby stated Council could expect to see regular updates during the funding process. Facilitators West and Beck provided summary highlights: 1) Economic Development and Land Use are going to take a lot of focus, and will involve community feedback 2) Master Plans in progress are intense and will determine how the City looks for the next generation 3) Huntington Beach has a great pavement rate of 79 vs 66 for most cities 4) Manager Hopkins and Director Crumby were congratulated for their dedication and focus in leading the teams that make the Master Plans reality Facilitator West noted the discussion after lunch would center on determining priorities for 2022. At 11:22 a.m., Facilitator West called for the lunch break. At 12:17 p.m., the Strategic Planning Meeting reconvened. Facilitator West instructed City Council to focus on Strategic Plan Priorities to determine whether they will remain the same or if there will be any new items, and review of Councilmember “H” Items. 19 Council/PFA Strategic Planning Workshop Minutes February 4, 2022 Page 4 of 8 • 2022 Strategic Plan Priorities Assistant City Manager Hopkins reviewed the COVID-19 Response 2021 priority and noted that most of the processes have become part of standard procedures, and there is no longer the need for intense focus in this area. Facilitator Beck noted that 101 priorities were determined last year and about half of them were completed. He asked for Councilmember input on potential new categories.  Sustainability  Improved Communication Mechanisms  Existing four categories are broad enough to include everything Facilitator Beck asked how the City could be more communicative with businesses and residents about all the great things going on. Surf City Break (Community Calendar) is friendly and easily accessible, but how can it be improved? Are there gaps?  Don't wait for a problem to arise  Be proactive with accolades  Take opportunities to identify what the City actually does (Citizen's Academy is an example)  Solid and accurate information is imperative  Pushing out information on Council decisions via regular press releases, i.e., should have been a press release ready to go after the Council recently voted on selecting the 100% Renewable Energy base utility standard  Elected leadership needs a means of communicating the bigger picture  Analyze ways people are connecting, as everyone may not go online to access Surf City Break  Plan for emergency or urgent communication Facilitator Beck asked Councilmembers what they are hearing about how people get information and suggestions for system improvements:  Update website, determine content and how it is accessed, and ensure accuracy  Determine if website should be “service” or “person” based for accessing information  Develop a ticket tracking system (expensive/complex) that allows for easy reporting and tracking of response time for accountability  Develop QR codes that say “Download the app” and ensure the app works  Temper expectations; analyze front-end and back-end functionality  Determine the best way to inform community regarding emergencies: sign-up for alerts, indicate importance or level of alert  Focus on groups/activities that benefit the community, including on Channel 3  Highlight Council interviews, including on Channel 3  Provide a method for residents to recognize/report community-based efforts such as beach clean- up opportunities, including resources and links for more details  Determine if “Helper” can be connected to City's website, when a phone bank or live phone answer staff would be effective  Citizen's Academy: augment in-person options, most valuable aspects need to be replicated to reach a broader audience: i.e., make available self-paced recorded sessions; provide sessions at City Hall for school district students  HB needs to become an any-age friendly city by considering the best way to communicate with various segments of the constituents, including volunteers, i.e., snail mail and door hangers for seniors who may not have online/computer access 20 Council/PFA Strategic Planning Workshop Minutes February 4, 2022 Page 5 of 8  Public records management, centralization, retention and response to public records requests Council prioritized options as:  Data access  Community communication  My HB workflow tracking system, and should “look” like the City’s website  Update the City's main website  Public Information  Understanding diverse audience, including volunteers, and consider the best ways to reach each segment Jennifer Carey, Public Affairs Manager, stated there is a need for better communication and becoming proactive, which will require more infrastructure, tools, procedures and policies. She stated her focus is on building a strategy and described the infrastructure needed to provide better communication and noted Councilmember comments are very helpful. • Review of Homelessness Priorities Assistant City Manager Travis Hopkins reviewed the "In Progress" list for 2022 Priorities. Facilitator Beck stated there should be an effort to use existing resources at the community, County, State and Federal levels, to ensure you do not pay for services that already exist, and do not re-invent the wheel. He added the focus should be to ensure people have access to the resources they need. Discussion topics included:  City's application status for Project Home Key at the Quality Inn  Ensure the Navigation Center is not left floundering as more focus is placed on the Healing Center  Schedule regular meetings with organizations already offering community resources  Project Zero — developing a system to recognize and incorporate existing provider services so when a need becomes obvious the resource is already part of the system  Integrate the many data points to help tell the story, get community involved, for making best decisions, and securing funding  Look both downstream and upstream to prevent homelessness, including ways to help people who may be facing homelessness, as well as engagement of volunteers  Recognizing existing faith-based and non-profit organizations and utilizing them  Volunteer Coordinator is being hired to thoroughly understand the existing resources, and to manage the volunteers according to their strengths and interests Facilitator Beck noted the 2021 efforts to end homelessness resulted in lots of good things, and now the effort will be to become more mature which includes integrating service partners. Facilitator Beck asked for other considerations for services integration that are not currently identified:  Permanent supportive housing and/or voucher system  Develop relationships with local property owners to encourage them to accept vouchers; i.e., housing options modeled after Family Forward or Roofs for Rent  Explore opportunities to utilize existing assets of local non-profits  Review response, job training, partnerships, housing, State funding, changing/enforcing State laws (lobbying and policy enforcement) 21 Council/PFA Strategic Planning Workshop Minutes February 4, 2022 Page 6 of 8  Develop integrated data system, with authority to share for community information exchange • Economic Development and Housing Facilitator Beck stated that updating the Housing Element is a major undertaking and will require resources. Ursula Luna-Reynoso, Director of Community Development, provided an update on the Draft Housing Element process that was submitted to Housing and Community Development (HCD) in early December and reply comments are expected to be available in the next week. She shared that the Housing Element is comprised of programs, and the re-zoning program is the most substantial, which means a big workload for the Planning Division. In addition, the City’s Accessory Dwelling Units (ADU) and Density Bonus ordinances must be brought into compliance with State law. The HCD response is expected to include directives and timeline for those updates. Interim City Manager Joyce stated this information is helpful, but because this report doesn't specifically appear on the meeting Agenda, he requested there be no further discussion of it, and encouraged everyone to feel free to schedule a meeting with Director Luna-Reynosa for any questions. Chief Assistant City Attorney Mike Vigliotta confirmed the Housing Element process will provide Public Hearing opportunities for public discussions of the plan. Facilitator Beck directed the discussion to Downtown revitalization improvements, how local businesses are being supported for economic development, and the cannabis retail program. Council responded by confirming there is already an effort for Downtown revitalization through the Downtown Redesign Project, as well as an Ad Hoc Committee addressing retail cannabis. Councilmembers expressed the need to:  Focus on a broad view of economic development  Consider the concept of Destination Stewardship, or taking a long view as Huntington Beach is revitalized as a tourist destination  Tourism is an economic development tool, and there needs to be a strategy to improve it  Potential short-term rental (STR) legislation and California Coastal Commission's stance that STRs are a form of affordable lodging and therefore it is against the Coastal Act to prohibit STRs  Sea rise level and how that will impact the beaches in 25 or 30 years, therefore diversification or expansion of tourist-drawing options need to be considered such as the Bolsa Chica wetlands for birders, or the great equestrian center Director Luna-Reynosa reminded Council that a new Economic Development Manager, Kriss Casanova, was recently hired, and she comes with economic development experience. She has been meeting with the Economic Development Committee, and some of their goals include:  Diversifying the City's economic base including review of land use regulations  Attracting quality industrial businesses, including the research and technology zone  Preserving and supporting retail  Downtown/Main Street revitalization of street scape, the Plaza, and increased outdoor dining opportunities  Working collaboratively with VisitHB on tourism  Generating wealth which benefits the community, or job creation 22 Council/PFA Strategic Planning Workshop Minutes February 4, 2022 Page 7 of 8  Business retention and expansion through GrowHB funds, and forming better strategic partnerships with Workforce Development partners  Expanding marketing communication with the business community and investors There was discussion that Economic Development and Housing In Progress Items 2 and 8 could probably be combined into one action item, and Assistant City Manager Hopkins suggested moving those items, including No. 10, to the Sustainability Master Plan, and by consensus, Council agreed. • Infrastructure and Parks Facilitator Beck suggested considering community involvement with the New Objective regarding hosting LA2028 Olympic sporting events, and including the financial commitment required. Additional New Objectives discussed included:  IT Security and infrastructure audit, i.e., understand vulnerability; consider upgrade maintenance costs when adding new programs; review need to update legacy programs; implement a system where when constituent communication is received, it is clearly obvious who is handling it, and when, to ensure nothing falls through the cracks  Director Crumby provided an update on internal policy development which includes arterial beautification in conjunction with street paving plans, as well as mobility and safety considerations  Include project priorities on the maps so the community better understands timing of projects  Become informed of CalTrans plans for Route 39/Beach Boulevard  Ensure the pavement map is easier for community members to find  Currently evaluating costs and implications for taking over portion of Pacific Coast Highway within City borders • Fiscal Sustainability, Public Safety or Other Discussion topics included:  The existing comprehensive plan to transfer any excess funds to the Trust 15 account  Bike safety especially for kids; reaching out to schools encouraging them to include as part of elementary curriculum  E-bike regulations  Strengthening relationship with school districts should be a stand-alone objective • Conclusion Facilitated by Pat West, LLC and City Manager’s Office In summary, for 2022, Council selected four of the current Strategic Priority Categories (Community Engagement, Homelessness Response, Economic Development and Housing, Infrastructure and Parks) and agreed with staff’s recommendation to replace COVID-19 Response with Fiscal Sustainability, Public Safety, or Other. Interim City Manager Joyce stated his support for continuing to make progress on the stated objectives, and appreciation for the talented team and cooperative staff in making life better for Huntington Beach constituents. Mayor Delgleize expressed Council's appreciation for Interim City Manager Joyce's leadership and voice of reason. She also thanked Facilitators West and Beck for their efforts to draw out ideas and good 23 Council/PFA Strategic Planning Workshop Minutes February 4, 2022 Page 8 of 8 sharing, and expressed appreciation to Assistant City Manager Hopkins, the Department Heads, and staff for their dedication and focus on seeing Council's objectives come to fruition. Each Councilmember in attendance shared their appreciation for the leadership provided to ensure a successful Strategic Planning opportunity and noted staff's dedication and focus on serving the community. Facilitators West and Beck acknowledged the Council, Managers and staff who were instrumental in this successful workshop. ADJOURNMENT — 2:17 p.m. to the next regularly scheduled meeting of the Huntington Beach City Council/Public Financing Authority on Tuesday, February 15, 2022, at 4:00 PM in the Civic Center Council Chambers, 2000 Main Street, Huntington Beach, California. INTERNET ACCESS TO CITY COUNCIL/PUBLIC FINANCING AUTHORITY AGENDA AND STAFF REPORT MATERIAL IS AVAILABLE PRIOR TO CITY COUNCIL MEETINGS AT http://www.huntingtonbeachca.gov _______________________________________ City Clerk and ex-officio Clerk of the City Council of the City of Huntington Beach and Secretary of the Public Financing Authority of the City of Huntington Beach, California ATTEST: ______________________________________ City Clerk-Secretary ______________________________________ Mayor-Chair 24 Minutes City Council/Public Financing Authority City of Huntington Beach Tuesday, March 1, 2022 5:00 PM – Council Chambers 6:00 PM – Council Chambers Civic Center, 2000 Main Street Huntington Beach, California 92648 or Virtual via Zoom Webinar A video recording of the 5:00 PM and 6:00 PM portions of this meeting is on file in the Office of the City Clerk, and archived at www.surfcity-hb.org/government/agendas/ 5:00 PM - COUNCIL CHAMBERS CALLED TO ORDER — 5:00 PM ROLL CALL City Clerk Robin Estanislau announced the presence of Chief Assistant City Attorney Mike Vigliotta attending in place of City Attorney Michael Gates who has not yet arrived. Present: Peterson, Bolton, Posey, Delgleize, Carr, Moser, and Kalmick Absent: None ANNOUNCEMENT OF SUPPLEMENTAL COMMUNICATIONS PERTAINING TO CLOSED SESSION (Received After Agenda Distribution) — None PUBLIC COMMENTS PERTAINING TO CLOSED SESSION ITEMS (3-Minute Time Limit) — None A motion was made by Bolton, second Carr to recess to Closed Session for Items 2 – 7. With no objections, the motion carried. RECESSED TO CLOSED SESSION — 5:02 PM CLOSED SESSION ANNOUNCEMENT(S) 1. 22-172 Mayor Delgleize Announced: Pursuant to Government Code § 54957.6, the City Council takes this opportunity to publicly introduce and identify designated labor negotiators: Sean Joyce, Interim City Manager and Brittany Mello, Administrative Services Director, who will be participating in today’s Closed Session discussions regarding labor negotiations for: Surf City Lifeguard Employees’ Association (SCLEA) and Police Officers’ Association (POA) 25 Council/PFA Regular Minutes March 1, 2022 Page 2 of 18 CLOSED SESSION 2. 22-167 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION. (Paragraph (1) of subdivision (d) of Section 54956.9). Name of case: Bottoms (Mark) v. City of Huntington Beach, et al.; OCSC Case No. 30-2021-01196342. 3. 22-168 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION. (Paragraph (1) of subdivision (d) of Section 54956.9). Name of case: Handrinos (Mathias) v. City of Huntington Beach, et al.; USDC Case No.: 8:20-cv-1206 FLA (DFMx). 4. 22-173 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION. (Paragraph (1) of subdivision (d) of Section 54956.9). Name of case: California Renters Legal Advocacy and Education Fund/THDT Investment, Inc. v. City of Huntington Beach; OCSC Case No.: 30-2020-01140855; Appellate Case No. G060842. 5. 22-174 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION. (Paragraph (1) of subdivision (d) of Section 54956.9). Name of case: Californians for Homeownership, Inc. v. City of Huntington Beach; OCSC Case No. 30-2019- 01107760; Court of Appeal No. G060835. 6. 22-177 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION. (Paragraph (1) of subdivision (d) of Section 54956.9). Name of case: Emmer (Cynthia) v. City of Huntington Beach; OCSC Case No. 30-2020-01145487. 7. 22-171 CONFERENCE WITH LABOR NEGOTIATORS (Gov. Code section 54957.6.) Agency designated representatives: Sean Joyce, Interim City Manager; also in attendance: Brittany Mello, Director of Administrative Services, regarding the following: Surf City Lifeguard Employees’ Association (SCLEA) and Police Officers’ Association (POA) 6:00 PM — COUNCIL CHAMBERS RECONVENED CITY COUNCIL/PUBLIC FINANCING AUTHORITY MEETING — 6:20 PM ROLL CALL Present: Peterson, Bolton, Posey, Delgleize, Carr, Moser, and Kalmick Absent: None PLEDGE OF ALLEGIANCE — Led by Councilmember Carr INVOCATION In permitting a nonsectarian invocation, the City does not intend to proselytize or advance any faith or belief. Neither the City nor the City Council endorses any particular religious belief or form of invocation. 8. 22-175 Mike Michaud from Dance4Joy Ministries and member of the Greater Huntington Beach Interfaith Council 26 Council/PFA Regular Minutes March 1, 2022 Page 3 of 18 CLOSED SESSION REPORT BY CITY ATTORNEY — None AWARDS AND PRESENTATIONS 9. 22-156 Mayor Delgleize called on Victoria Alberty for the Adoptable Pet of the Month Ms. Alberty introduced S.A.F.E. Rescue Team founder Markelle and 2-year-old Molly, a Labradoodle who is hypoallergenic, and stated additional details on pet adoption can be found at local rescue sites, or at https://saferescueteam.org. 10. 22-138 Mayor Delgleize proclaimed March as Women’s History Month Mayor Delgleize announced that March is Women's History Month, a time to highlight women who have pushed the envelope and made significant contributions to improve our communities. Women Providing Healing, Promoting Hope is the theme for 2022, to acknowledge the ceaseless efforts of caregivers and front-line workers during the on-going pandemic, and recognition of the thousands of ways women of all cultures have provided healing and hope throughout history. Each Friday in March, HBTV will air Women's History Month segments to feature women in our community, including the documentary, The Mayor's 100-Year Reflection, created several years ago for the City's Centennial. 11. 22-139 Mayor Delgleize called on members of the Huntington Beach Firefighters’ Association (HBFA) to present a check to the Huntington Beach High School Foundation for $40,000 from the HBFA Great Balls of Fire Charity Golf Tournament A member of the Huntington Beach Firefighters' Association briefly described the annual HBFA Great Balls of Fire Charity Golf Tournament, and noted that during the past 21 years over $1.4M has been donated back to the community through this annual event. The December 2021 event resulted in the $40,000 donation accepted by Lisa Kemmerer, Vice President of Programs, for the Huntington Beach High School Foundation (HBHSF). Ms. Kemmerer thanked the HBFA as well as the school parents who were instrumental in this fun and successful event. HBHSF Executive Vice President Teri Moore stated the funds would go directly back to the campus for the benefit of the students. 12. 22-157 Mayor Delgleize to call on members of the Marina High School Girls Wrestling Team who recently won the 2022 CIF-Southern Section Central Division Championships 13. 22-158 Mayor Delgleize called on Marina High School Cheerleaders who recently ranked as 2022 National Champions Mayor Delgleize introduced the Marina High School Cheerleaders, who demonstrated their skills with a cheer. This team is the first ever, back-to-back, National Champions at Marina High School. Ms. Loren Murphy, Advisor, introduced Head Coach Vraunwyn Denny, and Coaches Katie Shetlund, Lexi Gutierrez, and Moriah Vanderbrake, and each team member was presented with a certificate of recognition from the City. ANNOUNCEMENT OF SUPPLEMENTAL COMMUNICATIONS (Received After Agenda Distribution) Pursuant to the Brown "Open Meetings" Act, City Clerk Robin Estanislau announced supplemental communications received by her office following distribution of the Council Agenda packet: 27 Council/PFA Regular Minutes March 1, 2022 Page 4 of 18 Administrative Items #22 (22-123) PowerPoint Presentation titled Edison Park Conceptual Plan received from Chris Slama, Director of Community and Library Services. #22 (22-123) Eight (8) emails received regarding the proposed withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan. #23 (22-141) PowerPoint Presentation titled 21 Main Street – First Amendment – Exclusive Negotiating Agreement Between City and Surf City Partners, LLC received from Ursula Luna-Reynosa, Director of Community Development. #23 (22-141) Letter regarding the proposed first amendment to the ENA with Surf City Partners received from Sean Matsler, of Cox, Castle and Nicholson, LLP. #23 (22-141) Inter-Office Memo received from Ursula Luna-Reynosa, Director of Community Development, identifying a correction to the vote count noted on the staff report dated November 2, 2021. #24 (22-162) Inter-Office Memo received from Travis Hopkins, Assistant City Manager providing an updated version of Resolution No. 2022-07 and a draft resolution and ordinance. #24 (22-162) PowerPoint Presentation titled City of Huntington Beach – Cannabis Business Tax Ballot Measures received from Sean Joyce, Interim City Manager. Ordinances for Adoption #25 (22-092) Email received regarding the proposed adoption of Ordinance No. 4249. PUBLIC COMMENTS (2-Minute Time Limit) — 26 In-Person and 16 Call-In Speakers The number [hh:mm:ss] following the speakers' comments indicates their approximate starting time in the archived video located at http://www.surfcity-hb.org/government/agendas. Joe Carchio was called to speak and provided an update on Huntington Beach Central Park Conservancy. Mr. Carchio noted that the Huntington Beach Police Officers' Association selected their all-volunteer organization as a recipient of the 2021 Constable Golf Classic, to support The Park Ranger Program, restoration in Central Park, and added that the next Park project will be dedicated to fallen HB Officer Vella. (00:47:23) Bob Herold, a resident of Skandia Mobile Home Park, was called to speak and asked that City Council amend City Charter Section 803 to create a carve out, or Rent Stabilization Ordinance (RSO), for mobile home parks. (00:49:38) Arthur Estrada, a resident of Skandia Mobile Home Park, was called to speak and asked that City Council amend City Charter Section 803 to create a carve out for mobile home park residents. (00:51:44) Jeanne Ferrans, a resident of Skandia Mobile Home Park, was called to speak and stated senior citizens (65+ years old) represent twenty percent (20%) of residents in Huntington Beach, and asked that Council respond to the needs of this fixed income group by amending City Charter Section 803 to create a carve out for mobile home parks. (00:53:43) Shiela Lugenbuehl, Skandia Mobile Home Park Homeowners Association Secretary, was called to speak and stated her support for Council placing a Rent Stabilization Ordinance (RSO) for mobile home owners on the November 2022 ballot to allow Huntington Beach voters an opportunity to decide this issue. (00:55:56) 28 Council/PFA Regular Minutes March 1, 2022 Page 5 of 18 Michael Lugenbuehl, Skandia Mobile Home Park resident, was called to speak and stated his support for Council placing a Rent Stabilization Ordinance (RSO) for mobile home owners on the November 2022 ballot to allow Huntington Beach voters an opportunity to decide this issue. (00:57:38) Gina Alexander, Vice President, Skandia Mobile Home Park Homeowners Association, and 35-year resident of Huntington Beach, was called to speak and shared her opinion on how the quality of life deteriorates for family-owned mobile home parks after they are acquired by what she described as corporate predatory owners who spike space rents, and bring in oppressive management. Ms. Alexander asked City Council to represent this City of Compassion with actions, and not just words, to protect all mobile home owners. (00:59:48) Dan Pantano, a resident of Skandia Mobile Home Park, was called to speak and shared his opinions on the latest lease presented by IPG, and asked that Council respond to the resident requests for assistance by amending City Charter Section 803 to create a carve out for mobile home park owners. Mayor Delgleize asked that Mr. Pantano complete a blue card for staff follow-up. (01:01:51) John Buzan, a long-time resident of Huntington Beach, was called to speak and shared his opinions on the recent alleged attempt by a Black Lives Matter activist to assassinate a prominent Jewish Democratic figure in Louisville, Kentucky, and stated his support for Council's recent statement condemning local anti-Semitic activity in Huntington Beach. (01:03:36) Alan Gandall, American Youth Soccer Organization (AYSO) Area Director, and 40-year resident of Huntington Beach, was called to speak and stated that AYSO Region 56 is directly impacted by Administrative Items No. 22 regarding the Edison Park Reconfiguration, and read a statement from Ann McCarthy, AYSO Commissioner for Region 65. (01:06:13) Cindi Galey, a resident of Huntington Beach for over 40 years, and a wildlife rehabilitator, was called to speak and shared information related to birds hitting the reflective windows at Huntington Beach Central Library. Ms. Galey stated that Central Library staff are aware of the issue, and will soon present a solution, which she trusts Council will respond to in a timely manner to prevent more bird deaths. (01:08:28) Amory Hanson, a Candidate for City Council in 2022, and a member of the Historic Resources Board, was called to speak and shared his sadness at the recent fire and destruction of buildings in Historic Wintersburg. Mr. Hanson stated his encouragement for an independent Fire Department investigation into the cause of the fire, to ensure proper protection of the remaining Wintersburg buildings. (01:10:08) Mark Currie, a 33-year resident homeowner in Huntington Beach, was called to speak and shared his parking concerns related to Administrative Items No. 22 regarding the Edison Park Reconfiguration, and encouraged Council to approve the Conceptual Plan withdrawal so there can be more resident involvement in a win-win solution. (01:11:17) Marnie Pavlick, a resident who has walked her dogs in Edison Park for over 40 years, was called to speak and stated her support for Administrative Items No. 22 regarding withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan to allow for more time for all park users to be involved in a design review. (01:12:52) Mary Jo Baretich, a resident of the Cabrillo Beachfront Village for 39 years, was called to speak and asked that Council listen to the many requests of Huntington Beach mobile home park residents for 29 Council/PFA Regular Minutes March 1, 2022 Page 6 of 18 Council to ensure that a Rent Stabilization Ordinance is approved if Huntington Beach voters pass an amended City Charter Section 803 to create a carve out for mobile home park owners in the November 2022 election. (01:13:48) Patricia Taylor, a resident of Rancho Huntington Mobile Home Park, was called to speak and shared that IPG has a history of converting senior mobile home parks into family mobile home parks, and thanked City Council for approving a senior overlay ordinance in 2014 to protect the 10 existing mobile home parks. Ms. Taylor asked that City Council ensure an amended City Charter Section 803 to create a carve out for mobile home park owners is placed on the November 2022 ballot. (01:15:38) Erica Shane, a resident of Huntington Beach since 1986, currently living near Edison Park, was called to speak and stated her support for Administrative Items No. 22 regarding withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan to allow for more discussion with the School District regarding parking and soccer field location options, and her support for the area to remain an open park, rather than be converted into a sports complex. (01:17:49) Pam Shane, a resident of Huntington Beach since 1986, currently living within a 1,000 ft. of Edison Park, was called to speak and stated her support for Administrative Items No. 22 regarding withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan to allow for more discussion and consideration of input from impacted residents. (01:20:02) Matt Shane, a resident of Huntington Beach since 1986, currently living within a 1,000 ft. of Edison Park, was called to speak and stated his support for Administrative Items No. 22 regarding withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan to allow for an extensive review of Air Quality Management District (AQMD) standards, noting that Edison Park exists on a previous landfill. (01:22:28) Nancy Buchoz, a resident of southeast Huntington Beach for over 46 years, was called to speak and stated her support for Administrative Items No. 22 regarding withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan to allow for an extensive review of Air Quality Management District (AQMD) standards considering how close it is to the Ascon Landfill site, and possible destruction of any of the 49-year-old trees. (01:24:40) Don Albrecht, a 46-year resident of the neighborhood bordering the west side of Edison Park, was called to speak and stated his support for Administrative Items No. 22 regarding withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan to allow for extensive consideration of traffic impacts and for dialogue with all impacted neighbors. (01:26:49) Tim Geddes, a long-time resident of southeast Huntington Beach, was called to speak and shared his recent Letter to the Editor published in the Daily Pilot to describe his disappointment in learning that the City Council Recall effort has secured enough signatures to achieve their aims. He further shared his opinion the City Council Recall effort is based on trumped-up charges and twisted assertions, which may result in costing the City $1M for an unnecessary special election. (01:28:22) An unnamed Guest (Lorax) was called to speak and shared the personal experiences of her father, a decorated combat veteran and former Huntington Beach business owner, who uses Edison Park to walk and exercise in a safe place. She also stated there are at least three memorial benches in Edison Park, which have not been addressed in the Conceptual Plan. She stated her support for revisiting the 30 Council/PFA Regular Minutes March 1, 2022 Page 7 of 18 Conceptual Plan so that the needs of senior residents, the neurologically challenged community, and others who do not play organized sports are taken into consideration. (01:30:15) Gimo Trazo, a 13-year resident of Huntington Beach living across the street from Edison Park, was called to speak and stated her support for Administrative Items No. 22 regarding Withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan to allow for proper discussions with all impacted residents on issues such as increased traffic, parking, and removal of mature trees which would negatively impact quality of life. (01:32:35) Michael Moussalli, a resident of Huntington Beach, was called to speak and stated his full support for Administrative Items No. 24 regarding Proposed City Council sponsored initiative regarding a cannabis business tax, and his opinion that approval will assist with efforts to eliminate the illegal market, as demonstrated by the efforts in Costa Mesa during the last four years. (01:34:48) Geri Von Freymann was called to speak and stated her support for Administrative Items No. 22 regarding Withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan, to allow time for consideration of the needs of people who do not, or cannot, participate in organized sports. (01:36:30) Caller Ding-Jo Currie, a resident of Huntington Beach for over 30 years, was invited to speak and stated her support for Administrative Items No. 22 regarding Withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan to allow for proper discussions with all impacted residents and Edison Park users. (01:38:51) Caller Tony Riccobono, a 25-year resident living next to Edison Park, was invited to speak and stated his support for Administrative Items No. 22 regarding Withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan to address the significant concerns of neighborhood residents, and allow time for another look at options for all users. (01:41:13) Caller James Parkinson, a 54-year resident of Huntington Beach currently living on the north side of Edison Park, was invited to speak and stated support for Administrative Items No. 22 regarding Withdrawal of previous City Council approval for the Edison Park Reconfiguration Conceptual Plan to allow for proper discussions to minimize the loss of healthy mature trees. (01:42:52) Caller Allison Plum, a Del Mar Estates Mobile Home Park resident, was invited to speak and asked that City Council ensure a fair and equitable future for the City's mobile home owners by considering an amended City Charter Section 803 carve out for mobile home owners. Ms. Plum encouraged mobile home residents to attend upcoming Mobile Home Advisory Board meetings at 5 p.m. on March 8 and April 25. (01:44:39) Caller Tony, living adjacent to LeBard Park, was invited to speak and shared his opinion that too many parks are being over developed to the point of eliminating open green space. (01:47:03) Caller Ruben, a resident of Skandia Mobile Home Park and Navy veteran, was invited to speak and stated his dismay at the IPG unbearable proposed land rental increases, and asked that City Council ensure an amended City Charter Section 803 carve out for mobile home owners. (01:48:59) Caller Ada Hand was invited to speak and shared details related to her and Ms. Bartesch's December meeting with City Manager and staff to request a new Mobile Home Market Study to update the 31 Council/PFA Regular Minutes March 1, 2022 Page 8 of 18 comprehensive study completed in 2002. Ms. Hand stated her dismay that to date the City has not been forthcoming with information and details to prepare for a new study to compare with what she believes is skewed and flawed information being presented by predatory mobile home park owners. (01:50:17) Caller Lonnie Saeger, a resident living adjacent to Edison Park for 25 years, was invited to speak and stated that he was speaking on behalf of eight neighbors who support Administrative Items No. 22 regarding withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan to allow for proper discussions to ensure compliance with the Pacific Flyover Act, which protects migratory flight paths. (01:52:30) Caller #6061, Dave Reynoso, a Skandia Mobile Home Park resident living on a fixed income, was invited to speak and shared his concerns related to proposed rent increases by the Park's new owners, and requested that Council assist by amending City Charter Section 803 to create a carve out for mobile home park owners and placing it on the November 2022 ballot. (01:54:18) Caller Paul Simonds, Senior Vice President, Curt Cringle & Associates, speaking on behalf of his client, was invited to speak and stated opposition to Administrative Items No. 23 regarding a First Amendment to the Exclusive Negotiating Agreement (ENA) with Surf City Partners, LLC for 21 Main Street at the Huntington Beach Pier. Mr. Simonds stated that neither the current tenant, nor his client, have been allowed the opportunity to share their concept which includes doubling the original space, and added this is Council's opportunity to stop a flawed process, and direct staff to issue a new Request for Proposal (RFP) for either 800 square feet or 1,600 square feet. (01:56:19) Caller Jonette Hodson, owner of a rental home on 9th Street, was invited to speak and shared her concerns regarding the Short-Term Rental (STR) policy that only allows owner-hosted rental units. Ms. Hodson advocated for allowing professional management, and described her failed efforts via phone calls and emails to communicate directly with Councilmembers to share her concerns and suggestions. (01:58:49) Caller Mark Sheldon, a 30+ year resident of Huntington Beach, was invited to speak and shared his dismay at the recent fire that destroyed buildings at Historic Wintersburg, and the decision of the property owners to raise additional buildings. Mr. Sheldon encouraged City Council to prioritize the steps necessary to preserve and protect this important history. (02:01:09) Caller Krystal Anderson, a resident of Huntington Beach living near Edison Park, was invited to speak and stated her support for Administrative Items No. 22 regarding withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan to allow for more impacted resident discussions. Ms. Anderson also stated her opposition to Administrative Items No. 23 regarding a First Amendment to the Exclusive Negotiating Agreement (ENA) with Surf City Partners, LLC for 21 Main Street at the Huntington Beach Pier, which after review of the supporting Agenda documentation appears to her to be an unfair process. (02:03:23) Caller #4758, Casey McKeon, was invited to speak and stated his opposition to Administrative Items No. 23 regarding a First Amendment to the Exclusive Negotiating Agreement (ENA) with Surf City Partners, LLC for 21 Main Street at the Huntington Beach Pier, because in his opinion the whole process has been flawed, and all interested parties should be required to abide by the original Request for Quote (RFQ) based on an 800 square foot property. Mr. McKeon stated that proceeding by approving this item creates the image of City Council favoritism. (02:05:15) 32 Council/PFA Regular Minutes March 1, 2022 Page 9 of 18 Caller Fran Lebowitz, speaking on behalf of her family and several immediate neighbors, was invited to speak and stated their support for Administrative Items No. 22 regarding withdrawal of previous City Council approval for the Edison Park Reconfiguration Conceptual Plan to allow for further discussions on neighborhood concerns such as the noise from baseball games on School District land, and potential for additional lighting issues. (02:07:33) Caller Andrew Chan, a resident of Huntington Beach for 11 years, was invited to speak and stated his support for Administrative Items No. 24 regarding the proposed City Council sponsored initiative regarding a cannabis business tax. As a user of Edison Park, Mr. Chan also stated his support for Administrative Item No. 22 regarding Withdrawal of previous City Council approval of the Edison Park Reconfiguration Conceptual Plan. (02:09:33) COUNCIL COMMITTEE – APPOINTMENTS – LIAISON REPORTS, AB 1234 REPORTING, AND OPENNESS IN NEGOTIATIONS DISCLOSURES Mayor Pro Tem Posey reported that Orange County Council of Governments (OCCOG) voted to adopt a resolution in support of the local coastal program amendment for the Magnolia Tank Farm in Huntington Beach; announced that the Orange County Power Authority (OCPA) held a press conference last week to memorialize their Memorandum of Understanding (MOU) with Poseidon confirming Poseidon will use 100 percent renewable energy purchased from OCPA if they get their plant built; that OCPA has the largest portfolio of renewable energy of all of the power authorities in the State; and OCPA recently hired three new Business Development Managers. Councilmember Bolton reported attending a meeting of the Historic Resources Board, which is working on a strategic plan process. She also reported attending a meeting of the Jet Noise Commission that included an official from Long Beach Airport. Mayor Delgleize thanked Historic Resources Board Chair Kathie Schey for the wonderful history lesson she provided at the recent ceremony at Rogers Seniors' Center. Councilmember Kalmick reported speaking with a representative of the Huntington Beach Police Officers' Association (HBPOA). He also reported attending meetings of the Design-Build-Finance- Operate-Maintain (DBFOM) Sub-Committee; Technology and Smart Cities Committee; and Southern California Association of Government (SCAG) Emerging Technologies Committee as the Orange County Council of Governments (OCCOG) representative. Councilmember Moser reported attending meetings of the Technology and Smart Cities Committee; Homeless Task Force for updates on the Navigation Center, and noted that weekly updates can be found at hbhomelesssolutions.com; Huntington Central Park Collaborative and confirmed the restroom project is nearly completed, and work is starting on the elevated path around the lake; and Human Relations Committee which plans to engage the public regarding recent distribution of anti-Semitic flyers in Huntington Beach and Orange County. CITY MANAGER’S REPORT Interim City Manager Sean Joyce called on Fire Chief Scott Haberle who provided a report on recent fire activity that damaged historic structures on the Wintersburg property off Warner Avenue in Huntington Beach. 33 Council/PFA Regular Minutes March 1, 2022 Page 10 of 18 CONSENT CALENDAR Mayor Pro Tem Posey pulled Consent Calendar Item #16, and Councilmember Carr pulled Items #19 and #20 for further discussion. 14. 22-150 Approved and Adopted Minutes A motion was made by Moser, second Posey to approve and adopt the City Council/Public Financing Authority regular meeting minutes dated February 15, 2022. The motion carried by the following vote: AYES: Peterson, Bolton, Posey, Delgleize, Carr, Moser, and Kalmick NOES: None 15. 22-015 Received and filed the City Clerk’s quarterly listing of professional services contracts filed in the City Clerk’s Office between July 1, 2021 and December 31, 2021 A motion was made by Moser, second Posey to receive and file the "List of Professional Services Contracts Approved by Department Heads and Submitted to the Office of the City Clerk during the period of July 1, 2021 and September 30, 2021;" and, receive and file the "List of Professional Services Contracts Approved by Department Heads and Submitted to the Office of the City Clerk during the period of October 1, 2021 and December 31, 2021." The motion carried by the following vote: AYES: Peterson, Bolton, Posey, Delgleize, Carr, Moser, and Kalmick NOES: None 16. 22-152 Adopted Resolution No. 2022-06 permitting the City Manager to execute all documents related to the Permanent Local Housing Allocation Program (PLHA) A motion was made by Posey, second Delgleize to adopt Resolution No. 2022-06, "A Resolution of the City Council of the City of Huntington Beach Authorizing the Application and Adopting the PLHA Plan for Permanent Local Housing Allocation Program" authorizing the City Manager position or his/her designee to execute all documents related to the PLHA program. The motion carried by the following vote: AYES: Peterson, Bolton, Posey, Delgleize, Carr, Moser, and Kalmick NOES: None 17. 21-853 Approved and executed a Site License Agreement between New Cingular Wireless (AT&T) and the City of Huntington Beach for a wireless communication facility located at Fire Station 6 - Edwards A motion was made by Moser, second Posey to approve and authorize the Mayor and City Clerk to execute the "Site License Agreement for Installation and Use of a Communications Antenna Facility and 34 Council/PFA Regular Minutes March 1, 2022 Page 11 of 18 Supporting Equipment Between the City of Huntington Beach and New Cingular Wireless PCS, LLC" for the telecommunications facility at Fire Station 6 - Edwards based on the terms and conditions as presented herein. The motion carried by the following vote: AYES: Peterson, Bolton, Posey, Delgleize, Carr, Moser, and Kalmick NOES: None 18. 22-110 Accepted the lowest responsive and responsible bid and authorized execution of a construction contract with Palp, Inc. dba Excel Paving Company (Excel Paving) in the amount of $291,600 for the Flow Line Half Round Inlet Drainage Structures Project, CC-1676 A motion was made by Moser, second Posey to accept the most responsive and responsible bid submitted by Excel Paving in the amount of $291,600; and, authorize the Mayor and City Clerk to execute a construction contract in a form approved by the City Attorney. The motion carried by the following vote: AYES: Peterson, Bolton, Posey, Delgleize, Carr, Moser, and Kalmick NOES: None 19. 22-151 Approved Finance Commission Request to Discuss and Review the City’s Master Fee and Charges Schedule Councilmember Carr shared her opinion that this issue was already addressed in December 2018 and January 2019, and called on Chief Financial Officer Dahle Bulosan to explain the need to repeat extensive staff time for another review at the request of the Finance Commission. CFO Bulosan explained that every 3 to 5 years a comprehensive study is made in conjunction with the services of a consultant to review all fees to ensure they are based on accurate costs. He stated the last comprehensive study was completed in the 2016/2017 fiscal year, and added there have been incremental updates since that time. In addition to determining accurate labor costs, there is also analysis to determine what other agencies charge and this proposal would focus on the Consumer Price Index (CPI) especially in light of the recent pressures of inflation. Mayor Delgleize shared her recollection that the 2016/17 FY comprehensive report was an eye opener, and stated her support for this item. Councilmember Mosher confirmed with CFO Bulosan that focusing on CPI would not be overwhelming regarding staff time and would not cost anywhere near $30,000, therefore she supports the item. Mayor Pro Tem Posey stated his support for an annual market check, and added that soon Council will task the Finance Commission for a thorough and comprehensive Design-Build-Finance-Operate- Maintain (DBFOM) analysis, and he speculated that financial issues related to cannabis would also require Finance Commission time. Councilmember Kalmick confirmed with CFO Bulosan that the Finance Department asked for this review. 35 Council/PFA Regular Minutes March 1, 2022 Page 12 of 18 A motion was made by Carr, second Peterson to direct staff to review the Master Fees and Charges Schedule and review the results with Finance Commission for input and recommendations prior to City Council consideration. The motion carried by the following vote: AYES: Peterson, Bolton, Posey, Delgleize, Carr, Moser, and Kalmick NOES: None 20. 22-149 Approved and authorized execution of a Professional Services Contract with Townsend Public Affairs (TPA), Inc. for Legislative Advocacy and Grant Management Services Councilmember Carr stated she pulled this item to limit the contract to one (1) year versus the traditional 3-year contact, and added she would like to see TPA become more of a partner with the City of Huntington Beach by participating in the Strategic Planning Session so they are aware of Council's goals and objectives, as well as expecting TPA to be more aware of and help Huntington Beach acquire available State funding. Councilmember Mosher stated her support for Councilmember Carr's comments. Councilmember Bolton stated her support for proof of an effective public policy partnership, especially when the cost is $7,500 per month. Mayor Pro Tem Posey stated his opinion that $7,500 is not really a lot of money for a political consultant, and noted that the Inter-governmental Relations Committee (IRC) that interfaces with TPA will consist of all new members next year. He encouraged each Councilmember to become involved in communicating with TPA this next year to ease that transition. Mayor Delgleize suggested that Councilmembers who go to any meetings in Sacramento this year also become aware of other public policy organizations and check them out. Councilmember Peterson stated he has never had any issues with TPA, whether he was on the IRC or not, but a productive relationship requires each Councilmember to reach out to them. He added that the consultant needs to have Council's goals and parameters and with that information, he believes TPA has always performed well for Huntington Beach. Councilmember Peterson also stated his opinion that using TPA for at least two years would benefit Huntington Beach knowing the IRC will consist of all new members next year. Councilmember Carr stated her opinion that this conversation would not be needed if TPA had met past expectations, and it is appropriate to give them another chance. Assistant City Manager Travis Hopkins clarified that this is a new contract, not an extension of a previous contract. A motion was made by Carr, second Moser to approve and authorize the Mayor and City Clerk to execute a "Professional Services Contract between the City of Huntington Beach and Townsend Public 36 Council/PFA Regular Minutes March 1, 2022 Page 13 of 18 Affairs, Inc. for On-Call Legislative Advocacy and Grant Management Services," as amended to reduce contract term from three to one year. The motion as amended carried by the following vote: AYES: Bolton, Posey, Delgleize, Carr, Moser, and Kalmick NOES: Peterson 21. 22-153 Adopted Ordinance No. 4234 Approving Zoning Text Amendment (ZTA) No. 21-006 establishing electric vehicle charging station sign standards Approved for introduction Feb. 15, 2022 – Vote: 7 – 0 A motion was made by Moser, second Posey to adopt City Council Ordinance No. 4234, "An Ordinance of the City of Huntington Beach Amending Chapter 233 of the Huntington Beach Zoning and Subdivision Ordinance Establishing Electric Vehicle Charging Station Sign Standards (Zoning Text Amendment No. 21-006)." The motion carried by the following vote: AYES: Peterson, Bolton, Posey, Delgleize, Carr, Moser, and Kalmick NOES: None ADMINISTRATIVE ITEMS 22. 22-123 Approved Withdrawal of Previous City Council Approval of the Edison Park Reconfiguration Conceptual Plan Interim City Manager Sean Joyce introduced Community and Library Services Director Chris Slama who presented a Power Point titled Edison Park Conceptual Plan, with slides entitled: Project Purpose, Project Timeline, Community Outreach Summary (2), Current Configuration, Edison Park Conceptual Plan - November 19, 2021, Additional Feedback, Conceptual Plan - Option C, Current Situation, Recommended Actions, Next Steps, and Questions? A motion was made by Peterson, second Kalmick to withdraw the November 16, 2021 City Council approval of the final Edison Park Reconfiguration Conceptual Plan; and, direct staff to conduct further community outreach and additional review and analysis of the Conceptual Plan, and return to City Council. The motion carried by the following vote: AYES: Peterson, Bolton, Posey, Delgleize, Carr, Moser, and Kalmick NOES: None 23. 22-141 Approved and authorized a First Amendment to the Exclusive Negotiating Agreement (ENA) with Surf City Partners, LLC for 21 Main Street at the Huntington Beach Pier Interim City Manager Joyce introduced Community Services Director Ursula Luna-Reynosa who introduced Economic Development Manager Kriss Cassanova to present a PowerPoint communication 37 Council/PFA Regular Minutes March 1, 2022 Page 14 of 18 titled 21 Main Street - First Amendment - Exclusive Negotiating Agreement between City and Surf City Partners, LLC, with slides entitled: 21 Main Street - Background, 21 Main Street - ENA, Request to Expand Property Area, Replacement of Exhibit A - Property Description, Next Steps, and Questions? Councilmember Peterson asked how approving this item is fair to the other groups who responded to the original Request for Quote (RFQ) based on utilizing only the original building. He stated his opinion that the project should be rebid because of the apparent change in scope, and expressed concerns about the appearance of favoritism. He and Director Luna-Reynosa discussed whether any of the regulatory agencies are aware of the request for use of the expanded space, and the anticipation this will not change the Pier's public fishing space. A motion was made by Posey, second Kalmick to approve and authorize the Mayor and City Clerk to execute the "First Amendment Exclusive Negotiating Agreement Between City of Huntington Beach and Surf City Partners, LLC" to expand the property area to include the pier restroom building and surrounding area as part of the 21 Main Street property description. The motion carried by the following vote: AYES: Bolton, Posey, Delgleize, Carr, Moser, and Kalmick NOES: Peterson 24. 22-162 Approved proposed City Council Sponsored Initiative Regarding Cannabis Business Tax Interim City Manager Sean Joyce introduced Senior Administrative Analyst Grace Yoon-Taylor who presented a PowerPoint communication titled Cannabis Business Tax Ballot Measures with slides entitled: Background - City of Huntington Beach, Background - Continued, Special Tax vs. General Tax (2), Proposed Tax Rates, Cannabis Business Tax Measure - Special Tax, Timeline for June Election as Special Tax, and Recommended Actions (2). Councilmember Kalmick thanked both Analyst Yoon-Taylor and Chief Assistant City Attorney Vigliotta for their extensive time devoted to this project. He stated that in reality, the Finance Commission would recommend the actual tax rate, and approving this item provides an opportunity for the residents to decide whether or not to proceed. Councilmember Kalmick stated his opinion that any election costs will be recouped; the $300,000 to $600,000 potential revenue is very conservative; and placing this item on the June ballot creates the opportunity for proper regulation by the City, rather than allowing the industry to present their pro-industry option to the voters. Councilmember Carr stated her support for Councilmember Kalmick's comments, and belief that approving this item for the June ballot is the proper way to proceed. She further stated her support for where the generated funds will be directed, and appreciation for the ability to determine the actual tax rate in the future. Councilmember Peterson stated his support for taking the time to bring a complete ordinance before the voters that contains all of the facts, including amount of proposed tax. He further stated, in light of the fact that the industry will not be able to get a tax amount on the June ballot, further supports his recommendation to place a comprehensive item on the November ballot. Councilmember Peterson added his opinion that proceeding in this manner should prevent making the errors of other cities, who had to backtrack because of their haste. 38 Council/PFA Regular Minutes March 1, 2022 Page 15 of 18 Mayor Pro Tem Posey stated his support of Councilmember Peterson's comments, and thanked Analyst Yoon-Taylor, and public speaker Michael Moussalli for his recent tour and industry education. Mayor Pro Tem Posey stated his belief that City Council must stay ahead of this issue, and his support for a more complete package being presented to the voters that includes tax specifics. He confirmed he is keeping his mind open and appreciates the dialogue. Councilmember Moser stated her support for the comments of Councilmembers Carr and Kalmick. She further stated her opinion that making it possible to vote in June keeps the voters and Council in the driver's seat on this issue. Mayor Delgleize confirmed with Councilmember Kalmick that proceeding with a June vote will not limit options for the November vote. Councilmember Kalmick added that having voter consensus in June will guide how Council proceeds, and may or may not result in another vote in November. Councilmember Bolton confirmed with Chief Assistant City Attorney Vigliotta that a June ballot initiative would also designate where the special tax revenue is used, and therefore has her support. City Attorney Michael Gates clarified that a "special tax" initiative which defines revenue use, can be placed on either the June or the November ballot. Councilmember Kalmick reiterated that the final ordinance will clearly define the tax criteria and rates, that the item must receive two-thirds (2/3) voter approval and that funding for public safety and homeless issues is very important. Mayor Pro Tem Posey and Councilmember Kalmick discussed whether any proposed tax rate would be applied globally to all cannabis products, or if there might be a different tax rate for different product types. Councilmember Kalmick added that State regulations on the THC component would have to be considered. A motion was made by Kalmick, second Carr to adopt Resolution No. 2022-07, "A Resolution of the City Council of the City of Huntington Beach, California calling for a Special Election to place a special tax measure on the June 7, 2022 Statewide Primary election ballot for the submission to the qualified voters of proposed Ordinance No. 22-XX adding Chapter 3.25 to Title 3 of the Huntington Beach Municipal Code, establishing a tax on cannabis businesses within the City of Huntington Beach; requesting full election services from the County of Orange to conduct said election; and setting rules and deadlines for arguments and rebuttals for and against the Ordinance including designating council to draft arguments; and, direct staff to schedule a future meeting date at which the City Council can further consider the implications of various unresolved policy/regulatory matters associated with cannabis, after which time the City Attorney can prepare and return to the City Council for its consideration, a regulatory ordinance regarding cannabis regulations for City Council adoption or voter approval; and authorize a General Fund appropriation of up to $450,000 in Account 10010201.69505 for the OC Registrar of Voters to cover all associated election costs related to placing the measure on the June 7, 2022 ballot. Additionally, Council authorized its members Bolton, Carr and Kalmick to file a direct argument in favor of the measure. The motion carried by the following vote: AYES: Bolton, Delgleize, Carr, Moser, and Kalmick NOES: Peterson, and Posey 39 Council/PFA Regular Minutes March 1, 2022 Page 16 of 18 ORDINANCES FOR ADOPTION 25. 22-092 Adopted Interim Urgency Ordinance No. 4249 amending the Huntington Beach Zoning and Subdivision Ordinance to establish objective standards for urban lot splits and housing units constructed in accordance with Senate Bill 9 SIX AFFIRMATIVE VOTES ARE REQUIRED TO ADOPT THIS ORDINANCE PER GOVERNMENT CODE SECTION 65858 Interim City Manager Sean Joyce introduced Community Development Director Ursula Luna-Reynosa, who introduced Jennifer Villasenor, Deputy Community Development Director to present a PowerPoint communication titled Senate Bill 9 Interim Urgency Ordinance with slides entitled: Request, SB 9 Qualifying Criteria, Urban Lot Split Criteria, SB 9 Regulations, Proposed Objective Standards, Local Ordinance Objective Standards (2), and Recommendation & Next Steps. Mayor Delgleize confirmed with Director Luna-Reynosa that nearly every city in Orange County is dealing with this issue, and Director Luna-Reynosa thanked City Attorney Michael Gates and his staff for their immense help by reviewing existing ordinances and drafting objective standards that are appropriate for Huntington Beach. Mayor Pro Tem Posey stated his appreciation for this comprehensive ordinance and especially the design component, which he fully supports. There was further discussion to confirm that solar panel directives meet the standards in the current Building Code. For the benefit of the public, Mayor Pro Tem Posey stated that if this ordinance was not adopted, the City would then become subject to the full force of SB 9; and adopting this ordinance allows for maintaining local control. Councilmember Kalmick confirmed that SB 9 is not applicable if a Home Owner Association (HOA) has Covenants, Conditions and Restrictions (CC&Rs) that prohibit lot splits, or if a lot is in the appealable section of the Coastal Zone. He stated that the real purpose of SB 9 is to allow homeowners to build additional housing on their current property, and the City would get Regional Housing Needs Assessment (RHNA) credit for affordable housing. Councilmember Kalmick stated that this Interim Urgency Ordinance would ensure new building would remain cohesive with existing neighborhoods. Director Luna-Reynosa confirmed that there have been a number of inquiries from homeowners in all areas of the City interested in utilizing SB 9 for expansion and asking how to do it. Councilmember Peterson expressed appreciation for staff addressing parking and a design element in this ordinance. He confirmed with Director Luna-Reynosa that the ordinance will become effective immediately if approved by Council, and once the permanent regulations are prepared, the regulations will go through the Planning Commission and back to Council. Councilmember Moser thanked staff for their efforts on this ordinance, and noted that "intent to occupy" will require the development of an enforcement mechanism. Mayor Delgleize and Deputy Director Villasenor discussed several of the exemptions listed such as flood zones, and Mayor Delgleize stated Council needs to continue to do their best to ensure maintaining as much local control as possible. 40 Council/PFA Regular Minutes March 1, 2022 Page 17 of 18 A motion was made by Posey, second Moser to, after City Clerk reads by title, adopt Urgency Ordinance No. 4249, "An Interim Ordinance of the City Council of the City of Huntington Beach Adding Chapter 237 to Title 23 of the Huntington Beach Zoning and Subdivision Ordinance to Provide Objective Standards for Urban Lot Splits and Housing Units Built in Accordance with Senate Bill 9, Declaring the Urgency Thereof, and Making a Finding of Exemption Under CEQA." The motion carried by the following vote: AYES: Peterson, Bolton, Posey, Delgleize, Carr, Moser, and Kalmick NOES: None COUNCILMEMBER ITEMS 26. 22-166 Approved Item submitted by Mayor Pro Tem Posey and Councilmember Carr - Establishing a Memorial for Officer Nicholas Vella Mayor Pro Tem Posey introduced this item, explaining that he had already spoken with Newport Beach Councilmember Will O'Neill, Mayor Kevin Muldoon, and Interim City Manager Joyce had spoken with Newport Beach City Manager Grace Leung, who have all stated their support for this effort. Mayor Pro Tem Posey stated this incident reminds us of the real danger Police Officers face every day, and this is an appropriate way to remind people of that fact. Councilmember Carr stated it has been nearly 50 years since a Huntington Beach Officer has fallen in the line of duty. She thanked Mayor Pro Tem Posey for starting the conversation with Newport Beach and stated this is a small token of the City's appreciation for Officer Vella's service to the community. Mayor Pro Tem Posey also noted there is only one official donation link for Officer Vella at https://porac.org/fundraiser/support-officer-vella-his-family/. A motion was made by Posey, second Carr to ask staff to work collaboratively with the City of Newport Beach to determine all associated logistics with the development of a memorial for Officer Nicholas Vella at or near the crash site. Furthermore, staff will inform Officer Vella's family regarding the proposed memorial and seek their input throughout the process to ensure that it is reflective of his life and his commitment to public safety. The motion carried by the following vote: AYES: Peterson, Bolton, Posey, Delgleize, Carr, Moser, and Kalmick NOES: None COUNCILMEMBER COMMENTS (Not Agendized) Mayor Pro Tem Posey thanked Public Speaker Michael Moussalli for providing a tour of his Se7enLeaf facility; reported attending the OCTax Annual Meeting and providing a City of Huntington Beach Housing Update to the Building Industry Association Government Affairs Committee. Councilmember Carr reported participating in the Point-In-Time Count, Everyone Counts, on February 22, and gave a huge shout-out to Huntington Beach Officer Carsten, a member of the Homeless Task 41 Council/PFA Regular Minutes March 1, 2022 Page 18 of 18 Force, for escorting the Count team and knowing the name of each homeless person they spoke with. She also noted that the Navigation Center has already made a huge difference in the community. Councilmember Moser reported speaking at a 5th Grade Scout meeting at Moffett Park; reminded everyone of the Saturday, March 5th Blood Drive at City Hall; reported the Human Relations Committee hosting a cultural cinema showcase for Black History Month on HBTV, as well as a live audience screening night at Huntington Beach Central Library on Thursday, March 24th; and, remembered retired K-9 Officer Marco who retired from the HBPD in Dec 2021, and passed a few days ago. Councilmember Moser asked for a moment of silence for peace in Ukraine. Councilmember Bolton reported attending a Roundtable hosted by Orange County Human Relations where people were encouraged to respond to hate incidents by letting the targeted know they are not alone, and to articulate what the community expects in terms of standards. She reported making a visit to Vista View Middle School and answered student questions. Mayor Delgleize shared her pleasure at joining Garden Grove Mayor Jones for the final meeting of the year for OCTax; attending the Huntington Beach Chamber of Commerce Best of 2021 Awards ceremony; acknowledged Orange County Sheriff's Officer Don Barnes for a contribution to Officer Vella's memorial fund; and noted the Assistance League's children's books give-a-way, and Treasures by the Sea 2022 fundraising event on Saturday, March 26, 2022. ADJOURNMENT – at 10:04 PM to the next regularly scheduled meeting of the Huntington Beach City Council/Public Financing Authority on Tuesday, March 15, 2022, at 4:00 PM in the Civic Center Council Chambers, 2000 Main Street, Huntington Beach, California. INTERNET ACCESS TO CITY COUNCIL/PUBLIC FINANCING AUTHORITY AGENDA AND STAFF REPORT MATERIAL IS AVAILABLE PRIOR TO CITY COUNCIL MEETINGS AT http://www.huntingtonbeachca.gov _______________________________________ City Clerk and ex-officio Clerk of the City Council of the City of Huntington Beach and Secretary of the Public Financing Authority of the City of Huntington Beach, California ATTEST: ______________________________________ City Clerk-Secretary ______________________________________ Mayor-Chair 42 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-169 MEETING DATE:3/15/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO:Honorable Mayor and City Council Members SUBMITTED BY:Sean Joyce, Interim City Manager VIA:Sean Crumby, Director of Public Works PREPARED BY:Chris Davis, Senior Administrative Analyst Subject: Approve the West Orange County Water Board (WOCWB) proposed budget for Fiscal Year 2022/23 with the City of Huntington Beach amount of $1,036,594 Statement of Issue: The City is a member of the West Orange County Water Board (WOCWB) Joint Powers Authority. All individual member agencies of the WOCWB are required to approve their share of the proposed WOCWB budget for Fiscal Year (FY) 2022/23 before it is adopted by the Board as a whole. Financial Impact: The City’s share of the proposed FY 2022/23 WOCWB budget of $1,627,000 is $1,036,594, which is comprised of $57,222 for the annual operating budget, $418,372 for the City’s share of the loan repayment for the OC-35 Pipeline Relocation Project, and $561,000 for the Cathodic Protection Program. The FY 2022/23 proposed operating budget is included in Water Fund business unit 50685801. The debt service and the Cathodic Protection Program are included in the Water Master Plan business unit 50785999. Recommended Action: Approve the WOCWB proposed budget for FY 2022/23 with the City of Huntington Beach share being $1,036,594. Alternative Action(s): Do not approve the proposed budget and direct staff accordingly. Analysis: The WOCWB is a Joint Powers Authority comprised of the cities of Garden Grove, Seal Beach, Westminster and Huntington Beach for the purpose of purchasing water from the Municipal Water District of Orange County and transporting it via the OC-9 and OC-35 transmission mains. The transmission mains and associated appurtenances are owned by the Joint Powers cities, of which City of Huntington Beach Printed on 3/9/2022Page 1 of 2 powered by Legistar™43 File #:22-169 MEETING DATE:3/15/2022 the City of Huntington Beach owns 56.1 percent. WOCWB is governed by five elected officials, including one each from the cities of Garden Grove, Seal Beach and Westminster, and two from the City of Huntington Beach: Council Members Dan Kalmick and Natalie Moser. The General Manager of the WOCWB (the City of Huntington Beach Deputy Director of Public Works -Utilities) submits a proposed budget to the Board at mid-year for review by the Board. Each member agency must approve its share of the budget before the Board approves the budget as a whole, prior to the beginning of the new fiscal year. The proposed budget for FY 2022/23 is $1,627,000 and is comprised of the following: ·Operating Budget - funding for maintenance, electricity and administrative costs ($102,000); ·Debt Service - funding for repayment of the OC-35 Pipeline Relocation Project reimbursement agreement with the Orange County Transportation Authority ($525,000); and ·Cathodic Protection Program - funding to extend the lifespan of both the OC-9 and OC-35 transmission mains ($1,000,000) The Board reviewed the proposed budget at the January 19, 2022 regular meeting as an information item. Upon approval by each agency, the Board will consider approval of the budget at its next regular meeting scheduled for April 20, 2022. Included as attachments are the WOCWB Proposed FY 2022/23 Budget and Agency Contributions to receive and file. Environmental Status: Not applicable Strategic Plan Goal: Infrastructure & Parks Attachment(s): 1. West Orange County Water Board Proposed FY 2022/23 Budget 2. West Orange County Water Board Proposed FY 2022/23 Agency Contributions City of Huntington Beach Printed on 3/9/2022Page 2 of 2 powered by Legistar™44 WEST ORANGE COUNTY WATER BOARD PROPOSED FISCAL YEAR 2022/23 BUDGET FY 21/22 Approved FY 22/23 Proposed ACCOUNT NUMBER ACCOUNT DESCRIPTION OPERATING EXPENSES 50885101.61200 Electricity $4,500 $4,500 50885101.64620 Contracts for Repairs and Maintenance $50,000 $30,000 PLC Design for SCADA $25,000 $25,000 Vault (2) Refurbishment $20,000 $20,000 50885101.69345 Auditing $5,500 $5,500 50885101.69375 Attorney Fees $2,500 $2,500 50885101.69365 Other Contract Services $2,000 $0 50885101.73010 General/Liability Insurance $9,500 $9,500 50885101.75400 Board Stipend Expense $2,500 $2,500 50885101.79100 Contingency $2,500 $2,500 50885101.82100 Cathodic Protection $1,000,000 $1,000,000 OPERATING EXPENSES $1,124,000 $1,102,000 NON OPERATING EXPENDITURES 50885102.88010 Debt Service*$525,000 $525,000 TOTAL $1,649,000 $1,627,000 *Cities of Huntington Beach and Seal Beach for OC-35 realignment project loan January 10, 2022 45 FISCAL YEAR 2022/23 PROPOSED BUDGET AGENCY CONTRIBUTIONS ACCOUNT NUMBER AGENCY OWNERSHIP PERENTAGE FY 22/23 COST 50800508.46610 Huntington Beach 56.1 $618,222 50800508.46620 Garden Grove 4.2 $46,284 50800508.46630 Seal Beach 14.3 $157,586 50800508.46640 Westminster 25.4 $279,908 Totals 100.0 $1,102,000 50800508.46610 Huntington Beach 56.1 $418,372 50800508.46620 Garden Grove*4.2 $0 50800508.46630 Seal Beach 14.3 $106,628 50800508.46640 Westminster*25.4 $0 Totals 100.0 $525,000 50800508.46610 Huntington Beach 56.1 $1,036,594 50800508.46620 Garden Grove*4.2 $46,284 50800508.46630 Seal Beach 14.3 $264,214 50800508.46640 Westminster*25.4 $279,908 Total Budget $1,627,000 Operating Budget (Including Cathodic Protection) Fourth Year OC-35 Relocation Project Loan Payment Total Adopted Budget *Garden Grove and Westminster have paid off their portions of the loan January 10, 2022 46 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-002 MEETING DATE:3/15/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO:Honorable Mayor and City Council Members SUBMITTED BY:Robin Estanislau, CMC, City Clerk PREPARED BY:Robin Estanislau, CMC, City Clerk Subject: Reaffirm adoption of Resolution No. 2021-62 finding a proclaimed state of emergency continues to impact the ability to meet safely in person, and allows meetings of the City Council and all City boards, commissions and committees to be conducted remotely as needed in compliance with new Brown Act provisions identified in Assembly Bill 361 Statement of Issue: On September 16, 2021, Governor Newsom approved Assembly Bill 361 (Rivas) that amends the Ralph M. Brown Act to include a new authorization that allows all local agencies to host remote meetings and remote public comments. The authorization, which largely extends the provisions of the Governor’s Executive Order N-29-20 (approved March 17, 2020) and Executive Order N-35-20 (approved March 21, 2020), is in effect until January 1, 2024. To comply with the new provisions identified in AB 361, the City Council adopted Resolution No. 2021-62 finding a proclaimed state of emergency continues to impact the ability to meet safely in person, and allows meetings of the City Council and all City boards, commissions and committees to be conducted remotely as needed due to health and safety concerns for the public. Financial Impact: Not applicable. Recommended Action: Reaffirm Resolution No. 2021-62, “A Resolution of the City Council of the City of Huntington Beach, California, finding that the proclaimed state of emergency continues to impact the ability to meet safely in person.” Alternative Action(s): Do not reaffirm Resolution No. 2021-62 and direct staff accordingly. Analysis: A provision of Assembly Bill 361 requires local agencies to verify every 30 days that the exemption from traditional teleconference requirements is still necessary. Specifically, the legislative body must City of Huntington Beach Printed on 3/9/2022Page 1 of 2 powered by Legistar™47 File #:22-002 MEETING DATE:3/15/2022 make findings no later than 30 days after the first teleconference and every 30 days thereafter that: ·The legislative body has reconsidered the state of emergency circumstances; and ·Either i) the state of emergency continues to directly impact the ability of the members to meet safely in person, or ii) state or local officials continue to impose or recommend measures to promote social distancing. If necessary, the City will continue to make appropriate findings at least every 30 days to ensure compliance with this verification requirement of Assembly Bill 361 until its sunset date of January 1, 2024. Environmental Status: Not applicable. Strategic Plan Goal: Non Applicable - Administrative Item Attachment(s): 1. Resolution No. 2021-62 2. Assembly Bill 361 City of Huntington Beach Printed on 3/9/2022Page 2 of 2 powered by Legistar™48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-023 MEETING DATE:3/15/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO:Honorable Mayor and City Council Members SUBMITTED BY:Sean Joyce, Interim City Manager VIA:Sean Crumby, Director of Public Works PREPARED BY:Jacob Aube, Senior Civil Engineer Subject: Adopt Resolution 2022-01 ordering the Summary Vacation of a Storm Drain Easement at 18431 Beach Boulevard and 18455 Beach Boulevard; and, authorize recordation Statement of Issue: The Public Works Department requests that the City Council adopt a resolution to summarily vacate a storm drain easement at 18431 and 18455 Beach Boulevard pursuant to Division 9, Part 3, Chapter 4 of the California Streets and Highways Code commencing with Section 8334(a). Public notice is not required for a summary vacation of a public service easement. Financial Impact: Not applicable. Recommended Action: A) Adopt Resolution 2022-01, “A Resolution of the City Council of the City of Huntington Beach Ordering the Summary Vacation of a Storm Drain Easement on Property Located at 18431 Beach Boulevard and 18455 Beach Boulevard;” and, B) Authorize the Director of Public Works to determine a specific date to instruct the City Clerk to record the said Resolution and attached exhibits with the Orange County Recorder. Alternative Action(s): Deny the recommended action. Analysis: The properties at 18431 Beach Boulevard and 18455 Beach Boulevard have an existing storm drain easement over a portion of their sites that was dedicated to the City of Huntington Beach per parcel map filed in Book 76, Page 4 of parcel maps, in the office of the Orange County Recorder. This storm drain easement is used for the public storm drain system that serves the existing catch City of Huntington Beach Printed on 3/9/2022Page 1 of 2 powered by Legistar™66 File #:22-023 MEETING DATE:3/15/2022 basin on Beach Boulevard. With the development of the 18431 Beach Boulevard property for Jamboree Housing, a new public storm drain with associated easement will be constructed and the existing storm drain abandoned to accommodate the development. As a result of the public storm drain abandonment, the storm drain easement must be vacated. Upon vacation of the excess storm drain easement, the right to the underlying land would revert back to the fee owner of the properties. The vacation of the storm drain easement (public service easement) does not require a Planning Commission Approval for General Plan Conformance under Government Code Section No. 65402. Unlike the general street vacation process, the summary vacation of a public service easement does not have public noticing requirements, nor does it require a separate public hearing prior to the City Council taking action. Environmental Status: The proposed project is categorically exempt pursuant to Class V: Alterations in Land Use Limitations, sub-section (a) Minor street, alley, and utility easement vacations, of Resolution No. 4501 of the City of Huntington Beach. Categorically Exempt. Strategic Plan Goal: Non Applicable - Administrative Item Attachment(s): 1. Resolution of the City Council of the City of Huntington Beach Ordering the Summary Vacation of a Storm Drain Easement on Property Located at 18431 Beach Boulevard and 18455 Beach Boulevard. 2. New City of Huntington Beach Storm Drain Easement Replacing the Existing Storm Drain Easement. City of Huntington Beach Printed on 3/9/2022Page 2 of 2 powered by Legistar™67 68 69 70 71 72 73 74 75 76 77 78 79 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:21-666 MEETING DATE:3/15/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO:Honorable Mayor and City Council Members SUBMITTED BY:Sean Joyce, Interim City Manager VIA:Sean Crumby, Director of Public Works PREPARED BY:Alvin Papa, Deputy Director of Public Works Subject: Adopt Resolution No. 2022-05 approving the City of Huntington Beach Sewer System Management Plan (SSMP) Update Statement of Issue: Per State Water Resources Control Board (State Water Board) Order No. 2006-003-DWQ, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems (Order), the City of Huntington Beach is required to develop, implement, and adopt a written SSMP. Financial Impact: Adoption of the SSMP does not require funding. Programs described in the SSMP are included in the Sewer Service Fund (511) and Sewer Development Fund (210) approved budgets. Recommended Action: Adopt Resolution No. 2022-05, “A Resolution of the City Council of the City of Huntington Beach Updating the Sewer System Management Plan.” Alternative Action(s): Do not approve the recommended action and direct staff accordingly. Analysis: The City of Huntington Beach owns, operates, and maintains a wastewater collection system comprised of approximately 360 miles of wastewater pipelines and 27 sewer lift stations that transport a combined, estimated 20.3 million gallons of wastewater per day. The size of these pipelines range from 6 to 30 inches in diameter and convey the wastewater to Orange County Sanitation District regional trunk lines for wastewater treatment and resource recovery at Reclamation Plant No. 1 in Fountain Valley or Treatment Plant No. 2 in Huntington Beach. On May 2, 2006, the State Water Board adopted the Order that required all public entities that own or City of Huntington Beach Printed on 3/9/2022Page 1 of 2 powered by Legistar™80 File #:21-666 MEETING DATE:3/15/2022 operate sanitary sewer systems greater than 1 mile in length to develop and implement a system- specific SSMP. The SSMP serves as a document that describes the activities an agency uses to manage its wastewater collection system effectively. The required elements of an SSMP include the following: 1. Goals 2. Organization 3. Legal Authority 4. Operations and Maintenance Program 5. Design and Performance Provisions 6. Overflow Emergency Response Plan 7. Fats, Oils, and Grease (FOG) Control Program 8. System Evaluation and Capacity Assurance Plan (SECAP) 9. Monitoring, Measurement, and Program Modifications 10. Program Audits 11. Communications To be effective, the SSMP includes provisions to provide proper and efficient management, operation, and maintenance of our sanitary sewer system while also taking into consideration risk management and cost benefit analysis. The SSMP also contains a spill response plan that establishes standard procedures for immediate response to an SSO in a manner designed to minimize water quality impacts and potential nuisance conditions. To ensure long-term program effectiveness, the SSMP includes provisions for monitoring, measurement, and program modifications for each required program element. On April 6, 2009, City Council adopted Resolution No. 2009-20 approving the City of Huntington Beach SSMP to comply with the Order. As part of the Order, the SSMP must be updated every five years, and needs to include any significant program changes. Adoption of this resolution approves the City of Huntington Beach SSMP Update that City staff will submit to the State Water Board for re- certification. Environmental Status: Not applicable. Strategic Plan Goal: Non Applicable - Administrative Item Attachment(s): 1. Sewer System Management Plan Update 2. Resolution No. 2022-05 City of Huntington Beach Printed on 3/9/2022Page 2 of 2 powered by Legistar™81 City of Huntington Beach Sewer System Management Plan 1 Sewer System Management Plan City of Huntington Beach, Public Works Department California State Water Resources Control Board Order No. 2006-003-DWQ PREPARED BY: CITY OF HUNTINGTON BEACH PUBLIC WORKS DEPARTMENT 2000 MAIN STREET HUNTINGTON BEACH, CA 92648 MARCH 2022 82 City of Huntington Beach Sewer System Management Plan 2 Contents EXECUTIVE SUMMARY .......................................................................................................................... 6 Background ............................................................................................................................................... 6 City Service Area and Sewer System ....................................................................................................... 6 Purpose and Need ..................................................................................................................................... 6 Organization of the SSMP ........................................................................................................................ 6 About the SSMP ....................................................................................................................................... 7 PROHIBITIONS AND PROVISIONS ......................................................................................................... 8 Prohibitions ............................................................................................................................................... 8 Provisions .................................................................................................................................................. 8 SECTION 1 – GOALS ............................................................................................................................... 12 Purpose and Need ................................................................................................................................... 12 Goals ....................................................................................................................................................... 12 SECTION 2 – ORGANIZATION .............................................................................................................. 14 Authorized Representative ...................................................................................................................... 14 Management and Administration ............................................................................................................ 14 Maintenance ............................................................................................................................................ 15 Chain of Communications ...................................................................................................................... 16 Organization Chart .................................................................................................................................. 18 SECTION 3 – LEGAL AUTHORITY ....................................................................................................... 19 Prevention of illicit discharges ................................................................................................................ 19 Require that sewers and connections be properly designed and constructed .......................................... 19 Ensure access .......................................................................................................................................... 20 Limit the discharge of fats, oils, and greases .......................................................................................... 20 Enforce any violation of its sewer ordinances ........................................................................................ 21 Compliance Documents .......................................................................................................................... 21 SECTION 4 – OPERATIONS AND MAINTENANCE ............................................................................ 22 General Information ................................................................................................................................ 22 Mapping .................................................................................................................................................. 23 Preventative Maintenance ....................................................................................................................... 27 Line Cleaning ...................................................................................................................................... 28 Lift Station Maintenance ..................................................................................................................... 29 Manhole Monitoring System .............................................................................................................. 30 Closed Circuit Television Program ..................................................................................................... 32 83 City of Huntington Beach Sewer System Management Plan 3 Sewer Lateral Program........................................................................................................................ 33 Rehabilitation and Replacement Plan ..................................................................................................... 33 Training ................................................................................................................................................... 35 Equipment and Replacement .................................................................................................................. 36 SECTION 5 – DESIGN AND PERFORMANCE PROVISIONS ............................................................. 38 Design and Construction Standards and Specifications, and Standards for the Inspection and Testing of New Sewer Facilities .............................................................................................................................. 38 “GREENBOOK” Standard Specifications for Public Works Construction, latest edition ................. 38 City of Huntington Beach Standard Plans, Section 500 ..................................................................... 38 City of Huntington Beach Sewer Master Plan .................................................................................... 38 City of Huntington Beach Sewer Lift Station Design Manual ........................................................... 38 Standard Plans and Specifications for Private Sewer Lift Stations ..................................................... 39 Compliance Documents .......................................................................................................................... 39 SECTION 6 – OVERFLOW EMERGENCY RESPONSE PLAN ............................................................ 40 Compliance Documents .......................................................................................................................... 41 SECTION 7 – FATS, OILS, AND GREASE CONTROL PROGRAM .................................................... 42 FOG Program Development and Implementation .................................................................................. 42 Assessment of Sources of Sanitary Sewer Overflows (SSOs) ................................................................ 43 Inventory of Grease Producing Food Service Establishments ................................................................ 43 Adoption of FOG Ordinance .................................................................................................................. 43 Adoption of Fee Resolution .................................................................................................................... 44 Identifying Resources & Staff to Develop and Implement the FOG Control Program .......................... 44 Implementation of FOG Control Inspection Program ............................................................................ 44 Identification of FSEs to Enroll in FOG Control Inspection Program ................................................ 45 Inspection of FSEs in the FOG Control Inspection Program .............................................................. 45 Minimum FOG Best Management Practices (BMPs) ......................................................................... 45 Outreach to the Public ......................................................................................................................... 45 Record Keeping and Reporting ........................................................................................................... 46 Compliance Documents ...................................................................................................................... 46 SECTION 8 – SYSTEM EVALUATION AND CAPACITY ASSURANCE PLAN ............................... 47 Evaluation ........................................................................................................................................... 47 Design Criteria .................................................................................................................................... 48 Capacity Enhancement Measures ....................................................................................................... 48 Schedule .............................................................................................................................................. 49 SECTION 9 – MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS ................... 50 84 City of Huntington Beach Sewer System Management Plan 4 Performance Measure Identification ................................................................................................... 50 Goals ................................................................................................................................................... 50 Organization ........................................................................................................................................ 51 Legal Authority ................................................................................................................................... 51 Operation and Maintenance Program ................................................................................................. 51 Overflow Emergency Response Program (OERP) ............................................................................. 52 Fats, Oils and Grease (FOG) Control Program ................................................................................... 52 Design and Performance Provisions ................................................................................................... 52 System Evaluation and Capacity Assurance Plan (SECAP) ............................................................... 52 Monitoring, Program Modifications and Program Audits .................................................................. 52 Communication Program .................................................................................................................... 52 Program Modification Plan ................................................................................................................. 53 SECTION 10 – SSMP PROGRAM AUDITS ............................................................................................ 54 Compliance Summary ............................................................................................................................. 54 Schedule of Program Audits and Updates .............................................................................................. 54 SSMP Audit and Update Schedule ......................................................................................................... 54 Program Audit and Update Process ........................................................................................................ 54 SECTION 11 – COMMUNICATIONS ...................................................................................................... 56 Compliance Summary ............................................................................................................................. 56 Compliance Documents .......................................................................................................................... 56 ABBREVIATIONS / ACRONYMS ........................................................................................................... 57 APPENDICES ............................................................................................................................................ 59 APPENDIX A - SWRCB Order No. 2006-003 .......................................................................................... 60 APPENDIX B - Municipal Codes .............................................................................................................. 61 APPENDIX C - Enhanced Cleaning Locations .......................................................................................... 62 APPENDIX D - Sewer Lateral Program ..................................................................................................... 63 APPENDIX E - Certifications .................................................................................................................... 64 APPENDIX F - Sewer Master Plan (2003) ................................................................................................ 65 APPENDIX G - Sewer Capacity Analysis (2009) ...................................................................................... 66 APPENDIX H - Sewer Lift Station Priority List ........................................................................................ 67 APPENDIX I - Overflow Response Plan ................................................................................................... 68 APPENDIX J - FOG Impact Study............................................................................................................. 69 APPENDIX K - FOG Training Manual ...................................................................................................... 70 85 City of Huntington Beach Sewer System Management Plan 5 86 City of Huntington Beach Sewer System Management Plan 6 EXECUTIVE SUMMARY Background On May 2, 2006, the State Water Board adopted Water Quality Order 2006-0003-DWQ, Statewide Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (Order) which required that every public agency in California with more than one (1) mile of sanitary sewers that collect and/or convey untreated or partially treated wastewater to a publicly owned treatment facility in the State of California are required to prepare a Sewer System Management Plan (SSMP) outlining the management, operation, and maintenance practices needed to prevent and mitigate the impact of sanitary sewer overflows (SSOs). Public agencies that meet this criteria are required to develop a system-specific SSMP per the provisions set forth in the WDR and comply with Monitoring and Reporting Program (MRP) attached therein. A copy of the Order, along with the Amended MRP for Sanitary Sewer Overflows, MRP Order WQ 2013-0058-EXEC (Amended MRP), is included in Appendix A. City Service Area and Sewer System The City of Huntington Beach (City) is a coastal city in Orange County covering approximately 28.33 square miles. According to the United States Census Bureau, the City holds an estimated population of 199,223 residents as of July 1, 2019. The City’s wastewater collection system consists of approximately 360 miles of City-owned sewer lines and 27 sewer lift stations, which transport a combined, estimated 20.3 million gallons of wastewater per day. Regarding service laterals, the City is responsible for the maintenance and repair of the lower portion of the service laterals located within the City public right-of- way from the property line to the connection at the City’s sewer main. Purpose and Need The purpose of the City’s SSMP is to document system-specific activities utilized by the City to effectively operate, maintain, and manage its wastewater collection system to reduce the number and frequency of SSOs. This approach will in turn decrease the risk to human health and environment caused by SSOs. The SSMP includes provisions for proper and efficient management, operation, and maintenance, while also taking into consideration risk management and cost benefit analysis. The SSMP also contains a SSO response plan that establishes standard procedures for immediate response to an SSO in a manner designed to minimize water quality impacts and potential nuisance conditions. Organization of the SSMP The structure of this document follows the section numbering and nomenclature specified in the WDR. The SSMP includes eleven elements as listed below: i. Goals ii. Organization iii. Legal Authority iv. Operations and Maintenance Program v. Design and Performance Provisions vi. Overflow Emergency Response Plan vii. Fats, Oils and Grease (FOG) Control Program viii. System Evaluation and Capacity Assurance Plan ix. Monitoring, Measurement, and Program Modifications 87 City of Huntington Beach Sewer System Management Plan 7 x. SSMP Program Audits xi. Communication Program About the SSMP The SSMP serves as the City’s guidance document to ensure compliance with the various provisions of the Order and provides references to supporting documentation. Appendices within the SSMP contain reference information and support materials. Due to physical constraints, some references, i.e. large format drawings, relational databases, voluminous documents, etc., are not physically included in the SSMP. In these instances, documents links and references have been provided within the SSMP to indicate the type, owner, and location of the reference and support material. The City’s first SSMP was completed and certified by the City Council in 2005, with an update to the SSMP conducted in 2009. This document constitutes the latest update to the SSMP and reflects current information on the City’s sewer system management, operation, and maintenance programs. Per the requirements of the Order, this SSMP was developed by technically qualified and experience personnel. Update of this SSMP has been conducted by the City of Huntington Beach Department of Public Works per the requirements of the Order and the Amended MRP. 88 City of Huntington Beach Sewer System Management Plan 8 PROHIBITIONS AND PROVISIONS Prohibitions (In accordance with Section C of the Order) 1. Any SSO that results in a discharge of untreated or partially treated wastewater to waters of the United States is prohibited. 2. Any SSO that results in a discharge of untreated or partially treated wastewater that creates a nuisance as defined in California Water Code Section 13050(m) is prohibited. Provisions (In accordance with Section D of the Order) 1. The Enrollee must comply with all conditions of this Order. Any noncompliance with this Order constitutes a violation of the California Water Code and is grounds for enforcement action. 2. It is the intent of the State Water Board that sanitary sewer systems be regulated in a manner consistent with the general WDRs. Nothing in the general WDRs shall be: i. Interpreted or applied in a manner inconsistent with the Federal Clean Water Act, or supersede a more specific or more stringent state or federal requirement in an existing permit, regulation, or administrative/judicial order of Consent Decree; ii. Interpreted or applied to authorize an SSO that is illegal under either the Clean Water Act, an applicable Basin Plan prohibition or water quality standard, or the California Water Code; iii. Interpreted or applied to prohibit a Regional Water Board from issuing an individual NPDES permit or WDR, superseding this general WDR, for sanitary sewer system, authorized under the Clean Water Act or California Water Code; or iv. Interpreted or applied to supersede any more specific or more stringent WDRs or enforcement order issued by a Regional Water Board. 3. The Enrollee shall take all feasible steps to eliminate SSOs. In the event that an SSO does occur, the Enrollee shall take all feasible steps to contain and mitigate the impacts of an SSO. 4. In the event of an SSO, the Enrollee shall take all feasible steps to prevent untreated or partially treated wastewater from discharging from storm drains, flood control channels or waters of the United States by blocking the storm drainage system and by removing the wastewater from the storm drains. 5. All SSOs must be reported in accordance with Section G of the general WDRs. 6. In any enforcement action, the State and/or Regional Water Boards will consider the appropriate factors under the duly adopted State Water Board Enforcement Policy. And, consistent with the Enforcement Policy, the State and/or Regional Water Boards must consider the Enrollee’s efforts to contain, control, and mitigate SSOs when considering the California Water Code Section 1327 factors. In assessing these factors, the State and/or Regional Water Boards will also consider whether: 89 City of Huntington Beach Sewer System Management Plan 9 i. The Enrollee has complied with the requirements of this Order, including requirements for reporting, developing and implementing a SSMP; ii. The Enrollee can identify the cause or likely cause of the discharge event; iii. There were no feasible alternatives to the discharge, such as temporary storage or retention of untreated wastewater, reduction of inflow and infiltration (I&I), use of adequate backup equipment, collecting and hauling of untreated wastewater to a treatment facility, or an increase in capacity of the system as necessary to contain the design storm event identified in the SSMP. It is inappropriate to consider the lack of feasible alternatives, if the Enrollee does not implement a periodic or continuing process to identify and correct problems. iv. The discharge was exceptional, unintentional, temporary, and caused by factors beyond the reasonable control of the Enrollee; v. The discharge could have been prevented by the exercise of reasonable control described in a certified SSMP for: • Proper management, operation and maintenance; • Adequate treatment facilities, sanitary sewer system facilities, and/or components with an appropriate design capacity, to reasonably prevent SSOs (e.g., adequately enlarging treatment or collection facilities to accommodate growth, I&I , etc.); • Preventive maintenance (including cleaning and FOG control); • Installation of adequate backup equipment; and • I&I prevention and control to the extent practicable. vi. The sanitary sewer system design capacity is appropriate to reasonably prevent SSOs. vii. The enrollee took all reasonable steps to stop and mitigate the impact of the discharge as soon as possible. 7. When a sanitary sewer overflow occurs, the Enrollee shall take all feasible steps and necessary remedial actions to 1) control or limit the volume of untreated or partially treated wastewater discharged, 2) terminate the discharge, and 3) recover as much of the wastewater discharged as possible for proper disposal, including any wash down water. The Enrollee shall implement all remedial actions to the extent they may be applicable to the discharge and not inconsistent with an emergency response plan including the following: i. Interception and rerouting of untreated or partially treated wastewater lows around the wastewater line failure; ii. Vacuum truck recovery of sanitary sewer overflows and wash down water; iii. Cleanup of debris at the overflow site; iv. System modifications to prevent another SSO at the same location; v. Adequate sampling to determine the nature and impact of the release; and vi. Adequate public notification to protect the public from exposure to the SSO. 90 City of Huntington Beach Sewer System Management Plan 10 8. The Enrollee shall properly manage, operate, and maintain all parts of the sanitary sewer system owned or operated by the Enrollee, and shall ensure that the system operators (including employees, contractors, or other agents) are adequately trained and possess adequate knowledge, skills and abilities. 9. The Enrollee shall allocate adequate resources for the operation, maintenance, and repair of its sanitary sewer system, by establishing a proper rate structure, accounting mechanisms, and auditing procedures to ensure an adequate measure of revenues and expenditures. These procedures must be in compliance with applicable laws and regulations and comply with generally acceptable accounting practices. 10. The Enrollee shall provide adequate capacity to convey base flows and peak flows, including flows related to wet weather events. Capacity shall meet or exceed the design criteria as defined in the Enrollee’s System Evaluation and Capacity Assurance Plan for all parts of the sanitary sewer system owned or operated by the Enrollee. 11. The Enrollee shall develop and implement a written Sewer System Management Plan (SSMP) and make it available to the State and/or Regional Water Board upon request. A copy of this document must be publicly available at the Enrollee’s office and/or available on the Internet. This SSMP must be approved by the Enrollee’s governing board at a public meeting. 12. In accordance with the California Business and Professions Code sections 6735, 7835, and 7835.1 all engineering and geologic evaluations and judgments shall be performed by or under the direction of a registered professional, competent and proficient in the fields pertinent to the required activities. Specific elements of the SSMP that require professional evaluation and judgments shall be prepared by or under the direction of appropriately qualified professionals, and shall bear the professionals signature and stamp. 13. The mandatory elements of the SSMP are specified below. However, if the Enrollee believes that any element of this section is not appropriate or applicable to the Enrollee’s sanitary sewer system, the SSMP program does not need to address that element. The Enrollee must justify why that element is not applicable. The SSMP must be approved by the deadline listed in the SSMP Time Schedule below. The SSMP includes eleven elements as listed below. Each of these elements forms a section of this document that contains detailed information regarding each element. i. Goals ii. Organization iii. Legal Authority iv. Operation and Maintenance Program v. Design and Performance Provisions vi. Overflow Emergency Response Plan vii. FOG Control Program viii. System Evaluation and Capacity Assurance Plan 91 City of Huntington Beach Sewer System Management Plan 11 ix. Monitoring, Measurement, and Program Modifications x. SSMP Program Audits xi. Communication Program 14. Discharges Caused by Other Factors – For SSOs other than those covered under these provisions, the Permittee may establish an affirmative defense to an action brought for noncompliance if the discharger demonstrates through properly signed, contemporaneous operating logs, or other relevant evidence that: i. The Permittee can identify the cause or likely cause of the discharge event; ii. The discharge was exceptional, unintentional, temporary, and caused by factors beyond the reasonable control of the permittee; iii. The discharge could not have been prevented by the exercise of reasonable control, such as proper management, operation and maintenance, preventive maintenance; or installation of adequate backup equipment; and iv. The Permittee took all reasonable steps to stop, and mitigate the impact of, the discharge as soon as possible. 92 City of Huntington Beach Sewer System Management Plan 12 SECTION 1 – GOALS This chapter describes the goals of the Sewer System Management Plan (SSMP). The goal of the SSMP is to provide a plan and schedule to properly manage, operate, and maintain all parts of the sanitary sewer system. That will help reduce and prevent SSOs, as well as mitigate any SSOs that do occur. Purpose and Need The City is required to comply with Order No. 2006-0030-DWQ on General Waste Discharge Requirements, the 2013 Amended MRP, and any future amendments for publicly owned sewage collection agencies having more than one (1) mile of collection pipelines. The goal of the SSMP is to serve as a guidance document for City staff. It provides a documented plan that describes all wastewater collection activities and programs employed by the City to ensure proper management of all wastewater collection system assets. Implementing the SSMP helps reduce and prevent SSOs, as well as mitigate any SSOs that do occur, including meeting all applicable regulatory notification and reporting requirements. Goals As a living and sustainable document, the SSMP is regularly reviewed and updated to address any changes to the City’s needs. The City’s current SSMP goals are as follows: a. Protect public health and the environment through proper management, operations, and maintenance of all portions of the City’s wastewater collection system; b. Provide needs-based maintenance, including line cleaning, closed-circuit television (CCTV) inspection and evaluation, sewer lift station maintenance, and repair, replacement, and rehabilitation of the City’s entire sanitary sewer system to prevent, reduce, or eliminate preventable SSOs. At a minimum, the City shall clean all of its sewer pipelines every two (2) years, and annually review its operation and maintenance practices and procedures; c. Maintain a CCTV Inspection Program to assess maintenance effectiveness and identify system deficiencies. CCTV re-inspections of the entire wastewater collection system, including manholes, shall be performed a minimum of every 5-10 years (10-20% per year). CCTV re-inspection videos are to replace current system inspection videos. Spot CCTV inspections will be conducted during line cleaning operations to ensure line cleaning quality. d. Respond to and mitigate all SSOs discharging from the City’s sanitary sewer system and provide accurate reporting of all SSOs as described by the Order and the Amended MRP; e. Properly fund, manage, operate, and maintain the City’s sanitary sewer system with adequately trained staff and/or contractors. Maintain adequate reserves for future sanitary sewer system rehabilitation and/or replacement. Periodically review the City’s Sewer Service Fee to ensure that the fee is adequate to fund the need of the City’s sanitary sewer system. 93 City of Huntington Beach Sewer System Management Plan 13 Also included are the following specific goals: a. Incorporate Standard Plans and Specifications for the development of privately owned sewer lift stations that discharge into the City’s wastewater collection system; b. Continue to improve the ability to provide real time monitoring to the City’s collection system. The first step in this process is to capture data from the City’s existing facilities by monitoring wastewater flow at key locations, such as sanitary sewer lift stations and select manholes; c. Regularly obtain flow data from the Orange County Sanitation District (OC San), for sewers downstream of Huntington Beach, in order to capture and trend overall sewage flows coming from the City; and d. Update the City’s Sewer Master Plan every ten (10) years to review for capacity for new developments, and changes in industry standards for design and operating capacity. 94 City of Huntington Beach Sewer System Management Plan 14 SECTION 2 – ORGANIZATION This chapter describes the City’s organization and chain of communication. The SSMP must identify: a. The name of the responsible or authorized representative as described in Section J of this Order; b. The names and telephone numbers for management, administrative, and maintenance positions responsible for implementing specific measures in the SSMP program. The SSMP must identify lines of authority through an organization chart or similar document with a narrative explanation; and c. The chain of communication for reporting SSOs, from receipt of a complaint or other information, including the person responsible for reporting SSOs to the State and Regional Water Board and other agencies if applicable (such as County Health Officer, County Environmental Health Agency, Regional Water Board, and/or State Office of Emergency Services (OES)). Authorized Representative The authorized representative and Legally Responsible Official (LRO) for the City of Huntington Beach is Alvin Papa, Deputy Director of Public Works-Utilities. Management and Administration Sean Crumby, Director of Public Works, Alternate LRO, 714-374-5348 Under administration of the City Manager, the Director of Public Works is responsible for directing, planning, organizing, and managing the Public Works Department and its five (5) divisions: Administration, Engineering, Maintenance and Operations, Transportation, and Utilities. Alvin Papa, Deputy Director of Public Works – Utilities, LRO, 714-536-5503 Under administration of the Director of Public Works, the Deputy Director of Public Works-Utilities is responsible for directing, planning, organizing, and managing the Utilities Division and its five (5) sections: Wastewater, Water Distribution, Water Production, Water Quality, and Utilities Technology. The Deputy Director of Public Works-Utilities provides oversight to the Wastewater Supervisor who is the primary person responsible for implementing all sewer related operations and maintenance activities outlined within the SSMP. Chau Vu, Deputy Director of Public Works, 714-375-5345 Under administration of the Director of Public Works, the Deputy Director of Public Works is responsible for directing, planning, organizing, and managing the Engineering Division and Transportation Division. The Deputy Director of Public Works provides oversight to the City Engineer, who is responsible for engineering design and construction of all sewer related capital improvements, and to the Environmental Services Manager, who is responsible for the Fats, Oils, and Grease (FOG) Program, the Food Service Establishment (FSE) Inspection Program, and National Pollution Discharge Elimination System (NPDES) compliance citywide. 95 City of Huntington Beach Sewer System Management Plan 15 Tom Herbel, City Engineer, 714-375-5077 The City Engineer works under the administrative direction of the Deputy Director of Public Works and manages the Engineering Division. The City Engineer is responsible for the all engineering design, inspection, construction administration, surveying, right-of-way encroachment permitting, development plan review and approval processes. This work includes planning, design, and construction of all sewer related capital improvement program (CIP) projects. Five (5) full-time equivalent (FTE) engineering positions comprise the Water and Sewer Engineering Section and report directly to the City Engineer. Jim Merid, Environmental Services Manager, 714-374-1548 The Environmental Services Manager works under the administrative direction of the Deputy Director of Public Works and manages the Stormwater Quality Section. The Environmental Services Manager is responsible for the FOG Program, the FSE Inspection Program, and NPDES compliance citywide. Two (2) administrative environmental specialists report directly to the Environmental Services Manager. Maintenance Mark Birchfield, Wastewater Supervisor, 714-375-5041 Under general direction from the Deputy Director of Public Works-Utilities, the Wastewater Supervisor plans, supervises, and coordinates the operation, maintenance and repair of the City's wastewater and stormwater collection systems. This Wastewater Supervisor is responsible for exercising supervisory authority over field crews assigned to wastewater collection, transmission, and pumping systems, while the Wastewater Operations Crewleader determines daily priorities, issues assignments, and provides on-site training for personnel within the Wastewater Operations section. The Wastewater Supervisor also serves and the primary coordinator of the Citywide CCTV Inspection Program. Enrique Lemus, Wastewater Operations, Crewleader, (714) 375-5054 Under general supervision from the Wastewater Supervisor, oversees the work of crews in the maintenance and repair of sanitary sewer and storm drain systems. The Wastewater Operations Crewleader serves as the working supervisor who monitors and oversees the work of the section and crews, which includes SSO response and reporting. The Wastewater Operations Crewleader determines daily priorities, issues assignments, and provides on-site training for personnel within the Wastewater Operations section. Harry Bessa, Wastewater Leadworker, (714) 374-1706 Under general supervision from the Wastewater Operations Crewleader, performs a variety of skilled and semi-skilled tasks in the maintenance of the City's wastewater systems. Wastewater Operations Leadworkers differs from the Wastewater Operations Crewleader in that Wastewater Operations Leadworkers are responsible for coordinating and assigning the daily activities of other crewmembers This position is responsible for overseeing the maintenance activities of the sewer lift stations and response to/and immediate reporting of SSOs. 96 City of Huntington Beach Sewer System Management Plan 16 Paul Boucier, Wastewater Leadworker, (714) 916-8620 Under general supervision from the Wastewater Operations Crewleader, performs a variety of skilled and semi-skilled tasks in the maintenance of the City's wastewater systems. Wastewater Operations Leadworkers differs from the Wastewater Operations Crewleader in that Wastewater Operations Leadworkers are responsible for coordinating and assigning the daily activities of other crewmembers This position is responsible for overseeing the maintenance activities of the sewer line cleaning and response to/and immediate reporting of SSOs. This position is also responsible for leading CCTV inspections and evaluations for spot locations. Jason Jarosek, Wastewater Leadworker, (714) 375-5040 Under general supervision from the Wastewater Operations Crewleader, performs a variety of skilled and semi-skilled tasks in the maintenance of the City's wastewater systems. Wastewater Operations Leadworkers differs from the Wastewater Operations Crewleader in that Wastewater Operations Leadworkers are responsible for coordinating and assigning the daily activities of other crewmembers This position is responsible for overseeing the maintenance activities of the sewer lateral program and response to/and immediate reporting of SSOs. Chain of Communications During business hours, reports of SSO’s are initially referred to the Public Works Department, Utilities Division, followed by immediate communication to the Wastewater Supervisor, the Wastewater Operations Crewleader, or to a Wastewater Leadworker. After the initial report is received, a work order is generated in the Huntington Beach Service Management System (HBSMS) and a wastewater crew is dispatched to investigate and respond in accordance with the City’s Overflow Emergency Response Plan, e.g. Section 6 of the SSMP, included herein. The Wastewater Supervisor is responsible for immediately notifying the Orange County Health Care Agency (OCHCA), the Santa Ana Regional Water Quality Control Board (SARWQCB), California Office of Emergency Services (Cal-OES), and other agencies as applicable. The Wastewater Supervisor is also responsible for submitting the draft SSO report to the State and Regional Water Quality Control Boards via the California Integrated Water Quality System Project (CIWQS). The Wastewater Supervisor shall notify the Deputy Director of Public Works-Utilities immediately thereafter. The Deputy Director of Public Works-Utilities, via the Director of Public Works, is responsible for notifying the City Manager in instances where the SSO poses an immediate threat the public health and/or the environment. The Deputy Director of Public Works-Utilities, as LRO, will submit and certify the final SSO report to the State and Regional Water Quality Control Boards via CIWQS. After hours, SSO concerns are received by the City of Huntington Beach, Police Department, who notifies the Wastewater Crew stand-by personnel, and a wastewater crew is dispatched to investigate and respond in accordance with the City’s Overflow Emergency Response Plan, e.g. Section 6 of the SSMP. The Wastewater Leadworker is responsible for immediately notifying the Orange County Health Care Agency (OC HCA), the Santa Ana Regional Water Quality Control Board (SARWQCB), California Office of Emergency Services (Cal-OES), and other agencies as applicable. The Wastewater Leadworker shall notify the Wastewater Operations Crewleader and/or Wastewater Supervisor immediately thereafter. 97 City of Huntington Beach Sewer System Management Plan 17 If the SSO poses an immediate threat to public health and/or the environment, the Wastewater Leadworker, through the Wastewater Operations Crewleader and/or Wastewater Supervisor, shall notify the Deputy Director of Public Works-Utilities immediately. The Deputy Director of Public Works- Utilities, via the Director of Public Works, is responsible for immediately notifying the City Manager in instances where the SSO poses an immediate threat the public health and/or the environment. The next business day, the Wastewater Supervisor is responsible for collecting all information related to the SSO and submitting the draft SSO report to the State and Regional Water Quality Control Boards via the California Integrated Water Quality System Project (CIWQS). The Deputy Director of Public Works -Utilities, as LRO, will submit and certify the final SSO report to the State and Regional Water Quality Control Board via CIWQS. 98 City of Huntington Beach Sewer System Management Plan 18 Organization Chart 99 City of Huntington Beach Sewer System Management Plan 19 SECTION 3 – LEGAL AUTHORITY This chapter describes the legal authority required to implement the SSMP plans and procedures. Each Enrollee must demonstrate, through sanitary sewer system use ordinances, service agreements, or other legally binding procedures, that it possesses the legal authority to: a. Prevent illicit discharges into its sanitary sewer system (examples may include I/I, storm water, chemical dumping, unauthorized debris and cut roots, etc.); b. Require that sewers and connections be properly designed and constructed; c. Ensure access for maintenance, inspection, or repairs for portions of the lateral owned or maintained by the Public Agency; d. Limit the discharge of fats, oils, and grease and other debris that may cause blockages; and e. Enforce any violation of its sewer ordinances. Prevention of illicit discharges Resolution No. 2003-52 adopted the City’s 2003 Sewer Master Plan, which includes an analysis of the need for replacement of existing sewer facilities and construction of new facilities needed to serve new development and additional capacity demands. To deal with the uncertainty of future development at the time, extra pipeline capacity was added to allow for the possibility of actual wastewater flows being slightly higher than anticipated flows. The Sewer Master Plan also included probable locations of I&I to assist with future CIP project planning. Additionally, the pipe capacity criteria therein reserved a portion of the capacity for I&I, ventilation, and hydraulic instability. Municipal Code 14.36.030 requires submission of plans and specifications for new sewer mains and/or connections for approval by the Director of Public Works. As part of said approval, any new illicit connections are prohibited. Municipal Code 14.25.030, as well as Section 306.0 – 306.2 of the Uniform Plumbing Code, as adopted by Municipal Code 17.44, prohibits discharge of inflow other than sewage, which includes existing illicit connections. It should be noted that the City storm water infrastructure has low flow diversions (LFD) at most of its flood control stations. These LFDs are not considered illicit connections. A LFD is a structural system that diverts urban dry weather flow into the wastewater system for the purpose or reducing pollution in the ocean. Flow is only diverted during non-peak wastewater flow periods and is monitored and remotely controlled via supervisory control and data acquisition (SCADA) systems at each flood control station to ensure that the diverted stormwater flow remains within the wastewater collection systems operational capacity. In addition, LFDs are permitted by OC San to ensure regulatory and operational compliance with their wastewater collection system and wastewater treatment facility. Require that sewers and connections be properly designed and constructed Municipal Code 14.44.020 requires submission of plans and specifications for new sewer mains or connections for approval by the Director of Public Works. In addition, Municipal Code 12.10 adopts the Standard Specifications for Public Works Construction together with adopted Standard Plans of the Department of Public Works, as well as the Uniform Plumbing Code, as adopted by Municipal Code 17.44, outline design criteria and construction methods. 100 City of Huntington Beach Sewer System Management Plan 20 Ensure access The entire City’s wastewater collection system is already within the public right-of-way, on City-owned property, or within maintenance and access easements. For new developments, Municipal Code 14.36.030 requires submission of plans and specifications for new sewer mains or connections for approval by the Director of Public Works. Conditions of approval are written to require that ingress/egress for maintenance of the sewer main and any connecting laterals is provided. Maintenance and access easements are conditioned as needed to ensure adequate access for maintenance and repair of all sewer infrastructure. Regarding service laterals, the City took ownership of the portion of the sewer service laterals within the public right-of-way in 2008. As service laterals are repaired, replaced, and/or rehabilitated, clean-outs are being added at the public right-of-way as part of the Sewer Lateral Program to enhance and ensure access to all sewer service lateral connections. Limit the discharge of fats, oils, and greases In 2004, the City adopted Municipal Code 14.56, the Control and Regulation of Fats, Oils, & Grease (FOG Ordinance), and developed the FOG Control Program to address this element. Municipal Code 17.44 adopts the Uniform Plumbing Code, which requires the installation of a grease control device as required. Further, Section 306 of the Uniform Plumbing Code prohibits grease and other debris from entering the sewer system. In 2013, the FOG ordinance was revised by City staff and adopted by City Council. The major revisions to the FOG ordinance include: • FOG pre-treatment required for all existing FSEs that produce FOG upon change of ownership or change in operation which would involve the onsite cooking of beef, poultry, or fish; • FOG pre-treatment required for FSEs that undergo a remodel exceeding $50,000 in costs or involving one or a combination of the following: o Under slab plumbing in the food processing area; o 30% increase in the net public seating area; o 30% increase in the kitchen area; o Any changes in the size or type of food preparation equipment; • Clarification of language regarding employee training for FSEs in the FOG Control Inspection program. Revised ordinance requires existing employees to be trained at least once every six (6) months and all new-hires within two weeks of hire; and • Require periodic maintenance of private sewer laterals to prevent blockages; no more than 25% of sewer lateral capacity can be impacted. The FOG Control Program as coordinates with the Line Cleaning Program to add problematic FOG locations to the “Enhance Cleaning Locations” list to ensure more frequent cleaning of the sewer pipe at these problematic locations. Cleaning frequency is determined based on FOG severity at the location. 101 City of Huntington Beach Sewer System Management Plan 21 Enforce any violation of its sewer ordinances As adopted, the FOG ordinance gives the authority to the inspector to cite FSE’s that are found to be in violation of the FOG ordinance. City staff also has the authority to issue enforcement actions for SSOs under the City’s Storm Water and Urban Runoff Management ordinance (Municipal Code Section 14.25). Enforcement actions include Notice of Non-Compliance (formal written warning) that are issued for minor violations and Administrative Civil Citations, ranging from $125 to $1,000, that are issued for more severe or repeat violations. City staff also has the authority to issue Administrative Compliance Orders requiring the repair and/or replacement of private sewer laterals that are in poor condition due to structural deficiencies or lack of maintenance. Compliance Documents The aforementioned Municipal Codes are included in Appendix B, and can also be accessed on the City’s website at the following link: http://www.qcode.us/codes/huntingtonbeach/view.php?topic=municipal_code&frames=on Enhanced Cleaning Locations as part of the FOG Control Program is included in Appendix C. 102 City of Huntington Beach Sewer System Management Plan 22 SECTION 4 – OPERATIONS AND MAINTENANCE Per the Order, Enrollees shall properly manage, operate, and maintain all parts of the sanitary sewer system owned or operated by the Enrollee, and shall ensure that the system operators (including employees, contractors, or other agents) are adequately trained and possess adequate knowledge, skills, and abilities. The SSMP must include those elements listed below that are appropriate and applicable to the Enrollee’s system: a. Maintain an up-to-date map of the sanitary sewer system, showing all gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable storm water conveyance facilities; b. Describe routine preventive operation and maintenance activities by staff and contractors, including a system for scheduling regular maintenance and cleaning of the sanitary sewer system with more frequent cleaning and maintenance targeted at known enhanced cleaning service areas. The Preventative Maintenance (PM) program should have a system to document scheduled and conducted activities, such as work orders; c. Develop a rehabilitation and replacement plan to identify and prioritize system deficiencies and implement short-term and long-term rehabilitation actions to address each deficiency. The program will include regular visual and TV inspections of manholes and sewer pipes, and a system for ranking the condition of sewer pipes and scheduling rehabilitation. Rehabilitation and replacement should focus on sewer pipes that are at risk of collapse or prone to more frequent blockages due to pipe defects. Finally, the rehabilitation and replacement plan should include a capital improvement plan that addresses proper management and protection of the infrastructure assets. The plan shall include a time schedule for implementing the short- and long-term plans plus a schedule for developing the funds needed for the capital improvement plan; d. Provide training on a regular basis for staff in sanitary sewer system operations and maintenance, and require contractors to be appropriately trained; and e. Provide equipment and replacement part inventories, including identification of critical replacement parts. General Information The City of Huntington Beach is an urban city with a population of 199,223 residents, as of July 1, 2019 per the United States Census Bureau. The City encompasses approximately 17,730 acres, or 27.32 square miles, of which 97 percent is developed for residential, commercial, industrial, institutional, public, and street/highway use. Residential use is the largest single land use in the City. The City of Huntington Beach is surrounded by the City of Westminster to the north, the City of Fountain Valley to the northeast, the City of Costa Mesa to the east, the City of Newport Beach to the southeast, Sunset Beach to the northwest, and the Pacific Ocean to the west. Elevations vary from below sea level to approximately 200 feet above sea level. The City owns, operates, and maintains a wastewater collection system consisting of 27 sewer lift stations, 360 miles of sewer pipelines, and 10,091 manholes. Pipe sizes range from 4 to 30 inches in diameter, and collectively transport approximately 20.3 million gallons of wastewater a day. The lift 103 City of Huntington Beach Sewer System Management Plan 23 stations vary in capacity from approximately 80 to 1,800 gallons per minute, and assist in transporting roughly a third of the city’s wastewater. The remaining amount is conveyed via gravity flow. Mapping The requirement for this section is to maintain an up-to-date map of the sanitary sewer system showing all gravity line segments and manholes, pumping facilities, pressure pipes and valves, and storm water conveyance facilities. The City of Huntington Beach currently utilizes a Geographic Information System (GIS) based mapping system for its sanitary sewer system. The GIS database was developed to assist with compliance for GASB-34 requirements to inventory and assess the current value and depreciation of the sewer collection system. At a minimum, the following information is continuously maintained within the City’s GIS Utilities database for all public sewer lines and sewer manholes: a. Type of sewer pipe installed (e.g. vitrified clay, cast iron, etc.) b. Date of installation or replacement based on the date of record drawings c. Size of pipe (based on diameter in inches) d. Manhole rim invert elevations Detailed information is stored within the general description fields of the point and line elements of the Sewer GIS database as follows: Points Depth Depth of entity in inches Source Source of spatial accuracy (GPS, digital orthophoto, CAD, plans, field crew) SewerIndex Unique system index number EntityType Point feature entity (manhole, cleanout, plug/cap… etc.) DrawInfo Record drawing reference number in document imaging software (Laserfiche) Owner Owner (City, county, private… etc.) Arterial Yes/No value related to arterial lines DateAlter Date of spatial revision in GIS Lined Yes/No value for slip lining/sleeving LinedSource Source of lining information LinedYear Year of lining Problems Comments Lines SewerIndex Unique system index number Slope Slope of pipe GreaseCon Grease concentration for FOG study GreaseCln Grease cleaning for FOG study Deficient Deficient lines for FOG study FOGIndex FOG study index reference number FieldAtlas Rounded length of pipe segment 104 City of Huntington Beach Sewer System Management Plan 24 Diameter Diameter of pipe in inches SewerType Gravity, Force Main, Siphon DrawInfo Record drawing reference number in document imaging software (Laserfiche) DateRecorded Year of record drawing Owner Owner (City, county, private…etc.) Material Material of pipe (VCP, PVC, HDPE… etc.) Label For Atlas pipe labelling Arterial Yes/No value related to arterial lines DateAlter Date of spatial revision in GIS CCTV Yes/No value for CCTV camera inspection CCTVYear Year of latest inspection Lined Yes/No value for slip lining/sleeving LinedMaterial Lining material (PVC/CIPP) LinedSource Source of lining information LinedYear Year of lining PipeRunInsp Yes/No value for CCTV camera inspection documentation Calcium Yes/No value for calcium deposits from field crew All wastewater collection system GIS database information is housed and maintained by the Public Works GIS Section, who are overseen by the Utilities Technology Coordinator. The City’s wastewater collection system maps accurately reflect pipe locations and are useful tools for planning maintenance activities. The maps are checked by line cleaning crews as they are being used with any changes coordinated with GIS personnel and updated as needed. All updated information is submitted to the GIS section for correction on all future printed maps. In addition to the electronic database, the GIS Section also maintains up-to-date hardcopy map books for reference by maintenance field personnel. Copies of these hardcopy maps are also distributed to various departments citywide. Tract As-Built maps showing both the sanitary sewer system and storm drain systems are stored via document imaging with hardcopies housed in the Engineering Division of the Public Works Department for the City. The maps include the locations of manholes and their ID tags, siphons, easements, property parcels, pipelines, their depth and direction of flow, and other details. The GIS section also creates and maintain “atlas books” that serve to provide map reference of the City through “reporting districts”. Each reporting district is a half-mile by half-mile square that makes referencing easier for field personnel. Original sanitary sewer and storm drain system maps are owned and maintained by the Engineering Division of the Public Works Department. The documents supporting compliance with the requirements for mapping are as follows: • Tract Maps – available at the Engineering Division of the Public Works Department. • Sewer Atlas Maps – located within first responder’s vehicles, at the Public Works Utilities Yard, and at the Engineering Division of the Public Works Department. • Storm Drain Atlas Maps – located within first responder’s vehicles, at the Public Works Utilities Yard, and at the Engineering Division of the Public Works Department. • Sewer and Storm Drain GIS – Access available at City Hall and the Public Works Utilities Yard. • 2009 Sewer Master Plan– located at the Engineering Division of the Public Works Department. 105 City of Huntington Beach Sewer System Management Plan 25 The GIS Section also maintains the GIS information for the City’s storm drain system. Like the sewer atlas maps, the storm drain atlas maps are housed in the Engineering Division of the Public Works Department. Similar to the wastewater collection system maps, the storm drain system maps are regularly reviewed and updated as needed. The GIS databases can be accessed via the City’s intranet. These databases are maintained via nightly server backup by the City’s Information Services Division. Local copies of the databases are backup up on a monthly basis by the GIS Section. The hardcopy map books are available for reference either at City Hall, City Corporate Yard, City Utilities Yard, and the Emergency Operations Center. Copies of both the sewer atlas and storm drain atlas maps are kept in each Public Works maintenance field personnel/first responder’s vehicles and updated as needed. A sample copy of the digitized mapping data is attached (Figure III-1). 106 City of Huntington Beach Sewer System Management Plan 26 Figure III-1 – Sewer Facilities GIS Map (sample) 107 City of Huntington Beach Sewer System Management Plan 27 Preventative Maintenance The Order requires the City to describe routine preventive operation and maintenance activities by staff and contractors, including a system for scheduling regular maintenance and cleaning of the sanitary sewer system with more frequent cleaning and maintenance targeted at enhanced cleaning service areas. The Preventive Maintenance (PM) program should have a system to document scheduled and conducted activities, such as work orders. Funding for the operation and maintenance of the City’s sanitary sewer system is provided by the City’s sewer service fee. The sewer service fee was last adjusted the City Council in April 2019 and is dedicated to providing necessary funds for the sanitary sewer system. The Wastewater section is composed of 19 full time employees. The organizational structure of the section is as follows: Deputy Director of Public Works- Utilities Wastewater Supervisor Wastewater Crewleader LIFT STATIONS Wastewater Leadworker Senior Pump Mechanic Pump Mechanic COLLECTION SYSTEMS Wastewater Leadworker Equipment Operator (4) Maintenance Service Worker (6) SEWER LATERALS Wastewater Leadworker Equipment Operator Maintenance Service Worker 108 City of Huntington Beach Sewer System Management Plan 28 Line Cleaning Currently, the majority of the City’s sewer system is proactively cleaned with all gravity sewer pipe segments routinely cleaned and serviced every two (2) years. The Wastewater Section owns and operates one (1) hydro-jetter truck, one (1) hydro-jetter trailer, three (3) combination high-velocity, hydro-cleaning trucks, and one (1) CCTV equipped truck. Routine preventative maintenance of the Wastewater equipment is performed by the Fleet Maintenance Personnel in the Operations and Maintenance Division of the Public Works Department. Traffic control devices are established by the Equipment Operator and conform to the requirements of the latest California Manual on Uniform Traffic Control Devices (CA MUTCD) issued by the State of California, or the latest Work Area Traffic Control Handbook (WATCH) Manual. Line cleaning work is primarily performed by City forces with contractors utilized on an as-needed basis. Hydro-jetting is the primary method utilized to remove grease, roots, debris, and other obstructions from the sewer lines. When necessary, additional methods, such as the use of a chain-flail, are used to remove calcium buildup and other obstructions. The Leadworker is responsible for ensure the proper cleaning method used is appropriate for the type of sewer pipe being cleaned, i.e. vitrified clay pipe (VCP), polyvinyl chloride (PVC), etc. Sanitary sewer grit is disposed of in a grit chamber waste receptacle housed at the City Yard. It should also be noted that the City historically treats root cutting as a normal part of line cleaning operations. A root cutter is carried on one (1) of the four (4) hydro-jet cleaning trucks, and is routinely used in the field. In addition, a contractor is scheduled to treat certain root locations in two-year treatment cycles, as needed. At the beginning of each year, one of the Wastewater Leadworkers is assigned to manage the Line Cleaning Program and is responsible for scheduling line cleaning work for the rest of year. Under the general guidance of the Wastewater Crewleader, the Wastewater Leadworker develops a cleaning schedule that plans routine maintenance activities based on the results of the CCTV inspections, field observations, associated GIS data, and historical SSOs. Generally, work is planned by scheduling work via Reporting Districts (RD), and going from North to South and West to East. The Leadworker refers to progress made in the previous year as part of the planning process for scheduling of work in the current year. The three (3) cleaning crews generally follow the sewer system’s gravity flow, from the northeast part of the City to the southwest. Data gathered by CCTV inspections and entered into the GIS database is analyzed to establish the most effective cleaning schedule in each basin. Once the schedule is developed, the Wastewater Leadworker develops a cleaning schedule that includes an estimated breakdown on a day-by-day basis. Work is scheduled such that cleaning begins at the far upstream end of the sewer segment and proceeds in a downstream direction until all work on the subject sewer segment has been complete. In the event the crew cannot access a manhole for cleaning procedures, the Equipment Operator shall immediately notify the Leadworker and document the occurrence on their Daily Worksheet. Even with a regular cleaning schedule, some locations may still develop problems. These locations are placed on an “enhanced cleaning” location list and are cleaned more frequently. A list of the City’s enhanced cleaning locations is included in Appendix C. The frequency of the cleaning cycle varies based on the severity of the problem or the possible impact to the surrounding area. These cycles are 109 City of Huntington Beach Sewer System Management Plan 29 reviewed by Wastewater personnel during the cleaning of the line and adjusted as necessary to ensure the prevention of future blockages. The City currently has 235 enhanced cleaning locations and assigns two (2) full-time employees to their maintenance. Regarding documentation of schedule and conducted work activities, the City uses an in-house, computerized maintenance management system called HBSMS for recordkeeping and reporting purposes. These records are kept and maintained by the Wastewater Supervisor. Lift Station Maintenance The City’s 27 sewer lift stations are generally reliable. To maintain their reliability the City performs preventative maintenance on daily, monthly, quarterly, and yearly schedules. Lift stations are inspected weekly at a minimum. This includes visual inspection of all lift stations, exercising of valves and replacement of worn parts. Based on system design and capacity, some stations may require more frequent inspections. In addition to scheduled visits, emergency maintenance is performed on an as needed basis. Lift station maintenance and repair is performed by a combination of City forces and specialty contractors. Wet wells are typically pumped down and cleaned at least four (4) times a year, or more often if necessary to prevent solids and grease build-up. Inspection of pumps (submersible and dry) and impellers are typically performed quarterly, but may be adjusted depending on pump motor hours. Inspection and exercising of all gate and check valves are also performed quarterly to ensure proper working order. Cleaning and inspection of transducers and back-up floats are performed six (6) times a year to ensure proper performance. Inspection of lighting and alarm systems are performed weekly. Alarm system inspections and repairs are coordinated with the Utilities Technology Coordinator. Hour meters on each motor is reviewed with lead pumps alternated at least weekly. A logbook of motor hour readings, dates, and maintenance performed is kept at each station. It is the responsibility of staff to enter any work performed at the station prior to leaving the station. A quarterly inspection of all electrical motor control equipment is performed to identify poor connections and worn parts. This inspection includes infrared testing and panel maintenance. Inspection work is performed by the City Electrician or an appropriately licensed Contractor. Any deficiencies are reported to the Wastewater Supervisor for attention. For emergency situations, the City owns 14 portable generators and five (5) onsite, emergency generators to provide power to the sewer lift stations in the event of an unforeseen power failure and/or planned SCE outages. A copy of the SCE Rotating Outages Map is included in Figure IV-1. As part of routine weekly inspections, the onsite emergency back-up generator is visually inspected. At least quarterly, the generator is operated under load to ensure proper operation per operating permit requirements. This test conducted by tripping power to the station and observing a successful transfer to generator power for at least 15 minutes. The City’s warehouse maintains adequate stock of essential parts and equipment along with additional pumps and motors for all 27 sewer lift stations. Each lift station is design to be redundant and can handle normal incoming flows with only one pump. The secondary pump is utilized if the primary pump fails to operate, or is down for repair. The Wastewater Section owns two (2) 6-inch bypass pumps and six (6) 3- inch bypass pumps available for emergency use. 110 City of Huntington Beach Sewer System Management Plan 30 Float switches are also set up to run the pumps in the event of a control panel failure. Lastly, an automated telemetry system monitors the stations 24-hours a day and reports any potential issues to standby personnel. At the beginning of each year, one of the Wastewater Leadworkers is assigned to manage the Lift Station Program and is responsible for scheduling lift station cleaning to ensure continued and proper operation. Under the general guidance of the Wastewater Crewleader, the Wastewater Leadworker develops a cleaning schedule and/or repair schedule that plans routine maintenance activities based proactive, preventative maintenance practices the help reduce costs and increase equipment reliability and lifespan. Regarding documentation of schedule and conducted work activities, the City uses an in-house, computerized maintenance management system called HBSMS for recordkeeping and reporting purposes. These records are kept and maintained by the Wastewater Supervisor. As part of lift station inspections the following information is collected: date, time, initials of City personnel or contractor performing inspection, meter/hour readings for each pump-motor, general appearance, any maintenance and/or repairs performed, date of maintenance and/or replacement of pump and equipment, and other remarks as needed for future reference. In addition, all work performed is recorded in a written “Daily Log” that is collected and compiled by the Leadwork at the end of the year. The Annual Daily Log Book for each year is kept for a minimum of five (5) years, or per the City’s Record Retention Policy, whichever is longer in duration. Manhole Monitoring System The City of Huntington Beach, Utilities Division installed 27 Smart Cover with sensor technology at strategic locations in the sewer system pipelines to generate an alert with any potential capacity constraints and manholes with potential for vandalism or illegal dumping. The sensors trigger alarms in the case of surcharging beyond preset levels or in the case of intrusion. The Smart Covers are placed in areas with historic high maintenance and at the area of first discharge proximate to a lift station. Maintenance is performed in accordance with manufacturer’s recommendations and is contracted out directly to the Smart Cover vendor. Maintenance is performed on an annual basis and involved inspection of the unit and replacement of the battery. Defective units are replaced and/or repaired on an as-needed basis. Replacement/repair records are kept and maintained by the Wastewater Supervisor. 111 City of Huntington Beach Sewer System Management Plan 31 Figure IV-1 – SCE Rotating Outages Map 112 City of Huntington Beach Sewer System Management Plan 32 Closed Circuit Television Program The Wastewater Supervisor oversees the CCTV Inspection Program. All CCTV inspection work is completed by certified National Association of Sewer Service Companies (NASSCO) Pipeline Assessment and Certification Program (PACP) trained operator(s) using established PACP coding and observations. The City intends to CCTV its entire system over the next five (5) years via Contractors, with the long-term goal of updating Citywide CCTV inspections every 5-10 years. Based upon these CCTV inspections and evaluations, routine maintenance is tailored to meet the actual needs of the system including updating the City’s capital improvement program (CIP) for system rehabilitation and replacement. The City owns, operations, and maintains one (1) CCTV truck for localized CCTV inspections or sewer pipeline. The Leadworker overseeing the Line Cleaning Program also serves as the lead coordinator of the CCTV crew. For large-scale CCTV inspections, certified Contractors are used. Prior to CCTV inspection, sewers are cleaned by removing grit, loose solids, grease, and any construction debris that are present. Cleanings are typically completed within 72 hours, and no less than one hour, prior to inspection. The City crew and/or Contractor traps all debris at the downstream manhole and properly disposes of debris within the pipeline. All CCTV cameras have pan-and-tilt capabilities with a minimum of 460 lines of resolutions and meet Cal-OSHA requirements for operating in the sanitary sewer environment. Video inspection is conducted at a rate that does not exceed a traverse rate of 30 feet per minute. Video inspections for each pipe segment, e.g., manhole to manhole, are identified with an initial test screen and completed in accordance with PACP standards with inspection and reported submitted in a NASSCA-compatible format. All observations and defects are documented in a database that included the digital video recordings and digital photographs. Each video clip and photograph provided corresponds to inspection data in the database and is properly linked to the appropriate video clip and photos. The severity of each defect or observation is recorded and rated using PACP codes as outlined in NASSCO’s PACP Reference Manual. A minimum of two (2) photographs of each defect is taken, one (1) with a perspective view and one (1) with a close-up view. One (1) photograph is required for each lateral connection looking directly at the connection and from each manhole, from the bottom of the manhole looking up. Digital photographs in JPEG format are made for all recorded defect observations. JPEG images are captured at a minimum resolution of 640x480 pixels per inch. At a minimum, all photographs shall be named consisting of the following descriptions: “from manhole station number”, “to manhole station number”, and eight digit inspection date. After CCTV inspections are complete, as submittal review package consisting of a hard drive or DVD(s) and printed report is prepared. The hard drive or DVD(s) contain the inspection database, videos, and photo files. The printed report contains the footage calibration report for each camera used and PACP certificate copies for all CCTV equipment operators. Once the final review is complete, a final report and submittal is prepared that includes all video recordings, image files, and databases on a maximum of 20 DVDs or one (1) external hard drive. If a hard drive is submitted, the submittal shall include the power cord and USB connection cable. DVDs or the external hard drive, binder cover, and binder spine label shall include the following computer- generated labels: Public Works Utilities Division – Wastewater Section, City Crew or Contractor Name, Project Name, Start Date of CCTV Inspections, and Finish Date of CCTV Inspections. 113 City of Huntington Beach Sewer System Management Plan 33 Sewer Lateral Program The City of Huntington Beach has a Sewer Lateral Program which has been in place since January 2008. Per Section 14.54.035 Maintenance and Repair of the Huntington Beach Municipal Code, the: City will pay the cost of repair and maintenance of all lateral lines from the City- owned sewer main through the public right-of-way to the private property line. The owner is responsible for all costs of repair and maintenance of all lateral lines on private property not within the public right-of-way. Historically, it was the property owner’s responsibility maintain and repair the entire sewer lateral up to the point of connection to the public sewer main. This differed from standard municipal practice where cities take full or partial responsibility for maintaining the public portion of the lateral, with the property owner responsible for the private side of the lateral. In January 2008, the Municipal Code was updated to match standard municipal practice and transferred responsibility for maintaining the public portion of the lateral from the main to the property line to the City of Huntington Beach. The Sewer Lateral Program is a response driven program that facilitates the repair or replacement of sewer laterals on an as-needed basis. As part of the Sewer Lateral Program, homeowners experience problems with their sewer lateral can notify the Public Works Department, Utilities Division, to coordinate a repair. CCTV inspection of the sewer lateral is conducted by the property owner as part of the investigation process. Depending on the situation, there are typically two options for repair, e.g. slip lining or lateral replacement, which is completed by City forces. As part of the repair, tree roots are cut and a sewer cleanout is added at the property line, typically just behind the sidewalk. The sewer cleanout designates the transition between the public and private portion of the sewer lateral and facilitates easier maintenance in the future. The City is responsible for the replacement, repair, and/or lining of the portion of the sewer within the public right-of-way. Any sewer replacement, repair, and/or lining on private property remains the responsibility of the owner. The Sewer Lateral Program is scheduled on a daily basis by the Leadworker under the general oversight of the Wastewater Crewleader. A four (4) man crew with four (4) service trucks, one (1) backhoe, and one (1) trailer-jetter implement the Sewer Lateral Program four (4) days a week, 10 hours per day. All maintenance and repair work conducted as part of the Sewer Lateral Program is documented via the City’s HBMS Work Order Management System. A copy of the Sewer Lateral Program and procedure is included in Appendix D. Rehabilitation and Replacement Plan Every Enrollee is responsible for developing a rehabilitation and replacement plan to identify and prioritize system deficiencies and implement short-term and long-term rehabilitation actions to address each deficiency. The program should include regular visual and CCTV inspections of manholes and sewer pipes, and a system for ranking the condition of sewer pipes and scheduling rehabilitation. The rehabilitation and replacement plan should include a CIP that addresses proper management and protection of the infrastructure assets. The plan shall include a time schedule for implementing the short- and long-term plans plus a schedule for developing the funds needed for the capital improvement plan. The City has an adopted Sewer Master Plan dated May 2003 that was recently updated by the firm of Kennedy-Jenks Consultants. The Sewer Master Plan evaluates the comprehensive condition of the 114 City of Huntington Beach Sewer System Management Plan 34 Wastewater system including lines and equipment. Update of the City’s Sewer Master Plan is currently planned to start in 2022 with completion scheduled for Summer 2023. Per the current Sewer Master Plan, the City’s primary collection system generally appears to have adequate hydraulic capacity. The short term rehabilitation and replacement plan is focused primarily on sewer lift station replacement and sewer lining. The City currently has 27 sewer lift stations and budgets to replace one (1) sewer lift station per year. The current FY 2021-22 budget for sewer lift station replacement is approximately $4 million per year. The scope of work for each sewer replacement project includes the full replacement of the sewer lift station, which includes but is not limited to: wet well, pumps, motors, electrical equipment, telemetry, and appurtenances. Onsite emergency power is included in projects when feasible. For sewer lining projects, the City dedicates approximately $1 million per year toward sewer lining. Pipeline sections scheduled for replacement are guided by CCTV inspections and per feedback received from the Wastewater Supervisor and Wastewater Operations Crewleader based on current field conditions. Long-term CIP development is guided by the City’s Sewer Master Plan. Identification of structural deficiencies in the sewer lines is performed via television inspection of the City’s sewer lines. Damaged or broken sewer lines, which could result in a sewage spill, are designated as high priority. The lines in need of repair are evaluated and scheduled to either be slip-lined or replaced. The City of Huntington Beach adopted a Sewer Service Charge in 2001 and created a Sewer Service Fund. The Sewer Service Fund revenue is designated solely for the rehabilitation, replacement, repair, and maintenance of City-owned sewers, sewer lift stations, and sewer related facilities. This is in accordance with the California Health and Safety Code Section 5470, and is included in Ordinance Title 14 – Water and Sewers, which adds Chapter 14.54 to the Huntington Beach Municipal Code. Public Works is the City of Huntington Beach’s department responsible for the sewage collection system. The maintenance program consists of a recordkeeping and reporting system, a program to address requests for service from the public, an established cycle for regular cleaning as well as an “Enhanced cleaning list”, a 24- hour emergency response program, an inspection program, a GIS mapping program, and a sewer lift station maintenance program. Table VI-1 denotes the budget for the Wastewater section operations and capital improvements. The FY 2021-22 budget includes $4,000,000 for sewer lift station reconstruction of the Humboldt Lift Station. TABLE VI-1 -- FY 2020-21 Budget 511185201 Sewer Service Maintenance 00511 Sewer Service Fund 51000 Personnel Services 3.898,354 60000 Operating Expenses 4,323,398 80000 Capital Expenditures 5,097,500 TOTAL 13,319,252 115 City of Huntington Beach Sewer System Management Plan 35 Training The City is required to provide training on a regular basis for staff in sanitary sewer system operations and maintenance, and to ensure that contractors to be appropriately trained. The City has an ongoing training program for its Public Works employees. As part of this program, the Wastewater Section personnel have received safety training that includes the following: • Traffic Flagger - CalTrans Flagger Training Traffic and Driver Safety • Use of Personal Protective Equipment • Lockout-Tagout Programs Confined Space Entry -OSHA 29 CFR 1910.146 • Permit-required Confined Space standards for general industry - OSHA Compliance • Confined Space Rescue • Confined Space Entry Fall Protection - OSHA Compliant Safety Training • NFPA 70e Arc Flash • SCBA & Respiratory Training • Sanitary Sewer Overflows - Waste Discharge Requirements Training • Trenching & Excavation Safety • OSHA health precautions related to working around and with raw sewage including blood-borne pathogens. The Wastewater Supervisor, with support from the Utilities Division Secretary, is responsible for keeping training records and ensuring that training and refresher courses are scheduled as needed. Wastewater personnel have current certificates for the following, with current copies of all required certificates and training documentation maintained and stored by the Wastewater Supervisor at the Public Works Utilities Yard Administration Building: • California Water Environment Association (CWEA) (13 employees) • Grade 1 Collection System Maintenance Certification (5 employees) • Grade 2 Collection System Maintenance Certification (2 employees) • Grade 3 Collection System Maintenance Certification (2 employees) • Grade 4 Collection System Maintenance Certification (3 employees) Copies of each employees’ certifications are included in Appendix E. Lastly, contractors working on wastewater infrastructure within the City of Huntington Beach are required to have the appropriate licenses and permits are required by law. For CIP projects, contractor license requirements are included in the Notice Inviting Bids and within the Project Bid Documents. For 116 City of Huntington Beach Sewer System Management Plan 36 contractors utilized for sewer maintenance or repair work, the Wastewater Supervisor or Wastewater Crewleader is responsible for verifying that the contractor is appropriately licensed and certified. Equipment and Replacement Each Enrollee is required to provide equipment and replacement part inventories, including identification of critical replacement parts for the operation and maintenance of its sanitary sewer system. A copy of the Wastewater Asset List in included in Table VII-1 below. In addition, the City’s warehouse maintains adequate stock of essential parts and equipment along with additional pumps and motors for all 27 sewer lift stations. The Wastewater Section also owns two (2) 6- inch bypass pumps and six (6) 3-inch bypass pumps available for emergency use. For emergency situations, the City owns 14 portable generators and six (6) onsite, emergency generators to provide power to the sewer lift stations in the event of an unforeseen power failure and/or planned SCE outages. 117 City of Huntington Beach Sewer System Management Plan 37 Table VII-1 –Wastewater Asset List 118 City of Huntington Beach Sewer System Management Plan 38 SECTION 5 – DESIGN AND PERFORMANCE PROVISIONS This chapter references the design and construction standards and specifications for new sewer systems, pump stations, and other appurtenances, and for the rehabilitation and repair of existing sewer systems. Also included are the procedures and standards for the inspections and testing of these facilities. The Order requires the following design and performance provisions: a. Design and construction standards and specifications for the installation of new sanitary sewer systems, pump stations, and other appurtenances; and for the rehabilitation and repair of existing sanitary sewer systems; and b. Procedures and standards for inspecting and testing the installation of new sewers, pumps, and other appurtenances and for rehabilitation and repair projects. Design of the City’s sanitary sewer system is performed by licensed California registered civil engineers under the general oversight of the City Engineer. Construction management, inspection, and testing is performed by qualified City personnel or consultant firms, also under the general oversight of the City Engineer. Contractors must be appropriately licensed and insured. Design and Construction Standards and Specifications, and Standards for the Inspection and Testing of New Sewer Facilities “GREENBOOK” Standard Specifications for Public Works Construction, latest edition The City utilizes the latest edition of the “Standard Specifications for Public Works Construction” or “Greenbook” specifications for general construction and inspection of sewer facilities. The “Greenbook” is a readily available document, which is utilized by the majority of public agencies in Southern California and throughout the United States. Due to its large size and regular update every three (3) years, it is not included in this Plan. City of Huntington Beach Standard Plans, Section 500 The City’s Standard Plans and Specifications provides specific design criteria for construction and inspection for the sanitary sewage system. The City Standard Drawings (Section 500) can be accessed on the City’s website at the following link: https://www.huntingtonbeachca.gov/government/departments/public_works/standard_plans.cfm City of Huntington Beach Sewer Master Plan The City utilizes the City of Huntington Beach Sewer Master Plan, Final Report, May 2003, by Kennedy Jenks Consultants, to prioritize Sewer Lift Station replacement and gravity sewer segments that are considered to be hydraulically deficient. City of Huntington Beach Sewer Lift Station Design Manual The City utilizes the City of Huntington Beach Sewer Lift Station Design Manual, by Camp Dresser & McKee Inc., August 2001, to provide a consistent and uniform design criteria for the replacement of City owned Sewer Lift Stations. At Sewer Lift Stations, wherever possible, the City has installed natural gas powered site generators to provide a redundant energy supply in case of electrical power outage. The City also has mobile trailer 119 City of Huntington Beach Sewer System Management Plan 39 mounted generators available to power the Sewer Lift Stations that lack onsite backup generators. The City also has the capability to pump sewage with mobile diesel powered pumps, which couple to the existing force mains at each Sewer Lift Station. City of Huntington Beach, Design Standards for Instrumentation, Controls, and Electrical The City recently developed design standards for instrumentation, controls, and electrical equipment installations for SCADA equipment for Utilities Division facilities. The purpose of the document is to standardize controls system design and implementation across Utilities Division infrastructure. Standard Plans and Specifications for Private Sewer Lift Stations The City has drafted a set of requirements for privately owned sewer lift stations. These standards are not yet incorporated into a City of Huntington Beach Standard Plan, or Standard Specification. However, the City anticipates the adoption of these Standard Plans and Specifications in the near future. These standards will allow the City’s sewer maintenance personnel to respond to emergency disruptions of service at private facilities, with standard City equipment, such as portable pumps and generators. Compliance Documents The City’s 2003 Sewer Master Plan, prepared by Kennedy-Jenks Consultants in 2003 can be found in Appendix F. The Sewer Capacity Analysis, prepared by AKM Consulting Engineers in 2009 can be found in Appendix G. The Sewer Lift Station Priority List, which is a “living” list, subject to change, can be found in Appendix H. 120 City of Huntington Beach Sewer System Management Plan 40 SECTION 6 – OVERFLOW EMERGENCY RESPONSE PLAN Under the Order, each Enrollee shall develop and implement an Overflow Emergency Response Plan that identifies measures to protect public health and the environment. At a minimum, this plan must include the following: a. Proper notification procedures so that the primary responders and regulatory agencies are informed of all SSOs in a timely manner; b. A program to ensure an appropriate response to all overflows; c. Procedures to ensure prompt notification to appropriate regulatory agencies and other potentially affected entities (e.g. health agencies, regional water boards, water suppliers, etc.) of all SSOs that potentially affect public health or reach the Waters of the State in accordance with the MRP. All SSOs shall be reported in accordance with this MRP, the California Water Code, other State Law, and other applicable Regional Water Board WDRs of NPDES permit requirements. The SSMP should identify the officials who will receive immediate notification; d. Procedures to ensure that appropriate staff and contractor personnel are aware of and follow the Emergency Response Plan and are appropriately trained; e. Procedure to address emergency operations, such as traffic and crowd control and other necessary response activities; and f. A program to ensure that all reasonable steps are taken to contain and prevent the discharge of untreated and partially treated wastewater to Waters of the United States and to minimize or correct any adverse impact on the environment resulting from the SSOs, including such accelerated or additional monitoring as may be necessary to determine the nature and impact of the discharge. In 2002, the City developed an SSO Emergency Response Plan, to meet the aforementioned criteria. All public spills, and any known private spills that reach storm drain facilities, are reported to the State Water Resources Control Board via the California Integrated Water Quality System Project (CIWQS) online reporting program. All discharges of sewage, whether a sanitary sewer overflow or a subsurface sewer leak, shall be first be reported to the Public Works Department, Utilities Division. Leadworkers or a higher position will make the initial data submission to CIWQS. The Wastewater Section Supervisor or his/her designee, will be responsible for reporting all discharges of sewage immediately to applicable Federal, State, regional and local agencies. The California Emergency Management Agency and the Regional Water Quality Control Board are contacted by telephone. If the spill enters a county channel, the County of Orange Environmental Resources Department is notified by telephone. The Orange County Health Care Agency and the Regional Water Quality Control Board are also provided a copy of the spill report, normally via facsimile copy. After the draft SSO report is input into CIWQS by the Wastewater Section Supervisor, the Deputy Director of Public Works-Utilities certifies the final report and submits it to the SWRCB. Any discharge caused by defects in the system that cannot be corrected by the Utilities Division through normal maintenance efforts will be referred to the Engineering Division for assessment and recommended action. 121 City of Huntington Beach Sewer System Management Plan 41 Discharges that are determined to be caused by activities on private property will be directed to the Public Works Department, Wastewater Section for cleanup, billing and agency notifications. Compliance Documents The SSO Emergency Response Plan is documented as Administrative Regulation AR808, a copy of which is included in Appendix I. 122 City of Huntington Beach Sewer System Management Plan 42 SECTION 7 – FATS, OILS, AND GREASE CONTROL PROGRAM Under the Order, each Enrollee is required to evaluate its service area to determine whether a FOG Program is needed. If an Enrollee determines that a FOG program is not needed, the Enrollee must provide justification for why it is not needed. If FOG is found to be a problem, the Enrollee must prepare and implement a FOG source control program to reduce the amount of these substances discharged to the sanitary sewer system. This plan shall include the following as appropriate: a. An implementation plan and schedule for a public education outreach program that promotes proper disposal of FOG; b. A plan and schedule for the disposal of FOG generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of FOG generated within a sanitary sewer system service area; c. The legal authority to prohibit discharges to the system and identify measures to prevent SSOs and blockages caused by FOG; d. Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices maintenance requirements, BMP requirements, record keeping and reporting requirements. e. Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the FOG ordinance; f. An identification of sanitary sewer system sections subject to FOG blockages and establishment of a cleaning maintenance schedule for each section; and g. Development and implementation of source control measures for all sources of FOG discharged to the sanitary sewer system for each section identified in (f) above. FOG Program Development and Implementation The City of Huntington Beach FOG Control Program was initially developed and implemented in 2004 as a preventative measure to reduce the potential for SSOs. The development of the FOG Control Program included the following elements that were the foundation of the program development and implementation phase: • Assessment of the sources of sanitary sewer overflows; • Inventorying grease producing food service establishments (FSEs); • Adoption of a FOG ordinance (Control and Regulations of Fats, Oils, & Grease ordinance); • Adoption of a fee resolution to fund the program; • Identifying resources and staff to develop and implement the FOG Control Program; • Implementation of a FOG Control Inspection program; and • Outreach to the public. 123 City of Huntington Beach Sewer System Management Plan 43 The program was developed in collaboration with the OC SAN and member agencies as a shared-cost cooperative effort to develop and implement FOG Control Programs that met the requirements of the 2004 SSO WDR and that were consistent between the member agencies. The cooperative collaboration included the development of the FOG Control Program Best Management Practices (BMPs) Training Manual for Food Service Establishments (Appendix J) and the FOG Impact Study (Appendix K). The program has undergone some minor changes since its inception in 2004 with adoption of the amended FOG ordinance (Municipal Code Section 14.56) as the most notable programmatic change. Assessment of Sources of Sanitary Sewer Overflows (SSOs) In 2004, City staff conducted an informal review of SSOs from the City’s sanitary sewer system in the previous three years (2001-2003) to determine the cause of the SSOs. Although at the time of the informal review there were no formal records kept regarding the source of the SSOs, it was estimated that FOG related blockages resulted in more than half of the SSOs. This estimate was based on anecdotal evidence and historical knowledge of “enhanced cleaning areas” that were known to accumulate grease. Inventory of Grease Producing Food Service Establishments The City continually updates its inventory of grease producing FSEs on a monthly basis. This process is initiated at the beginning of every month by staff reviewing all business licenses issued to FSEs the previous month and assessing the need to include the FSE(s) in the FOG Control Inspection program. The basis for inclusion in the program is whether the FSE processes and/or prepares beef, poultry, or fish. This may require a site visit by City staff to confirm if the menu is not available online. The inventory of FSEs in the FOG Control Inspection program ranges between 270 to 300 FSEs. The inventory is divided into two categories; FSEs with a grease control device (GCD), which includes mechanical grease interceptors and/o gravity grease interceptors, and FSEs without a GCD. The current inventory of FSEs in the FOG Control Program has 286 FSEs of which 70% (201 FSEs) have a GCD and 30% (85 FSEs) do not have a GCD. Adoption of FOG Ordinance The City adopted the Control and Regulation of Fats, Oils, and Grease Ordinance in 2004 (Municipal Code Section 14.56) to grant the legal authority to: i. Declare sewer system overflows as a public nuisance; ii. Require FOG pre-treatment for FOG producing FSEs; iii. Grant City staff authority to conduct inspections under the FOG Control Inspection program; iv. Establish a minimum frequency for maintenance of FOG pre-treatment devices; v. Require the implementation of FOG best management practices (BMPs); vi. Establish enforcement penalties and cost recovery procedures for violations of the FOG ordinance and/or SSOs. In 2013, the City amended the Control and Regulation of Fats, Oils, and Grease ordinance to include the following provisions: i. FOG pre-treatment required of existing FSEs that under-go a change in ownership; 124 City of Huntington Beach Sewer System Management Plan 44 ii. FOG pre-treatment required of FSEs that apply for building permits in excess of $50,000 in improvements or involving one or a combination of the following: a. Under slab plumbing in the food processing/preparation area; b. 30% increase in the net public seating area; c. 30% increase in the kitchen area; d. Any change in the size or type of food preparation equipment. iii. Authorizes the Director of Public Works to require FSEs that have two or more SSOs with a one year period or three within a five year period to install FOG pre-treatment; iv. Require routine cleaning of private sewer laterals at a minimum frequency that prevents SSOs from occurring and that no more than 25% of the sewer lateral capacity is to be impacted by the accumulation of FOG or other substances. Adoption of Fee Resolution In 2004, the City adopted a Fee Resolution (Resolution No. 2004-89) to establish a fee structure to charge FOG producing FSEs enrolled in the FOG Inspection program a monthly fee (FOG Control Fee) to fund the FOG Control program. The FOG Control Fee is a two-tiered monthly fee that is assessed in a similar fashion to the utility user fee. The first tier is for FSEs that have FOG pre-treatment. These FSEs are charged a lower rate of approximately $0.40/day. The second tier is for FSEs that do not have a FOG pre- treatment device. These FSEs are charged approximately $1.05/day. The higher rate for FSEs without FOG pre-treatment was established to fund the additional inspection costs of these facilities as they are inspected bi-annually year versus FSEs that have FOG pre-treatment that are inspected annually. Identifying Resources & Staff to Develop and Implement the FOG Control Program Following the initial assessment 2004 of the FSEs that would be enrolled in the FOG Control Program, the City identified the staffing and resources required to develop and administer a FOG Control Program. The initial assessment in 2004 identified approximately 300 FSEs as potential enrollees in the FOG Control Program. This initial assessment was used as a baseline to assess the staffing and other required resources. Based on this initial assessment, the City identified the need to hire at least one full time employee and augment the hiring of the new employee with assistance from Wastewater staff from the Department of Public Works’ Utilities Division. In 2005, the City hired an Environmental Specialist to develop and administer the FOG Control Program. Over the years, the program has dovetailed with the Storm Water/Urban Runoff program and now has two Environmental Specialists that report to the Environmental Services Manager administering the FOG Control Program. The Environmental Specialists coordinate with the Wastewater Section staff to respond to SSOs, identify potential “enhanced cleaning areas” in the sanitary sewer system, conduct CCTV inspections of sewer mains and laterals, and conduct training and outreach to the public. Implementation of FOG Control Inspection Program The FOG Control Program consists of the following elements: • Identification of potential FOG Control Inspection Program enrollees; 125 City of Huntington Beach Sewer System Management Plan 45 • Inspection of FSEs in the FOG Control Inspection Program; • CCTV inspection of sewer laterals. Identification of FSEs to Enroll in FOG Control Inspection Program On a monthly basis, Environmental Specialists administering the FOG Control Program review the City’s business license database to identify new FSEs that would potentially need to be enrolled into the FOG Control Inspection Program. Staff confirms the status by reviewing the menu (if available) or conducting a site visit once the FSE has opened for business. Once confirmed, the new FSEs are enrolled and inspected at least once a calendar year. Inspection of FSEs in the FOG Control Inspection Program The FOG Control Inspection Program consists of two tiers; high priority and low priority. The FSEs that have a GCD are considered a lower threat to introducing FOG to the City’s sanitary sewer system and are thus designated a low priority facility and inspected only once a calendar year. The FSEs without any FOG pre-treatment are categorized as high priority since there is a greater potential for these FSEs to introduce FOG into the City’s sanitary sewer system. These facilities are inspected at least twice a calendar year. Minimum FOG Best Management Practices (BMPs) All FSEs in the FOG Control Program are required to implement the minimum FOG BMPs. These include proper disposal of waste oil/grease, dry wiping cookware/serving utensils to remove food and grease, wiping down of hood filters prior to washing, using absorbent to clean grease spills, and training staff every six months and all new hires within two weeks of hire. In addition to the minimum BMPs, FSEs with FOG pre-treatment are required to service the GCD on a quarterly basis at minimum. This is the minimum requirement and FSEs that consistently have FOG percentages above 25% of the total hydraulic volume of the GCD are required to increase the service frequency to every two months or even monthly in order to prevent exceeding the 25% FOG threshold. Other additional BMPs include requiring FSEs to service internal (kitchen) and external sewer laterals on a routine basis to remove FOG build-up in the lines. The most important element of all of the BMPs is the employee training. City staff provides FSEs a copy of the FOG Training Manual at the time of the initial inspection. The FOG Training Manual (Appendix J) is a three ring binder that includes all of the minimum BMPs required and an Employee Training Log to document all training. The FOG Training Manual also includes a DVD with all of the training materials and BMPs in four languages; English, Spanish, Mandarin, and Vietnamese. Outreach to the Public The City has developed a FOG Program webpage on its website https://www.huntingtonbeachca.gov/government/departments/public_works/fog/. The webpage targets both the general public and FSEs enrolled in the FOG Control Inspection Program. The webpage contains information for the general public on methods of how to properly dispose of FOG, and how to prevent FOG blockages. For FSEs in the FOG Control Inspection Program, the webpage includes links to the FOG Training Manual that FSEs can download and/or print and links to the FOG training videos in English and Spanish. 126 City of Huntington Beach Sewer System Management Plan 46 Record Keeping and Reporting FSE’s are responsible for maintaining training logs, GCD service records, and grease collection/disposal records for a minimum of four (4) years. All records are kept onsite by FSE’s and made available during their routine inspections. Although not a mandatory requirement, the City provides regular reports on the FOG program to the SWRCB as part of its Annual NPDES Report submittal. Compliance Documents The FOG Training Manual for Food Service Establishments is included in Appendix J and FOG Impact Study is included in Appendix K. 127 City of Huntington Beach Sewer System Management Plan 47 SECTION 8 – SYSTEM EVALUATION AND CAPACITY ASSURANCE PLAN The Order requires that each Enrollee shall prepare and implement a capital improvement program (CIP) that will provide hydraulic capacity of key sanitary sewer system elements for dry weather peak flow conditions, as well as the appropriate design storm or wet weather event. At a minimum, the plan must include: a. Evaluation: Actions needed to evaluate those portions of the sanitary sewer system that are experiencing or contributing to an SSO discharge caused by hydraulic deficiency. The evaluation must provide estimates of peak flows (including flows from SSOs that escape from the system) associated with conditions similar to those causing overflow events, estimates of the capacity of key system components, hydraulic deficiencies (including components of the system with limiting capacity) and the major sources that contribute to the peak flows associated with overflow events; b. Design Criteria: Where design criteria do not exist or are deficient, undertake the evaluation identified in (a) above to establish appropriate design criteria; and c. Capacity Enhancement Measures: The steps needed to establish a short- and long-term CIP to address identified hydraulic deficiencies, including prioritization, alternative analysis, and schedules. The CIP may include increases in pipe size, I/I reduction programs, increases and redundancy in pumping capacity, and storage facilities. The CIP shall include an implementation schedule and shall identify sources of funding. d. Schedule: The enrollee shall develop a schedule of completion dates for all portions of the capital improvement program developed in (a) – (c) above. This schedule shall be reviewed and updated consistent with the SSMP review and update requirements as described in Section D. 14. Evaluation The City utilizes the City of Huntington Beach Sewer Master Plan, Final Report, May 2003, by Kennedy Jenks Consultants, to prioritize sewer lift station replacement and the replacement of those gravity sewer segments that are considered hydraulically deficient. The evaluation included a limited field flow monitoring program to obtain actual field measure wastewater data and a desktop I&I analysis to assess potential I&I areas of the City. The recommended capital improvements within the report were developed to correct system deficiencies, provide the ability to serve future growth, and to replace aging infrastructure to improve system reliability. The City’s 27 sewer lift stations were also analyzed as part of the Sewer Master Plan. Based on this analysis, and with input from the City’s maintenance staff, a priority list was established for rehabilitation and/or replacement of these lift stations. Although the City is approximately 97% built out with only a minimal increase in future wastewater flows projected, the Sewer Master Plan identified possible deficiencies for further site specific evaluation in approximately nine miles (or less than 3%) of the entire gravity system. In 2008, the City completed an evaluation of those segments that exceeded the design criteria for “new” sewers. It was found that in all but two cases, the actual flow in the pipes was less than identified in the Sewer Master Plan’s desktop analysis. One segment, located on Beach Blvd., was upsized in 2016. The other segment was located 128 City of Huntington Beach Sewer System Management Plan 48 immediately downstream of the Edinger Lift Station. Modifications to that sewer lift station were made to limit the amount of flow discharged to this segment. With these two improvements, the City’s gravity sewer system does not exhibit any capacity issues, based on existing uses. In the event properties are redeveloped to a higher density that might impact the downstream sewer system, those property owners are required to provide an engineering analysis and make the necessary downstream improvements as a condition of approval of those projects. Design Criteria The City utilizes industry standards as the design criteria for its sanitary sewer system. All design work is conducted by registered California professional engineers and all contractors are required to be appropriately license and insured. The City required that all sewer infrastructure design be compliant with the “Standard Specifications for Public Works Construction” or “Greenbook”, current edition, the City of Huntington Beach Standard Plans, the City of Huntington Beach Sewer Lift Station Design Manual, and City of Huntington Beach Design Standards for Instrumentation, Controls, and Electrical, along with all other relevant building code standards and regulations. Wastewater flow criteria such as, but not limited to, land use wastewater generation factors, peaking factor, I&I, design capacity, pumping capacity, wet well sizing, and other design criteria is detailed and including within the City’s Sewer Master Plan, included as Appendix F. Capacity Enhancement Measures The City has incorporated several capacity enhancement measures into its sanitary sewer system. The City has an I&I program that rehabilitated existing sewer pipe via in situ lining technology to prevent storm water and groundwater from entering the system. The City’s CCTV Inspection Program and proactive Line Cleaning Program ensure the sanitary sewer system can handle its wastewater flows as design. The CCTV Inspection Program provides the City with visual data on internal deficiencies while the Line Cleaning Program keeps the sanitary sewer lines free of accumulations of FOG, roots, and other debris. The City also updated its CIP to regularly fund a sewer lining projects as part of the I&I program. Approximately, $1 million is dedicated annually toward this program. Furthermore, the City budgets for the replacement of one (1) sewer lift station per year to ensure that every sewer lift station is appropriately sized and in good working condition to handle its design flow. As a result of the City’s sewer master planning efforts, Chapter 14.36 of the City’s Municipal Code was updated to increase the sewer connection fee commensurate with the necessary capital improvements. The projects identified within the 2003 Sewer Master Plan report as being hydraulically deficient have already been replaced or remediated. The City considers the 2003 Sewer Master Plan viable, since trends in the generation of sewage in Huntington Beach have shown a decrease in sewage per capita and an overall decrease for the City as a whole even though the City’s population has increased since 2003. Data from the OC San supports this conclusion. The decline in sewage flows can be attributed to a trend towards water conservation and a decline in infiltration and inflow resulting from the City providing aggressive sewer lining projects. To further substantiate the adequacy of the 2003 Sewer Master Plan, the City will undergo a flow analysis study in key segments of the collection system and compare the actual flows to the flows and capacities provided in the 2003 document. The study is currently planned to be implemented as part of the City’s 2022 Sewer Master Plan Update. 129 City of Huntington Beach Sewer System Management Plan 49 Schedule The City’s current CIP lists improvements to the sanitary sewer system for the next five (5) years. The CIP is periodically reviewed with changes being made to the project list and start dates to meet the changing needs of the City. The CIP also contains budgetary cost projections for the listed projects. Funding is provided for the replacement and rehabilitation of the City’s sanitary sewer by the Sewer Enterprise Fund balance. Since adoption of the Sewer Master Plan, sewer lift stations B and #15 have been eliminated and twelve lift stations have been rebuilt. The City has sufficient sewer funding and plans to continue with replacing aged sewer lift stations at an average rate of one (1) sewer lift station per year, as needed. In addition to the replacement of aged sewer list stations, the City has also installed magnetic flow meters, and the SCADA capability adequate to capture flow data from these newer lift stations. Regarding sewer pipelines, the City regular allocates funds for sewer lining every year. Replacement and/or upsizing of sewer pipe is performed on an as-needed basis. The City is currently plans to update its Sewer Master Plan starting in 2022. Future CIP budgets will be adjusted in consideration of CIP project recommendations provided as part of the Sewer Master Plan Update. 8.1 Compliance Documents The City’s 2003 Sewer Master Plan, prepared by Kennedy-Jenks Consultants in 2003 can be found in Appendix F. The Sewer Capacity Analysis, prepared by AKM Consulting Engineers in 2009 can be found in Appendix G. The Sewer Lift Station Priority List, which is a “living” list, subject to change, can be found in Appendix H. 130 City of Huntington Beach Sewer System Management Plan 50 SECTION 9 – MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS Under the Order, Enrollees shall monitor and measure the effectiveness of the SSMP and shall make modifications as necessary to maintain the program’s effectiveness. This section describes City of Huntington Beach’s monitoring, measurement and program modification program. Under the Order, the Enrollee shall: a. Maintain relevant information to establish and prioritize appropriate SSMP activities; b. Monitor the implementation and, where appropriate, measure the effectiveness of each element of the SSMP; c. Assess the success of preventive maintenance activities; d. Update program elements, as appropriate, based on monitoring of performance evaluations; and e. Identify and illustrate SSO trends, including frequency, location and volume. Performance Measure Identification Improved wastewater infrastructure performance is a core task of any properly managed utility. The City of Huntington Beach is committed to continuous improvement by: • Utilizing a formalized program for continuous improvement • Institutionalizing continual evaluation of its performance • Identifying opportunities for continuous improvement To accomplish the above goals, the City of Huntington Beach has established a number of performance measures and routinely monitors progress in meeting those performance measures. The performance measures relating to each SSMP program element are listed in the following subsections. Goals The overall goal of the SSMP is to achieve zero preventable SSOs. While the City of Huntington Beach recognizes that US EPA and State of California regulatory agencies are encouraging a zero SSO goal, the random and unexpected nature of many SSO events make it challenging to achieve a goal of zero. SSOs that are caused by such acts as vandalism, contractor or property owner “hits,” excessive customer discharge of FOG or extreme weather events that are potentially able to be minimized by the utility, cannot always be prevented or totally eliminated. Consequently, the City of Huntington Beach has established a performance measure of zero preventable SSOs. SSO events will continue to be tracked by the City of Huntington Beach for cause and for location to identify “enhanced cleaning service areas” for additional preventive maintenance activities, but overall success of the program will be measured by progress in reducing the number of preventable SSO events towards an ultimate goal of zero preventable SSOs. 131 City of Huntington Beach Sewer System Management Plan 51 Organization The City of Huntington Beach has established an effective organizational structure for sewer management, operations and maintenance. The success of this structure depends, however, in retaining existing staff and in filling those staff positions that do become vacant with skilled and talented individuals. To measure organizational success, the City of Huntington Beach will monitor: • Staff resignations as a percent of filled positions • Staff vacancy rate as a percent of budgeted positions • Staff training and certification expiration and renewals Establishment of a performance goal associated with the performance measure for staff resignations may need to take unavoidable resignations, such as those due to retirements or disability, into account. Legal Authority The City of Huntington Beach has well-defined legal authority in place for the SSMP programs. No additional goals or performance measures are needed in this area at this time. Operation and Maintenance Program The City of Huntington Beach has established a number of performance measures for collection system O&M. The following lists the key performance measures for the SSMP program: • Miles of sewer cleaned • Miles of laterals cleaned • Miles of sewers inspected • Miles of sewer repaired/replaced • Number of laterals repaired • Number of sewer cleanouts installed • Number of sewer investigations • Number of manholes treated (roach control) • Number of stoppages cleared • Number of SSOs • Number of wet wells cleaned • Number of pump station inspections • Miles of force mains walked for visual inspection • Number of force main air relief valves inspected 132 City of Huntington Beach Sewer System Management Plan 52 These performance measures are reported in the Annual Sewer Service Fund Performance Audit as codified by Huntington Beach Municipal Code 14.54.070. Overflow Emergency Response Program (OERP) The following performance measures will be tracked to monitor OERP performance: • Time elapsed from SSO notification call received to time responders arrive on-site • Time elapsed until overflow is controlled Fats, Oils and Grease (FOG) Control Program The following performance measures will be tracked to monitor FOG control effectiveness: • Number of grease-related SSO events • Number of Food Service Establishment (FSE) inspections performed • Number of FSE enforcement actions initiated • Number of FSE enforcement actions resolve Design and Performance Provisions The following performance measures will be tracked to monitor the effectiveness of the City of Huntington Beach’s design and construction standards and specifications: • Number of warranty inspections completed • Percent of warranty inspections requiring follow-up work by the contractor System Evaluation and Capacity Assurance Plan (SECAP) The following performance measures will be tracked to monitor SECAP performance: • Number of capacity-related SSO events (including wet weather-related SSOs) • Number of recommended Capacity Enhancement CIP Projects completed Monitoring, Program Modifications and Program Audits The following performance measures will be tracked to monitor the effectiveness of the Monitoring program: • On-time completion of bi-annual SSMP program review and self-audit Communication Program The following performance measures will be tracked to monitor the effectiveness of the Communications program: • Number of public information brochures, newsletters, or similar materials distributed • Number of public education events attended 133 City of Huntington Beach Sewer System Management Plan 53 • Number of public education presentations completed Program Modification Plan The success of the SSMP program elements should lead to a reduction of SSOs within the City of Huntington Beach collection system. If no reduction in SSOs is seen, the program elements will be critically reviewed to determine areas for improvement. Those program elements will be modified as needed to improve performance. 134 City of Huntington Beach Sewer System Management Plan 54 SECTION 10 – SSMP PROGRAM AUDITS As a part of the SSMP, the permittee shall conduct periodic internal audits, appropriate to the size of the system and the number of SSOs. At a minimum, these audits must occur every two years and a report must be prepared and kept on file. This audit shall focus on evaluation the effectiveness of the SSMP and the Enrollees compliance with the SSMP requirements identified in this subsection (D.13), including identification of any deficiencies in the SSMP and steps to correct them. Compliance Summary The City uses the SSMP update process to identify actions for improving how it manages, operates, and maintains the collection system. This process identifies the tasks and actions that are required to meet SSMP goals and defines and prioritizes them. Resourcing and planning for delivery of the actions identified in the SSMP audit are incorporated into the City’s strategic planning process, described in Section 9 - Monitoring, Measurement and Program Modifications. Schedule of Program Audits and Updates The City monitors the performance of the collection system on an on-going basis through performance reviews. It also performs a formal audit of its SSMP every two years in accordance with the WDRs. The two-year frequency is the maximum allowed by the regulation; however this frequency is appropriate to the size of the City’s collection system and the historical number of overflows, and should be sufficient to identify any necessary improvements to the SSMP. The City will assess the need to audit the SSMP more frequently based on the performance of the sanitary sewer system using information from the key performance indicators and input from the Wastewater Department staff. Every five years, the City formally updates and recertifies the SSMP. Table 10-1 shows the timeline for SSMP audits and updates for the last five years and the anticipated schedule for the next five years. SSMP Audit and Update Schedule Year Task 2020 5 year SSMP update. Project/task commenced in 2019 and completed February 2021, revised in November 2021. 2023 Biennial self-audit to commence in late 2022. 2025 Biennial self-audit to commence in late 2024. Commence review and update of SSMP. 2026 5 year SSMP update. Program Audit and Update Process A team composed of City staff and management directly involved in the development and administration of the elements of the SSMP will be formed once every two (2) years to perform biennial self-audits in accordance with regulatory requirements for SSMP Program Audits. The team will be led by the Deputy 135 City of Huntington Beach Sewer System Management Plan 55 Director of Public Works-Utilities and will meet in a series of in-person meetings over the course of approximately three months to evaluate the effectiveness of each SSMP element, identify any deficiencies, and make recommendations for improvements and updates. This will be conducted by answering a set of questions developed specifically for the purpose of the audit for each element of the SSMP. It also includes referencing and reviewing performance reports and capacity reports, flows, and other important metrics gathered in the past two years. These findings will be documented in an audit report. Upon completion of the audit, a quality control review of the audit report will be performed, with a focus on consistency, completeness, and inclusion of references and attachments as appropriate. The final audit report will be reviewed by the City’s LRO (Deputy Director of Public Works-Utilities) before final acceptance. Audit reports and related materials will be maintained in a hard copy and an electronic copy. 136 City of Huntington Beach Sewer System Management Plan 56 SECTION 11 – COMMUNICATIONS The Enrollee shall communicate on a regular basis with the public on the development, implementation and performance of its SSMP. The communication system shall provide the public the opportunity to provide input to the Enrollee as the program is developed and implemented. The Enrollee shall also create a plan of communication with systems that are tributary and/or satellite to the Enrollee’s sanitary sewer system. Compliance Summary The City maintains a website (https://www.huntingtonbeach.gov/SSMP) to inform the public about the Sewer System Management Program. The website provides a full version of the SSMP, including all attachments, for public review. The City’s website is an effective communication source for providing information and news to the public. The website also provides information on reporting sewer system issues; includes phone numbers for reporting purposes during and after business hours. The City uses an electronic application called MyHB for use with both iPhones and Android systems. This application is a work-order system that allows the public to report issues of concern anywhere in the City (sewer non-emergency, storm drain non-emergency, odor issues, etc.). The City’s SSMP website includes a direct link to report sewer non-emergency issues. During FOG inspections, City staff provides information to business operators on protecting the sewer system, avoiding sewer overflows, and how to report sewer related issues. The City’s plan of communication with systems that are tributary consists of maintaining constant communication with neighboring agencies. Throughout the year, the City has several opportunities to regularly meet and communicate with local agencies through the CA WDR Group Meetings. The Wastewater Supervisor attends these meetings. The focus of the CA WDR Group is share information on everything related to sanitary sewer systems, including SSO notification, monitoring, reporting and requirements. Compliance Documents The FOG Control Program Best Management Practices Training Manual for Food Service Establishments is included in Appendix J. Examples of Public Outreach are included in Appendix L. 137 City of Huntington Beach Sewer System Management Plan 57 ABBREVIATIONS / ACRONYMS AB Assembly Bill BAT Best Available Technology BC Brown and Caldwell BMP Best Management Practice CCTV Closed-Circuit Television CFR Code of Federal Regulations CIP Capital Improvement Program CM Corrective Maintenance CMMS Computerized Maintenance Management System CWEA California Water Environment Association ERP Emergency Response Plan FSE Food Service Establishment FOG Fats, Oils, and Grease GPS Global Positioning System I/I Inflow / Infiltration IERP Integrated Emergency Response Plan MRP Monitoring and Reporting Program O&M Operation and Maintenance OCHCA Orange County Health Care Agency OC SAN Orange County Sanitation District OES Office of Emergency Services Order State Water Resources Control Board (SWRCB), Order No. 2006-0003 Pd Predictive Maintenance PM Preventative Maintenance PMP Preventative Maintenance Program R&R Rehabilitation and Replacement RWQCB Regional Water Quality Control Board SOP Standard Operating Procedure or Standard Maintenance Procedure SSO Sanitary Sewer Overflow and any sewer spill or overflow of sewage SSMP Sewer System Management Plan 138 City of Huntington Beach Sewer System Management Plan 58 WDR Waste Discharge Requirements WWTP Wastewater Treatment Plant 139 City of Huntington Beach Sewer System Management Plan 59 APPENDICES 140 City of Huntington Beach Sewer System Management Plan 60 APPENDIX A - SWRCB Order No. 2006-003 141 STATE WATER RESOURCES CONTROL BOARD ORDER NO. 2006-0003-DWQ STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR SANITARY SEWER SYSTEMS The State Water Resources Control Board, hereinafter referred to as “State Water Board”, finds that: 1. All federal and state agencies, municipalities, counties, districts, and other public entities that own or operate sanitary sewer systems greater than one mile in length that collect and/or convey untreated or partially treated wastewater to a publicly owned treatment facility in the State of California are required to comply with the terms of this Order. Such entities are hereinafter referred to as “Enrollees”. 2. Sanitary sewer overflows (SSOs) are overflows from sanitary sewer systems of domestic wastewater, as well as industrial and commercial wastewater, depending on the pattern of land uses in the area served by the sanitary sewer system. SSOs often contain high levels of suspended solids, pathogenic organisms, toxic pollutants, nutrients, oxygen-demanding organic compounds, oil and grease and other pollutants. SSOs may cause a public nuisance, particularly when raw untreated wastewater is discharged to areas with high public exposure, such as streets or surface waters used for drinking, fishing, or body contact recreation. SSOs may pollute surface or ground waters, threaten public health, adversely affect aquatic life, and impair the recreational use and aesthetic enjoyment of surface waters. 3. Sanitary sewer systems experience periodic failures resulting in discharges that may affect waters of the state. There are many factors (including factors related to geology, design, construction methods and materials, age of the system, population growth, and system operation and maintenance), which affect the likelihood of an SSO. A proactive approach that requires Enrollees to ensure a system-wide operation, maintenance, and management plan is in place will reduce the number and frequency of SSOs within the state. This approach will in turn decrease the risk to human health and the environment caused by SSOs. 4. Major causes of SSOs include: grease blockages, root blockages, sewer line flood damage, manhole structure failures, vandalism, pump station mechanical failures, power outages, excessive storm or ground water inflow/infiltration, debris blockages, sanitary sewer system age and construction material failures, lack of proper operation and maintenance, insufficient capacity and contractor- caused damages. Many SSOs are preventable with adequate and appropriate facilities, source control measures and operation and maintenance of the sanitary sewer system. 142 State Water Resources Control Board Order No. 2006-0003-DWQ Page 2 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 SEWER SYSTEM MANAGEMENT PLANS 5. To facilitate proper funding and management of sanitary sewer systems, each Enrollee must develop and implement a system-specific Sewer System Management Plan (SSMP). To be effective, SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems, while taking into consideration risk management and cost benefit analysis. Additionally, an SSMP must contain a spill response plan that establishes standard procedures for immediate response to an SSO in a manner designed to minimize water quality impacts and potential nuisance conditions. 6. Many local public agencies in California have already developed SSMPs and implemented measures to reduce SSOs. These entities can build upon their existing efforts to establish a comprehensive SSMP consistent with this Order. Others, however, still require technical assistance and, in some cases, funding to improve sanitary sewer system operation and maintenance in order to reduce SSOs. 7. SSMP certification by technically qualified and experienced persons can provide a useful and cost-effective means for ensuring that SSMPs are developed and implemented appropriately. 8. It is the State Water Board’s intent to gather additional information on the causes and sources of SSOs to augment existing information and to determine the full extent of SSOs and consequent public health and/or environmental impacts occurring in the State. 9. Both uniform SSO reporting and a centralized statewide electronic database are needed to collect information to allow the State Water Board and Regional Water Quality Control Boards (Regional Water Boards) to effectively analyze the extent of SSOs statewide and their potential impacts on beneficial uses and public health. The monitoring and reporting program required by this Order and the attached Monitoring and Reporting Program No. 2006-0003-DWQ, are necessary to assure compliance with these waste discharge requirements (WDRs). 10. Information regarding SSOs must be provided to Regional Water Boards and other regulatory agencies in a timely manner and be made available to the public in a complete, concise, and timely fashion. 11. Some Regional Water Boards have issued WDRs or WDRs that serve as National Pollution Discharge Elimination System (NPDES) permits to sanitary sewer system owners/operators within their jurisdictions. This Order establishes minimum requirements to prevent SSOs. Although it is the State Water Board’s intent that this Order be the primary regulatory mechanism for sanitary sewer systems statewide, Regional Water Boards may issue more stringent or more 143 State Water Resources Control Board Order No. 2006-0003-DWQ Page 3 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 prescriptive WDRs for sanitary sewer systems. Upon issuance or reissuance of a Regional Water Board’s WDRs for a system subject to this Order, the Regional Water Board shall coordinate its requirements with stated requirements within this Order, to identify requirements that are more stringent, to remove requirements that are less stringent than this Order, and to provide consistency in reporting. REGULATORY CONSIDERATIONS 12. California Water Code section 13263 provides that the State Water Board may prescribe general WDRs for a category of discharges if the State Water Board finds or determines that: xThe discharges are produced by the same or similar operations; xThe discharges involve the same or similar types of waste; xThe discharges require the same or similar treatment standards; and xThe discharges are more appropriately regulated under general discharge requirements than individual discharge requirements. This Order establishes requirements for a class of operations, facilities, and discharges that are similar throughout the state. 13. The issuance of general WDRs to the Enrollees will: a) Reduce the administrative burden of issuing individual WDRs to each Enrollee; b) Provide for a unified statewide approach for the reporting and database tracking of SSOs; c) Establish consistent and uniform requirements for SSMP development and implementation; d) Provide statewide consistency in reporting; and e) Facilitate consistent enforcement for violations. 14. The beneficial uses of surface waters that can be impaired by SSOs include, but are not limited to, aquatic life, drinking water supply, body contact and non- contact recreation, and aesthetics. The beneficial uses of ground water that can be impaired include, but are not limited to, drinking water and agricultural supply. Surface and ground waters throughout the state support these uses to varying degrees. 15. The implementation of requirements set forth in this Order will ensure the reasonable protection of past, present, and probable future beneficial uses of water and the prevention of nuisance. The requirements implement the water quality control plans (Basin Plans) for each region and take into account the environmental characteristics of hydrographic units within the state. Additionally, the State Water Board has considered water quality conditions that could reasonably be achieved through the coordinated control of all factors that affect 144 State Water Resources Control Board Order No. 2006-0003-DWQ Page 4 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 water quality in the area, costs associated with compliance with these requirements, the need for developing housing within California, and the need to develop and use recycled water. 16. The Federal Clean Water Act largely prohibits any discharge of pollutants from a point source to waters of the United States except as authorized under an NPDES permit. In general, any point source discharge of sewage effluent to waters of the United States must comply with technology-based, secondary treatment standards, at a minimum, and any more stringent requirements necessary to meet applicable water quality standards and other requirements. Hence, the unpermitted discharge of wastewater from a sanitary sewer system to waters of the United States is illegal under the Clean Water Act. In addition, many Basin Plans adopted by the Regional Water Boards contain discharge prohibitions that apply to the discharge of untreated or partially treated wastewater. Finally, the California Water Code generally prohibits the discharge of waste to land prior to the filing of any required report of waste discharge and the subsequent issuance of either WDRs or a waiver of WDRs. 17. California Water Code section 13263 requires a water board to, after any necessary hearing, prescribe requirements as to the nature of any proposed discharge, existing discharge, or material change in an existing discharge. The requirements shall, among other things, take into consideration the need to prevent nuisance. 18. California Water Code section 13050, subdivision (m), defines nuisance as anything which meets all of the following requirements: a. Is injurious to health, or is indecent or offensive to the senses, or an obstruction to the free use of property, so as to interfere with the comfortable enjoyment of life or property. b. Affects at the same time an entire community or neighborhood, or any considerable number of persons, although the extent of the annoyance or damage inflicted upon individuals may be unequal. c. Occurs during, or as a result of, the treatment or disposal of wastes. 19. This Order is consistent with State Water Board Resolution No. 68-16 (Statement of Policy with Respect to Maintaining High Quality of Waters in California) in that the Order imposes conditions to prevent impacts to water quality, does not allow the degradation of water quality, will not unreasonably affect beneficial uses of water, and will not result in water quality less than prescribed in State Water Board or Regional Water Board plans and policies. 20. The action to adopt this General Order is exempt from the California Environmental Quality Act (Public Resources Code §21000 et seq.) because it is an action taken by a regulatory agency to assure the protection of the environment and the regulatory process involves procedures for protection of the environment. (Cal. Code Regs., tit. 14, §15308). In addition, the action to adopt 145 State Water Resources Control Board Order No. 2006-0003-DWQ Page 5 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 this Order is exempt from CEQA pursuant to Cal.Code Regs., title 14, §15301 to the extent that it applies to existing sanitary sewer collection systems that constitute “existing facilities” as that term is used in Section 15301, and §15302, to the extent that it results in the repair or replacement of existing systems involving negligible or no expansion of capacity. 21. The Fact Sheet, which is incorporated by reference in the Order, contains supplemental information that was also considered in establishing these requirements. 22. The State Water Board has notified all affected public agencies and all known interested persons of the intent to prescribe general WDRs that require Enrollees to develop SSMPs and to report all SSOs. 23. The State Water Board conducted a public hearing on February 8, 2006, to receive oral and written comments on the draft order. The State Water Board received and considered, at its May 2, 2006, meeting, additional public comments on substantial changes made to the proposed general WDRs following the February 8, 2006, public hearing. The State Water Board has considered all comments pertaining to the proposed general WDRs. IT IS HEREBY ORDERED, that pursuant to California Water Code section 13263, the Enrollees, their agents, successors, and assigns, in order to meet the provisions contained in Division 7 of the California Water Code and regulations adopted hereunder, shall comply with the following: A. DEFINITIONS 1.Sanitary sewer overflow (SSO) - Any overflow, spill, release, discharge or diversion of untreated or partially treated wastewater from a sanitary sewer system. SSOs include: (i) Overflows or releases of untreated or partially treated wastewater that reach waters of the United States; (ii) Overflows or releases of untreated or partially treated wastewater that do not reach waters of the United States; and (iii) Wastewater backups into buildings and on private property that are caused by blockages or flow conditions within the publicly owned portion of a sanitary sewer system. 2.Sanitary sewer system – Any system of pipes, pump stations, sewer lines, or other conveyances, upstream of a wastewater treatment plant headworks used to collect and convey wastewater to the publicly owned treatment facility. Temporary storage and conveyance facilities (such as vaults, temporary piping, construction trenches, wet wells, impoundments, tanks, etc.) are considered to be part of the sanitary sewer system, and discharges into these temporary storage facilities are not considered to be SSOs. 146 State Water Resources Control Board Order No. 2006-0003-DWQ Page 6 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 For purposes of this Order, sanitary sewer systems include only those systems owned by public agencies that are comprised of more than one mile of pipes or sewer lines. 3.Enrollee - A federal or state agency, municipality, county, district, and other public entity that owns or operates a sanitary sewer system, as defined in the general WDRs, and that has submitted a complete and approved application for coverage under this Order. 4.SSO Reporting System – Online spill reporting system that is hosted, controlled, and maintained by the State Water Board. The web address for this site is http://ciwqs.waterboards.ca.gov. This online database is maintained on a secure site and is controlled by unique usernames and passwords. 5.Untreated or partially treated wastewater – Any volume of waste discharged from the sanitary sewer system upstream of a wastewater treatment plant headworks. 6.Satellite collection system – The portion, if any, of a sanitary sewer system owned or operated by a different public agency than the agency that owns and operates the wastewater treatment facility to which the sanitary sewer system is tributary. 7.Nuisance - California Water Code section 13050, subdivision (m), defines nuisance as anything which meets all of the following requirements: a. Is injurious to health, or is indecent or offensive to the senses, or an obstruction to the free use of property, so as to interfere with the comfortable enjoyment of life or property. b. Affects at the same time an entire community or neighborhood, or any considerable number of persons, although the extent of the annoyance or damage inflicted upon individuals may be unequal. c. Occurs during, or as a result of, the treatment or disposal of wastes. B. APPLICATION REQUIREMENTS 1. Deadlines for Application – All public agencies that currently own or operate sanitary sewer systems within the State of California must apply for coverage under the general WDRs within six (6) months of the date of adoption of the general WDRs. Additionally, public agencies that acquire or assume responsibility for operating sanitary sewer systems after the date of adoption of this Order must apply for coverage under the general WDRs at least three (3) months prior to operation of those facilities. 2. Applications under the general WDRs – In order to apply for coverage pursuant to the general WDRs, a legally authorized representative for each agency must submit a complete application package. Within sixty (60) days of adoption of the general WDRs, State Water Board staff will send specific instructions on how to 147 State Water Resources Control Board Order No. 2006-0003-DWQ Page 7 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 apply for coverage under the general WDRs to all known public agencies that own sanitary sewer systems. Agencies that do not receive notice may obtain applications and instructions online on the Water Board’s website. 3. Coverage under the general WDRs – Permit coverage will be in effect once a complete application package has been submitted and approved by the State Water Board’s Division of Water Quality. C. PROHIBITIONS 1. Any SSO that results in a discharge of untreated or partially treated wastewater to waters of the United States is prohibited. 2. Any SSO that results in a discharge of untreated or partially treated wastewater that creates a nuisance as defined in California Water Code Section 13050(m) is prohibited. D. PROVISIONS 1. The Enrollee must comply with all conditions of this Order. Any noncompliance with this Order constitutes a violation of the California Water Code and is grounds for enforcement action. 2. It is the intent of the State Water Board that sanitary sewer systems be regulated in a manner consistent with the general WDRs. Nothing in the general WDRs shall be: (i) Interpreted or applied in a manner inconsistent with the Federal Clean Water Act, or supersede a more specific or more stringent state or federal requirement in an existing permit, regulation, or administrative/judicial order or Consent Decree; (ii) Interpreted or applied to authorize an SSO that is illegal under either the Clean Water Act, an applicable Basin Plan prohibition or water quality standard, or the California Water Code; (iii) Interpreted or applied to prohibit a Regional Water Board from issuing an individual NPDES permit or WDR, superseding this general WDR, for a sanitary sewer system, authorized under the Clean Water Act or California Water Code; or (iv) Interpreted or applied to supersede any more specific or more stringent WDRs or enforcement order issued by a Regional Water Board. 3. The Enrollee shall take all feasible steps to eliminate SSOs. In the event that an SSO does occur, the Enrollee shall take all feasible steps to contain and mitigate the impacts of an SSO. 4. In the event of an SSO, the Enrollee shall take all feasible steps to prevent untreated or partially treated wastewater from discharging from storm drains into 148 State Water Resources Control Board Order No. 2006-0003-DWQ Page 8 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 flood control channels or waters of the United States by blocking the storm drainage system and by removing the wastewater from the storm drains. 5. All SSOs must be reported in accordance with Section G of the general WDRs. 6. In any enforcement action, the State and/or Regional Water Boards will consider the appropriate factors under the duly adopted State Water Board Enforcement Policy. And, consistent with the Enforcement Policy, the State and/or Regional Water Boards must consider the Enrollee’s efforts to contain, control, and mitigate SSOs when considering the California Water Code Section 13327 factors. In assessing these factors, the State and/or Regional Water Boards will also consider whether: (i) The Enrollee has complied with the requirements of this Order, including requirements for reporting and developing and implementing a SSMP; (ii) The Enrollee can identify the cause or likely cause of the discharge event; (iii) There were no feasible alternatives to the discharge, such as temporary storage or retention of untreated wastewater, reduction of inflow and infiltration, use of adequate backup equipment, collecting and hauling of untreated wastewater to a treatment facility, or an increase in the capacity of the system as necessary to contain the design storm event identified in the SSMP. It is inappropriate to consider the lack of feasible alternatives, if the Enrollee does not implement a periodic or continuing process to identify and correct problems. (iv) The discharge was exceptional, unintentional, temporary, and caused by factors beyond the reasonable control of the Enrollee; (v) The discharge could have been prevented by the exercise of reasonable control described in a certified SSMP for: xProper management, operation and maintenance; xAdequate treatment facilities, sanitary sewer system facilities, and/or components with an appropriate design capacity, to reasonably prevent SSOs (e.g., adequately enlarging treatment or collection facilities to accommodate growth, infiltration and inflow (I/I), etc.); xPreventive maintenance (including cleaning and fats, oils, and grease (FOG) control); xInstallation of adequate backup equipment; and xInflow and infiltration prevention and control to the extent practicable. (vi) The sanitary sewer system design capacity is appropriate to reasonably prevent SSOs. 149 State Water Resources Control Board Order No. 2006-0003-DWQ Page 9 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 (vii) The Enrollee took all reasonable steps to stop and mitigate the impact of the discharge as soon as possible. 7. When a sanitary sewer overflow occurs, the Enrollee shall take all feasible steps and necessary remedial actions to 1) control or limit the volume of untreated or partially treated wastewater discharged, 2) terminate the discharge, and 3) recover as much of the wastewater discharged as possible for proper disposal, including any wash down water. The Enrollee shall implement all remedial actions to the extent they may be applicable to the discharge and not inconsistent with an emergency response plan, including the following: (i) Interception and rerouting of untreated or partially treated wastewater flows around the wastewater line failure; (ii) Vacuum truck recovery of sanitary sewer overflows and wash down water; (iii) Cleanup of debris at the overflow site; (iv) System modifications to prevent another SSO at the same location; (v) Adequate sampling to determine the nature and impact of the release; and (vi) Adequate public notification to protect the public from exposure to the SSO. 8. The Enrollee shall properly, manage, operate, and maintain all parts of the sanitary sewer system owned or operated by the Enrollee, and shall ensure that the system operators (including employees, contractors, or other agents) are adequately trained and possess adequate knowledge, skills, and abilities. 9. The Enrollee shall allocate adequate resources for the operation, maintenance, and repair of its sanitary sewer system, by establishing a proper rate structure, accounting mechanisms, and auditing procedures to ensure an adequate measure of revenues and expenditures. These procedures must be in compliance with applicable laws and regulations and comply with generally acceptable accounting practices. 10. The Enrollee shall provide adequate capacity to convey base flows and peak flows, including flows related to wet weather events. Capacity shall meet or exceed the design criteria as defined in the Enrollee’s System Evaluation and Capacity Assurance Plan for all parts of the sanitary sewer system owned or operated by the Enrollee. 11. The Enrollee shall develop and implement a written Sewer System Management Plan (SSMP) and make it available to the State and/or Regional Water Board upon request. A copy of this document must be publicly available at the Enrollee’s office and/or available on the Internet. This SSMP must be approved by the Enrollee’s governing board at a public meeting. 150 State Water Resources Control Board Order No. 2006-0003-DWQ Page 10 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 12. In accordance with the California Business and Professions Code sections 6735, 7835, and 7835.1, all engineering and geologic evaluations and judgments shall be performed by or under the direction of registered professionals competent and proficient in the fields pertinent to the required activities. Specific elements of the SSMP that require professional evaluation and judgments shall be prepared by or under the direction of appropriately qualified professionals, and shall bear the professional(s)’ signature and stamp. 13. The mandatory elements of the SSMP are specified below. However, if the Enrollee believes that any element of this section is not appropriate or applicable to the Enrollee’s sanitary sewer system, the SSMP program does not need to address that element. The Enrollee must justify why that element is not applicable. The SSMP must be approved by the deadlines listed in the SSMP Time Schedule below. Sewer System Management Plan (SSMP) (i)Goal: The goal of the SSMP is to provide a plan and schedule to properly manage, operate, and maintain all parts of the sanitary sewer system. This will help reduce and prevent SSOs, as well as mitigate any SSOs that do occur. (ii)Organization: The SSMP must identify: (a) The name of the responsible or authorized representative as described in Section J of this Order. (b) The names and telephone numbers for management, administrative, and maintenance positions responsible for implementing specific measures in the SSMP program. The SSMP must identify lines of authority through an organization chart or similar document with a narrative explanation; and (c) The chain of communication for reporting SSOs, from receipt of a complaint or other information, including the person responsible for reporting SSOs to the State and Regional Water Board and other agencies if applicable (such as County Health Officer, County Environmental Health Agency, Regional Water Board, and/or State Office of Emergency Services (OES)). (iii)Legal Authority: Each Enrollee must demonstrate, through sanitary sewer system use ordinances, service agreements, or other legally binding procedures, that it possesses the necessary legal authority to: (a) Prevent illicit discharges into its sanitary sewer system (examples may include I/I, stormwater, chemical dumping, unauthorized debris and cut roots, etc.); 151 State Water Resources Control Board Order No. 2006-0003-DWQ Page 11 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 (b) Require that sewers and connections be properly designed and constructed; (c) Ensure access for maintenance, inspection, or repairs for portions of the lateral owned or maintained by the Public Agency; (d) Limit the discharge of fats, oils, and grease and other debris that may cause blockages, and (e) Enforce any violation of its sewer ordinances. (iv) Operation and Maintenance Program. The SSMP must include those elements listed below that are appropriate and applicable to the Enrollee’s system: (a) Maintain an up-to-date map of the sanitary sewer system, showing all gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable stormwater conveyance facilities; (b) Describe routine preventive operation and maintenance activities by staff and contractors, including a system for scheduling regular maintenance and cleaning of the sanitary sewer system with more frequent cleaning and maintenance targeted at known problem areas. The Preventative Maintenance (PM) program should have a system to document scheduled and conducted activities, such as work orders; (c) Develop a rehabilitation and replacement plan to identify and prioritize system deficiencies and implement short-term and long- term rehabilitation actions to address each deficiency. The program should include regular visual and TV inspections of manholes and sewer pipes, and a system for ranking the condition of sewer pipes and scheduling rehabilitation. Rehabilitation and replacement should focus on sewer pipes that are at risk of collapse or prone to more frequent blockages due to pipe defects. Finally, the rehabilitation and replacement plan should include a capital improvement plan that addresses proper management and protection of the infrastructure assets. The plan shall include a time schedule for implementing the short- and long-term plans plus a schedule for developing the funds needed for the capital improvement plan; (d) Provide training on a regular basis for staff in sanitary sewer system operations and maintenance, and require contractors to be appropriately trained; and 152 State Water Resources Control Board Order No. 2006-0003-DWQ Page 12 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 (e) Provide equipment and replacement part inventories, including identification of critical replacement parts. (v) Design and Performance Provisions: (a) Design and construction standards and specifications for the installation of new sanitary sewer systems, pump stations and other appurtenances; and for the rehabilitation and repair of existing sanitary sewer systems; and (b) Procedures and standards for inspecting and testing the installation of new sewers, pumps, and other appurtenances and for rehabilitation and repair projects. (vi)Overflow Emergency Response Plan - Each Enrollee shall develop and implement an overflow emergency response plan that identifies measures to protect public health and the environment. At a minimum, this plan must include the following: (a) Proper notification procedures so that the primary responders and regulatory agencies are informed of all SSOs in a timely manner; (b) A program to ensure an appropriate response to all overflows; (c) Procedures to ensure prompt notification to appropriate regulatory agencies and other potentially affected entities (e.g. health agencies, Regional Water Boards, water suppliers, etc.) of all SSOs that potentially affect public health or reach the waters of the State in accordance with the MRP. All SSOs shall be reported in accordance with this MRP, the California Water Code, other State Law, and other applicable Regional Water Board WDRs or NPDES permit requirements. The SSMP should identify the officials who will receive immediate notification; (d) Procedures to ensure that appropriate staff and contractor personnel are aware of and follow the Emergency Response Plan and are appropriately trained; (e) Procedures to address emergency operations, such as traffic and crowd control and other necessary response activities; and (f) A program to ensure that all reasonable steps are taken to contain and prevent the discharge of untreated and partially treated wastewater to waters of the United States and to minimize or correct any adverse impact on the environment resulting from the SSOs, including such accelerated or additional monitoring as may be necessary to determine the nature and impact of the discharge. 153 State Water Resources Control Board Order No. 2006-0003-DWQ Page 13 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 (vii)FOG Control Program: Each Enrollee shall evaluate its service area to determine whether a FOG control program is needed. If an Enrollee determines that a FOG program is not needed, the Enrollee must provide justification for why it is not needed. If FOG is found to be a problem, the Enrollee must prepare and implement a FOG source control program to reduce the amount of these substances discharged to the sanitary sewer system. This plan shall include the following as appropriate: (a) An implementation plan and schedule for a public education outreach program that promotes proper disposal of FOG; (b) A plan and schedule for the disposal of FOG generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of FOG generated within a sanitary sewer system service area; (c) The legal authority to prohibit discharges to the system and identify measures to prevent SSOs and blockages caused by FOG; (d) Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, BMP requirements, record keeping and reporting requirements; (e) Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the FOG ordinance; (f) An identification of sanitary sewer system sections subject to FOG blockages and establishment of a cleaning maintenance schedule for each section; and (g) Development and implementation of source control measures for all sources of FOG discharged to the sanitary sewer system for each section identified in (f) above. (viii) System Evaluation and Capacity Assurance Plan: The Enrollee shall prepare and implement a capital improvement plan (CIP) that will provide hydraulic capacity of key sanitary sewer system elements for dry weather peak flow conditions, as well as the appropriate design storm or wet weather event. At a minimum, the plan must include: (a)Evaluation: Actions needed to evaluate those portions of the sanitary sewer system that are experiencing or contributing to an SSO discharge caused by hydraulic deficiency. The evaluation must provide estimates of peak flows (including flows from SSOs 154 State Water Resources Control Board Order No. 2006-0003-DWQ Page 14 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 that escape from the system) associated with conditions similar to those causing overflow events, estimates of the capacity of key system components, hydraulic deficiencies (including components of the system with limiting capacity) and the major sources that contribute to the peak flows associated with overflow events; (b)Design Criteria: Where design criteria do not exist or are deficient, undertake the evaluation identified in (a) above to establish appropriate design criteria; and (c)Capacity Enhancement Measures: The steps needed to establish a short- and long-term CIP to address identified hydraulic deficiencies, including prioritization, alternatives analysis, and schedules. The CIP may include increases in pipe size, I/I reduction programs, increases and redundancy in pumping capacity, and storage facilities. The CIP shall include an implementation schedule and shall identify sources of funding. (d)Schedule: The Enrollee shall develop a schedule of completion dates for all portions of the capital improvement program developed in (a)-(c) above. This schedule shall be reviewed and updated consistent with the SSMP review and update requirements as described in Section D. 14. (ix) Monitoring, Measurement, and Program Modifications: The Enrollee shall: (a) Maintain relevant information that can be used to establish and prioritize appropriate SSMP activities; (b) Monitor the implementation and, where appropriate, measure the effectiveness of each element of the SSMP; (c) Assess the success of the preventative maintenance program; (d) Update program elements, as appropriate, based on monitoring or performance evaluations; and (e) Identify and illustrate SSO trends, including: frequency, location, and volume. (x) SSMP Program Audits - As part of the SSMP, the Enrollee shall conduct periodic internal audits, appropriate to the size of the system and the number of SSOs. At a minimum, these audits must occur every two years and a report must be prepared and kept on file. This audit shall focus on evaluating the effectiveness of the SSMP and the 155 State Water Resources Control Board Order No. 2006-0003-DWQ Page 15 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 Enrollee’s compliance with the SSMP requirements identified in this subsection (D.13), including identification of any deficiencies in the SSMP and steps to correct them. (xi) Communication Program – The Enrollee shall communicate on a regular basis with the public on the development, implementation, and performance of its SSMP. The communication system shall provide the public the opportunity to provide input to the Enrollee as the program is developed and implemented. The Enrollee shall also create a plan of communication with systems that are tributary and/or satellite to the Enrollee’s sanitary sewer system. 14. Both the SSMP and the Enrollee’s program to implement the SSMP must be certified by the Enrollee to be in compliance with the requirements set forth above and must be presented to the Enrollee’s governing board for approval at a public meeting. The Enrollee shall certify that the SSMP, and subparts thereof, are in compliance with the general WDRs within the time frames identified in the time schedule provided in subsection D.15, below. In order to complete this certification, the Enrollee’s authorized representative must complete the certification portion in the Online SSO Database Questionnaire by checking the appropriate milestone box, printing and signing the automated form, and sending the form to: State Water Resources Control Board Division of Water Quality Attn: SSO Program Manager P.O. Box 100 Sacramento, CA 95812 The SSMP must be updated every five (5) years, and must include any significant program changes. Re-certification by the governing board of the Enrollee is required in accordance with D.14 when significant updates to the SSMP are made. To complete the re-certification process, the Enrollee shall enter the data in the Online SSO Database and mail the form to the State Water Board, as described above. 15. The Enrollee shall comply with these requirements according to the following schedule. This time schedule does not supersede existing requirements or time schedules associated with other permits or regulatory requirements. 156 State Water Resources Control Board Order No. 2006-0003-DWQ Page 16 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 Sewer System Management Plan Time Schedule Task and Associated Section Completion Date Population > 100,000 Population between 100,000 and 10,000 Population between 10,000 and 2,500 Population < 2,500 Application for Permit Coverage Section C 6 months after WDRs Adoption Reporting Program Section G 6 months after WDRs Adoption1 SSMP Development Plan and Schedule No specific Section 9 months after WDRs Adoption2 12 months after WDRs Adoption2 15 months after WDRs Adoption2 18 months after WDRs Adoption2 Goals and Organization Structure Section D 13 (i) & (ii) 12 months after WDRs Adoption2 18 months after WDRs Adoption2 Overflow Emergency Response Program Section D 13 (vi) Legal Authority Section D 13 (iii) Operation and Maintenance Program Section D 13 (iv) Grease Control Program Section D 13 (vii) 24 months after WDRs Adoption2 30 months after WDRs Adoption2 36 months after WDRs Adoption2 39 months after WDRs Adoption2 Design and Performance Section D 13 (v) System Evaluation and Capacity Assurance Plan Section D 13 (viii) Final SSMP, incorporating all of the SSMP requirements Section D 13 36 months after WDRs Adoption 39 months after WDRs Adoption 48 months after WDRs Adoption 51 months after WDRs Adoption 157 State Water Resources Control Board Order No. 2006-0003-DWQ Page 17 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 1. In the event that by July 1, 2006 the Executive Director is able to execute a memorandum of agreement (MOA) with the California Water Environment Association (CWEA) or discharger representatives outlining a strategy and time schedule for CWEA or another entity to provide statewide training on the adopted monitoring program, SSO database electronic reporting, and SSMP development, consistent with this Order, then the schedule of Reporting Program Section G shall be replaced with the following schedule: Reporting Program Section G Regional Boards 4, 8, and 9 8 months after WDRs Adoption Regional Boards 1, 2, and 3 12 months after WDRs Adoption Regional Boards 5, 6, and 7 16 months after WDRs Adoption If this MOU is not executed by July 1, 2006, the reporting program time schedule will remain six (6) months for all regions and agency size categories. 2. In the event that the Executive Director executes the MOA identified in note 1 by July 1, 2006, then the deadline for this task shall be extended by six (6) months. The time schedule identified in the MOA must be consistent with the extended time schedule provided by this note. If the MOA is not executed by July 1, 2006, the six (6) month time extension will not be granted. E. WDRs and SSMP AVAILABILITY 1. A copy of the general WDRs and the certified SSMP shall be maintained at appropriate locations (such as the Enrollee’s offices, facilities, and/or Internet homepage) and shall be available to sanitary sewer system operating and maintenance personnel at all times. F. ENTRY AND INSPECTION 1. The Enrollee shall allow the State or Regional Water Boards or their authorized representative, upon presentation of credentials and other documents as may be required by law, to: a. Enter upon the Enrollee’s premises where a regulated facility or activity is located or conducted, or where records are kept under the conditions of this Order; b. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this Order; 158 State Water Resources Control Board Order No. 2006-0003-DWQ Page 18 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 c. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this Order; and d. Sample or monitor at reasonable times, for the purposes of assuring compliance with this Order or as otherwise authorized by the California Water Code, any substances or parameters at any location. G. GENERAL MONITORING AND REPORTING REQUIREMENTS 1. The Enrollee shall furnish to the State or Regional Water Board, within a reasonable time, any information that the State or Regional Water Board may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this Order. The Enrollee shall also furnish to the Executive Director of the State Water Board or Executive Officer of the applicable Regional Water Board, upon request, copies of records required to be kept by this Order. 2. The Enrollee shall comply with the attached Monitoring and Reporting Program No. 2006-0003 and future revisions thereto, as specified by the Executive Director. Monitoring results shall be reported at the intervals specified in Monitoring and Reporting Program No. 2006-0003. Unless superseded by a specific enforcement Order for a specific Enrollee, these reporting requirements are intended to replace other mandatory routine written reports associated with SSOs. 3. All Enrollees must obtain SSO Database accounts and receive a “Username” and “Password” by registering through the California Integrated Water Quality System (CIWQS). These accounts will allow controlled and secure entry into the SSO Database. Additionally, within 30days of receiving an account and prior to recording spills into the SSO Database, all Enrollees must complete the “Collection System Questionnaire”, which collects pertinent information regarding a Enrollee’s collection system. The “Collection System Questionnaire” must be updated at least every 12 months. 4. Pursuant to Health and Safety Code section 5411.5, any person who, without regard to intent or negligence, causes or permits any untreated wastewater or other waste to be discharged in or on any waters of the State, or discharged in or deposited where it is, or probably will be, discharged in or on any surface waters of the State, as soon as that person has knowledge of the discharge, shall immediately notify the local health officer of the discharge. Discharges of untreated or partially treated wastewater to storm drains and drainage channels, whether man-made or natural or concrete-lined, shall be reported as required above. Any SSO greater than 1,000 gallons discharged in or on any waters of the State, or discharged in or deposited where it is, or probably will be, discharged in or on any surface waters of the State shall also be reported to the Office of Emergency Services pursuant to California Water Code section 13271. 159 State Water Resources Control Board Order No. 2006-0003-DWQ Page 19 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 H. CHANGE IN OWNERSHIP 1. This Order is not transferable to any person or party, except after notice to the Executive Director. The Enrollee shall submit this notice in writing at least 30 days in advance of any proposed transfer. The notice must include a written agreement between the existing and new Enrollee containing a specific date for the transfer of this Order's responsibility and coverage between the existing Enrollee and the new Enrollee. This agreement shall include an acknowledgement that the existing Enrollee is liable for violations up to the transfer date and that the new Enrollee is liable from the transfer date forward. I. INCOMPLETE REPORTS 1. If an Enrollee becomes aware that it failed to submit any relevant facts in any report required under this Order, the Enrollee shall promptly submit such facts or information by formally amending the report in the Online SSO Database. J. REPORT DECLARATION 1. All applications, reports, or information shall be signed and certified as follows: (i) All reports required by this Order and other information required by the State or Regional Water Board shall be signed and certified by a person designated, for a municipality, state, federal or other public agency, as either a principal executive officer or ranking elected official, or by a duly authorized representative of that person, as described in paragraph (ii) of this provision. (For purposes of electronic reporting, an electronic signature and accompanying certification, which is in compliance with the Online SSO database procedures, meet this certification requirement.) (ii) An individual is a duly authorized representative only if: (a) The authorization is made in writing by a person described in paragraph (i) of this provision; and (b) The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity. K. CIVIL MONETARY REMEDIES FOR DISCHARGE VIOLATIONS 1. The California Water Code provides various enforcement options, including civil monetary remedies, for violations of this Order. 2. The California Water Code also provides that any person failing or refusing to furnish technical or monitoring program reports, as required under this Order, or 160 State Water Resources Control Board Order No. 2006-0003-DWQ Page 20 of 20 Statewide General WDR For Wastewater Collection Agencies 5/2/06 falsifying any information provided in the technical or monitoring reports is subject to civil monetary penalties. L. SEVERABILITY 1. The provisions of this Order are severable, and if any provision of this Order, or the application of any provision of this Order to any circumstance, is held invalid, the application of such provision to other circumstances, and the remainder of this Order, shall not be affected thereby. 2. This order does not convey any property rights of any sort or any exclusive privileges. The requirements prescribed herein do not authorize the commission of any act causing injury to persons or property, nor protect the Enrollee from liability under federal, state or local laws, nor create a vested right for the Enrollee to continue the waste discharge. CERTIFICATION The undersigned Clerk to the State Water Board does hereby certify that the foregoing is a full, true, and correct copy of general WDRs duly and regularly adopted at a meeting of the State Water Resources Control Board held on May 2, 2006. AYE: Tam M. Doduc Gerald D. Secundy NO: Arthur G. Baggett ABSENT: None ABSTAIN: None __________________________ Song Her Clerk to the Board 161 -------- --------------- State Water Resources Control Board July 26, 2013 All Enrollees Subject to the Statewide General Waste Discharge Requirements for Sanitary Sewer Systems Dear Enrollees: AMENDMENT OF STATEWIDE MONITORING AND REPORTING PROGRAM (MRP) REQUIREMENTS FOR SANITARY SEWER OVERFLOWS; MRP ORDER 2006-0003-DWQ Effective September 9, 2013, the MRP for the Statewide General Waste Discharge Requirements for Sanitary Sewer Systems (Order 2006-0003-DWQ) are amended. The amendments to the MRP set forth in Order 2013-0058-EXEC address compliance and enforceability in the existing MRP. The amendments additionally address stakeholder concern regarding cost of compliance issues. A copy of the amending Order and corresponding Fact Sheet describing my Executive Officer action, are enclosed. Monitoring and reporting requirements in MRP Order 2008-0002-EXEC that have been effective since 2008 are superseded by the amended requirements set forth in Order 2013-0058-EXEC. If you have any questions regarding these amendments, please contact Russell Norman, Water Resource Control Engineer at (916) 323-5598 or rnorman@waterboards.ca.gov . Sincerely, ~H Executive Director Enclosures cc: Regional Water Quality Control Board Executive Officers FELICIA MAF'::us, cHAti'l I THOM AS HewARD, execur·1e DIRECTOR 1001 I Street, Sacramento, CA 95814 I Mail ing Address: P.O. Box 100, Sacramento, Ca 95812-0100 I www.waterboards.ca.gov 6 RECYCLED PA?CR 162 STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD ORDER NO. WQ 2013-0058-EXEC AMENDING MONITORING AND REPORTING PROGRAM FOR STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR SANITARY SEWER SYSTEMS The State of California, Water Resources Control Board (hereafter State Water Board) finds: 1.The State Water Board is authorized to prescribe statewide general Waste Discharge Requirements (WDRs) for categories of discharges that involve the same or similar operations and the same or similar types of waste pursuant to Water Code section 13263(i). 2.Water Code section 13193 et seq. requires the Regional Water Quality Control Boards (Regional Water Boards) and the State Water Board (collectively, the Water Boards) to gather Sanitary Sewer Overflow (SSO) information and make this information available to the public, including but not limited to, SSO cause, estimated volume, location, date, time, duration, whether or not the SSO reached or may have reached waters of the state, response and corrective action taken, and an enrollee's contact information for each SSO event. An enrollee is defined as the public entity having legal authority over the operation and maintenance of, or capital improvements to, a sanitary sewer system greater than one mile in length. 3.Water Code section 13271, et seq. requires notification to the California Office of Emergency Services (Cal OES), formerly the California Emergency Management Agency, for certain unauthorized discharges, including SSOs. 4.On May 2, 2006, the State Water Board adopted Order 2006-0003-DWQ, "Statewide Waste Discharge Requirements for Sanitary Sewer Systems"1 (hereafter SSS WDRs) to comply with Water Code section 13193 and to establish the framework for the statewide SSO Reduction Program. 5.Subsection G.2 of the SSS WDRs and the Monitoring and Reporting Program (MRP) provide that the Executive Director may modify the terms of the MRP at any time. 6.On February 20, 2008, the State Water Board Executive Director adopted a revised MRP for the SSS WDRs to rectify early notification deficiencies and ensure that first responders are notified in a timely manner of SSOs discharged into waters of the state. 7.When notified of an SSO that reaches a drainage channel or surface water of the state, Cal OES, pursuant to Water Code section 13271(a)(3), forwards the SSO notification information2 to local government agencies and first responders including local public health officials and the applicable Regional Water Board. Receipt of notifications for a single SSO event from both the SSO reporter and Cal OES is duplicative. To address this, the SSO notification requirements added by the February 20, 2008 MRP revision are being removed in this MRP revision. 1 Available for download at: http://www.waterboards.ca.gov/board decisions/adopted orders/water guality/2006/wgo/wgo2006 0003.pdf 2 Cal OES Hazardous Materials Spill Reports available Online at: http://w3.calema.ca.gov/operational/malhaz.nsf/$defaultview and http://w3.calema.ca.gov/operational/malhaz.nsf 163 Monitoring and Reporting Program No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems Page 2 of 2 8.In the February 28, 2008 Memorandum of Agreement between the State Water Board and the California Water and Environment Association (CWEA), the State Water Board committed to re- designing the CIWQS3 Online SSO Database to allow "event" based SSO reporting versus the original "location" based reporting. Revisions to this MRP and accompanying changes to the CIWQS Online SSO Database will implement this change by allowing for multiple SSO appearance points to be associated with each SSO event caused by a single asset failure. 9.Based on stakeholder input and Water Board staff experience implementing the SSO Reduction Program, SSO categories have been revised in this MRP. In the prior version of the MRP, SSOs have been categorized as Category 1 or Category 2. This MRP implements changes to SSO categories by adding a Category 3 SSO type. This change will improve data management to further assist Water Board staff with evaluation of high threat and low threat SSOs by placing them in unique categories (i.e., Category 1 and Category 3, respectively). This change will also assist enrollees in identifying SSOs that require Cal OES notification. 10.Based on over six years of implementation of the SSS WDRs, the State Water Board concludes that the February 20, 2008 MRP must be updated to better advance the SSO Reduction Program4 objectives, assess compliance, and enforce the requirements of the SSS WDRs. IT IS HEREBY ORDERED THAT: Pursuant to the authority delegated by Water Code section 13267(f), Resolution 2002-0104, and Order 2006-0003-DWQ, the MRP for the SSS WDRs (Order 2006-0003-DWQ) is hereby amended as shown in Attachment A and shall be effective on September 9, 2013. Date 3 California Integrated Water Quality System (CIWQS) publicly available at http://www.waterboards .ca.gov/ciwgs/publicreports.shtml 4 Statewide Sanitary Sewer Overflow Reduction Program information is available at: http://www.waterboards.ca.gov/water issues/proqrams/sso/ 164 ATTACHMENT A STATE WATER RESOURCES CONTROL BOARD ORDER NO. WQ 2013-0058-EXEC AMENDING MONITORING AND REPORTING PROGRAM FOR STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR SANITARY SEWER SYSTEMS This Monitoring and Reporting Program (MRP) establishes monitoring, record keeping, reporting and public notification requirements for Order 2006-0003-DWQ, “Statewide General Waste Discharge Requirements for Sanitary Sewer Systems” (SSS WDRs). This MRP shall be effective from September 9, 2013 until it is rescinded. The Executive Director may make revisions to this MRP at any time. These revisions may include a reduction or increase in the monitoring and reporting requirements. All site specific records and data developed pursuant to the SSS WDRs and this MRP shall be complete, accurate, and justified by evidence maintained by the enrollee. Failure to comply with this MRP may subject an enrollee to civil liabilities of up to $5,000 a day per violation pursuant to Water Code section 13350; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement. The State Water Resources Control Board (State Water Board) reserves the right to take any further enforcement action authorized by law. A. SUMMARY OF MRP REQUIREMENTS Table 1 – Spill Categories and Definitions CATEGORIES DEFINITIONS [see Section A on page 5 of Order 2006-0003-DWQ, for Sewer Overflow (SSO) definition] CATEGORY 1 Discharges of untreated or partially treated wastewater of any volume resulting from an enrollee’s sanitary sewer system failure or flow condition that: · Reach surface water and/or reach a drainage channel tributary to a surface water; or · Reach a Municipal Separate Storm Sewer System (MS4) and are not fully captured and returned to the sanitary sewer system or not otherwise captured and disposed of properly. Any volume of wastewater not recovered from the MS4 is considered to have reached surface water unless the storm drain system discharges to a dedicated storm water or groundwater infiltration basin (e.g., infiltration pit, percolation pond). CATEGORY 2 Discharges of untreated or partially treated wastewater of 1,000 gallons or greater resulting from an enrollee’s sanitary sewer system failure or flow condition that do not reach surface water, a drainage channel, or a MS4 unless the entire SSO discharged to the storm drain system is fully recovered and disposed of properly. CATEGORY 3 All other discharges of untreated or partially treated wastewater resulting from an enrollee’s sanitary sewer system failure or flow condition. 165 CATEGORIES DEFINITIONS [see Section A on page 5 of Order 2006-0003-DWQ, for Sewer Overflow (SSO) definition] PRIVATE LATERAL SEWAGE DISCHARGE (PLSD) Discharges of untreated or partially treated wastewater resulting from blockages or other problems within a privately owned sewer lateral connected to the enrollee’s sanitary sewer system or from other private sewer assets. PLSDs that the enrollee becomes aware of may be voluntarily reported to the California Integrated Water Quality System (CIWQS) Online SSO Database. Table 2 – Notification, Reporting, Monitoring, and Record Keeping Requirements ELEMENT REQUIREMENT METHOD NOTIFICATION (see section B of MRP) · Within two hours of becoming aware of any Category 1 SSO greater than or equal to 1,000 gallons discharged to surface water or spilled in a location where it probably will be discharged to surface water, notify the California Office of Emergency Services (Cal OES) and obtain a notification control number. Call Cal OES at: (800) 852-7550 REPORTING (see section C of MRP) · Category 1 SSO: Submit draft report within three business days of becoming aware of the SSO and certify within 15 calendar days of SSO end date. · Category 2 SSO: Submit draft report within 3 business days of becoming aware of the SSO and certify within 15 calendar days of the SSO end date. · Category 3 SSO: Submit certified report within 30 calendar days of the end of month in which SSO the occurred. · SSO Technical Report: Submit within 45 calendar days after the end date of any Category 1 SSO in which 50,000 gallons or greater are spilled to surface waters. · “No Spill” Certification: Certify that no SSOs occurred within 30 calendar days of the end of the month or, if reporting quarterly, the quarter in which no SSOs occurred. · Collection System Questionnaire: Update and certify every 12 months. Enter data into the CIWQS Online SSO Database (http://ciwqs.waterboar ds.ca.gov/), certified by enrollee’s Legally Responsible Official(s). WATER QUALITY MONITORING (see section D of MRP) · Conduct water quality sampling within 48 hours after initial SSO notification for Category 1 SSOs in which 50,000 gallons or greater are spilled to surface waters. Water quality results are required to be uploaded into CIWQS for Category 1 SSOs in which 50,000 gallons or greater are spilled to surface waters. 166 RECORD KEEPING (see section E of MRP) · SSO event records. · Records documenting Sanitary Sewer Management Plan (SSMP) implementation and changes/updates to the SSMP. · Records to document Water Quality Monitoring for SSOs of 50,000 gallons or greater spilled to surface waters. · Collection system telemetry records if relied upon to document and/or estimate SSO Volume. Self-maintained records shall be available during inspections or upon request. 167 Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems Page 4 of 12 B. NOTIFICATION REQUIREMENTS Although Regional Water Quality Control Boards (Regional Water Boards) and the State Water Board (collectively, the Water Boards) staff do not have duties as first responders, this MRP is an appropriate mechanism to ensure that the agencies that have first responder duties are notified in a timely manner in order to protect public health and beneficial uses. 1. For any Category 1 SSO greater than or equal to 1,000 gallons that results in a discharge to a surface water or spilled in a location where it probably will be discharged to surface water, either directly or by way of a drainage channel or MS4, the enrollee shall, as soon as possible, but not later than two (2) hours after (A) the enrollee has knowledge of the discharge, (B) notification is possible, and (C) notification can be provided without substantially impeding cleanup or other emergency measures, notify the Cal OES and obtain a notification control number. 2. To satisfy notification requirements for each applicable SSO, the enrollee shall provide the information requested by Cal OES before receiving a control number. Spill information requested by Cal OES may include: i. Name of person notifying Cal OES and direct return phone number. ii. Estimated SSO volume discharged (gallons). iii. If ongoing, estimated SSO discharge rate (gallons per minute). iv. SSO Incident Description: a. Brief narrative. b. On-scene point of contact for additional information (name and cell phone number). c. Date and time enrollee became aware of the SSO. d. Name of sanitary sewer system agency causing the SSO. e. SSO cause (if known). v. Indication of whether the SSO has been contained. vi. Indication of whether surface water is impacted. vii. Name of surface water impacted by the SSO, if applicable. viii. Indication of whether a drinking water supply is or may be impacted by the SSO. ix. Any other known SSO impacts. x. SSO incident location (address, city, state, and zip code). 3. Following the initial notification to Cal OES and until such time that an enrollee certifies the SSO report in the CIWQS Online SSO Database, the enrollee shall provide updates to Cal OES regarding substantial changes to the estimated volume of untreated or partially treated sewage discharged and any substantial change(s) to known impact(s). 168 Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems Page 5 of 12 4. PLSDs: The enrollee is strongly encouraged to notify Cal OES of discharges greater than or equal to 1,000 gallons of untreated or partially treated wastewater that result or may result in a discharge to surface water resulting from failures or flow conditions within a privately owned sewer lateral or from other private sewer asset(s) if the enrollee becomes aware of the PLSD. C. REPORTING REQUIREMENTS 1. CIWQS Online SSO Database Account: All enrollees shall obtain a CIWQS Online SSO Database account and receive a “Username” and “Password” by registering through CIWQS. These accounts allow controlled and secure entry into the CIWQS Online SSO Database. 2. SSO Mandatory Reporting Information: For reporting purposes, if one SSO event results in multiple appearance points in a sewer system asset, the enrollee shall complete one SSO report in the CIWQS Online SSO Database which includes the GPS coordinates for the location of the SSO appearance point closest to the failure point, blockage or location of the flow condition that caused the SSO, and provide descriptions of the locations of all other discharge points associated with the SSO event. 3. SSO Categories i. Category 1 – Discharges of untreated or partially treated wastewater of any volume resulting from an enrollee’s sanitary sewer system failure or flow condition that: a. Reach surface water and/or reach a drainage channel tributary to a surface water; or b. Reach a MS4 and are not fully captured and returned to the sanitary sewer system or not otherwise captured and disposed of properly. Any volume of wastewater not recovered from the MS4 is considered to have reached surface water unless the storm drain system discharges to a dedicated storm water or groundwater infiltration basin (e.g., infiltration pit, percolation pond). ii. Category 2 – Discharges of untreated or partially treated wastewater greater than or equal to 1,000 gallons resulting from an enrollee’s sanitary sewer system failure or flow condition that does not reach a surface water, a drainage channel, or the MS4 unless the entire SSO volume discharged to the storm drain system is fully recovered and disposed of properly. iii. Category 3 – All other discharges of untreated or partially treated wastewater resulting from an enrollee’s sanitary sewer system failure or flow condition. 4. Sanitary Sewer Overflow Reporting to CIWQS - Timeframes i. Category 1 and Category 2 SSOs – All SSOs that meet the above criteria for Category 1 or Category 2 SSOs shall be reported to the CIWQS Online SSO Database: a. Draft reports for Category 1 and Category 2 SSOs shall be submitted to the CIWQS Online SSO Database within three (3) business days of the enrollee becoming aware of the SSO. Minimum information that shall be reported in a draft Category 1 SSO report shall include all information identified in section 8.i.a. below. Minimum information that shall be reported in a Category 2 SSO draft report shall include all information identified in section 8.i.c below. 169 Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems Page 6 of 12 b. A final Category 1 or Category 2 SSO report shall be certified through the CIWQS Online SSO Database within 15 calendar days of the end date of the SSO. Minimum information that shall be certified in the final Category 1 SSO report shall include all information identified in section 8.i.b below. Minimum information that shall be certified in a final Category 2 SSO report shall include all information identified in section 8.i.d below. ii. Category 3 SSOs – All SSOs that meet the above criteria for Category 3 SSOs shall be reported to the CIWQS Online SSO Database and certified within 30 calendar days after the end of the calendar month in which the SSO occurs (e.g., all Category 3 SSOs occurring in the month of February shall be entered into the database and certified by March 30). Minimum information that shall be certified in a final Category 3 SSO report shall include all information identified in section 8.i.e below. iii. “No Spill” Certification – If there are no SSOs during the calendar month, the enrollee shall either 1) certify, within 30 calendar days after the end of each calendar month, a “No Spill” certification statement in the CIWQS Online SSO Database certifying that there were no SSOs for the designated month, or 2) certify, quarterly within 30 calendar days after the end of each quarter, “No Spill” certification statements in the CIWQS Online SSO Database certifying that there were no SSOs for each month in the quarter being reported on. For quarterly reporting, the quarters are Q1 - January/ February/ March, Q2 - April/May/June, Q3 - July/August/September, and Q4 - October/November/December. If there are no SSOs during a calendar month but the enrollee reported a PLSD, the enrollee shall still certify a “No Spill” certification statement for that month. iv. Amended SSO Reports – The enrollee may update or add additional information to a certified SSO report within 120 calendar days after the SSO end date by amending the report or by adding an attachment to the SSO report in the CIWQS Online SSO Database. SSO reports certified in the CIWQS Online SSO Database prior to the adoption date of this MRP may only be amended up to 120 days after the effective date of this MRP. After 120 days, the enrollee may contact the SSO Program Manager to request to amend an SSO report if the enrollee also submits justification for why the additional information was not available prior to the end of the 120 days. 5. SSO Technical Report The enrollee shall submit an SSO Technical Report in the CIWQS Online SSO Database within 45 calendar days of the SSO end date for any SSO in which 50,000 gallons or greater are spilled to surface waters. This report, which does not preclude the Water Boards from requiring more detailed analyses if requested, shall include at a minimum, the following: i. Causes and Circumstances of the SSO: a. Complete and detailed explanation of how and when the SSO was discovered. b. Diagram showing the SSO failure point, appearance point(s), and final destination(s). c. Detailed description of the methodology employed and available data used to calculate the volume of the SSO and, if applicable, the SSO volume recovered. d. Detailed description of the cause(s) of the SSO. 170 Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems Page 7 of 12 e. Copies of original field crew records used to document the SSO. f. Historical maintenance records for the failure location. ii. Enrollee’s Response to SSO: a. Chronological narrative description of all actions taken by enrollee to terminate the spill. b. Explanation of how the SSMP Overflow Emergency Response plan was implemented to respond to and mitigate the SSO. c. Final corrective action(s) completed and/or planned to be completed, including a schedule for actions not yet completed. iii. Water Quality Monitoring: a. Description of all water quality sampling activities conducted including analytical results and evaluation of the results. b. Detailed location map illustrating all water quality sampling points. 6. PLSDs Discharges of untreated or partially treated wastewater resulting from blockages or other problems within a privately owned sewer lateral connected to the enrollee’s sanitary sewer system or from other private sanitary sewer system assets may be voluntarily reported to the CIWQS Online SSO Database. i. The enrollee is also encouraged to provide notification to Cal OES per section B above when a PLSD greater than or equal to 1,000 gallons has or may result in a discharge to surface water. For any PLSD greater than or equal to 1,000 gallons regardless of the spill destination, the enrollee is also encouraged to file a spill report as required by Health and Safety Code section 5410 et. seq. and Water Code section 13271, or notify the responsible party that notification and reporting should be completed as specified above and required by State law. ii. If a PLSD is recorded in the CIWQS Online SSO Database, the enrollee must identify the sewage discharge as occurring and caused by a private sanitary sewer system asset and should identify a responsible party (other than the enrollee), if known. Certification of PLSD reports by enrollees is not required. 7. CIWQS Online SSO Database Unavailability In the event that the CIWQS Online SSO Database is not available, the enrollee must fax or e- mail all required information to the appropriate Regional Water Board office in accordance with the time schedules identified herein. In such event, the enrollee must also enter all required information into the CIWQS Online SSO Database when the database becomes available. 171 Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems Page 8 of 12 8. Mandatory Information to be Included in CIWQS Online SSO Reporting All enrollees shall obtain a CIWQS Online SSO Database account and receive a “Username” and “Password” by registering through CIWQS which can be reached at CIWQS@waterboards.ca.gov or by calling (866) 792-4977, M-F, 8 A.M. to 5 P.M. These accounts will allow controlled and secure entry into the CIWQS Online SSO Database. Additionally, within thirty (30) days of initial enrollment and prior to recording SSOs into the CIWQS Online SSO Database, all enrollees must complete a Collection System Questionnaire (Questionnaire). The Questionnaire shall be updated at least once every 12 months. i. SSO Reports At a minimum, the following mandatory information shall be reported prior to finalizing and certifying an SSO report for each category of SSO: a. Draft Category 1 SSOs: At a minimum, the following mandatory information shall be reported for a draft Category 1 SSO report: 1. SSO Contact Information: Name and telephone number of enrollee contact person who can answer specific questions about the SSO being reported. 2. SSO Location Name. 3. Location of the overflow event (SSO) by entering GPS coordinates. If a single overflow event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the SSO appearance point explanation field. 4. Whether or not the SSO reached surface water, a drainage channel, or entered and was discharged from a drainage structure. 5. Whether or not the SSO reached a municipal separate storm drain system. 6. Whether or not the total SSO volume that reached a municipal separate storm drain system was fully recovered. 7. Estimate of the SSO volume, inclusive of all discharge point(s). 8. Estimate of the SSO volume that reached surface water, a drainage channel, or was not recovered from a storm drain. 9. Estimate of the SSO volume recovered (if applicable). 10. Number of SSO appearance point(s). 11. Description and location of SSO appearance point(s). If a single sanitary sewer system failure results in multiple SSO appearance points, each appearance point must be described. 12. SSO start date and time. 13. Date and time the enrollee was notified of, or self-discovered, the SSO. 14. Estimated operator arrival time. 15. For spills greater than or equal to 1,000 gallons, the date and time Cal OES was called. 172 Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems Page 9 of 12 16. For spills greater than or equal to 1,000 gallons, the Cal OES control number. b. Certified Category 1 SSOs: At a minimum, the following mandatory information shall be reported for a certified Category 1 SSO report, in addition to all fields in section 8.i.a: 1. Description of SSO destination(s). 2. SSO end date and time. 3. SSO causes (mainline blockage, roots, etc.). 4. SSO failure point (main, lateral, etc.). 5. Whether or not the spill was associated with a storm event. 6. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the overflow; and a schedule of major milestones for those steps. 7. Description of spill response activities. 8. Spill response completion date. 9. Whether or not there is an ongoing investigation, the reasons for the investigation and the expected date of completion. 10. Whether or not a beach closure occurred or may have occurred as a result of the SSO. 11. Whether or not health warnings were posted as a result of the SSO. 12. Name of beach(es) closed and/or impacted. If no beach was impacted, NA shall be selected. 13. Name of surface water(s) impacted. 14. If water quality samples were collected, identify parameters the water quality samples were analyzed for. If no samples were taken, NA shall be selected. 15. If water quality samples were taken, identify which regulatory agencies received sample results (if applicable). If no samples were taken, NA shall be selected. 16. Description of methodology(ies) and type of data relied upon for estimations of the SSO volume discharged and recovered. 17. SSO Certification: Upon SSO Certification, the CIWQS Online SSO Database will issue a final SSO identification (ID) number. c. Draft Category 2 SSOs: At a minimum, the following mandatory information shall be reported for a draft Category 2 SSO report: 1. Items 1-14 in section 8.i.a above for Draft Category 1 SSO. 173 Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems Page 10 of 12 d. Certified Category 2 SSOs: At a minimum, the following mandatory information shall be reported for a certified Category 2 SSO report: 1. Items 1-14 in section 8.i.a above for Draft Category 1 SSO and Items 1-9, and 17 in section 8.i.b above for Certified Category 1 SSO. e. Certified Category 3 SSOs: At a minimum, the following mandatory information shall be reported for a certified Category 3 SSO report: 1. Items 1-14 in section 8.i.a above for Draft Category 1 SSO and Items 1-5, and 17 in section 8.i.b above for Certified Category 1 SSO. ii. Reporting SSOs to Other Regulatory Agencies These reporting requirements do not preclude an enrollee from reporting SSOs to other regulatory agencies pursuant to state law. In addition, these reporting requirements do not replace other Regional Water Board notification and reporting requirements for SSOs. iii. Collection System Questionnaire The required Questionnaire (see subsection G of the SSS WDRs) provides the Water Boards with site-specific information related to the enrollee’s sanitary sewer system. The enrollee shall complete and certify the Questionnaire at least every 12 months to facilitate program implementation, compliance assessment, and enforcement response. iv. SSMP Availability The enrollee shall provide the publicly available internet web site address to the CIWQS Online SSO Database where a downloadable copy of the enrollee’s approved SSMP, critical supporting documents referenced in the SSMP, and proof of local governing board approval of the SSMP is posted. If all of the SSMP documentation listed in this subsection is not publicly available on the Internet, the enrollee shall comply with the following procedure: a. Submit an electronic copy of the enrollee’s approved SSMP, critical supporting documents referenced in the SSMP, and proof of local governing board approval of the SSMP to the State Water Board, within 30 days of that approval and within 30 days of any subsequent SSMP re-certifications, to the following mailing address: State Water Resources Control Board Division of Water Quality Attn: SSO Program Manager 1001 I Street, 15th Floor, Sacramento, CA 95814 D. WATER QUALITY MONITORING REQUIREMENTS: To comply with subsection D.7(v) of the SSS WDRs, the enrollee shall develop and implement an SSO Water Quality Monitoring Program to assess impacts from SSOs to surface waters in which 50,000 gallons or greater are spilled to surface waters. The SSO Water Quality Monitoring Program, shall, at a minimum: 174 Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems Page 11 of 12 1. Contain protocols for water quality monitoring. 2. Account for spill travel time in the surface water and scenarios where monitoring may not be possible (e.g. safety, access restrictions, etc.). 3. Require water quality analyses for ammonia and bacterial indicators to be performed by an accredited or certified laboratory. 4. Require monitoring instruments and devices used to implement the SSO Water Quality Monitoring Program to be properly maintained and calibrated, including any records to document maintenance and calibration, as necessary, to ensure their continued accuracy. 5. Within 48 hours of the enrollee becoming aware of the SSO, require water quality sampling for, at a minimum, the following constituents: i. Ammonia ii. Appropriate Bacterial indicator(s) per the applicable Basin Plan water quality objective or Regional Board direction which may include total and fecal coliform, enterococcus, and e - coli. E. RECORD KEEPING REQUIREMENTS: The following records shall be maintained by the enrollee for a minimum of five (5) years and shall be made available for review by the Water Boards during an onsite inspection or through an information request: 1. General Records: The enrollee shall maintain records to document compliance with all provisions of the SSS WDRs and this MRP for each sanitary sewer system owned including any required records generated by an enrollee’s sanitary sewer system contractor(s). 2. SSO Records: The enrollee shall maintain records for each SSO event, including but not limited to: i. Complaint records documenting how the enrollee responded to all notifications of possible or actual SSOs, both during and after business hours, including complaints that do not result in SSOs. Each complaint record shall, at a minimum, include the following information: a. Date, time, and method of notification. b. Date and time the complainant or informant first noticed the SSO. c. Narrative description of the complaint, including any information the caller can provide regarding whether or not the complainant or informant reporting the potential SSO knows if the SSO has reached surface waters, drainage channels or storm drains. d. Follow-up return contact information for complainant or informant for each complaint received, if not reported anonymously. e. Final resolution of the complaint. 175 Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems Date Page 12 of 12 ii. Records documenting steps and/or remedial actions undertaken by enrollee, using all available information, to comply with section D.7 of the SSS WDRs. iii. Records documenting how all estimate(s) of volume(s) discharged and, if applicable, volume(s) recovered were calculated. 3. Records documenting all changes made to the SSMP since its last certification indicating when a subsection(s) of the SSMP was changed and/or updated and who authorized the change or update. These records shall be attached to the SSMP. 4. Electronic monitoring records relied upon for documenting SSO events and/or estimating the SSO volume discharged, including, but not limited to records from: i. Supervisory Control and Data Acquisition (SCADA) systems ii. Alarm system(s) iii. Flow monitoring device(s) or other instrument(s) used to estimate wastewater levels, flow rates and/or volumes. F. CERTIFICATION 1. All information required to be reported into the CIWQS Online SSO Database shall be certified by a person designated as described in subsection J of the SSS WDRs. This designated person is also known as a Legally Responsible Official (LRO). An enrollee may have more than one LRO. 2. Any designated person (i.e. an LRO) shall be registered with the State Water Board to certify reports in accordance with the CIWQS protocols for reporting. 3. Data Submitter (DS): Any enrollee employee or contractor may enter draft data into the CIWQS Online SSO Database on behalf of the enrollee if authorized by the LRO and registered with the State Water Board. However, only LROs may certify reports in CIWQS. 4. The enrollee shall maintain continuous coverage by an LRO. Any change of a registered LRO or DS (e.g., retired staff), including deactivation or a change to the LRO’s or DS’s contact information, shall be submitted by the enrollee to the State Water Board within 30 days of the change by calling (866) 792-4977 or e-mailing help@ciwqs.waterboards.ca.gov. 5. A registered designated person (i.e., an LRO) shall certify all required reports under penalty of perjury laws of the state as stated in the CIWQS Online SSO Database at the time of certification. CERTIFICATION The undersigned Clerk to the Board does hereby certify that the foregoing is a full, true, and correct copy of an order amended by the Executive Director of the State Water Resources Control Board. 176 City of Huntington Beach Sewer System Management Plan 61 APPENDIX B - Municipal Codes 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 City of Huntington Beach Sewer System Management Plan 62 APPENDIX C - Enhanced Cleaning Locations 208 City of Huntington Beach Utilities Division Wastewater Section Enhanced Cleaning 2022 DIST STREET # MEN LOCATION 128 128-200 2 LARCHWOOD WEST OF NORTHRIDGE… JET EAST 400' (SIPHON) 128 128-001 2 GLENWOOD & EDGEVIEW…JET EAST 400' (SIPHON ) 138 138-040 2 THOR 625' (SIPHON) 138 518-090 3 SOUTHEAST CORNER SPRINGDALE & MCFADDEN JET NORTH 350' (SIPHON) 139 520-170 2 OXFORD & GOLDENWEST…JET NORTH150' 139 139-230 2 OXFORD & YORKSHIRE ..JET EAST 500' 139 139-240 2 CANTERBURY & YORKSHIRE.. JET NORTH 275' 139 502-050 3 HANOVER AT MC FADDEN... JET EAST…275' 149 149-230 2 MCFADDEN & DAWSON…JET SOUTH 800' 149 149-030 2 REDCOACH AND DAWSON…JET WEST 800' 154 154-040 2 HUMBOLDT & WEST OF WAYFARER…AT THE WET WELL JETWEST 875' 155 155-020 3 EDINGER & WAIKIKI..JET SOUTH 500' 155 503-010 3 EDINGER FROM MELODY TO BOLSA CHICA 1,375' 156 156-060 2 SISSON EAST OF WARREN…JET SOUTH UNDER THE CHANNELTOWARD MEADOWALARK 450' (SIPHON) 157 518-160 2 SPRINGDALE SOUTH OF EDINGER…JET SOUTH 250' AND EAST 30' 158 158-070 2 BRADBURY & CHRISTY…JET EAST 525' 158 158-080 3 HEIL & BRADBURY JET NORTH 500' 165 165-150 2 VISTA &GREEN…JET EAST 175' 165 165-090 2 PEARCE FROM LYNN TO BOLSA CHICA 1,475' ( CCTV Green 655' only) 165 165-100 2 GREEN & PEARCE... JET NORTH 525' AND SOUTH 400' ( CCTV 525' N only) 165 504-010 2 HEIL FROM GREEN TO ALGONQUIN 2,125' 165 529-020 2 ALGONQUIN ONE MANHOLE SOUTH OF HEIL JET NORTH 325' 165 516-305 3 BOLSA CHICA FROM SOUTH PEARCE TO HEIL 1,675 166 504-270 3 REGINA & HEIL…JET WEST 1,175' (TWO LNES) 169 169-305 2 DIANE & SYLVIA…JET TOWARD WEST THRU-PARK 700' 169 169-170 2 MARILYN & DIANE…JET NORTH 575' 169 169-180 3 MARILYN & GOLDENWEST…JET WEST 875' (CCTV 161'only) 169 519-085 3 EDWARDS & MARILYN…JET EAST 700' 169 518-080 3 EDWARDS SOUTH OF MARILYN & THE CHANNEL JET NORTH 800 (SIPHON ) 169 505-080 3 WARNER FROM POST OFFICE TO GOLDENWEST 1,175' 173 173-055 2 CORAL CAY & PCH …JET NORTH EAST 375' 174 174-135 2 WARNER ACROSS FROM HUNTINGTON HARBOR BAY & RACQUET CLUB …JET NORTH TOWARD THE CLUB 150' 177 177-210 2 NORDINA FROM FORBES TO SLATER LIFT STATION..1,225' 176 176-080 2 ST ANDREWS & KENILWORTH…JET NORTH 700' 176 176-090 3 GRAHAM & KENILWORTH…JET WEST 875' 176 517-020 3 GRAHAM & GRAHAM SEWER LIFT STATION JET NORTH 325' 1 209 City of Huntington Beach Utilities Division Wastewater Section Enhanced Cleaning 2022 DIST STREET # MEN LOCATION 176 517-200 3 GRAHAM & GRAHAM SEWER LIFT STATION JET SOUTH 75' 177 177-001 3 GERSHWIN JET 175' 179 179-120 2 ARGO JET 375' 179 179-090 2 CAPSTONE & DREY…JET EAST 300' 179 179-160 2 KURT AT MANHATTAN…JET SOUTH 275' 179 179-170 2 MANHATTAN FROM GIBSON TO MAYOR…JET 925' 179 179-240 2 MAYOR & SLATER AT THE COUNTY LINE JET NORTH 575' 179 179-290 3 SHENLYN & EDWARDS…JET EAST 525' (SIPHON) 187 187-340 2 WRIGHTWOOD FROM SOUTH OF PINON TO PRICE JET 1,425' 187 187-360 2 SPRINGDALE SOUTH OF SLATER..JET WEST 250' TOWARD PRICE. 188 188-050 2 FENLEY FROM EAST OF COLLIE TO SPRINGDALE JET 1,075' 188 518-220 2 SLATER LIFT STATION…JETSOUTH 275' 188 178-080 2 SLATER LIFT STATION…JET EAST TOWARD POINT LOMA 600' 189 189-020 2 FRONTAGE ROAD OFF EDWARDS SOUTH OF ARMADA JET EAST TOWARD VILLA NUEVA 500' 189 189-210 3 EDWARDS NORTH OF ARMADA…JET TOWARD EAST UNDER THE CHANNEL TOWARD SABBICAS 550' (SIPHON) 252 252-030 2 ALLEY BEHIND APT AT AMAZON & GANGES…JET EAST TOWARD AMAZON 875' 252 252-040 2 ALLEY BEHIND APT AT AMAZON AND GANGES NEXT MANHOLE JET NORTH 100' 252 252-001 2 RHONE BETWEEN ALHAMRA & NANCY…JET NORTH 500' SOUTH 175' BEHIND HOUSE NORTH OF HEIL..JET NORTH THEN EAST TOWARD RHONE 200' 253 523-150 2 NEWLAND 2 ND HOLE SOUTH OF EDINGER JET NORTH 275' 262 262-160 2 VIEWPOINT AND DAMASK …JET NORTH 875' 262 262-170 2 DAMASK…JET 500' 262 499-000 2 BEACH SOUTH OF DAMASK JET NORTH 200' (SIPHON) 263 263-275 2 ALLEY BEHIND NORMS SOUTH OF HEIL AND EAST OF BEACH LAST MANHOLE…JET TOWARD NORTH 400' 263 263-275 2 WAITE & BRUSH JET WEST TOWARD ALLEY BEHIND NORMS 175' 263 263-150 2 WAITE …JET 425' 263 263-140 2 BRUSH FROM WAITE TO NEWLAND 2,125' 263 523-170 3 NEWLAND FROM LOIS TO LAMAR 825' 263 523-180 3 NEWLAND FROM LAMAR TO THE SOUTH 150' 263 523-140 3 NEWLAND NORTH OF WARNER…JET NORTH 800' & SOUTH 100' ( SIPHON ) 263 263-030 3 "A ''& WARNER…JET NORTH 625' 292 292-130 2 DELAWARE SOUTH OF FRANKLIN…JET NORTH 350' 292 292-100 2 DELAWARE WEST BETWEEN HOUSE TOWARD YUKON 525' 292 292-305 2 DELAWARE EAST INTO ALLEY 700' 2 210 City of Huntington Beach Utilities Division Wastewater Section Enhanced Cleaning 2022 DIST STREET # MEN LOCATION 292 292-130 2 DELAWARE & ELLIS...JET NORTH 275' 292 508-030 2 HUNTINGTON & ELLIS..JET EAST 675' 292 532-060 3 MAIN FROM FLORIDA TO BEACH 1,025' 292 499-000 3 BEACH NORTH OF ELLIS TO ELLIS 950' 293 508-060 3 ELLIS WEST OF NEWLAND…JET WEST 275' 293 508-050 3 ELLIS WEST OF NEWLAND…JET EAST 250' 412 412-060 2 AMBERLEAF…JET 575' 412 536-080 2 DELAWARE FROM ELLIS TO MAIN 1,000' ( CCTV 346' only ) 412 536-090 2 DELAWARE FROM MAIN TO SOUTH ..JET 475' 412 508-070 3 ELLIS & MAIN …JET NORTH 175' 412 499-000 3 BEACH NORTH OF MAIN…JET SOUTH 325' 413 508-050 3 BEACH & ELLIS…JET EAST 875' 413 499-000 3 BEACH & ELLIS…JET SOUTH 800' 423 510-020 3 YORKTOWN WEST OF NEWLAND…JET EAST 325' & WEST 600' ( CCTV 442" only ) 423 523-280 3 NEWLAND NORTH OF BRIDGEPORT TO SOUTH OF YORKTOWN JET 2,125' (SIPHON) 423 423-290 3 DANBURY & NEWLAND…JET WEST 525' (SIPHON) 423 423-280 3 GILFORD & NEWLAND…JET WEST 450' (SIPHON) 423 423-280 3 GILFORD & NEWLAND…JET North 600' 424 424-340 2 HOME DEPOT SHOPPING CENTER SOUTH OF GARFIELD WEST OF MAGNOLIA…JET WEST TOWARD LUSS 400' AND NORTH 50' AND EAST 625' 424 524-130 3 MAGNOLA SOUTH OF GARFIELD TO GARFIELD 650' 424 424-220 3 YORKTOWN WEST OF MAGNOLA…JET NORTH TOWARD CORALWOOD 500' 424 510-030 3 YORKTOWN WEST OF MAGNOLA…JET EAST 175' FROM THE FIRST MANHOLE 424 510-160 3 YORKTOWN WEST OF MAGNOLA…JET WEST 800' FROM THE FRIST MANHOLE 425 510-130 3 YORKTOWN WEST OF BUSHARD JET EAST 875' (SIPHON) 426 526-160 3 BROOKHURST FROM GARFIELD TO KAMUELA 1,875' (SIPHON DO THE EVERY 3 MONTHS!!!) 427 427-170 3 KAMUELA EAST OF BROOKHURST…JET WEST 30' 432 511-010 3 HUNTINGTON & ADAMS…JET WEST 450' 433 433-060 2 ROTHERT FROM FLAXMAN TO NORTH NEWBRITAIN 550' 435 435-130 2 CRAWFORD JET 500' (DO NOT JET LOTUS) 435 435-250 3 CHESAPEAKE AND ADAMS …JET NORTH 500' 435 435-230 3 BUSHARD SVS RD WESTSIDE…JET NORTH 600' 435 510-140 3 YORKTOWN AND HONEYWOOD JET 800' ( SIPHON) 435 435-001 3 HONEYWOOD…JET 175' 436 436-450 2 CHARING CROSS…JET 200' (DO NOT GET ON THE SIDE WALK !) 436 436-490 2 SUTTON & ADAMS…JET NORTH 200' 436 511-060 3 SUTTON & ADAMS…JET EAST 875' 3 211 City of Huntington Beach Utilities Division Wastewater Section Enhanced Cleaning 2022 DIST STREET # MEN LOCATION 436 436-690 3 ADAMS TWO MANHOLES EAST OF BUSHARD…JET NORTH TOWARD LURES 400' 436 511-050 3 ADAMS & BUSHARD WEST SIDE… JET EAST 875' (SIPHON) 437 437-230 2 FRONTAGE ROAD & ADAMS SEWER LIFT STANTION JET EAST 500' 442 442-370 2 JOLIET & ALLEY EAST OF ENGLAND…JET EAST 675' 442 442-300 2 INDIANAPOLIS AND ALLEY EAST OF ENGLAND JET NORTH 800' 443 511-020 2 ADAMS & NORTH NEW BRITAIN WEST TOWARD THE STATION 100' 443 443-030 2 SOUTHPORT & CAPE COTTAGE…JET NORTH 500' 443 443-030 2 SOUTHPORT & CAPE COTTAGE…JET SOUTH THEN EAST THRU THE PARK 375' 443 443-050 2 SOUTH NEW BRITAIN…JET 700' (USE 600LB PRESSURE 4TH HOUSE!!) 443 443-040 2 SOUTHPORT…JET 500' 444 444-190 2 NEWBY…JET 250' 444 444-310 2 MEANDER SOUTH OF BURLCREST…JET WEST BETWEEN HOUSE 275' 444 444-310 2 BURLCREST FROM CROFT TO MAGNOLIA 1,075' 446 526-200 3 INDIANAPOLIS & BROOKHURST EAST SIDE JET NORTH 425' & SOUTH 100' 451 532-001 2 ALLEY BETWEEN 5TH & MAIN AT WALNUT JET SOUTHWEST 25' & JET NORTHEAST 400' 451 532-135 2 WALNUT SOUTH EAST OF MAIN AT ALLEY JET SOUTH WEST 200' 451 497-290 2 ALLEY BETWEEN 12TH & 13TH SOUTHWEST OF ORANGE JET NORTHEAST 400' 452 512-135 2 FLORDIA & INDIANAPOLIS…JET WEST 250' 452 452-040 2 GENEVA & FLORIDA…JET NORTH 275' 452 452-060 2 FRANKFORT & ALLEY EAST OF DELAWARE JET NORTH 800' 452 536-001 2 ALLEY & DETROIT EAST OF CALIFORNIA JET NORTH 800' 452 452-100 2 CALIFORNIA & DETROIT…JET EAST 175' 455 455-140 2 CARROLTOWN WEST OF HOPETOWN JET EAST 325' (SIPHON) 455 524-050 3 ATLANTA & MAGNOLIA…JET NORTH 650' 456 457-030 3 BROOKHURST SOUTH OF ENDEVER JET EAST150' (SIPHON ) 456 526-220 3 BROOKHURST AND ATLANTA JET NORTH 500' 457 457-150 3 BROOKHURST SOUTH OF INDIANOPOLIS JET EAST TOWARD SUBURBIA 175' 457 526-110 3 BROOKHURST & INDIANAPOLIS WEST SIDE 175' JET NORTH,. 457 446-260 3 THEN WEST BETWEEN HOUSES TOWARD HOTSPRINGS 600' 4 212 City of Huntington Beach Utilities Division Wastewater Section Enhanced Cleaning 2022 DIST STREET # MEN LOCATION 457 512-060 3 INDIANAPOLIS AND BROOKHURST JET EAST JET FROM BOTH SIDES 150' (SIPHON) 464 464-095 2 ST AUGUSTINE & BRETON…JET NORTH SOUTH 375' 464 464-090 2 ST AUGUSTINE & BRETON…JET NORTH 600' 464 464-080 2 ST AUGUSTINE FROM BRETON TO SEAFORTH 525' 464 464-085 2 ST AUGUSTINE FROM SEAFORTH TO NEWLAND 625' 464 523-320 2 NEWLAND NORTH OF ST AUGUSTINE…JET SOUTH 100' AND WEST 15' 475 523-190 2 RAMBLER & BUSHARD WEST SIDE..JET NORTH 675' 475 475-020 2 RHODESIA WEST OF KANEOHE…JET EAST 100' (SIPHON) 467 467-050 3 BROOKHURST AND SPAR…JET EAST 475' (SIPHON) 475 475-210 2 RAMBLER AND BUSHARD JET WEST 575' (SIPHON) 475 475-020 2 RHODESIA WEST OF KANEOHE…JET EAST 100' (SIPHON) 475 475-100 2 ALOHA WEST OF KANEOHE…JET EAST 75' (SIPHON) ONCE A MONTH CLEANING 138 138-186 3 COLUMBIA & MC FADDEN…JET NORTH 475' (SIPHON) 138 502-040 3 COLUMBIA & MC FADDEN…JET EAST 800' 242 242-000 3 CENTER FROM EAST OF HUNTINGTON VILLAGE TO HUNTINGTON VILLAGE…JET 975' (SIPHON) 253 253-001 2 STARK EAST OF BEACH…JET 625' 253 253-040 2 ALLEY FROM STARK EAST OF BEACH TO STARK AND MALAGA (SIPHON) …JET 1O25' 253 253-020 2 BEHIND WESTMONT SCHOOL…JET NORTH 750' (SIPHON) CLEANED EVERY TWO MONTHS 445 445-280 2 HARBOR ISLE AND BROWNING …JET EAST UNDER THE CHANNEL TOWARD RAMONA…JET 400' (SIPHON) 151 151-001 2 MARINER…JET 1150' ( CODE FOR GATE * 2468) 151 151-001 2 BEHIND SAM'S SEAFOOD PARKING LOT BY SAM'S SEAFOOD..JET N.W 300' 151 151-001 2 SAM'S & PCH …JET N.E. INTO PARKING LOT 150' 151 498-000 2 PETER'S LANDING AT PCH…PCH FROM SAM'S TO LAST HOLE IN THE GRASS AT PETER'S LANDING…JET 1,625' 166 505-250 3 GRAHAM ACROSS FROM MEADOW CIR …JET TOWARD THE SOUTH 600' ( CCTV 290' Only ) 166 517-030 3 ON WARNER FROM O.C.S.D M/H…JET TOWARD THE NORTH 350' 281 281-030 2 CENTRAL PARK ………………….1400' 412 412-070 2 FLORIDA FROM SOUTH OF MAIN TO SHAFFER JET 975' 462 540-010 2 BEACH FRONTAGE ROAD…JET 1750' 462 540-010 2 BEACH PARKING LOT…JET 900' 461 540-010 2 PIER…JET 1725' Call Bait Shop 24 HRS a head 714-960-1392 426 426-040 3 VELARDO AND BUSHARD JET EAST 800' (SIPHON) 465 465-020 3 HAMILTON AND BUSHARD JET TOWARD NORTHWEST…JET 100' (SIPHON) (NOTE TWO SIPHON) 476 526-049 2 BROOKHURST SOUTH OF HAMILTION JET SOUTH …375' 5 213 City of Huntington Beach Utilities Division Wastewater Section Enhanced Cleaning 2022 DIST STREET # MEN LOCATION CLEANED EVERY THREE MONTHS 272 272-120 2 SYCAMORE AND ASH…JET EAST 450' 158 158-199 1 MYRTLE AND MERCIER JET WEST 550' 137 518-100 3 SPRINGDALE SOUTH OF BOLSA JETT TOWARD THE NORTH 925' 443 511-020 4 ON BEACH BLVD & OCEAN HILL JET WEST 500' 443 511-020 3 ON ADAMS AVE JET SOUTH 200' (SIPHON) 443 511-020 4 ON BEACH BLVD & ADAMS AVE JET SOUTH 300' (SIPHON)( NEED TO SCHEDUL EARLY MORNING) 453 453-339 2 ATLANTA LIFT STATION THE MANHOLE NEXT TO THE WET WELL JET…TOWARD NORTH 300' CLEANED EVERY FOUR MONTHS 166 501140 3 BOLSA CHICA & WARNER MANHOLE NUMBER 2 LANE…JET NORTH 800' 232 232-060 2 COLGATE & CASCADE…JET WEST NEXT TO SCHOOL 150' AND JET SOUTH 500' 272 499-000 2 BEACH AND CYPRESS…JET NORTH 300' 272 499-000 2 BEACH AND CYPRESS…JET SOUTH 800' 272 272-110 3 CYPRESS AND ELM JET EAST 425' 272 272-173 3 ELM AND SCYAMORE…JET SOUTH 450' 262 505-200 3 WARNER FROM WEST OF BEACH TO OAK…JET 775' 264 505-160 3 WARNER & MAGNOLIA…JET WEST 475' 264 524-120 3 WARNER & MAGNOLIA…JET SOUTH 30' 262 505-200 3 LYNDON AND WARNER ...JET EAST 800' 262 262-220 3 LYNDON…JET 400' 271 271-200 2 BACK OF THE CITY YARD…JET ? 271 271-140 2 FORD AND CANNA JET EAST CLEANED EVERY SIX MONTHS 242 242-000 3 CENTER FROM HUNTINGTON VILLAGE TO RAIL ROAD TRACKS...JET 700' 157 157-190 3 PAR AND SPRINGDALE…JET WEST 800' 152 152-001 2 PARKING LOT OFF OF COUNTESS FROM PORTOFINO CONDO'S TO SEABRIDGE CONDO'S 625' 157 157-160 2 CHIPPER AND SNEAD…JET TOWARD THE NORTH BETWEEN THE HOUSES TOWARD THE STORE 150' 157 157-150 2 JET SNEAD...JET 575' 253 253-020 2 AROUND WESTMONT SCHOOL YARD FROM TO HEIL 1300' 253 504-140 2 HEIL FROM WESTMONT SCHOOL TO NEWLAND 1,050' 349 532-001 3 ON MAIN ST TO PCH JET 1,700 441 497-300 2 ALLEY BETWEEN 11TH AND 12TH AT PALM…JET 300' NORTH TO THE START AT CREST 463 463-001 3 SURFWOOD & ATLANTA…JET SOUTH 750' 463 513-010 3 ATLANTA FROM EAST OF SURFWOOD TO THE EAST OF BEACH…JET 1,100' 463 513-190 3 ATLANTA EAST OF BEACH…JET WEST 125' 453 513-010 2 ENTRANCE TO ATLANTA STATION…JET SOUTH 100' 457 513-030 3 ATLANTA AND NEWLAND...JET EAST 800' 6 214 City of Huntington Beach Utilities Division Wastewater Section Enhanced Cleaning 2022 DIST STREET # MEN LOCATION 457 523-030 3 ATLANTA AND NEWLAND JET NORTH 500' 457 523-320 3 ATLANTA AND NEWLAND SOUTH 25' TOWARD THE COUNTY 463 463-150 2 NEWLAND NORTH OF DONCASTER AT ALLEY JET WEST 800' CLEANED ONCE A YEAR 154 499-000 3 EDINGER & BEACH…JET SOUTH 875' 252 503-150 3 EDINGER FROM BEACH TO RR TRACKS…JET 2,700 327 327-015 3 SEAPOINT FROM GARFIELD TO SUMMIT..JET 189 520-060 3 GOLDENWEST FROM TALBERT THROUGH (SIPHON) AT RIO VISTA...JET 1,375 & (JET BACKWARD FROM TALBERT) 7 215 City of Huntington Beach Sewer System Management Plan 63 APPENDIX D - Sewer Lateral Program 216   Parkway Tree Root Intrusion Into Sewer Lateral ‐ Policy and Procedures  Section 14.54.035 of the City of Huntington Beach Municipal Code addresses responsibilities for the operation,  maintenance and repair of sewer laterals.  The City is responsible for the maintenance and repair of the portion of the  sewer lateral within the public right‐of‐way that extends from the City‐owned sewer main to the private property line.   The property owner is responsible for the repair and maintenance of the portion of the sewer lateral located on private  property.    Reminder‐ liquid grease solidifies as it travels from your sink to the collection system down‐stream and many items such  as baby wipes, feminine hygiene products, eggshells and coffee grounds should not be flushed.  Sewer Lateral Program Procedure:  1. A property owner experiencing problems* with the sewer lateral calls the Public Works Utilities Division at            (714) 536‐5921, to notify them of the problem.    2. The property owner secures the services of a qualified contractor to clean and video tape the interior of the sewer  lateral from the house cleanout to the public sewer main.  While cleaning and/or video taping the lateral, it is  important for the contractor to locate and mark the actual sewer lateral location at the property line, on the  sidewalk, at the curb and at the connection with the sewer main.  The use of water soluble spray paint to show the  location of the sewer lateral is highly recommended as laterals are often at different angles and locations than  portrayed on many record drawings.    3. The property owner submits a copy of the video to the Utilities Division staff at 19001 Huntington Street between  the hours of 7:00 AM and 4:30 PM, Monday through Friday.    4. The Utilities Division staff will review the video to determine the cause of the blockage, if and what type of repair is  needed and whether the location of the blockage and repair are within the City’s right‐of‐way.      5. Depending on the situation, there are typically two options for repair:  1) Slip Lining the sewer lateral within the  public right‐of‐way and on the private property leaving the parkway tree intact.  In this case, the city arborist needs  to determine that the integrity of the tree will not be impacted by the repairs made to the sewer lateral.  The  property owner is responsible for the cost of slip lining the sewer lateral on their private property.  2)  In a case  where it is determined that the tree must be removed to complete the repair, and it falls within the City’s  responsibility, the City will initiate repairs at the City’s cost and reimburse the cost of the video to the property  owner.  Questions regarding the Sewer Lateral Program should be directed to the Public Works Utilities Division at                        (714) 536‐5921.  This information can also be reviewed at the City’s website:   www.surfcity‐hb.org  *The first course of action for a blocked or clogged sewer line is a call to a qualified plumber or sewer contractor.  Often  times, cleaning of the line is needed immediately and residents should not wait for the claim process to be completed.   The need for frequent cleaning/rooting of the line is an indication of a possible sewer lateral break or tree root intrusion.  217 City of Huntington Beach Sewer System Management Plan 64 APPENDIX E - Certifications 218 219 220 221 222 223 224 225 226 227 228 229 230 City of Huntington Beach Sewer System Management Plan 65 APPENDIX F - Sewer Master Plan (2003) 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 City of Huntington Beach Sewer System Management Plan 66 APPENDIX G - Sewer Capacity Analysis (2009) 399 CITY OF HUNTINGTON BEACH SEWER CAPACITY ANALYSIS Prepared by: AKM Consulting Engineers October 2008 400 CITY OF HUNTINGTON BEACH SEWER CAPACITY ANALYSIS Submitted to City of Huntington Beach 2000 Main Street Huntington Beach, California 92648 Submitted by AKM Consulting Engineers 553 Wald Irvine, California 92618 October 2008 401 TOC-1 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis TABLE OF CONTENTS Section Page ES EXECUTIVE SUMMARY ES-1 Introduction ..........................................................................................................................ES-1 ES-2 Criteria..................................................................................................................................ES-1 ES-3 Existing System....................................................................................................................ES-1 ES-4 System Analysis...................................................................................................................ES-2 1 SEWER CAPACITY ANALYSIS 1-1 Introduction .........................................................................................................................1-1 1-2 Criteria.................................................................................................................................1-1 1-3 Existing System...................................................................................................................1-2 1-4 System Analysis..................................................................................................................1-3 APPENDICES A Deficient Locations B Flow Monitoring Locations C Diurnal Curves D 2003 Master Plan Capacity Analysis LIST OF TABLES Table No. Page ES1 2003 Master Plan Identified Deficiencies...................................................................................... ES-2 ES2 Flow Monitoring Summary............................................................................................................ ES-2 1 2003 Master Plan Identified Deficiencies.........................................................................................1-2 2 Initial Flow Monitoring Locations......................................................................................................1-4 3 Flow Monitoring Summary...............................................................................................................1-5 4 Precipitation and Flow Monitoring Summary...................................................................................1-6 5 Dry and Wet Weather Summary......................................................................................................1-6 6 Peaking Coefficients per Flow Monitoring Data...............................................................................1-7 7 Comparison of Master Plan Results and Flow Monitoring Data – Deficient Location No. 1 ...........1-8 8 Comparison of Master Plan Results and Flow Monitoring Data – Deficient Location No. 3 ...........1-9 9 Comparison of Master Plan Results and Flow Monitoring Data – Deficient Location No. 4 .........1-10 10 Comparison of Master Plan Results and Flow Monitoring Data – Deficient Location No. 5 .........1-11 11 Comparison of Master Plan Results and Flow Monitoring Data – Deficient Location No. 6 .........1-11 12 Pump No 1 Discharge Rate Summary...........................................................................................1-16 13 Pump No 2 Discharge Rate Summary...........................................................................................1-16 14 Comparison of Master Plan Results and Flow Monitoring Data – Deficient Location No. 9 .........1-17 402 TOC-2 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis 15 Comparison of Master Plan Results and Flow Monitoring Data – Deficient Location No. 8 (Flow Monitoring Site 11)...............................................................................................................1-19 16 Comparison of Master Plan Results and Flow Monitoring Data – Deficient Location No. 8 (Flow Monitoring Site 8).................................................................................................................1-20 17 Comparison of Master Plan Results and Flow Monitoring Data – Deficient Location No 8 (Flow Monitoring Site 12)...............................................................................................................1-21 18 Comparison of Master Plan Results and Flow Monitoring Data – Deficient Location No. 7 .........1-22 LIST OF FIGURES Figure No. Page 1 Manhole on Edwards Street and Brad Drive (Photo)......................................................................1-4 2 Flow Pattern Schematic for Site No.’s 7, 8, 10, 11 and 12............................................................1-12 3 SCADA Data at the Edinger Lift Station, July 14, 2007 .................................................................1-13 4 SCADA Data at the Saybrook Lift Station, July 14, 2007..............................................................1-13 5 SCADA Data at the Edinger Lift Station, July 20, 2007 .................................................................1-14 403 ES-1 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis City of Huntington Beach SEWER SYSTEM CAPACITY ANALYSIS EXECUTIVE SUMMARY ES-1 Introduction The City of Huntington Beach’s Sewer Master Plan was completed in May 2003. The Master Plan conducted a capacity analysis of the collection system and determined that out of approximately 360 miles of sewer reaches, only several reaches were found deficient based on the model results and criteria. The calculated deficiencies are based upon somewhat conservative unit flow factors and peaking relationships. Therefore it is prudent to verify the calculated deficiencies before investing in replacement or relief projects. The objective of this study is to conduct flow monitoring along the reaches that were identified as deficient by the 2003 Sewer Master Plan in order to ascertain whether a deficiency exists, and to provide recommendations for eliminating the verified deficiencies. ES-2 Criteria Sewer Design Criteria The 2003 Master Plan analysis of sewer pipes was based upon the depth to diameter ratio (d/D), resulting from peak dry weather flows. The criteria used for the 2003 Master Plan are as follows: - Depth to diameter ratio (d/D) less than or equal to 0.5 for pipes 12-inch and smaller in diameter - d/D less than or equal to 0.67 for 15-inch diameter pipes - d/D less than or equal to 0.75 for 18-inch diameter and larger pipes Reaches that do not satisfy the City’s d/D criteria are considered deficient and require additional capacity analyses. The 2003 Master Plan flow depths were calculated utilizing estimated peak dry weather flows. Average dry weather flows, which are calculated based upon the product of the tributary land use areas and unit flow factors, and a peaking relationship were used to estimate the peak dry weather flows. The depth of flow and design capacity of gravity pipes were calculated based on the Manning formula with a friction factor (Manning’s n) of 0.013. ES-3 Existing System The 2003 Sewer Master Plan identified nine (9) areas as deficient, which are listed in Table ES1. The locations of the deficient reaches are shown in Appendix A. 404 SEWER SYSTEM CAPACITY ANALYSIS ES-2 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis Table ES1 2003 Master Plan Identified Deficiencies Deficiency No. Hydraulic Model Pipe Numbers Existing Size Proposed Size Length (feet) 1 Hamilton Ave Brookhurst Street to extension of Archer Circle 1019, 1017, 1016, 1015, 1014, 1013 18" 21"1,540 2 Edwards Street, Heil Avenue From Brad Drive to Heil Avenue; From Edwards Street to Oakmont Lane 345, 335, 321, 308 293, 5005 10" 10", 8" 15" 15", 12"1,692 3 Heil Avenue From Sabot Lane to Goldenwest Street 296, 295, 294 12" 15"833 4 Speer Avenue Jacquelyn Lane to Beach Boulevard 550, 549, 543, 544, 545, 548 10" 15"1,397 5 Beach Boulevard From Speer Avenue to Slater Avenue 547, 531 12" 18"659 6 Beach Boulevard From South of Talbert Avenue to Ronald Road 5013, 1080, 598, 590 8", 10" 12", 15"1,086 7 Saybrook Lane South of Heil Avenue to Morning Star Drive 2586 12" 18 299 8 Mandalay Circle From Edinger Avenue to Humboldt Drive 202, 206, 211, 213, 216, 219, 221, 222, 232, 237 10" 15" 2,181 9 Edinger Avenue From Trinidad Lane to Santa Barbara Lane 194, 165, 166, 167, 168, 169, 170, 174 10" 15'1,967 Total Length 11,654 Location ES-4 System Analysis Flow Monitoring Locations The flow monitoring locations were chosen to analyze the capacity deficient sewers that were identified in the 2003 Sewer Master Plan. Extensive flow monitoring near the Edinger Lift Station was required to analyze the effects the pumped flows have on the existing sewer system. Initially, eleven (11) sites were selected for flow monitoring. Flow monitors were installed at nine (9) of the eleven (11) sites. Data was collected between 12:00 A.M. June 14, 2007 and 11:45 P.M. June 27, 2007. Two (2) additional flow monitoring sites were selected and monitors were installed between 12:00 A.M. January 16, 2008 and 11:45 P.M. February 5, 2008 to analyze the flows with the improved Edinger Lift Station. The flow monitoring results are summarized in Table ES2. Table ES2 Flow Monitoring Summary Site # Ave GPM Peak GPM Existing Size Slope Total Days Min GPM ADWF GPM PDWF GPM Max Depth d/D 1 Hamilton Ave West of John Ln 807 1,533 18 0.001 12.5 137 520 928 9.29 0.52 2 Edwards St Peggy Cir 3 Heil Ave Goldenwest St 186 411 12 0.002 14.0 40 149 256 5.54 0.46 4 Speer Ave Beach Blvd 263 561 8 0.002 14.0 3 41 140 4.35 0.54 5 Beach Blvd Slater Avenue 453 914 12 0.002 14.0 100 284 508 9.38 0.78 6 Beach Blvd Talbert Ave 149 336 10 0.002 14.0 64 234 431 7.67 0.77 7 Saybrook Ln Heil Ave 0 12 0.002 14.0 46 346 642 7.10 0.59 8 Mandalay Cir Humboldt Dr 229 494 10 0.002 14.0 29 227 455 8.78 0.88 8* Mandalay Cir Humboldt Dr 0 494 10 0.002 21.0 29 228 500 10.00 1.00 9 Edinger Ave Santa Barbara Ln 10 Edinger Ave Trinidad Ln 190 419 10 0.002 14.0 67 157 277 5.18 0.52 11 Santa Barbara Ln Shorebreak Dr 198 434 10 0.002 14.0 2 205 520 8.67 0.87 12* Saybrook Ln Fisher Dr 190 758 12**21.0 58 247 517 7.01 0.68 * Additional Flow Monitoring performed between January 16, 2008 to February 5, 2008 ** At Flow Monitoring Location the height of the inflow pipe was 11" which is used to calculate the d/D Removed from Flow Monitoring Removed from Flow Monitoring General Data Flow Monitoring Data Location 2003 Sewer Master Plan Data The City’s 2003 Sewer Master Plan used the following peaking relationship to develop the peak dry weather flow (Qpdw) from the average dry weather flow (Qadw): Qpdw = 1.93(Qadw)0.898 405 SEWER SYSTEM CAPACITY ANALYSIS ES-3 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis This relationship was evaluated with the use of the flow monitoring data, maintaining the exponent 0.898. Flow Monitoring Sites No.’s 4, 7, 8, 11, and 12 were excluded from this analysis because they are downstream of lift stations. The coefficient used in the Master Plan (1.93) is higher than the values calculated from the flow monitoring data, which average approximately 1.60. Therefore, the peak dry weather flow estimates used in the 2003 Master Plan were conservative, which is appropriate for planning level studies. Capacity Analysis and Recommendations During the initial field verification at Flow Monitoring Site No. 2, the field crew realized that the Sewer Master Plan Deficiency No. 2 was no longer in existence. The Orange County Sanitation District installed a 30-inch diameter trunk sewer on Heil Avenue, and the City was able to divert its wastewater directly into this facility. This also allowed the City to abandon the sewers on Heil Avenue from Torjian Lane to Oakmont Lane, and on Edwards Street from Heil Avenue to Brad Drive. Deficient Location No. 2 was part of these abandoned pipes and does not require further analysis. Assuming that the normal maximum flow recordings from the flow monitoring effort represent the peak dry weather flows, the flow monitoring results were analyzed based on the 2003 Sewer Master Plan criteria. • Sewer Master Plan Deficiency No.’s 1 and 3 meet the existing depth to diameter (d/D) criteria and are not recommended to be replaced for capacity. • Deficiency No.’s 4 and 9 do not satisfy the City’s d/D criteria. However, these deficiencies are minor and do not warrant replacement of the existing pipes for capacity. If the tributary land use is proposed to be changed significantly in the future, resulting in higher wastewater flows, then these reaches should be re-evaluated. • The flow monitoring measurements at Sewer Master Plan Deficiency No. 5 show a maximum depth to diameter ratio of 0.78. Based on a pipe slope of 0.002 and Manning’s n of 0.013, the Master Plan estimated that the ultimate peak dry weather flow would require a minimum pipe diameter of 15 inches to meet the City’s depth to diameter design criteria of 0.67. These reaches will require further evaluation by the City. • At Sewer Master Plan Deficiency No. 6, the flow monitoring shows the four reaches of sewer pipes flowing at a maximum depth to diameter ratio of 0.77. Based on the record slope of 0.002, Manning’s n of 0.013 and the ultimate peak dry weather flow, the existing sewers would require a minimum pipe diameter of 15 inches to meet the City’s depth to diameter criteria of 0.67. These reaches will require further evaluation by the City. • Sewer Master Plan Deficiency No. 7 is downstream of the Saybrook Lift Station, which is scheduled to be replaced in the next 3 to 8 years. The flow monitoring shows the reach flowing at a depth to diameter ratio of 0.59, which does not meet the City’s criteria. Based on a slope of 0.002, Manning’s n of 0.013 and the anticipated Saybrook Lift Station discharge of 826 gpm, a minimum pipe diameter of 15 inches in needed to meet the City’s depth to diameter design criteria of 0.67. This reach will require further evaluation by the City when the Saybrook Lift Station is improved. • The Edinger Lift Station underwent improvements during the recent sewer capacity analysis. Sewer Master Plan Deficiency No. 8 is downstream of this lift station and required additional analysis, which 406 SEWER SYSTEM CAPACITY ANALYSIS ES-4 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis included flow monitoring before and after the pump station improvements were completed as well as pump capacity tests at the Edinger Lift Station. The flow monitoring performed after the Edinger Lift Station was replaced indicated maximum flow rates of 500 gpm. Pump capacity tests conducted in May 2008 estimated similar flows of 510 gpm. Based on this flow rate, the record slope of 0.002, and Manning’s n of 0.013, a minimum pipe diameter of 15 inches would be necessary to meet the City’s depth to diameter criteria of 0.67 for the ten (10) reaches identified as deficient in the 2003 Sewer Master Plan. During the Edinger Lift Station pump capacity testing, the existing peak inflow into the lift station was measured as 285 gpm. To reduce the depth to diameter ratio in the ten (10) downstream sewers, the City may decrease the pump capacity from 500 gpm to 400 gpm. In doing so, approximately 37% of the ultimate PDWF will remain available for wet weather inflow and infiltration. By reducing the flow to 400 gpm, the downstream sewers are expected to flow at a depth to diameter ratio of approximately 0.744. • The 2003 Sewer Master Plan identified three (3) “Borderline” deficient reaches just downstream of Deficiency No. 8. During the master planning effort, “Borderline conditions” were the reaches that had calculated d/D values which were close to the deficiency criteria d/D values, but were not determined “Deficient” by engineering judgment. For this current analysis, these reaches were evaluated with the relevant Edinger Lift Station flow monitoring data. While the d/D ratios for these reaches were 0.59, which is deficient according to the master plan standards, it does not warrant replacement of the existing pipes for capacity. If the tributary land us is proposed to be changed significantly in the future, resulting in higher wastewater flows, then these reaches should be reevaluated. 407 1-1 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis City of Huntington Beach SEWER SYSTEM CAPACITY ANALYSIS 1-1 Introduction The City of Huntington Beach’s Sewer Master Plan was completed in May 2003. The Master Plan conducted a capacity analysis of the collection system utilizing a computer hydraulic model. Out of approximately 360 miles of sewer reaches, only a few reaches (less than 0.6 percent) were determined to be deficient. The calculated deficiencies are based upon somewhat conservative unit flow factors and peaking relationships. Therefore it is prudent to verify the calculated deficiencies before investing in replacement or relief projects. The objective of this study is to conduct flow monitoring along the reaches that were identified as deficient by the 2003 Sewer Master Plan in order to ascertain whether a deficiency exists, and to provide recommendations for eliminating the verified deficiencies. 1-2 Criteria The 2003 Sewer Master Plan generated the average dry weather flows by summing the product of tributary land uses and their corresponding unit flow factors. The land use was designated based on the general plan. The flow factors were created using the flow monitoring results as well as previous studies. The adequacy of a sewage collection system is based upon its ability to convey the peak flows. At any individual point in the system, peak dry weather flow (PDWF) is estimated by converting the total average dry weather flow upstream of the point in question to peak dry weather flow by an empirical peak-to-average relationship. The peaking relationship used in preparing the 2003 Master Plan was developed based upon the flow monitoring conducted at 12 locations throughout the City. Qpdw = 1.93(Qadw)0.898 Flowrates are in million gallons per day (mgd). Sewer Design Criteria Design criteria are established to ensure that the sewer system can operate effectively under all flow conditions. Each sewer reach must be able to carry peak wet weather flows without surcharging the system. Low flows must be conveyed at a velocity that will prevent solids from settling and blocking the system. The design and analysis of sewer pipes were based upon the depth to diameter ratio (d/D), resulting from peak dry weather flows. The criteria used for the 2003 Master Plan are as follows: Depth to diameter ratio (d/D) less than or equal to 0.5 for pipes 12-inch and smaller in diameter d/D less than or equal to 0.67 for 15-inch diameter pipes d/D less than or equal to 0.75 for 18-inch diameter and larger pipes 408 SEWER SYSTEM CAPACITY ANALYSIS 1-2 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis The remaining area above the maximum dry weather flow depth is primarily reserved for the selected design wet weather flows; however, this space also keeps the sewage aerated which reduces the possibility of septic conditions and odors. The 2003 Master Plan flow depths were calculated based on peak dry weather flows. The design capacity of gravity pipes is calculated based on the Manning formula: Q = 1.486 A R2/3 S1/2 / n Q = flow in cubic feet per second R = hydraulic radius in feet = A / P A = cross-sectional area of the pipe in square feet P = wetted perimeter in feet S = slope of pipe in feet of rise per foot of length n = Manning’s friction factor (n=0.013 was used for vitrified clay pipe in the 2003 Master Plan) The peak flow velocity should be greater than 2 feet per second to prevent deposition of solids in the pipe. 1-3 Existing System The City’s existing sewer collection system is made up of a network of gravity sewers, consisting of approximately 360 miles of pipe, and twenty-nine (29) sewer lift stations. The general direction of flow is from north to south and west to east. The majority of the City sewers tie into the Orange County Sanitation District (OCSD) trunk sewers for conveyance to the local treatment plant. The sewers are primarily constructed of vitrified clay pipe with sizes ranging from 6-inches to 30-inches in diameter. Approximately 85 percent of the pipes are 8-inches in diameter. The 2003 Sewer Master Plan identified nine (9) areas as deficient, which are listed in Table 1. The locations of the deficient reaches are shown in Appendix A. Table 1 2003 Master Plan Identified Deficiencies Deficiency No. Hydraulic Model Pipe Numbers Existing Size Proposed Size Length (feet) 1 Hamilton Ave Brookhurst Street to extension of Archer Circle 1019, 1017, 1016, 1015, 1014, 1013 18" 21"1,540 2 Edwards Street, Heil Avenue From Brad Drive to Heil Avenue; From Edwards Street to Oakmont Lane 345, 335, 321, 308 293, 5005 10" 10", 8" 15" 15", 12"1,692 3 Heil Avenue From Sabot Lane to Goldenwest Street 296, 295, 294 12" 15"833 4 Speer Avenue Jacquelyn Lane to Beach Boulevard 550, 549, 543, 544, 545, 548 10" 15"1,397 5 Beach Boulevard From Speer Avenue to Slater Avenue 547, 531 12" 18"659 6 Beach Boulevard From South of Talbert Avenue to Ronald Road 5013, 1080, 598, 590 8", 10" 12", 15"1,086 7 Saybrook Lane South of Heil Avenue to Morning Star Drive 2586 12" 18 299 8 Mandalay Circle From Edinger Avenue to Humboldt Drive 202, 206, 211, 213, 216, 219, 221, 222, 232, 237 10" 15" 2,181 9 Edinger Avenue From Trinidad Lane to Santa Barbara Lane 194, 165, 166, 167, 168, 169, 170, 174 10" 15'1,967 Total Length 11,654 Location 409 SEWER SYSTEM CAPACITY ANALYSIS 1-3 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis There are four (4) sewer lift stations that are upstream of the identified deficient sewer pipes. Speer Lift Station (LS No. 20) affects Deficient Location No. 4; Saybrook Lift Station (LS No. 22) affects Deficient Location No. 7; Edinger Lift Station (LS No. 25) affects Deficient Location No.’s 8 and 9; and Trinidad Lift Station (LS No. 29) affects Deficient Location No. 9. Speer Lift Station (LS No. 20) is located at Speer Avenue and Crabb Lane. It has two (2) Wemco 6 x 11 pumps with 9-inch impellers. Each pump has a rated capacity of 400 GPM at 14 foot total dynamic head (TDH). The 2003 Sewer Master Plan estimated the peak dry weather flow at 300 gpm, and did not recommend any capacity improvement at this lift station. Saybrook Lift Station (LS No. 22) is located on Saybrook Avenue, north of Heil Avenue. It has two (2) Wemco 4 x 11 M pumps with 9.75-inch impellers. Each pump has a rated capacity of 550 GPM at 23 foot TDH. The estimated ultimate peak dry weather flow is 739 gpm. The 2003 Sewer Master Plan recommended that the firm capacity of this pump station be increased to 1,000 gpm to accommodate the peak wet weather flows. Firm capacity is the total pumping capacity at the lift station when the largest pump is not in operation. The Edinger Lift Station (LS No. 25) is located on Edinger Avenue and Santa Barbara Drive. According to the 2003 Sewer Master Plan, the estimated ultimate peak dry weather flow is 423 gpm. Prior to the recent improvements, the lift station had two (2) Wemco 4 x 11 M pumps with 8-inch impellers. These pumps were rated at 300 GPM capacity and 12 foot TDH. Recent improvements increased the design capacity of the Edinger Lift Station pumps from 300 gpm to 400 gpm each. It currently contains two (2) Wemco 4 x 11 S pumps with 8.5-inch impellers. As shown in Tables 16 and 17, the flow monitoring conducted in January and February 2008 indicated that the flows recorded at Site No.’s 8 and 12 respectively, are notably higher than the improved pump station design capacity. Further testing at the pump station was performed to verify the actual pumping capacity, as detailed in Section 1-4. The downstream sewer facilities were analyzed based upon the actual pump capacities. Trinidad Lift Station (LS No. 29) is located on Trinidad Lane and Aquarius Drive. It has two (2) Wemco 4x11M pumps with 8-inch impellers. Each pump is rated at 250 gpm and 15 foot TDH. The estimated ultimate peak dry weather flow is 153 gpm. Since the existing firm capacity is greater than the expected peak wet weather flow, the 2003 Sewer Master Plan did not recommend any capacity improvement at this lift station. 1-4 System Analysis Flow Monitoring Locations The flow monitoring locations were chosen to analyze the capacity deficient sewers that were identified in the 2003 Sewer Master Plan. Ideally, the flow monitoring locations would have smooth flows with sufficient depth and velocity that could be detected by the flow monitoring equipment. Manholes with multiple inflow pipes or sharp turns are generally avoided because the turbulent flows cannot be accurately measured by the flow monitors. Extensive flow monitoring near the Edinger Lift Station was required to analyze the effects the pumped flows have on the existing sewer system. 410 SEWER SYSTEM CAPACITY ANALYSIS 1-4 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis The locations of the flow monitoring sites are described in Table 2, and shown in Appendix B. Table 2 Initial Flow Monitoring Locations Site Size 1 Hamilton Ave Between Archer Circle and St. John Lane 18" 2 3 Heil Avenue East of Goldenwest Street 12" 4 Speer Avenue West of Beach Boulevard 10" 5 Beach Boulevard South of Slater Avenue 12" 6 Beach Boulevard Between Talbert Ave and Ronald Road (line flowing to the north) 10" 7 Saybrook Lane Morning Star Drive 12" 8* Mandalay Circle North of Humboldt Drive 10" 9 10 Edinger Avenue Montego Drive 10" 11 Santa Barbara Lane South of Shorebreak Drive 10" 12* Saybrook Lane Fisher Drive 12" * Additional flow monitoring performed January 16, 2008 to February 5, 2008 Location Removed due to diverted flow Removed due to pump station upgrade Initially, eleven (11) sites were selected for flow monitoring. Prior to the installation of the flow monitoring equipment, field verifications were made on June 6, 2007 to ensure that the locations would provide useful data. Following the review of Flow Monitoring Site No. 2 at Edwards Street and Brad Drive, the field crew realized that the study sewer no longer exists at the location. The 2003 Sewer Master Plan shows that there are three (3) manholes on Edwards Street, between Brad Drive and Heil Avenue. The field crew could not locate any of these manholes. The inspection of the manhole at the intersection of Edwards Street and Brad Drive shows that the inlet pipe from the north had been blocked off, as shown on Figure 1. Figure 1 Manhole on Edwards Street and Brad Drive Blocked North Inlet ± 411 SEWER SYSTEM CAPACITY ANALYSIS 1-5 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis The Orange County Sanitation District installed a 30” diameter trunk sewer on Heil Avenue. The City was able to divert its wastewater directly into this OCSD facility at the intersection of Heil Avenue and Torjian Lane from the southwest and at the intersection of Heil Avenue and Oakmont Lane from the northeast. In doing so, the City abandoned the sewers on Heil Avenue from Torjian Lane to Oakmont Lane and on Edwards Street from Heil Avenue to Brad Drive. Since the sewers at Deficient Location No. 2 are included in this abandoned pipe set, there will be no need for improvements. Furthermore, while reviewing the flow monitoring Site No. 9 at Edinger Avenue and Santa Barbara Lane, the field crew became aware that the Edinger Lift Station was undergoing construction. The sewers that are upstream of the Edinger Lift station were inaccessible due to the construction of the improvements. Therefore, flow monitoring at Site No. 9 was not possible. Following the field verification, nine (9) flow monitoring sites were selected for the capacity analysis study. The improvements to the Edinger Lift Station were finalized after the initial flow monitoring was completed. Since the new pumps have higher capacities, further flow monitoring was required to accurately evaluate the capacity of the downstream sewer reaches with the new pumps. Flow monitoring was performed between January 16, 2008 and February 5, 2008 at two locations. One flow monitor was installed at Site No. 8, and another was installed at Saybrook Lane and Fisher Drive (Site No.12). The initial and additional flow monitoring data at Site No. 8 will be utilized throughout this report for various purposes; however, the final recommendations are based on the most recent flow monitoring data which reflect the current sewer system. General Flow Monitoring Results The initial flow monitors were installed and data was collected between 12:00 A.M. June 14, 2007 and 11:45 P.M. June 27, 2007. Subsequent flow monitoring was performed between 12:00 A.M. January 16, 2008 and 11:45 P.M. February 5, 2008. Flow vs. time graphs are located in Appendix C. The flow monitoring results are summarized in Table 3. Table 3 Flow Monitoring Summary Site # Ave GPM Peak GPM Existing Size Slope Total Days Min GPM ADWF GPM PDWF GPM Max Depth d/D 1 Hamilton Ave West of John Ln 807 1,533 18 0.001 12.5 137 520 928 9.29 0.52 2 Edwards St Peggy Cir 3 Heil Ave Goldenwest St 186 411 12 0.002 14.0 40 149 256 5.54 0.46 4 Speer Ave Beach Blvd 263 561 8 0.002 14.0 3 41 140 4.35 0.54 5 Beach Blvd Slater Avenue 453 914 12 0.002 14.0 100 284 508 9.38 0.78 6 Beach Blvd Talbert Ave 149 336 10 0.002 14.0 64 234 431 7.67 0.77 7 Saybrook Ln Heil Ave 0 12 0.002 14.0 46 346 642 7.10 0.59 8 Mandalay Cir Humboldt Dr 229 494 10 0.002 14.0 29 227 455 8.78 0.88 8* Mandalay Cir Humboldt Dr 0 494 10 0.002 21.0 29 228 500 10.00 1.00 9 Edinger Ave Santa Barbara Ln 10 Edinger Ave Trinidad Ln 190 419 10 0.002 14.0 67 157 277 5.18 0.52 11 Santa Barbara Ln Shorebreak Dr 198 434 10 0.002 14.0 2 205 520 8.67 0.87 12* Saybrook Ln Fisher Dr 190 758 12**21.0 58 247 517 7.01 0.68 * Additional Flow Monitoring performed between January 16, 2008 to February 5, 2008 ** At Flow Monitoring Location the height of the inflow pipe was 11" which is used to calculate the d/D Removed from Flow Monitoring Removed from Flow Monitoring General Data Flow Monitoring Data Location 2003 Sewer Master Plan Data For the most part, the flow monitoring results appear to be reasonable. The sites experienced flow patterns typical of their tributary sewersheds throughout the day, with the low flows occurring in the very early morning 412 SEWER SYSTEM CAPACITY ANALYSIS 1-6 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis hours. High flows for residential areas occur around 8:00 AM during weekdays and 11:00 A.M. during weekends. High flows in commercial areas occur roughly near 12:00 P.M. The flow monitoring between January 16, 2008 and February 5, 2008 included periods of wet weather. The precipitation data at Station 219, Costa Mesa, was obtained from Orange County Public Works (OC Public Works), Watershed and Coastal Resources Division. Table 4 shows the daily flow monitoring results and precipitation data at Site No 8. and Site No. 12. Table 4 Precipitation and Flow Monitoring Summary Daily Average (GPM) Daily Max (GPM) Max Depth (in) Time of Max Depth Daily Average (GPM) Daily Max (GPM) Max Depth (in) Time of Max Depth Wed 1/16/2008 226 499 10 7:25 245 499 6.86 8:35 Thu 1/17/2008 229 512 10 7:25 249 511 6.92 8:20 Fri 1/18/2008 220 508 10 7:30 245 505 7.01 8:40 Sat 1/19/2008 229 499 10 9:05 251 460 6.64 10:20 Sun 1/20/2008 233 508 10 9:10 250 517 6.9 9:35 Mon 1/21/2008 222 508 10 8:30 243 502 6.8 9:50 Tues 1/22/2008 0.11 226 508 10 7:05 246 497 6.83 10:00 Wed 1/23/2008 235 490 10 8:20 264 495 7.06 8:25 Thu 1/24/2008 0.7 237 482 10 7:25 258 537 6.97 13:05 Fri 1/25/2008 0.34 262 517 10 7:15 284 524 7.11 7:20 Sat* 1/26/2008*238 672 10 8:30 261 772 11 17:55 Sun 1/27/2008 0.31 243 511 10 9:15 281 512 7.27 10:30 Mon 1/28/2008 0.53 244 482 10 7:35 283 513 7.02 9:45 Tues 1/29/2008 0.04 232 490 10 7:45 265 509 7.15 7:50 Wed 1/30/2008 226 474 10 8:20 263 504 6.84 8:30 Thu 1/31/2008 218 465 10 7:25 258 526 6.85 7:20 Fri 2/1/2008 217 521 10 7:40 254 553 7.09 7:45 Sat 2/2/2008 222 508 10 9:55 256 499 6.85 10:25 Sun 2/3/2008 0.21 238 547 10 10:55 276 569 7.52 11:45 Mon 2/4/2008 0.26 227 525 10 11:20 265 510 7.05 8:35 Tues 2/5/2008 225 508 10 7:25 262 504 7 7:30 *Saybrook and Edinger Lift Stations were out of operation due to a power outage Day Flow Monitoring Site #8 (10" Pipe Diameter) Flow Monitoring Site #12 (12" Pipe Diameter) Date Precipitation at Station #219, Costa Mesa (in) Table 5 summarizes the average and peak flow conditions at these sites. For the purposes of this report, the dry weather conditions will be utilized for the pipe capacity analysis. Table 5 Dry and Wet Weather Summary Site # ADWF GPM PDWF GPM Max Depth d/D Ave GPM Max GPM Max Depth d/D 8 228 500 10.00 1.00 231 546 10.00 1.00 12 247 517 7.01 0.64 260 569 7.52 0.68 Includes Wet Weather Disregards Wet Weather As described in the criteria section, the City’s 2003 Sewer Master Plan used the following peaking relationship to develop the peak dry weather flow (Qpdw) from the average dry weather flow (Qadw): 413 SEWER SYSTEM CAPACITY ANALYSIS 1-7 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis Qpdw = 1.93(Qadw)0.898 This relationship was evaluated with the use of the flow monitoring data, maintaining the exponent 0.898. Flow Monitoring Sites No.’s 4, 7, 8, 11, and 12 were excluded from this analysis because they are downstream of lift stations. This review shows that the coefficient used in the Master Plan (1.93) is higher than the values calculated from the flow monitoring data, as shown in Table 6. Therefore, the peak dry weather flows calculated by the Master Plan are estimated conservatively, which is appropriate for planning studies. Table 6 Peaking Coefficients per Flow Monitoring Data Site # Minimum MGD Average MGD Maximum MGD (Qave)^0.898 Coefficient = Qmax/(Qave)^0.898 1 Hamilton Ave West of John lane 0.197 0.749 1.337 0.77 1.73 2 Edwards St Peggy Cir 3 Heil Ave Goldenwest St 0.058 0.214 0.368 0.25 1.47 4 Speer Ave Beach Blvd 0.005 0.059 0.202 5 Beach Blvd Slater Avenue 0.144 0.409 0.731 0.45 1.63 6 Beach Blvd Talbert Ave 0.092 0.337 0.62 0.38 1.65 7 Saybrook Lane Heil Ave 0.066 0.498 0.925 8 Mandalay Cir Humboldt Dr 0.042 0.327 0.656 8**Mandalay Cir Humboldt Dr 0.042 0.329 0.720 9 Edinger Ave Santa Barbara Ln 10 Edinger Ave Trinidad Lane 0.096 0.226 0.399 0.26 1.52 11 Santa Barbara Ln Shorebreak Dr 0.003 0.295 0.75 12** Saybrook Lane Fisher Drive 0.084 0.356 0.744 Average Peaking Coeficient = 1.60 * Downstream of Pump Station ** Additional Flow Monitoring Excluded* Excluded* Excluded* Excluded* Not Flow Monitored Not Flow Monitored General Data Flow Monitoring Data Calculations Location Excluded* Excluded* Capacity Analysis and Recommendations The hydraulic analysis for the 2003 Sewer Master Plan is included in Appendix D. It includes the calculated existing peak dry weather flow and the ultimate peak dry weather flow. Deficient Location No. 1 This location includes six (6) reaches of 18-inch diameter sewer located on Hamilton Avenue, from Brookhurst Street to Archer Circle with a total length of 1,530 feet. The flow monitor was installed in Pipe 1014, upstream of the manhole between Pipes 1013 and 1014. This location is near the downstream end of the deficient pipe, with nearly the largest tributary area of the six segments. The comparison of the flow monitoring data and the 2003 Sewer Master Plan data is shown in Table 7. 414 SEWER SYSTEM CAPACITY ANALYSIS 1-8 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis Table 7 Comparison of Master Plan Results and Flow Monitoring Data Deficient Location No. 1 Flow Monitoring Site Pipe ID Report Slope Size Material Model Length Existing ADWF GPM Existing PDWF GPM Existing Depth Existing d/D Ultimate PDWF GPM Ultimate Depth Ultimate d/D ADWF (GPM) PDWF (GPM)Depth d/D 1 1013 0.001 18" VCP 370 807 1,533 Full Full 1,547 Full Full 1* 1014 0.001 18" VCP 100 795 1,514 Full Full 1,527 Full Full 520 928 9.29 0.52 1 1015 0.001 18" VCP 226 794 1,512 Full Full 1,524 Full Full 1 1016 0.001 18" VCP 200 758 1,451 Full Full 1,460 Full Full 1 1017 0.001 18" VCP 330 757 1,448 14.28 0.79 1,458 14.40 0.80 1 1019 0.001 18" VCP 304 731 1,403 13.92 0.77 1,411 13.92 0.77 * Location of Flow Monitor Master Plan Data Data Flow Monitoring Data With the Master Plan calculated peak dry weather flows, four (4) of the six (6) reaches would flow full, and the depth to diameter ratio would exceed 0.75 in the other two reaches. The Site 1 flow monitor recorded average dry weather flow, peak dry weather flow, and depth values that are much lower than those calculated by the Sewer Master Plan. The Sewer Master Plan average dry weather flow (795 gpm) is larger than the flow monitoring average dry weather flow (520 gpm) by a factor of 1.5. The Sewer Master Plan peak dry weather flow (1,514 gpm) is larger than the flow monitoring peak dry weather flow (907 gpm) by a factor of 1.7. According to the flow monitoring data, this 18” sewer is flowing at a d/D of 0.52, which is considered sufficient. The sewers in this location are not recommended to be replaced for capacity. If the tributary land use is proposed to be changed in the future resulting in higher wastewater flows, these sewers should be re- evaluated. Deficient Location No. 2 Appendix D of the 2003 Sewer Master Plan shows that the ultimate d/D’s for the reaches of sewer on Edwards Street from Heil Avenue to Brad Drive and on Heil Avenue from Oakmont Lane to Edwards Street were calculated from 0.67 to full, which is deficient according to the master plan criteria. When these sewers were reviewed in the field for selecting flow monitoring locations, the field crew concluded that the sewer on Edwards Street was removed because the City sewers upstream have been diverted to the OCSD’s trunk sewer on Heil Avenue. The OCSD records show that the City facilities have been diverted to the OCSD trunk sewer on Heil Avenue at Torjian Lane and Heil Avenue at Oakmont Drive. The 2003 Master Plan indicates that none of these pipes are on the City’s Sewer GIS. Deficient Location No. 3 The 2003 Sewer Master Plan identified capacity deficiencies in three (3) reaches of 12-inch diameter pipe located on Heil Avenue between Sabot Lane on the east and Goldenwest Street on the west. With the master plan calculated peak dry weather flows, the d/D’s of these three (3) reaches are approximately 0.68, which is deficient per the master plan criteria. The total length of these reaches is approximately 830 feet. The flow direction is from east to west. The flow monitor was installed in Pipe 295, upstream of the manhole between Pipes 294 and 295. It measures nearly the entire flow tributary to the most downstream pipe. The comparison between the flow monitoring data and the 2003 Sewer Master Plan data is shown in Table 8. 415 SEWER SYSTEM CAPACITY ANALYSIS 1-9 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis Table 8 Comparison of Master Plan Results and Flow Monitoring Data Deficient Location No. 3 Flow Monitoring Site Pipe ID Report Slope Size Material Model Length Existing ADWF GPM Existing PDWF GPM Existing Depth Existing d/D Ultimate PDWF GPM Ultimate Depth Ultimate d/D ADWF (GPM) PDWF (GPM)Depth d/D 3 294 12" VCP 335 579 8.16 0.68 3* 295 0.002 12" VCP 330 186 411 6.60 0.55 579 8.16 0.68 149 256 5.54 0.46 3 296 0.002 12" VCP 165 186 410 6.60 0.55 578 8.16 0.68 . * Location of Flow Monitor Master Plan Data Data Flow Monitoring Data The Pipe 294 data is missing the slope value in the Master Plan. However, this value can be estimated as 0.002, which is representative of the slopes for the nearby pipes. The 2003 Sewer Master Plan estimates a depth to diameter ratio of 0.55 for all three reaches of 12” pipe. According to the 2003 Sewer Master Plan Criteria, these pipes are considered deficient. However the average dry weather flow from the flow monitoring (149 gpm) was lower than the calculated 2003 Sewer Master Plan existing average dry weather flow (186 gpm). Likewise, the peak dry weather flow from the flow monitoring (256 gpm) was far lower than the calculated 2003 Sewer Master Plan existing peak dry weather flow (411 gpm). The flow monitoring data shows that these pipes are flowing at a depth to diameter ratio of about 0.46 with the actual peak dry weather flows. Therefore, these reaches of pipe are currently sufficient per the 2003 Sewer Master Plan criteria, and are not recommended to be replaced for capacity. The 2003 Sewer Master Plan shows the ultimate peak dry weather flow at 579 gpm, an increase of nearly 41 percent. Based upon review of the aerial photographs, the tributary area does not seem to include significant vacant land. However, assuming a similar increase over the existing flows, the peak dry weather flow would be 354 gpm, and the depth to diameter ratio would be approximately 0.5, which is still sufficient. If the tributary land use is proposed to be changed in the future resulting in higher wastewater flows, then these reaches should be re-evaluated. Deficient Location No. 4 The 2003 Sewer Master Plan identified capacity deficiencies in six (6) reaches of 8-inch diameter sewer on Speer Avenue between Jacquelyn Lane to the west and Beach Boulevard to the east. With the master plan calculated peak dry weather flows, these six (6) reaches will flow full. The total length of these reaches is approximately 1,365 feet. The flow direction is from west to east. These reaches convey the wastewater flow pumped by Speer Lift Station (LS No. 20), which is located at Crabb Lane and Speer Avenue, as well as the wastewater collected from the tributary area to the east of the lift station. The flow monitor was installed in Pipe 545, upstream of the manhole between Pipes 545 and 548. It measures nearly the entire flow tributary to the most downstream reach of the deficient sewers. The comparison between the flow monitoring data and the 2003 Sewer Master Plan data is shown in Table 9. 416 SEWER SYSTEM CAPACITY ANALYSIS 1-10 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis Table 9 Comparison of Master Plan Results and Flow Monitoring Data Deficient Location No. 4 Flow Monitoring Site Pipe ID Report Slope Size Material Model Length Existing ADWF GPM Existing PDWF GPM Existing Depth Existing d/D Ultimate PDWF GPM Ultimate Depth Ultimate d/D ADWF (GPM) PDWF (GPM)Depth d/D 4 543 0.002 8" VCP 300 239 513 Full Full 514 Full Full 4 544 0.002 8" VCP 300 262 558 Full Full 561 Full Full 4* 545 0.002 8" VCP 300 263 561 Full Full 565 Full Full 41 140 4.35 0.54 4 548 0.002 8" VCP 300 205 449 Full Full 566 Full Full 4 549 0.002 8" VCP 15 237 511 Full Full 512 Full Full 4 550 0.002 8" VCP 150 237 511 Full Full 512 Full Full * Location of Flow Monitor Master Plan Data Data Flow Monitoring Data The 2003 Sewer Master Plan estimates peak dry weather flows of over 500 gpm near the pump station, and 449 gpm at the most downstream reach. All six reaches of pipe would flow full with the Master Plan estimated flows. However, the average dry weather flow from the flow monitoring (41 gpm) is approximately 25 percent of the Master Plan flows. The peak dry weather flow from the flow monitoring (140 gpm) is also approximately 25 percent of the Master Plan flows and the reported pump capacity of 500 gpm. Available aerial photography shows the lift station tributary area to be industrial. The flow monitoring results are clearly of an industrial land use with weekend flows significantly lower than the weekday flows. The discrepancy between the measured and calculated flows is most likely due to the high industrial unit flow factors used in the Master Plan, and the selected peaking relationship. The discrepancy between the reported pump capacity and measured flows may be due to the attenuation in the gravity pipe system, infrequent pump operation, and short duration of pumping. The tributary area is fully developed, and the ultimate flows are not expected to be greater than the existing flows. The flow monitoring data shows that these pipes are flowing at a maximum depth to diameter ratio of 0.54. While this is deficient per the City’s criteria, it does not warrant replacement of the existing pipes for capacity. If the tributary land use is proposed to be changed significantly in the future, resulting in higher wastewater flows, then these reaches should be re-evaluated. Deficient Location No. 5 The 2003 Sewer Master Plan identified capacity deficiencies in two (2) reaches of 12-inch diameter sewer on Beach Boulevard between Speer Avenue to the south and Slater Avenue to the north. With the master plan calculated peak dry weather flows, both reaches will flow full. The total length of these reaches is 657 feet and the flow direction is from south to north. The Deficient Location No. 4 flows, including the Speer Lift Station are tributary to this area. The flow monitor was installed in Pipe 547, upstream of the manhole between Pipes 531 and 547. It measures nearly the entire flow tributary to the most downstream reach of the deficient sewers. The comparison between the flow monitoring data and the 2003 Sewer Master Plan results is shown in Table 10. 417 SEWER SYSTEM CAPACITY ANALYSIS 1-11 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis Table 10 Comparison of Master Plan Results and Flow Monitoring Data Deficient Location No. 5 Flow Monitoring Site Pipe ID Report Slope Size Material Model Length Existing ADWF GPM Existing PDWF GPM Existing Depth Existing d/D Ultimate PDWF GPM Ultimate Depth Ultimate d/D ADWF (GPM) PDWF (GPM)Depth d/D 5 531 0.002 12" VCP 329 453 914 Full Full 946 Full Full 5* 547 0.0032 12" VCP 328 453 912 Full Full 944 Full Full 284 508 9.38 0.78 * Location of Flow Monitor Master Plan Data Data Flow Monitoring Data The 2003 Sewer Master Plan estimates existing peak dry weather flows of about 912 and 914 gpm in the two reaches of pipe. Both of these reaches would flow full with the Master Plan estimated flows. The average dry weather flow from flow monitoring (284 gpm) is approximately 63 percent of the Master Plan estimated existing flow. Likewise, the peak dry weather flow from the flow monitoring (508 gpm) is approximately 56 percent of the Master Plan estimated existing flows. The Master Plan estimates only a 3.9 percent increase in the average dry weather flows and 3.5 percent increase in the peak dry weather flows with the ultimate development of the tributary area. The discrepancy between the estimated and measured flows is most likely due to the high industrial unit flow factors, and the peaking relationship used in the Master Plan. The 2003 Sewer Master Plan estimated peak dry weather flow exceeds the capacity of the pipe, and both pipes would flow full under these conditions. The flow monitoring data shows a maximum depth to diameter ratio of 0.78. Based upon a pipe slope of 0.002, and Manning’s n of 0.013, the Master Plan estimated that the ultimate peak dry weather flow would require a minimum pipe diameter of 15 inches to meet the City’s depth to diameter design criteria of 0.67. These reaches will require further evaluation by the City. Deficient Location No. 6 The 2003 Sewer Master Plan identified deficiencies in two (2) reach of 8-inch and two reaches of 10-inch diameter sewer on Beach Boulevard between south of Talbert Avenue to the south and Ronald Road to the north. With the master plan calculated peak dry weather flows, two (2) of the four (4) reaches flow full and the d/D’s exceed 0.66 in the other two (2) reaches. The total length of the four reaches is 1,086 feet. The flow direction is from south to north. The flow monitor was installed in Pipe 598, upstream of the manhole between Pipes 590 and 598. It measures nearly the entire flow tributary to the most downstream reach of the deficient sewers. The comparison between the flow monitoring data and the 2003 Sewer Master Plan results is shown in Table 11. Table 11 Comparison of Master Plan and Flow Monitoring Data Deficient Location No. 6 Flow Monitoring Site Pipe ID Report Slope Size Material Model Length Existing ADWF GPM Existing PDWF GPM Existing Depth Existing d/D Ultimate PDWF GPM Ultimate Depth Ultimate d/D ADWF (GPM) PDWF (GPM)Depth d/D 6 590 10" VCP 293 360 6.96 0.69 6* 598 0.002 10" VCP 284 149 336 6.48 0.65 357 6.84 0.68 234 431 7.67 0.77 6 1080 0.002 8" VCP 294 149 336 Full Full 357 Full Full 6 5013 0.002 8" VCP 209 104 244 Full Full 263 Full Full * Location of Flow Monitor Master Plan Data Data Flow Monitoring Data 418 SEWER SYSTEM CAPACITY ANALYSIS 1-12 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis The Pipe 590 data is missing the slope value in the 2003 Sewer Master Plan. However, this value can be estimated as 0.002, which is representative of the slopes for the nearby pipes. The 2003 Sewer Master Plan estimates existing average and peak dry weather flow of 149 gpm and 336 gpm respectively in Pipe 598. The average dry weather flow from flow monitoring (234) is approximately 57 percent higher than the Master Plan estimated existing average dry weather flow. The peak dry weather flow from flow monitoring (431 gpm) is approximately 28 percent higher than the Master Plan estimated existing peak dry weather flow. The discrepancy between the measured and estimated flows may be due to the presence of some high water users in the tributary area. A detailed study of the water use in the tributary area should be conducted to identify the reason for the difference. The Master Plan estimates only a 7.3 percent increase in the average dry weather flows with the ultimate development of the tributary area. Applying the same increase to the measured flows, the ultimate peak dry weather flow would be 460 gpm. The flow monitoring shows these pipes flowing at a depth to diameter ratio of 0.77. Based on the slope of 0.002, Manning’s n of 0.013 and the ultimate peak dry weather flow of 460 gpm, the four (4) existing sewers would require a minimum pipe diameter of 15 inches to meet the City’s depth to diameter design criteria of 0.67. These reaches will require further evaluation by the City. Site No.’s 7, 8, 10, 11, and 12 - Flow Monitoring Sites No.’s 8, 10, 11, and 12 are tributary to Flow Monitoring Site No. 7. These five flow monitoring sites will be described together for clarity. The flow pattern is shown on Figure 2. Figure 2 Flow Pattern Schematic for Site No.’s 7, 8. 10, 11 and 12 FM #10 FM #11 FM #8 FM #12 FM #7 Edinger Lift Station LS No. 25 Saybrook Lift Station LS No. 22 Qin Qin Qin QinQin Qin Since the flow monitoring sites are tributary to one another; a variation at one site could affect all of the sites. Prior to the installation of the flow monitors, it was understood that the Edinger Lift Station (Lift Station No. 25) was undergoing replacement. During the period when the flow monitors were initially installed (June 14, 2007 to June 28, 2007), the City ran tests on this lift station. These tests might have altered the initial results at Flow Monitoring Sites No.’s 7, 8, and 11. To analyze the flow monitoring data at these three unique sites, the flow monitoring must be done simultaneously. Therefore, the Site No. 8 flow monitoring data described hereon will refer to the initial flow monitoring that took place in June 2007. The flow monitoring at Site No. 8 performed in January, 2008 will be analyzed later. The Edinger Lift Station underwent testing at roughly 10:30 AM on July 14, 2007. According to Dudek Engineering, the existing lift station (before capacity improvements) was temporarily shut down to test the capacity of the new pumps. The SCADA data at the Edinger Lift Station, illustrated on Figure 3, shows that the existing pumps were not in operation at 10:30 A.M. 419 SEWER SYSTEM CAPACITY ANALYSIS 1-13 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis Figure 3 SCADA Data at the Edinger Lift Station, June 14, 2007 Blue line represent the “Pump Trend” Value = 1 is when Pump 1 is turned on. Value = 2 is when Pump No. 2 is turned on. During the testing period, Flow Monitoring Site No.’s 7, 8 and 11 experienced higher flow rates, as can be seen on the flow versus time graphs for these sites in Appendix C. The Saybrook Lift Station also showed abnormal behavior at this time. Beginning at roughly 10:00 am, this station was incapable of pumping the entire inflow. Figure No. 4 shows the rise in the wet well water level during this time period. Figure No. 4 SCADA Data at the Saybrook Lift Station, June 14, 2007 #1 #2 #3 Green line represent water surface elevation in the wet well. Blue line represent the “Pump Trend” Value = 1 when Pump No. 1 is turned on. Value =2 when Pump No. 2 is turned on. Value =3 is when both Pumps are on. Pump #1 is turned on. Pump #1 and #2 are turned on. Pumps return to normal pumping 420 SEWER SYSTEM CAPACITY ANALYSIS 1-14 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis The Edinger Lift Station underwent testing at roughly 9:00 AM on June 20, 2007. According to the City, the flow was diverted around the Edinger Lift Station during this period. The flow data does not reflect normal operating conditions. Figure No. 5 SCADA Data at the Edinger Lift Station, June 20, 2007 The increased flows during the Edinger Lift Station testing must be analyzed in further detail before analyzing the downstream sewer lines. During these two periods, the Site No.’s 7, 8 and 11 flow monitors recorded abnormally high flow rates. These abnormalities can be seen on the flow versus time graphs for these sites in Appendix C. These high flow rates are more representative of the improved pump station conditions, not the conditions during that time period. The additional flow monitoring was performed at Site No. 8 and Site No. 12 following the completion of the improvement to the Edinger Lift Station (LS No. 25) in order to analyze the capacity of the downstream system. Prior to the improvements, each pump at the Edinger Lift Station had a design capacity of roughly 225 gpm. With both pumps running, the lift station has a capacity of about 450 gpm. The 2003 Sewer Master Plan calculated the existing PDWF at the Edinger Lift Station at 415 gpm. The pumped flow was measured at Site No. 11, which is directly downstream of the existing lift station. Not including the high flow values related to the pump station testing, the peak dry weather flows were measured to be roughly 460 gpm during the initial flow monitoring. These various flows are consistent and are representative of the Edinger Lift station flows before the improvements were completed. The existing pumps at the Edinger Lift Station were designed for a capacity of 400 gpm. Under normal circumstances, one pump will be in operation. The pumps currently alternate to avoid wear-and-tear on one single pump. However, during extreme wet weather conditions and/or emergencies, both pumps may be required to operate simultaneously when the wet well level exceeds the maximum set level. The results at the downstream Flow Monitoring Sites No. 8 and 11 exhibited flows that are greater than what the pumps were designed for. The maximum daily flows at these flow monitoring sites were frequently greater than 500 gpm, which is higher than what was expected if the Edinger Lift Station were in operation with one pump at a capacity of 400 gpm. During the flow monitoring period, the Edinger Lift Station required both pumps to run 421 SEWER SYSTEM CAPACITY ANALYSIS 1-15 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis simultaneously on only one occasion, which occurred when wastewater accumulated in the wet well during a power outage. Since the measured flows from the flow monitoring study were considerably higher than the design pump capacity, pump tests were performed to verify the actual capacity of the pumps. The testing was performed when the wastewater flows were expected to be largest. The City crew informed AKM Consulting Engineers that the testing should be performed at approximately 7:00 a.m., which is when the City generally observes peak dry weather flows. The tidal affects on the inflow to the lift station were also taken into consideration. The different tide levels affect the groundwater levels, which contribute to the amount of infiltration into the wastewater system. Since the Edinger Lift Station tributary area is adjacent to the Pacific Ocean, a tide analysis was conducted before performing the pump tests. The average daily flows from the recent Flow Monitoring Sites No. 8 and 12 were analyzed with the daily tide history during the same period. It was concluded that larger average day flows occurred approximately 5 days after a spring tide, which is when a tide’s range is at a maximum. The tide tables showed that the next spring tide occurred on May 5, 2008. The Edinger Lift Station testing was performed on Friday May 9, 2008 between 7:00 and 9:00 a.m. when the wastewater flows were anticipated to be at its highest. The flow rates determined during the field testing were compared to the readings at the existing flow meter at the Edinger Lift Station, which may be too low. The field testing consisted of measuring the time it takes to fill the wet well, every 0.5-foot increment between wet well levels of 2 feet to 5 feet. The time it takes each pump to lower the depth of wastewater in the wet well, every 0.5-foot increment between wet well levels of 5 feet to 2 feet was also measured. The wastewater levels in the wet well are constricted because the tributary sewer system will experience backflow conditions once the waste water level reaches an elevation of -8.50 feet amsl. The average incoming flow rate was calculated as follows: Time) ed(Accumulat Volume) ed(AccumulatQdaccumulate= Accumulated Volume = (L*W*H)*(7.48 gallons/cubic foot) L = Length (7.5-feet) W = Width (10.0-feet) H = Height (0.5-feet) Accumulated Time = Time to fill the wet well 3.0 feet (min) During the testing period, the wet well filled from the 2-foot elevation to 5-foot elevation at a minimum time of 6 minutes and 15 seconds which corresponds to a flow rate of 269.3 gpm. The minimum time it took to raise the wet well level 0.5 feet was measured to be 59 seconds, which corresponds to a flow rate of 285.3 gpm. This value is used as the peak dry weather flow into the Edinger Lift Station. The rate at which the flow is discharged is calculated in a similar manner; however, the flow into the wet well also needs to be accounted for. The flow rates were measured at every half foot increment to see how the 422 SEWER SYSTEM CAPACITY ANALYSIS 1-16 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis different elevations in the wet well affect the pump discharge rate. The discharge flow rate was calculated as follows: daccumulatedischargeQTime) (Discharge Volume) (DischargeQ += Discharge Volume = (L*W*H)*(7.48 gallons/cubic foot) L = Length (7.5-feet) W = Width (10.0-feet) H = Height (0.5-foot) Discharge Time = Time to lower the wet well every 0.5 Feet (min) Qaccumulated = Flow coming in to the wet well while pumps are on The discharge time was recorded at each 0.5 foot wet well depth increment. The flow reading from the lift station flow meter was also logged at most of the 0.5 foot increments. The results show that the flow meters indicate flow rates lower than those measured by the testing. Tables 12 and 13 show the measured discharge rate as well as the flow meter readings for each pump. Table 12 Pump No. 1 Discharge Rate Summary Level Reading on Stop Watch Calculated Flow (gpm) Flow Meter Reading (gpm) Reading on Stop Watch Calculated Flow (gpm) Flow Meter Reading (gpm) 5 0:1:18 494 0:30:18 476 419 4.5 0:2:18 485 415 0:31:34 474 424 4 0:3:20 477 0:32:51 460 417 3.5 0:4:24 465 403 0:34:13 442 407 3 0:5:31 454 402 0:35:43 438 402 2.5 0:6:41 451 395 0:37:15 425 395 2 0:7:52 0:38:54 390 Maximum 494.48 415.00 476.48 424.00 Average 470.27 403.75 450.73 407.71 Minimum 451.01 395.00 425.03 390.00 Test No. 1 Test No. 2 Table 13 Pump No. 2 Discharge Rate Summary Level Reading on Stop Watch Calculated Flow (gpm) Flow Meter Reading (gpm) Reading on Stop Watch Calculated Flow (gpm) Flow Meter Reading (gpm) 5 0:15:44 493 440 0:45:30 510 440 4.5 0:16:51 486 435 0:46:40 494 430 4 0:18:0 470 415 0:47:55 485 421 3.5 0:19:14 450 415 0:49:13 477 422 3 0:20:35 455 412 0:50:34 458 412 2.5 0:21:54 436 405 0:52:3 463 407 2 0:23:21 0:53:30 397-402 Maximum 493.39 440.00 509.74 440.00 Average 463.15 420.33 479.69 422.00 Minimum 435.64 405.00 458.41 407.00 Test No. 1 Test No. 2 423 SEWER SYSTEM CAPACITY ANALYSIS 1-17 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis Pump No. 1 has an average discharge rate of 461 gpm, while Pump No. 2 has a discharge rate of 471 gpm. On average Pumps 1 and 2 are pumping 15% and 18% more flow than the rated 400 gpm. The maximum calculated discharge rate at Pump No. 1 is 494 gpm or 124% of the design flow rate of 400 gpm. The maximum calculated discharge rate at Pump No. 2 is 510 gpm or 128% of the design flow rate of 400 gpm. The pump testing appears to validate the recent flow measurements at Flow Monitoring Site No. 8 and 12. For the purposes of this study, the Edinger Lift Station is rated at the maximum output of 510 gpm. Deficient Location No. 9 The 2003 Sewer Master Plan identified deficiencies in one (1) reach of 10-inch diameter sewer on Trinidad Lane south of Edinger Avenue; and seven (7) reaches of 10-inch diameter sewer on Edinger Avenue between Trinidad Lane to the west and Santa Barbara Lane to the east. With the master plan calculated peak dry weather flows, the d/D’s exceed 0.70 for all eight (8) reaches, which is deficient according to the master plan criteria. The total length of these deficient reaches is 2,171 feet. The flow direction is from south to north and west to east. These deficient sewers are downstream of the Trinidad Lift Station (LS No. 29), which has two pumps with rated capacities of 250 gpm, and upstream of the Edinger Lift Station (LS No. 25). The flow monitor was installed in Pipe 166 on Edinger Avenue west of Bimini Lane, upstream of the manhole between Pipes 167 and 166. It measures most, but not all, of the flows tributary to the most downstream reach of the deficient sewers. The comparison between the flow monitoring data and the 2003 Sewer Master Plan results is shown in Table 14. Table 14 Comparison of Master Plan Results and Flow Monitoring Data Deficient Location No. 9 Flow Monitoring Site Pipe ID Report Slope Size Material Model Length Existing ADWF GPM Existing PDWF GPM Existing Depth Existing d/D Ultimate PDWF GPM Ultimate Depth Ultimate d/D ADWF (GPM) PDWF (GPM)Depth d/D 10 194 0.002 10" VCP 138 382 7.20 0.72 10 165 0.002 10" VCP 320 169 376 7.08 0.71 382 7.20 0.72 10* 166 0.002 10" VCP 347 169 376 7.08 0.71 383 7.20 0.72 157 277 5.18 0.52 10 167 0.002 10" VCP 314 169 377 7.08 0.71 383 7.20 0.72 10 168 0.002 10" VCP 335 184 408 7.68 0.77 415 7.80 0.78 10 169 0.002 10" VCP 308 186 410 7.68 0.77 418 7.80 0.78 10 170 0.002 10" VCP 304 190 418 7.80 0.78 427 7.92 0.79 10 174 0.002 10" VCP 105 190 419 7.80 0.78 428 7.92 0.79 * Location of Flow Monitor Master Plan Data Data Flow Monitoring Data The Pipe 194 data is missing the slope value in the Master Plan. However, the value can be estimated as 0.002, which is representative of the slopes for the nearby pipes. The 2003 Sewer Master Plan estimates existing average dry weather flows of about 169 gpm in Pipe 165 to 190 gpm in Pipe 174. The average dry weather flow from flow monitoring (157 gpm) in Pipe 166 is approximately 92 percent of the Master Plan estimated existing average dry weather flow of 169 gpm in Pipe 166. The average dry weather flows estimated in the Master Plan are relatively similar to the average dry weather flows recorded by the flow monitors; however, the relationship between the peak dry weather flows is not as close. The 2003 Sewer Master Plan estimates existing peak dry weather flows of about 376 gpm in Pipe 165 to 419 gpm in Pipe 174. The peak dry weather flow from flow monitoring (277 gpm) in Pipe 166 is approximately 74 percent of the Master Plan estimated existing peak dry weather flow of 376 gpm in Pipe 166. The discrepancy between the measured and estimated flows may be due to the high coefficient used in the Master Plan peaking 424 SEWER SYSTEM CAPACITY ANALYSIS 1-18 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis relationships. The Master Plan estimates only a 1.9 percent increase in the peak dry weather flows with the ultimate development of the tributary area. The 2003 Sewer Master Plan calculated similar flow values through Pipes 194, 165, 166, and 167. The peak dry weather flows from the Master Plan calculations were exceeding the capacity of these pipes with both the existing and ultimate peak dry weather flows. The Master Plan also calculated the depth to diameter ratios at 0.72. The flow monitoring data shows that these four (4) pipes are flowing at a maximum depth to diameter ratio of 0.52. While this is deficient per the City’s criteria, it does not warrant replacement of the existing pipes for capacity. If the tributary land use is proposed to be changed significantly in the future, resulting in higher wastewater flows, then these reaches should be re-evaluated. According to the 2003 Sewer Master Plan, the four (4) reaches along Edinger Avenue between Bimini Lane to the west and the Edinger Lift station to the east, experience higher flows than the upstream reaches. The average dry weather flows from the lift station are a conservative estimate of the average dry weather flows through these four (4) reaches. The Master Plan calculated the average dry weather flow rates for Pipes 168, 169, 170, and 174 between 184 gpm to 190 gpm. The average dry weather flow from Flow Monitoring Site No. 11 (205 gpm) is approximately 8 percent higher than the Master Plan estimated average dry weather flow at Pipe 174 (190 gpm). During the pump testing on Friday May 9, 2008, the existing peak dry weather flows were measured to be approximately 285 gpm at the Edinger Lift Station. The Master Plan estimates only a 2.1 percent increase in the average dry weather flows with the ultimate development of the tributary area. Applying the same increase to the measured flows, the ultimate peak dry weather flow would be 291 gpm. Based on a slope of 0.002, Manning’s n of 0.013 and the ultimate peak dry weather flow, the four (4) existing 10-inch sewers are flowing at a d/D of 0.59. While this calculated d/D is deficient per the City’s criteria, it does not necessarily warrant replacement of the existing pipes for capacity. If the tributary land use is proposed to be changed in the future, resulting in higher wastewater flows, then these reaches should be re-evaluated. Deficient Location No. 8 The 2003 Sewer Master Plan identified capacity deficiencies in ten (10) reaches of 10-inch diameter sewers located on Santa Barbara Lane and Mandalay Circle between the Edinger Lift Station (LS No. 25) and Humboldt Drive. With the master plan calculated peak dry weather flows, all ten (10) reaches were flowing full. The total length of these reaches is 1,964 feet. In order to evaluate the effect of Edinger Lift Station (LS No. 25) flows on the downstream sewers, two flow monitors were initially installed on June 14, 2007. Two additional flow monitors were installed once the improvements to the Edinger Lift Stations were finalized. On June 14, 2007, the first flow monitor was installed in the downstream end of Pipe 202 at the manhole between Pipes 206 and 202 on Santa Barbara Lane and Shorebreak Drive (FM Site No. 11). Pipe 202 is the first pipe downstream of the Edinger Lift Station force main. The comparison of the initial flow monitoring data and the 2003 Sewer Master Plan results for the area tributary to the flow monitoring site is shown in Table 15. 425 SEWER SYSTEM CAPACITY ANALYSIS 1-19 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis Table 15 Comparison of Master Plan and Flow Monitoring Data Deficient Location No. 8 (Flow Monitoring Site 11) Flow Monitoring Site Pipe ID Report Slope Size Material Model Length Existing ADWF GPM Existing PDWF GPM Existing Depth Existing d/D Ultimate PDWF GPM Ultimate Depth Ultimate d/D ADWF (GPM) PDWF (GPM)Depth d/D 11* 202 0.002 10" VCP 136 198 434 8.04 0.80 443 Full Full 205 520 8.67 0.87 * Location of Flow Monitor Master Plan Data Data Flow Monitoring Data The 2003 Sewer Master Plan estimated the existing and ultimate peak dry weather flows at 434 gpm and 443 gpm, respectively. During pump operations before the improvements were implemented, the flow monitor recorded the peak dry weather flow at 520 gpm, which was significantly higher than both master plan values. During the Edinger Lift Station testing on June 14, 2007, the flow monitor recorded the peak dry weather flow at 900 gpm, which is significantly higher than all values. The Master Plan also estimated that this pipe would flow at a depth to diameter ratio of 0.80 with the existing peak dry weather flows and full with the ultimate peak dry weather flows. With the normal pump operations during June 2007, the flow monitoring equipment recorded the maximum depth to diameter ratio at about 0.87 which verifies that this 10” diameter sewer does not meet the existing criteria. When the Edinger Lift Station testing was performed, Site No 11 experienced full flow conditions. The design flow for the Edinger Lift Station is roughly 400 gpm; however, the pumping tests performed on May 9, 2008 show that the actual pumping rate is as high as 510 gpm. The measured pumping rate is capable of conveying both the existing and ultimate peak dry weather flows, and this value (510 gpm) will be used to evaluate the downstream sewer capacities. Based on a slope of 0.002, and a Manning’s n of 0.013, the required pipe size would be 15-inch diameter. Flow monitoring was performed at the downstream end of Pipe 232 at the manhole between Pipes 237 and 232 on Mandalay Circle north of Humboldt Drive (FM Site No. 8). The flow monitoring was performed in June, 2007 to analyze the affect the Edinger Lift Station had on the downstream sewer system. However, the Edinger Lift Station capacity was recently increased, and additional flow monitoring was necessary to analyze the downstream system based on the new pump capacities. A flow monitor was installed at Site No. 8 in January, 2008. The comparison of the flow monitoring data and the 2003 Sewer Master Plan results is shown in Table 16. This table shows the flows at Site No. 8 before and after the improvements to the Edinger Lift Station (LS No. 25) were completed. For the purposes of this report, the downstream reaches will be analyzed with the most-recent flow monitoring data because it represents the existing flow conditions. 426 SEWER SYSTEM CAPACITY ANALYSIS 1-20 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis Table 16 Comparison of Master Plan Results and Flow Monitoring Data Deficient Location No. 8 (Flow Monitoring Site 8) Flow Monitoring Site Pipe ID Report Slope Size Material Model Length Existing ADWF GPM Existing PDWF GPM Existing Depth Existing d/D Ultimate PDWF GPM Ultimate Depth Ultimate d/D ADWF (GPM) PDWF (GPM)Depth d/D 8 206 0.002 10" VCP 226 200 438 8.04 0.80 447 Full Full 8 211 0.002 10" VCP 204 202 443 Full Full 452 Full Full 8 213 0.002 10" VCP 112 204 447 Full Full 455 Full Full 8 216 0.002 10" VCP 240 205 449 Full Full 458 Full Full 8 219 0.002 10" VCP 240 208 453 Full Full 464 Full Full 8 221 0.002 10" VCP 108 208 453 Full Full 463 Full Full 8 222 0.002 10" VCP 213 223 483 Full Full 496 Full Full 8* (June 2007)0.002 10" VCP 239 226 490 Full Full 504 Full Full 227 455 8.78 0.88 8* (January 2008)0.002 10" VCP 239 226 490 Full Full 504 Full Full 228 500 Full Full 8 237 0.002 10" VCP 246 229 494 Full Full 509 Full Full * Location of Flow Monitor Master Plan Data Data Flow Monitoring Data 232 The 2003 Sewer Master Plan existing and ultimate peak dry weather flows exceed the capacities of the nine (9) reaches of sewers listed above. The existing peak dry weather flows varied from 438 gpm to 494 gpm, with the ultimate peak dry weather flows approximately 3 percent higher. With the upgraded Edinger Lift Station in operation, Flow Monitoring Site No. 8 recorded the peak dry weather flow as 500 gpm, which is similar to the Master Plan values. The Peak Dry weather flow (500 gpm) at flow monitoring Site No. 8 is less than the measured discharge at the Edinger Lift Station, due to the attenuation of the flows in the upstream gravity system. For the most part, the flow monitoring data at Site No. 8 consistently displays typical flow patterns during the three (3) weeks that the flow monitor collected data. However, on January 26, 2008, there was a power outage which shutdown both the Edinger Lift Station (#25) and the Saybrook Lift Station (#22). The power outage lasted between 5:45 P.M. to 7:10 P.M. As shown in Appendix C, Site 8 displays an abnormally high flow rate at 7:30. Once the power at the pump station was restored, the two (2) pumps were both automatically turned on to discharge the wastewater that accumulated in the wet well. This flow rate (656 cfs) at 7:30 illustrates the scenario when both pumps are running. During normal operations, the flow monitor recorded full or near full levels between 7:00 A.M. and 10:30 A.M, which coincides with normal peak wastewater production periods. Although it does not appear that two (2) pumps are running simultaneously during this time, the pumps are required to operate more frequently since the wet well fills at a faster rate during the peak period. The detailed flow monitoring results show the daily depths rise to full or near full levels at Site No. 8 for 1 to 4 hour periods. Based on the slope of 0.002, Manning’s n of 0.013 and the flow monitoring maximum flow of 500 gpm, a minimum pipe diameter of 15 inches would be necessary to meet the City’s depth to diameter design criteria of 0.67 for the nine (9) study reaches. The 15-inch pipe would also have the capacity to convey the measured flow rate of 656 cfs during the case when both pumps were in operation. The maximum inflow into the Edinger Lift Station was measured to be approximately 285 gpm and the pumps are discharging roughly 500 gpm. To reduce the depth to diameter ratio in the ten (10) downstream sewers, the City may decrease the pump capacity from 500 gpm to 400 gpm. In doing so, approximately 37% of the ultimate PDWF will remain available for wet weather inflow and infiltration. By reducing the flow to 400 gpm, 427 SEWER SYSTEM CAPACITY ANALYSIS 1-21 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis the downstream sewers are expected to flow at a depth to diameter ratio of approximately 0.744. While this is deficient according to the City’s standards, the sewers will no longer experience full flow conditions. To evaluate the effects of the improvements to the Edinger Lift Station (LS No. 25), an additional flow monitor was installed between Site No. 8 and the Saybrook Lift Station (LS No. 22). The flow monitor was installed in Pipe 256, upstream of the manhole between Pipes 256 and 261. It measures nearly the entire flow tributary to the Saybrook Lift Station. The comparison between the flow monitoring data and the 2003 Sewer Master Plan results is shown in Table 17. Table 17 Comparison of Master Plan Results and Flow Monitoring Data Deficient Location No. 8 (Flow Monitoring Site 12) Flow Monitoring Site Pipe ID Report Slope Size Material Model Length Existing ADWF GPM Existing Depth Existing d/D Ultimate ADWF GMP Ultimate PDWF GPM Ultimate Depth Ultimate d/D ADWF (GPM) PDWF (GPM)Depth d/D 12 239 12" VCP 302 300 632 7.80 0.65 12 256 12" VCP 513 347 719 7.20 0.60 12* 261 12" VCP 246 368 758 6.60 0.55 247 517 7.01 0.58 * Location of Flow Monitor Master Plan Data Data Flow Monitoring Data Like Site No. 8, the flow monitoring results at Site No. 12 are fairly typical, however, the site experienced high and low flows when the power outage left the Saybrook Lift Station (LS No. 22) and Edinger Lift Stations (LS No. 25) inoperable. As Shown in Appendix C, Site No. 12 experienced back water conditions at about 6:00 P.M. where the flow level reached the top of the pipe and the flow rate is zero. Site 12 is just upstream of the Saybrook Lift Station; therefore, the flow accumulated in the pipe once the wet well had reached its maximum capacity. During the power outage, Site No. 8 did not experience these backwater conditions because it is further upstream. Once the power at the lift station was restored, the two (2) pumps were automatically turned on to discharge the wastewater that accumulated in the wet well during the power outage. This flow rate (771 cfs) at 7:30 illustrates the scenario when both pumps are running. The 2003 Sewer Master Plan considered Pipes 239, 256, and 261 to be “Borderline conditions”, with ultimate average dry weather flows between 300 gpm and 368 gpm. During the master planning effort, “Borderline conditions” were the reaches that had calculated d/D values which were close the deficiency criteria d/D values, but were not determined “Deficient” by engineering judgment. During normal dry weather conditions the flow monitoring shows that the average and peak dry weather flows are 247 gpm and 517 gpm respectively. The Sewer Master Plan peak dry weather flow (758 gpm) is larger than the flow monitoring peak dry weather flow (517 gpm) by a factor of 1.47. According to the flow monitoring data, this 12” sewer is flowing at a d/D of 0.58. While this is deficient per the City’s criteria, it does not warrant replacement of the existing pipes for capacity. If the tributary land use is proposed to be changed significantly in the future, resulting in higher wastewater flows, then these reaches should be re-evaluated. Deficient Location No. 7 The 2003 Sewer Master Plan identified a capacity deficiency in one (1) reach of 8-inch diameter sewer on Saybrook Lane between Heil Avenue to the north and Morning Star Drive on the south. With the master plan calculated peak dry weather flow, this reach is flowing full. The total length is 290 feet, and the flow direction 428 SEWER SYSTEM CAPACITY ANALYSIS 1-22 City of Huntington Beach K:\Huntington Beach\Huntington_Beach_Capacity_study Capacity Analysis is from north to south. This reach conveys the wastewater flow pumped by Saybrook Lift Station (LS No. 22), located on Saybrook Lane north of Heil Avenue. The flow monitor was installed in the downstream end of Pipe 2586, upstream of the manhole between Pipes 312 and 2586 at the intersection of Saybrook Lane and Morning Star Drive. It measures the entire flow tributary to the deficient sewer. The comparison between the flow monitoring data and the 2003 Sewer Master Plan results is shown in Table 18. Table 18 Comparison of Master Plan and Flow Monitoring Data Deficient Location No. 7 Flow Monitoring Site Pipe ID Report Slope Size Material Model Length Existing ADWF GPM Existing PDWF GPM Existing Depth Existing d/D Ultimate PDWF GPM Ultimate Depth Ultimate d/D ADWF (GPM) PDWF (GPM)Depth d/D 7* 2586 0.002 12" VCP 299 311 652 9.00 0.75 760 Full Full 346 642 7.10 0.59 * Location of Flow Monitor Master Plan Data Data Flow Monitoring Data Based upon information contained in Appendix D of the 2003 Sewer Master Plan, the existing peak dry weather flow is 652 gpm, and the ultimate peak dry weather flow is 760 gpm. The Master Plan calculated a depth to diameter ratio of 0.75 in this 12-inch pipe with the existing peak dry weather flows. The flow monitoring equipment recorded a peak dry weather flow of 642 gpm, which is nearly the firm capacity of the Saybrook Lift Station. The flow monitors recorded the maximum depth to diameter ratio at 0.59 which verifies that this 12” diameter sewer does not meet the City’s existing criteria. The City anticipates that the Saybrook Lift Station will be replaced within the next 3 and 8 years. To reduce the length of time that the pumps are running, it is anticipated that the City will double the firm capacity of the pumps. Each pump’s existing design capacity is 413 gpm. The City recommends that the future design capacity of the downstream sewers will be 826 gpm. A minimum pipe diameter of 15 inches is needed to meet the City’s depth to diameter design criteria of 0.67. These reaches will require additional evaluation by the City. The system downstream of this reach should also be evaluated for this planned increase in the flows. 429 Deficient Location #1 Brookhurst St. City of Huntington BeachSewer SystemCapacity AnalysisJune, 2008FIGURE A-1Master Plan Deficient Location 1 430 Deficient Location #3 Deficient Location #2 City of Huntington BeachSewer SystemCapacity AnalysisJune, 2008FIGURE A-2Master Plan Deficient Locations 2 & 3 431 Deficient Location #5 Deficient Location #6 Deficient Location #4 City of Huntington BeachSewer SystemCapacity AnalysisJune, 2008FIGURE A-3Master Plan Deficient Locations 4, 5, & 6 432 Deficient Location #7 Pump Station #22 City of Huntington BeachSewer SystemCapacity AnalysisJune, 2008FIGURE A-4Master Plan Deficient Location 7 433 Deficient Location #8 Deficient Location #9 Pump Station #25 City of Huntington BeachSewer SystemCapacity AnalysisJune, 2008FIGURE A-5Master Plan Deficient Locations 8 & 9 Mandalay Cir Santa Barbara Ln. Humboldt Dr. 434 FM Site #1 Brookhurst St. City of Huntington BeachSewer SystemCapacity AnalysisJune, 2008FIGURE B-1Flow Monitoring Site 1 435 FM Site #3 City of Huntington BeachSewer SystemCapacity AnalysisJune, 2008FIGURE B-2Flow Monitoring Site 3 436 FM Site #5 FM Site #4 FM Site #6 Pump Station #20 City of Huntington BeachSewer SystemCapacity AnalysisJune, 2008FIGURE B-3 Flow Monitoring Sites 4, 5, & 6437 FM Site #7 Pump Station #22 City of Huntington BeachSewer SystemCapacity AnalysisJune, 2008FIGURE B-4 Flow Monitoring Site 7438 FM Site #8 FM Site #10 FM Site #11 Pump Station #25 Pump Station #22 FM Site #12 City of Huntington BeachSewer SystemCapacity AnalysisJune, 2008FIGURE B-5 Flow Monitoring Sites 8, 10, 11, & 12Mandalay Cir Santa Barbara Ln Humboldt Dr. 439 Site #1, Flow VS. Time010020030040050060070080090010003924639246.53924739247.53924839248.53924939249.53925039250.53925139251.53925239252.53925339253.53925439254.53925539255.53925639256.53925739257.53925839258.5Flow (GPM)440 Site #3, Flow VS. Time0501001502002503006/14/2007 0:006/14/2007 12:006/15/2007 0:006/15/2007 12:006/16/2007 0:006/16/2007 12:006/17/2007 0:006/17/2007 12:006/18/2007 0:006/18/2007 12:006/19/2007 0:006/19/2007 12:006/20/2007 0:006/20/2007 12:006/21/2007 0:006/21/2007 12:006/22/2007 0:006/22/2007 12:006/23/2007 0:006/23/2007 12:006/24/2007 0:006/24/2007 12:006/25/2007 0:006/25/2007 12:006/26/2007 0:006/26/2007 12:006/27/2007 0:006/27/2007 12:006/28/2007 0:00Flow (GPM)441 Site #4, Flow VS. Time0204060801001206/14/2007 0:006/14/2007 12:006/15/2007 0:006/15/2007 12:006/16/2007 0:006/16/2007 12:006/17/2007 0:006/17/2007 12:006/18/2007 0:006/18/2007 12:006/19/2007 0:006/19/2007 12:006/20/2007 0:006/20/2007 12:006/21/2007 0:006/21/2007 12:006/22/2007 0:006/22/2007 12:006/23/2007 0:006/23/2007 12:006/24/2007 0:006/24/2007 12:006/25/2007 0:006/25/2007 12:006/26/2007 0:006/26/2007 12:006/27/2007 0:006/27/2007 12:006/28/2007 0:00Flow (GPM)442 Site #5, Flow VS. Time01002003004005006006/14/2007 0:006/14/2007 12:006/15/2007 0:006/15/2007 12:006/16/2007 0:006/16/2007 12:006/17/2007 0:006/17/2007 12:006/18/2007 0:006/18/2007 12:006/19/2007 0:006/19/2007 12:006/20/2007 0:006/20/2007 12:006/21/2007 0:006/21/2007 12:006/22/2007 0:006/22/2007 12:006/23/2007 0:006/23/2007 12:006/24/2007 0:006/24/2007 12:006/25/2007 0:006/25/2007 12:006/26/2007 0:006/26/2007 12:006/27/2007 0:006/27/2007 12:006/28/2007 0:00Flow (GPM)443 Site #6, Flow VS. Time0501001502002503003504004506/14/2007 0:006/14/2007 12:006/15/2007 0:006/15/2007 12:006/16/2007 0:006/16/2007 12:006/17/2007 0:006/17/2007 12:006/18/2007 0:006/18/2007 12:006/19/2007 0:006/19/2007 12:006/20/2007 0:006/20/2007 12:006/21/2007 0:006/21/2007 12:006/22/2007 0:006/22/2007 12:006/23/2007 0:006/23/2007 12:006/24/2007 0:006/24/2007 12:006/25/2007 0:006/25/2007 12:006/26/2007 0:006/26/2007 12:006/27/2007 0:006/27/2007 12:006/28/2007 0:00Flow (GPM)444 Site #7, Flow VS. Time01002003004005006007008006/14/2007 0:006/14/2007 12:006/15/2007 0:006/15/2007 12:006/16/2007 0:006/16/2007 12:006/17/2007 0:006/17/2007 12:006/18/2007 0:006/18/2007 12:006/19/2007 0:006/19/2007 12:006/20/2007 0:006/20/2007 12:006/21/2007 0:006/21/2007 12:006/22/2007 0:006/22/2007 12:006/23/2007 0:006/23/2007 12:006/24/2007 0:006/24/2007 12:006/25/2007 0:006/25/2007 12:006/26/2007 0:006/26/2007 12:006/27/2007 0:006/27/2007 12:006/28/2007 0:00Flow (GPM)445 Site #8, Flow VS. Time (Before Edinger Lift Station Improvements)01002003004005006007006/14/2007 0:006/14/2007 12:006/15/2007 0:006/15/2007 12:006/16/2007 0:006/16/2007 12:006/17/2007 0:006/17/2007 12:006/18/2007 0:006/18/2007 12:006/19/2007 0:006/19/2007 12:006/20/2007 0:006/20/2007 12:006/21/2007 0:006/21/2007 12:006/22/2007 0:006/22/2007 12:006/23/2007 0:006/23/2007 12:006/24/2007 0:006/24/2007 12:006/25/2007 0:006/25/2007 12:006/26/2007 0:006/26/2007 12:006/27/2007 0:006/27/2007 12:006/28/2007 0:00Flow (GPM)446 Site #8, Flow VS Time (After Edinger Lift Station Improvements)01002003004005006007001/16/2008 0:001/17/2008 0:001/18/2008 0:001/19/2008 0:001/20/2008 0:001/21/2008 0:001/22/2008 0:001/23/2008 0:001/24/2008 0:001/25/2008 0:001/26/2008 0:001/27/2008 0:001/28/2008 0:001/29/2008 0:001/30/2008 0:001/31/2008 0:002/1/2008 0:002/2/2008 0:002/3/2008 0:002/4/2008 0:002/5/2008 0:002/6/2008 0:00Flow (GPM)447 Site #10, Flow VS. Time0501001502002503006/14/2007 0:006/14/2007 12:006/15/2007 0:006/15/2007 12:006/16/2007 0:006/16/2007 12:006/17/2007 0:006/17/2007 12:006/18/2007 0:006/18/2007 12:006/19/2007 0:006/19/2007 12:006/20/2007 0:006/20/2007 12:006/21/2007 0:006/21/2007 12:006/22/2007 0:006/22/2007 12:006/23/2007 0:006/23/2007 12:006/24/2007 0:006/24/2007 12:006/25/2007 0:006/25/2007 12:006/26/2007 0:006/26/2007 12:006/27/2007 0:006/27/2007 12:006/28/2007 0:00Flow (GPM)448 Site #11, Flow VS. Time01002003004005006007008006/14/2007 0:006/14/2007 12:006/15/2007 0:006/15/2007 12:006/16/2007 0:006/16/2007 12:006/17/2007 0:006/17/2007 12:006/18/2007 0:006/18/2007 12:006/19/2007 0:006/19/2007 12:006/20/2007 0:006/20/2007 12:006/21/2007 0:006/21/2007 12:006/22/2007 0:006/22/2007 12:006/23/2007 0:006/23/2007 12:006/24/2007 0:006/24/2007 12:006/25/2007 0:006/25/2007 12:006/26/2007 0:006/26/2007 12:006/27/2007 0:006/27/2007 12:006/28/2007 0:00Flow (GPM)449 Site #12, Flow VS Time (After Edinger Lift Station Improvements)01002003004005006007008001/16/2008 0:001/17/2008 0:001/18/2008 0:001/19/2008 0:001/20/2008 0:001/21/2008 0:001/22/2008 0:001/23/2008 0:001/24/2008 0:001/25/2008 0:001/26/2008 0:001/27/2008 0:001/28/2008 0:001/29/2008 0:001/30/2008 0:001/31/2008 0:002/1/2008 0:002/2/2008 0:002/3/2008 0:002/4/2008 0:002/5/2008 0:002/6/2008 0:00Flow (GPM)450 Appendix D 2003 Master Plan Capacity Analysis 451 City of Huntington Beach Sewer System Management Plan 67 APPENDIX H - Sewer Lift Station Priority List 452 Priority No Station No.Station Name Year Built 113Slater & Springdale 1966 222Saybrook & Heil 1965 323New Britain & Adams 1972 421McFadden & Dawson 1972 519Bushard & Pettswood 1969 618Atlanta & Beach 1973 711Lark & Warner 1964 82 Humboldt & Wayfarer 1964 95 Davenport & Baruna 1963 10 3 E Station 1962 11 20 Speer & Crabb 1968 12 14 Gothard & Ellis 1992 13 17 Brookhurst & Effingham 2000 14 4 A Station 2000 15 31 Boeing 2003 16 28 Coral Cay 2006 17 25 Edinger & Santa Barbara 2006 18 9 D Station 2007 19 32 Brightwater 2008 20 26 Brighton & Shoreham 2009 21 24 Edwards & Balmoral 2010 22 16 Adams & Ranger 2012 23 10 Algonquin & Boardwalk 2013 24 7 C Station 2014 25 30 Trinidad & Edinger 2016 26 1 Graham & Kenilworth 2019 27 6 Edgewater & Davenport 2019 SEWER LIFT STATION PRIORITY LIST 453 City of Huntington Beach Sewer System Management Plan 68 APPENDIX I - Overflow Response Plan 454 ADMINISTRATIVE REGULATION Office of the City Administrator Number Sections Effective Date Responsible Department Review Date 808 1-7 8/1/07 Public Works 8/1/12 SUBJECT: Sanitary Sewer Overflow and Subsurface Sewer Leak Response Procedures 1. Purpose: To minimize the impact of an accidental discharge from the City's wastewater collection system. 2. Authoritv: 3. Application: Beach. Section 401 of the Huntington Beach City Charter This regulation applies to all officers and employees of the City of Huntington 4. Definitions: 4.1. An above-ground release of untreated sewage from the City's wastewater collection and/or pumping system. 4.2. Subsurface Sewer Leak: A release of untreated sewage through collection system pipe and/or pumping system defects below the ground. 5. Responsibilities: 5.1. All discharges of sewage, whether a sanitary sewer overflow or a subsurface sewer leak, shall be reported to the Public Works Utilities Division. 5.2. The Public Works Utilities Division, Wastewater Section Supervisor or his designee, will be responsible for reporting all discharges of sewage immediately to applicable Federal, State, regional and local agencies. 5.3. Any discharge caused by defects in the system that cannot be corrected by the Public Works Utilities Division through normal maintenance efforts will be referred to the Engineering Division for assessment and recommended action. 5.4. The Director of Public Works shall be notified of all discharges of sewage. 5.5. Records of discharges shall be kept for a period of not less than five years, subject to the latest adopted version of the City's records retention policy. 6. Procedures: 6.1. A representative of the Fire Department, Public Works Department, or both, will respond to all reported discharges to identify the responsible party. 6.2. Discharges that are determined to be caused by activities on private property will be directed to the Public Works Department Wastewater Section for enforcement of cleanup, billing and agency notifications. 6.3. Discharges that are determined to be caused by activities on City property, or which responsibility cannot be established, will be directed to the Public Works. 6.4. Department Wastewater Section for cleanup and agency notifications. Actions to alleviate discharges will be performed in the following order: 455 Page 2 6.4.1. Contain and/or minimize the discharge. 6.4.2. Identify and notify the responsible party. 6.4.3. Collect information, estimate discharge volumes and capture photo documentation. 6.4.4. Begin cleanup of the discharge (concurrently with 7.4.3.) 6.4.5. Notify all applicable Federal, State, regional and local agencies. 6.4.6. Notify Public Works management up through the Director of Public Works. 6.4.7. Inform the Public Works Department, Engineering Division for an assessment and recommended course of action if the problem cannot be corrected through normal maintenance efforts. 6.5. Private property owners will be billed for all City costs, including overhead, associated with the response or cleanup of a spill caused as a result of activities on their property. 7.Attachments Attachment A: Attachment B: Attachment C: Attachment D: Detailed Sanitary Sewer Overflow Response Procedures Detailed Subsurface Sewer Leak Response Procedures Sanitary Sewer Overflow Report Form Calculation of Sanitary Sewer Overflow Volumes 4~4 Penelope Culbreth-Graft,DPA,City Administrator 808 456 Page 3 808 ATTACHMENT A: Detailed Sanitary Sewer Overflow Response Procedures 457 Page 4 Detailed Sanitary Sewer Overflow Response Procedures Notification: Notification ofa sewage spill on public or private property typically will be received by telephone, either through Police Dispatch (9-1-1) or through the Public Works Department Utilities Operations Division. A call received via 9-1-1 will result in Fire Department response. Calls received by the Public Works Department will initiate dispatch of trained response crews to the site where the spill will be evaluated and other, appropriate City departments will be notified as necessary. Incident Response: Fire Department and/or Public Works Department will respond to all reported sewage spills to identify the responsible party and provide clean-up protocol procedures for sewage that has been discharged into the environment on public or private property. Assessment Process: The Fire Department/Public Works Department Incident Commander will investigate the incident and determine if the sanitary sewer overflow is on public or private property. If the overflow is on City property, or has the potential of reaching City property, the Public Works Department Wastewater Section will respond. Notification schedule: Utilities Yard 7:00 a.m. - 4:00 p.m. (714) 536-5921 or Wastewater Section after hours callout at (714) 296-9295. The Public Works Department Utilities Division Wastewater Section Supervisor or his/her designee shall be responsible for immediately notifying applicable Federal, State, regional and local agencies noted in Attachment C by phone, Internet-based reporting to the State Water Resources Control Board, facsimile and certified mail/return receipt. If the overflow is on private property, the Fire Department Incident Commander and/or Public Works Department Utilities Division Wastewater Section Supervisor or his designee will contact the responsible party for proper removal of the sewage. The responsible party shall be advised that the substance must be removed immediately under the applicable Federal, State, regional and local codes and regulations. The Fire Department and/or Public Works Department Wastewater Section Supervisor or his designee shall immediately notify applicable Federal, State, regional and local agencies by phone, Internet-based reporting to the State Water Resources Control Board, facsimile and certified mail/return receipt. In addition, the State Water Resources Control Board also shall be notified by and Internet-based reporting system established for such purpose. The City may initiate cleanup if deemed appropriate to protect the public health, safety and welfare. 808 458 Page 5 Incident Action Plan: Action taken at the scene by Public Works Department or private contractor pertaining to sewage spills on public or private properties: 1. Contain and/or minimize the discharge. 2. Identify and notify the responsible party. 3. Collect information, estimate overflow volumes and capture photo documentation. 4. Begin cleanup of the overflow (concurrently with step 3). 5. Notify all applicable Federal, State, regional and local agencies by phone, facsimile and certified mail/return receipt. 6. Notify management up through the Director of Public Works. 7. Inform the Engineering Division for an assessment and recommended course of action if the problem cannot be corrected through normal maintenance efforts. 8. Send billing information to Administrative Services Department to invoice responsible private property owners for any City costs associated with the responses/clean-up of the overflow caused as a result of activities on private property. 808 459 Page 6 808 ATTACHMENT B: Detailed Subsurface Sewer Leak Response Procedures 460 Page 7 Detailed Subsurface Sewer Leak Response Procedures Notification: Notification of a subsurface sewer leak is typically made during routine cleaning or robotic camera inspection by Public Works Department crews but may also be received from the public via calls to Fire or Police. All notifications shall be referred to the Public Works Utilities Division 7:00 a.m. - 4:00 p.m. at (714) 536-5921 or Wastewater Section after- hours callout at 714-206-9295. Incident Procedure: The Public Works Department, Wastewater Section crews shall respond to all suspected subsurface sewer leaks that are within the public right-of-way and will take appropriate action as determined by an assessment process. If the suspected subsurface leak is in a service lateral to a privately-owned building, regardless if said lateral is in the public right- of-way, it is the responsibility of the building owner and said owner will benotified to repair the line immediately. Assessment Process: The Public Works Wastewater Supervisor, or his/her designee, shall investigate all reported subsurface sewer leaks within the public right-of-way. If the Supervisor determines that a crack or leak could be in violation of applicable water quality and/or health care regulations, he/she shall immediately report the incident to the County of Orange Health Care Agency, the California Regional Water Quality Control Board, Santa Ana Region, and the Public Works Street/Wastewater Supervisor(1). Outside agency notifications shall be made by phone, facsimile and certified mail/return receipt. The Public Works Wastewater Supervisor shall immediately notify the Utilities Manager and submit an Incident Report to the Public Works Department, City Engineer. The Utilities Manager, via the Director of Public Works, shall immediately notify the City Administrator. Upon receipt of an Incident Report, the City Engineer shall immediately cause the leak to be assessed and, if deemed appropriate, develop a Corrective Action Plan, which may include excavation and repair/replacement, slip lining or other appropriate techniques. 808 461 Page 8 Incident Action Plan: Continuous communication shall be established with the Santa Ana Regional Water Quality Control Board with regard to all findings, decisions and timetables pertaining to repair and/or monitoring of possible subsurface leaks. Subsurface leaks, at the determination of the Public Works Street/Wastewater Supervisor, may require the immediate diversion of sewage until the repair of the damaged infrastructure may be affected by the City Engineer; however the Street/Wastewater Supervisor, in consultation with the City Engineer, may determine that the extent of the damage is not susceptible to immediate violations of applicable laws and repair may be deferred, or deemed unnecessary, but subject to a specific monitoring schedule to be determined at that time. (1)Subsurface sewage leaks of less than 1,000 gallons per day are not subject to immediate repair and reporting to regulatory agencies unless there is a potential for contamination of Waters of the State. Nonetheless, documentation and any necessary repair of the damaged line shall be affected pursuant to the City Engineer's Corrective Action Plan and included in the sewer system audit and routine reports to the Regional Water Quality Control Board. 808 462 Page 9 808 ATTACHMENT C: Sanitary Sewer Overflow report Form (Delivery by Facsimile and Certified Mail/Return Receipt) 463 Page 10 CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD SANTA ANA REGION SANITARY SEWER OVERFLOW REPORT FORM ALL ITEMS ARE REQUIRED TO BE ADDRESSED. 1. THIS REPORT IS (CHECK ONE):D PRELIMINARY D FINAL D REVISED FINAL 2. SANITARY SEWER OVERFLOW SEQUENTIAL TRACKING NUMBER:_ 3. REPORTED TO:.(ENTER FAX, VOICE MAIL, OR NAME OF REGIONAL BOARD STAFF) 4. DATE REPORTED: / / (MM/DD/YY) 5. TIME REPORTED:(MILITARY OR 24-HOUR TIME) 6. REPORTED BY:_ 7. PHONE: ~(_~)_ 8. REPORTING SEWER AGENCY: 9. RESPONSIBLE SEWER AGENCY: (MM/DD/YY) (MILITARY OR 24 HOUR TIME) (MM/DD/YY) (MILITARY OR 24 HOUR TIME) 11. ESTIMATED OVERFLOW FLOW RATE:(GALLONS PER MINUTE) 12. TOTAL OVERFLOW VOLUME:(GALLONS) DATE:_ 9. OVERFLOW START: 10. OVERFLOW END: DATE: TIME:_ TIME:_ L 13. DESCRIPTION OF HOW VOLUME WAS DETERMINED/CALCULATED. ATTACH PHOTOG RAPH(S )/DIAGRAM(S): 14. OVERFLOW VOLUME RECOVERED:(GALLONS) 15. OVERFLOW VOLUME RELEASED TO ENVIRONMENT:(GALLONS) 808 464 Page 11 SANITARY SEWER OVERFLOW LOCATION AND DESCRIPTION: 16. ADDRESS: CITY:_ 17. COUNTY:(SB, RV, OR) ZIP CODE: 18. SANITARY SEWER OVERFLOW STRUCTURE I.D.:_ 19. NUMBER OF OVERFLOWS WITHIN 1000FT. OF THIS LOCATION IN PAST 12 MONTHS: 20. DATES OF OVERFLOWS WITHIN 1000FT. OF THIS LOCATION IN PAST 12 MONTHS: 21. OVERFLOW CAUSE - SHORT DESCRIPTION - CHECK ONE: D ROOTS D GREASEDLINE BREAKDINFILTRATION DROCKS D BLOCKAGEDPOWER FAILUREDPUMP STATION FAILURE oDEBRIS D VANDALISMDFLOOD DAMAGEDMANHOLE FAILURE DOTHER D UNKNOWNDCONSTRUCTIONDPRIVATE PROPERTY 22. OVERFLOW CAUSE - DETAILED DESCRIPTION OF CAUSE: 23. SANITARY SEWER OVERFLOW CORRECTION - DESCRIPTION OF ALL PREVENTATIVE AND CORRECTIVE MEASURES TAKEN OR PLANNED: 24. WAS THERE MEASURABLE PRECIPITATION DURING 72-HOUR PERIOD PRIOR TO THE OVERFLOW? INITIAL AND SECONDARY RECEIVING WATERS: 25. DID THE SANITARY SEWER OVERFLOW ENTER A STORM DRAIN?(Y OR N) 26. DID THE SANITARY SEWER OVERFLOW REACH SURFACE WATERS OTHER THAN A STORM DRAIN?(Y OR N) 808 465 Page 12 27. NAME OR DESCRIPTION OF INITIAL RECEIVING WATERS: (IF NONE, WRITE "NONE") 28. NAME OR DESCRIPTION OF SECONDARY RECEIVING WATERS: (IF NONE, WRITE "NONE") 29. IF THE SANITARY SEWER OVERFLOW DID NOT REACH SURFACE WATERS, DESCRIBE THE FINAL DESTINATION OF SEWAGE. NOTIFICATION: 30. WAS THE lOCAL HEALTH SERVICES AGENCY NOTIFIED?(Y OR N) County of Orange, Health Care Agency (714) 667-3751 After Hours (714) 628-7008, FAX (714) 667-3754 Date of Call: / / Time of Call: _~_ Date Faxed:L / 31. WAS THE OFFICE OF EMERGENCY SERVICES (OES) NOTIFIED? __ (Y OR N) State Office of Emergency Services (800) 852-7550 Date of Call: / / Time of Call:_ Reported To:_ Control #: ADDITIONAL NOTIFICATIONS: Regional Water Quality Control Board (909) 782-4130 After Hours (916) 262-1621 or (800) 962-8179 FAX (909) 781-6288 Date of Call: / / Time of Call: _~ __ Reported To:_ Date Faxed: Public Facilities & Resources Department (714) 567-6363 (If the spill enters a county channel)Date of Call: / / Time of Call: _ Reported To:_ Repol 808 Utilities Manager (714) 536-5921 Director of Public Works (714) 536-5437 City Attorney Investigator (714) 536-5257 Date of Call: / / Time of Call: _~ __ Date of Call: / / Time of Call:_ Date of Call: / / Time of Call: 466 Page 13 AFFECTED AREA POSTING: 32. WERE SIGNS POSTED TO WARN OF CONTAMINATION?(Y OR N) 33. LOCATION OF POSTING (IF POSTED): 34. HOW MANY DAYS WERE THE WARNING SIGNS POSTED? 35. WERE SAMPLES OBTAINED OF CONTAMINATED WATER?(Y OR N,IF YES ATTACH RESUL TS) 36. OTHER REMARKS: I swear under penalty of perjury that the information submitted in this document is true and correct, and that I have personally examined and am familiar with the information submitted in this document, including all attachments. Based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment. SIGNATURE:_____________NAME:_ DATE: 808 ________________TITLE:_ 467 Page 14 808 ATTACHMENT D: Calculation of Sanitary Sewer Overflow Volumes (Excerpt from Irvine Ranch Water District Operations Manual) 468 Page 15 SEWER SPILL PROCEDURE )CALCULATING SPILLS The purpose ofthis report is to take the mystery out of calculating spills. Almost all spills can be calculated usmg the two examples discussed in this section. You can use the orifice equation when trying to fi~e out the volume of a spill. Understanding the orifice equation is not as complex as it may sound. If you know the diameter ofthe hole (i.e., pick hole or annual space between the ring and cover) and the height at which the fluid is coming out of the hole, then you can figure the .. flow out of that hole. The equation is Q = Ca-r2gh. mere: Q = C = a = g = h =flow of fluid from the hole, coefficient of discharge, area of the hole (measured in feet), gravity (32.2 ftIsec), and height of the fluid above the cover (measured in feet). The coefficient of discharge (C) is the product of the coefficient of velocity (Cv) multiplied by the coefficient of contraction (Cc). The values for Cv have been found to vary from 0.954 for :x ·inch orifices to 0.991 for 2.5 inch orifices. The values for Cc have been found to vary from 0.67 for *inch.orifices to 0.614 for 2.5 inch orifices. Example 1 You receive a report of a spill occurring at 12 noon. Your crews respond to the spill and relieve the spill at 2:30 p.m. In addition, they inform you that the flow was coming from two *inch pick holes in the manhole cover, and when they arrived on the scene, the flow appeared to be coming out of the holes approximately 4 inches above the lid. What is the total flow that you are to report to the Regional Board? Assumptions forExample 1 spill: 1. Flow started at noon and was stopped at 2:30 p.m. Total time of spill was 2.5 hours (150 minutes). 2. Flow was coming from two *inch pick boles. Tbe area of each :x inch hole is 0.44179 in. (see Table 1-2).To convert in2 to ft2multiply by 0.006944. Therefore, a =0.44179 inch2x 0.006944 =0.0031 ft zfor each hole. 808 tRVVOTechnical Operations Manual 1.14 -6 March 2000 469 Page 16 3. SEWER SPILL PROCEDURE Flow was coming out of each hole at a height of 4 inches. 1foot To convert inches to feet, multiply by 12 inches 1 foot Therefore, H= 4 inches x --- = 0.33 ft 12 inches 4. The coefficient of di~cbaIge. C =Cv x Cc. For a *inch hole, Cv ==0.954. Cc == 0~67. Therefore, C =0.954 x 0.67 =0.639 5. Using the orifice equation Qh =CQ~2gh the flow from each hole is: Qh =0.639 {(.0031 ft2)J2(32.2ft Isec1)(0.33ft) 6. Total flow, Qt = Qh:x: number of holes x length of spill (minutes) . Qt = 4:099 gpmlhole x 2 holes x 150 minutes ==.1.230 gallons. Example 2 In this next Example, the facts aIe similar to Example 1, except in addition to the flow. coming out of the two pick holes, it is also coming out of the ~ inch gap between tbe ring and cover at a height of 4 inches. 7. In addition to steps 1 through 6 in Example 1, you also need to figure the total area where the flow is coming·out between the ring and cover. We know that the relationship between the ring and cover probably looks like this: FIGURE 1.14.2 SEWER SPILL CALCULATION EXAMPLE 36"~ '/." GAP ] I I RING IRVVOTechnical Operctions Manual RING 1.14-7 March 2000 470 Page 17 I.j SEWER SPILL PROCEDURE This problem is made simple if you take the ID of the ring (shown hereto be 36 . inches), figure out its area and subtract it from the area of the cover (shown here to be 36" -Y:"=35.5 inches). Since both of these areas are cixcles, we know that the formula is A =[l(D/2)2.Therefore: A =A ring - A Cover =m(36/2)2] -mC35.5/2 2]TI=3.1416 =[3.1416 (324)] - [3.1416(315.1)] =1017.9 - 989.8 =28.1 in2 x 0.006944 =0.195 ft2 8. From Example 1; H =0.33 ft, g =32.2 r-Jsec, C =0.639 9. Using ormce equation Q =Ca..J2gh Q =0.639 {(O.195 ft2)~2(32.2ft /see!(0.33ft) =0.574 CFS =257.82 gpm =257.82 gpm x 150 min =38,673· gallons 10. In this example, flow was coming from two pick holes and the space between the ring and cover. So in this example we must add the flow calculated in Step 6 above to the flow calculated in Step 9 above - making the total flow of the spill in this example: Qt =1230 gallons +38,673 gallons =39,903 gallons IR\ND Technical Operations Manual 1.14-6 March 2000 471 Page 18 W ASTEW ATER SPILL CALCULATOR How high in inches was the water coming out of the pick 1inches hole?How many pick holes (there are two per manhole)? 2pick holes How many minutes was the water running? 15minutes Complete the following if water was also coming out around the manhole lid. (Leave these fields blank if the above condition does not apply) How high was the water coming out around the manhole inches lid?How many manhole lids? manholes 808 The spill rate is: The amount spilled is: 7.28 gallons per minute 109 gallons 472 City of Huntington Beach Sewer System Management Plan 69 APPENDIX J - FOG Impact Study 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 City of Huntington Beach Sewer System Management Plan 70 APPENDIX K - FOG Training Manual 510 1 BBBeeesssttt MMMaaannnaaagggeeemmmeeennnttt PPPrrraaaccctttiiiccceeesss (((BBBMMMPPPsss))) TTTrrraaaiiinnniiinnnggg MMMaaannnuuuaaalll fffooorrr FFFooooooddd SSSeeerrrvvviiiccceee EEEssstttaaabbbllliiissshhhmmmeeennntttsss CCCiiitttyyy ooofff HHHuuunnntttiiinnngggtttooonnn BBBeeeaaaccchhh FFFaaatttsss,,, OOOiiilllsss,,, aaannnddd GGGrrreeeaaassseee (((FFFOOOGGG))) CCCooonnntttrrrooolll PPPrrrooogggrrraaammm 511 Table of Contents Section 1 What is FOG? ............................................................................................ 1 1.1 How Does FOG Affect You? ......................................................................................................................... 1 1.2 The City of Huntington Beach FOG Control Program .................................................................................. 1 Section 2 How to Achieve Compliance with the Food Service Establishment FOG Control Program ......................................................................................... 2 Section 3 Employee Training and Awareness ............................................................. 2 3.1 “Dry Wiping” Pots, Pans, Dishware and Work Areas to Remove Grease .................................................... 3 3.2 Spill Prevention and Proper Clean-Up Methods .......................................................................................... 3 3.3 Drain Screening ............................................................................................................................................ 4 3.4 Dishwashing and Equipment Cleaning ........................................................................................................ 4 3.5 Recycling FOG .............................................................................................................................................. 5 3.6 Maintenance of Kitchen Exhaust Filters ...................................................................................................... 5 3.7 Post “No Grease” Signs ................................................................................................................................ 6 Section 4 Grease Control Devices; Grease Trap vs. Grease Interceptor ...................... 6 4.1 Grease Trap Maintenance ........................................................................................................................... 9 4.2 Grease Interceptor Maintenance ................................................................................................................ 9 Section 5 Recordkeeping ......................................................................................... 11 Attachments Attachment I Employee Training Record Attachment II Grease Trap Maintenance Log Attachment III Grease Recycling and Grease Control Device Service Providers Attachment IV Hood Filter Service Vendor 512 1 The City of Huntington Beach has developed the “Best Management Practices (BMPs) for Food Service Establishments” Training Manual to assist Food Service Establishments in developing simple, easy-to-follow steps and procedures to prevent Fats, Oils, and Grease (FOG) from entering the City’s sewer system. This manual covers all the basic elements to eliminate FOG and is a helpful tool to convey the message to your staff and achieve compliance with the FOG Control Program. 1.What is FOG? FOG is a combination of fats, oils, and grease used in food preparation, and is generated by Food Service Establishments (FSEs). Products that contain and create FOG include cooking oil, fat, grease, butter, shortening, and cooking meat. 1.1 How Does FOG Affect You? Food waste, as well as water that has been used to wash kitchen equipment, dishes, and floors, contains FOG. When FOG is washed or poured down the drain and into the sewer, it cools and solidifies causing sewer pipes to become clogged. Over time, FOG builds up and eventually blocks entire sewer pipes, causing sewage backups and overflows. Property damage can result from sewage backing up into the building leading to expensive cleanup and plumbing repairs that you are responsible for. Sewage spills and backups can also result in Health Department code violations that can lead to the closure of your business operations. If a sewer spill occurs, immediately stop using water, call a plumber, and the City of Huntington Beach at (714) 536-5921 or (714) 960-8825 after hours. If sewage is released and enters a storm drain, the sewage will flow to the ocean causing an immediate public health hazard and possible beach closure. 1.2 The City of Huntington Beach FOG Control Program To eliminate FOG related sewer spills and backups, the City has adopted an aggressive maintenance program to frequently inspect and clean the City’s sewer lines. However, the most effective way to minimize FOG accumulation in sewers is to prevent the introduction of FOG into the sewer system in the first place. To achieve this goal, the City adopted Municipal Code 14.56, Control and Regulation of Fats, Oils, and Grease, a FOG Control Program that regulates FSEs and provides a FOG Blockage in Sewer Pipe 513 2 mechanism to help control and minimize the introduction of FOG into the City’s sewer system. The City’s FOG Control Program implements a three-part approach: o Public Outreach and Education Public outreach programs educate commercial business operators/owners and residents on the problems associated with improper disposal of FOG and encourage the implementation of FOG BMPs. o Food Service Establishment FOG Control Program The FSE FOG Control program provides the City, through the FOG ordinance, with the authority to inspect and monitor the implementation of BMPs. o Enhanced Sewer Maintenance and Cleaning Enhanced sewer maintenance activities are scheduled as a result of the City’s inspection of the sewer system using a closed circuit television (CCTV) inspection system. 2.How to Achieve Compliance with the Food Service Establishment FOG Control Program Achieving compliance with the City’s FSE FOG Control Program requires the implementation of all of the following BMPs by the owner/operator of the FSE through an Employee Training and Awareness Program. o “Dry Wiping” Pots, Pans, Dishware, and Work Areas to Remove Grease o Spill Prevention and Proper Clean Up Methods o Drain Screening o Proper Dish Washing and Equipment Cleaning o Recycling FOG o Maintenance of Kitchen Exhaust Filters o Posting “No Grease” Signs o Maintenance of Grease Control Devices (Grease Traps and Grease Interceptors) The above BMPs are designed to reduce or eliminate FOG into the sewer system. Other BMPs not listed may be necessary to further reduce or eliminate FOG. 3.Employee Training and Awareness Program The success of your establishment's BMP program to eliminate FOG from entering your sewer system is largely dependent upon your employees. The City requires the training of all employees at least twice a calendar year and all new hires within two calendar weeks of hire on the following subjects: 514 3 o “Dry wiping” pots, pans, dishware, and work areas to remove grease o Spill prevention and proper cleanup methods o Drain Screening o Dishwashing and Equipment Cleaning o Proper FOG Recycling/Disposal o Maintenance of Kitchen Exhaust Filters o Post “No Grease” Signs o Employee training must be documented in the Employee Training Record (Attachment I) and include employee signatures indicating each employee’s attendance and understanding of the practices reviewed. All training records must be kept on site at all times and made available for review by the City. The following sections cover training elements required by the City of Huntington Beach. The italic/bold texts are recommendations for restaurant managers/supervisors to train employees. These are only recommendations that may or may not work and should be used or modified accordingly. 3.1 “Dry Wiping” Pots, Pans, dishware, and Work Areas to Remove Grease Remove food waste with paper towels or a spatula from dishes, pans, and work- areas by “dry wiping” before washing will prevent FOG from entering your sewer system. Washing food waste and FOG into the drains will eventually cause FOG to build up and create costly blockages in your sewer lines. Train employees how to “dry wipe” food waste from pots, pans, and dishware by: o Using rubber scrapers or paper towels to remove food waste, fats, oils and grease from cookware, utensils, pots, and pans before washing. Food waste should be disposed in a double bagged trash can. o Keep “dry wipe” tools by the dish washing area for easy access and use. o Using food grade paper to soak up oil and grease under fryer baskets prior to mopping floors. 3.2 Spill Prevention and Proper Clean-Up Methods All employees shall be trained on spill containment and proper spill cleanup methods. Preventing spills will help prevent slips and fall hazards as well as clogged drains. 515 4 For spill prevention: o Empty containers before they are full to avoid spills. o Place lids on all containers when transporting liquids, particularly containers with liquid wastes containing FOG. o Provide employees with proper tools, e.g., carts with wheels, and ample containers to transport materials without spilling. o Practice effective spill containment and clean up. Sweep or vacuum spills of dry products. Establishments that use large amounts of cooking fats, such as deep fryers, should post their spill response procedures and have a spill kit in an easily accessible well known location. The spill kit shall contain absorbent material, like absorbent pads or kitty litter for liquid spills. To clean FOG spills employees should be trained to: o Block off all sinks and floor drains near the spill. o Use absorbent material in the spill kit to completely surround the spill. o Sweep up used absorbent material and throw it away. o Mop with a degreaser only to remove trace residues. 3.3 Drain Screening Keeping food particles containing FOG out of the sewer system can prevent clogged drains and pipe blockages. To implement this, install screens that have 1/8-inch or 3/16-inch screen openings in each floor, mop and hand sink. Train employees on the following: o How to clean drain screens frequently and dispose of the collected material in a trash can. o How to replace damaged or missing screens. 3.4 Dishwashing and Equipment Cleaning Proper dishwashing and cleaning methods will prevent food solids and FOG from clogging drains and causing backups. 516 5 Train employees to: o Use a rubber spatula to scrape the sides of deep fryers and large pots then wipe with paper towels before washing All excess grease and oil should be placed into a waste grease container and throw paper towels in the trash. o Empty grill and broiler drip pans into a waste grease container and then wipe down with paper towels prior to washing. Dispose of the paper towels in trash. 3.5 Recycling FOG All waste fryer oil and cooking grease must be disposed into designated waste FOG containers. A list of suggested recycling companies is provided in Attachment III. To recycle FOG, train your employees to: o Never throw waste oil down any drain. o Collect and store deep fryer waste oil in a designated recycling container. Please see Attachment III of this manual for a suggested list of vendors that may provide this service. o Keep FOG waste containers covered at all times and promptly clean all spills and residue. o If FOG waste containers are stored outside, lock and secure lids to prevent theft and/or vandalism, and rain from getting into the container. o Keep containers in good working order and free of leaks. o If possible store waste FOG containers indoors. This will minimize the risk of theft and spills. 3.6 Maintenance of Kitchen Exhaust Filters Routinely clean kitchen exhaust system filters. If filters are not cleaned on a regular basis, grease and oils escape through the kitchen exhaust system and can accumulate on the roof of your establishment and eventually enter the storm drain system when it rains. Hood filters can be cleaned by a company or employees. 517 6 If employees clean hood filters train your employees to: o Place the hood filters over a double bagged trash can. Spray degreaser on the dirty hood filters to loosen the grease and allow the excess degreaser to drip into the trash can. o Use a paper towel to wipe down the hood filters once the degreaser has been applied. o Dispose of the paper towel in the trash can. o Wash the hood filters with soap and hot water once all the excess grease has been removed. Spraying filters with hot water using little or no detergent over a mop sink connected to a grease trap or interceptor can also effectively clean hood filters. After a hot water rinse (drain must be connected to a grease trap or interceptor), filter panels can be placed into the dishwasher. 3.7 Post “No Grease” Signs Post “No Grease” signs near three compartment sinks and mop sinks to remind your staff that FOG should never be poured down the drain. This will serve as a constant reminder to your employees to properly recycle FOG and to dispose of food waste in the garbage, not down the drain. The City will provide your facility with “No Grease” signs and other FOG related information that you can use to educate your staff. 4.Grease Control Devices; Grease Trap vs. Grease Interceptor Grease Trap vs. Grease Interceptor Grease traps and grease interceptors are both considered grease control devices. Grease traps are smaller devices, usually 25-100 gallon capacity, that are typically located inside a food service facility. A grease interceptor is a larger device, usually 750 to 2,000 gallon capacity, which is located underground and outside of a food service establishment. Typical Grease Traps 518 7 Grease control devices are designed to collect, contain and remove food solids and grease from wash water while allowing the remaining liquid waste to discharge to the sewer system. Maintenance of Grease Control Devices For grease control devices to be effective, the units must be properly sized and maintained to allow adequate time for food solids and FOG to settle and accumulate. Inspecting and cleaning a grease control device is critical to ensure that it is functioning properly. Grease Control Devices are required to be cleaned at minimum on a quarterly basis. Proof of maintenance shall be retained in the training manual. The maintenance frequency for your grease control device depends on the volume of FOG your facility generates. Your FSE will save grease control device maintenance costs by implementing the BMPs detailed in this manual. Here are some basic maintenance requirements for grease control devices: The total FOG and solids in the grease control device should never be over 25% of the capacity of the tank. Always review the maintenance record to see that it is less than 25%. If the grease control devices is greater than 25 percent of the holding capacity you are required to perform a full cleaning of the device. FSEs that choose to service the grease traps on their own are required to maintain a record that documents the cleaning activities in the FOG Training Manual. Records should include the name of the employee who performed the cleaning, date/time of cleaning, amount of grease removed and the disposal location for the grease. A sample maintenance log (see Attachment II – Maintenance Log) has been provided for your use and should be utilized to document the inspection and cleaning of your grease trap. Grease interceptors should be serviced, at a minimum, quarterly by a licensed service provider and service records must be kept onsite for review by City staff. A suggested list of service providers is in Attachment III - Grease Recycling and Grease Control Device Service Providers. Grease Interceptor Manholes 519 8 It is important to review the grease control device maintenance record. Often, the grease service provider performing the cleaning will indicate repairs that need to be made if something is broken, missing, and requires additional cleaning or repair. 520 9 4.1 Grease Trap Maintenance When inspecting and/or cleaning your grease trap, confirm that the grease traps contain their internal baffles and inlet piping flow restrictors/air relief during every inspection and cleaning. These components aid in grease removal by reducing turbulence and increasing holding time within the trap. The proper maintenance procedure for a grease trap is outlined below: Steps Actions 1 Remove water in the trap to facilitate cleaning. The water should be disposed of in the sewer system. 2 Remove baffles, if possible. 3 Remove the accumulated grease out of the interceptor and deposit in a FOG container. 4 Scrape the sides, lid, and baffles to remove as much of the grease as possible, and deposit the grease into a FOG container. 5 Replace the baffle and lid. 6 Record the volume of grease removed on the maintenance log (see Attachment II). 7 Contact a hauler or recycler for grease pick-up. Oil & Grease Accumulation 521 10 4.2 Grease Interceptor Maintenance Grease interceptors, due to their size, will usually be cleaned by licensed grease haulers. The proper maintenance procedures for a grease interceptor are outlined below: Steps Actions 1 Contact a licensed grease hauler for cleaning (Attachment III). 2 Ensure that all flow is stopped to the interceptor by shutting the isolation valve in the inlet piping to the interceptor. The Following Steps Should Be Performed By a Licensed Grease Hauler 3 Remove the lid and bail out any water in the interceptor to facilitate cleaning. The water should be discharged to the sanitary sewer system. 4 Remove baffles, if possible. 5 Remove the accumulated grease out of the interceptor and deposit in a watertight container. 6 Pump out the settled solids and then the remaining liquids. 7 Scrape and wash the walls, lid, and baffles to remove as much of the grease as possible, and deposit the grease into a watertight container. 8 Replace the lids. 9 Record the volume of grease removed on the maintenance log. Oil & Grease Accumulation Oil & Grease Accumulation 522 11 5.Recordkeeping Recordkeeping and documentation is an important element to successfully implementing a FOG elimination program. The City requires that each FSE retain the following records and documents on-site for at least three (3) years, and be available for review during normal operating hours: Employee Training Records (Attachment I) Grease Trap Cleaning and Maintenance Log (Attachment II) Grease Interceptor Cleaning and Maintenance Invoices and manifests Management should inform all supervisory staff where FOG related documents are located so they can be reviewed upon request by City inspectors. Grease Interceptor Service Record 523 Employee Training Record Training Required Every 6 Months Business Name: __________________________________________________ Training Topic(s): _______________________________________________ Trainer: _________________________________________________________ Employee Name Employee Signature Date 524 GREASE TRAP MAINTENANCE LOG Service Company used (if contracted): _______________________________ DATE CLEANED BY GALLONS PUMPED GREASE DISPOSAL SITE (i.e., grease barrel) REMARKS/COMMENTS 525 Grease Recycling and Grease Control Device Service Providers Grease is the number one cause of sewer line blockages. Grease from restaurants and other food service establishments clogs the lines and blocks the flow, causing backups and sewer spills. These spills can enter the storm drain and pollute the ocean, causing beach closures. Renderers are companies that collect Fats, Oil, and Grease (FOG) from food service establishments. The renderer then properly recycles or disposes of the grease. The two most common products rendered from a food service facility are yellow grease and brown grease.  Yellow grease: from bulk deep fat frying operations and oil/water separator units.  Brown grease: from grease traps and grease interceptor waste. The following is a listing of businesses that provide rendering services. Please note that the City of Huntington Beach does not endorse the following contractors and their services: Baker Commodities www.bakercommodities.com 4020 Bandini Blvd. Los Angeles, CA 90023 (800) 427-0696 Orange County Pumping http://ocpumping.com P.O. Box 10415 Santa Ana, CA 92701 (714) 836-6258 Eco-Fry (Grand Natural) www.grandnaturalinc.com 1415 E. McFadden St., Suite H Santa Ana, CA 92705 (855) 519-5550 Darling International www.darlingii.com 2624 S. Hickory Santa Ana, CA 92707 (714) 556-7867 R.E. Commodities www.recommoditiesandpumping.com 31650 Rockridge Circle Lake Elsinore, CA 92532 (951) 830-7315 Martinez Pumping Grease Trap Service P.O. Box 39144 Downey, CA 90239 (626) 625-6051 S.M.C. Grease Specialists www.smcgrease.com P.O. Box 1343 Corona, CA 92878 (951) 788-6042 Triple A Pumping & Jetting Services www.tripleapumping.com P.O. Box 1147 Orange, CA 92856 (714) 628-0900 526 Hood Filter Cleaning Service & Soak Tank Service Providers Grease is the number one cause of sewer line blockages. Grease from restaurants and other food service establishments clogs the lines and blocks the flow, causing backups and sewer spills. These spills can enter the storm drain and pollute the ocean, causing beach closures. The following is a listing of businesses in the area that provide hood filter cleaning and tank services. Please note that the City of Huntington Beach does not endorse the following contractors and their services: Hood Filter Cleaning Diversified Kitchen Solutions (DKS) alan@DKSsolutions.com www.DKSsolutions.com Alan Inselberg (866) DKS-1033 (866) 357- 1033 Super Clean Inc CMS_superclean@yahoo.com Jerry Suh (800) 700-0404 Royal Exhaust Hood Cleaning Services www.royalexhaustcleaning.com Henry Beltran Jerry Suh 1-323-582-7443 Soak Tanks (Used to clean stainless steel kitchen equipment by soaking in cleaning/degreasing solution) Diversified Kitchen Solutions (DKS) alan@DKSsolutions.com www.DKS .com Alan Inselberg (866) DKS-1033 (866) 357- 1033 Kitchen Cleaning Service Ricky Tejada (818) 481-2629 Flue Steam Inc www.fluesteam.com Contact@fluesteam.com Kathy Corona 1-800-700-3583 (ext. 208) Hyginix info@hyginix.com www.fogtank.com Katrina (858)566-6212 527 528 529 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-128 MEETING DATE:3/15/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO:Honorable Mayor and City Council Members SUBMITTED BY:Sean Joyce, Interim City Manager VIA:Sean Crumby, Director of Public Works PREPARED BY:John Martin, Construction Manager Subject: Accept the lowest responsive and responsible bid, approve appropriation and authorize execution of a construction contract with California Waters Development, Inc., in the amount of $2,665,504.99 for the Central Library Fountain Restoration Project, CC-1630 Statement of Issue: On January 27, 2022, bids were electronically opened for the Central Library Fountain Restoration Project, CC-1630. City Council action is requested to award the construction contract to California Waters Development, Inc., the lowest responsive and responsible bidder. Financial Impact: The total cost of the project, including contingency and supplemental expenses, is $3,285,000. Funds are available for this project in the Infrastructure Fund 31440005.82800 ($847,000), Park Development Impact 22845022.82900 ($27,570), and Library Impact Fee Acct 22950002.82900 ($300,000). Staff is seeking an additional appropriation for the balance of $2,110,430 from the Infrastructure Fund. Recommended Action: A) Accept the lowest responsive and responsible bid submitted by California Waters Development., Inc., in the amount of $2,665,504.99; and, B) Appropriate $2,110,430 from the Infrastructure Fund to account 31440005.82800; and, C) Authorize the Mayor and City Clerk to execute a construction contract in a form approved by the City Attorney. Alternative Action(s): Reject all bids, or provide staff with an alternative action. City of Huntington Beach Printed on 3/9/2022Page 1 of 3 powered by Legistar™530 File #:22-128 MEETING DATE:3/15/2022 Analysis: The project involves the renovation of the Central Library’s two exterior fountain systems, which consist of an approximately 4,000 square foot cascading fountain located southeast of the building’s main entrance, and an approximately 16,750 square foot fountain located outside the northwest portion of the facility in addition to associated piping and pumping systems. Originally constructed in 1975, the Central Library was designed by internationally renowned architect Dion Neutra. Incorporated into Neutra’s library design were several internal and external water feature bowls and fountains, which were intended to reflect the surrounding park, lakes, and landscape. This project will restore the two large exterior water fountains and renovate the entire pumping and filtration system. The original fountain liner membrane on both fountains has frayed and delaminated from the perimeter fountain walls. Due to a liner failure in 2016, the northwest pool has not been able to retain water and has experienced soil undermining through retaining wall toe drains. The lighting system and panel, level control system, and electrical sub-panels are either obsolete analog systems or no longer functioning. Old buried piping, conduit, and wiring are at end of life and will be replaced due to the risk of water damage. The deficient water treatment and filtration systems will be upgraded or installed as a new system. The perimeter fountain walls have also sustained several cracks that need to be ground out and sealed. To achieve better flow and water chemistry control, the northwest and southeast fountains will also be segregated to two independent systems. Bids were electronically opened on January 27, 2022, with the following results: BIDDER'S NAME BID AMOUNT Klassic Engineering & Construction Inc. (withdrew bid)$1,753,000.00 California Waters Development, Inc.$2,665,504.99 Woodcliff Corporation $3,441,000.00 Mehta Mechanical Company, Inc.$4,795,260.00 The apparent low bidder, Klassic Engineering & Construction (KEC), wtihdrew its bid proposal due to clerical and mathematical errors. The apparent second lowest bidder, California Waters Development Inc., has provided the requisite work experience references on similar projects as required by the project specifications. Therefore, staff recommends awarding a contract to California Waters Development Inc., in the amount of $2,665,504.99. The total cost of the project is $3,285,000, which includes the construction contract of $2,665,504.99, plus fifteen-percent (15%) construction contingency, and supplemental expenses for project inspection and material testing. Environmental Status: The project is categorically exempt pursuant to Class 1, Section 15301(c) of the California Environmental Quality Act Strategic Plan Goal: Infrastructure & Parks Attachment(s): City of Huntington Beach Printed on 3/9/2022Page 2 of 3 powered by Legistar™531 File #:22-128 MEETING DATE:3/15/2022 1. Vicinity Map City of Huntington Beach Printed on 3/9/2022Page 3 of 3 powered by Legistar™532 533 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-146 MEETING DATE:3/15/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO:Honorable Mayor and City Council Members SUBMITTED BY:Sean Joyce, Interim City Manager VIA:Sean Crumby, Director of Public Works PREPARED BY:Bob Milani, Principal Civil Engineer Subject: Adopt Resolution No. 2022-04 establishing a pierhead line adjacent to Lots 6 & 7 of Tract 5829 (16850 and 16854 Bayview Drive) Statement of Issue: In the harbor along the waterways used for water vessel navigation, wharfage areas are designated for docking vessels. The City is responsible for establishing the pierhead lines that provide the separation of navigation waterways and the wharfage area. The pierhead lines have not yet been created for the subject properties and must now be established. Financial Impact: No expenditure of funds is involved in this action. Recommended Action: Adopt Resolution No. 2022-04, “A Resolution of the City Council of the City of Huntington Beach Establishing a Pierhead Line Adjacent to Tract 5829” which provide a wharfage width of 25 feet adjacent to the subject lots (Attachment 1). Alternative Action(s): Deny recommended action. Analysis: A pierhead line is the line between the bulkhead and a waterway that separates the area open for navigation from the area in which mooring and docking of vessels is permitted. Pursuant to Section 13.32.020 of the Municipal Code, the distance from the bulkhead line to the pierhead line is established by the City Council. The pierhead lines in the City are typically established on a Final Tract Map to create wharfage area for the purpose of mooring and docking of vessels of the adjacent lots being created by the same City of Huntington Beach Printed on 3/9/2022Page 1 of 2 powered by Legistar™534 File #:22-146 MEETING DATE:3/15/2022 map. However, Tract Map 5829 (Attachment 2) did not locate the pierhead line adjacent to the newly created lots, but rather across Ramora Channel, next to what would become Channel Lane with the construction of Admiralty Island. On that map, the Huntington Harbour Corporation dedicated Lots A & B (i.e. Remora Channel) as a navigable public waterway, but further reserved an easement over Lot B for the purpose of mooring and docking, thereby establishing the wharfage area on Lot B across from the residential lots. Since the map recorded in 1968, only one dock has existed on Lot B, within an easement that was recently sold and quitclaimed to the owners of Lots 6 & 7 (Attachment 3), who have relocated the easement to their side of the channel (Attachment 4). Those owners are now requesting that City establish the pierhead line that will accommodate the relocated easement and subsequent docks adjacent to their properties. Once the new pierhead line is established, the owners will be required to obtain the necessary permits from other agencies such as California Coastal Commission and Army Corps of Engineers, prior to the City’s issuance of permits for the actual docks (Attachment 5). Additionally, prior to issuing the said permit, the City will require that the owner extinguish and quitclaim the existing easement on Lot B by recording the Termination and Elimination Agreement (Attachment 6) as well as demolish and physically remove the dock itself. It is important to note the owner’s claim that the easement and subsequent dock relocation will benefit navigation in the channel, and they have obtained signatures in support of that claim (Attachment 7). Staff coordinated the relocation with the Army Corps of Engineers and the Corps opined that navigation would be unaffected by the relocation of the pierhead line. Environmental Status: This action is exempt pursuant to Section 15305 Class 5, of the California Environmental Quality Act., which exempts minor alterations in land use limitations that do not result in any changes to land use or density. Strategic Plan Goal: Non Applicable - Administrative Item Attachment(s): 1. Resolution 2022-04 2. Tract Map 5829 3. Existing easement on Lot B (sold) 4. New easements adjacent to Lots 6 & 7 (relocated) 5. New dock exhibit adjacent to Lots 6 & 7 6. Termination and Elimination of existing easement on Lot B 7. Signatures in support of relocating the easement and docks City of Huntington Beach Printed on 3/9/2022Page 2 of 2 powered by Legistar™535 536 537 538 539 540 541 ^fr) PREPARED NND RECORDING REQUESTED BY: Ashley Skylar l6{t50 Bayvierv Drive Huntington llcach, Ch 92649 WHF,N RF,CORDED, MN IL TO AND MAIL TAX STATEMENTS TO: Ashlcy Skylar 16850 llayvicw Drive Huntinglon Beach, CA 92(o/i9 Recorded in Offlclal Records, Orange County Hugh Nguyen, Clerk-Recorder I illl I lllill lll llll lll llll ilil lll lru mil il ilil| ll I I ll lll s+ oo t-3 R 0 0 t 3 4 2 2 3 3 2 3 * 2021000764632 11:23 am 1A2A2'l 380 414A Q01 4 0.00 0.00 0.00 0.00 9.00 0.00 0.000.0075.00 3.00 4l t(,{r.'}c,. \vr..,' : - Martin Fcnton, Jr. Fluntington Flarbour Corporation Spacc Abovc This Linc for Rcconlcr's Usc Only APN: l7&53L13 eUITCLATM DEED (€osm"n\) Thc undcmigncd grantor(s) dcclare(s): Docurncntary transfcr tax is d gi++ Sf-ornputc.t on thc consitlcration or vatuc of property.on@f- ll Conrputed on thc full value of licns and cncurnbranccs rcrnaining at thc timc of salc I Unincorporatcd arca: fl City of Huntington Bcach, ancl; FOR A VALUABLE CONSIDERATION, rcccipt of which is hcrcby acknowtcdgcd, HUNTINGTON HARBOUR CORPORATION, a corporation organizcd undcr thc laws of thc Statc of Dclawarc hcrcby REMISE, RELEASE, AND FOREVER QUITCLAIM to ASHLEY SKY[,AR, an Unrnarricd Wornan, thc follorving dcscribed rcal propcrty in lhc City of Fluntington Bcach, County of Orangc, Statc of Califonria; An cascmcnt for thc purposcs of locating, constructing, maintaining, using, and opcrating thercon docks, wharyqs, slips, ratnps, piers, floats, landings, and othcr mooring slruclurcs ovcr southwcstcrly 25.00 fcct of Lot A of Tract No. 5829, in thc City of Huntington Bcach, County of Orangc, Statc of Califomia, as pcr lnap rccordcd in book 222, pages I 3 and I 4 of M isccllaneous Maps, in thc officc of thc County Rccordcr of said county, said cascmcnt bcing boundcd northwcstcrly by lhc northcastcrly prolongation of the northrvcstcrly line of Lot 6 of said Tract No. 5829 and boundcd southeastcrly by thc norlhcastcrly prolongation of lhc southcastcrly linc of said Lot 6. Arca of said cascrncnt is 750 squarc fcct, morc or lcss. Scc attached Exhibits "A" and "8" tf tlt) 1)/ ft td lb J.tI 542 CALttFORNttA ALLoPURPOSE ACKHOWLEDGMENT CIVIL CODE s l180 A notaり public or other o“icer∞mpleting this cenittcate vettnes onげ the identⅢ of the indi胡 duat who doned the documentto whtth this cenmcate`attached,and notthe tn〕thf』ne鶴・a∝uracy,or v創 耐ity ofthat d∝ument. State of CanfOrnia County of 訥 iじ ♂】 On Date personaIIy appeared !`2f bofore me,和咀m.K.61お ilπ 卜´器h膨 陀.脱″十A膨 、十ム ′ザere 」r′r,sett Name a′,J釉わorf′,e dttσ 日Attorney in Fact 回Guardian or ConseⅣator Namero)o「説9暉 儲 who proved to me on the basis of saustactOry evidence to be the personlsl WhOSe namelSl iS′are subscttbed to the within instrument and acknowiedged to me that he/she/they executed the same in his′her/theirauthottzed capacityliesl,and that by his′her/their signaturo(s10n the instrumentthe personlsli orthe entity upon behar Of which the personlsl aCted,ex∝uted the instrument. i certi,y under PENALTY OF PERJURY underthelaws of the State of Califomia that the foregoing paragraph is true and corect. WiTNESS my hand and o“iciai seal. . Signature_」(3Jと と 1争 jl!1方 と141イ 落ti;I甘 !:|:L≧ 一―……… P′a∞Ⅳotaり Sea′ハboye OPTrONAと ηЮvg′,P′,た sectio,た op詭爾.oo′ηρ′otilng i拘 た加′ormatio′,ca′,Jeter a′どo燿 riOn Orrん e」Ocvtter,Po「 rttvJv′。′,t reattac′,pe′,t ort′,た rO″η!。al,v′,il「,ren」eJ Jocw′ηer,と Desc両 ption of Attched Tiuo Or Type of Document ,虫 D∝ument Date:Number of Pages: Signer(s,Other Than Named Above:′ ′Signer's Name: □CoHporate Oricer_Tide6〉口Corporato O“icer―Tttielsl: 同Partner― ロロ mtted tt General □Partner―□日mked □General 回 individual □Attomey in Fact 口Trust∞ □Guardian or ConseⅣator □OtheR □Other Signer is Representing: 洵 dMdual □Trustee 餓 25 02016 NationaI Notaり Association e www.NationaINotaryo「g。1‐800‐US NOTARY(牛 800‐876‐68271 kem#5907 543 EXHIBIT A PROPOSED EASEMENT AN EASEMENT FOR THE PURPOSES OF LOCATING, CONSTRUCTING′ MAINTAINING′USING′AND OPERATING THEREON DOCKS′WHARVES′ SLIPS′ RAMPS′ PIERS′ FLOATS′ LANDINCS, AND OTHER MOORING STRUCTURES OVER SOUTHWESTERLY 25.00 FEET OF LOT A OF TRACT NO. 5829, IN THE CIttW OF HUNⅥNGTON BEACH, COUNTY OF ORANGE′ STATE OF CALIFORNIA′AS PER MAP RECORDED IN B00K 222,PAGES 13 AND 14 0F MISCELLANEOUS MAPS,IN THE OFFICE OF THE COUNW RECORDER OF SAID COUNTY′SAID EASEMENT BEING BOUNDED NORTHWESTERLY BY THE NORTHEASTERLY PROLONGATION OF THE NORTHWESTERLY LINE OF LOT 6 0F SAIDTRACT NO. 5829 AND BOUNDED SOUTHEASTERLY BY THE NORTHEASTERLY PROLONGATION OF THE SOUTHEASTERLY LINE OF SAID LOT 6. AREA OF SAID EASEMENT IS 750 SQUARE FEET,MORE OR LESS. SEE AttACHED EXHIBIT B 544 2448N42ロロ.ロロ'N42°19'26賄ロロ.ロロB′ШN42°48.24増3口.ロロ・,ヽ田IIШ」く日切田545 5J) PREPARI;D AND RECORDINC REQUESTED BY: 'Ihomas Nucunt l6854llayvicw l)rivc Huntinglon Beach, CA 92Ug WI{EN RECORDED. MAIL TO AND MNIL TAX STATEMENTS 1'O: Thomas Nucum l6854llayvicw Drivc Huntington Beach, CA 92Mg APN: 17&532-14 lrT lv .)l Recorded ln Official Records, Orange County Huoh Nouven. Clerk-Recorder ll]l! lfilllluilrilUlfill[nlil[lil[lilUiltllll lll o+ oo 2021000764633 11:23 am 1212212,,l 3804r4AQ01 4 o.oo o.oo 0.00 0.00 9.00 0.00 0.000.0075.00 3.00 Spacc Abovc This Linc for Rqcordcr's Usc Only Martin Fcnton, Jr. Fluntington Harbour Corporation ( 'l12 tt, rrQUITCLAIM DEED C€ qsr+nen| ) Thc unclcrsigncd granror(s) dcclarc(s): f)ocunrcntary lransfcr lax is O Gtl+ E Cornputed on thc consideration or valuc of propcrty convcycd, or ! Computcd on thc full valuc of licns and cncumbranccs rcmaining at thc tirnc of salc fl Unincorporatcd arca: ! City of Huntington Bcach, and; FOR A VALUABLE CONSIDERATION, rcceipt of which is hcrcby acknowlcdged, HUNTINGTON HARBOUR CORPORATION, a corporation organizcd undcr thc larvs of thc State of Dclawarc, hcrcby REMISE, RELEASE, AND FOREVER QUITCLAIM to THOMAS NUCUM, an Unmanicd Man, thc following dcscribed rcal property in thc City of Huntington Bcach, County of Orangc, State of California; An caserncnt for thc purposes of locating, constructing, maintaining, usirtg, and opcrating thcrcon docks, wharycs, slips, ramps, picrs, floats, landings, and othcr rnooring structurcs ovcr southwcstcrly 25.00 fcct of Lot A of Tract No. 5829, in thc City of Huntington Beach, County of Orangc, Statc of California, as pcr map rccordcd in book 222, pagcs t 3 and l4 of Misocllancous Maps, in thc ofTicc of thc County Rccordcr of said county, said eascmcnt bcing boundcd northrvcslcrly by lhc northcasterly prolongation of thc northwcstcrly linc of Lot 7 of said Tmct No. 5829 and boundcd southcaslcrly by thc norlhcastcrly prolongation of thc soulhcastcrly linc of said Lot 7. Arca of said easenlcnt is 750 squarc fcct, morc or lcss. Ses attachcd Exhibits "A" and "8" 4i\ K. -,- '1,I f'r. 546 CALBFORNBA ALL・ PUR,OSE ACKNOWLEDGMEHT CiViL CODE s l189 A notary puЫ ねo「other omcer OOmtteting thに cerericaぃ 耐ies onり the dentt orthe indi胡 dutt who Sgned he document to which this cenricate is attached]and not the truthfuiness,accuracy,or vatidity of that document, State of CountyD i生 (2 ●)On 後也 before me,¬駒に猟.K.θl迅|Tわ れ'生 Name arlJ胤 燈 O廟 ∞rDare persona∥y appeared NanerS)orsenerrs, 岳縮紹r吼 縮r脳 L解 饂:却 t講 蹴1珊 艦縄冊沼珊絲S弼 諾訛鵡.orthe enttty upon behar Of which the personlsl aCted,executed the instrument. M評 へ 汗配階配鞣理瀦濡鋸篇紀駕鶏S駕 器鑑結 is true and corect. WiTNESS my hand and o“iciat seal. Signature Sむ 贈tVre NOraり Pvb施 P′ace Norary sea′Aboye 0打 ′ONAと ア′,ov9′,的 おsectilonね oρ tion餌,COmp′etilng的 た加romatil。′,can」eter arte′a囃 銀 Orr′,e docvme′,t or rttvJv′er)f reattac力 阿er,r ort′,is rO打 ,tO an vlつ ″,ten」OJ Jocvment Descttption of Attached lム たTiue Or Type of Document: Document Date:Number of Pages: Signerls1 0ther Than Named Above:れ, 一 Capacity〔ioS' Signer's Name:rSigner's Name: □Corporate Officer―Title6〉□Corporate Omcer_Titielsl: 回Pattner一 口日mited □General □Pattner一 口Limked □General □ind帝 idual □Attorley in Fact □Tttst∞ □Guardian or ConseⅣator E〕Other:□Other: Signer is Representing: 測nd胡 du』 □Trust∞ □Attorney in Fact □Guardian or ConseⅣator 餓 25 ◎2016 NationaI Notary Association・ 岬 .NationaINotary.org。1‐800‐US NOTARY(1‐300‐87併 6827)item#5907 547 EXHIBIT A PROPOSED EASEMENT AN EASEMENT FOR THE PURPOSES OF LOCATING,CONSTRUCTING′ MAINTAINING′USING′AND OPERATING THEREON DOCKS,WHARVES, SLIPS′ RAMPS′ PIERS′ FLOATS′ LANDINGS, AND OTHER M00RING STRUCTURES OVER SOUTHWESTERLY 25.00 FEET OF LOT A OF TRACT NO. 5829′ IN THE CITY OF HUNTINGTON BEACH, COUNTY OFORANGE,STATE OF CALIFORNIA,AS PER MAP RECORDED IN B00K 222,PAGES 13 AND 14 0F MISCELLANEOUS MAPS′IN THE OFFICE OF THE COUNtt RECORDER OF SAID COUNTY′SAID EASEMENT BEING BOUNDED NORTHWESTERLY BY THE NORTHEASTERLY PROLONGATION OF THE NORTHWESTERLY LINE OF LOT 7 0F SAIDTRACT NO. 5829 AND BOUNDED SOUTHEASTERLY BY THE NORTHEASTERLY PROLONGATION OF THE SOUTHEASTERLY LINE OF SAID LOT 7. AREA OF SAID EASEMENT IS 750 SQUARE FEET′MORE OR LESS. SEE ATTACHED EXHIBIT B 548 N42°19・26増Ξ口.口 lB N42°48324賄Ξ口.ロロB′Ш田′N42°43.24BWΞロロロロB′トZ′口LШ′||′ロ549 FOR REVIEW & NOT FOR CONSTRUCTION (E) FLOATING DOCK (N) 2 1/2' X 18' GANGWAY PROPOSED PL (E) SEAWALL GANGWAY AREA: (2) 2.5' X 18' )7ò TOTAL )7ò LANDING AREA: (2) 3' X 4' )7ò TOTAL )7ò TOTAL AREA:)7ò CLIENT SITE DATEDRAWNCHECKED REVISION 1.0 CONTRACTOR LIC. #797052-A ROSKYLAR, ASHLEY NUCUM, THOMAS 16850-16854 BAYVIEW DR. HUNTINGTON BEACH, CA 92649 6351 Industry Way, Westminster, CA 92683 Phone: (949) 631-3121 Fax: (714) 509-0618 www.swiftslipdocks.com 06/24/21 AMENDMENTS REV DESCRIPTION BY DATE INITIAL HERE PL PL 25'8'1'25'4' 30'30' 4'1' (N) 3' X 4' LANDING (N) FLOATING DOCK (N) FLOATING DOCK (N) PIPE DAVITS (2 PER DOCK) DOCK AREA: (2) 8' X 25' )7ò TOTAL )7ò (E) GANGWAY & LANDING 550 551 552 553 554 555 556 557 558 559 560 Date: 4/25/21 To whom it may concern, My name is Irene Nortler and I have owned Huntington Harbor Boat Rentals which is located at 16732 PCH in Sunset Beach since 2012. I have paddleboards, kayaks, and eleven duffys that are rented out daily for use on the Huntington Beach harbor. The renters often use the Sunset Island Channel that is adjacent to Admiralty Island. There has always been navigation problems on the Admiralty side of the channel due to the oversized boats that occup y the large docks making navigation difficult. For this reason, I always discourage all of the renters from using that side of the channel because of the safety issues created by the large docks that have oversized vessels on that narrow channel. However, renters still will typically frequent that side of the channel as they go around the Sunset Island loop. I am supportive of any changes that can improve safe ty and navigation for p addleboarder s, kayakers, and duffy boat renters that use that area of the Ramora Channel. Sincerely, Irene Nortler Owner Huntington Harbor Boat Rentals 562-592-7877 561 4/25/21 To whom it may concern, I have lived at 16848 Bayview Drive that is adjacent to Ashley Skylar who lives at 16850 Bayview Drive since 2004. I have noticed over the years, an abundance of oversized boats on the large dock that is a rental on the Admiralty side of the channel across the south end of my property. I have never seen the dock being used by the owner and it has only been occupied by renters who rent it out and to my knowledge the renters have not been local to the island. For example, the last renters for several years lived in Corona and their young son frequently came with large groups of friends to party at the dock and take the boat out. These extremely large boats that have occupied the large dock have been causing a problem with navigation for years in this channel. In addition to the size of the boats, I have also witnessed the tenants being very loud at all hours of the day and night partying on the boat for days at a time. They also party on the north end of the dock in the water which is not even part of their dock area as this end of the dock is open with ou t an neig hboring dock. All of this impacts our quality of life and safety in n avigation in the channel who live here on Bayview Drive. This disrupts the peacefulness and safety of this chan nel. I am in full support eliminating the large dock and creating two 30 foot easements for my neighbors properties at 16850 and 16854 Bayview drive that will be owner occupied and adjacent to their property. As two smaller docks that are used and maintained by the neighbors would naturally imp rove safety, navigation and quality of life for us all on this side of the channel. Dante Almendral 16848 Bayview Drive Owner 562 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-176 MEETING DATE:3/15/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Sean Joyce, Interim City Manager VIA: Sean Crumby, Director of Public Works PREPARED BY:Brian Polivka, Contract Administrator Subject: Accept additive alternative bid item #1 for the Fiber Optic Communications project from City Hall to Pier Plaza and authorize execution of a change order contract with project contractor, Elecnor Belco Electric, Inc. (EBE) to accommodate the additive alternative bid item; and, approve appropriation of funds, CC-1621 Statement of Issue: In May 2021, the City awarded a contract to the lowest responsive and responsible bidder, Elecnor Belco Electric, Inc. (“EBE”), for the construction of fiber optic communications from City Hall to Pier Plaza. Since then, staff has identified the necessity of including additive alternative bid item #1 to the initial contract with EBE to install fiber optic connection to an additional City facility. Therefore, it is recommended to award a change order to fund this additive alternative bid item #1 to EBE. Financial Impact: Staff is seeking an appropriation of $110,500 from the Energy Efficiency Fund (807) to account number 80787002.82800 to fund the proposed change order contract with EBE. Recommended Action: A) Accept the additive alternative bid item #1 to the lowest responsive and responsible bid submitted by Elecnor Belco Electric, Inc., in the amount of $85,000; and, B) Authorize the Mayor and City Clerk to execute a construction change order contract with Elecnor Belco Electric, Inc. in a form approved by the City Attorney; and, C) Appropriate $110,500 from the Energy Efficiency Fund to account 80787002.82800 to fund this bid item, which includes the lowest responsive and responsive bid amount of $85,000 plus contingency and other administrative expenses. Alternative Action(s): City of Huntington Beach Printed on 3/9/2022Page 1 of 2 powered by Legistar™563 File #:22-176 MEETING DATE:3/15/2022 Deny approval of the recommended actions and recommend an alternative action. Analysis: The Information Services Division of the Administrative Services Department, in consultation with the Public Works Department, identified the need to develop a fiber optic connection between City Hall and various City facilities in the downtown area. Following a bid process, the City awarded to EBE a contract for the installation of a new fiber network from City Hall to Pier Plaza that includes connections to the 5th Street Police Substation, Downtown Library, Art Center and Lake Street Fire Station. The proposed bid package also included an Add Alternative item for an additional connection to the Main Street Parking Structure. That item was not approved at the time of contract award to EBE, and since then, the City has engaged in additional analysis of the City’s infrastructure and concluded that this connection to the Parking Structure is critical for public safety, security, and connectivity between City Hall and City facilities in the downtown area. The need for these improvements is identified in the Fiber and Communications Master Plan. EBE has confirmed that they will honor their original bid price for additive alternative bid item #1 without a cost escalation. The total estimated cost of the item as a change order to their initial contract with the City is $110,500: Additive Alternative Bid Item #1 $ 85,000 10% Construction Contingency $ 8,500 10% Construction Administration $ 8,500 10% Construction Supplementals $ 8,500 Total $110,500 Attachment(s): 1. Vicinity/Location Map 2. Approved Plan Set 3. Agreement, Bid Package 4. Elecnor Proposal City of Huntington Beach Printed on 3/9/2022Page 2 of 2 powered by Legistar™564 565 Underground Service Alert Call: TOLL FREE 811 SHEET NO. OF PLW CITY OF HUNTINGTON BEACH DOWNTOWN FIBER OPTIC COMMUNICATION PLANS DEPARTMENT OF PUBLIC WORKS ’ TITLE SHEET FIBER OPTIC COMMUNICATION PLANS 6TH ST., LAKE ST., PCH, YORKTOWN AVE.16 1 10/21/2021 21-0831 566 Underground Service Alert Call: TOLL FREE 811 SHEET NO. OF PLW 16 2 FIBER OPTIC COMMUNICATION PLAN CONSTRUCTION NOTES AND 6TH ST., LAKE ST., PCH, YORKTOWN AVE. HUB TS TS TS TS TST S TS COMMUNICATION ARCHITECTURE SCHEMATIC 567 ccVV V Underground Service Alert Call: TOLL FREE 811 SHEET NO. OF PLW 16 3 FIBER OPTIC COMMUNICATION PLAN PACIFIC COAST HIGHWAY BETWEEN 5TH ST. AND MAIN ST. STA 7+00 TO 20+00 DETAIL A SCALE: 1"=10' CALTRANS ENCROACHMENT PERMIT #1221-NUS-0831 568 569 570 571 572 573 574 575 576 577 578 Underground Service Alert Call: TOLL FREE 811 SHEET NO. OF PLW 16 14 FIBER OPTIC COMMUNICATION PLAN CONSTRUCTION DETAILS REMOVAL AND REPLACEMENT OF EXISTING PULL BOX/UTILITY VAULT TYPICAL UTILITY VAULT/ FIBER OPTIC ENTERING CABINET DETAIL TYPICAL CONDUIT ENTERING UTILITY VAULT/ PULL BOX DETAIL TYPICAL CONDUIT RADIUS TYPICAL TRENCH DETAIL PULL BOX AND CONDUIT 579 580 VV Underground Service Alert Call: TOLL FREE 811 SHEET NO. OF PLW 16 16 FIBER OPTIC COMMUNICATION PLAN CONSTRUCTION DETAILS JACK AND BORE METHOD PACIFIC COAST HIGHWAY FROM 6TH STREET TO MAIN STREET SECTION B-B PACIFIC COAST HIGHWAY CROSSING MAIN ST6TH STREET PACIFIC COAST HIGHWAY PLAN VIEW NOT TO SCALE PROFILE VIEW NOT TO SCALE TYPICAL CONDUIT INSTALLATION - JACK AND BORE METHOD TRENCH IN PAVEMENT DETAIL PER CALTRANS ENCROACHMENT PERMIT MANUAL TYPICAL TRENCH DETAIL TR-1053 CALTRANS ENCROACHMENT PERMIT #1221-NUS-0831 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 14320 Albers Way Chino, CA 91710 We think about a better world (909) 993-5470 Office www.elecnorbelco.com (909) 993-5476 Fax CA License 738518 1/24/2022 City of Huntington Beach Serial No. 14-0605-004 2000 Main Street Huntington Beach, CA 92648 Attention: Mr. Brian Polivka, Contract Administrator Reference: Downtown Fiber Optic Communications City of Huntington Beach Project CC No. 1621 Belco Job No. 14-0605 Subject: PCO 1.00R2 Yorktown to City Hall Fiber Route Revision, Installation of 144 SMFO in City Hall Basement, and Upgrade of 12 SMFO Drop Cable to 24 SMFO, Confirmation of Additive Alternate Bid Pricing Dear Mr. Polivka: Please consider the following as our price proposal for the Yorktown to City Hall Fiber Revision, Installation of 144 SMFO in the City Hall Basement Floor Plan Improvement Plans, and upgrade of the 12 SMFO drop cables in the Additive Alternate bid item to 24 SMFO. This pricing includes installing new conduit from the fiber vault on Yorktown Ave (contract work) to the existing pull box on Yorktown Ave, and installing an additional 144 SMFO into the existing conduit from this box to the City Hall basement (plan page 2 of 7, Fiber Optics Installation project). Belco will install new 144 SMFO and the necessary equipment, in existing conduit, to the City Hall basement and terminate at the existing server rack as shown on the attached plans (sheet A-26, Partial Basement-Admin & Develop. Bldg.). Belco will also upgrade the specified 12 SMFO drop cables to 24 SMFO drop cables as shown on the ArchSplice Revision for the additive alternate bid item. Our price for this work is: $23,803.52. Belco is also confirming the price submitted in the original bid proposal for the additive alternate bid item: $85,000.000 The total for both of these items of work is: $108,803.52. If this price is acceptable, please sign and return this change order for implementation. Should you have any questions or concerns, please do not hesitate to contact me at (909) 993-5470 ext. 234. Sincerely, Elecnor Belco Electric, Inc. Doug McWhorter Project Manager 618 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-184 MEETING DATE:3/15/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO:Honorable Mayor and City Council Members SUBMITTED BY:Sean Joyce, Interim City Manager VIA:Sean Crumby, Director of Public Works PREPARED BY:Ken Dills, Administrative Services Manager Subject: Approve and authorize execution of contract Amendment No. 1 with Advanced Avant-Garde Corporation for On-Call Grant Writing and Administrative Consulting Services Statement of Issue: On July 21, 2021, City Council approved a three-year agreement with Avant-Garde Corporation for on-call grant writing and administrative consulting services in an amount not to exceed $250,000. Staff anticipates an increase in workload necessary to manage the labor compliance and administration of the City's Federal American Rescue Plan Act (ARPA) and Federal Emergency Management Agency (FEMA) funding and is seeking the amend Advance Avant-Garde’s contract by increasing the not-to-exceed amount to $500,000 and adding one additional year to the term. Financial Impact: Services provided by Advanced Avant-Garde will be funded by available project funding in the Fiscal Year 2022/23 Capital Improvement Program (CIP) and in subsequent year CIPs. Recommended Action: Approve and authorize the Mayor and City Clerk to execute “Amendment No. 1 to Agreement Between the City of Huntington Beach and Advanced Avant-Garde Corporation for On-Call Grant Writing and Administrative Consulting Services” increasing the not-to-exceed amount to $500,000 and extending the contract term one additional year. Alternative Action(s): Do not approve the amendment. Analysis: On July 20, 2021, staff anticipated federal stimulus grants related to infrastructure and secured the support services of Advance Avant-Garde to apply for grant funding and administer those funds related to water, wastewater, stormwater, transportation and park improvements. Since that time, the City has secured almost $30 million in ARPA funding and $6 million in FEMA funding. Advance Avant City of Huntington Beach Printed on 3/9/2022Page 1 of 2 powered by Legistar™619 File #:22-184 MEETING DATE:3/15/2022 Garde’s expertise is in federal compliance, and its services have been required to review documents for all of the City’s federally funded projects. Staff anticipates an increase in workload necessary to manage the labor compliance and administration as the federal projects progress into implementation and construction phases Environmental Status: Not applicable for this action. Strategic Plan Goal: Infrastructure & Parks Attachment(s): 1. Amendment No.1 to Agreement Between the City of Huntington Beach and Advanced Avant- Garde Corporation City of Huntington Beach Printed on 3/9/2022Page 2 of 2 powered by Legistar™620 621 622 623 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-216 MEETING DATE:3/15/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO:Honorable Mayor and City Council Members SUBMITTED BY:Sean Joyce, Interim City Manager PREPARED BY:Chris Slama, Director of Community & Library Services Subject: Approve and authorize execution of a Service Agreement between the City of Huntington Beach and the Huntington Beach Downtown Business Improvement District (HBDBID) for Management and Operation of an Artisan Fair at Huntington Beach Pier Plaza Statement of Issue: There exists a need to approve a service agreement with the Huntington Beach Downtown Business Improvement District (HBDBID) to offer quality programmed events and activities at Huntington Beach Pier Plaza (Pier Plaza) and the downtown area throughout the year. Hosting a regularly scheduled arts and craft fair on certain weekends throughout the year is a viable option that has shown success and encourages residents and visitors to patronize downtown businesses while providing a family-friendly recreational opportunity. Financial Impact: Approval of the Recommended Action is estimated to generate approximately $53,000 annually. Recommended Action: Approve and authorize the Mayor and City Clerk to execute “Service Agreement Between the City of Huntington Beach and the Huntington Beach Downtown Business Improvement District for Management and Operation of the Pier Plaza Artisan Fair.” Alternative Action(s): Do not approve the recommended action and direct staff accordingly. Analysis: In addition to many major annual and seasonal events that are held in Pier Plaza, the City has hosted a craft fair in the downtown area since the 1990s. Prior to 2022, the operator of the downtown craft fair had been Pier Plaza Art-A-Faire (Art-A-Fair). The Promotional Agreement between Art-A-Faire and the City of Huntington Beach began in 2009 and expired in February 2012. Between 2012 and 2021, service conditions and fees for Art-A-Faire were honored by the City in accordance with the agreement approved in 2009. Art-A-Faire continued to provide a premier venue for various local City of Huntington Beach Printed on 3/9/2022Page 1 of 3 powered by Legistar™624 File #:22-216 MEETING DATE:3/15/2022 artists to display and sell their work, while appealing to local residents and visitors alike. However, due to the expired agreement and outdated terms coupled with additional requests from event organizers to conduct craft fairs similar to Art-A-Faire, there has been a need to formalize a new agreement with one or more craft fair operators to continue offering this long-standing fair to the City’s residents, visitors, and local businesses. On September 7, 2021, City Council approved a motion to direct staff to issue a Request for Qualifications (RFQ) to identify the most qualified arts and craft fair operators and return to City Council with a proposed operator and promotional agreement for consideration (Attachment 2). On November 15, 2021, a Request for Proposals (RFP) for the operation and management of an artisan fair in Pier Plaza was issued (Attachment 3). The City sought proposals from qualified individuals or firms with a strong background in outdoor arts and craft fair planning, development, and promotion. The goal was to provide an artisan fair that would promote artistry and provide a venue for works of merit as well as create a family-friendly event experience at Pier Plaza. One proposal was received (Attachment 4) from the HBDBID, and after thorough review and an in- depth interview process, staff recommends that the City of Huntington Beach enter into a service agreement with HBDBID for a three-year term with the option of two additional one-year terms. Listed below are the main responsibilities of both the HBDBID and the City, as included in the agreement. HBDBID: ·Shall curate, produce and manage an Artisan Fair that provides locally and regionally produced artisan wares and goods ·Maintain vendor rates and fees at a fair market value ·May review rates with City on an annual basis upon submission of satisfactory documentation of rates at similar facilities ·Shall pay to the City a flat rate of $650.00 per event ·May display event banners & signage in compliance with City Zoning and Municipal Code City of Huntington Beach: ·Shall assign a staff coordinator to work with Operator ·May approve rate adjustment at a rate not higher than the Consumer Price Index (CPI) based upon satisfactory documentation at similar facilities ·Maintains the right to approve or require changes or removal of banners and signage ·Reserves the right to cancel or reschedule events from time to time due to other activities at the Pier or the beach The HBDBID will strive to provide a quality artisan faire experience at Pier Plaza referred to as Surf City Collective on approximately forty-two (42) Fridays per year with the opportunity for additional weekends each month and the occasional extended holiday weekend when available. The Surf City City of Huntington Beach Printed on 3/9/2022Page 2 of 3 powered by Legistar™625 File #:22-216 MEETING DATE:3/15/2022 Collective will showcase regionally produced artisan wares and goods and will strive to cultivate community connectedness and work with artists and the local business community to foster cultural harmony and accessibility. The Collective will also feature space for local nonprofits and offer other ancillary experiences such as music, artisanal consumable goods and educational opportunities. Environmental Status: The actions to approve a service agreement to operate an art fair at Pier Plaza meets the categorical exemption criteria set forth in the CEQA State Guidelines pursuant to Section 15301 (Existing Facilities), which exempts the operation, repair, maintenance, permitting, leasing, licensing or minor alterations of existing public or private structures or facilities involving negligible or no expansion of use; Section 15311 (Accessory Structures) which exempts placement of minor structures accessory to existing commercial, industrial, or institutional facilities, including, but not limited to, temporary use items in publicly owned facilities or other facilities designated for public use; and Section 15323 (Normal Operations of Facilities for Public Gatherings) which allows for the normal operations of existing facilities for public gatherings for which the facilities were designed, where there is a past history of the facility being used for the same or similar kind of purpose has been occurring for at least three years and that there is a reasonable expectation that the future occurrence of the project would not represent a change in the operation of the facility Strategic Plan Goal: Community Engagement Attachment(s): 1) Service Agreement between the City of Huntington Beach and HBDBID for Management and Operation of an Artisan Fair at Huntington Beach Pier Plaza 2) RCA Options Regarding the Pier Plaza Art-A-Faire Events at Pier Plaza (September 7, 2021) 3) City RFP for the Operations and Management of an Artisan Fair in Pier Plaza (November 15, 2021) 4) HBDBID RFP submittal (December 8, 2021) City of Huntington Beach Printed on 3/9/2022Page 3 of 3 powered by Legistar™626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 CITY OF HUNTINGTON BEACH REQUEST FOR PROPOSAL for the Operations and Management of an Artisan Fair in Pier Plaza, Huntington Beach Issued November 15, 2021 Site Visit Meeting Monday, November 22, 2021 at 10:00 AM Pier Plaza RFP RESPONSE DUE DATE: Wednesday, December 8, 2021, no later than 4:00 PM 690 1 PURPOSE The City of Huntington Beach Community & Library Services Department (City) is seeking proposals from highly qualified individuals or firms with a solid background in outdoor Arts and Crafts Fair planning, development, and promotion, to operate and manage the City’s Artisan Fair. This Artisan Fair is located at the “world-famous” Huntington Beach Pier Plaza. The Artisan Fair is currently held most Fridays and some weekends. The Artisan Fair should promote artistry and provide a venue for works of merit. The wares should be unique in design, hand-made by skilled artisans, and not mass-produced commercial items. In addition to qualifications, the City is asking Proposers to provide their vision on how to best provide a family friendly experience for visitors. BACKGROUND The City of Huntington Beach has been home to an Arts and Crafts Fair in the downtown area since approximately 1993. These events started as a means to bring foot traffic into the downtown and to create a positive community atmosphere. The Fair has been a fixture at Pier Plaza since 2000. Offering quality programmed events and activities at the Huntington Beach Pier Plaza (Pier Plaza) and the downtown area throughout the year is a practicable option that has shown success in encouraging residents and visitors alike to patronize the downtown businesses while providing a family-friendly recreational opportunity. QUALIFICATIONS The City of Huntington Beach is seeking proposals from qualified individuals or firms to provide comprehensive management services for an Artisan Fair at Pier Plaza in downtown Huntington Beach. The goal is to create and manage a weekly Artisan Fair featuring locally and regionally produced wares and goods. The information requested in this section should describe the qualifications of the individual or firm and key staff performing projects of a similar size and scope to demonstrate competence to perform these services. Information shall include: Previous Projects Provide a list of previous projects, including the names of key staff that participated on the named projects and their specific responsibilities with respect to this scope of work. Experience Provide a summary of the individual’s or firm’s demonstrated capability, experience developing, managing and/or operating Artisan Fairs, including the length of time services were provided. 691 2 References Provide up to three (3) references that received similar services from you or your firm. The City of Huntington Beach reserves the right to contact any of the organizations or individuals listed. Information provided should include: A. Client Name B. Project Description C. Project Start and End Dates D. Client Project Manager’s Name, Telephone Number, and Email Address Staffing and Artisans • Provide a list of key individuals who will be working on this project and indicate the functions that each will perform. Include a resume for each designated individual. • Provide a sample list of past artists who have exhibited for you and provide images of their work with the Proposal. SCOPE OF WORK General Operator shall at all times during the term of the Agreement, at its own cost and expense, provide administration, marketing, and supervision of the Artisan Fair operations. The Operator will cultivate community connectedness and work with artists and the local business community to foster cultural harmony and accessibility. Operator shall curate, produce and manage an Artisan Fair that provides locally and regionally produced artisan wares and goods. Mass-produced goods, multi-level marketing items and craft/art items made from kits will not be permitted. Additionally, City and Operator shall follow all health and safety guidelines and regulations, put forth by the Federal, State, County, and other governmental health agencies. Best industry or management practices may require additional services not noted in this RFP. Additionally, the Proposer is encouraged to propose additional concepts outside of the Scope of Work, in order to enhance the Artisan Fair experience. City will provide a staff member of the Community & Library Services Department as the primary contact for business purposes. Goals & Objectives • The City’s objective for the Artisan Fair at Pier Plaza is to provide residents, visitors and artists alike with a fun, friendly, and safe environment where they can enjoy the beauty 692 3 of the surroundings. Please provide a summary of the Firm’s goals and objectives for this Event, and how they align with the City’s objectives. Administrative • Operator shall obtain and maintain all permits and supporting documentation to satisfy all permitting requirements for the State of California, County of Orange, and the City of Huntington Beach. • Operator shall abide by all Federal, State, and local laws, rules and regulations, and all City policies and directions. • Operator shall adhere to specific safety and security measures as required by the City of Huntington Beach Police and Fire Departments. • Operator shall provide City with quarterly statistical reports, which reflect the total number or vendors, the type of products exhibited/sold, the estimate Fair attendance, and the quarterly gross revenue. • Operator shall conduct outreach to identify artists who make hand-made products and who will diligently display and sell their wares at the Artisan Fair. Note: Products that are not hand-made by an artist cannot be offered for sale at the Artisan Fair. • Operator shall not allow the sales of alcohol; CBD products; smoking, or vape paraphernalia or products. • Operator shall participate in an annual evaluation and review of the operation by the City. Operations & Maintenance • Operator shall operate the Artisan Fair year-round on most Fridays, with the opportunity for additional weekends each month and the occasional extended holiday weekend when available. As a reference, in the past the Fair has ran approximately 48 Fridays per year, 34 weekend days, which included holiday Mondays on President’s Day, Martin Luther King Day, Memorial Day, Labor Day, and Veteran’s Day. (Note: This information is a sample only and not intended as a verified schedule.) • The City may request at times throughout the year that Operator conduct an Artisan Fair to accompany other City-sponsored activities. The Operator will strive to operate the Artisan Fair when requested. • The Artisan Fair shall be developed annually upon mutual agreement of both Parties. City and Operator will review the schedule quarterly to keep the Operator apprised of additional Pier Plaza and beach events, and/or additional opportunities for Artisan Fair business. • The City reserves the right to cancel or relocate the event from time to time due to other activities at the Pier or the beach that may conflict with the Artisan Fair. 693 4 • Operational hours will be mutually agreed upon based on seasonal time changes. Operator may propose additional activities/events to enhance the Artisan Fair experience, including evening hours when available. • The City reserves the right to change the schedule due to Specific Events, weather, natural disaster, facility issues, or other acts beyond the City’s control. • In most cases, City will notify Operator 7-days in advance, should modification be required to the date or location of the Fair. • Selected Operator is expected to provide all essential materials that are in line with best management practices for a professionally run Artisan Fair, including but not limited to uniform tents/booths (which are equal in size and shape), tables and signage, in order to maintain a cohesive aesthetic. • Operator shall provide on-site supervision the day of the event(s). Operator shall coordinate all logistics including setup, take down, and move-in and move-out of vendors. • Operator shall prevent unauthorized vendors from participation in the Artisan Fair. • Operator shall maintain the cleanliness of the property and leave it completely clean and free of trash and debris after each day’s event. • Operator shall use trip-guards with all cables, cords, hoses, wires, and conduits where applicable. These items are not permitted to cross pedestrian pathways. • Signage - Per M.C. 13.48.140 (Advertising), limited commercial/sponsorship signage may be considered by the Director or their designee. • Operator must provide access in accordance with requirements set forth by the Americans with Disabilities Act (ADA). • Operator will see that Vendors unload and load merchandise from the location where the parking lot meets Pier Plaza. Vendors may not drive onto the Plaza. • No sales may be conducted after the conclusion of the event. • Food or beverages may not be sold or given away to the public at Pier Plaza without prior approval by the Director or their designee. • Polystyrene (commonly referred to by the trade name Styrofoam) is prohibited at all events on public property and within City facilities. This prohibition shall apply to event organizers, agents of the event, event vendors and any other party who enter into an agreement with one or more of the sponsors of the event to sell or provide goods, food, or beverages at the event. Marketing & Outreach Contractor shall provide the following minimum services: • Design, publish and distribution of marketing materials and vendor forms. Materials to include print and digital media platforms. City will assist Operator with social media 694 5 marketing through the City’s platforms. Logos and branding materials must be approved by City staff. • Operator shall design and operate a website for the Artisan Fair activities that may include, but are not limited to, vendor registration; upcoming events; past, present and future artist lists and their public contact information. An example of the website should be included with the proposal. • Dissemination of social media and public relations material shall be approved by City staff prior to any press release dissemination. City reserves the right to have Operator remove any marketing or messaging that is not in line with the City’s core values. • Operator shall provide at least one free space each Fair occurrence for use by the City of Huntington Beach and/or its partners, if requested. Merchandise and Contracting of Vendors • Operator shall not permit merchandise vendors that do not meet the Artisan Fair criteria. • Operator may include artisanal consumable products, applicable to all County of Orange Health and Food Safety permits and regulations. • Operator will prepare and distribute any required forms to vendors for registration and exhibition, rules and regulations, and health and safety, prior to contracting with artisan vendors. Fees and Financial Terms • Proposer understands that in lieu of permit fees, the City of Huntington Beach intends to enter into a revenue sharing agreement with selected Operator(s). Operator shall provide a recommended business model to include revenue-sharing opportunities paid to the City. • Operator shall be responsible for collection and payment of all fees, including, but not limited to, all booth and events fees, artwork and artisan product sales, payment of all appropriate sales taxes, etc. • Operator shall maintain a current business license on file with the City during the term of the agreement. • Operator shall verify that all artisan vendors maintain a current sellers’ permit, listing the Huntington Beach as the point of sale. • Operator shall keep copies on file of sale receipts pursuant to State requirements. Independent Contractor/Staffing • Operator shall be retained as an independent contractor and will not be considered an employee of the City of Huntington Beach. Operator is responsible for any and all staff 695 6 hired to work the Artisan Fair, and shall be responsible for following best labor practices in accordance with the State of California labor laws. The Site • The Artisan Fair is located in Pier Plaza, which is northwest of the Huntington Beach Pier entrance and north of the Pier Plaza Amphitheater. The Artisan Fair site and its immediate surroundings are shown in Exhibit A aerial map for reference. ROLE OF ARTISAN FAIR OPERATOR AND CITY The selected Operator will provide comprehensive development and management services that result in a weekly Artisan Fair at Pier Plaza in downtown Huntington Beach. The Operator will be responsible for, but not limited to, recruitment of appropriate artisan vendors, development of a marketing image and plan, establishment of an Artisan Fair website and social media platforms, Fair setup and takedown, regular reporting to the City of Huntington Beach, scheduling of special activities and participation in downtown events, among other duties. Operator will also be responsible for all permitting, insurance, tax liability and other items related to operation of the Artisan Fair. Operator will regularly confer with inspectors to ensure safety and proper food sanitation practices. Operator will be expected to stay in communication with adjacent businesses and strive to coordinate with and maintain a positive and productive relationship with the business district. The City is committed to facilitating the ongoing presentation of an Artisan Fair by any reasonable means, including possibly offering assistance in the form of advertising, assistance with communications, assistance with access to power, potable water, etc. SELECTION PROCESS The City reserve the right to select more than one firm, should it be in the best interest of the project. RFP Assessment Process • The City’s contractor evaluation and selection process is based on Qualifications Based Selection (QBS) for operational services. The City of Huntington Beach may use some or all of the following criteria in its evaluation and comparison of proposals submitted. The criteria listed are not necessarily an all-inclusive list. The order in which they appear is not intended to indicate their relative importance: • Compliance with RFP requirements. • Understanding the project. 696 7 • Recent experience in conducting similar scope, complexity, and magnitude for other public agencies. • Price. • References. The City may also contact and evaluate the Proposer’s and subcontractor’s references; contact any Proposer to clarify any response; contact any current users of a Proposer’s service; visit any site the Proposer may currently manage; solicit information from any available sources concerning any aspect of a proposal; and seek and review any other information deemed pertinent to the evaluation process. The evaluation committee shall not be obligated to accept the lowest priced proposal, but shall make an award in the best interest of the City. After written proposals have been reviewed, discussions with prospective firms may or may not be required. If scheduled, the oral interview will be a question/answer format for the purpose of clarifying the intent of any portions of the proposal. The individual from your firm will be directly responsible for carrying out the contract, if awarded, should be present at the oral interview. A Notification of Intent to Award may be sent to the selected Proposer(s). Award is contingent upon the successful negotiation of final contract terms. Negotiations shall be confidential and not subject to disclosure to competing Proposers unless an agreement is reached. If contract negotiations cannot be concluded successfully, the City may negotiate a contract with the next highest scoring vendor or withdraw the RFP. This Request for Proposal (RFP) will be governed by the following schedule: Release of RFP November 15, 2021 Pre-Proposal Site Inspection November 22, 2021 Deadline for Written Questions by 4:00 PM, November 29, 2021 Responses to Questions Posted on Website December 2, 2021 Proposal Due by 4:00 PM, December 8, 2021 Tentative Interview Date (if needed) December 15 2021 Proposal Evaluation Completed December 17, 2021 Approval of Contract January 2022 NOTE: A Pre-Proposal Site Inspection will be held at 10:00 AM PST, on Monday, November 22, 2021 at Pier Plaza in Huntington Beach. Attendance is optional, however, highly recommended. Copies of the RFP will NOT be available onsite. 697 8 The purpose of the site inspection is to give potential Proposers an opportunity to become familiar with any conditions, which may affect performance and pricing, and to prevent any misunderstanding of the City’s position. Submission of an offer will be prima facie that Proposer did, in fact, make the pre-proposal site inspection and is aware of all conditions. QUESTIONS AND INQUIRIES REGARDING THE RFP: All questions and requests for clarifications, changes, exceptions, deviations to the terms and conditions set forth in the RFP must be submitted in written form prior to the “Questions Deadline” listed above for response. Questions are to be submitted through the PlanetBids Q&A tab no later than 4:00 PM, November 29, 2021 for consideration. The sole point of contact for this Request for Proposal is: Jennifer Anderson City of Huntington Beach, Finance Dept. (714) 374-1569 Email: Jennifer.Anderson@surfcity-hb.org From the date that this RFP is issued until a firm is selected and the selection is announced, firms are not allowed to communicate for any reason with any City Council Member or City employee other than the contracting officer listed above regarding the RFP, except during the pre-proposal site visit. The City reserves the right to reject any proposal for violation of this provision. No questions other than written will be accepted and no response other than written will be binding upon the City. TERMS AND CONDITIONS Agreement Terms The Community & Library Services Department for the City will administer the agreement. Pending the quality of proposals received and cost for services, the City may enter into a three (3) year agreement with an option to renew the service upon mutual agreement for an additional one (1) year term, but not to exceed two (2) additional renewal terms before opening the project up for rebid. Amendments The City reserves the right to amend this RFP prior to the proposal due date. All amendments and additional information will be posted to the PlanetBids website https://www.planetbids.com/portal/portal.cfm?CompanyID=15340, bidders should check this webpage daily for new information. 698 9 Cost of Preparing Proposal The cost for developing the proposal is the sole responsibility of the Proposer. All proposals submitted become the property of the City. Contract Discussions Prior to award, the apparent successful firm will be required to enter into discussions with the City to reach agreement on details, to include, but not limited to, final logistics, hours of operations, and revenue sharing terms. These discussions are to be finalized and all exceptions resolved within approximately 2-4 weeks from notification. If no agreement is reached, the proposal may be rejected and discussions will be initiated with the second highest scoring firm. See Exhibit “C” for a sample agreement. Financial Information The City is concerned about bidders’ financial capabilities to perform, and, therefore, may ask you to provide sufficient data to allow for an evaluation of your firm’s financial capabilities. Insurance Requirements City Resolution 2008-63 requires that licensees, lessees, and vendors have an approved Certificate of Insurance (not a declaration or policy) on file with the City for the issuance of a permit or contract. Within ten (10) consecutive calendar days of award of contract, successful bidder must furnish the City with the Certificates of Insurance proving coverage as specified in Insurance Requirements, Exhibit “D”. For full details of City’s Insurance Requirements, see Resolution 2008-63. Failure to furnish the required certificates within the time allowed will result in forfeiture of the Proposal Award and discussions will be initiated with the second highest scoring firm. Note: Please carefully review the Sample Agreement and Insurance Requirements before responding to the Request for Proposal enclosed herein. The terms of the agreement, including insurance requirements have been mandated by City Council and can be modified only if extraordinary circumstances exist. Your response to the Request for Proposal must indicate if you are unwilling or unable to execute the agreement as drafted as well as providing the insurance requirements. The City will consider this in determining responsiveness to the Request for Proposal. Ethics and Conflicts of Interest Operator shall discharge their duties impartially so as to ensure fair competitive access to the Artisan Fair opportunities by interested vendor or artist. Moreover, Operator shall conduct business in such a manner as to foster public confidence in the integrity of City programming and activities. 699 10 Operator shall not solicit, demand, accept or agree to accept from any other person a gratuity or benefit in connection with the Agreement. Employees are prohibited from engaging in any outside activities that conflict with, or have the appearance of conflicting with, the duties assigned to them in the employment of the City. • Please do not ask employees for any special favor or consideration that is not available to every other citizen. • Please do not ask an employee to disclose any information that is not available to every other citizen through normal public information channels. • Please do not offer to compensate the employee by offering to hire or do business with any business entity of the employee or family member. • Do not ask employees to represent you or your company or make any recommendations on your behalf other than those that are a part of their official duties with the City. • Please do not ask employees to endorse the products or services of your company. • Please do not ask employees to hand out or post advertising materials, unless designated. PROPOSAL GUIDELINES Interested Proposers are to provide the City of Huntington Beach with a thorough proposal using the following guidelines: Number of Proposals Submit one (1) PDF file format copy of your proposal in sufficient detail to allow for thorough evaluation and comparative analysis. Proposal Format Proposal should be typed and should contain no more than 20 typed pages using a 12-point font size, including transmittal letter and resumes of key people, but excluding Index/Table of Contents, tables, charts, and graphic exhibits. Each proposal will adhere to the following order and content of sections. Proposal should be straightforward, concise and provide “layman” explanations of technical terms that are used. Emphasis should be concentrated on conforming to the RFP instructions, responding to the RFP requirements, and on providing a complete and clear description of the offer. Proposals, which appear unrealistic in the terms of technical commitments, lack of technical competence or are indicative of failure to comprehend the complexity and risk of this contract, may be rejected. The following proposal sections are to be included in the bidder’s response: • Proposer Application Form and Cover Letter - Complete Exhibit “B”, “Request for Proposal- Vendor Application Form” and attach this form to the cover letter. A cover letter, not to exceed two pages in length, should summarize key elements of the proposal. An individual authorized 700 11 to bind the consultant must sign the letter. The letter must stipulate that the proposal price will be valid for a period of at least 180 days. Indicate the address and telephone number of the Contractor’s office located nearest to Huntington Beach, California and the office from which the project will be managed. • Background and Project Summary Section - The Background and Project Summary Section should describe your understanding of the City, the work to be done, and the objectives to be accomplished. Refer to Scope of Work of this RFP for details. • Methodology Section - Provide a detailed description of the approach and methodology to be used to accomplish the Scope of Work of this RFP. The Methodology Section should include: o Implementation of a plan that describes:  The methods, including controls by which your firm manages projects of the type and size sought by this RFP.  Methodology for soliciting and documenting input from internal and external stakeholders and how you will address both positive and negative feedback.  And any other project management or implementation strategies or techniques that the respondent intends to employ in carrying out the work. o A detailed project schedule identifying the rollout of all tasks and deliverables to be performed. o Provide a health and safety plan describing your ability to ensure the safety and security of participants, visitors, and staff with emphasis on emergency response, first aid/CPR/AED, or other official certification or permit requirements. o Provide in detail, the firm’s methodology for selecting artisan vendors. o Provide your firm’s methodology for attracting attendees, including local residents and visitors alike. o Provide your firm’s methodology or proposal for creating ancillary activities to make and keep the Artisan Fair a fresh and new experience for visitors. CONDITIONS FOR PROPOSAL ACCEPTANCE This RFP does not commit the City to award a contract or pay any costs incurred for any services. The City, at its sole discretion, reserves the right to accept or reject any or all proposals received as a result of this RFP to negotiate with any qualified source or to cancel this RFP in part or in its entirety. All proposals will become the property of the City of Huntington Beach, USA. If any proprietary information is contained in the proposal, it should be clearly identified. 701 12 EXHIBIT “A” SITE LOCATION Pacific Coast Hwy and Main Street (Entrance area to Huntington Beach Pier) 702 APPENDIX B 703 1 of 2 REQUEST FOR PROPOSAL VENDOR APPLICATION FORM TYPE OF APPLICANT:  NEW  CURRENT VENDOR Legal Contractual Name of Corporation: ______________________________________ Contact Person for Agreement: ____________________________________________________ Corporate Mailing Address: ________________________________________________ City, State and Zip Code: __________________________________________________ E-Mail Address: _________________________ Phone: ________________________ Fax: ________________________ Contact Person for Proposals: ______________________________________________________ Title:______________________________ E-Mail Address: ______________________ Business Telephone: _________________________ Business Fax: ________________ Is your business: (check one)  NON PROFIT CORPORATION  FOR PROFIT CORPORATION Is your business: (check one)  CORPORATION  LIMITED LIABILITY PARTNERSHIP  INDIVIDUAL  SOLE PROPRIETORSHIP  PARTNERSHIP  UNINCORPORATED ASSOCIATION 704 2 of 2 Names & Titles of Corporate Board Members (Also list Names & Titles of persons with written authorization/resolution to sign contracts) Names Title Phone ___________________________________ ________________ ___________________ ___________________________________ ________________ ___________________ ___________________________________ ________________ ___________________ ___________________________________ ________________ ___________________ ___________________________________ ________________ ___________________ ___________________________________ ________________ ___________________ Federal Tax Identification Number: __________________________________________ City of Huntington Beach Business License Number: _____________________________ (If none, you must obtain a Huntington Beach Business License upon award of contract.) City of Huntington Beach Business License Expiration Date: __________________________ 705 APPENDIX C 706 17-6145/170197/11/28/17/DO 1 SERVICE AGREEMENT BETWEEN THE CITY OF HUNTINGTON BEACH AND _______________ FOR _____________________ THIS AGREEMENT (“Agreement”) is made and entered into by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter called “City,” and___________________, a California Limited Liability Company, hereinafter referred to as “Contractor.” Recitals A. The City desires to retain a Contractor having special skill and knowledge in the field of janitorial and porter services. B. Contractor represents that Contractor is able and willing to provide such services to the City. C. In undertaking the performance of this Agreement, Contractor represents that it is knowledgeable in its field and that any services performed by Contractor under this Agreement will be performed in compliance with such standards as may reasonably be expected from a comparable company or firm in the field. Contractor has been selected to perform these services pursuant to Huntington Beach Municipal Code Chapter 3.02. NOW, THEREFORE, it is agreed by City and Contractor as follows: 1. Scope of Services Contractor shall provide all services as described in Exhibit “A,” which is attached hereto and incorporated into this Agreement by this reference. These services shall sometimes hereinafter be referred to as the “Project.” Contractor hereby designates ________________, who shall represent it and be its sole contact and agent in all consultations with City during the performance of this Agreement. 2. City Staff Assistance City shall assign a staff coordinator to work directly with Contractor in the performance of this Agreement. 707 17-6145/170197/11/28/17/DO 2 3. Compensation a. City agrees to pay, and Contractor agrees to accept as total payment for its services, the rates and charges identified in Exhibit “B.” The total sum to be expended under this Agreement, shall not exceed ___________ ($______) per year for any one year during the term of this Agreement, with a _____ year aggregate total not to exceed amount of __________ ($_______). b. Payment by City shall be made within thirty (30) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City. c. Contractor shall be paid pursuant to the terms of Exhibit “B.” 4. Term Time is of the essence of this Agreement. The services of Contractor are to commence _________, or as soon as practicable after the execution of this Agreement by City (the “Commencement Date”) and terminate ________, unless terminated earlier in accordance with the provisions of this Agreement. Contract may be extended for 2 additional one-year periods if mutually agreed to in writing by both parties. The time for performance of the tasks identified in Exhibit “A” are generally to be shown in Exhibit “A.” This schedule and Term may be amended to benefit the Project if mutually agreed to in writing by City and Contractor. In the event the Commencement Date precedes the Effective Date, Contractor shall be bound by all terms and conditions as provided herein. 5. Extra Work In the event City requires additional services not included in Exhibit “A” or changes in the scope of services described in Exhibit “A,” Contractor will undertake such work only after receiving written authorization from City. Additional compensation for such extra work shall be allowed only if the prior written approval of City is obtained. 6. Disposition of Plans, Estimates and Other Documents Contractor agrees that title to all materials prepared hereunder, including, without limitation, all original drawings, designs, reports, both field and office notices, calculations, computer code, language, date or programs, maps, memoranda, letters and other documents, shall belong to City, and Contractor shall turn these materials over to City upon expiration or termination of this Agreement or upon Project completion, whichever shall occur first. These materials may be used by City as it sees fit. 708 17-6145/170197/11/28/17/DO 3 7. Hold Harmless Contractor hereby agrees to protect, defend, indemnify and hold harmless City, its officers, elected or appointed officials, employees, agents, and volunteers from and against any and all claims, damages, losses, expenses, judgments, demands and defense costs, and consequential damage or liability of any kind or nature, however caused, including those resulting from death or injury to Contractor’s employees and damage to Contractor’s property, arising directly or indirectly out of the obligations or operations herein undertaken by Contractor, caused in whole or in part by any negligent act or omission of the Contractor, any subcontractors, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including but not limited to concurrent active or passive negligence, except where caused by the active negligence, sole negligence, or willful misconduct of the City. Contractor will conduct all defense at its sole cost and expense and City shall approve selection of Contractor’s counsel. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Contractor. 8. Workers Compensation Insurance Pursuant to California Labor Code Section 1861, Contractor acknowledges awareness of Section 3700 et seq. of this Code, which requires every employer to be insured against liability for workers’ compensation; Contractor covenants that it will comply with such provisions prior to commencing performance of the work hereunder. Contractor shall obtain and furnish to City workers’ compensation and employer’s liability insurance in an amount of not less than the State statutory limits. Contractor shall require all subcontractors to provide such workers’ compensation and employer’s liability insurance for all of the subcontractors' employees. Contractor shall furnish to City a certificate of waiver of subrogation under the terms of the workers’ compensation and employer’s liability insurance and Contractor shall similarly require all subcontractors to waive subrogation. 9. General Liability Insurance In addition to the workers’ compensation and employer’s liability insurance and Contractor’s covenant to defend, hold harmless and indemnify City, Contractor shall obtain and furnish to City, a policy of general public liability insurance, including motor vehicle coverage covering the Project/Service. This policy shall indemnify Contractor, its officers, employees and agents while acting within the scope of their duties, against any and all claims arising out of or in connection with the Project/Service, and shall provide coverage in not less than the following amount: combined single limit bodily injury and property damage, including products/completed operations liability and blanket contractual liability, of One Million Dollars ($1,000,000) per occurrence. If coverage is provided under a form which includes a designated general aggregate limit, 709 17-6145/170197/11/28/17/DO 4 the aggregate limit must be no less than One Million Dollars ($1,000,000) per occurrence. If coverage is provided under a form which includes a designated general aggregate limit, the aggregate limit must be no less than One Million Dollars ($1,000,000) for this Project/Service. This policy shall name City, its officers, elected or appointed officials, employees, agents, and volunteers as Additional Insureds, and shall specifically provide that any other insurance coverage which may be applicable to the Project/Service shall be deemed excess coverage and that Contractor’s insurance shall be primary. Under no circumstances shall said above-mentioned insurance contain a self- insured retention, or a “deductible” or any other similar form of limitation on the required coverage. 10. Automobile Liability Insurance Contractor shall obtain and furnish to City an automotive liability insurance policy covering the work performed by it hereunder. This policy shall provide coverage for Contractor’s automotive liability in an amount not less than One Million Dollars ($1,000,000.00) per occurrence and a separate “Additional Insured Endorsement” page listing both the policy number and naming the “City of Huntington Beach, its officers, elected or appointed officials, employees, agents and volunteers” as additional insured on the endorsement. The above-mentioned insurance shall not contain a self-insured retention, “deductible” or any similar form of limitation on the required coverage except with the express written consent of City. 11. Certificate of Insurance Prior to commencing performance of the work hereunder, Contractor shall furnish to City a certificate of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverage as required by this Agreement; the certificate shall: a. provide the name and policy number of each carrier and policy; b. state that the policy is currently in force; and c. promise that such policy shall not be suspended, voided or canceled by either party, reduced in coverage or in limits except after thirty (30) days’ prior written notice; however, ten (10) days’ prior written notice in the event of cancellation for nonpayment of premium. Contractor shall maintain the foregoing insurance coverage in force until the work under this Agreement is fully completed and accepted by City. This requirement for carrying the foregoing insurance coverage shall not derogate from Contractor’s defense, hold harmless and indemnification obligations as set forth in this Agreement. City or its representative shall at all times have the right to demand the original or a copy of the policy of insurance. Contractor shall pay, in a prompt and timely manner, the premiums on the insurance hereinabove required. 710 17-6145/170197/11/28/17/DO 5 12. Independent Contractor Contractor is, and shall be, acting at all times in the performance of this Agreement as an independent contractor herein and not as an employee of City. Contractor shall secure at its own cost and expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll deductions for Contractor and its officers, agents and employees and all business licenses, if any, in connection with the Project and/or the services to be performed hereunder. 13. Conflict of Interest Contractor covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement. 14. Termination This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Contractor shall be entitled to receive and the City shall pay Contractor compensation for all services performed by Contractor prior to receipt of such notice of termination, subject to the following conditions: a. As a condition of such payment, the Director may require Contractor to deliver to the City all work product completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Contractor consents the City’s use thereof for such purposes as the City deems appropriate. b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement. 15. Exclusivity and Amendment This Agreement represents the complete and exclusive statement between the City and Contractor, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Contractor. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Contractor or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein. 711 17-6145/170197/11/28/17/DO 6 16. Assignment Inasmuch as to this Agreement is intended to secure the specialized services of Contractor, Contractor may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City’s prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City’s ability to have any of the services which are the subject to this Agreement performed by City personnel or by other Contractors retained by City. 17. City Employees and Officials Contractor shall employ no City official nor any regular City employee in the work performed pursuant to this Agreement. No officer or employee of City shall have any financial interest in this Agreement in violation of the applicable provisions of the California Government Code. 18. Notices Any notices, certificates, or other communications hereunder shall be given either by personal delivery to Contractor’s agent (as designated in Section 1 hereinabove) or to City as the situation shall warrant, or by enclosing the same in a sealed envelope, postage prepaid, and depositing the same in the United States Postal Service, to the addresses below. City and Contractor may designate different addresses to which subsequent notices, certificates or other communications will be sent by notifying the other party via personal delivery, a reputable overnight carrier or U.S. certified U.S. certified mail-return receipt requested: To City: Contractor: City of Huntington Beach __________________ Attn: ______________ Attn: _________________ 2000 Main Street ___________________ Huntington Beach, CA 92648 ____________________ 19. Consent When City’s consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be a consent/approval to any subsequent occurrence of the same or any other transactions or event. 20. Modification No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties. 712 17-6145/170197/11/28/17/DO 7 21. Section Headings The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of reference only and are not representative of matters included or excluded from such provisions, and do not interpret, define, limit or describe, or construe the intent of the parties or affect the construction or interpretation of any provision of this Agreement. 22. Interpretation of this Agreement The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties. If any provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here. As used in this Agreement, the masculine or neuter gender and singular or plural number shall be deemed to include the other whenever the context so indicates or requires. Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law, ordinance or regulation contrary to which the parties have no right to contract, then the latter shall prevail, and the provision of this Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law. 23. Duplicate Original The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each of which so executed shall, irrespective of the date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it. 24. Immigration Contractor shall be responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of the United States Code regarding employment verification. 25. Legal Services Subcontracting Prohibited Contractor and City agree that City is not liable for payment of any subcontractor work involving legal services, and that such legal services are expressly outside the scope of services contemplated hereunder. Contractor understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive legal counsel for City; 713 17-6145/170197/11/28/17/DO 8 and City shall not be liable for payment of any legal services expenses incurred by Contractor. 26. Confidentiality Contractor recognizes that in the performance of its duties under this Agreement, it must conduct its activities in a manner designed to protect information of a sensitive nature from improper use or disclosure. Contractor warrants that it will use reasonable efforts consistent with practices customary in the facilities management industry in recruiting, training and supervising employees and in otherwise performing its duties hereunder in order to achieve this result. In the furtherance of this, Contractor agrees, at the request of the City, to require its employees to execute written undertakings to comply with the foregoing confidentiality provision. 27. Discrimination Contractor shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, training, utilization, promotion, termination or other employment related activities. Contractor affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations. 28. Jurisdiction – Venue This Agreement and all questions relating to its validity, interpretation, performance, and enforcement shall be government and construed in accordance with the laws of the State of California. This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement. 29. Professional Licenses Contractor shall, through the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Huntington Beach and all other governmental agencies. Contractor shall notify the City immediately and in writing of her inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement. 714 17-6145/170197/11/28/17/DO 9 30. Attorney’s Fees In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorney’s fees, such that the prevailing party shall not be entitled to recover its attorney’s fees from the non-prevailing party. 31. Survival Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement, shall so survive. 32. Governing Law This Agreement shall be governed and construed in accordance with the laws of the State of California. 33. Signatories Each undersigned represents and warrants that its signature hereinbelow has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. 34. Entirety (a) The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm’s length negotiation, and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements, promises, agreements or warranties, oral or otherwise, have been made by that party or anyone acting on that party’s behalf, which are not embodied in this Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement warranty, fact or circumstance not expressly set forth in this Agreement. (b) All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement. 715 17-6145/170197/11/28/17/DO 10 35. Effective Date IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their authorized officers. This Agreement shall be effective on the date of its approval by the Mayor. This Agreement shall expire when terminated as provided herein. CONTRACTOR CITY OF HUNTINGTON BEACH, a _____________________ municipal corporation of the State of _____________________, a California California limited liability corporation By:_______________________________ ______________________________ Mayor __________________________________ Print name ITS: (circle one) Chairman/President/ Vice President ______________________________ City Clerk AND By:_______________________________ INITIATED AND APPROVED: Print name ITS: (circle one) Secretary/Chief Financial Officer/Asst. Secretary-Treasurer ______________________________ Director of _____________ APPROVED AS TO FORM: ______________________________ City Attorney REVIEWED AND APPROVED: ______________________________ City Manager 716 APPENDIX D 717 HB Insurance Matrix_revised 4-7-16 (2).xlsx 1 of 4 Automobile Liability General Liability Professional Liability Property Insurance Workers' Comp Additional Insured Endorsements Contractors: Any persons or entities who contract with the City and/or provide services to the City which are readily available and efficiently procured by competitive bidding. Permittees: Any persons or entities who make application to the City for any use of or encroachment upon any public street, waterway, pier, or City property. Vendors: Any persons or entities who transfers property or goods to the City which may or may not involve delivery and/or installation. CITY OF HUNTINGTON BEACH INSURANCE REQUIREMENTS Note 2 - Workers' Compensation Exemption: If entity has no employees, a signed Declaration of Non-Employee Status form is required. Note 1 - Automobile Liability: The City of Huntington Beach, its officers, elected or appointed officials, employees, agents and volunteers must be named as certificate holder and as additional insured by separate attached endorsement. Permittees who do not use vehicles or equipment in connection with the permit shall not be required to provide auto insurance. To be exempt from this requirement, permittees must execute a declaration such as Exhibit 1 attached. Huntington Beach City Council Resolution No. 2008-63 requires submittal of certificates of insurance evidencing the following minimum limits with a California admitted carrier with a current A.M. Best’s Rating of no less than A:VII. See Exhibits A1 - 4 for sample forms. Email: Justin.Wessels@surfcity-hb.org or Heather.Campbell@surfcity-hb.org Phone: 714-374-5378 or 714-536-5210. Fax: 714-536-5212. Vendor Type Minimum Insurance Requirements Any deductible other than those allowed in this matrix, self-insured retentions or similar forms of coverage limitations or modifications must be approved by the Risk Manager and City Attorney of the City of Huntington Beach. NOTE: Waivers and / or modifications are discouraged and will be considered only under extraordinary circumstances. As required by the State of California, with Statutory Limits and Employer’s Liability Insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease. (See Note 2 below.) Include the policy number and Additional Insured Endorsement Requirement statement below. (See Note 3 below.) Minimum of $1,000,000 per occurrence for bodily injury, personal injury and property damages. Allows up to $1,000 deductible.(See Note 1 below.) Combined single limit bodily injury and property damage. Minimum of $1,000,000 per occurrence. Allows up to $5,000 deductible. (Additional Insured Endorsement is always required with General Liability Ins.) Note 3 - Additional Insured Endorsement Requirements: The City, its officers, elected or appointed officials, employees, agents, and volunteers are to be covered as additional insureds by separate attached endorsement(s) as respects liability arising out of action performed by or on behalf of the contractor, products and completed operations of the contractor, premises owned, occupied or used by the contractor, or automobiles owned, leased or borrowed by the contractor. The coverage shall contain no special limitations on the scope of protection afforded to the City. 718 HB Insurance Matrix_revised 4-7-16 (2).xlsx 2 of 4 Automobile Liability General Liability Professional Liability Property Insurance Workers' Comp Additional Insured Endorsements CITY OF HUNTINGTON BEACH INSURANCE REQUIREMENTS Huntington Beach City Council Resolution No. 2008-63 requires submittal of certificates of insurance evidencing the following minimum limits with a California admitted carrier with a current A.M. Best’s Rating of no less than A:VII. See Exhibits A1 - 4 for sample forms. Email: Justin.Wessels@surfcity-hb.org or Heather.Campbell@surfcity-hb.org Phone: 714-374-5378 or 714-536-5210. Fax: 714-536-5212. Vendor Type Minimum Insurance Requirements Any deductible other than those allowed in this matrix, self-insured retentions or similar forms of coverage limitations or modifications must be approved by the Risk Manager and City Attorney of the City of Huntington Beach. NOTE: Waivers and / or modifications are discouraged and will be considered only under extraordinary circumstances. Design Professionals: Professional service contractors who contract with the City and/or provide architectural and/or engineering services to the City. Professional Services: Services that involve the exercise of professional discretion and independent judgment based on an advanced or specialized knowledge, expertise or training gained by formal studies or experience or services which are not readily or efficiently procured by competitive bidding pursuant to HB Muni Code 3.02. Services includes but are not limited to those services provided by appraisers, architects, attorneys, engineers, instructors, insurance advisors, physicians and other specialized consultants. 4) The reporting of circumstances or incidents that might give rise to future claims. 1) The policy retroactive date coincides with or precedes the professional services contractor’s start of work (including subsequent policies purchased as renewals or replacements). 2) The professional services contractor will make every effort to maintain similar insurance during the required extended period of coverage following project completion, including the requirement of adding all additional insureds. 3) If insurance is terminated for any reason, professional services contractor agrees to purchase an extended reporting provision of at least two (2) years to report claims arising from work performed in connection with this agreement or permit. Claims made policies are acceptable if the policy further provides that: Minimum of $1,000,000 per occurrence and in the aggregate. Allows up to $10,000 deductible. 719 HB Insurance Matrix_revised 4-7-16 (2).xlsx 3 of 4 Automobile Liability General Liability Professional Liability Property Insurance Workers' Comp Additional Insured Endorsements CITY OF HUNTINGTON BEACH INSURANCE REQUIREMENTS Huntington Beach City Council Resolution No. 2008-63 requires submittal of certificates of insurance evidencing the following minimum limits with a California admitted carrier with a current A.M. Best’s Rating of no less than A:VII. See Exhibits A1 - 4 for sample forms. Email: Justin.Wessels@surfcity-hb.org or Heather.Campbell@surfcity-hb.org Phone: 714-374-5378 or 714-536-5210. Fax: 714-536-5212. Vendor Type Minimum Insurance Requirements Any deductible other than those allowed in this matrix, self-insured retentions or similar forms of coverage limitations or modifications must be approved by the Risk Manager and City Attorney of the City of Huntington Beach. NOTE: Waivers and / or modifications are discouraged and will be considered only under extraordinary circumstances. Licensees/Lessees: Any persons or entities who contract with the City for the use of public property. Combined single limit bodily injury and property damage. Minimum of $1,000,000 per occurrence. Allows up to $5,000 deductible. (Additional Insurance Endorsement is always required with General Liability Ins.) Full replacement cost with no coinsurance penalty provision. As required by the State of California, with Statutory Limits and Employer’s Liability Insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease. (See Note 1 below.) Include the policy number and Additional Insured Endorsement Requirement statement below.(See Note 2.) Note 1 - Workers' Compensation Exemption: If entity has no employees, a signed Declaration of Non-Employee Status form is required. Note 2 - Additional Insured Endorsement Requirements: The City, its officers, elected or appointed officials, employees, agents, and volunteers are to be covered as additional insureds by separate attached endorsement(s) as respects liability arising out of action performed by or on behalf of the contractor, products and completed operations of the contractor, premises owned, occupied or used by the contractor, or automobiles owned, leased or borrowed by the contractor. The coverage shall contain no special limitations on the scope of protection afforded to the City. 720 HB Insurance Matrix_revised 4-7-16 (2).xlsx 4 of 4 Minimum Insurance Requirements Professional Liability Design Professionals: Professional service contractors who contract with the City and/or provide architectural and/or engineering services to the City. Professional Services: Services that involve the exercise of professional discretion and independent judgment based on an advanced or specialized knowledge, expertise or training gained by formal studies or experience or services which are not readily or efficiently procured by competitive bidding pursuant to HB Muni Code 3.02. Services includes but is not limited to those services provided by appraisers, architects, attorneys, engineers, instructors, insurance advisors, physicians and other specialized consultants. CITY OF HUNTINGTON BEACH INSURANCE REQUIREMENTS Huntington Beach City Council Resolution No. 2008-63 requires submittal of certificates of insurance evidencing the following minimum limits with a California admitted carrier with a current A.M. Best’s Rating of no less than A:VII. Any deductible other than those allowed in this matrix, self-insured retentions or similar forms of coverage limitations or modifications must be approved by the Risk Manager and City Attorney of the City of Huntington Beach. NOTE: Waivers and / or modifications are discouraged and will be considered only under extraordinary circumstances. 4) The reporting of circumstances or incidents that might give rise to future claims. Vendor Type Claims made policies are acceptable if the policy further provides that: Minimum of $1,000,000 per occurrence and in the aggregate. Allows up to $10,000 deductible. 1) The policy retroactive date coincides with or precedes the professional services contractor’s start of work (including subsequent policies purchased as renewals or replacements). 2) The professional services contractor will make every effort to maintain similar insurance during the required extended period of coverage following project completion, including the requirement of adding all additional insureds. 3) If insurance is terminated for any reason, professional services contractor agrees to purchase an extended reporting provision of at least two (2) years to report claims arising from work performed in connection with this agreement or permit. 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-212 MEETING DATE:3/15/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO:Honorable Mayor and City Council Members SUBMITTED BY:Sean Joyce, Interim City Manager VIA:Travis K. Hopkins, Assistant City Manager PREPARED BY:Catherine Jun, Assistant to the City Manager Subject: Consider adoption of the 2022 City Council Strategic Planning Work Plan Statement of Issue: On February 4, 2022, the City Council conducted a Strategic Planning Workshop to identify overall goals and objectives for integration into the City’s annual work plan for 2022. Pat West Consulting and the City Manager’s Office facilitated discussions during which the City Council reaffirmed 4 of the 5 policy priority areas that were set in 2021 (excluding COVID-19 Response) and moved them forward for 2022. The City Council also added Fiscal Sustainability, Public Safety and Other as the fifth policy priority area. The City will continue to achieve goals within these five areas over this calendar year: 1. Community Engagement 2. Homelessness and Behavioral Services Response 3. Economic Development & Housing 4. Infrastructure & Parks 5. Fiscal Sustainability, Public Safety and other For each of the areas above, the City Council identified specific goals and objectives that they wished for the City to achieve. A 2022 City Council Work Plan that includes a summary of these goals and objectives is attached to this report. Once adopted, the Work Plan will serve to focus and prioritize the City’s efforts throughout the calendar year. Financial Impact: The fiscal impact of specific projects will be considered separately as they are developed. Recommended Action: Adopt the 2022 City Council Work Plan. City of Huntington Beach Printed on 3/9/2022Page 1 of 3 powered by Legistar™749 File #:22-212 MEETING DATE:3/15/2022 Alternative Action(s): Do not adopt the 2022 City Council Work Plan, and provide staff with additional direction. Analysis: The City Council held a Strategic Planning Workshop on February 4, 2022 facilitated by Pat West Consulting and the City Manager’s Office. During the Workshop, City Council reaffirmed four of the five policy priority areas and respective strategic goals set in 2021 (excluding COVID-19 Response) and decided to continue them forward in 2022. The City Council also added Fiscal Sustainability, Public Safety and Other as a fifth policy priority area: 1. Community Engagement Priorities o Strategic Goal: Improve Communication Mechanisms Utilized by the City o Strategic Goal: Improve Community / Constituent Engagement Experience 2. Homelessness and Behavioral Services Response Priorities o Strategic Goal: Enhance Existing Homeless Response Efforts o Strategic Goal: Develop Homeless Response Solutions to Address the Root Causes of Homelessness o Strategic Goal: Position Huntington Beach to be a Regional Leader in Addressing Homelessness, Mental Health, and Other Related Issues 3. Economic Development & Housing Priorities o Strategic Goal: Develop City Programs Aimed at Supporting, Promoting, and Diversifying our Economic Base o Strategic Goal: Utilize Updates to the City’s Housing Element and Land Use Policies as an Economic Development Tool o Strategic Goal: Pursue Policies and Projects to Increase the Local Housing Supply 4. Infrastructure & Park Priorities o Strategic Goal: Develop a Plan to Address Major Facility Needs o Strategic Goal: Prioritize Park and Community Center Improvements in the City’s CIP Budget o Strategic Goal: Develop Multi-Modal and Active Transportation Infrastructure Projects (Inclusive of Disability Access), Especially in the City’s Downtown Resort District o Strategic Goal: Develop Smart City Policies While Prioritizing Broadband / Small Cell Access Throughout the Community 5. Fiscal Sustainability, Public Safety and Other o Strategic Goal: Maintain a balanced budget and responsible spending of annual surpluses o Strategic Goal: Implement solutions to enhance public safety During this exercise, the City Council reviewed the 2021 objectives that were set under each strategic goal, identifying those that were successfully completed and those that are under progress. In addition to those items in progress, the City Council set additional objectives under each priority area for 2022. A summary of those items are available in the proposed 2022 Work Plan (see City of Huntington Beach Printed on 3/9/2022Page 2 of 3 powered by Legistar™750 File #:22-212 MEETING DATE:3/15/2022 attached). If adopted by the City Council, the Work Plan will serve to focus the City’s resources to achieve the objectives throughout the calendar year. Environmental Status: Not applicable Strategic Plan Goal: Non Applicable - Administrative Item Attachment(s): 1. 2022 City Council Strategic Planning Work Plan City of Huntington Beach Printed on 3/9/2022Page 3 of 3 powered by Legistar™751 2022 Strategic Planning Workshop Recap Identified Goals & Objectives March 15, 2022 752 2 Background City Council held a 2022 Strategic Planning Workshop on February 4, 2022 at Central Library from 9:00am to 2:30pm. The workshop was facilitated by Pat West Consulting and the City Manager’s Office. The Workshop began with a review of the City’s progress on last year’s goals, followed by goal setting for 2022. 753 2021 Strategic Plan Outcomes 66 Strategic Plan Objectives 31 Objectives Completed 34ObjectivesIn Progress 1 Objective Tabled Since the 2021 Strategic Planning Workshop, staff has initiated all 66 objectives (excluding one item that was tabled) and has completed 31. 34 in progress objectives have continued onto 2022 and remain active. 754 2021 H-Items Outcomes In 2021, City Council also initiated 41 additional objectives through the H-Item process and approved 35. Nearly all approved H-Items are aligned with one of the five 2021 Strategic Planning Priorities. All 35 objectives have been initiated, and a majority (23) have been completed. 12 objectives are in progress. 35 Approved H-Items 23 Objectives Complete 12Objectives In Progress 0 Objectives Tabled 755 2022 Strategic Plan Priorities Community Engagement •Improve communication mechanisms •Improve community engagement experience Homelessness Response •Enhance existing response efforts •Develop response solutions to address root causes of homelessness •Position HB to be a regional leader in addressing homelessness, mental health and related issues Economic Dev. & Housing •Develop programs to support, promote and diversity economic base •Utilize updates to Housing Element and land use policies as an economic development tool •Pursue policies and projects to increase local housing supply Infrastructure & Parks •Develop plan to address major facility needs •Prioritize park and community center improvements in CIP •Develop multi-modal and active transit infrastructure, esp. in downtown •Develop smart city policies/ small cell access Fiscal Sustainability, Public Safety, Other •Maintain a balanced budget and responsible spending of annual surpluses •Implement solutions to enhance public safety Following a review of 2021 goals and objectives, the City Council reaffirmed 4 of the 5 policy areas (excluding COVID-19 Response) and added Fiscal Sustainability, Public Safety and Other as the 5th policy area. These policy areas will serve to focus the City’s efforts throughout 2022. 756 2021 Completed Goals Community Engagement Improve Communication Mechanisms •Developed/standardized information campaign tools •Hosted 20+ virtual town halls during the pandemic •Moved Council Meetings to the 1st and 3rd Tuesdays •Examined creation of a small business roundtable Improve Community Engagement Experience •Modernized City’s 40+ board/commission structure •Coordinated a Charter Review process •Coordinated Citizen’s Academy during pandemic •Instituted social media policy for elected and appointed officials •Developed partnerships with community groups Completed in 2021 •Condemned the 1/6 Capitol Insurrection •Reaffirmed Declaration of Policy About Human Dignity •Created a Council Policy Analyst position •Established Annual Rockin’ Fig Day •Developed Rockin’ Fig Memorial plans •Coordinated OC Human Relations and DEI events •Denounced white supremacy •Recognized LGBTQ Pride Month; raised Pride flag •Eliminated the Environmental Assessment / Subdivision Committees to streamline services •Recognized October as Nat’l Bullying Prevention Month and reaffirmed commitment against bullying 757 Community Engagement Virtual Town Halls during COVID-19 758 Community Engagement Events to Connect with Residents Community Pop-Up Picnic in April 2021 2021 Citizens Academy759 2022 Goals Community Engagement Improve Communication Mechanisms •Update the City’s main website •Expand the Communications Committee’s scope of work beyond HBTV •Centralize records management and PRA processes •Replace or modernize the existing emergency notification system and constituent communication tool (MyHB) •Develop a neighborhood-focused town hall program •Create a central data platform and performance dashboard In Progress and New for 2022 Improve Community Engagement Experience •Increase resident engagement with proactive, trustworthy and accurate info on all city outlets •Develop age-friendly outreach, programs and infrastructure for all age groups •Establish a dialogue series to heal community discord •Develop a volunteer project coordination program •Examine campaign finance reform options •Examine ethics policy reform options •Denounce hate crimes; develop process to manage hate crime data 760 •Efforts are underway to redesign and redevelop the City’s website to be more user-friendly and serve as a one-stop shop for all City related information. Community Engagement Website Redevelopment 761 •Develop communication tools that can reach and engage with residents of all ages, so they have greater access to City services, programs and civic engagement opportunities. Community Engagement Age-Friendly Communities 762 2021 Completed Goals Homelessness and Behavioral Services Response Completed in 2021 Enhance Existing Response Efforts •Assessed operations of the Navigation Center and returned with an update of improvements that can be linked to the future Healing Center project • Established a full-time position dedicated to homelessness and behavioral services • Conducted quality-of-life enforcement activities • Engaged community organizations to develop response programs •Supported regulations on sober living homes and body brokering Position City to be Regional Leader in Homelessness, Mental Health and Other Related Issues •Launched Be Well mobile crisis response program Develop Solutions to Address Root Causes of Homelessness • Pursued City-sponsored permanent supportive housing developments • Examined homelessness prevention program partnerships •Created public outreach programs addressing homelessness and mental health • Used data to define success at the Navigation Center 763 Homelessness & Behavioral Services Be Well OC in Huntington Beach •Be Well OC in Huntington Beach is the first mobile crisis response program in Orange County to deliver mental health services directly to all community members in need. •The program operates two vans, each staffed with a pair of crisis counselors who respond to non- emergency, non-medical situations such as a mental health crisis and follow up with case management services to ensure residents receive continual care. •From August 2021 thru January 2022, the City has answered approximately 900 calls from 911 dispatch, freeing up police officers, EMTs and firefighters for more emergent situations. 764 •Since opening in December 2021, the Navigation Center has served 277 homeless persons, housed 45, and matched 71 more with housing vouchers. •The Center has been a key resource for the City’s homeless response efforts and has given us an opportunity to connect with 4,411 individuals, serve 73,000 meals and provide onsite services ranging from health to employment. Homelessness & Behavioral Services Navigation Center 765 2022 Goals Homelessness Response In Progress and New for 2022 Develop Solutions to Address the Root Causes of Homelessness • Continue identifying opportunities to develop or increase access to transitional or permanent supportive housing. •Develop an integrated data system that allows for client community information exchange to facilitate their care and housing placement Position City to be Regional Leader in Homelessness, Mental Health and Related Areas •Develop the Healing Center project to provide a local continuum of care that integrates resources from regional agencies, non-profit organizations, and community and volunteer based groups. •Utilize the Healing Center to incorporate mental health and addiction response programs such as Be Well; new job training programs; and regional partnerships with homeless response agencies. 766 •Reimagine the current Navigation Center site to provide more comprehensive, coordinated services for the homeless. •Staff is beginning to examine a potential site layout and is also securing partners to help develop and operate the Center and also pursue grant funding. Homelessness & Behavioral Services Healing Center Project Photo of the Navigation Center today 767 2021 Completed Goals Economic Development and Housing Completed in 2021 Develop Programs to support, promote and diversify economic base •Review allowance of retail cannabis sales in HB • Reviewed existing EV charging station regulations and amend applicable land use codes to prevent noise disruptions. • Adopted a resolution supporting a permanent ban on new offshore oil, gas drilling off the California coast •Developed a recovery fund program to support local businesses impacted by Adrian’s Kickback Utilize Housing Element Updates and land use policies as an economic tool •Provided STR operators with an extension to comply with updated STR regulations Pursue Projects to Increase Housing Supply • Pursued a City-sponsored permanent supportive housing project • Pursued workforce housing development projects • Instituted inclusionary housing program rule updates 768 •City Council formed an ad hoc subcommittee to begin developing a proposed ordinance to permit cannabis businesses (retail and non-retail) to operate in the City. •The City has also decided to place a proposed special tax on the June 2022 ballot while developing an ordinance. Economic Develoment Cannabis Sales 769 •The Elan (18504 Beach Bl) and Breakwater Apartments (16761 Viewpoint Ave.) will be part of the City’s new housing program to provide affordable rentals for moderate income families. Economic Development Middle Income Housing The Elan on 18504 Beach Bl. 770 2022 Goals Economic Development and Housing In Progress and New for 2022 Develop Programs to support, promote and diversify economic base •Develop a Sustainability Master Plan •Develop a strategy to reinvest in local tourism and destination stewardship efforts as an economic development tool •Consider Downtown revitalization improvements •Institute new economic development strategy •Consider investment modification policies that would limit or prevent investments in fossil fuel corporations •Consider the development of a program to facilitate music events at appropriate city venues •Review need for local hiring preferences ordinance •Review legality of existing City food truck rules •Develop a plan to attract millennials and Gen Z •Partnering with Goldenwest College to develop job training Utilize Housing Element Updates and land use policies as an economic tool •Update Housing Element •Assess viability of green industry growth / incubator •Relax parking ratio regulations citywide •Enable mixed uses in industrial zones •Develop land-use changes to encourage redevelopment of strip-malls •Analyze zoning code to facilitate ongoing outdoor dining and retail (post-COVID 19) Pursue Projects to Increase Housing Supply •Continue to identify opportunities to increase the affordable housing stock 771 Economic Development Sustainability Master Plan •A Sustainability Master Plan will provide a clear roadmap for the City to evolve into a sustainable community in the areas of environmental and climate protection. However the Plan is unique in that it will also promote sustainability in community health and wellbeing and financial security for our most vulnerable residents. 772 •City will continue to consider and identify various potential improvements to the downtown to increase public safety, accessibility and a family-friendly atmosphere for residents and tourists alike. A proposed rendering of a reimagined Downtown HB Economic Development Downtown Revitalization 773 2021 Completed Goals Infrastructure and Parks Completed in 2021 Develop Plan to Address Major Facility Needs • Examined viability of a Design-Build-Finance-Operate- Maintain (DBFOM) program •Established a DBFOM Committee Develop multi-modal/active transit infrastructure •Developed an arterial beautification pilot program Develop smart city polices and small cell access • Reconstituted the Smart Cities Council Task Force Prioritize park and community center improvements •Constructed a total of 29 capital improvement projects valued at $18M: •5 park projects ($2.9M) •9 facility projects ($1.3M) •7 street projects ($8M) •8 utility projects ($5.8M) • Adopted a resolution in support of an OC Veterans Cemetery in the City of Anaheim 774 Facility Improvement Needs •Police Station •City Hall •Lake Fire Station •Marine Safety at Junior Lifeguard Headquarters Infrastructure and Parks DBFOM Project 775 Infrastructure and Parks Park Improvements Edison Skate Spot Central Park Playground Bluff Top Railing Replacement 776 2022 Goals Infrastructure and Parks In Progress and New for 2022 Develop Plan to Address Major Facility Needs •Develop plan and cost analysis to shift to 100% renewables •Develop plan to upgrade City fleet to alternative fuel vehicles Develop multi-modal/active transit infrastructure •Develop a Citywide ATP plan which prioritizes various transit modes. •Assess viability of rail in appropriate transit corridors •Conduct feasibility analysis regarding relinquishment of PCH to improve vehicle and pedestrian safety •Permit use of e-bikes on beach paths, coupled with other speed enforcement and infrastructure improvements •Implement study to identify street segments eligible for speed limited reductions under AB 43 •Update residential street paving plan to enhance street maintenance •Develop a downtown resort district connectivity plan •Develop a complete streets plan that includes pavement, alleys, and other surrounding issues Prioritize park and community center improvements •Identify a long-term plan for 2nd block of Main Street •Pursue efforts to host LA2028 sporting events to HB •Examine the potential annexation of Bolsa Chica •An additional 77 capital improvement projects valued at $49M are underway: 5 park projects under construction; 11 in design 3 facility projects under construction; 16 in design 5 street projects under construction; 27 in design 7 utility projects under construction; 3 in design Develop smart city polices and small cell access •Develop broadband access plans in appropriate community locations •Update underground policy to ease telecom / broadband expansions •Conduct an IT Security Audit to prevent cyberattacks and modernize our existing IT infrastructure, including constituent communication tools 777 Residential Zone Program •The City’s 12-year paving program began in 2011 and successfully increased our PCI. •FY 22/23 will be the final year of the program. Afterwards, the City will move on to a 6- year cycle that will pave streets in shorter intervals. Infrastructure and Parks Paving Program 778 •City has met with stakeholders to discuss hosting a trio of Olympic action sports events in Huntington Beach. Sporting events include surfing, skateboarding and BMX. Infrastructure and Parks LA2028 Olympics 779 •The City is working collaboratively with the Ocean View School District and the general community to prepare a master plan to redevelop the Community Center and adjacent Oak View Park, as well as expand and modernize Oak View Library to better meet the needs of this neighborhood. Infrastructure and Parks Oak View Community Center 780 Other Major Projects •Central Park Fountains •Edison Park •Carr Park •Bluff Top Erosion •Main Street Improvements Master Plans •Mobility Plan •ADA Transition Plan •Fire Station Master Plan •Fiber Master Plan •Fleet Management Plan •Sustainability Master Plan •Pavement Management Plan (Update) •Park Master Plan •Library Facilities Master Plan Infrastructure and Parks Major Initiatives in 2022 781 2021 Completed Goals COVID-19 plus Fiscal Sustainability Completed in 2021 Monitor and Respond to COVID-19 • Coordinated regular distribution of COVID-19 info •Facilitated virtual town hall series on vaccine topics • Served as a role model for COVID-19 guidelines to facilitate reopening •Continued to maintain access to all City services •Developed small businesses economic support programs •Supported regulatory flexibility to help businesses recover • Reviewed applicability of relevant Federal & State support programs •Terminated COVID-19 Local Emergency Declaration •Considered instituting a local eviction moratorium (tabled) Maintain a balanced budget and responsible spending of annual surpluses •Developed and institute a plan to balance the City’s budget •Developed and institute a sustainable plan to finalize labor contracts •Analyzed the need to update and modernization the City’s UUT •Coordinated development of a General Fund Reserve Policy 782 32 City Budget & Fiscal Position We are projecting a FY 21-22 surplus with modest surpluses over the next four years as a result of key financial decisions made by City Council and the ongoing recovery from the COVID-19 economic downturn. FY2020-21 concluded with a $5.2M surplus, after year-end transfers •City Council approved additional investments of $4.4M into capital infrastructure and $1.3M of essential capital equipment needs from the year-end surplus. FY2021-22 is projected to conclude with a $4.3M surplus (subject to change) Historic Infrastructure Investments in FY2021-22 General Fund transfer to the Infrastructure Fund increased by 130% to $11.5M. CIP budget increased 57% to $39.3M Additional One-Time Funding City received $29.6M through the American Rescue Plan Act. City Council approved an expenditure plan to invest funds in projects. 783 2022 Goals Fiscal Sustainability, Public Safety, and Other In Progress and New for 2022 Provide Public Safety Solutions • Adopt an ordinance to prohibit the unlawful possession of catalytic converters • Develop a bicycle safety plan that promotes safe routes, safety instruction for students, and e-bike regulations • Address the long term future of Main Street Maintain a balanced budget and responsible spending of annual surpluses •Maintain responsible spending of the annual surplus and a continued balanced budget each year. 784 2022 Strategic Planning Workshop Recap 785 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-183 MEETING DATE:3/15/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO:Honorable Mayor and City Council Members SUBMITTED BY:Sean Joyce, Interim City Manager VIA:Ursula Luna-Reynosa, Director of Community Development PREPARED BY:Kriss Casanova, Economic Development Manager Subject: Approve and authorize execution of a Memorandum of Understanding (MOU) between the City and the Huntington Beach Auto Dealers Association extending the Auto Incentive Beach Parking Program for an additional five (5) years Statement of Issue: In 2011, the City Council authorized a one-year Memorandum of Understanding (MOU) with the Huntington Beach Auto Dealers Association (Association) for an Auto Incentive Beach Parking Program (program) that provided car purchasers with a voucher to redeem an annual free beach parking pass from the City. The program has proven to be successful (or associated with) increasing sales and was renewed on an annual basis until 2015, when it was extended for a five year term. The Association considers the City’s incentive valuable for attracting vehicle buyers and has requested another five year extension of the MOU. Per Government Code Section 53083, a public hearing is required prior to approving the economic development subsidy. Financial Impact: Annual sales tax revenue to the City from car sales and leases is estimated to be between $8-9 million. An average of 2,750 passes are redeemed each year at a cost of $150 each, resulting in an annual subsidy of approximately $412,500 with approximately 250 hours of staff time. The annual cost of printing parking passes is approximately $1,900 and is included in the Community and Library Services Department budget. Recommended Action: A) Open the public hearing and receive written and oral testimony; and, B) Approve and authorize the Mayor and City Clerk to execute a new “Memorandum of Understanding Between the City of Huntington Beach and the Huntington Beach Auto Dealers Association.” City of Huntington Beach Printed on 3/9/2022Page 1 of 3 powered by Legistar™786 File #:22-183 MEETING DATE:3/15/2022 Alternative Action(s): Do not approve the recommended motion and direct staff accordingly. Analysis: In 2011, the City Council authorized a one-year Memorandum of Understanding (MOU) with the Huntington Beach Auto Dealers Association (Association) to pilot an Auto Incentive Beach Parking Program (program). The program was designed to encourage car sales and downtown eating and shopping during the off-season by providing qualified vehicle buyers with a voucher to obtain a free beach parking pass. The program provides an extra incentive over other dealerships in adjacent communities, allowing the City to receive sales tax revenue that might otherwise be received by neighboring cities. The Association, made up of 12 dealerships, markets the incentive to prospective car buyers. Eligible buyers initially include buyers of new vehicle, and in 2015, the program was extended to buyers of used automobiles selling for at least $20,000. Leased sales have historically also been eligible. The pilot program was successful and renewed annually and then for an additional 5-year term in 2015. The Association considers the City’s incentive to be valuable and has requested to continue the program for five more years until 2027 (Attachment 1). The MOU (Attachment 2) memorializes the City and the Association’s collective objectives and responsibilities regarding the continued implementation of the program. Updates to the MOU include memorializing leased vehicles as part of the program and the inclusion of program procedures for all participating auto dealerships. Staff recommends that the program be extended given its perceived success enhancing the local economy. Car dealerships are the largest sales tax generators in the City with annual sales tax revenue estimated to be between $8-9 million. The program is an indirect marketing tool provided by the City at a low cost that may entice customers not only to purchase their automobile in Huntington Beach, but also encourages vehicle owners/lessees to visit the beach, shops and restaurants in the Downtown area for the year that the beach parking pass is valid, with the hopes of renewing the pass. The City is able to analyze the number of parking passes that have been redeemed for the past several years, including what city each program participant resides. Since 2018, 11,016 parking vouchers have been redeemed, and of those, 5,539 purchasers were from Huntington Beach (50.3%). While the majority of the vouchers redeemed are buyers from Huntington Beach and adjacent cities, the program has also been successful attracting regional buyers and lessees. The average number of parking passes issued in association with the program between 2018 through 2021 was approximately 2,750 annually. Overall numbers for 2020 were down due to COVID-19, with a slight increase for 2021. The number of parking passes redeemed for the past several years are as follows: Parking Passes Redeemed--Per City Residence of Buyer2018 2019 2020 2021 TOTAL % Huntington Beach1,878 1,593 1,043 1,025 5,539 50.3% Fountain Valley263 241 138 148 790 7.2% Westminster 177 171 93 111 552 5% Costa Mesa 165 148 103 84 500 4.5% Garden Grove160 111 76 76 423 3.8% Irvine 87 55 30 52 224 2% Santa Ana 97 87 62 52 298 2.7% Long Beach 109 66 40 55 270 2.5% Anaheim 98 79 50 65 292 2.7% Orange 55 46 20 32 153 1.4% Others 595 577 383 420 1,975 17.9% TOTAL 3,684 3,174 2,038 2,120 11,016 100.00% City of Huntington Beach Printed on 3/9/2022Page 2 of 3 powered by Legistar™787 File #:22-183 MEETING DATE:3/15/2022 Parking Passes Redeemed--Per CityResidence of Buyer2018 2019 2020 2021 TOTAL % Huntington Beach1,878 1,593 1,043 1,025 5,539 50.3% Fountain Valley263 241 138 148 790 7.2% Westminster 177 171 93 111 552 5% Costa Mesa 165 148 103 84 500 4.5% Garden Grove160 111 76 76 423 3.8% Irvine 87 55 30 52 224 2% Santa Ana 97 87 62 52 298 2.7% Long Beach 109 66 40 55 270 2.5% Anaheim 98 79 50 65 292 2.7% Orange 55 46 20 32 153 1.4% Others 595 577 383 420 1,975 17.9% TOTAL 3,684 3,174 2,038 2,120 11,016 100.00% Government Code Section 53083 requires that the City Council hold a noticed public hearing and, prior to the public hearing, provide information to the public through the City’s website regarding the proposed economic development subsidy in a report. An “economic development subsidy” is any expenditure of public funds or loss of revenue of $100,000 or more, for the purpose of stimulating economic development. Since the aggregate expenditure of public funds by the City for the program is anticipated to be approximately $412,500 annually, an economic development subsidy report (Attachment 3) has been prepared. Highlights of the report are as follows: ·Agreement term for five years through March 14, 2027. ·Approximately 24,600 vehicles sold on average for the past 3 years (new/used/leased) with annual sales tax revenue of $8-9 million. ·The City will retain approximately $1,000,000 in annual sales tax revenue from vehicle purchases or leases in association with continuing the program. ·The City will provide beach passes at a value of approximately $2,000,000 throughout the five year term. ·Continuation of the program will assist in retaining approximately 1,100 auto dealer jobs. Environmental Status: Pursuant to CEQA Guidelines Section 15378(b)(4), government fiscal activities that do not result in a physical change in the environment and do not commit the lead agency to any specific project, do not constitute a project. Therefore, these activities are exempt in accordance with CEQA Guidelines Section 15060(c)(3). Strategic Plan Goal: Economic Development & Housing Attachment(s): 1. Huntington Beach Auto Dealers Association - Letter of Support 2. Memorandum of Understanding 3. Economic Development Subsidy Report City of Huntington Beach Printed on 3/9/2022Page 3 of 3 powered by Legistar™788 789 790 791 792 793 794 795 796 797 798 ECONOMIC DEVELOPMENT SUBSIDY REPORT PURSUANT TO GOVERNMENT CODE SECTION 53083 FOR AUTO INCENTIVE BEACH PARKING PASS PROGRAM BY AND BETWEEN THE CITY OF HUNTINGTON BEACH AND THE HUNTINGTON BEACH AUTO DEALERS ASSOCIATION Pursuant to Government Code Section 53083, the City Council of Huntington Beach must hold a noticed public hearing and, prior to the public hearing, provide all of the following information in written form and available to the public through the City’s website regarding a proposed economic development subsidy provided by the City pursuant to a Memorandum of Understanding between the City of Huntington Beach and the Huntington Beach Auto Dealers Association, in connection with the Auto Incentive Beach Parking Program. Notice was published on the City’s website for a public hearing to be held on March 15, 2022. The purpose of this report is to provide the information required pursuant to Government Code Section 53083 in regards to the City’s Auto Incentive Beach Parking Pass Program. This report shall remain available to the public and posted on the City’s website until the end of date of the economic development subsidy, as further described in number two below. 1. The name and address of all corporations or any other business entities, except for sole proprietorships, that are the beneficiary of the economic development subsidy. Norm Reeves Honda Superstore Toyota of Huntington Beach 19131 Beach Blvd. 18881 Beach Blvd. Huntington Beach, CA 92648 Huntington Beach, CA 92648 Car Pros KIA Huntington Beach McKenna Subaru 18835 Beach Blvd. 18801 Beach Blvd. Huntington Beach, CA 92648 Huntington Beach, CA 92648 Huntington Beach Ford DeLillo Chevrolet 18255 Beach Blvd. 18211 Beach Blvd. Huntington Beach, CA 92648 Huntington Beach, CA 92648 Surf City Nissan Huntington Beach Mazda 17331 Beach Blvd. 16800 Beach Blvd. Huntington Beach, CA 92647 Huntington Beach, CA 92647 Huntington Beach Hyundai Huntington Beach Chrysler, Dodge, Ram 16751 Beach Blvd. 16701 Beach Blvd. Huntington Beach, CA 92647 Huntington Beach, CA 92647 799 McKenna Volkswagen Huntington Beach Jeep 18711 Beach Blvd. 16701 Beach Blvd. Huntington Beach, CA 92648 Huntington Beach, CA 92647 2. The start and end dates and schedule, if applicable, for the economic development subsidy. Upon City Council approval, the proposed agreement is expected to commence on March 15, 2022 and end on March 14, 2027. 3. A description of the economic development subsidy, including the estimated total amount of the expenditures of public funds by, or of revenue lost to, the local agency as a result of the economic development subsidy. The economic development subsidy will provide an incentive to car buyers, lessees, and participating members of the Huntington Beach Auto Dealers Association by providing a voucher to obtain a free annual beach parking pass ($150 per vehicle) with the purchase of new, used ($20,000 or more), or leased vehicles. Data from the on-going program suggests that the City redeems about 2,750 vouchers each year. Therefore, the City estimates that a subsidy of approximately $412,500 will be provided annually which equates to the cost of the beach parking passes provided, with a total expenditure of approximately $2,062,500 throughout the 5-year duration of the program. Additionally, 250 hours of City staff will be devoted to oversee the program. 4. A statement of the public purposes for the economic development subsidy. Car dealerships are the largest sales tax generators in Huntington Beach with annual sales tax revenue estimated to be between $8-9 million. Maintaining sales tax revenue from the City’s auto dealerships is needed to fund vital City services. The program helps to spur sales tax revenue growth, encourages local residents and regional visitors to purchase and lease vehicles in the City of Huntington Beach, and prevents leakage of automotive purchases and leases to outside jurisdictions. 5. Projected tax revenue to the local agency as a result of the economic subsidy. The average number of vehicles sold (new and used) and leased by the Huntington Beach Auto Dealers Association between 2018 and 2020 was roughly 24,600 annually. Approximately, 2,750 vouchers were redeemed each year between 2018 and 2021, which equates to an 11% voucher redemption rate. The projected total gross sales for vehicles within the City is roughly $800-900 million of which the City will retain 1% in sales tax totaling $8-9 million. Using the 11% voucher redemption rate as a way to determine the impact of extending the subsidy and keeping the program active, the City will retain almost $1 million in sales tax annually and $5 million throughout the 5-year duration of the program. Increased marketing of the economic subsidy will allow the City to receive additional sales tax from purchases or leases made under the program, which also provide increased sales tax generation on parts and service. 800 Promotion of this program will allow the City’s auto dealers to stay competitive with other dealerships throughout the region. The program also encourages car buyers and lessees to frequent the City’s beach, downtown shops, and restaurants when utilizing the beach parking pass, expanding support to other local businesses and increasing overall sales tax to the City. 6. Estimated number of jobs created by the economic development subsidy, broken down by full-time, part-time, and temporary positions. The proposed subsidy will assist in retaining approximately 1,100 auto dealer jobs. 801 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-191 MEETING DATE:3/15/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO:Honorable Mayor and City Council Members SUBMITTED BY:Sean Joyce, Interim City Manager PREPARED BY:Brittany Mello, Administrative Services Director Subject: Adopt Resolution No. 2022-09 modifying the salary and benefits for non-represented employees and approve for introduction Ordinance No. 4250 to amend Section 2.76.010 of the Huntington Beach Municipal Code related to exclusions from competitive service; and, authorize appropriation of funds Statement of Issue: The Non-Associated Resolution governing compensation and benefits for non-represented employees is proposed to be amended to include the same adjustments provided to the Management Employees’ Organization (MEO) in December 2021. Financial Impact: The Finance Department estimates the total projected average annual cost increase to be $157,177 per year over a three-year period. Recommended Action: A) Adopt Resolution No. 2022-09, “A Resolution of the City Council and the City of Huntington Beach Modifying Salary and Benefits for Non-Represented Employees;” and, B) Approve for Introduction Ordinance No. 4250, “An Ordinance of the City of Huntington Beach Amending the Huntington Beach Municipal Code by Amending Section 2.76.010 Thereof Related to Exclusions from the Competitive Service;” and, C) Authorize appropriations for all costs related to implementation of Resolution No. 2022-09. Alternative Action(s): Do not approve the proposed modifications to the Resolution for Non-Associated employees or to the Ordinance related to exclusions from the competitive service, and direct staff to propose an alternate action. Analysis: The Non-Associated Executive Management group is comprised of 21 members. The current City of Huntington Beach Printed on 3/9/2022Page 1 of 3 powered by Legistar™802 File #:22-191 MEETING DATE:3/15/2022 resolution governing the compensation and benefits for these employees, Resolution No. 2016-50, was adopted in July 2016. Historically, the Non-Associated unit has received comparable wage and benefit adjustments as the Management Employees’ Organization (MEO). On December 21, 2021, the City Council approved a successor Memorandum of Understanding with MEO covering the period of January 1, 2022, through December 31, 2024. The benefits provided to MEO are being proposed to apply to the Non- Associated group via an updated resolution. Key changes in the proposed resolution include the following: Term of Agreement The proposed resolution has an indefinite term. Salary Range Adjustment ·Beginning the pay period following City Council approval, employees will shift to a new, seven- step salary range (A - G). Classifications will be placed on the nearest Step F in the new range without losing any wages. Once on Step F, classifications will be moved to a range two percent (2%) higher. All employees will be placed on the step in the new salary range that is closest to their current base salary step without being less. ·Employees who have reached top step (Step G) will be eligible to earn an annual merit-based bonus of up to three percent (3%) of their base rate of pay at their regularly scheduled performance evaluations. Medical Benefits ·Beginning the pay period following City Council approval, the City’s maximum monthly contribution to medical plan rates will increase proportionally based on the medical plan and enrollment tier with the highest maximums correlating to the Blue Shield PPO plan of $789.58 for employee only; $1,402.57 for two party; and $1,590.03 for family coverage. ·Beginning January 1, 2023, the City’s maximum monthly contribution will increase by $23.33 per month, per medical plan, per enrollment tier up to but not to exceed the monthly plan premium cost. Leave Benefits ·Add Christmas Eve Day (December 24th each year) and New Year’s Eve Day (December 31st each year) to the list of approved City-paid holidays. ·Increase the maximum General Leave Cash-Out from 120 hours to 160 hours to match the MEO pre-existing benefit. These key changes and all other revisions are included in the proposed resolution including a tracked -changes version of Resolution No. 2016-50. Note that Government Code Section 54957.6 prohibits the City Council from deliberating about compensation adjustments for elected officials in Closed Session. As such, the February 15, 2022, Closed Session discussion of the Non-Associated Resolution refrained from any reference to the City of Huntington Beach Printed on 3/9/2022Page 2 of 3 powered by Legistar™803 File #:22-191 MEETING DATE:3/15/2022 City’s three elected staff positions including the City Clerk, City Attorney, and City Treasurer. If approved, the proposed adjustments will apply to the appointed Non-Associated positions while preserving the current salary and benefit levels for elected Non-Associated positions. Environmental Status: Not applicable. Strategic Plan Goal: Non Applicable - Administrative Item Attachment(s): 1. Resolution No. 2022-09, “A Resolution of the City Council and the City of Huntington Beach Modifying Salary and Benefits for Non-Represented Employees,” including Exhibit A. 2. Ordinance No. 4250, “An Ordinance of the City of Huntington Beach Amending the Huntington Beach Municipal Code by Amending Section 2.76.010 Thereof Related to Exclusions from the Competitive Service.” 3. Resolution No. 2016-50 with Tracked Changes 4. Fiscal Impact Report City of Huntington Beach Printed on 3/9/2022Page 3 of 3 powered by Legistar™804 805 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 i NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION - EXHIBIT A …………………………………... .................................................................... 1 SECTION I – PAY ........................................................................................................... 1 A. APPOINTED SALARY SCHEDULE ............................................................................... 1 B. ELECTED SALARY SCHEDULE ................................................................................... 1 C. PERFORMANCE BONUS ............................................................................................ 1 D. DIRECT DEPOSIT ..................................................................................................... 2 E. ASSIGNED VEHICLE/AUTO ALLOWANCE .................................................................... 2 SECTION II – HOURS OF WORK/OVERTIME/TIME OFF ............................................. 2 A. EXECUTIVE LEAVE ................................................................................................... 2 B. FLEXIBLE AND ALTERNATIVE W ORK SCHEDULES........................................................ 2 1. 5/40 Work Schedule .................................................................................................................... 2 2. 9/80 Work Schedule .................................................................................................................... 2 3. Alternative Work Schedule .......................................................................................................... 2 SECTION III – HEALTH AND OTHER INSURANCE BENEFITS ................................... 3 A. HEALTH INSURANCE ................................................................................................ 3 1. Medical, Dental and Vision Insurance......................................................................................... 3 2. City and Employee Paid Health Insurance ................................................................................. 3 3. Medical Cash Out ........................................................................................................................ 5 4. Section 125 Plan ......................................................................................................................... 5 B. LIFE AND ACCIDENTAL DEATH AND DISMEMBERMENT INSURANCE ............................... 5 C. LONG-TERM DISABILITY INSURANCE ......................................................................... 5 D. CITY-PAID PHYSICAL EXAMINATIONS ........................................................................ 6 E. MISCELLANEOUS ..................................................................................................... 6 F. RETIREE MEDICAL COVERAGE FOR RETIREES NOT ELIGIBLE FOR THE CITY MEDICAL RETIREE SUBSIDY PLAN ................................................................................................. 6 G. POST-65 SUPPLEMENTAL MEDICARE COVERAGE ...................................................... 6 SECTION IV – RETIREMENT ......................................................................................... 7 A. BENEFITS ............................................................................................................... 7 1. Self-Funded Supplemental Retirement Benefit .......................................................................... 7 2. Medical Insurance for Retirees ................................................................................................... 7 B. PUBLIC EMPLOYEES' RETIREMENT SYSTEM CONTRIBUTIONS AND REPORTING………...7 1. "Classic Member" Miscellaneous Retirement Benefits…………………………….………………7 2. "New Member" Miscellaneous Retirement Benefits………………….…………………………….8 3. "Classic Member" Safety Members Retirement Benefits…………………………………………..8 4. "New Member" Safety Retirement Benefits…………………….…………………………………...9 5. IRS Code 414(h)(2)………………………………………………………………………………. ....... 9 6. Pre-Retirement Optional Settlement 2 Death Benefit ................................................................. 9 7. Fourth Level of 1959 Survivor Benefits ....................................................................................... 9 8. VEBA Plan Requirements ........................................................................................................... 9 806 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 ii SECTION V – LEAVE BENEFITS ................................................................................ 11 A. GENERAL LEAVE ................................................................................................... 11 1. Accrual ...................................................................................................................................... 11 2. Eligibility and Approval ............................................................................................................. 11 3. Leave Benefit Entitlements ....................................................................................................... 11 4. Conversion to Cash .................................................................................................................. 11 B. HOLIDAYS AND PAY PROVISIONS ............................................................................ 12 C. BEREAVEMENT LEAVE ........................................................................................... 12 D. VOLUNTARY CATASTROPHIC LEAVE DONATION PROGRAM ........................................ 13 SECTION VI – RETIREE SUBSIDY MEDICAL PLAN .................................................. 13 SECTION VII – MISCELLANE OUS .............................................................................. 13 A. COLLECTION OF PAYROLL OVERPAYMENTS ............................................................. 13 B. UNIFORMS AND CALPERS REPORTING .................................................................. 13 EXHIBIT 1A – NON-ASSOCIATED APPOINTED SALARY SCHEDULE .................... 14 EXHIBIT 1B – NON-ASSOCIATED ELECTED SALARY SCHEDULE…………………15 EXHIBIT 2 – RETIREE MEDICAL PLAN ...................................................................... 16 EXHIBIT 3 – 9/80 WORK SCHEDULE ......................................................................... 20 EXHIBIT 4 – VOLUNTARY CATASTROPHIC LEAVE DONATION............................. 22 807 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 1 EXHIBIT A SECTION I – PAY A. Appointed Salary Schedule Effective March 19, 2022, the parties agree that the salary schedule in Exhibit 1A reflects the following modifications from the salary schedule in Resolution No. 2016-50: 1. The salary schedule will include seven (7) steps from A-G; 2. The steps will be five percent (5%) steps; 3. The salary ranges will be one percent (1%) apart; 4. Each job classification will be assigned a salary range by: a. Locating the range on the new salary schedule with a Step F that is nearest to the position’s current top step (Step E) without being less; and then, b. Moving two ranges higher, thereby providing a wage increase of not less than two percent (2%) for all appointed non-represented employees. 5. Each employee will be placed on the step (A-F) of their classification’s assigned salary range that is nearest to their base salary step (A-E of the November 2, 2020, salary schedule) without being less. 6. Once placed on the new, seven-step salary schedule, employees will be eligible to move to the next step on their anniversary date (i.e., the date they are due for their next evaluation) upon receipt of a satisfactory evaluation. 7. The City Manager is authorized to set the salaries of the appointed executive management positions identified in Exhibit 1A at any rate at or below Step E of the designated salary range. The City Manager is authorized to increase the salary by 5% based upon performance at annual review and market data. However, no salary for a new employee may be set above Step E at any time without City Council approval. B. Elected Salary Schedule 1. All elected executive management positions shall receive the salaries as identified in Exhibit 1B. 2. The City Council shall set the salaries of the elected executive management positions identified in Exhibit 1B, at any rate within the designated salary range. C. Performance Bonus 1. Appointed employees who are at Step G on the salary schedule are eligible for an annual performance bonus of up to three percent (3%) of their base pay at the time of their evaluation. 2. The annual performance bonus amount will be determined based upon the evaluation of the employee’s performance. A completed performance evaluation with specific 808 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 2 recognition of outstanding performance must be attached to the Personnel Action Form and sent to the Human Resources Division. The evaluation will also identify performance goals and objectives. The parties agree that to the extent permitted by CalPERS or law, the City will report the compensation in this section as special compensation pursuant to Title 2 CCR, Section 571(a)(1) Bonus. D. Direct Deposit All Non-Associated employees are required to utilize direct deposit of payroll checks. E. Assigned Vehicle/Auto Allowance Appointed Department Heads, Contract Non-Department Heads, as well as the City Clerk, City Treasurer, and City Attorney shall receive an auto allowance in the amount of two hundred thirty dollars and seventy-seven cents ($230.77) per bi-weekly pay period plus reimbursement of out-of-town travel at the approved mileage rate. Appointed Department Heads and the City Clerk, City Treasurer, and City Attorney shall have the option of an assigned City vehicle in lieu of an auto allowance. SECTION II – HOURS OF WORK/TIME OFF A. Executive Leave Non-Associated exempt employees shall not be eligible for overtime compensation. Exempt department heads and contract non-department heads shall be credited with eighty (80) hours of executive leave per calendar year. B. Flexible and Alternative Work Schedules 1. 5/40 Work Schedule The 5/40 work schedule shall be defined as working five (5), eight (8) hour days, Monday through Friday each week, with a one-hour lunch during each work shift, totaling a forty (40) hour work week. 2. 9/80 Work Schedule The 9/80 work schedule, as outlined in Exhibit 3, shall be defined as working nine (9) days for eighty (80) hours in a two-week pay period by working eight (8) days at nine (9) hours per day and working one (1) day for eight (8) hours (Friday), with a one-hour lunch during each work shift, totaling forty (40) hours in each FLSA designated work week. The 9/80 work schedule shall not reduce service to the public, departmental effectiveness, productivity and/or efficiency as determined by the City Manager or designee. 3. Alternative Work Schedule Non-associated employees may elect any alternative work schedule approved by the City Manager or designee. 809 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 3 SECTION III – HEALTH AND OTHER INSURANCE BENEFITS A. Health Insurance 1. Medical, Dental, and Vision Insurance The City shall continue to make group medical, dental, and vision benefits available to all Non-Associated employees. 2. City and Employee Paid Health Insurance The City and the employee shall pay for health insurance premiums for employees and qualified dependent(s) effective the first of the month following the employee’s hire date. The employee payroll deduction for premium contributions shall be deducted on a pre- tax basis. Such deductions shall be aligned with the effective date of coverage and the ending date of coverage upon employment separation. The employee’s payroll deduction amount shall begin no later than the beginning of the first full pay period following the effective date of coverage and pro-rated for coverage through the end of the month in which employment was separated. i. Maximum Employer Contributions – The City’s maximum monthly employer contributions for each employee’s health and other insurance premiums are set forth as follows: a. The City’s maximum monthly contribution to medical premiums for elected non-represented positions will continue at the current City contribution rate. Actual contributions for plan year 2022 based on premium costs are shown in the rate sheet included herein. b. Effective the beginning of the month following Council approval, the City’s maximum monthly contribution to medical premiums for appointed non- represented positions will increase as summarized in the table below. c. Effective the pay period that includes January 1, 2023, the City’s maximum monthly contribution to medical premiums will increase by $23.33 per month, per medical plan and enrollment tier, up to, but not to exceed the monthly plan premium cost. d. The maximum City contribution shall be based on the employee’s enrollment in each plan. If the employee enrolls in a plan wherein the costs exceed the City contribution, the employee is responsible for all additional premiums through pre-tax payroll deductions. 810 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 4 Plan Tier Current City Contribution // Maximum for Elected Positions* Maximum City Contributions for Appointed Positions Effective the Month Following City Council Approval Effective the Pay Period Including January 1, 2023 Kaiser Single 551.00 587.92 611.25 Two-Party 1,174.36 1,233.08 1,256.41 Family 1,370.04 1,438.54 1,461.87 Blue Shield TRIO HMO Single 621.00 662.61 685.94 Two-Party 1,174.36 1,233.08 1,256.41 Family 1,370.04 1,438.54 1,461.87 Blue Shield HMO Single 677.00 722.36 745.69 Two-Party 1,174.36 1,233.08 1,256.41 Family 1,370.04 1,438.54 1,461.87 Blue Shield PPO Single 740.00 789.58 812.91 Two-Party 1,335.78 1,402.57 1,425.90 Family 1,514.31 1,590.03 1,613.36 Blue Shield HDHP Single 567.00 590.33 Two-Party 1,163.00 1,186.33 Family 1,432.00 1,455.33 *Applies to elected non-represented positions for an indefinite period. ii. “Safety Member” Health Premiums – Employer Contribution Employees who are classified as a “safety member” by the California Public Employees’ Retirement System (CalPERS) may have access to the medical plans offered by CalPERS as contracted by the City. In accordance with eligibility provisions, the Police Chief and the Fire Chief may elect to enroll in the CalPERS health insurance program offered by the City. The City’s maximum monthly employer contributions for the CalPERS health insurance program will match the PORAC Region 2 premiums, but not to exceed the maximum amounts indicated in the chart below. The amounts listed therein include the mandated Public Employees’ Medical and Hospital Care Act (PEMHCA) contribution. Non-Associated Safety Members Plan Tier Current City Contribution Effective the Month Following City Council Approval Effective the Pay Period Including January 1, 2023 Medical Single 774.00 825.86 849.19 Two-Party 1,623.00 1,704.15 1,727.48 Family 2,076.00 2,179.80 2,203.13 iii. Employees shall not be entitled to the difference between the employer contribution and the premiums for insurance plan(s) selected by the employee. 811 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 5 iv. Future Premiums The City caps its contributions toward monthly group medical, dental, and vision plan premiums by category (Single, Two-Party, and Family) as outlined in sections i and ii above. For the term of this agreement, and thereafter unless modified by negotiated agreement of the parties, the City’s monthly contributions to medical, dental, and vision insurance shall remain as specified for the 2022 and 2023 Health Premiums and Contribution amounts, unless otherwise specified herein. The City’s contribution caps will remain in place, even if premium increases result in these additional costs being borne by the employee. 3. Medical Cash Out If an employee is covered by a medical program outside of a City-provided program (evidence of which must be supplied to Human Resources), the employee may elect to discontinue City medical coverage and receive the monthly value of the City’s contribution to the Kaiser, Employee-only medical premium offered to this unit. Safety Members will receive the monthly value of the City’s contribution for the lowest-cost, employee only medical coverage as described in Article III.A.2.(ii). 4. Section 125 Plan Employees shall be eligible to participate in a City-approved Section 125 Flexible Spending Account Plan the same as all other eligible employees, as provided by IRS law. This plan allows employees to use pre-tax salary to pay for regular childcare, adult dependent care, and/or medical expenses. B. Life and Accidental Death and Dismemberment Insurance Each Non-Associated employee shall be provided with $50,000 life insurance and $50,000 accidental death and dismemberment insurance paid for by the City. Each employee shall have the option, at their own expense, to purchase additional amounts of life insurance and accidental death and dismemberment insurance to the extent provided by the City’s current providers. Evidence of insurability is contingent upon total participation in additional amounts. C. Long-Term Disability Insurance This program provides benefits for each incident of illness or injury after a waiting period of thirty (30) calendar days during which the Non-Associated employee may use accumulated sick leave, general leave, or executive leave pay. Subsequent to the thirty-(30) day waiting period, the employee will be covered by an insurance plan paid for by the City providing sixty-six and two-thirds percent (66 2/3%) of the first $12,500 of the employee’s basic monthly earnings up to a maximum monthly benefit of $8,332.50. The maximum benefit period for disability due to injury or illness shall be to age sixty-five (65). Days and months refer to calendar days and months. Benefits under the plan are integrated with sick leave, Worker’s Compensation, Social Security and other non-private program benefits to which the employee may be entitled. Disability is defined as: “The inability to perform all of the duties of regular occupation during two years and thereafter the inability to engage in any employment or occupation, for which they are fitted by reason of education, training or experience.” Rehabilitation benefits are provided in the event the individual, due to disability, 812 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 6 must engage in other occupation. Survivor’s benefits continue the plan payment for three (3) months beyond death. A copy of the plan is on file in the Human Resources Office. D. City-Paid Physical Examinations Non-Associated employees shall be provided, once every two years, with a City-paid physical examination comparable to the current pre-placement class physical examination or reimbursed the amount authorized for said physical examination. No more than one-half of the eligible employees shall receive examinations in any one fiscal year. Said exam shall be comprehensive in nature and shall include: 1. A complete medical history, physical exam and review of results by physician. 2. Health testing including vision, hearing, breathing, chest x-ray and stress EKG. 3. Laboratory test including standard chemical test, blood count, HDL, urinalysis and stool test for blood. E. Miscellaneous When a Non-Associated employee is on a leave of absence without pay for reason of medical disability, the City shall maintain the City-paid insurance premiums during the period the employee is in a non-pay status for the length of said leave, not to exceed twenty-four (24) months. F. Retiree Medical Coverage for Retirees Not Eligible for the City Medical Retiree Subsidy Plan Employees who retire from the City after January 1, 2004, and are granted a retirement allowance by the California Public Employees’ Retirement System and are not eligible for the City’s Retiree Subsidy Medical Plan may choose to participate in City-sponsored medical insurance plans until the first of the month in which they turn age sixty-five (65). The retiree shall pay the full premium for City-sponsored medical insurance for themselves and/or qualified dependents without any City subsidy. Employees who retire from the City and receive a retirement allowance from the California Public Employees’ Retirement System and are not eligible for the City’s Retiree Subsidy Medical Plan and choose not to participate in City-sponsored medical insurance upon retirement permanently lose eligibility for this insurance. However, if a retiree who is not eligible for the City’s Retiree Subsidy Medical Plan chooses not to participate in City-sponsored medical insurance plans because the retiree has access to other group medical insurance, and subsequently loses eligibility for that group medical insurance, the retiree and their qualified dependents will have access to City-sponsored medical insurance plans reinstated. Eligibility for Retiree Medical Coverage terminates the first of the month in which the retiree or qualified dependent turns age sixty-five (65). G. Post-65 Supplemental Medicare Coverage Retirees who are participating in the Retiree Subsidy Medical Plan as of January 1, 2004, and all future retirees who meet the criteria to participate in City-sponsored medical insurance, with or 813 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 7 without the Retiree Medical Subsidy Plan, may participate in City-sponsored medical insurance plans that are supplemental to Medicare, after a contract is in place between the City and a health insurance provider. A retiree or qualified dependent must choose to participate in City-sponsored medical insurance plans that are supplemental to Medicare beginning the first of the month in which the retiree or qualified dependent turns age sixty-five (65). The retiree shall pay the full premium to participate in City-sponsored medical insurance plans that are supplemental to Medicare for themselves or qualified dependents without any City subsidy. Retirees or qualified dependents, upon turning age 65, who choose not to participate in the City- sponsored medical insurance plans that are supplemental to Medicare permanently lose eligibility for this insurance. SECTION IV – RETIREMENT A. Benefits 1. Self-Funded Supplemental Retirement Benefit In the event a Non-Associated employee member elects Option #1, #2, #2W, #3, #3W or #4 of the Public Employees’ Retirement law, the City shall pay the difference between such elected option and the unmodified allowance which the member would have received for their life alone as provided in California Government Code sections 21455, 21456, 21457, and 21548 as said referenced Government Code sections exist as of the date of this agreement. This payment shall be made only to the member (Non-Associated employee), shall be payable by the City during the life of the member, and upon that member’s death, the City’s obligation shall cease. Unless previously excluded by employment or resolution, eligibility for this benefit is limited to employees hired before December 27, 1997. 2. Medical Insurance for Retirees a. Upon retirement, whether service or disability connected, each Non-Associated employee shall be entitled to cause self, spouse, and dependents to participate fully in the City’s group health insurance program at the equivalent of the City’s group premium rate in accordance with the provisions specified by Consolidated Omnibus Budget Reconciliation Act of 1985 (COBRA). Such participation shall be at employee’s expense and upon terms, conditions, and restrictions currently in effect. b. As an alternative to the benefit described in the preceding paragraph, the City will provide a financial contribution towards the cost of retiree medical premiums as described in Section VI. B. Public Employees’ Retirement System Contributions and Reporting 1. “Classic Member” Miscellaneous Members Retirement Benefits 814 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 8 a. Retirement Formula – The City shall provide all miscellaneous employees described as classic members by the Public Employees’ Pension Reform Act of 2013 with that certain retirement program commonly known and described as the “2.5% at age 55 plan,” which is based on the retirement formula as set forth in the California Public Employees’ Retirement System (CalPERS), Section 21354 of the California Government Code. b. Classic Member Miscellaneous CalPERS Member Contribution – All miscellaneous bargaining unit classic members shall pay to CalPERS as part of the required member retirement contribution eight percent (8%) of pensionable income. This provision shall not sunset. c. One-Year Final Compensation – The City shall contract with CalPERS to have retirement benefits calculated based upon the classic employee’s highest one year’s compensation, pursuant to the provisions of Section 20042 (highest single year). d. The obligations of the City and the retirement rights of employees as provided in this Article shall survive the term of this resolution. 2. “New Member” Miscellaneous Members Retirement Benefits – For New Members within the meaning of the California Public Employees’ Pension Reform Act of 2013 as defined in California Government Code Section 7522.04(f). a. Retirement Formula – New Members shall be governed by the two percent at age 62 (2% @ 62) retirement formula set forth in Government Code section 7522.20. b. Final Compensation – Final compensation will be based on the highest annual average compensation earnable during the 36 consecutive months immediately preceding the effective date of retirement, or some other 36 consecutive month period designated by the member. c. New Member Miscellaneous CalPERS Member Contribution – Effective January 1, 2013, all new members, as defined by PEPRA and determined by CalPERS, shall contribute one half (50%) of the normal cost as established by CalPERS each year in its annual valuation for the City, as required by California Government Code Section 7522.30(c). 3. “Classic Member” Safety Members Retirement Benefits a. Retirement Formula – The City shall provide all safety employees described as “classic” members by the Public Employees’ Pension Reform Act of 2013 – “PEPRA” with that certain retirement program commonly known and described as the “3% at age 50 plan” which is based on the retirement formula as set forth in the California Public Employees’ Retirement System (CalPERS), Section 21362.2 of the California Government Code. 815 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 9 b. Classic Member Safety CalPERS Member Contribution – All safety employees described as “classic” members shall pay to CalPERS as part of the required member retirement contribution nine percent (9%) of pensionable income. This provision shall not sunset. c. One-Year Final Compensation – The City shall contract with CalPERS to have retirement benefits calculated based upon the “classic” employee’s highest one year’s compensation, pursuant to the provisions of Section 20042 (highest single year). d. The obligations of the City and the retirement rights of employees as provided in this Article shall survive the term of this resolution. 4. “New Member” Safety Members Retirement Benefits – For New Members within the meaning of the California Public Employees’ Pension Reform Act of 2013. a. Retirement Formula – New Members shall be governed by the two and seven tenths percent at age 57 (2.7% @ 57) retirement formula set forth in Government Code section 7522.25(d) b. Final Compensation – Final compensation will be based on the highest annual average compensation earnable during the 36 consecutive months immediately preceding the effective date of retirement, or some other 36 consecutive month period designated by the member. c. New Member Miscellaneous CalPERS Member Contribution – All new members as defined by PEPRA and determined by CalPERS, shall contribute one half (50%) of the normal cost, as established by CalPERS. 5. IRS Code Section 414(h)(2) The City has adopted the CalPERS Resolution in accordance with IRS Code section 414(h)(2) to ensure that both the employee contribution and the City pickup of the required member contribution are made on a pre-tax basis. However, ultimately, the tax status of any benefit is determined by the law. 6. Pre-Retirement Optional Settlement 2 Death Benefit Non-Associated employees shall be covered by the Pre-Retirement Optional Settlement 2 Death Benefit as identified in Section 21548 of the California Government Code when approved by the City Council. 7. Fourth Level of 1959 Survivor Benefits Non-Associated employees shall be covered by the Fourth Level of the 1959 Survivor Benefit as identified in Section 21574 of the California Government Code. 8. VEBA Plan Requirements a. Eligibility Defined Effective December 23, 2009, all eligible non-associated employees with 25 years of continuous service to the City of Huntington Beach will participate in the Plan. An eligible employee is an employee who works twenty (20) or more hours per week and 816 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 10 receives benefits. Eligibility criteria may be amended upon a majority vote of non- associated employees, as no cost is borne by the City. b. Leave Payout Plan Contribution Each eligible unrepresented management employee shall designate all leave payouts to be rolled over to their VEBA Plan account based on the established range upon separation from City employment. c. Participant Account A separate account is maintained for each contributing eligible non-associated employee, which documents the employee’s contributions and disbursements. Contributions to a VEBA plan account as well as any disbursements to cover nonreimbursed, post-tax medical care expenses are both tax free. Eligible benefits subject to reimbursement by the Plan shall be limited to long-term care expenses and nonreimbursed medical premiums, co-pays, prescribed drug expenses and other medical care costs as that term is defined by the Internal Revenue Code Section 213. d. Administrative Fees Any Plan administrative fees will be deducted from interest on the total Plan investments. An eligible non-associated employee’s Plan account is subject to a monthly administrative fee for expenses related to recordkeeping, claims processing, and claims reimbursement. The fee will first be deducted from interest on total plan investments, and then deducted, if necessary, from the employee’s individual account. e. Dispute Resolution This Resolution and any disputes arising under or in connection with this Resolution shall not be subject to any dispute resolution procedures in the City’s Personnel Rules, nor shall this Resolution and any such dispute relating thereto be subject to the jurisdiction of the City’s Personnel Commission for any reason whatsoever. f. Indemnification All non-associated employees agree to indemnify and hold the City of Huntington Beach harmless against any claims made of any nature and against any suit instituted against the City arising from this Resolution, including, but not limited to, claims arising from an employee’s participation in VEBA or from any salary reduction initiated by the City for VEBA contributions. 817 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 11 SECTION V – LEAVE BENEFITS A. General Leave 1. Accrual General leave may be used for any purpose, including vacation, sick leave, and personal leave. General leave for non-associated employees shall be accrued as follows: 2. Eligibility and Approval General leave must be pre-approved except for illness, injury or family sickness, which may require a physician’s statement for approval. General leave accrued time is to be computed from hiring date anniversary. Employees shall not be permitted to take general leave in excess of actual time earned. Employees shall not accrue general leave in excess of six hundred forty (640) hours. Employees may not use their general leave to advance their separation date on retirement or other separation from employment. 3. Leave Benefit Entitlements The City shall comply with all State and Federal leave benefit entitlement laws. An eligible employee on an approved leave shall be allowed to use applicable earned Sick Leave, General Leave, or Executive Leave for family or personal health issues. For more information on employee leave options contact the Human Resources Office. 4. Conversion to Cash a. Pay Off at Termination An employee shall be paid for unused general leave upon termination of employment at which time such terminating employee shall receive compensation at their current salary rate for all unused, earned general leave to which they are entitled up to and including the effective date of their termination. b. Conversion to Cash Two times during each fiscal year, each permanent employee shall have the option to convert into a cash payment or deferred compensation up to a total of one hundred and sixty (160) general leave benefit hours per fiscal year. The employee shall give payroll two (2) weeks’ advance notice of their decision to exercise such option. Years of Service Annual General Leave Allowance Biweekly General Leave Allowance First through Fourth Year 176 hours 6.77 Fifth through Ninth Year 200 hours 7.69 Tenth through Fourteenth Year 224 hours 8.62 Fifteenth Year and Thereafter 256 hours 9.85 818 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 12 c. Deferred Compensation Contribution at Time of Separation The value of any unused earned leave benefits may be transferred to deferred compensation at separation (including retirement), but only during the time that the employee is actively employed with the City. The latest opportunity for such transfer must be the beginning of the pay period prior to the employee’s last day of employment. B. Holidays and Pay Provisions 1. Non-Associated employees shall receive the following legal holidays as of the first pay period following adoption of the Non-Associated Resolution paid in full per the employee’s regularly scheduled work shift: (1) New Year’s Day (January 1) (2) Martin Luther King Day (third Monday in January) (3) Presidents Day (third Monday in February) (4) Memorial Day (last Monday in May) (5) Independence Day (July 4) (6) Labor Day (first Monday in September) (7) Veteran’s Day (November 11) (8) Thanksgiving Day (fourth Thursday in November) (9) The Friday after Thanksgiving (10) Christmas Day (December 25) In addition, all appointed positions shall receive the following holidays: (11) Christmas Eve (December 24) (12) New Year’s Eve (December 31) 2. Any day declared by the President of the United States to be a national holiday or by the Governor of the State of California to be a state holiday and adopted as an employee holiday by the City Council of the City of Huntington Beach. 3. The parties agree that the City shall issue an official City holiday calendar in January of each year that will determine the dates that holidays are observed, following the guidelines below: a. City paid holidays which fall on Saturday shall be observed the preceding Friday, and those falling on Sunday shall be observed the following Monday. b. In the event that two consecutive City paid holidays fall on a Friday and Saturday, the two holidays shall be observed on the preceding Thursday and Friday. c. In the event that two consecutive City paid holidays fall on a Sunday and Monday, the two holidays shall be observed on Monday and the following Tuesday. C. Bereavement Leave Employees shall be entitled to bereavement leave not to exceed twenty-four (24) hours in each instance of death in their immediate family. Immediate family is defined as a parent, sibling, spouse, registered domestic partner, child, grandparent, grandchild, or wards of which 819 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 13 the employee is the legal guardian, recognizing all birth, marital, and other legal ties (i.e., step relatives, in-laws, etc.). D. Voluntary Catastrophic Leave Donation Program Under certain conditions, an employee may donate leave time to another employee in need. The program is outlined in Exhibit 4. SECTION VI – RETIREE SUBSIDY MEDICAL PLAN An employee who has retired from the City shall be entitled to participate in the City-sponsored medical insurance plans in accordance with the Retiree Subsidy Medical Plan as outlined in Exhibit 2. Employees hired on or after December 1, 2009, shall not be eligible for this benefit. SECTION VII – MISCELLANEOUS A. Collection of Payroll Overpayments In the event that a payroll overpayment is discovered and verified, and considering all reasonable factors including the length of time that the overpayment was made and if and when the employee could have reasonably known about such overpayment, the City shall take action to collect from the employee the amount of overpayment(s). Such collection shall be processed by payroll deduction over a reasonable period of time considering the total amount of overpayment. In the event the employee separates from employment during the collection period, the final amount shall be deducted from the last payroll check of the employee. If applicable, the balance due from the employee shall be communicated upon employment separation if the last payroll check does not sufficiently cover the amount due the City. It shall be the responsibility of the employee and the City to periodically monitor the accuracy of compensation payments or reimbursements due to the possibility of a clerical oversight or error. The City reserves the right to also collect compensation overpayments caused by or the result of misinterpretation of a pay provision by non-authorized personnel. The interpretation of all pay provisions shall be administered by the City Manager or designee and as adopted by the City Council. Unauthorized compensation payments shall not constitute a past practice (1/03/05). B. Uniforms and CalPERS Reporting The City provides uniforms to active duty employees in the classifications of Police Chief and Fire Chief. These employees are required to wear a standard uniform for appearance, uniformity, and public recognition purposes. The City will report to the California Public Employees’ Retirement System (CalPERS) the average annual cost of uniforms as special compensation for each eligible employee in accordance with Title 2, California Code of Regulations, Section 571(a)(5). 820 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 14 EXHIBIT 1A NON-ASSOCIATED APPOINTED EXECUTIVE MANAGEMENT SALARY SCHEDULE Effective March 19, 2022* Starting Point Control Point High Point Job No Description Pay Range A B C D E F G EXECUTIVE MANAGEMENT 0591 City Manager 294 103.38 108.55 113.98 119.68 125.66 131.94 138.54 0029 Interim City Manager 289 98.36 103.28 108.44 113.87 119.56 125.54 131.82 DEPARTMENT HEADS 0592 Assistant City Manager 275 85.57 89.85 94.34 99.06 104.01 109.21 114.67 0015 Fire Chief 275 85.57 89.85 94.34 99.06 104.01 109.21 114.67 0011 Police Chief 275 85.57 89.85 94.34 99.06 104.01 109.21 114.67 0518 Chief Financial Officer 269 80.61 84.64 88.88 93.32 97.99 102.88 108.03 0589 Community Development Director 269 80.61 84.64 88.88 93.32 97.99 102.88 108.03 0800 Director of Administrative Services 269 80.61 84.64 88.88 93.32 97.99 102.88 108.03 0801 Director of Community & Library Services 269 80.61 84.64 88.88 93.32 97.99 102.88 108.03 0010 Director of Public Works 269 80.61 84.64 88.88 93.32 97.99 102.88 108.03 CONTRACT NON-DEPARTMENT HEADS 0593 Chief Assistant City Attorney 261 74.44 78.17 82.08 86.18 90.49 95.01 99.76 0860 Deputy Dir. of Homelessness & Behavioral Health Services 258 72.26 75.87 79.66 83.64 87.83 92.22 96.83 0845 Deputy Director of Public Works 258 72.26 75.87 79.66 83.64 87.83 92.22 96.83 0900 Assistant Chief Financial Officer 249 66.07 69.37 72.84 76.48 80.30 84.32 88.53 0850 Deputy Director of Administrative Services 249 66.07 69.37 72.84 76.48 80.30 84.32 88.53 0855 Deputy Director of Community & Library Services 249 66.07 69.37 72.84 76.48 80.30 84.32 88.53 0840 Deputy Director of Community Development 249 66.07 69.37 72.84 76.48 80.30 84.32 88.53 0699 Deputy Community Prosecutor 206 43.07 45.22 47.48 49.86 52.35 54.97 57.72 *Per Resolution No. 2022-09 821 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 15 EXHIBIT 1B NON-ASSOCIATED ELECTED EXECUTIVE MANAGEMENT SALARY SCHEDULE Effective November 2, 2020* Job No Description Pay Grade Starting Point Control Point High Point ELECTED OFFICIALS 0016 City Attorney NA0016 100.18 111.51 124.10 0017 City Clerk NA0017 69.94 77.85 86.66 0018 City Treasurer (Part-Time) NA0018 69.94 77.85 86.66 *Per Resolution No. 2020-80 822 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 16 EXHIBIT 2 RETIREE MEDICAL PLAN An employee who has retired from the City shall be entitled to participate in the City sponsored medical insurance plans and the City shall contribute toward monthly premiums for coverage in an amount as specified in accordance with this Plan, provided: A. At the time of retirement the employee has a minimum of ten (10) years of continuous full time City service or is granted an industrial disability retirement; and B. At the time of retirement, the employee is employed by the City; and C. Following official separation from the City, the employee is granted a retirement allowance by the California Public Employees’ Retirement System. The City’s obligation to pay the monthly premium as indicated shall be modified downward or cease during the lifetime of the retiree upon the occurrence of any one of the following: 1. On the first of the month in which a retiree or dependent reaches age 65 or on the date the retiree or dependent can first apply and become eligible, automatically or voluntarily, for medical coverage under Medicare (whether or not such application is made) the City’s obligation to pay monthly premiums may be adjusted downward or eliminated. Benefit coverage at age 65 under the City’s medical plans shall be governed by applicable plan document. 2. In the event of the death of any employee, whether retired or not, the amount of the retiree medical insurance subsidy benefit which the deceased employee was receiving at the time of their death would be eligible to receive if they were retired at the time of death, shall be paid on behalf of the spouse or family for a period not to exceed twelve (12) months. D. Schedule of Benefits 1. Minimum Eligibility for Benefits With the exception of an industrial disability retirement, eligibility for benefits begins after an employee has completed ten (10) years of continuous full time service with the City of Huntington Beach. Said service must be continuous unless prior service is reinstated at the time of their rehire in accordance with the City’s Personnel Rules. Employees hired on or after December 1, 2009 shall not be eligible for this benefit. 2. Disability Retirees Industrial disability retirees with less than ten (10) years of service shall receive a maximum monthly payment toward the premium for health insurance of $121. Payments shall be in accordance with the stipulations and conditions, which exist for all retirees. Payment shall not exceed dollar amount, which is equal to the full cost of premium for employee only. 3. Marital Status – Married retirees eligible for benefits under the Retiree Medical Subsidy Plan may each receive the benefit earned pursuant to Section 4 – Maximum Monthly Subsidy Payments, whether enrolled individually as the plan enrollee or whether enrolled as a dependent on any City-sponsored medical plan. 823 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 17 a. In the case where a retiree is married to a City employee (active or retired) who is not an unrepresented/non-associated employee or retiree, this provision shall remain applicable. b. This provision shall apply to State of California registered domestic partners the same as married spouses. 4. Maximum Monthly Subsidy Payments Payment amounts may be reduced each month as dependent eligibility ceases due to death, divorce or loss of dependent child status. However, the amount shall not be reduced if such reduction would cause insufficient funds needed to pay the full premium for the employee and the remaining dependents. In the event no reduction occurs and the remaining benefit premium is not sufficient to pay the premium amount for the employee and the eligible dependents, said needed excess premium amount shall be paid by the employee. All retirees, including those retired as a result of disability whose number of years of service prior to retirement, exceeds ten (10) years of continuous full time service, shall be entitled to maximum monthly payment of premiums by the City for each year of completed City service as follows: Maximum Monthly Payment for Retirements After: Years of Service Subsidy 10 $121 11 136 12 151 13 166 14 181 15 196 16 211 17 226 18 241 19 256 20 271 21 286 22 300 23 315 24 330 25 344 824 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 18 MISCELLANEOUS PROVISIONS A. Eligibility: 1. The effective start-up date of the Retiree Subsidy Medical Plan for the various employee groups shall be the first of the month following retirement date. 2. A retiree may change plans, add dependents, etc., during annual open enrollment. The Human Resources Office shall notify covered retirees of this opportunity each year. 3. Years of service computed for the Retiree Subsidy Medical Plan are actual years of completed service with the City of Huntington Beach. B. Benefits: 1. The Retiree Subsidy Medical Plan includes any medical plan offered by the City to active and/or retired unrepresented/non-associated employees and retirees. 2. City Plans are the primary payer for active employees age 65 and over, with Medicare the secondary payer. Retirees age 65 and over have no City Plan options and are eligible only for Medicare. 3. Premium payments are to be received at least one month in advance of the coverage period. C. Subsidies: 1. The subsidy payments will pay for: a. The Retiree Subsidy Medical Plan. b. HMO. c. Part A of Medicare for those retirees not eligible for paid Part A. 2. Subsidy payments will not pay for: a. Part B Medicare. b. Any other employee benefit plan. c. Any other commercially available benefit plan. d. Medicare supplements D. Medicare: 1. All persons are eligible for Medicare coverage at age 65. Those with sufficient credit quarters of Social Security will receive Part A of Medicare at no cost. Those without sufficient credited quarters are still eligible for Medicare at age 65, but will have to pay for Part A of Medicare if the individual elects to take Medicare. In all cases, Part B of Medicare is paid for by the participant. 825 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 19 2. When a retiree and their spouse are both 65 or over, and neither is eligible for paid Part A of Medicare, the subsidy shall pay for Part A for each of them or the maximum subsidy, whichever is less. 3. When a retiree at age 65 is eligible for paid Part A of Medicare and their spouse is not eligible for paid Part A, the spouse shall not receive subsidy. When a retiree at age 65 is not eligible for paid Part A of Medicare and their spouse who is also age 65 is eligible for paid Part A of Medicare, the subsidy shall be for the retiree’s Part A only. E. Cancellation: 1. For retirees/dependents eligible for paid Part A of Medicare, the following cancellation provisions apply: a. Coverage for a retiree under the Retiree Subsidy Medical Plan will be eliminated on the first day of the month in which the retiree reaches age 65. If such retiree was covering dependents under the Plan, dependents will be eligible for COBRA continuation benefits effective as of the retiree’s 65th birthday. b. Dependent coverage will be eliminated upon whichever of the following occasions comes first: 1) After 36 months of COBRA continuation coverage, or 2) When the covered dependent reaches age 65 in the event such dependent reaches age 65 prior to the retiree reaching age 65. c. At age 65 retirees are eligible to make application for Medicare. Upon being considered “eligible to make application,” whether or not application has been made for Medicare, the Retiree Subsidy Medical Plan will be eliminated. 2. See provisions under “Benefits,” ”Subsidies,” and “Medicare” for those retirees/dependents not eligible for paid Part A of Medicare. 3. Retiree Subsidy Medical Plan and COBRA participants shall be notified of non- payment of premium by means of a certified letter from Employee Benefits in accordance with provisions of the Non-Associated Resolution. 4. A retiree who fails to pay premiums due for coverage and is in arrears for sixty (60) days shall be terminated from the Plan and shall not have reinstatement rights. 826 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 20 EXHIBIT 3 9/80 WORK SCHEDULE This work schedule is known as “9/80”. The 9/80 work schedule is designed to be in compliance with the requirements of the Fair Labor Standards Act (FLSA). In the event that there is a conflict with the current rules, practices and/or procedures regarding work schedules and leave plans, then the rules listed below shall govern. 9/80 WORK SCHEDULE DEFINED The 9/80 work schedule shall be defined as working nine (9) days for eighty (80) hours in a two week pay period by working eight (8) days at nine (9) hours per day and working one (1) day for eight (8) hours (Friday), with a one-hour lunch during each work shift, totaling forty (40) hours in each FLSA work week. The 9/80 work schedule shall not reduce service to the public, departmental effectiveness, productivity and/or efficiency as determined by the City Manager or designee. A. Forty (40) Hour FLSA Work Week The actual FLSA workweek is from Friday at mid-shift (p.m.) to Friday at mid-shift (a.m.). No employee working the 9/80 work schedule will be able to flex their Friday start time nor the time they take their lunch break, which will be from 12:00 p.m. to 1:00 p.m. on Fridays. All employee work shifts will start at 8:00 a.m. on their Friday worked. The start of the FLSA workweek is 12:00 noon Friday. B. Two Week Pay Period The pay period for employees starts Friday mid-shift (p.m.) and continues for fourteen (14) days until Friday mid-shift (a.m.). During this period, each week is made up of four (4) nine (9) hour work days (thirty-six (36) hours) and one (1) four (4) hour Friday and those hours equal forty (40) work hours in each work week (e.g. the Friday is split into four (4) hours for the a.m. shift, which is charged to work week one and four (4) hours for the p.m. shift, which is charged to work week two). C. A/B Schedules To continue to provide service to the public every Friday, employees are to be divided between two schedules, known as the “A” schedule and the “B” schedule, based upon the departmental needs. For identification purposes, the “A” schedule shall be known as the schedule with a day off on the Friday in the middle of the pay period, or, “off on payday”, the “B” schedule shall have the first Friday (p.m.) and the last Friday (a.m.) off, or “working on payday”. An example is listed below: AM PM AM PM AM PM F F S S M T W Th F F S S M T W Th F F A Schedule 4 4 - - 9 9 9 9 - - - - 9 9 9 9 4 4 B Schedule - - - - 9 9 9 9 4 4 - - 9 9 9 9 - - 827 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 21 D. A/B Schedule Changes FLSA exempt employees may change A/B schedules at the beginning of any pay period with supervisor or City Manager approval. E. Emergencies All employees on the 9/80 work schedule are subject to be called to work any time to meet any and all emergencies or unusual conditions which, in the opinion of the City Manager, or designee may require such service from any of said employees. LEAVE BENEFITS When an employee is off on a scheduled workday under the 9/80 work schedule, then nine (9) hours of eligible leave per workday shall be charged against the employee’s leave balance or eight (8) hours shall be charged if the day off is a Friday. All leaves shall continue under the current accrual, eligibility, request and approval requirements. 1. General Leave – As stated in the Non-Associated Resolution. 2. Sick Leave – As stated in the Non-Associated Resolution. 3. Executive Leave – As stated in the Non-Associated Resolution. 4. Bereavement Leave – As stated in the Non-Associated Resolution. 5. Holidays – As stated in the Non-Associated Resolution. 6. Jury Duty – The provisions of the Personnel Rules shall continue to apply, however, if an FLSA exempt employee is called to serve on jury duty during a normal Friday off, Saturday, or Sunday, or on a City holiday, then the jury duty shall be considered the same as having occurred during the employees day off work, therefore, the employee will receive no added compensation. 828 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 22 EXHIBIT 4 VOLUNTARY CATASTROPHIC LEAVE DONATION Guidelines 1. Purpose The purpose of the voluntary catastrophic leave donation program is to bridge employees who have been approved leave time to either return to work, long-term disability, or medical retirement. Permanent employees who accrue vacation, general leave or compensatory time may donate such leave to another permanent employee when a catastrophic illness or injury befalls that employee or because the employee is needed to care for a seriously ill family member. The leave-sharing Leave Donation Program is Citywide across all departments and is intended to provide an additional benefit. Nothing in this program is intended to change current policy and practice for use and/or accrual of vacation, general, or sick leave. 2. Definitions Catastrophic Illness or Injury - A serious debilitating illness or injury, which incapacitates the employee or an employee's family member. Family Member - For the purposes of this policy, the definition of family member is that defined in the Family Medical Leave Act (child, parent, spouse or domestic partner). 3. Eligible Leave Accrued compensatory, vacation or general leave hours may be donated. The minimum donation an employee may make is two (2) hours and the maximum is forty (40) hours. 4. Eligibility Permanent employees who accrue vacation or general leave may donate such hours to eligible recipients. Compensatory time accrued may also be donated. An eligible recipient is an employee who: • Accrues vacation or general leave; • Is not receiving disability benefits or Workers' Compensation payments; and • Requests donated leave. 5. Transfer of Leave The maximum donation credited to a recipient's leave account shall be the amount necessary to ensure continuation of the employee's regular salary during the employee's period of approved catastrophic leave. Donations will be voluntary, confidential and irrevocable. Hours donated will be converted into a dollar amount based on the hourly wage of the donor. The dollar amount will then be converted into accrued hours based on the recipient’s hourly wage. An employee needing leave will complete a Leave Donation Request Form and submit it to the Department Director for approval. The Department Director will forward the form to Human Resources for processing. Human Resources, working with the department, will send out the request for leave donations. 829 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 23 Employees wanting to make donations will submit a Leave Donation Form to the Finance Department (payroll). All donation forms submitted to payroll will be date stamped and used in order received for each bi-weekly pay period. Multiple donations will be rotated in order to insure even use of time from donors. Any donation form submitted that is not needed will be returned to the donor. 6. Other Please contact the Human Resources Office with questions regarding employee participation in this program. 830 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 24 Please submit this form to the Human Resources Office for processing. Voluntary Catastrophic Leave Donation Program Leave Request Form Requestor, Please Complete According to the provisions of the Voluntary Catastrophic Leave Donation Program, I hereby request donated vacation, general leave or compensatory time. MY SIGNATURE CERTIFIES THAT: • A Leave of absence in relation to a catastrophic illness or injury has been approved by my Department; and • I am not receiving disability benefits or Workers' Compensation payments. Name: (Please Print or Type: Last, First, MI) Work Phone: Department: Job Title: Employee ID#: Requester Signature: Date: Department Director Signature of Support: Date: Human Resources Office Use Only End donation date will bridge to: Long Term Disability Medical Retirement beginning Length of FMLA leave ending Return to work End donation date: Administrative Services Director Signature: Date signed: 831 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit A to Non-Associated Resolution No. 2022-09 25 Voluntary Catastrophic Leave Donation Program Leave Donation Form Donor, please complete Donor Name: (Please Print or Type: Last, First, MI) Work Phone: Donor Job Title: Type of Accrued Leave: Vacation Compensatory Time General Leave Number of Hours I wish to Donate: Hours of Vacation Hours of Compensatory Time Hours of General Leave I understand that this voluntary donation of leave credits, once processed, is irrevocable; but if not needed, the donation will be returned to me. I also understand that this donation will remain confidential. I wish to donate my accrued vacation, comp or general leave hours to the Leave Donation Program for: Eligible recipient employee's name (Last, First, MI): Donor Signature: Date: Please submit to the Payroll/Finance Department. 832 833 834 835 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-50 i EXHIBIT A - NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION - EXHIBIT A ……………………………………………………………………………... ........... 1 SECTION I – PAY ........................................................................................................... 1 A. APPOINTED SALARY SCHEDULE ............................................................................... 1 B. ELECTED SALARY SCHEDULE ................................................................................... 1 C. PERFORMANCE BONUS ............................................................................................ 1 D. DIRECT DEPOSIT ................................................................................................... 21 EC. ASSIGNED VEHICLE/AUTO ALLOWANCE .................................................................... 2 1. Department Heads ...................................................................................................................... 2 D. Deferred Compensation ...................................................................................... 1 SECTION II – HOURS OF WORK/OVERTIME/TIME OFF ............................................. 2 A. EXECUTIVE LEAVE ................................................................................................. 21 B. FLEXIBLE AND ALTERNATIVE W ORK SCHEDULES........................................................ 2 1. 5/40 Work Schedule .................................................................................................................... 2 2. 9/80 Work Schedule .................................................................................................................... 2 3. Alternative Work Schedule .......................................................................................................... 2 SECTION III – HEALTH AND OTHER INSURANCE BENEFITS ................................... 3 A. HEALTH INSURANCE .............................................................................................. 32 1. Medical, Dental and Vision Insurance....................................................................................... 32 2. City and Employee Paid Health Insurance ............................................................................... 32 3. Medical Cash Out ...................................................................................................................... 54 4. Section 125 Plan ....................................................................................................................... 54 B. LIFE AND ACCIDENTAL DEATH AND DISMEMBERMENT INSURANCE ............................... 6 C. LONG-TERM DISABILITY INSURANCE ......................................................................... 7 D. CITY-PAID PHYSICAL EXAMINATIONS ...................................................................... 65 E. MISCELLANEOUS ..................................................................................................... 7 F. RETIREE MEDICAL COVERAGE FOR RETIREES NOT ELIGIBLE FOR THE CITY MEDICAL RETIREE SUBSIDY PLAN ................................................................................................. 7 G. POST-65 SUPPLEMENTAL MEDICARE COVERAGE ...................................................... 8 SECTION IV – RETIREMENT ....................................................................................... 76 A. BENEFITS ............................................................................................................. 76 1. Self-Funded Supplemental Retirement Benefit ........................................................................ 76 2. Medical Insurance for Retirees ................................................................................................. 76 B. PUBLIC EMPLOYEES' RETIREMENT SYSTEM CONTRIBUTIONS AND REPORTING………...7 1. "Classic Member" Miscellaneous Unit Members Retirement Benefits ....................................... 7 2. "New Member" Miscellaneous Members Retirement Benefits……………………………..8 3.2. "Classic Member" Safety Unit Members Retirement Benefits ............................................... 87 4. "New Member" Safety Member Retirement Benefits………………………………………………..9 5.3. IRS Code 414(h)(2)………………………………………………………………………………. .. 98 836 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-50 ii 64. Pre-Retirement Optional Settlement 2 Death Benefit ............................................................. 98 75. Fourth Level of 1959 Survivor Benefits ................................................................................... 11 86. VEBA Plan Requirements ....................................................................................................... 98 SECTION V – LEAVE BENEFITS .............................................................................. 110 A. GENERAL LEAVE ................................................................................................. 110 1. Accrual .................................................................................................................................... 110 2. Eligibility and Approval ........................................................................................................... 110 3. Leave Benefit Entitlements ..................................................................................................... 110 4. Conversion to Cash .............................................................................................................. 1112 B. HOLIDAYS AND PAY PROVISIONS .......................................................................... 121 C. SICK LEAVE .......................................................................................................... 15 1. Accrual ...................................................................................................................................... 11 2. Credit ......................................................................................................................................... 12 3. Usage ........................................................................................................................................ 12 4. Payoff at Termination ................................................................................................................ 12 CD. BEREAVEMENT LEAVE ......................................................................................... 123 DE. VOLUNTARY CATASTROPHIC LEAVE DONATION PROGRAM ........................................ 13 SECTION VI – RETIREE SUBSIDY MEDICAL PLAN .................................................. 13 SECTION VII –- MISCELLANEOUS ............................................................................. 13 A. COLLECTION OF PAYROLL OVERPAYMENTS ............................................................. 13 B. UNIFORMS AND CALPERS REPORTING ................................................................ 134 EXHIBIT 1A –- NON-ASSOCIATED APPOINTED SALARY SCHEDULE ................. 145 EXHIBIT 1B – NON-ASSOCIATED ELECTED SALARY SCHEDULE…………………15 EXHIBIT 2 –- RETIREE MEDICAL PLAN .................................................................... 16 EXHIBIT 3 –- 9/80 WORK SCHEDULE ........................................................................ 20 EXHIBIT 4 –- VOLUNTARY CATASTROPHIC LEAVE DONATION ........................... 22 837 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS PROVISIONSRESOLUTION EXHIBIT A Exhibit “A” to Non-Associated Resolution No. 2022-0916-50 1 EXHIBIT A SECTION I – PAY A. Appointed Salary Schedule Effective March 19, 2022, the parties agree that the salary schedule in Exhibit 1A reflects the following modifications from the salary schedule in Resolution No. 2016-50: 1. The salary schedule will include seven (7) steps from A-G; 2. The steps will be five percent (5%) steps; 3. The salary ranges will be one percent (1%) apart; 4. Each job classification will be assigned a salary range by: a. Locating the range on the new salary schedule with a Step F that is nearest to the position’s current top step (Step E) without being less; and then, b. Moving two ranges higher, thereby providing a wage increase of not less than two percent (2%) for all appointed non-represented employees. 5. Each employee will be placed on the step (A-F) of their classification’s assigned salary range that is nearest to their base salary step (A-E of the November 2, 2020, salary schedule) without being less. 6. Once placed on the new, seven-step salary schedule, employees will be eligible to move to the next step on their anniversary date (i.e., the date they are due for their next evaluation) upon receipt of a satisfactory evaluation. 7. The City Manager is authorized to set the salaries of the appointed executive management positions identified in Exhibit 1A at any rate at or below Step E of the designated salary range. The City Manager is authorized to increase the salary by 5% based upon performance at annual review and market data. However, no salary for a new employee may be set above Step E at any time without City Council approval. B. Elected Salary Schedule 1. All elected executive management positions shall receive the salaries as identified in Exhibit 1B. 2. The City Council shall set the salaries of the elected executive management positions identified in Exhibit 1B, at any rate within the designated salary range. C. Performance Bonus 1. Appointed employees who are at Step G on the salary schedule are eligible for an annual performance bonus of up to three percent (3%) of their base pay at the time of their evaluation. 838 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-502 2. The annual performance bonus amount will be determined based upon the evaluation of the employee’s performance. A completed performance evaluation with specific recognition of outstanding performance must be attached to the Personnel Action Form and sent to the Human Resources Division. The evaluation will also identify performance goals and objectives. The parties agree that to the extent permitted by CalPERS or law, the City will report the compensation in this section as special compensation pursuant to Title 2 CCR, Section 571(a)(1) Bonus. 1. All current Non-Associated employees shall receive the salaries as identified in Exhibit 1. 2. The City Council shall set the salaries of the elected executive management positions identified in Exhibit 1, at any rate within the designated salary range. 3. The City Manager is authorized to set the salaries of the non-elected executive management positions identified in Exhibit 1 at any rate at or below the control point of the designated salary range. The City Manager is authorized to increase the salary by any percentage not greater than 5% based upon performance at annual review and market data. However, no salary for a new employee may be set above the control point at any time without City Council approval. B.D. Direct Deposit All Non-Associated employees are required to utilize direct deposit of payroll checks. C.E. Assigned Vehicle/Auto Allowance 1. Department Heads Appointed Department Heads, Contract Non-Department Heads, as well asnd the City Clerk, City Treasurer, and City Attorney shall have the option of an assigned City vehicle or receive an auto allowance in the amount of two hundred thirty dollars and seventy-seven cents ($230.77) per bi-weekly pay period plus reimbursement of out-of-town travel at the approved mileage rate. Appointed Department Heads and the City Clerk, City Treasurer, and City Attorney shall have the option of an assigned City vehicle in lieu of an auto allowance. D. Deferred Compensation Effective the beginning of the pay period following City Council approval of this resolution, each employee covered by this resolution, including the City Attorney, City Clerk and City Treasurer, shall receive a one-time deposit to the employee’s 457 Deferred Compensation account in the amount of $3,800.00. 1. This shall be a single, one-time only deposit. All appropriate Federal and State legal mandates regarding the tax-treatment of this one-time deposit shall apply. SECTION II – HOURS OF WORK/TIME OFF A. Executive Leave 839 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-503 Non-Associated exempt employees shall not be eligible for overtime compensation. Exempt department heads and contract non-department heads shall be credited with eighty (80) hours of executive leave per calendar year. B. Flexible and Alternative Work Schedules 1. 5/40 Work Schedule The 5/40 work schedule shall be defined as working five (5), eight (8) hour days, Monday through Friday each week, with a one-hour lunch during each work shift, totaling a forty (40) hours work week. 2. 9/80 Work Schedule The 9/80 work schedule, as outlined in Exhibit 3, shall be defined as working nine (9) days for eighty (80) hours in a two- week pay period by working eight (8) days at nine (9) hours per day and working one (1) day for eight (8) hours (Friday), with a one-hour lunch during each work shift, totaling forty (40) hours in each FLSA designated work week. The 9/80 work schedule shall not reduce service to the public, departmental effectiveness, productivity and/or efficiency as determined by the City Manager or designee. 3. Alternative Work Schedule Non-associated employees may elect any alternative work schedule approved by the City Manager or designee. SECTION III – HEALTH AND OTHER INSURANCE BENEFITS A. Health Insurance 1. Medical, Dental, and Vision Insurance The City shall continue to make group medical, dental, and vision benefits available to all Non-Associated employees. 2. City and Employee Paid Health Insurance The City and the employee shall pay for health insurance premiums for employees and qualified dependent(s) effective the first of the month following the employee’s hire date. The employee payroll deduction for premium contributions shall be deducted on a pre- tax basis. Such deductions shall be aligned with the effective date of coverage and the ending date of coverage upon employment separation. The employee’s payroll deduction amount shall begin no later than the beginning of the first full pay period following the effective date of coverage and pro-rated for coverage through the end of the month in which employment was separated. 840 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-504 i. Maximum Employer Contributions – Health Plan Employee and Employer Contributions Chart for Non-Safety Classifications in EXHIBIT 1 The City’s maximum monthly employer contributions for each employee’s health and other insurance premiums are set forth as follows: a. The City’s maximum monthly contribution to medical premiums for elected non-represented positions will continue at the current City contribution rate. Actual contributions for plan year 2022 based on premium costs are shown in the rate sheet included herein. b. Effective the beginning of the month following Council approval, the City’s maximum monthly contribution to medical premiums for appointed non- represented positions will increase as summarized in the table below. c. Effective the pay period that includes January 1, 2023, the City’s maximum monthly contribution to medical premiums will increase by $23.33 per month, per medical plan and enrollment tier, up to, but not to exceed the monthly plan premium cost. i.d. The maximum City contribution shall be based on the employee’s enrollment in each plan. If the employee enrolls in a plan wherein the costs exceed the City contribution, the employee is responsible for all additional premiums through pre-tax payroll deductions. Plan Tier Current City Contribution // Maximum for Elected Positions* Maximum City Contribution for Appointed Positions Effective the Month Following City Council Approval Effective the Pay Period Including January 1, 2023 Kaiser Single 551.00 587.92 611.25 Two-Party 1,174.36 1,233.08 1,256.41 Family 1,370.04 1,438.54 1,461.87 Blue Shield TRIO HMO Single 621.00 662.61 685.94 Two-Party 1,174.36 1,233.08 1,256.41 Family 1,370.04 1,438.54 1,461.87 Blue Shield HMO Single 677.00 722.36 745.69 Two-Party 1,174.36 1,233.08 1,256.41 Family 1,370.04 1,438.54 1,461.87 Blue Shield PPO Single 740.00 789.58 812.91 Two-Party 1,335.78 1,402.57 1,425.90 Family 1,514.31 1,590.03 1,613.36 Blue Shield HDHP Single 567.00 590.33 Two-Party 1,163.00 1,186.33 Family 1,432.00 1,455.33 *Applies to elected non-represented positions for an indefinite period. City of Huntington Beach 2016 Health Premiums and Contributions 841 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-505 Effective pay period following final City Council approval Non-Associated/Non-Safety Plan Tier Monthly Premium Employer Monthly Contribution Employee Monthly Contribution Employee Bi-Weekly Contribution Kaiser Single 466.65 466.65 0.00 0.00 Two-Party 1,022.11 974.36 47.75 22.04 Family 1,343.90 1,170.04 173.86 80.24 Blue Shield HMO Single 671.00 640.76 30.24 13.96 Two-Party 1,466.00 974.36 491.64 226.91 Family 1,896.00 1,170.04 725.96 335.06 Blue Shield PPO Single 736.00 736.00 0.00 0.00 Two-Party 1,555.00 1,135.78 419.22 193.49 Family 1,927.00 1,314.31 612.69 282.78 Delta Dental PPO Single 58.10 45.02 13.08 6.04 Two-Party 108.60 85.91 22.69 10.47 Family 143.20 122.18 21.02 9.70 Delta Care HMO Single 30.11 30.11 0.00 0.00 Two-Party 51.19 51.19 0.00 0.00 Family 78.29 78.29 0.00 0.00 VSP Vision Single 25.12 0.00 25.12 11.59 Two-Party 25.12 0.00 25.12 11.59 Family 25.12 0.00 25.12 11.59 Medical Opt-Out: $466.65 per month ($215.38 bi-weekly) ii. “Safety Member” Health Premiums – Employer Contribution Employees whothat are classified as a “safety member” by the California Public Employees’ Retirement System (CalPERS) may have access to the medical plans offered by CalPERS as contracted by the City. In accordance with eligibility provisions, the Police Chief and the Fire Chief may elect to enroll in the CalPERS health insurance program offered by the City. The City’s maximum monthly employer contributions for the CalPERS health insurance program will match the PORAC Region 2 premiums, but not to exceed the maximum amounts indicated in the chart below. is set forth in the current City of Huntington Beach Non-Associated Safety Health Premiums and Contributions Chart. The amounts listed therein include the mandated Public Employees’ Medical and Hospital Care Act (PEMHCA) contribution. Non-Associated Safety Members Plan Tier Current City Contribution Effective the Month Following City Council Approval Effective the Pay Period Including January 1, 2023 842 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-506 Medical Single 774.00 825.86 849.19 Two-Party 1,623.00 1,704.15 1,727.48 Family 2,076.00 2,179.80 2,203.13 iii. Employees shall not be entitled to the difference between the employer contribution and the premiums for insurance plan(s) selected by the employee. iv. Future Premiums The City “caps” its contributions toward monthly group medical, dental, and vision plan premiums by category (Single, Two-Party, and FamilyEE, EE + 1, and EE + 2 or more) as outlined in sections i and ii above. For the term of this agreement, and thereafter unless modified by negotiated agreement of the parties, the City’s monthly contributions to medical, dental, and vision insurance shall remain as specified for the 2022 and 2023 Health Premiums and Contribution amounts, unless otherwise specified herein. The City agrees to increase the contribution toward monthly group medical by $200 per plan, per tier, effective following City Council approval of this resolution. The employee and employer contributions rates set forth in sections i and ii above shall remain in effect in 2017 and beyond unless otherwise modified by a successor Non-Associated Resolution. Employee and City Contributions subject to change as a result of City Council approval. The City’s contribution caps for dental and vision in effect as of August 1, 2014 shall not be increased. The City’s contribution caps will remain in place, even if premium increases result in these additional costs being borne by the employee. 3. Medical Cash Out If an employee is covered by a medical program outside of a City-provided program (evidence of which must be supplied to Human Resources), the employee may elect to discontinue City medical coverage and receive the monthly value of the City’s contribution to the lowest costKaiser, Eemployee-only medical plan paid bi- weeklypremium offered to this unit. Safety Members will receive the monthly value of the City’s contribution for the lowest-cost, employee only medical coverage as described in Article III.A.2.(ii). 4. Section 125 Plan Employees shall be eligible to participate in a City-approved Section 125 Flexible Spending Account Plan the same as all other eligible employees, as provided by IRS law. This plan allows employees to use pre-tax salary to pay for regular childcare, adult dependent care, and/or medical expenses. B. Life and Accidental Death and Dismemberment Insurance Each Non-Associated employee shall be provided with $50,000 life insurance and $50,000 accidental death and dismemberment insurance paid for by the City. Each employee shall have the option, at their own expense, to purchase additional amounts of life insurance and accidental 843 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-507 death and dismemberment insurance to the extent provided by the City’s current providers. Evidence of insurability is contingent upon total participation in additional amounts. C. Long-Term Disability Insurance This program provides benefits for each incident of illness or injury after a waiting period of thirty (30) calendar days during which the Non-Associated employee may use accumulated sick leave, general leave, or executive leave pay. Subsequent to the thirty-(30) day waiting period, the employee will be covered by an insurance plan paid for by the City providing sixty-six and two-thirds percent (66 2/3%) of the first $12,500 of the employee’s basic monthly earnings up to a maximum monthly benefit of $8,332.50. The maximum benefit period for disability due to injury or illness shall be to age sixty-five (65). Days and months refer to calendar days and months. Benefits under the plan are integrated with sick leave, Worker’s Compensation, Social Security and other non-private program benefits to which the employee may be entitled. Disability is defined as: “The inability to perform all of the duties of regular occupation during two years and thereafter the inability to engage in any employment or occupation, for which they are fitted by reason of education, training or experience.” Rehabilitation benefits are provided in the event the individual, due to disability, must engage in other occupation. Survivor’s benefits continue the plan payment for three (3) months beyond death. A copy of the plan is on file in the Human Resources DepartmentOffice. D. City-Paid Physical Examinations Non-Associated employees shall be provided, once every two years, with a City-paid physical examination comparable to the current pre-placement class physical examination or reimbursed the amount authorized for said physical examination. No more than one-half of the eligible employees shall receive examinations in any one fiscal year. Said exam shall be comprehensive in nature and shall include: 1. A complete medical history, physical exam and review of results by physician. 2. Health testing including vision, hearing, breathing, chest x-ray and stress EKG. 3. Laboratory test including standard chemical test, blood count, HDL, urinalysis and stool test for blood. E. Miscellaneous When a Non-Associated employee is on a leave of absence without pay for reason of medical disability, the City shall maintain the City-paid insurance premiums during the period the employee is in a non-pay status for the length of said leave, not to exceed twenty-four (24) months. F. Retiree Medical Coverage for Retirees Not Eligible for the City Medical Retiree Subsidy Plan Employees who retire from the City after January 1, 2004, and are granted a retirement allowance by the California Public Employees’ Retirement System and are not eligible for the City’s Retiree Subsidy Medical Plan may choose to participate in City-sponsored medical insurance plans until the first of the month in which they turn age sixty-five (65). The retiree shall pay the full premium for City-sponsored medical insurance for themselves and/or qualified dependents without any City subsidy. 844 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-508 Employees who retire from the City and receive a retirement allowance from the California Public Employees’ Retirement System and are not eligible for the City’s Retiree Subsidy Medical Plan and choose not to participate in City-sponsored medical insurance upon retirement permanently lose eligibility for this insurance. However, if a retiree who is not eligible for the City’s Retiree Subsidy Medical Plan chooses not to participate in City-sponsored medical insurance plans because the retiree has access to other group medical insurance, and subsequently loses eligibility for that group medical insurance, the retiree and their qualified dependents will have access to City-sponsored medical insurance plans reinstated. Eligibility for Retiree Medical Coverage terminates the first of the month in which the retiree or qualified dependent turns age sixty-five (65). G. Post-65 Supplemental Medicare Coverage Retirees who are participating in the Retiree Subsidy Medical Plan as of January 1, 2004, and all future retirees who meet the criteria to participate in City-sponsored medical insurance, with or without the Retiree Medical Subsidy Plan, may participate in City-sponsored medical insurance plans that are supplemental to Medicare, after a contract is in place between the City and a health insurance provider. A retiree or qualified dependent must choose to participate in City-sponsored medical insurance plans that are supplemental to Medicare beginning the first of the month in which the retiree or qualified dependent turns age sixty-five (65). The retiree shall pay the full premium to participate in City-sponsored medical insurance plans that are supplemental to Medicare for themselves or qualified dependents without any City subsidy. Retirees or qualified dependents, upon turning age 65, who choose not to participate in the City- sponsored medical insurance plans that are supplemental to Medicare permanently lose eligibility for this insurance. SECTION IV – RETIREMENT A. Benefits 1. Self-Funded Supplemental Retirement Benefit In the event a Non-Associated employee member elects Option #1, #2, #2W, #3, #3W or #4 of the Public Employees’ Retirement law, the City shall pay the difference between such elected option and the unmodified allowance which the member would have received for their life alone as provided in California Government Code sections 21455, 21456, 21457, and 21548 as said referenced Government Code sections exist as of the date of this agreement. This payment shall be made only to the member (Non-Associated employee), shall be payable by the City during the life of the member, and upon that member’s death, the City’s obligation shall cease. Unless previously excluded by employment or resolution, eligibility for this benefit is limited to employees hired before December 27, 1997. 2. Medical Insurance for Retirees 845 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-509 a. Upon retirement, whether service or disability connected, each Non- Associated employee shall be entitled to cause self, spouse, and dependents to participate fully in the City’s group health insurance program at the equivalent of the City’s group premium rate in accordance with the provisions specified by Consolidated Omnibus Budget Reconciliation Act of 1985 (COBRA). Such participation shall be at employee’s expense and upon terms, conditions, and restrictions currently in effect. b. As an alternative to the benefit described in the preceding paragraph IV.A.2.a above, the City will provide a financial contribution towards the cost of retiree medical premiums as described in Section VI. B. Public Employees’ Retirement System Contributions and Reporting 1. “Classic Member” Miscellaneous Members Retirement Benefits a. Retirement Formula – The City shall provide all miscellaneous employees described as “classic members by the Public Employees’ Pension Reform Act of 2013 – “PEPRA” with that certain retirement program commonly known and described as the “2.5% at age 55 plan,” which is based on the retirement formula as set forth in the California Public Employees’ Retirement System (CalPERS), Section 21354 of the California Government Code. b. Classic Member Miscellaneous CalPERS Member Contribution – All miscellaneous bargaining unit “classic members” shall pay to CalPERS as part of the required member retirement contribution eight percent (8%) of pensionable income. This provision shall not sunset. c. One-Year Final Compensation – The City shall contract with CalPERS to have retirement benefits calculated based upon the “classic” employee’s highest one year’s compensation, pursuant to the provisions of Section 20042 (highest single year). d. The obligations of the City and the retirement rights of employees as provided in this Article shall survive the term of this resolution. e.2. “New Member” Miscellaneous Members Retirement Benefits -– For “New” Members within the meaning of the California Public Employees’ Pension Reform Act of 2013 as defined in California Government Code Section 7522.04(f). a. Retirement Formula – New Members shall be governed by the two percent at age 62 (2% @ 62) retirement formula set forth in Government Code section 7522.20. b. Final Compensation – Final compensation will be based on the highest annual average compensation earnable during the 36 consecutive months immediately preceding the effective date of retirement, or some other 36 consecutive month period designated by the member. c. New Member Miscellaneous CalPERS Member Contribution – Effective January 1, 2013, all, “new” members, as defined by PEPRA and determined by CalPERS, shall contribute one half (50%) of the normal cost as established by CalPERS each year in its annual valuation for the City, as required by California Government Code Section 7522.30(c). 846 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5010 c. 2.3. “Classic Member” Safety Members Retirement Benefits a. Retirement Formula – The City shall provide all safety employees described as “classic” members by the Public Employees’ Pension Reform Act of 2013 – “PEPRA” with that certain retirement program commonly known and described as the “3% at age 50 plan” which is based on the retirement formula as set forth in the California Public Employees’ Retirement System (CalPERS), Section 21362.2 of the California Government Code. b. Classic Member Safety CalPERS Member Contribution – All safety employees described as “classic” members shall pay to CalPERS as part of the required member retirement contribution nine percent (9%) of pensionable income. This provision shall not sunset. b. c. One-Year Final Compensation – The City shall contract with CalPERS to have retirement benefits calculated based upon the “classic” employee’s highest one year’s compensation, pursuant to the provisions of Section 20042 (highest single year). c. d. The obligations of the City and the retirement rights of employees as provided in this Article shall survive the term of this resolution. d.4. “New Member” Safety Members Retirement Benefits – For “New” Members within the meaning of the California Public Employees’ Pension Reform Act of 2013. a. Retirement Formula – New Members shall be governed by the two and seven tenths percent at age 57 (2.7% @ 57) retirement formula set forth in Government Code section 7522.25(d) b. Final Compensation – Final compensation will be based on the highest annual average compensation earnable during the 36 consecutive months immediately preceding the effective date of retirement, or some other 36 consecutive month period designated by the member. c. New Member Miscellaneous CalPERS Member Contribution – Effective January 1, 2013, all “new” members as defined by PEPRA and determined by CalPERS, shall contribute one half (50%) of the normal cost, as established by CalPERS. c. 3.5. IRS Code Section 414(h)(2) The City has adopted the CalPERS Resolution in accordance with IRS Code section 414(h)(2) to ensure that both the employee contribution and the City pickup of the required member contribution are made on a pre-tax basis. However, ultimately, the tax status of any benefit is determined by the law. 6. Pre-Retirement Optional Settlement 2 Death Benefit Non-Associated employees shall be covered by the Pre-Retirement Optional Settlement 2 Death Benefit as identified in Section 21548 of the California Government Code when approved by the City Council. 847 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5011 4.7. Fourth Level of 1959 Survivor Benefits Non-Associated employees shall be covered by the Fourth Level of the 1959 Survivor Benefit as identified in Section 21574 of the California Government Code. 5.8. VEBA Plan Requirements a. Eligibility Defined Effective December 23, 2009, all eligible Unrepresented Managementnon-associated eEmployees with 25 years of continuous service to the City of Huntington Beach will participate in the Plan. An eligible employee is an employee who works twenty (20) or more hours per week and receives benefits. Eligibility criteria may be amended upon a majority vote of non-associated employees, as no cost is borne by the City. b. Employee Contributions c.b. Leave Payout Plan Contribution Each eligible unrepresented management employee shall designate all leave payouts to be rolled over to their VEBA Plan account based on the established range upon separation from City employment. d.c. Participant Account A separate account is maintained for each contributing eligible unrepresented non- associated management employee, which documents the employee’s contributions and disbursements. Contributions to a VEBA plan account as well as any disbursements to cover nonreimbursed, post-tax medical care expenses are both tax free. Eligible benefits subject to reimbursement by the Plan shall be limited to long- term care expenses and nonreimbursed medical premiums, co-pays, prescribed drug expenses and other medical care costs as that term is defined by the Internal Revenue Code Section 213. e.d. Administrative Fees Any Plan administrative fees will be deducted from interest on the total Plan investments. An eligible unrepresented non-associated management employee’s Plan account is subject to a monthly administrative fee for expenses related to recordkeeping, claims processing, and claims reimbursement. The fee will first be deducted from interest on total plan investments, and then deducted, if necessary, from the employee’s individual account. f.e. Dispute Resolution This Resolution and any disputes arising under or in connection with this Resolution shall not be subject to any dispute resolution procedures in the City’s Personnel Rules, nor shall this Resolution and any such dispute relating thereto be subject to the jurisdiction of the City’s Personnel Board Commission for any reason whatsoever. 848 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5012 g.f. Indemnification All non-associatedUnrepresented Management eEmployees agree to indemnify and hold the City of Huntington Beach harmless against any claims made of any nature and against any suit instituted against the City arising from this Resolution, including, but not limited to, claims arising from an employee’s participation in VEBA or from any salary reduction initiated by the City for VEBA contributions. SECTION V – LEAVE BENEFITS A. General Leave 1. Accrual Employees will accrue General Leave at the accrual rates outlined below. General leave may be used for any purpose, including vacation, sick leave, and personal leave. General leave for non-associated employees shall be accrued as follows: 2. Eligibility and Approval General leave must be pre-approved except for illness, injury or family sickness, which may require a physician’s statement for approval. General leave accrued time is to be computed from hiring date anniversary. Employees shall not be permitted to take general leave in excess of actual time earned. Employees shall not accrue general leave in excess of six hundred forty (640) hours. Employees may not use their general leave to advance their separation date on retirement or other separation from employment. 3. Leave Benefit Entitlements The City shall comply with all State and Federal leave benefit entitlement laws. An eligible employee on an approved leave shall be allowed to use applicable earned Sick Leave, General Leave, or Executive Leave for family or personal health issues. For more information on employee leave options contact the Human Resources DepartmentOffice. 4. Conversion to Cash a. Pay Off at Termination An employee shall be paid for unused general leave upon termination of employment at which time such terminating employee shall receive compensation at their current salary rate for all unused, earned general leave to which they are entitled up to and including the effective date of their termination. Years of Service Annual General Leave Allowance Biweekly General Leave Allowance First through Fourth Year 176 hours 6.77 Fifth through Ninth Year 200 hours 7.69 Tenth through Fourteenth Year 224 hours 8.62 Fifteenth Year and Thereafter 256 hours 9.85 849 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5013 b. Conversion to Cash Two times during each fiscal year, each permanent employee shall have the option to convert into a cash payment or deferred compensation up to a total of one hundred and-twenty (120) sixty (160) general leave benefit hours per fiscal year. The employee shall give payroll two (2) weeks’ advance notice of their decision to exercise such option. c. One Week Minimum Vacation Requirement The City Manager may require certain positions which handle money or transfer funds to take a minimum of one week, (i.e., five consecutive work days) paid vacation each calendar year. d.c. Deferred Compensation Contribution at Time of Separation The value of any unused earned leave benefits may be transferred to deferred compensation at separation (including retirement), but only during the time that the employee is actively employed with the City. The latest opportunity for such transfer must be the beginning of the pay period prior to the employee’s last day of employment. B. Holidays and Pay Provisions 1. Non-Associated employees shall receive the following legal holidays as of the first pay period following adoption of the Non-Associated Resolution paid in full per the employee’s regularly scheduled work shift: (1) New Year’s Day (January 1) (2) Martin Luther King Day (third Monday in January) (3) Presidents Day (third Monday in February) (4) Memorial Day (last Monday in May) (5) Independence Day (July 4) (6) Labor Day (first Monday in September) (7) Veteran’s Day (November 11) (8) Thanksgiving Day (fourth Thursday in November) (9) The Friday after Thanksgiving (10) Christmas Day (December 25) In addition, all appointed positions shall receive the following holidays: (11) Christmas Eve (December 24) (12) New Year’s Eve (December 31) 2. Any day declared by the President of the United States to be a national holiday or by the Governor of the State of California to be a state holiday and adopted as an employee holiday by the City Council of the City of Huntington Beach. 850 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5014 3. For Civic Center holiday closure purposes, holidays which fall on Sunday shall be observed the following Monday, and those falling on Saturday shall be observed the preceding Friday. 3. The parties agree that the City shall issue an official City holiday calendar in January of each year that will determine the dates that holidays are observed, following the guidelines below: a. City paid holidays which fall on Saturday shall be observed the preceding Friday, and those falling on Sunday shall be observed the following Monday. b. In the event that two consecutive City paid holidays fall on a Friday and Saturday, the two holidays shall be observed on the preceding Thursday and Friday. c. In the event that two consecutive City paid holidays fall on a Sunday and Monday, the two holidays shall be observed on Monday and the following Tuesday. 851 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5015 C. Sick Leave 1. Accrual No employee shall accrue sick leave. 2. Credit Employees assigned to Non-Associated shall carry forward their sick leave balance and shall no longer accrue sick leave credit. 3. Usage Employees may use accrued sick leave for the same purposes for which it was used prior to December 25, 1999. Sick leave shall not be used to extend absences due to work related (industrial) injuries or illnesses, this provision shall be added to Personnel Rule 18.10. 4. Payoff at Termination a. Non Associated employees with continuous service with the City since November 20, 1978, shall be entitled to the following sick leave payoff plan: At involuntary termination by reason of disability, or by death, or by retirement, employees shall be compensated at their then current rate of pay for seventy-five percent (75%) of all unused sick leave accumulated as of July 1, 1972, plus fifty percent (50%) of unused sick leave accumulated subsequent to July 1, 1972, up to a maximum of seven hundred and twenty hours (720) of unused, accumulated sick leave, except as provided in paragraph V.C.5.d below. Upon termination for any other reason, employees shall be compensated at their then current rate of pay for fifty percent (50%) of all unused accumulated sick leave, up to a maximum of 720 hours of such accumulated sick leave. b. Non-Associated employees hired after November 20, 1978 shall be entitled to the following sick leave payoff plan: Upon termination, all employees shall be paid, at their then current salary rate, for twenty-five percent (25%) of unused, earned sick leave to 480 hours accrued, and for thirty-five percent (35%) of all unused, earned sick leave in excess of 480 hours, but not to exceed 720 hours, except as provided in paragraph V.C.2.c below. c. Except as provided in paragraph V.C.5.d below, no Non-Associated employee shall be paid at termination for more than 720 hours of unused, accumulated sick lave. However, employees may utilize accumulated sick leave on the basis of “last in, first out,” meaning that sick leave accumulated in excess of the maximum for payoff may be utilized first for sick leave, as defined in Personnel Rule 18-8. 852 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5016 d. Non-Associated employees who had unused, accumulated sick leave in excess of 720 hours as of July 5, 1980, shall be compensated for such excess sick leave remaining on termination under the formulas described in paragraphs V.C.5.a and b above. In no event shall any employee be compensated upon termination for any accumulated sick leave in excess of the “cap” established by this paragraph (i.e., 720 hours plus the amount over 720 hours existing on July 5, 1980). Employees may continue to utilize sick leave accrued after that date in excess of such “cap” on a “last in, first out” basis. To the extent that any such “capped” amount of excess sick leave over 720 hours is utilized, the maximum compensable amount shall be correspondingly reduced. (Example: Employee had 1,000 hours accumulated. Six months after July 5, 1980, employee had accumulated another 48 hours. Employee is then sick for 120 hours. Employee’s maximum sick leave “cap” for compensation at termination is now reduced by 72 hours to 928.) CD. Bereavement Leave Employees shall be entitled to bereavement leave not to exceed twenty-four (24) hours in each instance of death in the immediate family. Immediate family is defined as father, mother, sister, brother, spouse, children, grandfather, grandmother, stepfather, stepmother, step grandfather, step grandmother, grandchildren, stepsisters, stepbrothers, mother-in-law, father-in-law, son-in-law, daughter-in-law, brother-in-law, sister-in-law, stepchildren, or wards of which the employee is the legal guardian. Employees shall be entitled to bereavement leave not to exceed twenty-four (24) hours in each instance of death in their immediate family. Immediate family is defined as a parent, sibling, spouse, registered domestic partner, child, grandparent, grandchild, or wards of which the employee is the legal guardian, recognizing all birth, marital, and other legal ties (i.e., step relatives, in-laws, etc.). E. D. Voluntary Catastrophic Leave Donation Program Under certain conditions, an employee may donate leave time to another employee in need. The program is outlined in Exhibit 4. SECTION VI – RETIREE SUBSIDY MEDICAL PLAN An employee who has retired from the City shall be entitled to participate in the City-sponsored medical insurance plans in accordance with the Retiree Subsidy Medical Plan as outlined in Exhibit 2. Employees hired on or after December 1, 2009, shall not be eligible for this benefit. SECTION VII – MISCELLANEOUS A. Collection of Payroll Overpayments In the event that a payroll overpayment is discovered and verified, and considering all reasonable factors including the length of time that the overpayment was made and if and when the employee could have reasonably known about such overpayment, the City shall take action to collect from the employee the amount of overpayment(s). Such collection shall be processed by payroll deduction over a reasonable period of time considering the total amount of overpayment. In the event the employee separates from employment during the collection period, the final amount shall be deducted from the last payroll check of the employee. If applicable, the balance 853 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5017 due from the employee shall be communicated upon employment separation if the last payroll check does not sufficiently cover the amount due the City. It shall be the responsibility of the employee and the City to periodically monitor the accuracy of compensation payments or reimbursements due to the possibility of a clerical oversight or error. The City reserves the right to also collect compensation overpayments caused by or the result of misinterpretation of a pay provision by non-authorized personnel. The interpretation of all pay provisions shall be administered by the City Manager or designee and as adopted by the City Council. Unauthorized compensation payments shall not constitute a past practice (1/03/05). B. Uniforms and CalPERS Reporting The City provides uniforms to active duty employees in the classifications of Police Chief and Fire Chief. These employees are required to wear a standard uniform for appearance, uniformity, and public recognition purposes. The City will report to the California Public Employees’ Retirement System (CalPERS) the average annual cost of uniforms as special compensation for each eligible employee in accordance with Title 2, California Code of Regulations, Section 571(a)(5). 854 NON-ASSOCIATED EMPLOYEE PAY AND BENEFITS PROVISIONSRESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-50 18 EXHIBIT 1 NON-ASSOCIATED EXECUTIVE MANAGEMENT SALARY SCHEDULE EFFECTIVE SEPTEMBER 24, 2016 - 2.0% Increase Job No. Description Pay Starting Control High Grade Point Point Point EXECUTIVE MANAGEMENT 0591 City Manager NA0591 NA NA 128.29 DEPARTMENT HEADS 0592 Assistant City Manager NA0592 85.82 95.51 106.32 0009 Director of Building & Safety NA0009 74.64 83.07 92.46 0014 Director of Community Services NA0014 74.64 83.07 92.46 0008 Director of Economic Development NA0008 74.64 83.07 92.46 0574 Director of Human Resources NA0574 74.64 83.07 92.46 0479 Chief Information Officer NA0479 74.64 83.07 92.46 0007 Director of Library Services NA0007 69.94 77.85 86.66 0589 Community Development Director NA0589 80.82 89.97 100.13 0010 Director of Public Works NA0010 80.82 89.97 100.13 0518 Chief Financial Officer NA0518 80.82 89.97 100.13 0015 Fire Chief NA0015 85.82 95.51 106.31 0011 Police Chief NA0011 85.82 95.52 106.31 ELECTED OFFICIALS 0016 City Attorney NA0016 100.18 111.51 124.10 0017 City Clerk NA0017 69.94 77.85 86.66 ELECTED OFFICIALS PART-TIME 0018 City Treasurer - PART-TIME NA0018 74.64 83.07 92.46 *Annual Salary Not to Exceed $51,812 CONTRACT NON-DEPARTMENT HEAD Job No. Description Pay A B C D E Grade 0593 Chief Assistant City Attorney NA0593 71.05 74.96 79.08 83.43 88.01 855 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5019 EXHIBIT 1A NON-ASSOCIATED APPOINTED EXECUTIVE MANAGEMENT SALARY SCHEDULE Effective March 19, 2022* Starting Point Control Point High Point Job No Description Pay Range A B C D E F G EXECUTIVE MANAGEMENT 0591 City Manager 294 103.38 108.55 113.98 119.68 125.66 131.94 138.54 0029 Interim City Manager 289 98.36 103.28 108.44 113.87 119.56 125.54 131.82 DEPARTMENT HEADS 0592 Assistant City Manager 275 85.57 89.85 94.34 99.06 104.01 109.21 114.67 0015 Fire Chief 275 85.57 89.85 94.34 99.06 104.01 109.21 114.67 0011 Police Chief 275 85.57 89.85 94.34 99.06 104.01 109.21 114.67 0518 Chief Financial Officer 269 80.61 84.64 88.88 93.32 97.99 102.88 108.03 0589 Community Development Director 269 80.61 84.64 88.88 93.32 97.99 102.88 108.03 0800 Director of Administrative Services 269 80.61 84.64 88.88 93.32 97.99 102.88 108.03 0801 Director of Community & Library Services 269 80.61 84.64 88.88 93.32 97.99 102.88 108.03 0010 Director of Public Works 269 80.61 84.64 88.88 93.32 97.99 102.88 108.03 CONTRACT NON-DEPARTMENT HEADS 0593 Chief Assistant City Attorney 261 74.44 78.17 82.08 86.18 90.49 95.01 99.76 0860 Deputy Dir. of Homelessness & Behavioral Health Services 258 72.26 75.87 79.66 83.64 87.83 92.22 96.83 0845 Deputy Director of Public Works 258 72.26 75.87 79.66 83.64 87.83 92.22 96.83 0900 Assistant Chief Financial Officer 249 66.07 69.37 72.84 76.48 80.30 84.32 88.53 0850 Deputy Director of Administrative Services 249 66.07 69.37 72.84 76.48 80.30 84.32 88.53 0855 Deputy Director of Community & Library Services 249 66.07 69.37 72.84 76.48 80.30 84.32 88.53 0840 Deputy Director of Community Development 249 66.07 69.37 72.84 76.48 80.30 84.32 88.53 0699 Deputy Community Prosecutor 206 43.07 45.22 47.48 49.86 52.35 54.97 57.72 *Per Resolution No. 2022-09 856 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5020 EXHIBIT 1B NON-ASSOCIATED ELECTED EXECUTIVE MANAGEMENT SALARY SCHEDULE Effective November 2, 2020* Job No Description Pay Grade Starting Point Control Point High Point ELECTED OFFICIALS 0016 City Attorney NA0016 100.18 111.51 124.10 0017 City Clerk NA0017 69.94 77.85 86.66 0018 City Treasurer (Part-Time) NA0018 69.94 77.85 86.66 *Per Resolution No. 2020-80 Historical changes to Non-Associated position titles: Per Ordinance 3855 adopted on 1/19/10, Building & Safety Department duties were combined with the Planning Department creating a new position of Director of Planning and Building. Per Resolution 2010-106 adopted on 12/20/10 the City Treasurer was established as a part-time position. Per Ordinance 3906 adopted on 2/7/11 amended the title of City Administrator to City Manager. Per Ordinance 3959 adopted on 10/01/12, the position of Chief Assistant City Attorney was established. Per Resolution 2012-95 adopted on 12/17/12 the title of Deputy City Manager was changed to Assistant City Manager. Per Ordinance 4086 adopted 4/18/16: the position of Finance Director was changed to Chief Financial Officer, the Director of Information Services was changed to Chief Information Officer and the Director of Planning and Building was changed to Community Development Director. 857 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5021 EXHIBIT 2 RETIREE MEDICAL PLAN An employee who has retired from the City shall be entitled to participate in the City sponsored medical insurance plans and the City shall contribute toward monthly premiums for coverage in an amount as specified in accordance with this Plan, provided: A. At the time of retirement the employee has a minimum of ten (10) years of continuous full time City service or is granted an industrial disability retirement; and B. At the time of retirement, the employee is employed by the City; and C. Following official separation from the City, the employee is granted a retirement allowance by the California Public Employees’ Retirement System. The City’s obligation to pay the monthly premium as indicated shall be modified downward or cease during the lifetime of the retiree upon the occurrence of any one of the following: 1. On the first of the month in which a retiree or dependent reaches age 65 or on the date the retiree or dependent can first apply and become eligible, automatically or voluntarily, for medical coverage under Medicare (whether or not such application is made) the City’s obligation to pay monthly premiums may be adjusted downward or eliminated. Benefit coverage at age 65 under the City’s medical plans shall be governed by applicable plan document. 2. In the event of the death of any employee, whether retired or not, the amount of the retiree medical insurance subsidy benefit which the deceased employee was receiving at the time of their death would be eligible to receive if they were retired at the time of death, shall be paid on behalf of the spouse or family for a period not to exceed twelve (12) months. D. Schedule of Benefits 1. Minimum Eligibility for Benefits With the exception of an industrial disability retirement, eligibility for benefits begins after an employee has completed ten (10) years of continuous full time service with the City of Huntington Beach. Said service must be continuous unless prior service is reinstated at the time of their rehire in accordance with the City’s Personnel Rules. Employees hired on or after December 1, 2009 shall not be eligible for this benefit. 2. Disability Retirees Industrial disability retirees with less than ten (10) years of service shall receive a maximum monthly payment toward the premium for health insurance of $121. Payments shall be in accordance with the stipulations and conditions, which exist for all retirees. Payment shall not exceed dollar amount, which is equal to the full cost of premium for employee only. 858 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5022 3. Marital Status – Married retirees eligible for benefits under the Retiree Medical Subsidy Plan may each receive the benefit earned pursuant to Section 4 – Maximum Monthly Subsidy Payments, whether enrolled individually as the plan enrollee or whether enrolled as a dependent on any City-sponsored medical plan. a. In the case where a retiree is married to a City employee (active or retired) who is not an unrepresented/non-associated employee or retiree, this provision shall remain applicable. b. This provision shall apply to State of California registered domestic partners the same as married spouses. 4. Maximum Monthly Subsidy Payments Payment amounts may be reduced each month as dependent eligibility ceases due to death, divorce or loss of dependent child status. However, the amount shall not be reduced if such reduction would cause insufficient funds needed to pay the full premium for the employee and the remaining dependents. In the event no reduction occurs and the remaining benefit premium is not sufficient to pay the premium amount for the employee and the eligible dependents, said needed excess premium amount shall be paid by the employee. All retirees, including those retired as a result of disability whose number of years of service prior to retirement, exceeds ten (10) years of continuous full time service, shall be entitled to maximum monthly payment of premiums by the City for each year of completed City service as follows: Maximum Monthly Payment for Retirements After: Years of Service Subsidy 10 $121 11 136 12 151 13 166 14 181 15 196 16 211 17 226 18 241 19 256 20 271 21 286 22 300 23 315 24 330 25 344 859 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5023 MISCELLANEOUS PROVISIONS A. Eligibility: 1. The effective start-up date of the Retiree Subsidy Medical Plan for the various employee groups shall be the first of the month following retirement date. 2. A retiree may change plans, add dependents, etc., during annual open enrollment. The Human Resources DepartmentOffice shall notify covered retirees of this opportunity each year. 3. Years of service computed for the Retiree Subsidy Medical Plan are actual years of completed service with the City of Huntington Beach. B. Benefits: 1. The Retiree Subsidy Medical Plan includes any medical plan offered by the City to active and/or retired unrepresented/non-associated employees and retirees. 2. City Plans are the primary payer for active employees age 65 and over, with Medicare the secondary payer. Retirees age 65 and over have no City Plan options and are eligible only for Medicare. 3. Premium payments are to be received at least one month in advance of the coverage period. C. Subsidies: 1. The subsidy payments will pay for: a. The Retiree Subsidy Medical Plan. b. HMO. c. Part A of Medicare for those retirees not eligible for paid Part A. 2. Subsidy payments will not pay for: a. Part B Medicare. b. Any other employee benefit plan. c. Any other commercially available benefit plan. d. Medicare supplements D. Medicare: 1. All persons are eligible for Medicare coverage at age 65. Those with sufficient credit quarters of Social Security will receive Part A of Medicare at no cost. Those without sufficient credited quarters are still eligible for Medicare at age 65, but will have to pay 860 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5024 for Part A of Medicare if the individual elects to take Medicare. In all cases, Part B of Medicare is paid for by the participant. 2. When a retiree and their spouse are both 65 or over, and neither is eligible for paid Part A of Medicare, the subsidy shall pay for Part A for each of them or the maximum subsidy, whichever is less. 3. When a retiree at age 65 is eligible for paid Part A of Medicare and their spouse is not eligible for paid Part A, the spouse shall not receive subsidy. When a retiree at age 65 is not eligible for paid Part A of Medicare and their spouse who is also age 65 is eligible for paid Part A of Medicare, the subsidy shall be for the retiree’s Part A only. E. Cancellation: 1. For retirees/dependents eligible for paid Part A of Medicare, the following cancellation provisions apply: a. Coverage for a retiree under the Retiree Subsidy Medical Plan will be eliminated on the first day of the month in which the retiree reaches age 65. If such retiree was covering dependents under the Plan, dependents will be eligible for COBRA continuation benefits effective as of the retiree’s 65th birthday. b. Dependent coverage will be eliminated upon whichever of the following occasions comes first: 1) After 36 months of COBRA continuation coverage, or 2) When the covered dependent reaches age 65 in the event such dependent reaches age 65 prior to the retiree reaching age 65. c. At age 65 retirees are eligible to make application for Medicare. Upon being considered “eligible to make application,” whether or not application has been made for Medicare, the Retiree Subsidy Medical Plan will be eliminated. 2. See provisions under “Benefits,” ”Subsidies,” and “Medicare” for those retirees/dependents not eligible for paid Part A of Medicare. 3. Retiree Subsidy Medical Plan and COBRA participants shall be notified of non- payment of premium by means of a certified letter from Employee Benefits in accordance with provisions of the Non-Associated Resolution. 4. A retiree who fails to pay premiums due for coverage and is in arrears for sixty (60) days shall be terminated from the Plan and shall not have reinstatement rights. 861 NON-ASSOCIATED EMPLOYEE PAY AND BENEFITS PROVISIONSRESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-50 25 EXHIBIT 3 - 9/80 WORK SCHEDULE This work schedule is known as “9/80”. The 9/80 work schedule is designed to be in compliance with the requirements of the Fair Labor Standards Act (FLSA). In the event that there is a conflict with the current rules, practices and/or procedures regarding work schedules and leave plans, then the rules listed below shall govern. 9/80 WORK SCHEDULE DEFINED The 9/80 work schedule shall be defined as working nine (9) days for eighty (80) hours in a two week pay period by working eight (8) days at nine (9) hours per day and working one (1) day for eight (8) hours (Friday), with a one-hour lunch during each work shift, totaling forty (40) hours in each FLSA work week. The 9/80 work schedule shall not reduce service to the public, departmental effectiveness, productivity and/or efficiency as determined by the City Manager or designee. A. Forty (40) Hour FLSA Work Week The actual FLSA workweek is from Friday at mid-shift (p.m.) to Friday at mid-shift (a.m.). No employee working the 9/80 work schedule will be able to flex their Friday start time nor the time they take their lunch break, which will be from 12:00 p.m. to 1:00 p.m. on Fridays. All employee work shifts will start at 8:00 a.m. on their Friday worked. The start of the FLSA workweek is 12:00 noon Friday. B. Two Week Pay Period The pay period for employees starts Friday mid-shift (p.m.) and continues for fourteen (14) days until Friday mid-shift (a.m.). During this period, each week is made up of four (4) nine (9) hour work days (thirty-six (36) hours) and one (1) four (4) hour Friday and those hours equal forty (40) work hours in each work week (e.g. the Friday is split into four (4) hours for the a.m. shift, which is charged to work week one and four (4) hours for the p.m. shift, which is charged to work week two). C. A/B Schedules To continue to provide service to the public every Friday, employees are to be divided between two schedules, known as the “A” schedule and the “B” schedule, based upon the departmental needs. For identification purposes, the “A” schedule shall be known as the schedule with a day off on the Friday in the middle of the pay period, or, “off on payday”, the “B” schedule shall have the first Friday (p.m.) and the last Friday (a.m.) off, or “working on payday”. An example is listed below: AM PM AM PM AM PM F F S S M T W Th F F S S M T W Th F F A Schedule 4 4 - - 9 9 9 9 - - - - 9 9 9 9 4 4 B Schedule - - - - 9 9 9 9 4 4 - - 9 9 9 9 - - 862 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5026 D. A/B Schedule Changes FLSA exempt employees may change A/B schedules at the beginning of any pay period with supervisor or City Manager approval. E. Emergencies All employees on the 9/80 work schedule are subject to be called to work any time to meet any and all emergencies or unusual conditions which, in the opinion of the City Manager, or designee may require such service from any of said employees. LEAVE BENEFITS When an employee is off on a scheduled workday under the 9/80 work schedule, then nine (9) hours of eligible leave per workday shall be charged against the employee’s leave balance or eight (8) hours shall be charged if the day off is a Friday. All leaves shall continue under the current accrual, eligibility, request and approval requirements. 1. General Leave – As stated in the Non-Associated Resolution. 2. Sick Leave – As stated in the Non-Associated Resolution. 3. Executive Leave – As stated in the Non-Associated Resolution. 4. Bereavement Leave – As stated in the Non-Associated Resolution. 5. Holidays -– As stated in the Non-Associated Resolution. 6. Jury Duty – The provisions of the Personnel Rules shall continue to apply, however, if an FLSA exempt employee is called to serve on jury duty during a normal Friday off, Saturday, or Sunday, or on a City holiday, then the jury duty shall be considered the same as having occurred during the employees day off work, therefore, the employee will receive no added compensation. 863 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5027 EXHIBIT 4 - VOLUNTARY CATASTROPHIC LEAVE DONATION Guidelines 1. Purpose The purpose of the voluntary catastrophic leave donation program is to bridge employees who have been approved leave time to either return to work, long-term disability, or medical retirement. Permanent employees who accrue vacation, general leave or compensatory time may donate such leave to another permanent employee when a catastrophic illness or injury befalls that employee or because the employee is needed to care for a seriously ill family member. The leave-sharing Leave Donation Program is Citywide across all departments and is intended to provide an additional benefit. Nothing in this program is intended to change current policy and practice for use and/or accrual of vacation, general, or sick leave. 2. Definitions Catastrophic Illness or Injury - A serious debilitating illness or injury, which incapacitates the employee or an employee's family member. Family Member - For the purposes of this policy, the definition of family member is that defined in the Family Medical Leave Act (child, parent, spouse or domestic partner). 3. Eligible Leave Accrued compensatory, vacation or general leave hours may be donated. The minimum donation an employee may make is two (2) hours and the maximum is forty (40) hours. 4. Eligibility Permanent employees who accrue vacation or general leave may donate such hours to eligible recipients. Compensatory time accrued may also be donated. An eligible recipient is an employee who: • Accrues vacation or general leave; • Is not receiving disability benefits or Workers' Compensation payments; and • Requests donated leave. 5. Transfer of Leave The maximum donation credited to a recipient's leave account shall be the amount necessary to ensure continuation of the employee's regular salary during the employee's period of approved catastrophic leave. Donations will be voluntary, confidential and irrevocable. Hours donated will be converted into a dollar amount based on the hourly wage of the donor. The dollar amount will then be converted into accrued hours based on the recipient’s hourly wage. An employee needing leave will complete a Leave Donation Request Form and submit it to the Department Director for approval. The Department Director will forward the form to Human Resources for processing. Human Resources, working with the department, will send out the request for leave donations. 864 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5028 Employees wanting to make donations will submit a Leave Donation Form to the Finance Department (payroll). All donation forms submitted to payroll will be date stamped and used in order received for each bi-weekly pay period. Multiple donations will be rotated in order to insure even use of time from donors. Any donation form submitted that is not needed will be returned to the donor. 6. Other Please contact the Human Resources DepartmentOffice with questions regarding employee participation in this program. 865 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5029 Please submit this form to the Human Resources Office for processing. Voluntary Catastrophic Leave Donation Program Leave Request Form Requestor, Please Complete According to the provisions of the Voluntary Catastrophic Leave Donation Program, I hereby request donated vacation, general leave or compensatory time. MY SIGNATURE CERTIFIES THAT: • A Leave of absence in relation to a catastrophic illness or injury has been approved by my Department; and • I am not receiving disability benefits or Workers' Compensation payments. Name: (Please Print or Type: Last, First, MI) Work Phone: Department: Job Title: Employee ID#: Requester Signature: Date: Department Director Signature of Support: Date: Human Resources DepartmentOffice Use Only End donation date will bridge to: Long Term Disability Medical Retirement beginning Length of FMLA leave ending Return to work End donation date: Human Resources Administrative Services Director Signature: Date signed: 866 NON-ASSOCIATED EMPLOYEES PAY AND BENEFITS RESOLUTION Exhibit “A” to Non-Associated Resolution No. 2022-0916-5030 Voluntary Catastrophic Leave Donation Program Leave Donation Form Donor, please complete Donor Name: (Please Print or Type: Last, First, MI) Work Phone: Donor Job Title: Type of Accrued Leave: Vacation Compensatory Time General Leave Number of Hours I wish to Donate: Hours of Vacation Hours of Compensatory Time Hours of General Leave I understand that this voluntary donation of leave credits, once processed, is irrevocable; but if not needed, the donation will be returned to me. I also understand that this donation will remain confidential. I wish to donate my accrued vacation, comp or general leave hours to the Leave Donation Program for: Eligible recipient employee's name (Last, First, MI): Donor Signature: Date: Please submit to the Payroll/Finance Department. 867 City of Huntington BeachNon‐Assoicated (NA) Proposal3‐Year Fiscal Analysis (Indefinite Term)Year 1 Year 2 Year 32022 2023 2024MOU Item # UnionDescription Rate / $Estimated YOYImpactEstimated YOYImpactEstimated YOYImpactTotal Cost of Proposal Notes:1 NA Term: 3 years (January 1, 2022 through December 31, 2024) Fiscal analysis conducted for period of January 1, 2022 ‐ December 31, 2024.  If approved, changes to take effect the following pay period. 2a NA Salary Adjustment ‐ Move to new range 2% increase, 7 steps, 5% between steps.Various 230,293             75,490                24,995           330,778            2b NA Annual Top Step Bonus up to 3% Up to 3%‐                      64,425                21,288           85,713               Assume 2% due to department discretion in bonuses given3 NA Health Insurance 9,785                  11,053                ‐                  20,837               4 NA 2 Additional Paid Holidays 18 hrs 32,806                1,060                  336                 34,202               Total Cost of ProposalNA272,884           152,028           46,619           471,530          868 City of Huntington Beach 2000 Main Street, Huntington Beach, CA 92648 File #:22-186 MEETING DATE:3/15/2022 Submitted by Mayor Delgleize - Request for City Council approval of direction to staff to identify methods for improving ongoing maintenance of public restrooms at the 6 th Street beach lot Direct staff to identify methods for improving ongoing maintenance of public restrooms at various locations along the beach path and return to the City Council with a program for doing so. City of Huntington Beach Printed on 3/9/2022Page 1 of 1 powered by Legistar™869 CITY OF HUNTINGTON BEACH CITY COUNCIL MEETING – COUNCIL MEMBER ITEMS REPORT TO: THE HONORABLE MAYOR AND CITY COUNCIL FROM: BARBARA DELGLEIZE, MAYOR DATE: MARCH 15, 2022 SUBJECT: REQUEST FOR CITY COUNCIL APPROVAL OF DIRECTION TO STAFF TO IDENTIFY METHODS FOR IMPROVING ONGOING MAINTENANCE OF PUBLIC RESTROOMS AT THE 6TH STREET BEACH LOT I recently received an email from a recent visitor to our community concerning the disturbing condition of our bathrooms located at the 6th Street beach lot. The visitor’s message resonated with me on many levels and moves me to ask my City Council colleagues to consider ways to to address the deplorable conditions that the visitor found on that day, because I am certain that this was not a unique experience. I say that the visitor’s report moved me on so many levels, because we have all witnessed scenes in our lives similar to that which he described and want better for those we serve. We also aspire to remain and gain even greater traction as a premier tourism destination for people all over the world, for the benefit of our residents and businesses. In addition to the uncommon beauty of our beaches and top-notch downtown resorts, unique retail shops, and bountiful restaurants, the proper functionality for all of our public places and spaces is a critical component of our success. I am sure that we can all agree that we have an obligation to do everything reasonable to ensure that the City maintains public restrooms at a high standard. I am open-minded about the steps necessary to meet this standard, including increasing the staffing level and service frequency, re- visiting the hours of service, and other creative ways to meet the expectations of residents and beach visitors throughout the year. RECOMMENDED ACTION Direct staff to identify methods for improving ongoing maintenance of public restrooms at various locations along the beach path and return to the City Council with a program for doing so. 870