Loading...
HomeMy WebLinkAboutInstallation of New Playground Equipment and Rubberized Surf 2000 Main Street. Huntington Beach, CA 92648 City of Huntington Beach File #: 22-276 MEETING DATE: 4/5/2022 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Sean Joyce, Interim City Manager VIA: Chris Slama, Director of Community & Library Services PREPARED BY: Elaine Kuhnke, Senior Administrative Analyst Subiect: Request to approve funding of $250,000 from the Park Development Impact Fund for installation of new playground equipment and rubberized surfacing at Booster Park Statement of Issue: Staff requests City Council authorization to appropriate $250,000 from the Park Development Impact Fund toward the installation of new playground equipment and rubberized surfacing at Booster Park in Fiscal Year 2021-2022. Financial Impact: A budget appropriation of$250,000 from the Park Development Impact Fund is requested since this project is not included in the FY 2021/22 Capital Improvement Plan (CIP) budget. Recommended Action: Authorize the appropriation of $250,000 from the Park Development Impact Fund to account 22845029.82900 for the installation of new playground equipment and rubberized surfacing at Booster Park. Alternative Action(s): Do not approve the recommended action and direct staff accordingly. Analysis: Following a recent safety inspection by the Public Works Department, it was determined that the playground equipment at Booster Park needed to be removed due to its aged condition and the inability to order replacement parts. It was also observed that the rubberized surfacing had deteriorated in some locations, creating further need to renovate the area. Improvements to the playground were initially scheduled to be requested as part of the FY 2022/23 CIP. However, due to the unexpected need to remove the playground equipment and high community usage of playground equipment, staff is requesting that the funds be appropriated now, so the equipment may be ordered City of Huntington Beach Page 1 of 2 Printed on 3/302022 c_nee$Z Lea sta " File #: 22-276 MEETING DATE: 4/5/2022 and installed this fiscal year. Booster Park is a mini-park in Huntington Harbour located at 16861 Baruna Lane on Davenport Island. The park is popular and is within walking distance of Harbour residents. In addition to the recently removed playground equipment, amenities include a half-court basketball court and open grass area, making the park a highly frequented location for the surrounding community. Booster Park is on the City Council Approved Amended Park Playground and Equipment Replacement Priority List (3/18/19). Environmental Status: The installation of new playground equipment at Booster Park is categorically exempt from CEQA pursuant to Section 15302 of the CEQA Guidelines because the project consists of the replacement of existing structures where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity. Strategic Plan Goal: Infrastructure & Parks Attachment(s): 1. Amended Park Playground and Equipment Replacement Priority List City of Huntington Beach Page 2 of 2 Printed on 3/30/2022 oowerec2q Legistar" AMENDED PARK PLAYGROUND & EQUIPMENT REPLACEMENT PRIORITY LIST (3/18/19) STATUS PARK CONDITION NON ADA ADA MISSING PARTS Completed 1 Oak View' Poor - 2-5,5-12,wings Slated for removal Completed 2 Seabridge' Poor Swings All play units removed Completed 3 Tarbox Damaged& removed Entire play unit removed Completed 4 HCP Lower Lake' Poor - Swings All play units removed 5 Edison'' Poor 2-5, 5-12,swings - Swing seats Completed 6 Eader' Poor 2-S, swings 5-12 Large swing seats Completed 7 Bushard Fair 5-12,swings - Completed 8 Circle View Fair 5-12 - 9 Drew' Fair 5-12,swings - In process 10 Glen View Fair 5-12,swings - 11 Haven View Fair 5-12 - 12 Langenbeck Fair 5-12,swings - Completed 13 LeBard Fair 2-5,5-12,swings - Swing seats 14 Newland East Fair 2-5,5-12,swings - Swing seats 15 Pleasant View Fair 2-5, 5-12,swings - 16 Robinwood Fair 2-5,5-12,swings - Completed 17 Schroeder' Fair 2-5, 5-12,swings - 18 Marine View' Good 2-5, 5-12,swings - 19 Arevalos Fair 5-12 Swings 20 Lake View' Fair 5-12 2-5 Entire swing unit In process 21 Sun View Poor(5-12) 5-12 2-5 22 Seely Fair 2-5,swings 5-12 23 Talbert' Fair 5-12,swings 2-5 24 Perry Fair Swings 2-5, 5-12 Requested 25 Booster Poor - 5-12, swings Completed 26 HCP Picnic Shelters' Poor 5-12,swings 2-5 27 HCP Slater" Poor - 2-5, 5-12,swings 28 Pattinson' Poor(5-12) - 5-12 . HIGH-USE PARK METHODOLOGY EMPTY PLAY AREA Non-ADA 1. Empty Node Within Tot Lot Poor Condition 2.Separate Play Area-No Equipment High-Use 24