Loading...
HomeMy WebLinkAboutOrange County Flood Control District - 2023-09-26 (2) UNT1NGT- 2000 Main Street, � 0?�9 Huntington Beach,CA n City of Huntington Beach APPROVED 7-0 ��UN7Y GPI File #: 24-389 MEETING DATE: 6/4/2024 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Eric G. Parra, Interim City Manager VIA: Chau Vu, Director of Public Works PREPARED BY: Joseph Fuentes, Principal Civil Engineer Subject: Approve and authorize execution of Amendment No. 1 to add Yorktown bridge to the existing Cooperative Agreement with the Orange County Flood Control District for funding, construction, and maintenance of bridges Statement of Issue: Consider approval of Amendment No. 1 to the existing Cooperative Agreement, MA-080-23011516, between the City of Huntington Beach (City) and the Orange County Flood Control District (OCFCD). To clarify the roles and responsibilities, OCFCD, as the lead agency, submitted a Cooperative Agreement to the City. The cooperative agreement specifies funding, construction, and maintenance commitments between OCFCD and the City. Financial Impact: None. OCFCD is responsible for funding 100% of improvements related to the construction of the bridge flood walls in accordance with the contract documents. When OCFCD completes the project, the City is responsible for any post-construction maintenance within City right-of-way. Recommended Action: Approve and authorize the Mayor and City Clerk to execute "Amendment No. 1 to Cooperative Agreement MA-080-23011516, between Orange County Flood Control District and City of Huntington Beach for addition of Funding, Construction, and Maintenance of the Talbert Channel (D02) at Yorktown Avenue Improvements Project." Alternative Action(s): Deny approval of the Cooperative Agreement, which would result in stalling the project. Analysis: OCFCD identified that the Yorktown Avenue bridge over the Talbert Channel does not meet Federal Emergency Management Agency freeboard requirements, which is the minimum clearance between the bridge structure's lowest elevation and the highest design flood water elevation in the channel. City of Huntington Beach Page 1 of 2 Printed on 5/30/2024 powered*LegistarTM File #: 24-389 MEETING DATE: 6/4/2024 Flood walls are therefore required so that wave action or flow surges do not overtop the channel. OCFCD has completed the contract documents in order to construct these needed improvements. OCFCD has prepared .Amendment No. 1 to the existing Cooperative Agreement MA-080-23011516 for this project. The agreement specifies the responsibilities of each agency during the construction and post-construction phases. The existing agreement with OCFCD was for the funding, construction, and maintenance of the East Garden Grove-Wintersburg Channel (CO5) bridges at Warner Avenue, Springdale Street, and Edwards Street Bridges. Amendment No. 1 will include the addition of the bridge at Yorktown Avenue over the Talbert Channel. During construction, OCFCD will be responsible for all funding, inspections, project management, and all incidentals related to completing the construction of this project. Once construction is completed and accepted by the City , and OCFCD, the City will assume responsibility for operation and maintenance. Construction is expected to start in the Summer of 2024 and is anticipated to be completed by the fall of 2024. Environmental Status: The project lead is the OCFCD, and they have obtained all environmental approvals prior to the start of the project. Strategic Plan Goal: Non Applicable -Administrative Item Attachment(s): 1. Amendment No. 1 to the existing Cooperative Agreement, MA-080-23011516, between Orange County Flood Control District and City of Huntington Beach for Funding, Construction, and Maintenance of the East Garden Grove-Wintersburg Channel (C05) Bridges at Warner Avenue, Springdale Street, and Edwards Street Improvements Project 2. Cooperative Agreement, MA-080-23011516, between Orange County Flood Control District and City of Huntington Beach for Funding, Construction, and Maintenance of the East Garden Grove-Wintersburg Channel (C05) Bridges at Warner Avenue, Springdale Street, and Edwards Street Improvements Project 3. PowerPoint Presentation City of Huntington Beach Page 2 of 2 Printed on 5/30/2024 poweree&39 LegistarTM - • M0-25-0006441 Amendment 9 Agreement MA.O0.23o11816 AiiigliQM TWMLIWMMMIMYFt1 This AMENDMENT No. 1 TO AGREEMENT,hereinafter referred to as"AMENDMENT No.1", dated for identification purposes as of .Anal ,2024,Is BY and BETWEEN • • The ORANGE COUNTY FLOOD CONTROL. DISTRICT,a body corporate and politic, hereinafter referred to as"DISTRICT", And i The CITY OF HUNTINGTON BEACH,a charter • city, hereinafter referred to as"CITY," which are sometimes€ndividually referred to.as"PART'Y,"or collectively referred to as"PARTIES." REgJT41-S WHEREAS,PARTIES entered into a Cooperative Agreement dated September,2028,delineating the PARTIES respective responsibilities for Implementation and poet-construction of flood walls to meat Federal Emergency Management Agency freeboard requirements on City-owned and maintained bridge crossings. WHEREAS,PARTIES desire to amend Section 1 B of the AGREEMENT to-include the CITY-owned and maintained bridge crossing*at Yorktown Avenue. NOW,THEREFORE,It•Is mutually understood and agreed by DISTRICT and CITY that the AGREEMENT is amended as follows; 1. SECTION 1B of the AGREEMENT Is hereby amended to read as follows: 1.B Project Contractor. Upon written approval by the City of the final Project TES&E, the DISTRICT shell perform all administrative work required for negotiating and executing the construction contract with the DISTRICT%Contractor("CONTRACTOR"). CONTRACTOR shall perform ali work as required-by, and.i►1 strict accordance with, the construction contract documents,which censlate of removing the existing decks and barriers and replacing them with voided precast • girder units With a polyester overlay and new sidewalk and barrier that connects to the flood wells at the Edwards Street Bridge, Springdale Street Bridge,Warner Avenue Bridge and Yorktown Avenue Bridge.The DISTRICT shall require CONTRACTOR to identify the CITY as an additional insured on CONTRACTOR'S required Insurance policy(les)with the coverage to the satisfaction of the CITY. 2. Except as amended by this AMENDMENT 1,the AGREEMENT remains In full force and effect as originally therein set forth. -Pagel of 2_, MO.23.000644/Amendment I Agreement MA-080-2301 1 51 6 IN WITNESS WHEREOF. each PARTY hereto has executed this AMENDMENT No 1 by its duly authorized representatives as of the date set forth above. CITY OF HUNTINGTON BEAC a charter city �/�, ', Date 'f //.31 --ea By r' " "o/ C—. Gracey Van Der Mark, Mayor ATTEST APPROVED AS TO FORM: Fad By. Robin Estanislau, City Clerk Michael E. Gates, City Attorney ORANGE COUNTY FLOOD CONTROL DISTRICT, a body corporate and politic Date James Treadaway Director of Public Works APPROVED AS TO FORM. Office of the County Counsel Orange County, California Date: 7-i)2-9 By ____5!" Deputy County Counsel County of Orange. California -Page2of2- d®BST�TINGT D ..aPa:��.ti�; City of Huntington Beach z 2000 Main Street ♦ Huntington Beach, CA 92648 . �� (714) 536-5227 • www.huntingtonbeachca.gov CpUNTY 0p. ®10 Office of the City Clerk ®s�� Robin Estanislau, City Clerk March 25, 2024 Orange County Public Works OC Construction Attn: Diane Hernandez 601 N. Ross Street Santa Ana, CA 92701 Dear Ms. Hernandez: Enclosed is the partially executed original Amendment 1 to Agreement MA-080- 23011516, approved by City Council on June 4, 2024, for final execution by OCFCD. Upon final execution, please provide a fully executed copy to: City of Huntington Beach City Clerk's Office Attn: Donna Switzer, Senior Deputy City Clerk 2000 Main Street, 2nd Floor Huntington Beach CA 92648 Your attention to this matter is greatly appreciated. Sincerely, 944,Z41/14-44) Robin Estanislau, CMC City Clerk RE:ds Enclosure Sister City: Anjo, Japan MO-23-000644 Agreement MA-080-23011516 COOPERATIVE AGREEMENT BETWEEN ORANGE COUNTY FLOOD CONTROL DISTRICT AND CITY OF HUNTINGTON BEACH FOR FUNDING, CONSTRUCTION,AND MAINTENANCE OF THE EAST GARDEN GRQVE- WINTERSBURG CHANNEL(CO5)BRIDGES AT WARNER AVENUE, SPRINGDALE STREET AND EDWARDS STREET IMPROVEMENTS PROJECT This Cooperative Agreement("Agreement") is made and entered into this 2(.0+&`day of csTS'ht 6 -- 2023 ("Agreement"), by and between the ORANGE COUNTY FLOOD CONTROL DISTRICT ("DISTRICT"), a body corporate and politic, and the CITY OF HUNTINGTON BEACH ("CITY"), a municipal corporation in the State of California. The DISTRICT and CITY shall sometimes be referred to separately as a "PARTY" and collectively as the"PARTIES". RECITALS A. In April 2023, the DISTRICT completed flood control improvements along a certain segment of DISTRICT's regional flood facility commonly referred to as East Garden Grove-Wintersburg Channel, Facility Number C05 ("CHANNEL"). The completed improvements included CHANNEL widening from upstream of Warner Avenue to 1,200 feet downstream of Goldenwest Street to increase the channel capacity and fortify the levees, as shown on Exhibit A, which is attached to and made part of this Agreement. B. The DISTRICT has proactively programmed a series of flood control improvement projects from Pacific Coast Highway to the San Diego Freeway, Interstate 405, that are integral with the United States Army Corps of Engineers' Westminster Watershed Flood Risk Management Project which seeks to remove the surrounding Huntington Beach area out of the existing floodplain. C. The completed CHANNEL improvements excluded the three (3) CITY-owned and maintained bridge crossings at Warner Avenue, Springdale Street and Edwards Street ("BRIDGES"), as additional coordination and technical studies with the City were needed for flood control improvements to these BRIDGES. D. The DISTRICT identified that the BRIDGES do not meet Federal Emergency Management Agency freeboard requirements and therefore require flood walls. The proposed Project that is the subject of this Agreement consists of installing flood walls on both the upstream and downstream ends of the BRIDGES and replacing the superstructures to be compatible with the recently constructed CHANNEL improvements to provide I% annual chance of exceedance flood protection. E. The BRIDGES are structurally in good condition according to Caltrans Bridge Inspection Reports and technical studies performed by DIS1'RICT's Project Engineer. As such, the proposed Project is addressing only the hydraulic deficiencies. 1 659 MO-23-000644 Agreement MA-080-23011516 F. DISTRICT has prepared the Plans, Specifications, and Estimate (PS&E) for the Project and the CITY has proactively reviewed the PS&E during the development stage.The PS&E is substantially complete. G. The CITY supports the Project and the DISTRICT shall obtain approval of the PS&E prior to any work proposed to be made in accordance with California Public Contract Code 21020. H. The CITY desires to cooperate with the DISTRICT in implementing the Project and maintaining ownership and maintenance of the BRIDGES upon Project completion. 1. The CITY has determined that the Project conforms to the City's General Plan. J. For the purpose of this Agreement, the Project shall encompass.the construction phase and post-construction phase. The construction phase shall begin with issuance of a Notice to Proceed to the DISTRICT'S Contractor and end with Project close-out when the DISTRICT completes construction of the Project and files a Notice,of Completion(NOC). The post-construction of the Project shall be the responsibility of the CITY after the filing of the NOC. K. The PARTIES desire to outline their respective responsibilities with respect to the implementation of the Project and after the Project is completed. AGREEMENT NOW, THEREFORE, in consideration of the foregoing recitals of fact, the mutual covenants and conditions contained herein and other consideration, the value and adequacy of which are hereby acknowledged,the PARTIES agree as follows: 1. Construction Phase Oblieations a. Protect Engineer. DISTRICT is hereby designated as Project Engineer ("ENGINEER") and shall be responsible for any approvals, permissions, or notices required pursuant to the construction contract documents. Construction contract documents include,but are not limited to, Project plans, specifications, and estimates ("PS&E"). The DISTRICT shall be responsible for executing and delivering all documents required in connection with the construction of Project including as-built plans and drawings("as-builts"). b. Project Contractor.Upon written approval by the City of the final Project PS&E, the DISTRICT shall perform all administrative work required for negotiating and executing the construction contract with the DISTRICT's Contractor 2 660 MO-23-000644 Agreement MA-080-23011516 ("CONTRACTOR"). CONTRACTOR shall perform all work as required by, and in strict accordance with, the construction contract documents, which consists of removing the existing decks and barriers and replacing them with voided precast girder units with a polyester overlay and new sidewalk and barrier that connects to the flood walls at the Edwards Street Bridge, Springdale Street Bridge and Warner Avenue Bridge. The DISTRICT shall require CONTRACTOR to identify the CITY as an additional insured on CONTRACTOR's required insurance policy(ies) with coverage to the satisfaction of the CITY. c. Project Construction. The DISTRICT shall be responsible for funding one hundred percent (100%) of the construction of all Project-related funding obligations to construct the Project in accordance with the construction contract documents. d. Project Inspection.The DISTRICT shall have primary inspection responsibility to ensure the constructed Project and all components thereof conform to the approved PS&E. The DISTRICT shall require the CONTRACTOR to obtain any and all necessary permits for the Project, including encroachment permits from the CITY. The DISTRICT will invite the CITY to attend the pre-construction meeting prior to the start of the construction activity. The DISTRICT will hold the pre-construction conference at the Project site or nearby field office. The DISTRICT will notify the CITY no less than fourteen calendar days prior to the start of construction. The CITY shall provide a Project liaison ("CITY ENGINEER")during construction to coordinate with DISTRICT representatives. As required by the CITY encroachment permits,CITY shall regularly inspect the PROJECT within their jurisdiction and communicate with the DISTICT's Project Manager and DISTRICT's Construction Inspector. Furthermore, the CITY will be invited to and included in all construction progress/scheduling meetings conducted for the Project.Should the CITY deem any remedial work to be necessary, consistent with the construction contract documents, at the conclusion of construction for the Project or any component thereof the CITY • shall notify the DISTRICT and specifically describe the needed corrections and the proposed remedial work.All communications with the CONTRACTOR shall be through the DISTRICT, unless immediate action is necessary to address safety related concerns. e. Construction Continuencies. The DISTRICT shall review and approve any usage of CONTRACTOR or DISTRICT contingencies necessary for construction of the Project and in accordance with the construction contract documents. However, should CITY request additional work beyond that approved by the PARTIES in the PS&E, and the additional work results in contingency usage, CITY shall be responsible for funding one hundred percent (100%) of costs associated with the CITY-initiated contingency usage for work in excess of that approved in the PS&E. 3 661 MO-23-000644 Agreement MA-080-23011516 f. Project Acceptance. Prior to the DISTRICT's acceptance of Project improvements and filing of a Notice of Completion, the CITY ENGINEER shall review and provide written approval of all Project work. The CITY ENGINEER's written approval shall only be withheld for work not completed in accordance with the construction contract documents for the Project. The DISTRICT shall furnish the CITY with an electronic copy of record drawings for the completed Project and an electronic copy of the filed Notice of Completion. g. Warranties. DISTRICT shall require CONTRACTOR to provide and assign all warranties, maintenance manuals,and material safety data sheets for the Project. Once received, the DISTRICT shall forward the received warranties, maintenance manuals, and material safety data sheets to the CITY prior to filing NOC. 2. Post-Construction Phase Oblieations a. Notice of Completion. When the DISTRICT completes the Project and issues a copy of the Notice of Completion to the CITY, the CITY's post-construction funding obligations shall begin, at which point the CITY shall assume ownership of the completed Project within CITY permitted easements and right-of-way. b. Post-Construction Maintenance. Upon CITY ENGINEER's written approval and DISTRICT'S acceptance of the Project, CITY shall assume ownership, and operation and maintenance obligations for all Project improvements within CITY permitted easements and right-of-way. 3. Miscellaneous Oblieations a. Indemnification&Hold Harmless. The Parties shall indemnify, defend with counsel approved in writing, save and hold each of their elected officials, officers, directors, agents and employees harmless from any and all claims, injuries, liabilities, actions, damages, losses or expenses, of every type and description to which they may be subjected arising out of any act or omission of, their employees, representatives, agents and independent contractors in connection with the-implementation of the actions described in this Agreement. The Parties' duties and obligations under this paragraph shall survive termination or expiration of this Agreement. b. Assiimment.This Agreement shall be binding upon and inure to the benefit of the successors and assigns of the Parties. No assignment of either Parry's interest in this Agreement shall be made without the written consent of the other Party. c. Entirety:Amendments. This Agreement contains the entire agreement between the Parties with respect to the matters provided for herein. No 4 662 MO-23-000644 Agreement MA-080-23011516 alteration or variation of the terms of this Agreement shall be valid unless made in writing and signed by the Parties; and no oral understanding or agreement not incorporated herein shall be binding on either of the Parties. d. Severability.If any part of this Agreement is held,determined, or adjudicated to be illegal, void, or unenforceable by a court of competent jurisdiction, the remainder of this Agreement shall be given effect to the fullest extent possible. e. Notices. Notices or ether communications which may be required or provided under the terms of this Agreement shall be given as follows: CITY: City of Huntington Beach 2000 Main Street Huntington Beach,CA 92648 Attention:Tom Herbel, City Engineer Email:Tom.Herbelasurfcity-hb.or_ DISTRICT: Orange County Flood Control District OC Public Works 601 N.Ross Street Santa Ana,CA.92701 Attention:Kevin Onuma, Chief Engineer Email: Kevin.Onuma+u°vcpw.ocsov.corn All notices shall be in writing and deemed effective when delivered via email, in person, or deposited in the United States mail,first class,postage prepaid and addressed as above. Notwithstanding the above, the Parties may also provide notices by facsimile transmittal, and any such notice so given shall be deemed to have been given upon receipt during normal business hours or, in the event of receipt after business hours, on the following business day. Any notices, correspondence, reports and/or statements authorized or required by this Agreement,addressed in any other fashion shall be deemed not given. f. Attorne' 's Fees. In any action or proceeding to enforce or interpret any provision of this Agreement, or where any provision hereof is validly asserted as a defense,the Parties shall bear their own attorney's fees,costs and expenses. g. Governing Law&Venue. This Agreement has been negotiated and executed in the State of California and shall be governed by and construed under the laws of the State of California. In the event of any legal action to enforce or interpret this Agreement, the sole and exclusive venue shall be a court of competent jurisdiction located in Orange County,California, and the Parties hereto agree to and do hereby submit to the jurisdiction of such court,notwithstanding Code of Civil Procedure Section 394. 5 663 MO-23-000644 Agreement MA-080-23011516 h. Counterparts. This Agreement may be executed in two or more counterparts, each of which shall be deemed an original, but all of which together shall constitute a single instrument, i. Termination. In the event DISTRICT or CITY defaults in the performance of any of their obligations under this Agreement or materially breaches any of the provisions of this Agreement, CITY and DISTRICT shall have the option to terminate this Agreement upon thirty (30) days' prior written notice to the other Party. In the event CITY or DISTRICT cures such default within the thirty (30) day notice period, CITY and DISTRICT's election to terminate shall be deemed revoked and of no further force and effect as to that particular default. Any Party's failure to enforce this Agreement as to one instance of breach shall not constitute a waiver of any Party's ability to enforce this Agreement as to any future breaches or noncompliance. a. Availability of Funds. This Agreement is subject to the availability of funds appropriated for this purpose, and nothing herein shall be construed as obligating the Parties to expend or as involving the Parties in any contract or other obligation for future payment of money in excess of appropriations authorized by law. 6 664 MO-23-000644 Agreement MA-080-23011516 IN WITNESS WHEREOF, the PARTIES have executed this Agreement the day and year first above written. CITY OF HUNTINGTON BEACH, a municipal corporation Date: b f c2 i/A OR-2 By: Tony Strickland,Mayor ATTEST: APPROVED AS TO FORM: By: ' ,,,,•Pss.. r Robii Estanislau, City Clerk 'cliael E. Gates,City Attorney CtANGE COUNTY FLOOD CONTROL 5ISTRICT,a body corporate and politic 2c� 23 Date: �(/ � By: Chairman,Board of:upervisors County of Orange,California SIGNED AND CERTIFIED THAT A APPROVED AS TO FORM: COPY OF THIS DOCUMENT HAS BEEN DELIVERED TO THE CHAIR OF THE BOARD OF SUPERVISORS PER GC § 25103,RESO. 79-153504: �J �t � ,�..� Otg(tally Agrted 6y5tepbanie[lark 1��.. 'I `fli"J(,;C= B Stephanie Clarkpatr2023.08.141324A7ATa0' Robin .gtieler Deputy County Counsel Clerk of the Board of Supervisors County of Orange, California County of Orange,California 7 665 A Amendment No. 1 to add Yorktown Ave. to ING - T the existing Agreement, MA-080-23011516, •• ,cO R P O RA TF 0 •.•••.• <53 •. •• \' <' \ Between the City of Huntington Beach and 17 /,spin/ • c, \ the and Orange County Flood Control % District (OCFD) for Funding , Construction, %���i + and Maintenance of Bridges at Warner • -- 4 - l , Ave. Springdale St. , and Edwards St. \tea 909 , P�.' •••••• I 0UNTN Public Works Department June 4 2024 666 BAC KG ROU N D • Project Area: Talbert Channel (D02) at Yorktown Avenue Bridge • Orange County Flood Control District (OCFD) previously installed sheet piles along the DO2 channel to increase channel capacity but did not address the Yorktown bridge location • OCFCD identified this bridge location does not meet Federal Emergency Management Agency (FEMA) freeboard requirements. Raising the top of the channel walls are required in order to provide the required freeboard ° 1 t r _ .= 4" ,- r Gran `" " IA Ate . y . 1 I.K pay Q � N GIG mitib, Ymklown Av Yorktown Ave 'll Q`0, rl� rfp 4� �., , I - N , 1 s , _ -i , A r. ''4 7- :FIRER. ROLLS) % E � SAGING AREA \ V % FE -- at 4 ; ..-r.,-' = , a —,—.1.. 1 1 , - ._ a . . , `� .CUUNT`1 �Pi#F 667 NEED/WHY/ BENEFITS • Flood Protection • Raising the top of the channel walls adjacent to the sidewalk will meet FEMA freeboard requirements and increase channel capacity • Provide concrete repairs to existing OCFCD channel adjacent to bridge61111LL gI �� ... c,ORP0RAT?, ..._ 4`-4" �r _• s'‹ `� { j Existing Flood Wall Rendering Make oU:.'....CPSN Nil F,l 668 DETAILS • Construction expected to commence Summer 2024 • Expected completion date: Fall 2024 • City Costs: No Financial Impact • OCFCD Project Costs - $700K • A Cooperative Agreement specifies the responsibilities for each agency during construction and post-construction phases. OCFCD will be responsible for all construction related activities and City will , , ro;�n assume responsibility for operation and maintenance once construction is completed. /finF,FFe Ao�\�q�+� 669 RECOMMENDATION • Approve and authorize the Mayor and City Clerk to execute Amendment No. 1 to the Cooperative Agreement Between the City of Huntington Beach and Orange County Flood Control District-for Funding, Construction, and Maintenance of the Talbert Channel Bridge at Yorktown Avenue Project " \% INGT 0 _ Q .•'�NOflPORgrEO•••• V \ =Y -- : • �•. . --. s a--==•• f ..=0005 CP;' 670 r s; 3 ti sue` r,_ '7`*° it q F k a� y �� � . il ffi f 19j. �°j (,i�1 fix'; 417 .,,,',l..:,-.,'.r:-,.',',o,,:,.t.•,,3:,-.,'1,-1,,,4.''!"'t"','4'4t:,,i,-:.:„_',,,'..,:,1,'04,,I'''1'r:"':;''t:',:i,„,!,''i',1,'-,,,',,,„,._',,..'...„,,,,;.,1,-:-..;.1.."4:-.„'1,.1-''..e,,.,:-.t,1„'',''•,-',t'',,!'N\N. t n1:'.-,-.‘1-1„-i-,,1.-..,'..,.i--c,,;•-l-:,.;.,..i;.,;,,,,;-;,...,.g,i.t..'..''..t-'c,x.x-4.t,t-o1...'''.;''‘-.,...-..,,.,1-1.,,,.,-. 04i,,.,:„.,.'-f,':.'',..-,.:!/ L .ern <-.^ 1 '!e' r°` ' ..4,"I.:'.:.W-;.;.,.-•-,3;'d.":.:.:, .4—:,,7.-,'„,,';4;,'4'.-',-,,r"',.,',,,:'',.*;,... 4.5,:°:$4:.I1:t 4:.4-,.pt: 4O44%1t'.: r�,,�. s till ,--i S iY 4 t' y� / " t S ?bN py. 1° . r�''�Ak'�`v 4 d ..'r� & • ♦' Ai.'a "' a e 4 ri' i� ia•: 4 r F[t F�ym - r, F s :itY..� ,— Pw?' -4�y .- ,� J.ilb mb � � fr'Y, �"vim �� s fi . x " . § G . p tl 671 �0JTINGro,. 2000 Main Street, oF.,.•„o A, ., Huntington Beach, CA !A City of Huntington Beach �ypfl L��92648 i'�// )V Y-[ aCF-oUNTN File #: 23-467 MEETING DATE: 6/20/2023 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Al Zelinka, City Manager VIA: Chau Vu, Acting Director of Public Works PREPARED BY: Chris Tanio, Principal Civil Engineer Subject: Approve and authorize execution of a Cooperative Agreement with the Orange County Flood Control District for the East Garden Grove-Wintersburg Channel Flood Wall Improvements at Warner Avenue, Springdale Street, and Edwards Street Bridges Statement of Issue: Approval of an agreement is requested between the City of Huntington Beach (City) and the Orange County Flood Control District (OCFCD) to clarify roles and responsibilities as they related to the East Garden Grove-Wintersburg Channel Flood Wall Improvements project. OCFCD, as the lead agency submitted a Cooperative Agreement to the City, specifying funding, construction, and maintenance commitments between both agencies. Financial Impact: None. OCFCD is responsible for funding 100% of improvements related to the construction of the bridge flood walls in accordance with the contract documents. The City is currently responsible for maintenance and operation of the bridges. When OCFCD completes the project, the City will continue to be responsible for any post-construction maintenance within City right-of-way. Therefore, no additional costs are anticipated. Recommended Action: Approve and authorize the Mayor and City Clerk to execute "Cooperative Agreement Between Orange County Flood Control District and City of Huntington Beach for Funding, Construction, and Maintenance of the East Garden Grove-Wintersburg Channel (C05) Bridges at Warner Avenue, Springdale Street, and Edwards Street Improvements Project." Alternative Action(s): Deny approval of the Cooperative Agreement, which would result in stalling the project. Analysis: City of Huntington Beach Page 1 of 2 Printed on 6/15/2023 powere7f'h7y LegistarTM File #: 23-467 MEETING DATE: 6/20/2023 In April 2023, OCFCD completed flood control improvements at the East Garden Grove-Wintersburg Channel (EGGWC). These improvements included widening the channel from Warner Avenue to 1,200 feet downstream of Goldenwest Street to increase the channel capacity and fortify the levees. Improvements at the Warner Avenue, Springdale Street, and Edwards Street bridge crossings were excluded from this work due to additional coordination and technical studies. As a result, OCFCD identified these bridges do not meet Federal Emergency Management Agency freeboard requirements, which is the minimum clearance between the bridge structure's lowest elevation and the highest design flood water elevation in the channel. Flood walls are therefore required to meet the minimum freeboard to prevent overtopping of any embankment and provide a safety factor to protect homes. OCFCD has completed the contract documents in order to build these needed improvements. OCFCD has prepared a Cooperative Agreement for this project, and the agreement specifies the responsibilities for each agency during the construction and post-construction phase. Currently the City is responsible for operation and maintenance of these bridges. During construction, OCFCD will be responsible for all funding, inspections, project management, and all incidentals related to completing construction of this project. Once construction is completed and accepted by the City and OCFCD, the City will reassume responsibility for operation and maintenance. Construction is expected to start in fall 2023 and anticipated to be complete by summer 2025. CIAB/Public Works Commission Action: None required for this action. Environmental Status: The project lead is the OCFCD, and they have obtained all environmental approvals prior to the start of the project. Strategic Plan Goal: Infrastructure & Parks Attachment(s): 1. Cooperative Agreement Between Orange County Flood Control District and City of Huntington Beach for Funding, Construction, and Maintenance of the East Garden Grove-Wintersburg Channel (C05) Bridges at Warner Avenue, Springdale Street, and Edwards Street Improvements Project 2. PowerPoint Cooperative Agreement with OCFCD 2023-06-20 City of Huntington Beach Page 2 of 2 Printed on 6/15/2023 powereirkey LegistarTM • MO-23-000644 Agreement MA-080-23011516 COOPERATIVE AGREEMENT BETWEEN ORANGE COUNTY FLOOD CONTROL DISTRICT AND CITY OF HUNTINGTON BEACH FOR FUNDING, CONSTRUCTION,AND MAINTENANCE OF THE EAST GARDEN GROVE- WINTERSBURG CHANNEL(C05)BRIDGES AT WARNER AVENUE, SPRINGDALE STREET AND EDWARDS STREET IMPROVEMENTS PROJECT This Cooperative Agreement("Agreement") is made and entered into this (2°4"- day of J /-e r 6&- 2023 ("Agreement"), by and between the ORANGE COUNTY FLOOD CONTROL DISTRICT ("DISTRICT"), a body corporate and politic, and the CITY OF HUNTINGTON BEACH ("CITY"), a municipal corporation in the State of California. The DISTRICT and CITY shall sometimes be referred to separately as a "PARTY"and collectively as the"PARTIES". RECITALS A. In April 2023, the DISTRICT completed flood control improvements along a certain segment of DISTRICT's regional flood facility commonly referred to as East Garden Grove-Wintersburg Channel, Facility Number C05 ("CHANNEL"). The completed improvements included CHANNEL widening from upstream of Warner•Avenue to 1,200 feet downstream of Goldenwest Street to increase the channel capacity and fortify the levees, as shown on Exhibit A, which is attached to and made part of this Agreement. B. The DISTRICT has proactively programmed a series of flood control improvement projects from Pacific Coast Highway to the San Diego Freeway, Interstate 405, that are integral with the United States Army Corps of Engineers' Westminster Watershed Flood Risk Management Project which seeks to remove the surrounding Huntington Beach area out of the existing floodplain. C. The completed CHANNEL improvements,excluded the three (3) CITY-owned and maintained bridge crossings at Warner Avenue, Springdale Street and Edwards Street ("BRIDGES"), as additional coordination and technical studies with the City were needed for flood control improvements to these BRIDGES. D. The DISTRICT identified that the BRIDGES do not meet Federal Emergency Management Agency freeboard requirements and therefore require flood walls. The proposed Project that is the subject of this Agreement consists of installing flood walls on both the upstream and downstream ends of the BRIDGES and replacing the superstructures to be compatible with the recently constructed CHANNEL improvements to provide 1% annual chance of exceedance flood protection. E. The BRIDGES are structurally in good condition according to Caltrans Bridge Inspection Reports and technical studies performed by DISTRICT's Project Engineer. As 'such, the proposed Project is addressing only the hydraulic deficiencies. 1 MO-23-000644 Agreement MA-080-23011516 F. DISTRICT has prepared the Plans, Specifications, and Estimate (PS&E) for the Project and the.CITY has proactively reviewed the PS&E during the development stage.The PS&E is substantially complete. G. The.CITY supports the Project and the DISTRICT shall obtain approval of the PS&E prior to any work proposed to be made in accordance with California Public Contract Code 21020. H. The CITY desires to cooperate with the DISTRICT in implementing the Project and maintaining ownership and maintenance of the BRIDGES upon Project completion. I. The CITY has determined that the Project conforms to the City's General Plan. J. For the purpose of this Agreement, the Project shall encompass the construction phase and post-construction phase. The construction phase shall begin with issuance of a Notice to Proceed to the DISTRICT's Contractor and end with Project close-out when the DISTRICT completes construction of the Project and files a Notice of Completion(NOC). The post-construction of the Project shall be the responsibility of the CITY after the filing of the NOC. K. The PARTIES desire to outline their respective responsibilities with respect to the implementation of the Project and after the Project is completed. AGREEMENT NOW, THEREFORE, in consideration of the foregoing recitals of fact, the mutual covenants and conditions contained herein and other consideration, the value and adequacy of which are hereby acknowledged,the PARTIES agree as follows: 1. Construction Phase Obligations a. Project Engineer. DISTRICT is hereby designated as Project Engineer ("ENGINEER") and shall be responsible for any approvals, permissions, or notices required pursuant to the construction contract documents. Construction contract documents include, but are not limited to, Project plans, specifications, and estimates ("PS&E"). The DISTRICT shall,be responsible for executing and delivering all documents required in connection with the construction of Project including as-built plans and drawings("as-builts").. b. Project Contractor. Upon written approval by the City of the final Project PS&E, the DISTRICT shall perform all administrative work required for negotiating and executing the construction contract with the DISTRICT's Contractor 2 MO-23-000644 Agreement MA-080-23011516 ("CONTRACTOR"). CONTRACTOR shall perform all work as required by, and in strict accordance with, the construction contract documents, which consists of removing the existing decks and barriers and replacing them with voided precast girder units with a polyester overlay and new sidewalk and barrier that connects to the flood walls at the Edwards Street Bridge, Springdale Street Bridge and Warner Avenue Bridge. The DISTRICT shall require CONTRACTOR to identify the CITY as an additional insured on CONTRACTOR's required insurance policy(ies) with coverage to the satisfaction of the CITY. c. Project Construction. The DISTRICT shall be responsible for funding one hundred percent (100%) of the construction of all Project-related funding obligations to construct the Project in accordance with the construction contract documents. d. Project Inspection. The DISTRICT shall have primary inspection responsibility to ensure the constructed Project and all components thereof conform to the approved PS&E.The DISTRICT shall require the CONTRACTOR to obtain any and all necessary permits for the Project, including encroachment permits from the CITY. The DISTRICT will invite the CITY to attend the pre-construction meeting prior to the start of the construction activity. The DISTRICT will hold the pre-construction conference at the Project site or nearby field office. The DISTRICT will notify the CITY no less than fourteen calendar days prior to the start of construction. The CITY shall provide a Project liaison ("CITY ENGINEER")during construction to coordinate with DISTRICT representatives. As required by the CITY encroachment permits, CITY shall regularly inspect the PROJECT within their jurisdiction and communicate with the DISTICT's Project Manager and DISTRICT's Construction Inspector. Furthermore, the CITY will be invited to and included in all construction progress/scheduling meetings conducted for the Project. Should the CITY deem any remedial work to be necessary, consistent with the construction contract documents, at the conclusion of construction for the Project or any component thereof the CITY shall notify the DISTRICT and specifically describe the needed corrections and the proposed remedial work.All communications with the CONTRACTOR shall be through the DISTRICT, unless immediate action is necessary to address safety related concerns. e. Construction Contingencies. The DISTRICT shall review and approve any usage of CONTRACTOR or DISTRICT contingencies necessary for construction of the Project and in accordance with the construction contract documents. However, should CITY request additional work beyond that approved by the PARTIES in the PS&E, and the additional work results in contingency usage, CITY shall be responsible for funding one hundred percent (100%) of costs associated with the CITY-initiated contingency usage for work in excess of that approved in the PS&E. 3 MO-23-000644 Agreement MA-080-23011516 f. Project Acceptance. Prior to the DISTRICT's acceptance of Project improvements and filing of a Notice of Completion, the CITY ENGINEER shall review and provide written approval of all Project work. The CITY ENGINEER's written approval shall only be withheld for work not completed in accordance with the construction contract documents for the Project. The DISTRICT shall furnish the CITY with an electronic copy of record drawings for, the completed Project and an electronic copy of the filed Notice of Completion. g. Warranties. DISTRICT shall require CONTRACTOR to provide and assign all warranties,maintenance manuals,and material safety data sheets for the Project. Once received, the DISTRICT shall forward the .received warranties, maintenance manuals, and material safety data sheets to the CITY prior to filing NOC. 2. Post-Construction Phase Oblisations a. Notice of Completion. When the DISTRICT completes the Project and issues a copy of the Notice of Completion to the CITY, the CITY's post-construction funding obligations shall begin, at which point the CITY shall assume ownership of the completed Project within CITY permitted easements and right-of-way. b. Post-Construction Maintenance.Upon CITY ENGINEER's written approval and DISTRICT'S acceptance of the Project, CITY shall assume ownership, and operation and maintenance obligations for all Project improvements within CITY permitted easements and right-of-way. 3. Miscellaneous Oblieations a. Indemnification&Hold Harmless..The Parties shall indemnify, defend with counsel approved in writing, save and hold each of their elected officials, officers, directors, agents and employees harmless from any and all claims, injuries, liabilities, actions, damages, losses or expenses, of every type and description to which they may be subjected arising out of any act or omission of, their employees, representatives, agents and independent contractors in connection with the implementation of the actions described in this Agreement. The Parties' duties and obligations under this paragraph shall survive termination or expiration of this Agreement. b. Assignment.This Agreement shall be binding upon and inure to the benefit of the successors and assigns of the Parties. No assignment of either Party's interest in this Agreement shall be made without the written consent of the other Party. c. Entirety:Amendments. This Agreement contains the entire agreement between the Parties with respect to the matters provided for herein. No 4 MO-23-000644 Agreement MA-080-23011516 alteration or variation of the terms of this Agreement shall be valid unless made in writing and signed by the Parties; and no oral understanding or agreement not incorporated herein shall be binding on either of the Parties. • d. Severability.If any part of this Agreement is held, determined, or adjudicated to be illegal, void, or unenforceable by a court of competent jurisdiction, the remainder of this Agreement shall be given effect to the fullest extent possible. e. Notices. Notices or other communications which may be required or provided under the terms of this Agreement shall be given as follows: CITY: City of Huntington Beach 2000 Main Street Huntington Beach, CA 92648 Attention:Tom Herbel, City Engineer Email:Tom.Herbel@surfcity-hb.oru DISTRICT: Orange County Flood Control District OC Public Works 601 N.Ross Street Santa Ana, CA.92701 Attention:Kevin Onuma, Chief Engineer Email: Kevin.Onumaeocpw.ocaov.com All notices shall be in writing and deemed effective when delivered via email, in person, or deposited in the United States mail,first class,postage prepaid and addressed as above. Notwithstanding the above, the Parties may also provide notices by facsimile transmittal, and any such notice so given shall be deemed to have been given upon receipt during normal business hours or, in the event of receipt after business hours, on the following business day. Any notices, correspondence, reports and/or statements authorized or required by this Agreement, addressed in any other fashion shall be deemed not given. f. Attorney's Fees. In any action or proceeding to enforce or interpret any provision of this Agreement, or where any provision hereof is validly asserted as a defense,the Parties shall bear their own attomey's fees, costs and expenses. g. . Governini?:Law&Venue. This Agreement has been negotiated and executed in the State of California and shall be governed by and construed under the laws of the State of California. In the event of any legal action to enforce or interpret this Agreement, the.sole and exclusive venue shall be a court of competent jurisdiction located in Orange County,California, and the Parties hereto agree to and do-hereby submit to the jurisdiction of such court, notwithstanding Code of Civil Procedure Section 394. 5 • MO-23-000644 Agreement MA=080-23011516 h. Counterparts. This Agreement may be executed in two or more counterparts, each of which shall be deemed an original, but all of which together shall constitute a single instrument. i. Termination. In the event DISTRICT or CITY defaults in the performance of any of their obligations under this Agreement or materially breaches any of the provisions of this Agreement, CITY and DISTRICT shall have the option to terminate this Agreement upon thirty (30) days' prior written notice to the other Party. In the event CITY or DISTRICT cures such default within the thirty (30) day notice period, CITY and DISTRICT's election to terminate shall be deemed revoked and of no further force and effect as to that particular default. Any Party's failure to enforce this Agreement as to one instance of breach shall not constitute a waiver of any Party's ability to enforce this Agreement as to any future breaches or noncompliance. a. Availability of Funds. This Agreement is subject to the availability of funds appropriated for this purpose, and nothing herein shall be construed as obligating the Parties to expend or as involving the Parties in any contract or other obligation for future payment of money in excess of appropriations authorized by law. . 6 • MO-23-000644 Agreement MA-080-23011516 IN WITNESS WHEREOF, the PARTIES have executed this Agreement the day and year first above written. CITY OF HUNTINGTON BEACH, a municipal corporation Date: bha/ g 0R-3 By: J"'T Tony Strickland,Mayor ATTEST: APPROVED AS TO FORM: By: f .00 Robfh Estanislau, City Clerk 1hael E. Gates,City Attorney (RANGE COUNTY FLOOD CONTROL alOISTRICT,a body corporate and politic 2to 3 B : `--7k . Date: /2 Y Chairman,Board of upervisors County of Orange, California SIGNED AND CERTIFIED THAT A . APPROVED AS TO FORM: COPY OF THIS DOCUMENT HAS BEEN DELIVERED TO THE CHAIR OF THE BOARD OF SUPERVISORS PER GC § 25103,RESO.79-1535 ""84$ '( -r'M Digitally signed by Stephanie Clark r' 9Zir Stephanie Clark Date:2023.06.14132407-0roce By: � �k.). 6 - By Robin tieler Deputy County Counsel Clerk of the Board of Supervisors County of Orange, California County of Orange, California 7 gig �NTING.4 City of Huntington Beach A, , ,.•`tigORPOfiAiaQ . 4o.`. 4. .e,v` 2000 Main Street ♦ Huntington Beach, CA 92648 _ —=-== (714) 536-5227 ♦ www.huntingtonbeachca.gov -,z ql VGF Z:e ti A°�. 0 A� Office of the City Clerk COUNTY O, Robin Estanislau, City Clerk June 21, 2023 Orange County Flood Control District OC Public Works 601 N. Ross Street Santa Ana, CA 92701 Attn: Kevin Onuma, Chief Engineer Dear General Manager: Enclosed is a partially executed original of the Cooperative Agreement between Orange County Flood Control District and the City of Huntington Beach for Funding, Construction, and Maintenance of the East Garden Grove-Wintersburg Channel (C05) Bridges at Warner Avenue, Springdale Street and Edwards Street Improvements Projectapproved by the Huntington Beach City Council on June 20, 2023. Upon complete execution, please return a fully executed copy to: Robin Estanislau City Clerk 2000 Main Street, 2nd Floor Huntington Beach CA 92648 Your attention to this matter is greatly appreciated. Sincerely, 6?rifiu 9-6"haizill.44) Robin Estanislau, CMC City Clerk RE:ds Enclosure Sister City: Anjo, Japan "► Agreement Between the Cityof Huntington Beach ,,,,,...w.0P-........ g g QR P 0 RA r 1\\"\ -11 I N. ......... ,G,,•'•• �` and the and Orange CountyFlood Control District •.• ���' Fp •• � \ g __ _ ___` • . (OCFCD) for Funding, Construction, and /, ,rrI- /r1 ��h it,!/,, , , � , • ' Maintenance of the East Garden Grove- . ( �` 1: � ,� Wintersburg Channel (C05) Bridges at Warner �,� )0, : *, p Ave., Springdale St., and Edwards St. • - -." - -'---k %." c., * 0 oC` •..• r Public Works Department r °OUNT 's( June 20, 2023 ..., ir,Our •./ 126 BAC KG RO U N D • Project Area: East Garden Grove-Wintersburg Channel (C05) bridges at Warner Ave., Springdale St., and Edwards St. • Orange County Flood Control District (OCFD) previously installed sheet piles along the C05 channel from Warner Avenue to. 1 ,200 feet downstream of Goldenwest Street tol increase channel capacity but did not address bridge locations. • OCFCD identified these bridge locations do not meet Federal Emergency Management Agency (FEMA) freeboard requirements. Flood walls are required in order to provide the required freeboard. - ar mot „�, v d 5 „m P. `�Pt s c... .. , `/ � ,�.� � ' yy d a tn _✓ .w•- tih ... € "."'fi t .. i. t `; f . f`" � �',�\ r��� .�,.t� 1 �' ;�ii MiODEl:5�..HOOL � 1,14 .i.J:.' $ �.' _+ 4) t ' '-70.:"4, r. i-,, A - a?- nr r iri... '. - t�y r�1+ f 'Is t e!M yz' rt T N G -44 x j + S V• \M\\..... Y a r+ - ,, r�'b 1 ' �P•f 1 1+04, . s . gr�.l.t ik ' • 1 ........ pRPOH ezi� .t a tt r I i•1 f�11s ' i • ylr RNf �iV4 - ,. -� • ��C'� — i 7 .I Y PAr' , t*[�� . U - - i pA : �.l� l. CQNT`l ,P: � ,t os{ LARK , �" fi`4' : ''� t. p -r' . 127 NEED/WHY/ BENEFITS • Flood Protection • Installing flood walls will meet FEMA freeboard requirements • Improving bridge deck will resist upward water forces t. A III/ \ TINGT Flood Wall Rendering 9 \\\,b, •�••y8.l t 7,1909. O..•�O�I1, • COUNT\( C'' 128 DETAILS • Construction expected to commence Fall 2024 • Expected completion date: Fall 2025 • City Costs: No Financial Impact • OCFCD Project Costs - $19M • A Cooperative Agreement specifies the responsibilities for each agency during construction and post-construction phases. OCFCD will ' ' be responsible for all construction related activities and City will ���6-1.1NGTon' 00 O -..otpRRORA,..•..6 assume responsibility for operation and maintenance once construction is completed. WW'=z 0 Dt/NTy 129 RECOMMENDATION Approve and authorize the Mayor and City Clerk to execute "Cooperative Agreement Between the City of Huntington Beach and Orange County Flood Control District for Funding, Construction, and Maintenance of the East Garden Grove-Wintersburg Channel (C05). Bridges at Warner Avenue, Springdale Street, and Edwards Street Improvements Project" , <<II*�N��NGro czC �2C •s;..�,dog;:•• 0ii1 130 ctestio • x 11i �, SD x _ • � � 4t.��1 :, •���t, ,�:._mom�-;' _ 1 400 ✓ 131