HomeMy WebLinkAboutApprove the Fiscal Year 2022/23 Infrastructure Fund Annual R 2000 Main Street,
e� ev �4 Huntington Beach,CA
o �, 92648
,.= City of Huntington Beach
,,.vB �fl?Qz APPROVED 7-0
cF6DUNTY CP 1 ✓
File #: 24-305 MEETING DATE: 5/21/2024 ,
REQUEST FOR CITY COUNCIL ACTION
_ SUBMITTED TO: Honorable Mayor and City Council Members
SUBMITTED BY: Eric G. Parra, Interim City Manager
VIA: Chau Vu, Director of Public Works
PREPARED BY: Sarah Whitecotton, Management Analyst
Subject:
Approve the Fiscal Year 2022/23 Infrastructure Fund Annual Report
Statement of Issue:
The City Charter requires an annual review and performance audit of the Infrastructure Fund, and a
report on the findings to the City Council prior to the adoption of the following fiscal year budget. This
review addresses Fiscal Year (FY) 2022/23.
Financial Impact: .
Not applicable.
Recommended Action:
Approve the Infrastructure Fund Annual Report for Fiscal Year 2022/23.
Alternative Action(s):
Instruct staff to make revisions and resubmit at a later date.
Analysis:
The Infrastructure Fund was established in 2002 by City Charter Section 617(c), which states that the
City Council must establish the Citizens Infrastructure Advisory Board (CIAB) to conduct an annual
review and performance audit of the Infrastructure Fund and report its findings to the City Council.
Per the City Charter, the Infrastructure Fund is designated for the sole purpose of infrastructure
expenditures. "Infrastructure" is defined in the Charter as "long-lived capital assets that normally are
stationary in nature and normally can be preserved for significantly greater number of years. They
include storm drains, storm water pump stations, alleys, streets, highways, curbs and gutters,
sidewalks, bridges, street trees, landscaped medians, parks, beach facilities, playgrounds, traffic
signals, streetlights, block walls along arterial highways, and all public buildings and public ways."
City of Huntington Beach Page 1 of 2 Printed on 5/15/2024
powere324 LegistarTM
File #: 24-305 MEETING DATE: 5/21/2024
Infrastructure expenditures are defined as "direct costs related to infrastructure improvements or
maintenance, including construction, design, engineering, project management, inspection, contract
administration and property acquisition."
The single substantial revenue source to the fund is unassigned fund balance in the General Fund
per the Financial Policy adopted in FY 2006/07 and revised in FY 2009/10. The policy states that
50% of the unassigned fund balance will be allocated to the General Fund Pension Stabilization
Reserve, of which 25% is assigned to the Economic Uncertainties Reserve, 12.5% to the
Infrastructure Fund, and 12.5% to the Capital Improvement Reserve.
Beginning in FY 2017/18, Capital Improvement Program (CIP) projects previously budgeted in the
General Fund were instead budgeted in the Infrastructure Fund with an accompanying General Fund
transfer.
Transfers in FY 2022/23 totaled $28,740,805 to fund infrastructure improvements and maintenance.
Interest and market adjustments totaled $(1,565,054), due to market adjustments to investments
required for financial statement reporting purposes. Other revenue included a maintenance
agreement reimbursement of$10,422 and miscellaneous reimbursements totaling $490,971 from
agencies such as the Orange County Sanitation District and the City of Fountain Valley. Total revenue
was $27,677,144. Expenditures for the year totaled $14,762,937. The fund balance at year's end
(June 30, 2023) was $33,398,338. Additional details are available in the Infrastructure Fund Annual
Report (Attachment 1).
CIAB/Public Works Commission Action: The Annual Infrastructure Fund Report was
recommended for City Council consideration at the April 17, 2024, meeting of the CIAB/Public Works
Commission by a vote of 6-0-1 (Rivas absent).
Environmental Status:
This action is not subject to the California Environmental Quality Act (CEQA) pursuant to Sections
15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change
in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the
CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for
resulting in physical change to the environment, directly or indirectly.
Strategic Plan Goal:
Non Applicable - Administrative Item
For details, visit www.huntingtonbeachca.gov/strategicplan
<http://www.huntingtonbeachca.gov/strategicplan>.
Attachment(s): •
1. Infrastructure Fund Annual Report
2. PowerPoint Presentation
City of Huntington Beach Page 2 of 2 Printed on 5/15/2024
powereay LegistarM
�, 1iN�rQ- 2000 Main Street,
eOk> r �.o Huntington Beach,CA
� 92648
4 � City of Huntington Beach
File #: 24-297 MEETING DATE: 4/17/2024
CIAB/PUBLIC WORKS COMMISSION
REQUEST FOR ACTION
SUBMITTED TO: MEMBERS OF CIAB/PUBLIC WORKS COMMISSION
. SUBMITTED BY: Chau Vu, Director of Public Works
PREPARED BY: Nancy Rodriguez, Management Aide & Sarah Whitecotton, Management Analyst
Subject:
Approve Infrastructure Fund Annual Report for Fiscal Year 2022/23
Statement of Issue:
The City Charter requires an annual review and performance audit of the Infrastructure Fund, and a
report of the findings to the City Council. This provides audited information on Fiscal Year 2022/23.
Financial Impact:
No funding is required for this action.
Recommended Action:
Motion to recommend to City Council approval of the Infrastructure Fund Annual Report.
Alternative Action(s):
Direct staff to modify the Annual Report.
Analysis:
The Infrastructure Fund was established in 2002, by City Charter Section 617. Per Section 617 (a),
the originally intended revenue source for the Infrastructure Fund was a planned utility use tax on
natural gas purchased to generate electricity. However, this ballot measure failed. So, while the
Charter amendment created the fund, it was left with no source of revenue.
Other Charter requirements related to the fund are:
• Revenue placed in the Infrastructure Fund shall not supplant existing infrastructure funding.
• General Fund expenditures for infrastructure improvements and maintenance, subsequent to
2001, shall not be reduced below 15% of general fund revenues based on a five-year rolling average.
• The Citizen's Infrastructure Advisory Board/Public Works Commission conducts an annual
review and performance audit of the Infrastructure Fund and reports its findings to the City Council
prior to the City Council's adoption of the ensuing fiscal year budget.
City of Huntington Beach Page 1 of 3 Printed on 4/17/2024
powereI LegistarM
File #: 24-297 MEETING DATE: 4/17/2024
The single substantial revenue source to the fund is General Fund excess fund balance per the
Financial Policy adopted in Fiscal Year 2006/07. The Policy was revised beginning in Fiscal Year
2009/10 to allow for an Economic Uncertainties Reserve commitment. Excerpts addressing the
Infrastructure Fund for the previous and current policies are shown in Attachment 1 along with
Municipal Charter Section 617.
Revenue - FY 2022/23
1. There were total General Fund transfers of$28,740,805 for capital improvements and
equipment replacement in FY 2022/23.
2. The fund was reimbursed $10,422 for traffic signal maintenance at Beachmont Plaza per a
development agreement.
3. Miscellaneous reimbursements were collected in the amount of$490,971 from projects that
shared funding with other agencies such as Orange County Sanitation District and the City of
Fountain Valley.
4. Interest and market adjustments are paid in proportion to the citywide investments and fund
balance. This amounted to ($1,565,054) in FY 2022/23.
Total Revenue for FY 2022/23 was $27,677,144.
Revenue Item Actual
Reimbursements $501,393
Interest and Market Adjustments ($1,565,054)
General Fund Transfers $28,740,805
Total Revenue $27,677,144
Expenditures FY 2022/23
Budgeted expenditures for FY 2022/23 consisted of new and carry forward projects and carry over
encumbrances from 2021/22. Beginning in Fiscal Year 2022/23 a substantial amount of
infrastructure related salaries and maintenance previously budgeted in the General Fund were
moved to the Infrastructure Fund in business unit 31485201. Where applicable, project sheets from
the FY 2021/22 and 2022/23 Capital Improvement Program (CIP) are included as Attachment 2.
Total expenditures for the year were $14,762,937. Below is a detail of expenditures by business unit.
Project Spent
31440001 - Infrastructure Projects $356,746
31440002 - Infrastructure Central Park $230,314
31440003 - Infrastructure 20-21 `$56,034
31440005 - Infrastructure Projects 21-22 $3,779,012
31440006 - Infrastructure Projects 22-23 $3,060,129
31445003 - Main Prom P.S. Improvements $158,202
31485201 - Infrastructure Engineer Design $4,673,047
31488001 - Heil Pump Station $89,529
City of Huntington Beach Page 2 of 3 Printed on 4/17/2024
powered LegistarTA9
File #: 24-297 MEETING DATE: 4/17/2024
31490007 -Arterial Rehabilitation 20-21 $10,093
31490008 -Arterial Rehabilitation 21-22 $319,627
31490009 - Rodgers Senior Center Redev $1,069,236
31490012 - Oakview Community Center $49,666
31490013 - Downtown Revitalization $86,030
31490018 - Mobility and Corridor Improv $358,372
31490019 - FD/PD Youth Training Center $63,400
31490020 - Carr Park Improvements $27,797
31490022 - Residential Pavement $375,702
Fund Balance - FY 2022/23
Fund Balance 7/1/22 $20,484,131
Revenue FY 2022/23 $27,677,144
Expenditures FY 2022/23 ($14,762,937)
Fund Balance 7/1/23 $33,398,338
Budgeted Revenue FY 2023/24 $16,136,763
Budgeted Expenditures FY 2023/24 ($48,190,006)
Budgetary Fund Balance 7/1/24 $1,345,095
Environmental Status:
This action is not subject to the California Environmental Quality Act (CEQA) pursuant to Sections
15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change
in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the
CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for
resulting in physical change to the environment, directly or indirectly.
Strategic Plan Goal:
Non Applicable -Administrative Item
For details, visit www.huntingtonbeachca.gov/strategicplan
<http://www.huntingtonbeachca.gov/strategicplan>.
Attachment(s):
1. Excerpts from Financial Policies adopted FY 2006/07 and 2009/10
2. Project Sheets
3. PowerPoint Presentation
City of Huntington Beach Page 3 of 3 Printed on 4/17/2024
powered LegistarTM
Attachment 1
Financial Policies
341
City of Huntington Beach
Financial Policies
Adopted FY 2006/07
FINANCIAL REPORTING AND ACCOUNTING STANDARDS
. The City's accounting system will be maintained in accordance with generally accepted accounting
practices and the standards of the Government Accounting Standards Board and the Government Finance
Officers Association.
. The annual financial report will be prepared within six months of the close of the previous fiscal year. The
City will use generally accepted accounting principles in preparing the annual financial statements and will
attempt to qualify for the Government Finance Officers Association's Excellence in Financial Reporting
Program.
. The City will strive for an unqualified audit opinion. An unqualified opinion is rendered without reservation
by the independent auditor that financial statements are fairly presented.
. The City will contract for an annual audit by a qualified independent certified public accounting firm. The
independent audit firm will be selected through a competitive process at least once every five years. The
contract period will be for an initial period of three years, with two one-year options.
BUDGETING
. The budget will be prepared consistent with the standards developed by the Government Finance Officers
Association and California Society of Municipal Finance Officers. In addition, a summary version will be
provided to the public in a user-friendly format.
. The City will maintain a balanced operating budget for all funds with estimated revenues being equal to, or
greater than, estimated expenditures, and with periodic City Council reviews and necessary adjustments to
maintain balance.
. On-going revenues will support on-going expenditures. Revenues from one-time or limited duration
sources will not be used to balance the annual operating budget.
. Support function appropriations will be placed in the department in which they are managed.
GENERAL FUND BALANCE
The General Fund reserve (designation) will be a minimum of seven percent of the General Fund budget.
In addition, a second tier reserve will consist of the net accumulation of amounts that were in excess of the
seven percent reserve (designation) and remained in the General Fund after application of the financial
policy that immediately follows. This second tier reserve will be used to balance budget fluctuations.
. Allocation of the audited General Fund balance in excess of the above reserves (designations) may be as
follows:
25 percent for capital projects (transferred to the Capital improvement Reserve)
25 percent for InfrastructureStransferred to the Infrastructure Fund)
50 percent to increase the 2 tier reserve
. All supplemental appropriations from the General Fund minimum reserve that cannot otherwise be funded
during the current fiscal year operating budget must meet one of the three following criteria:
It is an unanticipated emergency.
It is required to implement a Memoranda of Understanding (MOU)or a mandate.
It is a new expense that is offset by related revenues.
342
Lo
a @ut r0d ,..
�` City of Huntington Beach �sos zoos
-> zt y Financial Policies -,
y�Faur �Foz, ,�, ;. - -�,
Adopted Budget— FY 2009l9 0 -��
FINANCIAL REPORTING AND ACCOUNTING STANDARDS
o The City's accounting system will be maintained in accordance with generally accepted
accounting practices and the standards of the Government Accounting Standards Board
(GASB)and the Government Finance Officers Association (GFOA).
o The annual financial report will be prepared within six months of the close of the previous
fiscal year. The City will use generally accepted accounting principles in preparing the
annual financial statements and will attempt to qualify for the Government Finance Officers
Association's Excellence in Financial Reporting Program.
o The City will strive for an unqualified audit opinion. An unqualified opinion is rendered •
without reservation by the independent auditor that financial statements are fairly presented.
o The City will contract for an annual audit by a qualified independent certified public
accounting firm. The independent audit firm will be selected through a competitive process
at least once every five years. The contract period will be for an initial period of three years,
with two one-year options.
BUDGETING
o The budget will be prepared consistent with the standards developed by the Government
Finance Officers Association and California Society of Municipal Finance Officers (CSMFO).
In addition, a summary version will be provided to the public in a user-friendly format.
❑ The City will maintain a balanced operating budget for all funds with estimated revenues
being equal to, or greater than, estimated expenditures, and with periodic City Council
reviews and necessary adjustments to maintain balance.
o On-going revenues will support on-going expenditures. Revenues from one-time or limited
duration sources will not be used to balance the annual operating budget.
o Support function appropriations will be placed in the department in which they are managed_
GENERAL FUND BALANCE
o There will be an established Economic Uncertainties Reserve commitment in the General
Fund. The goal is to have an Economic Uncertainties Reserve commitment equal to the
value of two months of the General Fund expenditure adopted budget amount.
o Once established, appropriations from the Economic Uncertainties Reserve commitment
can only be made by formal City Council action. Generally, appropriations and access to
these funds will be reserved for emergency situations. Examples of such emergencies
include, but are not limited to:
• An unplanned, major event such as a catastrophic disaster requiring expenditures over
5% of the General Fund adopted budget
• Budgeted revenue taken by another government entity
-t Drop in projected/actual revenue of more than 5% of the General Fund adopted
revenue budget
❑ Should the Economic Uncertainties Reserve commitment be used, and its level falls below
the minimum amount of two months of General Fund expenditures adopted budget, the
goals is to replenish the fund within three fiscal years.
350
343
�}ttit�Gr Z -u`
ou ' City of Huntington Beach
g 08
Financial Policies ' ,�Q9 za ;
� Adopted Budget — FY 2009/10
u Allocation of the audited General Fund unassigned fund balance will be done as follows if,
and until, the Economic Uncertainties Reserve commitment is fully funded (i.e., two months
of General Fund expenditures):
■ 50%to Economic Uncertainties Reserve commitment
• 25%for Infrastructure Fund
25%.to Capital Improvement Reserve (CI R)commitment
o Once the Economic Uncertainties Reserve commitment attains full funding, unassigned fund
balance will be divided as follows:
• 25%for Infrastructure Fund
25%to Capital Improvement Reserve (CI R)commitment
• 50%to Equipment Replacement commitment
o Any unanticipated and unrestricted revenues received during the fiscal year will be added to
the fund balance of the General Fund.
FUND BALANCE CLASSIFICATION
o The City's fund balance is made up of the following components:
■ Nonspendable fund balance typically includes inventories, prepaid items, and other
items that, by definition cannot be appropriated.
-- The restricted fund balance category includes amounts that can be spent only for the
specific purposes stipulated by constitution, external resource providers, or through
enabling legislation.
■ The committed fund balance classification includes amounts that can be used only for
the specific purposes determined by a formal action of the City Council. The City
Council has authority to establish, modify, or rescind a fund balance commitment.
• Amounts in the assigned fund balance classification are intended to be used by the
City for specific purposes but do not meet the criteria to be classified as restricted or
committed. The City Administrator or designee has the authority to establish, modify,
or rescind a fund balance assignment.
• Unassigned fund balance is the residual classification for the City's funds and includes
all spendable amounts not contained in the other classifications.
o The City considers restricted or unrestricted amounts to have been spent when an
expenditure is incurred for purposes for which both restricted and unrestricted fund balance
is available.
o The City's committed, assigned, or unassigned amounts are considered to have been spent
when an expenditure is incurred for purposes for which amounts in any of those unrestricted
fund balance classifications could be used.
APPROPRIATION AUTHORITY
o The City Council is the appropriation authority for the City Budget. As required by state law,
appropriations expire at the end of each fiscal year.
351
344
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Replace R22 Air PROJECT DESCRIPTION: Over the next five years, replace all existing Air Conditioning equipment
Conditioning Equipment containing R22 refrigerant.
PROJECT NEED: Federal regulation prohibits the manufacture and import of R22 refrigerant
FUNDING DEPARTMENT: effective 1/1/2020. Equipment containing R22 is now obsolete, and retrofit to a
Public Works new refrigerant is not cost effective. R22 is increasingly scarce and expensive.
DEPT. PROJECT MGR: SOURCE DOCUMENT: EPA.gov Phase-out of Ozone Depleting Substances
Denny Bacon
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: N/A Design/Environmental
Construction Complete: FY 2025/26 Construction $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000
I FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
. ;f Ink Fund(314) S 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000
( w
J TOTAL $ 150,000 $ 150,000. $ 150,000 $ 150,000 $ 150,000
{ MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 750,000
Additional annual cost: $0
/ Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
r included in Public Works Operating Budget.
4.
CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
Facilities R22 Replacement
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Helipad Lot Rehabilitation PROJECT DESCRIPTION: Remove and replace the asphalt landing pad at the Police Heliport with
concrete.
PROJECT NEED: The current helipad is asphalt and quickly comes into disrepair. As the asphalt
FUNDING DEPARTMENT: degrades, small rocks are kicked up by the turbulent air coming off the rotors.
Police This allows the rocks to become a hazard.
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Jon Naught
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21122 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental $ 10,000
Construction Complete: FY 2021/22 Construction $ 480,000
Project Management
Supplementals $ 10,000
R/W
PROJECT LOCATION Other
TOTAL $ 500,000
C'
FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
InkFund(314) $ 500,000
g
n
TOTAL $ 500,000
con.re
FS
M11
hill
NI
MAINTENANCE COST IMPACT:
Additional annual cost: $0 TOTAL PROJECT COST: $ 500,000
taboo
NRopah Dr
/5 Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
included in Police Operating Budget.
.p Crc k P�"a fl 1
s e. a s t��as CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
Facilities Helipad
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION (New)
PROJECT TITLE: Civic Center UST PROJECT DESCRIPTION: Remove fuel underground storage tank(UST)and replace with new double wall
Replacement tank and new underground piping and electronics for tank management.
Upgrade obsolete dispensers. Upgrade canopy for vehicle clearance and
protection from the elements
PROJECT NEED: AQMD and California Water Resources Board compliance necessitates the
FUNDING DEPARTMENT: replacement of existing aging, obsolete fuel infrastructure serving the Police
Public Works Department at the Civic Center
DEPT. PROJECT MGR: SOURCE DOCUMENT: NA
Denny Bacon
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental $ 75,000
Construction Complete: FY 2022/23 Construction $ 900,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 75,000 $ 900,000
FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
ink Fund(314) $ 75,000 $ 900,000
Yorktown Ave
y 1 _' TOTAL $ 75,000 $ 900,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 975,000
Utica Ave Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
included in Public Works Operating Budget.
CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
Facilities CC UST Replacement
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Huntington Bluffs PROJECT DESCRIPTION: Phase 1 is for Design/Studies to obtain approval from CA Coastal Commission
Stabilization Project to stabilize two localized areas along the Bluffs. Phase 2 would be for
construction.
PROJECT NEED: The bluffs continue to erode and will eventually jeopardize existing pathways
FUNDING DEPARTMENT: and parking lots.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: Moffatt& Nichol Coastal Engineering Feasibility Study(2018)
Chris Tanio
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental $ 400,000
Construction Complete: FY 2022/23 Construction $ 1,000,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
i`T� t*Kz TOTAL $ 400,000 $ 1,000,000
^*! *\ •�. ., J FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
F . _, % Ink Fund $ 400,000 $ 1,000,000
`•.•. ;4:* TOTAL $ 400,000 $ 1,000,000
.�` MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 1,400,000
•; Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
included in Public Works Operating Budget.
CATEGORY: Parks & Beaches
COMMENTS ON GRANTS/OTHER FUNDS:
Parks & Beaches HB Bluffs Stabilization Project
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Oak View Community PROJECT DESCRIPTION: The complete project includes design and rehabilitation of the existing Oak View
Center Rehabilitation Community Center, including the Oak View Family Resource Center and Gym,
as well as expansion of the Oak View Branch Library. Phasing of construction
is proposed to limit programming impacts.
PROJECT NEED: Expansion and rehabilitation of the facility is necessary in order to better serve
FUNDING DEPARTMENT: the Oak View community.
Community Services
DEPT. PROJECT MGR: SOURCE DOCUMENT: Development Impact Fee Calculation and Nexus Report,April 27, 2012
Farhad Bolourchi
COUNCIL PRIORITY POLICY: Enhance and maintain infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental $ 900,000
Construction Complete: FY 2023/24 Construction $ 4,125,000 $ 4,125,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other -
TOTAL $ 900,000 $ 4,125,000 $ 4,125,000
x
FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
w lnfr Fund(314) $ 900,000 $ 4,125,000 $ 4,125,000
z
TOTAL $ 900,000 $ 4,125,000 $ 4,125,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 9,150,000
Additional annual cost: $0
None PROJECT TYPE: New & Rehabilitation
CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
Alternative funding sources with local community
partners will be pursued as plans develop.
Facilities Oak View Com Ctr
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION (New)
PROJECT TITLE: Central Library Restroom PROJECT DESCRIPTION: Rehabilitate the lower level restroom at the Central Library to bring it into
ADA Rehabilitation compliance with the American's with Disabilities Act(ADA).
PROJECT NEED: The existing restroom was built in 1975 and is not in compliance with the ADA.
FUNDING DEPARTMENT:
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: City of Huntington Beach Facilities ADA Transition Plan
Chris Tanio
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental S 30,000
Construction Complete: FY 2022/23 Construction $ 260,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 30,000 $ 260,000
vai Ue Sa or.
FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Infr Fund(314) S 30,000 $ 260,000
TOTAL $ 30,000 $ 260,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 290,000
Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
included in Public Works Operating Budget.
CATEGORY: Facilities
COMMENTS ON GRANTS I OTHER FUNDS:
Facilities Central Library Restroom
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION (New)
PROJECT TITLE: Huntington Lake Elevated PROJECT DESCRIPTION: As part of multi-year ongoing improvements to Central Park, construct a new
Pathway elevated pathway in Central Park East near the lake.
PROJECT NEED: Improve the appearance and function of the park.
FUNDING DEPARTMENT:
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Denny Bacon
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: N/A Design/Environmental
Construction Complete: FY 2021/22 Construction S 250,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 250,000
FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Ink Fund(314) S 250,000
Talbert Awp-,,
U)
0 3 0
m y m
EII Ave° " TOTAL $ 250,000 _
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 250,000
Additional annual cost: $5,000
Project includes installation of new infrastructure PROJECT TYPE: New Construction
that will require maintenance.
CATEGORY: Parks& Beaches
COMMENTS ON GRANTS/OTHER FUNDS:
Parks& Beaches Huntington Lake Elevated Path
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION (New)
PROJECT TITLE: Central Library Exterior PROJECT DESCRIPTION: Repaint Central Library exterior surfaces
Paint
PROJECT NEED: Exteriors have not been painted since 1995, which is well past recommended
FUNDING DEPARTMENT: paint lifecycle. Repainting is necessary to preserve the building exterior and
Public Works improve appearance.
DEPT. PROJECT MGR: SOURCE DOCUMENT: 15/16 Facilities Condition Assessment, Facilities Deferred Maintenance Plan,
Denny Bacon Unfunded Facilities CIP Needs Assessment
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21122 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: N/A Design/Environmental
Construction Complete: FY 2021/22 Construction S 82,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 82,000
Yrs4 Da$tl Df. g
FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
.ui acre ur. a I , --
InkFund(314) $ 82,000
Re Vttln Del
= TOTAL $ 82,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 82,000
;Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
included in Public Works Operating Budget.
CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
Facilities Central Library Exterior Paint
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Jr. Lifeguard HQ Upgrades PROJECT DESCRIPTION: Replace, repair and/or restore building exterior components and finishes as
necessary including railings, roof drains, downspouts, stucco, paint, and roof
PROJECT NEED: Rehabilitation is necessary to restore facility due to deterioration from
FUNDING DEPARTMENT: environmental conditions, age, and use. The anchoring system for the exterior
Public Works railing is failing and creating a safety issue
DEPT. PROJECT MGR: SOURCE DOCUMENT: 15/16 Facilities Condition Assessment, Facilities Deferred Maintenance Plan,
Denny Bacon Unfunded Facilities CIP Needs Assessment
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: N/A Design/Environmental
Construction Complete: FY 2021/22 Construction S 210,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 210,000
FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
lnfr Fund(314) S 210,000
'tck TOTAL $ 210,000
c� c
� Dip Grp r — --
3 "' MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 210,000
Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
included in Public Works Operating Budget.
CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
Facilities Jr LG Upgrades
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Fueling Station Canopies PROJECT DESCRIPTION: This is a multi year project to install three (3) new caponies and replace five (5)
old canopies.
PROJECT NEED: The City has eight(8)fueling islands-three(3) have no canopies and five (5)
FUNDING DEPARTMENT: have outdated canopies. Canopies are necessary to comply with NPDES
Public Works requirements.
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Denny Bacon
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental
Construction Complete: FY 2022/23 Construction $ 500,000 $ 300,000
Project Management $ 50,000 $ 30,000
Supplementals
R/W
PROJECT LOCATION Other
1,, -L TOTAL $ 550,000 $ 330,000
.1.
I • al FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
N i I. _' , Ink Fund(314) $ 550,000 $ 330,000
\- I - -"""
. 1. ;. i, / TOTAL $ 550,000 $ 330,000
! MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 880,000
c-
`',N ) • . Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
included in Public Works Operating Budget.
CATEGORY: Drainage
COMMENTS ON GRANTS/OTHER FUNDS:
Drainage Fuel Canopies
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Arterial Rehabilitation PROJECT DESCRIPTION: Streets include Edinger(Saybrook-Countess),Warner(Algonquin-Los Patos),
Talbert(Edwards-Springdale), Newland (Talbert-Slater), Brookhurst(Yorktown-
Adams), Saybrook(Edinger-Heil), and Springdale (Warner-Slater)as budget
allows
PROJECT NEED: Required to meet the goals of the Pavement Management Plan.
FUNDING DEPARTMENT:
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: 2020 Pavement Management Plan
Chris Tanio
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental
Construction Complete: FY 2021/22 Construction $ 5,200,000 S 5,400,000 $ 5,400,000 $ 5,400,000 $ 5,400,000
Project Management $ 100,000 S 100,000 $ 100,000 $ 100,000 $ 100,000
Supplementals $ 100,000 S 100,000 $ 100,000 $ 100,000 $ 100,000
R/W
PROJECT LOCATION Other
TOTAL $ 5,400,000 $ 5,600,000 $ 5,600,000 $ 5,600,000 $ 5,600,000
FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
-• lnfr Fund(314) $ 600,000 $ 600,000 $ 600,000 $ 600,000 $ 600,000
• tqq ,..,-..� RMRA (1247) $ 4,800,000 $ 5,000,000 $ 5,000,000 $ 5,000,000 $ 5,000,000
� 3
- TOTAL $ 5,400,000_ $ 5,600,000 $ 5,600,000 $ 5,600,000—
: $ 5,600,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 27,800,000
Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
included in Public Works Operating Budget.
CATEGORY: Streets
COMMENTS ON GRANTS I OTHER FUNDS:
Streets&Transportation Arterial Rehabilitation
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Gothard Street Fiber Optic PROJECT DESCRIPTION: Install fiber optic conduit and cable along Gothard Street between Edinger
Avenue and Warner Avenue. Project provides improved communication
resilience between City Hall and the northerly part of the City including the City
Yard and the traffic signals in the area.
PROJECT NEED: This is needed to improve connectivity between City Hall and other City facilities
FUNDING DEPARTMENT: and traffic signals to the north. This segment improves redundancy which will
Public Works maintain communications in case of a single break in the cable.
DEPT. PROJECT MGR: SOURCE DOCUMENT: Traffic Signal System Master Plan
William Janusz
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental $ 80,000
Construction Complete: FY 2022/23 Construction S 606,000
Project Management S 30,000
Supplementals $ 15,000
R/W
PROJECT LOCATION Other
TOTAL $ 80,000 $ 651,000
1 l FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
lnfr Fund(314) $ 80,000 $ 651,000
v, Ate• i
Slaba A.e
TOTAL $ 80,000 $ 651,000
MAINTENANCE COST IMPACT:
Additional annual cost: $1,000 TOTAL PROJECT COST: $ 731,000
A,i•AeIA nv.
ti�:_ I 7 Project includes installation of new infrastructure PROJECT TYPE: New
that will require maintenance.
CATEGORY: Transportation
COMMENTS ON GRANTS/OTHER FUNDS:
Streets&Transportation Gothard Fiber
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Zone 5 Curb Ramps PROJECT DESCRIPTION: Installation of curb access ramps in conjunction with maintenance improvements
within Maintenance Zone 5.
PROJECT NEED: Curb access ramps are required when adjacent streets are altered or
FUNDING DEPARTMENT: rehabilitated.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: 2020 Pavement Management Plan
Chris Tanio
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental
Construction Complete: FY 2025/26 Construction S 652,516 $ 600,000 $ 600,000 $ 600,000 $ 600,000
Project Management $ 65,000 $ 65,000 $ 65,000 $ 65,000 $ 65,000
Supplementals
R/W
PROJECT LOCATION Other
cs
s,..
TOTAL $ 717,516 $ 665,000 $ 665,000 $ 665,000 $ 665,000
L A FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
N �4°'Ave 5, Measure M(213) $ 200,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000
Ink Fund(314) $ 315,000 $ 65,000 $ 65,000 $ 65,000 $ 65,000
•, 5` CDBG (239) $ 203,283 $ 300,000 $ 300,000 $ 300,000 $ 300,000
1`
eIs TOTAL $ 718,283 $ 665,000 $ 665,000 $ 665,000 $ 665,000
�a
`'� MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 3,378,283
Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: New
included in Public Works Operating Budget.
CATEGORY: Neighborhood
COMMENTS ON GRANTS/OTHER FUNDS:
Neighborhood Residential Curb Ramps
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Residential Street Name PROJECT DESCRIPTION: Replace deteriorated street name signs throughout the City.
Signs
PROJECT NEED: Many of the street name signs throughout the City have become faded, bent, or
FUNDING DEPARTMENT: hard to read and need to be replaced.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Bob Stachelski
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental
Construction Complete: FY 2021/22 Construction $ 500,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
V--:1_:3
TOTAL $ 500,000
'1 FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
,\ 3 _. I"""` �—1 lnfr Fund(314) $ 500,000
I
\\ T...ctl_.4c.
s pi !i TOTAL $ 500,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 500,000
ro�,� !., Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
included in Public Works Operating Budget.
CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
Streets&Transportation Residential Street Name Signs
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION (New)
PROJECT TITLE: Beach Parking Lot PROJECT DESCRIPTION: This project will rehabilitate the south beach parking lots between 1st and
Rehabilitation Huntington Streets-which includes the Sunset Vista RV Campground. Parking
lot has not been resurfaced since 2003. Over 250,000 vehicles and RVs use this
section of the lot annually.
PROJECT NEED: Parking lot is aged with allorgatoring asphalt and diminished stall markings. In
FUNDING DEPARTMENT: addition, campsite hook-up pedestals need replacing and upgrading to 50 amps.
Public Works Current pedestals are a safety hazard due to exposed wires and rust.
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Farhad Bolourchi
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental $ 50,000
Construction Complete: FY 2021/22 Construction $ 1,355,000
Project Management $ 70,000
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 1,475,000
oavou
FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
.. , . lnfr Fund(314) $ 1,475,000
wa
TOTAL $ 1,475,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 1,475,000
Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
included in Public Works Operating Budget.
1 CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
Parks& Beaches Beach Pkg Lot
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: HCP Sports Complex LED PROJECT DESCRIPTION: Year 1 of a five-year plan to replace existing lighting at HCP Sports Complex
Lighting Retrofit with new LED fixtures as follows: Year 1 to include Fields 1 and 2; Year 2 to
include Fields 3 and 4; Year 3 to include Fields 5 and 7; Year 4 to include Fields
6 and 8; Year 5 includes the batting cage area and artificial turf fields.
PROJECT NEED: Existing ballasts are rusting due to the marine environment. LED lighting will
FUNDING DEPARTMENT: reduce energy and maintenance costs, as well as reduce spill light and glare.
Public Works Warranty program includes materials and onsite labor over a 25-year period.
DEPT. PROJECT MGR: SOURCE DOCUMENT: Vendor estimate.
Farhad Bolourchi
COUNCIL PRIORITY POLICY: Enhance and maintain infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: N/A Design/Environmental
Construction Complete: FY 2025/26 Construction S 477,000 $ 482,000 $ 429,000 $ 331,000 $ 276,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 477,000 $ 482,000 $ 429,000 $ 331,000 $ 276,000
_ FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
lnfrFund(314) $ 477,000 $ 482,000 $ 429,000 $ 331,000 $ 276,000
A
4 A , , .., TOTAL $ 477,000 $ 482,000 $ 429,000 $ 331,000 $ 276,000
Iill MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 1,995,000
\, Additional annual cost: $0
Any unanticipated maintenance cost will be included in PROJECT TYPE: New & Rehabilitation
PROJECT LOCATION • Public Works Operating Budget.
\ •
\ CATEGORY: Facilities
‘<. .. COMMENTS ON GRANTS/OTHER FUNDS:
\ j,
Facilities Sports Complex LED Lighting
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION (New)
PROJECT TITLE: Glen View Park Playground PROJECT DESCRIPTION: Installation of new playground equipment and turf renovation at Glen View Park
Improvements
PROJECT NEED: The playground equipment at Glen View Park is over 20 years old. New
FUNDING DEPARTMENT: equipment and site turf improvements are needed in order for the playground to
Public Works comply with ADA requirements.
DEPT. PROJECT MGR: SOURCE DOCUMENT: 2018 City Council approved Playground Replacement Priority list; City of
Farhad Bolourchi Huntington Beach Parks& Recreation Master Plan, Feb. 2016
COUNCIL PRIORITY POLICY: Enhance and maintain infrastructure
SCHEDULE: PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental
Construction Complete: FY 2021/22 Construction S 215,000
Project Management S 5,000
Supplementals
R/W
PROJECT LOCATION Other
.. ! k ` - _ _ All TOTAL $ 220,000
FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
"Gfr^ � c " "}1i ` ' Ink Fund(314) S 220,000
ix ,.
L,. ,....
n✓ aisraire iw.
.�._.- 1 t {
H— w ,1 „ TOTAL $ 220,000
_� '!:
Y MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 220,000
.i a_ t - Ina rc In
M�,,,:,.,. Additional annual cost: $0
L,10001 4 r _ i C MOnle'•n
- Any unanticipated maintenance cost will be included in PROJECT TYPE: New & Rehabilitation
Public Works Operating Budget.
7,1TTu..4.1.Jdi;n r n I I-I I CATEGORY: Parks & Beaches
COMMENTS ON GRANTS/OTHER FUNDS:
Parks& Beaches Glen View Park Playground Imp
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Citywide Mobility anct PROJECT DESCRIPTION: Design and construction of various bikeway and aesthetic infrastructure on key
Corridor Improvements routes where enhanced bicycle and pedestrian facilities can be implemented with
minimal roadway restructuring. Target roadways include Delaware, Atlanta,
Graham, Springdale and Goldenwest.
PROJECT NEED: Project goals support overall desire to improve pedestrian and bicycle safety,
FUNDING DEPARTMENT: enhance experience, and promote alternative modes of transportation.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: Bike Master Plan
William Janusz
COUNCIL PRIORITY POLICY: Enhance and maintain the infrastructure
SCHEDULE: r PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental $ 90,000
Construction Complete: FY 2022/23 Construction $ 600,000
Project Management $ 50,000
Supplementals $ 60,000
R/W
PROJECT LOCATION Other
I_L TOTAL ' $• 800,000
FUNDING SOURCES FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
`N 1 . `=1 Infr Fund(314) ' $• 400,000
''' R - Traffic Impact Fee(206) $ 400,000
•LC1h6J
�\ ,r-- 1 • �JJ TOTAL $• 800,000
1 E
! ' ..1 , .i` MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 800,000
l Additional annual cost: $20,000
Project includes installation of new infrastructure PROJECT TYPE: New
i that will require maintenance.
I \`/- CATEGORY: Transportation
COMMENTS ON GRANTS I OTHER FUNDS:
Streets&Transportation Citywide Mobility
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION (Continuing Project)
PROJECT TITLE: Fueling Station Canopies PROJECT DESCRIPTION: This is a multi year project to install three (3) new fuel island canopies and
replace two(2)old canopies. Warner Fire Station is from prior years. FY 23/24
will install one each at PTL Yard and Lake Fire Station. FY 24/25 will install two
at Corp Yard.
PROJECT NEED: The City is required to install/replace fuel island canopies at five (5)City facility
FUNDING DEPARTMENT: locations-three (3) locations have no existing canopies and two(2)
Public Works have outdated canopies. Canopies are necessary to comply with NPDES
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
B. Polivka
STRATEGIC PLAN GOAL: Implement solutions to enhance public safety
Approved Requested
SCHEDULE: PROJECT COSTS ' Prior FY 23/24 FY 24/25 FY 25/26 FY 26/27
Design Complete: FY 2022/23 Design/Environmental
Construction Complete: FY 2023/24 Construction $ 500,000 $ 500,000 $ 500,000
Project Management $ 50,000
Supplementals
R/W
PROJECT LOCATION Other
Lf TOTAL $ 550,000 $ 500,000 $ 500,000
eev - FUNDING SOURCES Prior FY 23/24 FY 24/25 FY 25/26 FY 26/27
•
lull-■' $ 500,000
��.��1®MI lnfr Fund(314) $ 550,000 $ 500,000
.,Fs 1) eee.
il re■
Ia.
' I TOTAL $ 550,000 $ 500,000 $ 500,000
\�, 111eeee, MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 1,550,000
�' 111.11 I Additional annual cost: $60,000
`� E= / Annual maintenance for fueling equipment and PROJECT TYPE: Rehabilitation
111111111 storage tanks
4 I 1 CATEGORY: Drainage
COMMENTS ON GRANTS/OTHER FUNDS:
Drainage Fueling Station Canopies
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Surfside-Sunset Beach PROJECT DESCRIPTION: Collaborative project with the US Army Corps of Engineers, cities of Newport
Nourishment Project Beach, Seal Beach, and Surfside Stormwater Protection Division, and County of
Orange. Project entails dredging 1.75 million cubic yards of sand from off shore
site to replenish eroded beach sand. This is the 13th stage of the project.
PROJECT NEED: Project is needed to restore eroded beach sand which acts as a natural buffer
FUNDING DEPARTMENT: from damaging waves and provides recreational amenities for residents and
Public Works visitors alike.
DEPT. PROJECT MGR: SOURCE DOCUMENT:
Jim Merid
STRATEGIC PLAN GOAL: Implement solutions to enhance public safety
SCHEDULE: PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28
Design Complete: FY 2020/21 Design/Environmental
Construction Complete: FY 2023/24 Construction $410,517
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 410,517
FUNDING SOURCES FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28
lnfr Fund(314) $ 410,517
\\\\
TOTAL $ 410,517
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 410,517
Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
included in Public Works Operating Budget.
CATEGORY: Parks& Beaches
COMMENTS ON GRANTS/OTHER FUNDS:
Parks&Beaches Surfside-Sunset Bch Nourishment
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: McCallen Storm Drain PROJECT DESCRIPTION: Construction and installation of a trash removal device in-line system
Trash Removal Project (TrashTrap)on Delaware Street adjacent to McCallen Park. The device is an
extra large fixed basket designed to remove trash/debris larger than 5mm in
size.
PROJECT NEED: The basis for this project is compliance with the State's Trash Provisions which
FUNDING DEPARTMENT: requires the City to implement trash removal devices to remove trash 5mm or
Public Works greater from the storm drain system.
DEPT. PROJECT MGR: SOURCE DOCUMENT: Trash Provisions regulation as adopted by the State Water Resources Control
Jim Merid Board in 2017. Consultant cost estimate.
STRATEGIC PLAN GOAL: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
Design Complete: FY 2021/22 Design/Environmental $ 12,000
Construction Complete: FY 2022/23 Construction $ 763,000
Project Management $ 35,000
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 810,000
FUNDING SOURCES FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
Ink Fund(314) $ 310,000
Project X(1275) $ 500,000
j TOTAL $ _ 810,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 810,000
PROJECT - Arms AvE Additional annual cost: $1,200
AREA Any unanticipated maintenance cost will be PROJECT TYPE: New
included in Public Works Operating Budget.
CATEGORY: Drainage
COMMENTS ON GRANTS/OTHER FUNDS:
Drainage Trash Removal
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Joint Youth Training Center PROJECT DESCRIPTION: This funding would be allocated to build a new Joint Youth Training Center on
for Fire and Police the CNET training ground with new Fire Department and Police Department
equipment to develop a two-track program that provides vocational and
educational pathways for local students and underserved youth.
PROJECT NEED: The new building would house the Police Department and Fire Department's
FUNDING DEPARTMENT: two-track youth program equipment, education, and training.
Fire
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Eric McCoy
STRATEGIC PLAN GOAL: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
Design Complete: FY 2022/23 Design/Environmental $ 180,000
Construction Complete: FY 2023/24 Construction $ 1,640,000
Project Management $ 180,000
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 2,000,000
FUNDING SOURCES FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
Infr Fund(314) $ 2,000,000
IMP
—16.1101/10
• TOTAL $ 2,000,000
EII4 A.o
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 2,000,000
Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: New Construction
included in Public Works Operating Budget.
CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
HB Recovery Funds
Facilities Joint Youth Training Center
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION (Continuing Project)
PROJECT TITLE: Oak View Community PROJECT DESCRIPTION: The complete project includes the demolition and reconstruction of the Family
Center Rehabilitaion Resources Center, rehabilitation of the gym, path &lighting improvements, as
well as expansion of the Oak View Branch Library. The prior year amount is for
community input, conceptual design, as well as plans and specs.
PROJECT NEED: Expansion & rehabilitation of the community center&branch library are needed
FUNDING DEPARTMENT: in order to better serve the community. The Council-approved ARPA funding
Public Works will be allocated to the next steps in the design/construction phase.
DEPT. PROJECT MGR: SOURCE DOCUMENT: Development Impact Fee and Nexus Report-April 27, 2012
Ashley Wysocki
STRATEGIC PLAN GOAL: Enhance and maintain the infrastructure
Approved Requested
SCHEDULE: PROJECT COSTS Prior FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: Design/Environmental $ 900,000
Construction Complete: Construction $ 2,000,000 $ 6,250,000 $ 3,000.000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 900,000 $ 2,000,000 $ 6,250,000 $ 3,000,000
Z C
rJ
FUNDING SOURCES Prior FY 22/23 FY 23/24 FY 24/25 FY 25/26
a' Ink Fund(314) $ 900,000 $ 2,000,000
Unfunded $ 6,250,000 $ 3,000,000
2
TOTAL $ 900,000 $ 2,000,000 $ 6,250,000 $ 3,000,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 12,150,000
Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: New & Rehabilitation
included in Public Works Operating Budget.
CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
HB Recovery Fund
Facilities Oak View Community Center
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(Continuing Project)
PROJECT TITLE: Civic Center UST PROJECT DESCRIPTION: Design was completed in FY 21-22. Construction phase includes removal of
Replacement existing Underground Storage Tank, installation of new double wall tank, and
associated infrastructure and technology. Replace obsolete dispenser. Upgrade
canopy for vehicle clearance and weather protection.
PROJECT NEED: AQMD and California Water Resources Board compliance necessitates the
FUNDING DEPARTMENT: replacement of existing aging, obsolete fuel infrastructure serving the Police
Public Works Department at the Civic Center by 2025.
DEPT. PROJECT MGR: SOURCE DOCUMENT: NA
Cody Jahn
STRATEGIC PLAN GOAL: Enhance and maintain the infrastructure
Approved Requested
SCHEDULE: PROJECT COSTS Prior FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2021/22 Design/Environmental $ 75,000
Construction Complete: FY 2022/23 Construction $ 1,000,000
Project Management $ 160,000
Supplementals $ 50,000
R/W
PROJECT LOCATION Other
TOTAL $ 75,000 $ 1,210,000
FUNDING SOURCES Prior FY 22/23 FY 23/24 FY 24/25 FY 25/26
lnfr Fund(314) $ 75,000 $ 1,210,000
Yorktown Ave
•
r.lr'N TOTAL $ 75,000 $ 1,210,000
ri $
ie * H
ill 2
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 1,285,000
Additional annual cost: $0
utice Ave
lipp .•
/ Any unanticipated maintenance cost will be PROJECT TYPE: New
included in Public Works Operating Budget.
CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
Facilities Civic Center UST Replacement
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Civic Center Generator and Main PROJECT DESCRIPTION: Replace the two existing Civic Center generators with a modern diesel driven
Switchgear Replacement generator capable of providing power to the required Civic Center circuits in the
event of a power failure.Also, replace the outdated switchgear equipment with
modern technology equipment.
PROJECT NEED: The current generators are undersized, out of compliance with fire code and do
FUNDING DEPARTMENT: not have the capacity to supply power to the building fire sprinkler pump.
Public Works Generator and switchgear are also 45+years old, parts no longer available.
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Kevin Dupras
STRATEGIC PLAN GOAL: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
Design Complete: FY 2022/23 Design/Environmental $ 30,000
Construction Complete: FY 2022/23 Construction $ 1,250,000
Project Management $ 100,000
Supplementals $ 55,000
RNV
PROJECT LOCATION Other
TOTAL $ 1,435,000
FUNDING SOURCES FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26127
lnfr Fund(314) $ 1,435,000
Yorktown Ave
Ct
r f TOTAL $ 1,435,000
/ d
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 1,435,000
Utica Ave Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: New & Rehabilitation
included in Public Works Operating Budget.
CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
Facilities Civic Center Generator
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Roof Replacement City PROJECT DESCRIPTION: Roof replacement needed at the City Yard, Building"A"due to overall poor
Yard Building"A" condition and multiple leaks.
PROJECT NEED: Roof is leaking and in poor condition.
FUNDING DEPARTMENT:
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
Kevin Dupras
STRATEGIC PLAN GOAL: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
Design Complete: FY 2022/23 Design/Environmental
Construction Complete: FY 2022/23 Construction $ 130,000
Project Management $ 25,000
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 155,000
r FUNDING SOURCES FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
lnfr Fund(314) $ 155,000
Don Kiser f
Municipal Yard
ISlater Ave. TOTAL $ 155,000 i
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 155,000
Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: New Construction
included in Public Works Operating Budget.
CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
Facilities Roof Replacement City Yard
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: PD Heliport Hangar PROJECT DESCRIPTION: Interior improvements including remodeling maintenance office, kitchen,
recreation area, restrooms, locker room and pilot lounge. Exterior improvements
include roof improvements and skylight replacement.
PROJECT NEED: Current hangar is in need of refurbishment and additional maintenance hangar
FUNDING DEPARTMENT: is needed.
Police
DEPT. PROJECT MGR: SOURCE DOCUMENT:
Capt. Tim Martin
STRATEGIC PLAN GOAL: Enhance and modernize public safety service delivery
SCHEDULE: PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
Design Complete: FY 2022/23 Design/Environmental $ 200,000
Construction Complete: FY 2023/24 Construction $ 1,200,000
Project Management $ 40,000
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 200,000 $ 1,240,000
`^"`..co FUNDING SOURCES FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 '
lnfr Fund(314) $ 200,000 `$ 1,240,000
Rouen::I.
TOTAL $ 200,000 $ 1,240,000
FS Nig
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 1,440,000
kali •
Additional annual cost: $0
155 Any unanticipated maintenance cost will be PROJECT TYPE: New & Rehabilitation
included in Public Works Operating Budget.
nra.rU rw K a,,.,,,.o
CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
Facilities PD Heliport
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION (Continuing Project)
PROJECT TITLE: Replace R22 Air PROJECT DESCRIPTION: Multi-year project to replace all existing Air Conditioning equipment containing
Conditioning Equipment R22 refrigerant at various city facility locations
PROJECT NEED: Federal regulation prohibits the manufacture and import of R22 refrigerant
FUNDING DEPARTMENT: I effective 1/1/2020. Equipment containing R22 is now obsolete and retrofit to a
Public Works new refrigerant is cost prohibitive. R22 is increasingly scarce and expensive.
DEPT. PROJECT MGR: SOURCE DOCUMENT: EPA.gov Phase Out of Ozone Depleting Substances
Denny Bacon
_ STRATEGIC PLAN GOAL: Enhance and maintain the infrastructure
Approved Requested
SCHEDULE: PROJECT COSTS Prior _ FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: N/A Design/Environmental
Construction Complete: FY 2025/26 Construction $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000
Project Management $ 15,000 $ 15,000 $ 15,000 $ 15,000
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 150,000 $ 165,000 $ 165,000 $ 165,000 $ 165,000
r,
FUNDING SOURCES Prior FY 22/23 FY 23/24 FY 24/25 FY 25/26
M Infr Fund(314) $ 150,000 $ 165,000 $ 165,000 $ 165,000 $ 165,000
1
y
r ( TOTAL $ 150,000 $ 165,000 $ 165,000 $ 165,000 $ 165,000
� ij
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 810,000
Additional annual cost: $0
"'" • Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
�i� included in Public Works Operating Budget.
�/ __ CATEGORY: Facilities
COMMENTS ON GRANTS/OTHER FUNDS:
Facilities R22 Replacement
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: City Hall 4th Floor Office PROJECT DESCRIPTION: The City Manager's office on the fourth floor has a new Public Information
Improvements Officer, a Homeless Services Manager, and a new Administrative Assistant. A
space planning study is needed to plan for tenant improvements to house new
staff.
PROJECT NEED: Project need is due to provide more room for new staff within the City Manager's
FUNDING DEPARTMENT: office at City Hall.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT:
TBD
STRATEGIC PLAN GOAL: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
Design Complete: FY 2022/23 Design/Environmental $ 75,000
Construction Complete: N/A Construction
Project Management $ 10,000
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 85,000
FUNDING SOURCES FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
Infr Fund(314) $ 85,000
TOTAL $ 85,000
Yorktown Ave
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 85,000
N r i a Additional annual cost: $0
r.
Any unanticipated maintenance cost will be PROJECT TYPE: Rehabilitation
included in Public Works Operating Budget.
CATEGORY: Facilities
Utica Ave COMMENTS ON GRANTS/OTHER FUNDS:
Facilities City Hall 4th Floor
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(New)
PROJECT TITLE: Zone 2 Curb Ramps PROJECT DESCRIPTION: Installation of curb access ramps in conjunction with maintenance improvements
within Maintenance Zone 2.
PROJECT NEED: Curb access ramps are required when adjacent streets are altered or
FUNDING DEPARTMENT: rehabilitated.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: 2020 Pavement Management Plan
Joseph Fuentes
STRATEGIC PLAN GOAL: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25126 FY 26/27
Design Complete: FY 2022/23 Design/Environmental
Construction Complete: FY 2022/23 Construction $ 600,000 $ 600,000 $ 600,000 $ 600,000 $ 600,000
Project Management $ 65,000 $ 65,000 $ 65,000 $ 65,000 $ 65,000
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 665,000 $ 665,000 $ 665,000 $ 665,000 $ 665,000
± 1A _ ii _ _ //
40/ TO / FUNDING SOURCES FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
N4r, ' Measure M(213) $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000
3 ___ Infr Fund(314) $ 365,000 $ 365,000 $ 365,000 $ 365,000 $ 365,000
n > �� TOTAL $ 665,000 $ 665,000 $ 665,000 $ 665,000 $ 665,000
N/
Nq' MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 3,325,000
\ Additional annual cost: $0
\�/'-�� � Any unanticipated maintenance cost will be PROJECT TYPE: New
\ included in Public Works Operating Budget.
CATEGORY: Neighborhood
COMMENTS ON GRANTS/OTHER FUNDS:
Neighborhood Residential Curb Ramps
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION (New)
PROJECT TITLE: Pattinson Park PROJECT DESCRIPTION: Installation of new custom play units for ages 2-5 and 5-12 years and as needed
Playground/Picnic Area refurbishing of ADA compliant rubberized safety surfacing, as well as
rehabilitation of the picnic area.
PROJECT NEED: Playground equipment is over 20 years old. The units are in significant disrepair
FUNDING DEPARTMENT: and beyond retrofitting of parts to address the current condition. Complete
Public Works replacement of play units are needed.
DEPT. PROJECT MGR: SOURCE DOCUMENT: 2018 City Council approved Playground Replacement Priority List
Ashley Wysocki
STRATEGIC PLAN GOAL: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
Design Complete: FY 2022/23 Design/Environmental
Construction Complete: FY 2022/23 Construction $ 625,000
Project Management
Supplementals
R/W
PROJECT LOCATION Other
TOTAL $ 625,000
5 7,577.
G7.
m d1SS / FUNDING SOURCES FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
lnfr Fund(314) $ 625,000
" bc3
Fauns°n
`°as TOTAL $ 625,000
\ i MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 625,000
\\ Additional annual cost: $0
Any unanticipated maintenance cost will be PROJECT TYPE: New & Rehabilitation
included in Public Works Operating Budget.
CATEGORY: Parks & Beaches
COMMENTS ON GRANTS/OTHER FUNDS:
Parks& Beaches Pattinson Park
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION (New)
PROJECT TITLE: Downtown Revitalization PROJECT DESCRIPTION: Project will reconfigure the broader downtown resort district, including
Improvements enhancements to Main St.
PROJECT NEED: This project will enhance connectivity, revitalize businesses, and provide for
FUNDING DEPARTMENT: increased activities for downtown visitors.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: ARPA Proposed Projects Log
TBD
STRATEGIC PLAN GOAL: Enhance and maintain the infrastructure
SCHEDULE: PROJECT COSTS FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
Design Complete: FY 2022/23 Design/Environmental $ 1,750,000
Construction Complete: FY 2023/24 Construction
Project Management
Supplementals
R/W
PROJECT LOCATION Other
v TOTAL $ 1,750,000
:.9"No
�..,;.�•. FUNDING SOURCES r FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27
~ ® lnfr Fund(314) $ 1,750,000
1,6
TOTAL $ 1,750,000
MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 1,750,000
Additional annual cost: $0
® O '-„ "0 Any unanticipated maintenance cost will be PROJECT TYPE: New
included in Public Works Operating Budget.
CATEGORY: Streets
COMMENTS ON GRANTS/OTHER FUNDS:
HB Recovery Fund
Streets&Transportation Downtown Revitalization
CITY OF HUNTINGTON BEACH
CAPITAL IMPROVEMENT PROJECT INFORMATION(Continuing Project)
PROJECT TITLE: Citywide Mobility and PROJECT DESCRIPTION: Design and construction of various bikeway and aesthetic infrastructure on key
Corridor Improvements routes where enhanced bicycle and pedestrian facilities can be implemented
with minimal roadway restructuring.
PROJECT NEED: Project goals support overall desire to improve pedestrian and bicycle safety
FUNDING DEPARTMENT: while promoting alternative modes of transportation.
Public Works
DEPT. PROJECT MGR: SOURCE DOCUMENT: N/A
William Janusz
STRATEGIC PLAN GOAL: Enhance and maintain the infrastructure
Approved Requested
SCHEDULE: PROJECT COSTS Prior FY 22/23 FY 23/24 FY 24/25 FY 25/26
Design Complete: FY 2022/23 Design/Environmental $ 90,000 $ 200,000
Construction Complete: FY 2022/23 Construction $ 600,000 $ 1,400,000
_ Project Management $ 50,000 $ 300,000
Supplementals $ 60,000 $ 100,000
R/W
PROJECT LOCATION Other _
:__-_, TOTAL $ 800,000 $ 2,000,000
--) —I f
,M� �� FUNDING SOURCES Prior FY 22/23 FY 23/24 FY 24/25 FY 25/26
�r.= lnfr Fund(314) $ 400,000 $ 2,000,000
t■::�� y ` Traffic Impact Fee(206) $ 400,000
��11■
L_.
a•Mi■
+`'11'411111uJ
Inimuoir TOTAL $ 800,000 $ 2,000,000
• iIRlU■
• moons'
'1401 • MAINTENANCE COST IMPACT: TOTAL PROJECT COST: $ 2,800,000
- ! Additional annual cost: $10,000
Any unanticipated maintenance cost will be PROJECT TYPE: New
included in Public Works Operating Budget.
CATEGORY: Transportation
COMMENTS ON GRANTS/OTHER FUNDS:
HB Recovery Fund
Streets &Transportation Citywide Mobility
nfrastru c u re
,,,- _
ING .,
T
......., 04/ v I s o ry F u n..,
, N Report FY
•••••ropRP0RA7F ••• A
•
__ ___
__ _ __ .. ..,72.,
____ ___ , .
- ,,,,,,,,,4,4„, , , 22/23
. -- - ,, ,„,,, „_ i . ,, 20
_ ,
___ .
____:___ _
- _-_ . %
-� - • , April 17, 2024
...-ce-- -- ' ' ... <<' Or
� 1
•• ••
e 0
C°UNTN
�c
�ii;//
BAC KG RO U N
• Prior to 2015, the Public Works Commission acted in
the role of the Citizen's Infrastructure Advisory Board
to review and approve the Infrastructure Fund Report.
In 2015, the CIAB and its duties were separated out,
only to be combined again as of January 2022.
i/� TIN T
III O��•\N�pRPORArF�•.y. 5
i
• ii,
BACKGROU N
• The Infrastructure Fund was established in 2002 , by
City Charter Section 617. Per Section 617 (a), the
originally intended revenue source for the
Infrastructure Fund was a planned utility use tax on
natural gas purchased to generate electricity.
However, this ballot measure failed . So, while the
Charter amendment created the fund , it was left with •,#/' NTlrucr
no source of revenue. %, � . '• , ,
C)bUNTV iAi
NEED/WHY/ BENEFITS
• Charter requirements related to the fund are:
•Revenue placed in the Infrastructure Fund shall not
supplant existing infrastructure funding.
•General Fund expenditures for infrastructure
improvements and maintenance, subsequent to 2001 , shall
not be reduced below 15% of general fund revenues based
on a five-year rolling average.
•The Citizen's Infrastructure Advisory Board/Public Works ....
el°,7\'`°Commission conducts an annual review and performance ; •audit of the Infrastructure Fund and reports its findings to ; " _
the City Council prior to the City Councils adoption of the \
••. :11
:�cF••FB I 1909• ••••�OII'
ensuing fiscal year budget. =coiiiuTy c:P;,�
NEED/WHY/BENEFITS
• The single substantial revenue source to the fund
is General Fund excess fund balance per the
Financial Policy adopted in Fiscal Year 2006/07 .
The Policy was revised beginning in Fiscal Year
2009/10 to allow for an Economic Uncertainties
Reserve commitment. Excerpts addressing the
Infrastructure Fund for the previous and current ,IIo�,-VGTti767A
policies are shown in Attachment 1 of the find
report along with Municipal Charter Section
=COUNTY c,4,ll
DETAILS
• This report covers fiscal year July 1 , 2022-June 30,
2023
Fund Balance July 1 , 2022 $20,484,131
Revenue FY 2022/23 $27,677, 144
Expenditures FY 2022/23 ($ 14,762,937)
Fund Balance July 1 , 2023 $33,398,338
Budgeted Revenue FY 2023/24 $14,900 000 •••01\,�NTINCTo�
%
Budgeted Expenditures FY 2023/24 ( 4$, 190,006)
Budgetary Fund Balance July 1 , 2024 $1 ,355,063 ��'� „ice/
$1 >345 095 ��F :: :::Y:::=.•\`o0°AUNT �P���
RECOMMENDATION
• Approve the Infrastructure Fund Annual Report for
Fiscal Year 2022/23
NTINGT
1,'I o`• .`\NOORPORATeo�*.%vF�\�
f
°OUNTY.t ,0
__,..„,,...g -.-:-r.3--t--•
,. -a... .. ............_ ,‘,....,
..,... ....,... .,..„....._
...„.
/......
Questions •
..,,,,...,
.,,,..„..... ..
. . ;.g___.„,... T,•eat ; ;OW rt:-„,..,,,,,,,_..
"'-• -
-0111 fi...)4t.:10.1m,:tvt
Ba--.-_,:--",*----____„,.. .-,,,-- -,_, .,
skt•'.41athrt''.e754"'Ll- • ' 017. ik ''-;;;";... ..±.,;;';.
. • - -..----7---r..-1--"-•V... 0:.;.!4. . ; 7.r.;-'-.. -4"C.S.0-'-'7'. .
_ Ve,...,..• '..I i t:-'-.---_-_,..1r„i:-. 4?
--...,,..,,-............,„,.,... - ,. „.
r.-4,--..,„,,,;,-_- -
#4,41t
. ,
•-•t:c...,• 0
....--t,.... --.........._ ,
- --1 ---• _ ..--..
...„,...„4„,,--.....,-,.„--:-.-,-- --•,:. • , ---, ., ,-, .. •
„-..-_,....„...•.._..„,...:
0,--,,,,,....-- .,., . .- . ',... -. .. .,,. .•
-., ••••, ,. .41140 •,-.
- •c ,., -." .- •
limo •' . •. . . ..,
. . .
ING , \
'ge�•.•• cpRPORA7e •% <5 \
. _•
_ _ ••
-_-- ---- • V FY 2022/23 Infrastructure
/,„,
"1„,( : z Fund Annual Report
•
•
May 21 ,2024
•dp. 4;:kist
F ••• . 17, 1909 •• ‹c AO
•••••••••••-
Ct #,
0
P
NTV
Infrastructure Fund FY 2022/23
• Section 617 (c) of the City Charter requires that the Citizens
Infrastructure Advisory Board conduct an annual review and
performance audit of the Infrastructure Fund and reports its
findings to the City Council prior to the adoption of the following
fiscal year budget.
• The Citizens Infrastructure Advisory Board/Public Works
Commission reviewed and recommended Council approval of the
Infrastructure Fund Report for Fiscal Year 2022/23 on April 17,
2024.
• The report covers July 1 , 2022 to June 30, 2023 ���o'�,�NT'N�ro2
Aieo ,o>
k
� • r ?tiff l= i
W,,(.4%&8 `Q i
Infrastructure Fund FY 2022/23
• Fund Balance
• Fund Balance 7/1/22 $20,484,131
• Revenue 2022/23 +$27,677,144
• Expenditures 2022/23 -$14,762,937
• Fund Balance 6/30/23 $33,398,338
• Revenue $27,677, 144
• General Fund Transfer of $28,740,805
• ($1 ,565,054) in interest and market adjustments
• $10,422 in maintenance reimbursements
• $490,971 in reimbursements from agencies such as the Orange County 0#10.TIJ ioti
Sanitation District and the Cityof Fountain Valleyfor pavingprojects d 0�•••''"\N` °RA'f7••••
p j � - �\
Cobr 0\�i1
Infrastructure Fund FY 2022/23
• Expenditures - $14,762,937
• Infrastructure Projects - $356,746
• Central Park Projects - $230,314
• 20-21 Projects - $56,034
• 21-22 Projects - $3,779,012
• Main Promenade Parking - $158,202
• Maintenance and Design - $4,673,047
• Heil Pump Station - $89,529
• Arterial Rehabilitation 20-21 - $10,093
• Arterial Rehabilitation 21-22 - $319,627
• Rodgers Senior Center - $1 ,069,236
• Oakview Community Center - $49,666 ��� �W.1 NGI
0` • ••�pRPORgj�••�� k4
• Downtown Revitalization $86,030 :••• N_ ___ E • ,•‹
• Mobility and Corridor Improvements $358,372 __
• FD/PD Youth Training Center $63,400 Y
• Carr Park Improvements $27,797 •
• Residential Pavement - $375,702 �2�FCO.:„„;;::CP\-��C11l�
- ----'I -
Ques4isions •
-,...,.. ..,..(--
,i i
ill I fr.' firaiti10:illi _,,...-....:::,..1 -- -- -- -;....'" ,..c.••=.Fr;.;abeir".. ..4.'-....- ‘1 :
-, .. ,:,--'4'---1-.cr-fi•--_.--- --.,.• - -• • i=4, ......-=--..."`
I.. - . _••-..,-....„2__„.--_ , ,,,,,:,,, -, 7f.-_, _,„ .cr..........i.-,
...•-•"-------,---'- -.1..2% '1+:T:X." i •rA7'.-
\
.t..----..„,„. • _L•, ,, t___, :... m..0.0,. .„,...._,
\
t',--,---7-_--- - 4 t •r•-•..,- -•
-.. -.:-..--.1. ..- -- ,- ''.• --,,cr_ ,, i
.'W,Nzer• • . - -- ..,,,...""''...'
44.1.t.
,,,,--.,-,::•:,7,,„,„,„„,,,, 1,Aft4ftl,, 1,%L,, , -•thikje,1••••:.,.•
-=-I-• '1- •r., •-.
rk, • , ,75 7.. , e-- -•
\,.',:::--;,,f- - _...-,"•-•. .-:-. ,- '
, _...
•,,,_-i:c•,.i, 0
- 4--;,;•-7,--i .' • --•
- ------'''•°-:-,-..7-'.--s--.•- .. .'-:..•• --•-It. „. ,' , -
.•.„,..ei---.:•-•..'..:tt-7...-...;•-: I . ' . • 4_ .---
- - .--.1#:•Ir"-' ....l'...--•;:; .- ' .,' —I...`4...7-- - I '‘4,-
''•2:;°Ael_ ' •• • 1.':"4-,..•,
. 0110-79'-••••-• , ....,,- ., .•.,. , ..... ,-. .. y., _-
#0-10/gPt:4r•
i-I'm` i •'IN
-v•-"4-‘ '
. .... , '"