File#: 24-833 MEETING DATE: 12/17/2024
REQUEST FOR CITY COUNCIL ACTION
SUBMITTED TO: Honorable Mayor and City Council Members
SUBMITTED BY: Travis Hopkins, Acting City Manager
VIA:- Chau Vu, Director of Public Works
PREPARED BY: Joseph Fuentes, Principal Civil Engineer
Subject:
Approve and accept the Orange County Transportation Authority (OCTA) grants for Complete
Streets Project; and approve appropriation of funds
Statement of Issue:
In June 2024, the City was awarded two Orange County Transportation Authority (OCTA) grants
totaling $8,971,000 for complete street projects. City Council action is requested to accept the grants
and approve the federal funding into the City's OCTA Complete Streets Projects Fund 1299.
Financial Impact:
The estimated total project cost is $11 million which includes a City's match for design and
construction. $8,971,000 in federal OCTA grant funding has been awarded for this project. This
total includes $5 million in grant funding for the Banning Roundabout and Southeast Corridors (SEC)
project, and $3,971,000 for the Hamilton project. The requested appropriation at this time accounts
for fiscal year 2024/25 grant funding for the projects. The future grant funding will be appropriated in
upcoming fiscal years budgets. The City's total match is estimated to cost approximately $2 million
dollars. The match and any contingencies will be provided by a combination of AES funds, Measure
M, or Roads Maintenance and Rehabilitation Account funding.
Recommended Action:
A) Approve and accept the Orange County Transportation Authority (OCTA) grants for$8,971,000;
and,
B) Approve appropriation of grant award funding into the OCTA Complete Streets Projects business
units: $203,000 for Banning Roundabout into 129985001 and $176,000 for Hamilton Avenue into
129985002; and,
C) Authorize the Public Works Director to execute necessary documents and agreements.
City of Huntington Beach Page 1 of 3 Printed on 12/11/2024
powered by Legistar,"
289
File#: 24-833 MEETING DATE: 12/17/2024
Alternative Action(s):
Do not approve the recommended action and direct staff accordingly,
Analysis:
In October 2023, staff applied for projects through OCTA's Orange County Complete Streets Program
which is funded by the Southern California Association of Governments (SCAG) Surface
Transportation Block Grant Program (STBG) and Congestion Mitigation Air Quality (CMAQ) federal
funds. Complete Streets addresses a wide range of elements, such as sidewalks, bicycle lanes, bus
lanes, public transportation stops, crossing opportunities, median islands, accessible pedestrian
signals, curb extensions, modified vehicle travel lanes, streetscape, and landscape treatments.
Complete Streets reduce motor vehicle-related crashes and pedestrian risk, as well as bicyclist risk.
when well-designed bicycle-specific infrastructure is included (Reynolds, 2009). They can promote
walking and bicycling by providing safer places to achieve physical activity through transportation.
The City was awarded two projects through OCTA.
The first project is the Banning Roundabout and Southeast Corridors Complete Streets
Improvements (Banning Roundabout and SEC). This project includes constructing a roundabout at
the intersection of Banning Avenue and Bushard Street to improve pedestrian, bike, and traffic safety
and mobility. The project will also enhance non-motor vehicle mobility by reconstructing damaged
sidewalks, upgrading curb ramps and driveway approaches for Americans with Disabilities Act (ADA)
compliance, planting new arterial trees, pavement slurry treatment, and enhancing bike lanes with
new pavement striping throughout Newland, from Adams to Pacific Coast Highway, and Bushard
from Adams to Brookhurst Street. The project will also provide radar feedback signs in strategic_
locations to help reduce speeding through the arterials.
The second project is on Hamilton between Magnolia and just east of Brookhurst to the city's limit at
the bridge. The project will provide new pavement and enhance non-motor vehicle mobility in the
area by constructing new landscaped medians, reconstructing damaged sidewalks, upgrading curb
ramps and driveway approaches for ADA compliance, planting new street trees, and enhancing bike
lanes with new striping.
These projects will be in design during Fiscal Year 2024/2025 and ready for construction in Fiscal
Year 2025/2026. Funds are approved in the 2023 Federal Transportation Improvement Program
(FTIP) and OCTA has included the Banning Roundabout project in amendments #23-30 and the
Hamilton project in amendments #23-33. The City can proceed with requesting obligation and notice
to proceed through the Caltrans Local Assistance District.
The Banning Roundabout and SEC projects are estimated to cost $6 million for design, right-of-way
certification, and construction, while the Hamilton Project is expected to total $5 million. In total, the
combined cost for both projects is anticipated to be approximately $11 million.
Environmental Status:
Not applicable
Strategic Plan Goal:
City of Huntington Beach Page 2 of 3 Printed on 12/11/2024
powered by LegistarTM
290
File#: 24-833 MEETING DATE: 12/17/2024
Non Applicable -Administrative Item
Attachment(s):
1. Award Information
2. Vicinity Map
3. PowerPoint
City of Huntington Beach Page 3 of 3 Printed on 12/11/2024
powered by LegistarTm
291
OCTA
2023 Federal Transportation Improvement Program ($000)
TIP ID ORA233001 Implementing Agency Huntington Beach, City of
:4 0 1.114 Pro1e4 7120004 Project Title
Banning Avenue Roundabout&Southeast Corridors Complete Streets Improvements
s "t Project Description
474' aS Banning Avenue Roundabout&Southeast Corridors Complete Streets Improvements-construct a
IFAs# t roundabout at the intersection of Banning Ave and Bushard St to improve pedestrian,bike,and traffic
System Route Postmile safety and mobility.The project will also enhance non-motor vehicle mobility by reconstructing damaged
Local Hwy sidewalk, upgrading ADA curb ramps,adjusting driveway approaches for ADA compliance, planting
trees,and enhancing bike lanes with new pavement striping throughout Southwest Huntington Beach.
Program Code
NCRH1 -INTERSECTION Fiscal Year Revenue Source Engineering Right of Way Construction Total Revenue
IMPROVEMENTS/CHANNELIZATION 24/25 CMAQ-Congestion Mitigation Air Quality $203 $203
Enviromentel Document 25/26 CMAQ-Congestion Mitigation Air Quality - $20 $20
CATEGORICAL EXCLUSION/CATEGORICAL 26/27 CMAQ-Congestion Mitigation Air Quality $3,793 $3.793
EXEMPTION—JOINT NEPA/CEQA-09/30/2024 26/27 STPL-R-STP Local Regional $984 $984
Conformity Category 24/25 CITY-City Funds $30 $30�
EXEMPT-93.127 25/26 CITY-City Funds $3 $3
26/27 CITY-City Funds $698 $698
Total Estimate
$5,731 $233 $23 $6,476 $6,731
Air Basin
SCAB
Project Completion Date
05/31/2030
Current Implementation Status
Project Manager
Chau Vu-(714)374-5345
Last Modified By
Mina Kim on 06/11/2024
Administrative Comments:
Last Revised Amendment 23-30-APPROVED Total Programmed $5,731
Page 1 Monday,August 26,2024
292
£6Z •
•
•
•
•
•
3t Sa VT.' S `St $s F SzOta
.vbrs _.._5 •V6L">w'____. ,._. S " ._ , ,. _.., ..5:;i•,., 'r 5 ,:,ssis EU! ,
Si ,:m 54' S. <'',4v4 i SW!
+.r enad r L r8 vr�mr+a gU pU'm rs as r
7wie;s#id uemldL@£j* md'JAbd�bMaw1.#ipa'aanai3Oeq-a( . aad O.6'1,Y a • 3 '..
p�6amcF cas€e,,, .sv rY edms q 6042SC aaa�,#-caw 0 94'. uu.apge4. o p ,
E.
1!>+,?'°'.??!d'ra/3iPp1!8veT5u0,r!?rJff! ? 33Fm„+p[uurBFpr+ °0U?y�?rm14P4: k'L4d'+.u?a!a' „ems` , 4,`�a:. _
, a IN
e-
O•
O
�� L s9ti
O�6
BOLSA AVE. CQ N
I NTS
N
a
McFADDEN AVE.
= C' N
0 EDINGER AVE.
z
,` x a a a W HEIL N NAVE.
♦ o Z cn = o
SGN♦ •♦ o c. 1 O § < ¢ >
s��♦♦♦ Q N m o WARNER o AVE. m
�cy�\ N 0
N a- SLATER AVE. 405
g �,o , , TALBERT AVE.r
90 z
j W
o ELLIS AVE. 1-- e
0
GARFIELD AVE. N
�' I vi
N YORKTOW AVE.
3
C' z U ci) cn v~i ccn
oI,s> M m ADAMS AVE. 0
LEGEND ;.,it,/ (x Y
a 0
mml PROJECT BOUNDARY ;C�` INDIANAPOLIS AVE.
�9`cF o z m o ix m
ATLANTA 3 Z_N AVE.
PROJECT LOCATION Z 0 m
O NEWALND ST (ADAMS—PCH) ill ' ` I/fON
20 BUSHARD ST (ADAMS—BROOKHURST) y
BANNvG
0HAMILTON AVE (MAGNOLIA — BROOKHURST) AVE.
cAIN
q�C'
0 N
PROJECT TITLE
PROJECT VICINITY MAP ' 4 p
CITY OF HUNTINGTON BEACH 0 P
DEPARTMENT OF PUBLIC WORKS 1 OF 1 i
294
AfroAr400-40„:40.0.
„050.
or
\s mow.
N to
sesessi0041 vs.&
16,
c iii,° ta co-0 11 r u RA 74. % Ao‘o --1,1,..
c•r- ' t4tlii,
0 --"*--....„„„„‘„ „.„,..,_ --.„..._ .......--.. •-• , 0 1(.1.‘ Arterial
.
....,.... .....,
Complete
—
_ •
— ---- •
.....----- — _ -- -. —.... .-. .
.-- • 4Cr
i Streets Projects
• ,,,, ,...
44)
1 .0 0: 17 gus %N.,. <(‘
0wieles%se
11,, or December 17, 2024
if
411w „for
41 I I 1 I i I 11 I 0 6 P:dif 0 IPA Or
295
BAC KG ROU N D _
`� .
• Newland Street (Adams Avenue to Pacific Coast Highway) `®:
• 2 street miles of construction
gar
'''' israrldwievaial
• Bushard Street (Adams Avenue to Brookhurst Street) s a_
• 2 street miles of construction °` lill :''*441 -Ng: 1 tir
:'
• Hamilton Avenue (Magnolia Street to East CityLimit) �64,04 4rAv004-9.44—er.r01001 4' -ft/44
$" " "`"` °° ' '
• 1 streetmileof construction
�# , �\11T1NGTlI
je:
i'f (Z
�y °''ei,�Fg 77 194y P9
296
NEEDS/WHY/ BENEFITS
,.... . , , , :,
.,„,
, _.„.„,,,,„„„ ,:,...._,„._: 4
• New slurry coat or asphalt overlay required to existing pavement for 1 "d" k ►
extending life of street .
• Reconstruct damaged and uneven concrete • ,
• Landscape enhancement with tree replacement 1 a i' --
• Striping and signage improvements including enhance bike lines and `°
ye`ve.e. • 4*
pedestrian crosswalks
• New Roundabout at Banning and Bushard A' '`°; _ `
• ' ,k -1
• .. 11ll', +'
a .01 �q.
r ex P. 1 O '
'Fv+t k
. n
e
r � j�
Iv v iUN..-ki c'.." - t `may i .... ..
c....Fv..\,.:\..i"fk.",.
per, z' - . .c7I':
r
U N t1,,
297
cuNDING
Proposed Project Costs $ IIM
o Orange County Transportation Grant (OCTA )
Total OCTA Funding $8,971 ,000
o $5M for Newland and Bushard Project
o $3,971 ,000 for Hamilton Project
o Local Funds: AES/Measure M/RMRA 77 ti °° Qp"�f°° r
o $2M
ai y •o° /? ;g98� °.
298
SCHEDULE
• Design in FY 2024/25
• Construction in 2025/26
004 NN T
� Oa70,V
Ith
%a 6), .a rr 1 tq.P� 0
�f T tV'® ®
299
3 .. ,, 9 qs,.: y�y 7. .tea'
y a a e `, +ss` F✓
' Ay s WF " fro. r s F `' a ''.: .s 3 .F1
Questions .
A g 3j
s, . ,
_ ''''‘. '.44.4*.',4.',a4:r' t 1 0 /*'' '''e'''f'
,-.'ice .,ai d ,i {
.
.2 kW.. - ( # ,� ;
LL_
y r, . , - 1}'l-r s,.,„Ai`,,-
1
.• ` ., ? -
-,f„x.t.I.-0:s"A--
300