Loading...
HomeMy WebLinkAboutApprove and Accept Highway Bridge Program (HBP) Grant Fundin (2) �a1iNc o 2000 Main Street, oF? `=dx>;a` Huntington Beach,CA it-:"446 =1City of Huntington Beach 92648 APPROVED 7-0 0006 File#: 24-790 MEETING DATE: 12/17/2024 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Travis Hopkins, Acting City Manager VIA: Chau Vu, Director of Public Works PREPARED BY: Joseph Fuentes, Principal Civil Engineer Subject: Approve and accept the Highway Bridge Program (HBP) grant funding from California Department of Transportation (Caltrans) for the Admiralty Drive Bridge Rehabilitation Project, CC-1450; and approve appropriation of funds. Statement of Issue: On August 13, 2024, $1,916,490 of additional HBP grant funding was awarded for the construction of the Admiralty Drive Bridge Rehabilitation Project, CC-1450 ("Project"). City Council action is requested to accept and approve the additional HBP funding into the City's Highway Bridge Replacement & Rehab Account (HBRR) No. 96185001.82800. Financial Impact: The original estimated project cost is $5,880,000 which includes the construction contract with the contractor Beador, a 15% contingency, and supplemental expenses. The previously awarded project budget includes $3,280,000 of federal grant funds in the HBRR Account No. 96185001.82800, $500,000 from the Infrastructure Fund in Account No. 31440005.82300, and $2,100,000 from the Measure M Fund No. 21390036.82300. The additional grant funds of $1,916,490 will allow the City to save the Infrastructure and Measure M Funds for this project. Recommended Action: A) Approve and accept the Highway Bridge Program grant funding for$1,916,490; and B) Approve appropriation of funds into the Highway Bridge Replacement& Rehab (HBRR) (Account No. 96185001.82800). Alternative Action(s): Do not approve the recommended action and direct staff accordingly. Analysis: City of Huntington Beach Page 1 of 2 Printed on 12/11/2024 powered by LegistarTM 279 File#: 24-790 MEETING DATE: 12/17/2024 The Admiralty Drive Bridge in Huntington Harbour is a steel girder bridge originally constructed in 1963 and seismically retrofitted in 1994. The rehabilitation is underway for the bridge and work includes removal and replacement of the concrete barriers, street lighting, sidewalks, and bridge deck; cleaning and painting of I-girders and other steel members; replacement of bearings; removal and replacement of any unsound concrete that could expose internal reinforcement to outdoor elements; removal and replacement of water mainline pipe; construction of a temporary traffic signal system; utility relocation; and ancillary work as required. Construction began in the fall of 2024 and.is expected to conclude in the spring of 2025. The total construction cost of this project is $5,880,000, which includes the Contractor's bid price, contingency, and supplemental work. The original HBRR grant included a total funding of $3,280,000. Per Caltrans Local Assistance Program Guidelines, city staff submitted a cost change request and was approved for an additional $1,916,490 of HBRR funding. Environmental Status: Categorical Exclusion was approved on January 12, 2016, in compliance with NEPA. Mitigated Negative Declaration No. 15-002 was approved on December 16, 2015, in compliance with CEQA. Strategic Plan Goal: Non Applicable -Administrative Item Attachment(s): 1. Finance Letter 2. Location Map 3. PowerPoint Presentation City of Huntington Beach Page 2 of 2 Printed on 12/11/2024 powered by LegistarTM 280 DEPARTMENT OF TRANSPORTATION Date:08/13/2024 EA No: D_CO_RT:12-O RA-0-H NTB FINANCE LETTER Project No:BRLO-5181(174) Adv.Project Id:1212000146 Project End Date:09/01/2026 To: City of Huntington Beach Est Tot Proj Costs: $5,958,452 FINANCE ITEMS PRO RATA OR TOTAL COST OF FEDERAL PART. FED.REIMB% FEDERAL FEDERAL FEDERAL LOCAL FUNDS OTHER(NON- LUMP SUM WORK COST PARTICIPATING) L11E Y120 Y233 Agency Preliminary Engineering Pro Rata $585,000.00 $585,000.00 100.00% $585,000.00 $0.00 $0.00 $0.00 $0.00 Contract Items: $4,565,300IT, - • z � � •. Contingencies: $456.530 "` r �� t Total: $5,021,830 e y' ` Construction Lump Sum $5,021,830.00 $4,844,867.50 100.00% $0.00 $2,929,000.00 $1,915,867.50 $0.00 $176,962.50 Agency Construction Engineering Lump Sum $351,622.50 $351,622.50 100.00% $0.00 $351,000.00 $622.50 $0.00 $0.00 Totals: $5,958,452.50 55,781,490.0E $585,000.00 $3,200,000.00 $1,916,490.00 $0.00 $176,962.50 Participation Ratio: 97.03% This Finance Letter was cre ted based on specific financial information provided by the responsible local agency.The following encumbrance istory pr ared by Local Assistance Accounting Office and is provided here for local agency's information and action. Signature: Printed Name: Ferdinand A.Batatan Title: HQ Sr rea Engineer Telephone No: (279)599-2032 Remarks: Seq#2:This Finance Letter refl cts the obligation of$3,280,000 for Construction and Construction Engineering under Y120 using the HBP fund programmed under ORA020501 in Amendment#23-04 and approved on 02/03/2023 to SCAG's 2023 FTIP.Toll credit($376,216))was used in lieu of a local match. ***Please note that the Y120 fund code is funding from the Bridge Formula Program(BFP)and has specific timely use of funds rule.The Y120 funds expire on 09/30/2030 and will not be available for reimbursement past this date.Invoices must be submitted to allow for sufficient time for invoice processing.Any unexpended BFP funds that expire will not be backfilled and will be the fiscal obligation of the local agency.*** Seq#3:This Finance Letter reflects the award cost adjustment and obligating $1,916,490 for Construction and Construction Engineering via Post-programming under Y233 using the HBP fund programmed under ORA020501 in Administrative Modification#23-28 and approved on 05/09/2024 to SCAG's 2023 FTIP.Toll credit($219,821.40)was used in lieu of a local match. Page 1 of 2 281 4,1 S,9 EA BRIDG' PROJECT �����/ I �Ot� \\ PARK / �oo`' AREA BOLSA AVE. cp \ /�Q� �J,• < Mc FADDEN AVE. l o HUNTINGTON \ o m s v EDINGER AVE. / •4NCO\\ HARBOUR \ / {5z ,1 w > ,� \/ ISO • \ VENT ZHEILm AVE. m �� y= R \ \\ �RF g \,‘ PROJECT AREA R ADMIRAL a�, a WARNER �_ AVE. \\ . � p.�p�� /�1� \ Ph En z x \ `� DR o w F- _ _ - JC1q . SLA-ER 8 8 AVE. 405 �\ �o / it,.... "tp� W \\ � \ \ c \ \ " 13 o c� o c\ TALBERT AVE. r \ \ �G Qp �''' \ �y t' S \ PACIFIC yn�c ELLIS AVE. r-I l \ Z 71- 9< �O \ \ 92? �� \ oMFRSFT 44, iGARFIELD , AVE. '90+\ ii��/�J <� Gl \ \ 9 \\ O g YORKTOWN AVE. Ncrne 3 Q 1C / / 1 Owl oAil c` ADAMS AVE. \\C'O\ 91) \\ cpS'\C'1/4/ \ 0'. .. = SUNSET 2O,PT \ `t\ly \ < ' ip G,� INDANAPOLIS AVE. Yo COUNTY BEACH y • TLA I TA -I Z = AVE. m t,�, \ <5 ; u= to \)--\\, .E z m \ m HAMILTON AVE. F \ '�' N , /\ OCEAN BANAVE. NG /\ VICINITY MAP N. N LOCATION MAP N.T.S. N.T.S. 282 irArsop.400:41010. vibs„. I‘s .% TO A. ' . ( 0,46 tiofkpoRAr. 40. 45) N466. 401„. Ilk . * Ad m,. ,..___ ............... ,,.......,,... . , • . <tosi, 11, . , . I ralty D rive ...,,.......„..... . /Az, ft 1 ' ,tip •' • . . ' Wilk ,' ' ' , ' fli • - '' ' ,, '•- '1 , Bridge Rehab -.7.... r-r--••• '0 % ,..,- ...;:........ .--•••••••-•,,,.. ..... f ' ' ;', ..„-iirotr-,?7,-- :!/,,,,,,,,,/ )71,,A 0 , .4140•44., 450 • 4 :' 764641144,,,, 17 .,1, - 40 , i\lt:c' .' '' • 7,111 1 190 ilk 06 - 41.s%:.' • # - . e December 17, 2024 . ONTN ii# 40,40r- 4110%.0tatior ,.. - - - . • 283 Project Map :/.f ;ite, kt41—t-., . f P^ ..t ' gyp `y 41 ,,,,.... ,. I vry DR 'BRI .GE--‘).,ste t 4 4 .y, ! A«,f` I 'i q7 .F" T od ♦ 0 ( fl £9.+ vIiaK�a ' �` 4 R M) f 11" Ns: ' .....:4).4e. *0: • - "3' ' `' @a s _ _,ga y ��� �k ; mac t ~ -C. ,....* r a S�iris U�rc �' i 1k♦ y ip, � .' ';# . i ,, Via vil-;. To vs. , \ � r ? _'e�' ::i P rr l . � .r.� '" �" *\J..... ...... Nw� \ i y Mx ) .�y • 'VTR !� J S� j7 .max , .tA= ibt •'6-8 ••199 •Ni.. y�••N•N•••• • lb. I..i �,' ' d , 1' V '. i ' litin tte, 284 • Admiraltyridge • 3-span steel girder bridge with 4-column reinforced concrete bents supported on timber piles Length = 155'-3" • Width = 52' ' • Originally constructed in 1963 • Seismically retrofitted in 1994 5. �r ANT I N G 'I#,wc.,.••,,cRcoRarFo•.,. 6' •• { c. : { -sue• = - cQUNTY 4i� 285 Scope of W ... • Re lace concrete barriers and railing � � tr ���- p a • Replace street lighting on bridge • Replace concrete sidewalk and bridge deck • Clean & paint steel girders and other � � , 7:7! wilt steel members z • Repair unsound concrete at bridge „if itiw- -"__ bents , �\ TING o .� • Utility relocation and minor AC paving "_--' ��- i work \:� ��«'s{k- : : ` 2F.FF8 s***,0v CO�NTV c,�"�/O 286 Funding • Beador Construction Bid: $4,565,300 • 15% Contingency: $ 684,795 • Supplemental Costs: $ 629,905 $5,880,000 Current Funding • Federal Construction Funds: $3,280,000 • Infrastructure Funds: $ 500,000 • Measure M: $2,100,000 $5,880,000 #d. T I NGT `�0 '`.pPPOR.4• • \ Proposed Funding Dec 19 io:: '" '°•'•••°i<, • Federal Construction Funds: $5,196,490 (max.) ; • Measure M: $ 683,510 ss, ) $5,880,000 \w2 ` t8 PU+ .�4<Zz- '1 OUNT`I \',/ 287 . , Questions ? . ,.,.,4, , ,o, , i LI k f.V.s. i ' . Ply ialt ktit', i t'-':'4'1''1'''4.'. Paz` IA:-L«;:1. w,.* e r : if � _ C'�- 4 rp • f .....:".:''I.'.'t--.,.>:'Itigi,:,''' '' ' .;:..A:7:,'"I':-1- ':'-''.'.-k4:'';i::::i'``.4::114:::::::"777:,.:,..4'..;.:,,,:4.40;::::::::, "":ice„,. : z —-y--A%-"1--""'"R44.7' ''1,-1 a"N "''' .- -'' ...,„.:-s4;:.1..f,;:,:,,„iii*,;:tfiliti r 2Bel