Loading...
HomeMy WebLinkAboutAuthorize the appropriation of $98,000 from the Huntington C 2000 Main Street, Huntington Beach,CA 92648 City of Huntington Beach 9c F� #=, APPROVED 5-0-2 ° (KENNEDY, WILLIAMS-NO) � �(INTV r File #: 25-788 MEETING DATE: 10/7/2025 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Travis Hopkins, City Manager VIA: Ashley Wysocki, Director of Community & Library Services PREPARED BY: Chris Cole, Community & Library Services Manager Subject: Authorize the appropriation of$98,000 from the Huntington Central Park Sports Complex (HCPSC) Capital Improvement Fund 325 to replace the failed irrigation booster pump at the Huntington Beach Sports Complex Statement of Issue: The irrigation booster pump at the Huntington Central Park Sports Complex has exceeded its useful lifespan and has become inoperable. To replace the pump, the City Council is requested for an appropriation from the Huntington Central Park Sports Complex Capital Improvement fund. Financial Impact: As of June 30, 2025, the Huntington Central Park Sports Complex (HCPSC) Capital Improvement Fund 325 has a balance of$221,400 (unaudited). Staff are requesting that $98,000 of this balance be allocated to the Huntington Central Park Sports Complex booster pump replacement project. Recommended Action: Authorize the appropriation of $98,000 from the Huntington Central Park Sports Complex (HCPSC) Capital Improvement Fund Account 32545001.83700 to replace the irrigation booster pump at the Huntington Beach Sports Complex. Alternative Action(s): Do not authorize the recommended action and direct staff accordingly. Analysis: The irrigation booster pump at the Huntington Central Park Sports Complex has exceeded its useful lifespan and has become inoperable. Recent attempts to fix it have failed and it must be replaced. The grass in the ballfields cannot be watered as required without a functioning booster pump. The scope of services needed to complete the project include removal of the failed pump, the City of Huntington Beach Page 1 of 2 Printed on 10/1/2025 powered by LegistarTM 64 File#: 25-788 MEETING DATE: 10/7/2025 installation of the new pump, connecting/reconnecting the inlet and discharge to the existing plumbing and station startup/certification. The cost will be approximately $98,000, including contingency. Environmental Status: Pursuant to CEQA Guidelines Section 15378(b)(5), administrative activities of governments that will not result in direct or indirect physical changes in the environment do not constitute a project. Strategic Plan Goal: Goal 6 - Infrastructure Investment, Strategy C - Conduct an assessment of all City facilities to determine priorities for upgrades and repairs, implementation and financial priority. Attachment(s): 1. Rider to Emergency Requisition - Emergency Purchase Justification City of Huntington Beach Page 2 of 2 Printed on 10/1/2025 powered by LegistarTM 65 `""( `' CITY OF HUNTINGTON BEACH 9� U 4 x�,-t�: P ;;I= Rider to Emergency Requisition `,.mi,, Emergency Purchase Justification DATE: 9/18/2025 DEPARTMENT: Community & Library Services REQUESTED BY: Ashley Wysocki, Director ITEM: Sports Complex Irrigation Booster Pump SOURCE: THE ITEM(S) OR SERVICE(S) TO BE PURCHASED OR PROCURED PURSUANT TO THIS REQUISITION IS AVAILABLE FROM A SINGLE SOURCE ONLY BECAUSE: ❑ There is great public calamity. ❑ There is immediate need to prepare for national or local defense. ® There is a breakdown in machinery or an essential service, which requires an immediate procurement in order to safeguard the public health, safety, or welfare. ® An essential, departmental operation affecting the public health, safety or welfare would be greatly hampered if the prescribed procurement procedure would cause an undue delay in the procurement of the needed services. ❑ Other EXPLANATION OF ITEM(S) CHECKED (Please include business unit): The Sports Complex irrigation booster pump failed early August and the fields are dying due to a lack of City water pressure necessitating a replacement booster pump ASAP to boost city water pressure to properly irrigate fields. AUTHORIZATION • i q I OS L ep r ment e df 3.01iI3. (a)) Date 6 - cr*a--5— Chief Financial Officer 3.02.190(b)) Date *--it,Manager l Dat Once signatures have been obtained, please forward original to the Purchasing Department—scan or copy to originating department. 66 ,;^��s,r,; Evolution Landscaping&Plumbing Estimate # 21427 a„--�•, :;:,����. 18931 Gothard St , =% ,/r,i l Huntington Beach,CA 92648 office@evolutionlp.com - EVOthTIO ._.. IAHGSGHPIHG G Pl01181HG ADDRESS SHIP TO City of Huntington Beach City of Huntington Beach :DATE '..: ::.. TOTAL. 2000 Main Street 18100 Goldenwest St, 09/12/2025 $89,249.00 Huntington Beach, CA 92648 Huntington Beach,CA 92648 REPRESENTATIVE LOCATION Ricardo Sport Complex PRODUCT/SERVICE QTY PRICE PER UNIT TOTAL Provide&Install Pump NSI-PUMP 89,249.00 89,249.00 -Includes: --> Pump Startup --> Pump Start Up Install --> Install: Item Note: Includes installation of new pump station on new concrete pad connecting/reconnecting the inlet& discharge to existing plumbing, and station startup/certification. --> Miscellaneous Parts We look forward to working with you! SUBTOTAL 89,249.00 For questions, contact Office at(714)715-7993 or Emergency TAX(0.0775) 0.00 Services at(714)541-7993 TOTAL $89,249.00 THANK YOU. Accepted By Accepted Date All material is guaranteed to be as specified.All alterations or deviation from the above specifications involving extra costs will be executed ONLY upon written change order.The cost will become an extra charge over and above the estimate.The estimate does not Include additional labor and materials which may be required should unforeseen problems arise after the work has started. 67