File #: 25-827 MEETING DATE: 10/21/2025
Subject:
Public Works Projects Update
efirryir.r. 67,02._e
City Huntington Huntin ton Beach Page 1 of 1 Printed on 10/15/2025
powered by LegistarTM
12
iAl\cTIN767-""-...NG\\•\ ..,,,,
••••t,„ 1, , u nA opnr, F•••• \1 •••,_r ___ , •
____ ____j_ roje c u m m a
- ________ O.
,,,,; •• Re o
== i .
- •
; Zone 2 Overlay
,�/ j/ : , 1
_lowim, _ =_ October 21 , 2025
40c 0 W
••• 17, 1909 1 ••
\ , T.: ;: -
t::C5OONTN
••••..•••••-
tv,,'
U.S.GROVE
ut i WE5.11.�,E.,
-s s
lae* 10 sA
Project1' `�
J y rWr i I'.
WI - -II;Kw 7),�) ,: I , - ,,.rt.,.
• Rehabilitated over 100 of the residential street �� h '; ,m �� er-
segments in poorest condition in Zone 2 , -`1 ,a ,,, m= , ; -
• Zone 2 boundaries: °" '�' 0.` `� ___ s col u
Warner Ave (N), Beach Blvd (E), Ellis Ave (S), ,,, �, -`'
Springdale St (W) :° .� i 4s u 4, _.
• Work included: , '` 'N
• Spot pavement repairs
a
• Crack sealing ..._ `N'
• Cold milling #/1�\NTING10
• Asphalt overlay �• o�.•'\N,,OAP�R4rep'y���\
• New striping �� '`' __--�--.�- � - •.`9`'\�
"• - : s
NA o:
n' Qr ,
=LOUNT`i C',f1l
� I'
Project
and S
• Project Benefits:
• Streets now have 12 or more years of useful life
• Part of the City's 12-zone pavement plan
• Treatments based on pavement condition
• Schedule:
Start Date: 3/3/25
Substantial Completion: 7/9/25 iN 11NG70�/�"`
II ` " •
Final Completion: 7/16/25 i c,pHPORAr•..• o ,
. 11. 190 , .•
°OONT' ��;I'
Financial
Summary
Approved Project Budget $4,551,907.00
Final Construction Contract $4,133,721.02
Amount
Construction Inspection and $245,344.00
Survey Monumentation Services
Remaining Budget Balance $172,841.98 ,,�
I,, 0NTINGT
`(UNTCi//#
Conclusion/ Photos
• improved street quality with minimal disruption
• Coordinated with:
• Schools
• Trash collection and Street Sweeping
• Deliveries
• Delivered on time and under budget
• Sets a strong model for future paving projects
e 4
. p - ,--
v . ,
ii \NTINGie_, �I `,`
r MSic -= � cSBOA Rq .....
.„i , --.ter± ' _ _
rem,r P .•„ % /ram _yi,/� 4
•9
F
" ' <� ,� V ib .�•FB � Ao : •
..:� ..3 .oUNTV t ,f
1NG..,,,,,,,........„
iv e„,,,,,.....„,,,,, 4/‘,"\cWT
1..„,
4 •.• t 0RP ORAre •••\ •
Summary
//O//r/ "), • (. -/
Report
�� - _
_ _ __ _ ____,,___ _ ______
___ .
-- ` ` ; 17th Street Arterial Rehabilitation
;00,..,„aiiii,,--odi:-.7- i/ 4; A
_ - -� •— - - - 1 <kb 1 October 21 , 2025
I % ces ° *e. O 0
•• •• 17 1909 1 .•
F ••••
C
P
o tg0
NT�f
,i
�'ii�/-
•
trz.:p
ro • ec u m mar b; . •
g i : ._' *_
_ , t '' "
I '�' v t
4
17th Street Arterial Rehabilitation "' II
.ii. �*r _
• Project Manager „„ , ,,,
Eduardo Okamoto-Cerda if'^4 -1 `
• Project Scope: - F. ; .4
Rehabilitated 17th Street from Main to Palm --------___"
Poor PCI of 42
• Work Included:
• Asphalt Concrete Paving
• Traffic Loops �i���%_
• Curb, gutter, sidewalk repairs •/ � N ••GT
<</ TIN
• Striping III O`• .�\NOOPPOR4TE•o%.��\
• New trees 11=: .. - 7 •sv� \
NT`( UAffill
Project an
Schedule
• Benefits:
• Extended pavement life by approximately 20 years
• Improved visibility for pedestrians and bicyclists
• Nearby schools: HBHS, Dwyer MS, Smith ES.
• Schedule:
Start Date: June 23, 2025
Substantial Completion: Sept 17, 2025 #
Final Completion: Pending Close-out 1iii0NTING7-
: OOAPO RAT'•
_ Fo •.•�
ap
=°O/NT`f t�i,"
Financial
Summary
Approved Project Budget $1,952,522.10
Final Construction Contract $1,595,404.26
Amount
Geotechnical Pavement Testing $10,162.00
Services
Remaining Budget Balance $346,955.84 \N 1NG. ..
• •••
0ouNpi
i
Conclusion/ Photos
• Key Outcomes:
• Critical investment in local street infrastructure
• Delivered with:
• Minimal disruption to schools, trash, and deliveries
• Strong contractor collaboration
• On time and within budget
• Community Impact: . , - ,
• Long-lasting improvements for residents . `
• Model for future CIP paving projects .
i #�\ I,NGT94n,
-- r" ,'I O<(. `GORPORAT•••• vF
= 1
,q4k,iiii_.;....7,7___=_::::_ec) of ,:s
Psi_CGUNTY t� F
4-
/ ,,,,,,,tor........
0NTIN
GTOT
..•....• 4, Project
•.• stORPOffATF ••••
. • u m m a
ry
-------- - - -7 -- - -- • -'7°
„____
____ _- -- , ,,,,rrei,,„1,,, ,, 1 c--) N Report
- . , , ,,, iii", " , ,.. .
_ _ _ _ / . =
__________ __ ______ _ ____ _. ____.
______,_ ____________ .
0__z_ _ __ ______,
__ _ - - ,
_____ _ _ __.,_ __ _ , Traffic Signal Improvements at Warner Ave. & Ash
'ipsowelligtfi,_____ ! _ `jam��y� , Ln. / Millstream Ln. and Main St & Delaware St.
• October 21 , 2025 17 19O • ç44
I
C
D C) \NTy
.—
Project
_ _
,... ...
Traffic Signal Improvements at r �`
t
1) Warner Ave. & Ash Ln. •
2) Main St & Delaware St. _
,rf�. ,�• ,� „bt .
n
r
• Purpose Wtto t. ,i! -" I • �
Improvements aim to enhance traffic safety, W
accessibility, and overall intersection
functionality.
• Scope of Work:
• Removed and replaced traffic signal poles and
foundations ,.��,,---_
�0'0ATINGT-—
• Installed new electrical conduit and pull boxes IA��?:•\N�oa......o.•,?�
• Constructed ADA-compliant curb ramps and IL-3 : 4ftriiNAL66‘ 1Q
i� „•� - = �'.;-57 ,„„
sidewalk improvements - _ _ -_
• Installed new signage and striping �� % " =_,!
�,.6F'':8.: Ur- °.••(o °I
COUNTY c,,#
ID
ro ect Bene � s an
Schedule
• Project Benefits
• Traffic Signal Upgrades: Replaced existing signal poles and foundations; installed new electrical
conduit and pull boxes.
• ADA and Sidewalk Enhancements: Constructed ADA-compliant curb ramps and improved
sidewalks.
• Signage and Striping: Installed new roadway signs and pavement markings.
• Safety Enhancements:
• Introduced protected left-turn phasing at both intersections.
• This eliminates conflicts between left-turning vehicles, through traffic, and crossing ��
�i�0
pedestrians—significantly improving intersection safety. � NT I NGTO"///'jjj��'
01 c`••.•\N.ORPORgTFO.
• Project Schedule �I F`. ilw •'9=\\�
Start Date: June 12, 2025
Substantial Completion: August 15, 2025 1„,„y
Final Completion / Close-Out Status: August 31, 2025 �, Pl��l'
- NT`I ,e1"
Financial
Summary
Approved Project Budget $1,320,000.00
Final Construction Contract $1,161,687.08
Amount
Construction Management and $152,558.02
Inspection Services
Remaining Budget Balance $5,754.90 i��NTINGT
�
<, ........... ..
••;;7
c's -- -- . ice \
COONT`.t,,#°
1
1
Conclusion/ Photos
• Key Outcomes:
• Improved traffic and pedestrian safety
• Delivered with:
• Minimal schedule disruption
• Strong contractor collaboration If•}
SAL•• Within budget 44IM,„ .• - #^ I . ,
• CommunityImpact: 6:::::1‘ "
• Long-term operational improvements -.h.K , .. , � , _ - +
_-
,, �j �. ' � .7.i 4•
\t
C+ S "a14 '.. :44.; I1i �NT I ONR AGTf T•
•4 �F' O P0
t, £ . '
_t�` �w l r� - k V
i- % ��I
='D0NTY 0,"
Before .��,,.."/
Questions ?
.....,... ,... ,
Ok.
ire j t� ....
�cct�,'1
ii1ui `!1 its( ' ,._,.....--
c ,yam 0
"