Loading...
HomeMy WebLinkAboutVido Artukovich & Son, Inc./Vidmar, Inc., a JV - 2026-03-17 RECEIVED BY: CITY CLERK RECEIPT COPY M C cQ Nv-k Return DUPLICATE to City Clerk's Office (Name) after signing/dating -74 2,10 (Date) CITY OF HUNTINGTON BEACH INTERDEPARTMENTAL COMMUNICATION TO: City Treasurer FROM: City Clerk DATE: 14/1 SUBJECT: Bond Acceptance I have received the bonds for V► tD A' h - i cy\, , c . gi ttrnAC1 Ir., 4')J (Company Name) CAPITAL PROJECTS (Includes CC's and MSC's) Performance Bond No. Payment Bond (Labor and Materials) Bond No. CiC C ' 3 Warranty or Maintenance Bond No. TRACT AND DEVELOPMENT Faithful Performance Bond No. Labor and Material Bond No. Guarantee and Warranty Bond No. Monument Bond No. Franchise Bond No. Letter of Credit Bond No. Other r,(A 'j` !y r►vi,t Re: Tract No. _ Approved 2 11-/-171n (Council Approval Date) CC No. Wqr‘ --- 4ihrlSej Agenda Item No. I0 (24" I1-1(.0) MSC No. City Clerk Vault No. k OO. SO Other No. SIRE System ID No. 11" GL--- g:/forms/bond transmittal to treasurer i �jN,-.,o 2000 Main Street, fa o� j4 ti� Huntington Beach,CA / _ City of Huntington Beach APPROVED87-0 .f� 777 9�$`DUNri CP�\.7'yM File #: 26-146 MEETING DATE: 3/17/2026 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Travis Hopkins, City Manager VIA: Chau Vu, Director of Public Works PREPARED BY: Michael Aguas, Capital Projects Administrator Subject: Accept the lowest responsive and responsible bid and authorize execution of a construction contract with Vido Artukovich & Son, Inc.Nidmar, Inc., a JV, in the amount of$4,495,550 for the McFadden Sewer Lift Station, Wet Well Project Phase 2, (CC1610); Reject bids 1-3; Authorize a 15% in contingency; and Authorize appropriation of additional funds Statement of Issue: On October 21, 2025, the City of Huntington Beach publicly opened bids for the McFadden Sewer Lift Station Wet Well Project Phase 2, CC1610. Shortly thereafter, on November 21, 2025, a formal bid protest was submitted to the Public Works Department. Following a thorough investigation, it was determined that the bids in question did not meet the required contract specifications. In light of these findings, City Council action is requested to award the construction contract to Vido Artukovich & Son, Inc.Nidmar, Inc., a JV, identified as the lowest responsive and responsible bidder. Financial Impact: The total project cost is $5,818,625.10, which includes the construction contract with Vido Artukovich & Son Inc.Nidmar, Inc., a JV in the amount of$4,495,550, a 15% construction contingency of $674,332.50, and supplemental expenses of$648,742.60. The available funding for this project is $1,462,325.01 from the Sewer Service Fund (511) in Account No. 51189027.82600. Additional new funding of$651,039.74 and reappropriation of existing funding in the amount of$3,705,260.35, totaling $4,356,300.09 is requested to be appropriated to fund this project from the Sewer Service Fund (511). Staff identified savings in the current fiscal year budget in the amount of$3,705,260.35 from the Sewer Service Fund (511) as follows: Savings from Account No. 51185101.69365 $199, . Sewer Service Fund (511) Account No. 51185201.83700 $31559,000 348.077 0 City of Huntington Beach Page 1 of 4 Printed on 3/11/2026 powered by LegistarTM 246 File #: 26-146 MEETING DATE: 3/17/2026 Account No. 51189017.82600 $415,801.58 Account No. 51189021.82000 $2,735,110.00 Total Funds to Appropriate $3,705,260.35 Staff is requesting that City Council reappropriate savings from available funds in the amount of $3,705,260.35 from the Sewer Service Fund (511) and appropriate additional funding in the amount of$651,039.74 from the Sewer Service Fund (511) to Account No. 51189027.82600 to cover the total project cost. Recommended Action: A) Appropriate $4,356,300.09 in additional funding from the Sewer Service Fund (511); and B) Accept the lowest responsive and responsible bid submitted by Vido Artukovich & Son, Inc.Nidmar, Inc., a JV, in the amount of$4,495,550; and C) Reject bids 1-3 as non-responsive to the bid requirements; and D) Authorize the Director of Public Works to approve change orders up to a 15% contingency for potential construction change orders; and E) Authorize the Mayor and City Clerk to execute a construction contract with Vido Artukovich & Son, Inc.Nidmar, Inc., a JV, in a form approved by the City Attorney. Alternative Action(s): Reject all bids and provide staff with direction. Analysis: The existing sewer facilities were constructed in 1972 and are near the end of their functional life. The existing concrete box structure is also experiencing structural failures due to immersion in a high chloride groundwater environment. The issue concerning insufficient wet well capacity is problematic, as the wet well lacks holding time, which limits maintenance staffs ability to respond to issues. Additionally, the undersized wet well causes the pumps to cycle excessively, which reduces pump life and overall station's reliability. A new duplex submersible pump lift station and a separate valve vault with a magnetic flow meter will be constructed using current state-of-the-art equipment and materials, which will improve the sewer system's reliability and staff response time during emergencies. Phase 2 of this project will include reconstruction of the wet well, valve vault, an 8-inch gravity flow pipe system, a new force main system, mechanical and electrical support infrastructure, and other associated site improvements. This lift station will also be connected to a new emergency natural gas generator to ensure the sewer facility remains operational during a power outage, thereby minimizing the risk of sewage spills at South Greer Park. Bids were opened on November 20, 2025, with the following results: 'Bidder's Name (Submitted and Verified Bid I City of Huntington Beach Page 2 of 4 Printed on 3/11/2026 powered by Leg istarTM 247 File #: 26-146 MEETING DATE: 3/17/2026 Mehta Mechanical Company, Inc. $3,654,385.00 R2 Build $3,938,015.00 Lonerock, Inc. $4,368,875.00 Vido Artukovich &Son Inc.Nidmar, Inc. a JV $4,495,550.00 Caliagua, Inc. $5,553,650.00 On November 21, 2025, a formal bid protest against Bids 1-3 was submitted to City staff. Upon a thorough review of the protest, it was determined that Bidders 1-3 did not meet contract requirements. The primary reasons for disqualification of Bidders 1-3 include: • A non-responsive bid was determined due to mobilization costs exceeding the maximum percentage expressly permitted in the bid specifications, in violation of Public Contract Code 10264. • A non-responsive bid was determined for failure to comply with mandatory bid requirements, including identification of required key personnel and demonstration of minimum experience, as expressly required by the bid specifications, consistent with Public Contract Code 20101 and 20155.1. • A non-responsive bid was determined due to failure to demonstrate the minimum experience expressly required by the bid specifications, consistent with Public Contract Code 20101 and applicable bid responsiveness principles. Bidders 1-3 have been notified of their disqualification; No further action has been taken. Based on the low bid received, the total estimated construction costs of this project is $5,818,625.10 as itemized below: Item Amount Bid submitted by Vido Artukovich & Son, Inc. $4,495,550 15% Contingency $674,332.50 Supplemental $648,742.60 TOTAL CONSTRUCTION COST: $5,818,625.10 Staff recommends rejecting Bids 1-3 and awarding the construction contract to Vido Artukovich & Son, Inc.Nidmar, Inc., a JV, in the amount of$4,495,550. Vido Artukovich & Son, Inc.Nidmar, Inc., a JV, has successfully completed similar construction projects before. The total project cost is estimated to be $5,818,625.10, which includes the construction contract, on-call construction management& inspection, and the construction contingency. Environmental Status: The project is categorically exempt pursuant to Sections 15302 (Replacement or Reconstruction), 15301 (Existing Facilities), and 15304 (Minor Alterations to Land) of California Environmental Quality City of Huntington Beach Page 3 of 4 Printed on 3/11/2026 powered by Legistarie 248 File #: 26-146 MEETING DATE: 3/17/2026 Act. Strategic Plan Goal: Non Applicable -Administrative Item For details, visit www.huntingtonbeachca.gov/strategicplan. Attachment(s): 1. Construction Contract 2. RCA Contract Agreement Summary 3. PowerPoint Presentation City of Huntington Beach Page 4 of 4 Printed on 3/11/2026 powered by LegistarTM 249 CITY FUNDED CONSTRUCTION CONTRACT BETWEEN THE CITY OF HUNTINGTON BEACH AND VIDO ARTUKOVICH & SON, INC./VIDMAR, INC.. A JV FOR MCFADDEN SEWER LIFT STATION AND WET WELL, CC 1610 THIS AGREEMENT ("Agreement") is made and entered into by and between the City of Huntington Beach, a municipal corporation of the State of California, hereinafter referred to as "CITY," and VIDO ARTUKOVICH & SON, INC./VIDMAR, INC. A JV , a California corporation,hereinafter referred to as "CONTRACTOR." WHEREAS, CITY has solicited bids for a public works project, hereinafter referred to as "PROJECT," more fully described as MCFADDEN SEWER LIFT STATION AND WET WELL, CC1610 in the City of Huntington Beach; and CONTRACTOR has been selected to perform said services, NOW, THEREFORE, in consideration of the promises and agreements hereinafter made and exchanged the parties covenant and agree as follows: 1. STATEMENT OF WORK; ACCEPTANCE OF RISK CONTRACTOR shall complete and construct the PROJECT pursuant to this Agreement and the Contract Documents (as hereinafter defined) and furnish, at its own cost and expense, all labor, plans, tools, equipment, supplies, transportation, utilities and all other items, services and facilities necessary to complete and construct the PROJECT in a good and workmanlike manner. CONTRACTOR agrees to fully assume the risk of all loss or damage arising out of the nature of the PROJECT, during its progress or prior to acceptance by CITY, from the action of the elements, from any unforeseen difficulties which may arise or be encountered in the 1 16-5195/City Funded Construction Contract.docx—revised 04/2016 prosecution of work, and for all other risks of any description in connection with the work, including, but not limited to, all expenses incurred by or in consequence of the suspension or discontinuance of work, except such as are herein expressly stipulated to be borne by CITY, and for well and faithfully completing the work within the stipulated time and in the manner shown and described in this Agreement, and in accordance with the requirements of CITY for the compensation set forth in the accepted bid proposal. 2. ACCEPTANCE OF CONDITIONS OF WORK; PLANS AND SPECIFICATIONS CONTRACTOR acknowledges that it is fully familiar with all the terms,conditions and obligations of this Agreement and the Contract Documents (as defined below in this Section), has inspected the location of the job site, and the conditions under which the work is to be performed, and that it enters into this Agreement based upon its thorough investigation of all such matters and is relying in no way upon any opinions or representations of CITY. It is agreed that the Contract Documents are incorporated into this Agreement by this reference, with the same force and effect as if the same were set forth at length herein, and that CONTRACTOR and its subcontractors, if any, shall be bound by the Contract Documents insofar as they relate in part or in any way, directly or indirectly, to the work covered by this Agreement. "Contract Documents" as defined herein mean and include: A. This Agreement; B. Bonds covering the work herein agreed upon; C. The CITY's standard Plans and Specifications and special contractual provisions, including those on file in the office of the Department of Public Works of CITY, and any revisions, amendments or addenda thereto; 2 16-5195/City Funded Construction Contract.docx—revised 04/2016 D. The edition of Standard Specifications for Public Works Construction, published by Builders'News,Inc., 10801 National Boulevard,Los Angeles, CA 90064, and all amendments thereto, written and promulgated by the Southern California chapter of the American Public Works Association and the Southern California District Associated General Contractors of the California Joint Cooperative Committee as specified in the particular Plans, Specifications, Special Provisions and Addendum applicable to the Project; E. Bid documents including the Notice Inviting Bids, the Special Instructions to Bidders and the CONTRACTOR'S proposal, (which is attached hereto as Exhibit "A" and incorporated herein by this reference); F. The particular Plans, Specifications, Special Provisions and Addenda applicable to the PROJECT. Anything mentioned in the Specifications and not indicated in the Plans or indicated in the Plans and not mentioned in the Specifications, shall be of like effect as if indicated and mentioned in both. In case of a discrepancy between any Plans, Specifications, Special provisions, or Addenda, the matter shall be immediately submitted by CONTRACTOR to the Director of Public Works of CITY or his or her written designee (hereinafter referred to as "DPW"), and CONTRACTOR shall not attempt to resolve or adjust the discrepancy without the decision of DPW, save only at its own risk and expense. Should there be any conflict between the terms of this Agreement and the bid or proposal of CONTRACTOR, then this Agreement shall control and nothing herein shall be considered as an acceptance of the terms of the bid or proposal which is in conflict herewith. 3 16-5195/City Funded Construction Contract.docx—revised 04/2016 3. COMPENSATION CITY agrees to pay and CONTRACTOR agrees to accept as full compensation for the faithful performance of this Agreement, subject to any additions or deductions made under the provisions of this Agreement or the Contract Documents, a sum not to exceed Four Million Four Hundred Ninety Five Thousand Five Hundred Fifty Five and 00/100 Dollars ( $4,495,550 ), as set forth in the Contract Documents, to be paid as provided in this Agreement. 4. COMMENCEMENT OF PROJECT CONTRACTOR agrees to commence the PROJECT within ten(10)working days after the Notice To Proceed is issued and diligently prosecute the PROJECT to completion within Two Hundred ( 200 ) consecutive Working days from the day the Notice to Proceed is issued by DPW, excluding delays provided for in this Agreement. 5. TIME OF THE ESSENCE The parties hereto recognize and agree that time is of the essence in the performance of this Agreement and each and every provision of the Contract Documents. CONTRACTOR shall prepare and obtain approval as required by the Contract Documents for all shop drawings, details and samples, and do all other things necessary and incidental to the prosecution of its work in conformance with the progress schedule set forth in the Contract Documents. CONTRACTOR shall coordinate its work with the work of all other contractors, subcontractors, and CITY forces working on the PROJECT in a manner that will facilitate the efficient completion of the PROJECT and in accordance with the terms and provisions of this Agreement. CITY shall have complete control of the premises on which the work is to be performed and shall have the right to decide the time and order in which the various portions of the work shall be performed and the priority of the work of other contractors, 4 16-5195/City Funded Construction Contract.docx—revised 04/2016 subcontractors and CITY forces and, in general, all matters concerning the timely and orderly conduct of the work of CONTRACTOR on the premises. 6. CHANGES CONTRACTOR shall adhere strictly to the plans and specifications set forth in the Contract Documents unless a change therefrom is authorized in writing by DPW. CONTRACTOR agrees to make any and all changes, furnish materials and perform all work necessary within the scope of the PROJECT as DPW may require in writing. Under no condition shall CONTRACTOR make any changes without the prior written order or acceptance of DPW, and CITY shall not pay any extra charges made by CONTRACTOR that have not been agreed upon in writing by DPW. When directed to change the work, CONTRACTOR shall submit immediately to DPW a written cost proposal reflecting the effect of the change. Should DPW not agree to such cost proposal, the work shall be performed according to the changes ordered in writing by DPW and the proper cost thereof shall be negotiated by the parties upon cost and pricing data submitted by CONTRACTOR; thereupon, CITY will promptly issue an adjusted change order to CONTRACTOR and the contract price will be adjusted upward or downward accordingly. 7. NOTICE TO PROCEED No work, services, material, or equipment shall be performed or furnished under this Agreement unless and until a Notice to Proceed has been given to CONTRACTOR by CITY. CITY does not warrant that the work will be available on the date the Notice to Proceed is issued. In the event of a delay in commencement of the work due to unavailability of the job site, for any reason,relief to CONTRACTOR shall be limited to a time extension equal to the delay due to such unavailability. 5 16-5195/City Funded Construction Contract.docx—revised 04/2016 8. BONDS Only bonds issued by California admitted sureties will be accepted. CONTRACTOR shall, prior to its performance of this Agreement, furnish the following two (2) bonds approved by the City Attorney: One in the amount of one hundred percent (100%) of the contract price to guarantee the CONTRACTOR's faithful performance of the work, and one in the amount of one hundred percent of the contract price to guarantee payment of all claims for labor and materials furnished. In addition, CONTRACTOR shall submit to CITY a bond in the amount of one hundred percent (100%) of the final contract price, including all change orders, to warrant such performance for a period of one (1) year after CITY's acceptance thereof within ten (10) days of filing of the Notice of Completion. 9. WARRANTIES CONTRACTOR unconditionally guarantees all work done under this Agreement including, but not limited to, any workmanship, installation, fabrication, material or structural facilities constructed. CONTRACTOR, within ten (10) days after notice by CITY of any defect in the work, shall have the option to make appropriate repairs or replace the defective item or items. Upon expiration of such ten (10) day period, CITY may then make appropriate repair or replacement at CONTRACTOR's risk and own cost and expense. 10. INDEPENDENT CONTRACTOR It is understood and agreed that CONTRACTOR is, and shall be, acting at all times hereunder as an independent contractor and not an employee of CITY. CONTRACTOR shall secure at its own cost and expense, and be responsible for any and all payment of all taxes, social security, state disability insurance compensation, unemployment compensation and other payroll 6 16-5195/City Funded Construction Contract.docx—revised 04/2016 deductions for CONTRACTOR and its officers, agents and employees and all business licenses, if any, in connection with the PROJECT and/or the services performed hereunder. 11. LIQUIDATED DAMAGES/DELAYS It is agreed by the parties hereto that in case the total work called for hereunder is not in all parts and requirements finished or completed within the number of calendar days as set forth herein, damage will be sustained by CITY; and that it is, and would be, impractical and extremely difficult to ascertain and determine the actual damage which CITY would sustain in the event of and by reason of such delay. It is, therefore, agreed that CONTRACTOR will pay to CITY, as liquidated damages and not as a penalty, the sum of One Thousand Five Hundred and 00/100 ( $1,500 ) per each calendar day's delay in completing the work in excess of the number of working/calendar days set forth herein, which represents a reasonable endeavor by the parties hereto to estimate a fair compensation for the foreseeable damages CITY would sustain in the event of and by reason of such delay; and CONTRACTOR agrees to pay these damages herein provided, and further agrees that CITY may deduct the amount thereof from any monies due or that may become due to CONTRACTOR hereunder. CONTRACTOR will be granted an extension of time and will not be assessed damages for any portion of the delay in the completion of the work due to unforeseeable causes beyond the control and without the fault or negligence of CONTRACTOR, including, but not limited to, acts of God or of the public enemy, fire, floods, epidemics, quarantine restrictions, strikes, unsuitable weather,or delays of subcontractors due to such causes. CONTRACTOR shall, within fifteen (15) days from the beginning of any such delay(unless DPW shall grant a further period of time), notify DPW in writing of the cause of the 7 16-5195/City Funded Construction Contract.docx—revised 04/2016 delay and CITY shall extend the time for completing the work if, in its judgment, the findings of fact thereon justify the delay; and the decision of DPW shall be conclusive on the parties hereto. Should CONTRACTOR be delayed in the prosecution or completion of the work by the act, neglect or default of CITY, or should CONTRACTOR be delayed by waiting for materials required by this Agreement to be furnished by CITY, or by damage caused by fire or other casualty at the job site for which CONTRACTOR is not responsible, or by the combined action of the workers, in no way caused by or resulting from default or collusion on the part of CONTRACTOR, or in the event of a lockout by CITY, then the time herein fixed for the completion of the work shall be extended by the number of days CONTRACTOR has thus been delayed,but no allowance or extension shall be made unless a claim therefor is presented in writing to CITY within fifteen (15) days of the commencement of such delay. No claims for additional compensation or damages for delays, irrespective of the cause thereof, and including without limitation the furnishing of materials by CITY or delays by other contractors or subcontractors will be allowed and an extension of time for completion shall be the sole remedy of CONTRACTOR. 12. DEMANDS FOR ADDITIONAL TIME OR MONEY. A. Definitions. (1) "Change Order"means a document signed by the CONTRACTOR and CITY which authorizes an addition, deletion or revision in the work, or an adjustment in the Compensation under Section 3, or the Completion Time specified at Section 4. (2) "Demand" means a written demand for a Change Order by the CONTRACTOR for any of the following: (a) A time extension; 8 16-5195/City Funded Construction Contract.docx—revised 04/2016 (b) Payment of money or damages arising from work done by, or on behalf of, the CONTRACTOR pursuant to this Agreement and payment of which is not expressly permitted pursuant to Section 3 of this Agreement; (c) Payment of an amount the CITY disputes; (d) Any disputes and other matters relating to the acceptability of the work performed or the interpretation of the Contract Documents; (e) A request for a time extension or additional payment based upon differing site conditions, such as subsurface or latent physical conditions at the job site differing materially from those indicated in this Agreement or the Contract Documents, or unknown physical conditions at the job site, of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent to work of the PROJECT; or (f) A request for a time extension or additional payment based upon acts of neglect by CITY or due to fires, floods, labor disputes, epidemics, abnormal weather conditions or acts of God. B. A Demand for a time extension or payment of money or damages may only be granted by a Change Order. C. No Change Order may be granted except where the Contractor has submitted a Demand to the DPW(or his or her written designee). All Demands shall be submitted promptly, but in no event later than thirty (30) days after the occurrence of the event giving rise to the Demand. The Demand shall be in writing and include all documents necessary to substantiate the Demand. The DPW shall act on the Demand within fifteen (15) days after receipt, including by requesting additional information from the CONTRACTOR to determine whether to approve the Change Order the Demand seeks. The DPW shall act on the Demand within fifteen(15) days 9 16-5195/City Funded Construction Contract.docx—revised 04/2016 after receipt of the additional information or within a period of time no greater than the time the CONTRACTOR took to produce the additional information requested, whichever is greater. D. Notwithstanding the thirty (30) days to submit a Demand under Subparagraph C, in the case of differing or unknown site conditions, immediately upon encountering the conditions, CONTRACTOR shall notify the DPW in writing of the conditions, so that the CITY may promptly investigate the conditions. E. If the CONTRACTOR disputes the DPW's written response on the Demand, or the CITY fails to respond within the time prescribed, the CONTRACTOR may so notify the City Engineer,in writing, either within fifteen(15)days of receipt of the City Engineer's response or within fifteen (15) days of the DPW's failure to respond within the time prescribed, respectively, and request an informal conference to meet and confer for settlement of the Demand. Upon the CONTRACTOR's request,the DPW shall schedule a meet and confer conference within thirty (30) days to seek to resolve. F. CITY and CONTRACTOR shall execute appropriate Change Orders covering changes to the time or price by executing the Change Order by mutual agreement. If the CITY and CONTRACTOR are unable to reach a mutual agreement, then the City Engineer shall issue a written decision on the claim within a reasonable time. G. Following the meet and confer conference, if the Demand remains in dispute,the CONTRACTOR may file a claim with the City as provided in Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the CONTRACTOR submits his 10 16-5195/City Funded Construction Contract.docx—revised 04/2016 or her Demand until the Demand is denied as a result of the meet and confer process, including any period of time utilized by the meet and confer process. 13. VARIATIONS IN ESTIMATED QUANTITIES The quantities listed in the bid schedule will not govern final payment. Payment to CONTRACTOR will be made only for the actual quantities of contract items used in construction of the PROJECT, in accordance with the plans and specifications. Upon completion of the PROJECT, if the actual quantities used are either more than or less than the quantities listed in the bid schedule, the bid price shall prevail subject to the provisions of this Section. DPW may, at its sole discretion, when warranted by the facts and circumstances, order an equitable adjustment, upwards or downwards, in payment to CONTRACTOR where the actual quantities used in construction of the PROJECT are in variation to the quantities listed in the bid schedule. No claim by CONTRACTOR for an equitable adjustment in price or time for completion shall be allowed if asserted after final payment under this Agreement. If the quantity variation is such as to cause an increase in the time necessary for completion, DPW shall ascertain the facts and circumstances and make such adjustment for extending the completion date as in its sole judgment the findings warrant. 14. PROGRESS PAYMENTS Each month DPW will make an estimate in writing of the work performed by CONTRACTOR and the value thereof From each progress estimate, five percent (5%) will be deducted and retained by CITY and the remainder of the progress estimate, less the amount of all previous payments since commencement of the work, will be paid to CONTRACTOR. When CONTRACTOR has, in the judgment of DPW, faithfully executed fifty percent (50%) or more of the value of the work as determined from the bid schedule, and if DPW finds that satisfactory progress has been and is being made, CONTRACTOR may be paid such 11 16-5195/City Funded Construction Contract.docx—revised 04/2016 sum as will bring the payments of each month up to one hundred percent (100%) of the value of the work completed since the commencement of the PROJECT,as determined in its sole discretion by DPW, less all previous payments and less all previous retained amounts. CITY's final payment to CONTRACTOR, if unencumbered, or any part thereof unencumbered, shall be made thirty-five (35) days after the acceptance of the work and the filing of a Notice of Completion by CITY. Provided, however, that in the event of a dispute between CITY and CONTRACTOR, CITY may withhold from the final payment an amount not to exceed 150 percent of the value of any disputed amount of work. Payments shall be made on demands drawn in the manner required by law, each payment to be accompanied by a certificate signed by DPW, affirming that the work for which payment is demanded has been performed in accordance with the terms of the Agreement and that the amount stated in the certificate is due under the terms of the Agreement. Partial payments on the contract price shall not be considered as an acceptance of any part of the work. 15. WITHHELD CONTRACT FUNDS, SUBSTITUTION OF SECURITIES At the request and at the sole cost and expense of CONTRACTOR,who shall retain beneficial ownership and receive interest, if any thereon, CITY shall permit the substitution and deposit therewith of securities equivalent to the amount of any monies withheld by CITY to ensure performance under the terms of this Agreement. 16. AFFIDAVITS OF SATISFACTION OF CLAIMS After the completion of the work contemplated by this Agreement, CONTRACTOR shall file with DPW its affidavit stating that all workers and persons employed, all firms supplying materials and all subcontractors working upon the PROJECT have been paid in full and that there are no claims outstanding against the PROJECT for either labor or material, except certain items,if any,to be set forth in CONTRACTOR's affidavit covering disputed claims, 12 16-5195/City Funded Construction Contract.docx`—revised 04/2016 or items in connection with Notices to Withhold, which have been filed under the provisions of the statutes of the State of California. 17. WAIVER OF CLAIMS The acceptance by CONTRACTOR of the payment of the final certificate shall constitute a waiver of all claims against CITY under or arising out of this Agreement. A. The CITY has ascertained from the Director of Industrial Relations of the State of California the general prevailing rate of per diem wages and the general prevailing rate for legal holiday and overtime work in the locality in which the work is to be performed for each craft or type of work needed to execute this Agreement, and the same has been set forth by resolution on file in the office of the City Clerk of CITY. CONTRACTOR and any subcontractor under it shall pay not less than said prevailing wage rates to all workers employed on this public works Agreement, as required by California Labor Code Sections 1771 and 1774. In accordance with the provisions of Section 3700 of the California Labor Code, CONTRACTOR agrees to secure payment of compensation to every employee. B. Pursuant to this Agreement and in accordance with Section 1774 and 1775 of the California Labor Code, CONTRACTOR shall, as penalty to CITY, forfeit twenty-five dollars ($25) for each calendar day or portion thereof for each worker paid (either by CONTRACTOR or any of its subcontractors) less than the prevailing wage rate established for that particular craft or type of work. 18. CALIFORNIA PREVAILING WAGE LAW A. The CITY has ascertained from the Director of Industrial Relations of the State of California the general prevailing rate of per diem wages and the general prevailing rate for legal holiday and overtime work in the locality in which the work is to be performed for each craft or type of work needed to execute this Agreement, and the same has been set forth by 13 16-5195/City Funded Construction Contract.docx—revised 04/2016 resolution on file in the office of the City Clerk of CITY. CONTRACTOR and any subcontractor under it shall pay not less than said prevailing wage rates to all workers employed on this public works Agreement, as required by California Labor Code Sections 1771 and 1774. In accordance with the provisions of Section 3700 of the California Labor Code, CONTRACTOR agrees to secure payment of compensation to every employee. B. Pursuant to this Agreement and in accordance with Section 1774 and 1775 of the California Labor Code, CONTRACTOR shall, as penalty to CITY, forfeit twenty-five dollars ($25) for each calendar day or portion thereof for each worker paid (either by CONTRACTOR or any of its subcontractors) less than the prevailing wage rate established for that particular craft or type of work. 19. CALIFORNIA EIGHT-HOUR LAW A. California Labor Code, Sections 1810 et seq, shall apply to the performance of this Agreement; thereunder, not more than eight (8) hours shall constitute one day's work and CONTRACTOR and each subcontractor employed by its hereunder, shall not require more than eight (8) hours of labor per day or forty (40) hours per week from any one person employed by it hereunder, except as stipulated in California Labor Code Section 1815. CONTRACTOR and each subcontractor employed by it hereunder shall, in accordance with California Labor Code Section 1812, keep an accurate record, open to inspection at all reasonable hours, showing the name and actual hours worked each calendar day and each calendar week by each worker employed in connection with the PROJECT. B. Pursuant to this Agreement and in accordance with California Labor Code Section 1813, CONTRACTOR shall, as a penalty to CITY, forfeit twenty-five dollars ($25) for each worker employed hereunder by CONTRACTOR or any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any one 14 16-5195/City Funded Construction Contract.docx—revised 04/2016 (1) calendar day or forty(40)hours in any one (1) calendar week in violation of California Labor Code Section 1815. 20. PAYMENT OF TRAVEL AND SUBSISTENCE ALLOWANCE Section 1773.8 of the California Labor Code, regarding the payment of travel and subsistence allowance is applicable to this PROJECT. 21. EMPLOYMENT OF APPRENTICES Section 1777.5 of the California Labor Code, regarding the employment of apprentices is applicable to this PROJECT. 22. PAYROLL RECORDS CONTRACTOR agrees to keep accurate payroll record showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice or worker employed by it in connection with the PROJECT and agrees to require each of its subcontractors to do the same. CONTRACTOR further agrees that its payroll records and those of its subcontractors, if any, shall be available at all reasonable times to the CITY, and the employee or his representative, and the Division of Labor Standards Enforcement and the Division of Apprenticeship Standards, and to comply with all of the provisions of California Labor Code Section 1776, in general. 23. INDEMNIFICATION, DEFENSE, HOLD HARMLESS CONTRACTOR hereby agrees to protect, defend, indemnify and hold harmless CITY, its officers, elected or appointed officials, employees, agents, and volunteers from and against any and all claims, damages, losses, expenses, judgments, demands, defense costs, and consequential damage or liability of any kind or nature, however caused, including those resulting from death or injury to CONTRACTOR's employees and damage to CONTRACTOR's property, 15 16-5195/City Funded Construction Contract.docx—revised 04/2016 arising directly or indirectly out of the obligations or operations herein undertaken by CONTRACTOR, caused in whole or in part by any negligent act or omission of the CONTRACTOR, any subcontractors, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including but not limited to concurrent active or passive negligence, except where caused by the active negligence, sole negligence, or willful misconduct of the CITY, its officers, elected or appointed officials, employees, agents, and volunteers. CONTRACTOR will conduct all defense at its sole cost and expense and CITY shall approve selection of CONTRACTOR's counsel. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by CONTRACTOR. 24. WORKERS' COMPENSATION AND EMPLOYER'S LIABILITY INSURANCE Pursuant to California Labor Code Section 1861, CONTRACTOR acknowledges awareness of Section 3700 et seq. of this Code, which requires every employer to be insured against liability for workers' compensation; CONTRACTOR covenants that it will comply with such provisions prior to commencing performance of the work hereunder. CONTRACTOR shall obtain and furnish to City workers' compensation and employer's liability insurance in an amount of not less than the State statutory limits. CONTRACTOR shall require all subcontractors to provide such workers' compensation and employer's liability insurance for all of the subcontractors' employees. CONTRACTOR shall furnish to CITY a certificate of waiver of subrogation under the terms of the workers' compensation and employer's liability insurance and CONTRACTOR shall similarly require all subcontractors to waive subrogation. 16 16-5195/City Funded Construction Contract.docx—revised 04/2016 25. INSURANCE In addition to the workers' compensation and employer's liability insurance and CONTRACTOR's covenant to defend,hold harmless and indemnify CITY, CONTRACTOR shall obtain and furnish to CITY, a policy of general public liability insurance, including motor vehicle coverage covering the PROJECT. This policy shall indemnify CONTRACTOR, its officers, employees and agents while acting within the scope of their duties, against any and all claims arising out or in connection with the PROJECT, and shall provide coverage in not less than the following amount: combined single limit bodily injury and property damage, including products/completed operations liability and blanket contractual liability, of One Million Dollars ($1,000,000) per occurrence. If coverage is provided under a form which includes a designated general aggregate limit,the aggregate limit must be no less than One Million Dollars ($1,000,000) for this PROJECT. This policy shall name CITY, its officers, elected or appointed officials, employees, agents, and volunteers (the"Additionally Insured Parties") as Additional Insureds, and shall specifically provide that any other insurance coverage which may be applicable to the PROJECT shall be deemed excess coverage and that CONTRACTOR's insurance shall be primary and non-contributory with any other valid and collectible insurance or self-insurance available to the Additionally Insured Parties. Any available insurance proceeds in excess of the minimum coverage amount specified herein shall be available to the Additionally Insured Parties. All coverage available to CONTRACTOR shall also be available to the Additionally Insured Parties. Under no circumstances shall said above-mentioned insurance contain a self-insured retention without the express written consent of CITY; however an insurance policy "deductible" of Five Thousand Dollars ($5,000.00) is permitted. CONTRACTOR shall be responsible for causing all Subcontractors to maintain the same types and limits of insurance coverage as that required of CONTRACTOR by this Agreement. 17 16-5195/City Funded Construction Contract.docx—revised 04/2016 26. CERTIFICATES OF INSURANCE; ADDITIONAL INSURED ENDORSEMENTS Prior to commencing performance of the work hereunder, CONTRACTOR shall furnish to CITY certificates of insurance subject to approval of the City Attorney evidencing the foregoing insurance coverages as required by this Agreement; the certificates shall: 1. Provide the name and policy number of each carrier and policy; 2. State that the policy is currently in force; and 3. Promise to provide that such policies will not be canceled or modified without thirty (30) days' prior written notice of CITY. CONTRACTOR shall maintain the foregoing insurance coverages in force until the work under this Agreement is fully completed and accepted by CITY. The requirement for carrying the foregoing insurance coverages shall not derogate from the CONTRACTOR'S defense, hold harmless and indemnification obligations as set forth under this Agreement. CITY or its representative shall at all times have the right to demand the original or a copy of all the policies of insurance. CONTRACTOR shall pay, in a prompt and timely manner, the premiums on all insurance hereinabove required. CONTRACTOR shall provide a separate copy of the additional insured endorsement to each of CONTRACTOR's insurance policies, naming CITY, its officers, elected and appointed officials, employees, agents and volunteers as Additional Insureds, to the City Attorney for approval prior to any payment hereunder. 27. NOTICE OF THIRD PARTY CLAIM Pursuant to Public Contracts Code §9202, CITY shall provide notice to CONTRACTOR of receipt of any claim filed with CITY or a court of competent jurisdiction which arises out of performance of this agreement within ten(10)days of receipt of such claim or claims. 18 16-5195/City Funded Construction Contract.docx—revised 04/2016 28. DEFAULT AND TERMINATION If CONTRACTOR fails or refuses to prosecute the work hereunder with diligence, or fails to complete the work within the time specified, or is adjudged bankrupt or makes an assignment for the benefit of creditors or becomes insolvent, or violates any provision of this Agreement or the Contract Documents, CITY may give CONTRACTOR notice in writing of its intention to terminate this Agreement. Unless the violation is cured within ten(10)days after such Notice of Intention has been served on CONTRACTOR, CITY may, without prejudice to any other remedy it may have, terminate this Agreement upon the expiration of that time. Upon such default by CONTRACTOR, CITY may elect not to terminate this Agreement; in such event CITY may make good the deficiency in which the default consists and deduct the resulting costs from the progress payments then or to become due to CONTRACTOR. If it is subsequently determined by a court of competent jurisdiction that CITY's termination of this Agreement under this Section was wrongful, such termination shall be converted to a termination for convenience under Section 29 and any damages shall be assessed as set forth in Section 29. 29. TERMINATION FOR CONVENIENCE CITY may terminate this Agreement for convenience at any time with or without cause, and whether or not PROJECT is fully complete upon seven(7) calendar days written notice to CONTRACTOR. In the event of termination, under this Section CITY shall pay CONTRACTOR for value of work in place on the PROJECT through the termination period less all such payments already made. In case of such termination for convenience,the CONTRACTOR shall be entitled to receive payment for work executed, and costs incurred by reason of such termination. In no event shall CONTRACTOR be entitled to recover overhead, profit or CONTRACTOR's fee on work not performed. Such payment by CITY shall be CONTRACTOR's 19 16-5195/City Funded Construction Contract.docx—revised 04/2016 sole and exclusive remedy for termination by CITY for its convenience and CITY shall have no further obligation to CONTRACTOR. 30. DISPOSITION OF PLANS, ESTIMATES AND OTHER DOCUMENTS CONTRACTOR agrees that upon completion of the work to be performed hereunder, or upon expiration or earlier termination of this Agreement, all original plans, specifications, drawings, reports, calculations, maps and other documents pertaining to this Agreement shall be delivered to CITY and become its sole property at no further cost. 31. NONASSIGNABILITY CONTRACTOR shall not sell, assign, transfer, convey or encumber this Agreement,or any part hereof,or any right or duty created herein,without the prior written consent of CITY and the surety. 32. CITY EMPLOYEES AND OFFICIALS CONTRACTOR shall employ no CITY official nor any regular CITY employee in the work performed pursuant to this Agreement. No officer or employee of CITY shall have any financial interest in this Agreement in violation of the California Government Code. 33. STOP NOTICES; RECOVERY OF ADMINISTRATIVE COSTS CITY shall be entitled to all reasonable administrative costs and necessary disbursements arising out of the processing of Stop Notices, Notices to Withhold, or any similar legal document. This obligation shall be provided for in the labor and materials payment bond required of CONTRACTOR. CITY may charge an administrative fee of One Hundred Dollars ($100)for every Stop Notice filed in excess of two (2),regardless of whether or not CITY is named in an action to enforce such stop notices. CITY may set off any unreimbursed cost or expense so incurred against any sum or sums owed by CITY to CONTRACTOR under this Agreement. 20 16-5195/City Funded Construction Contract.docx—revised 04/2016 34. NOTICES Any notices, certificates, or other communications hereunder shall be given either by personal delivery to CONTRACTOR's agent (as designated in Section 1 hereinabove) or to CITY as the situation shall warrant,or by enclosing the same in a sealed envelope,postage prepaid, and depositing the same in the United States Postal Service, to the addresses specified below; provided that CITY and CONTRACTOR may designate different addresses to which subsequent notices, certificates or other communications will be sent by notifying the other party via personal delivery, reputable overnight carrier or U. S. certified mail-return receipt requested: TO CITY: TO CONTRACTOR: City of Huntington Beach VIDO ARTUKOVICH& SON,INCJVIDMAR, ATTN: Michael Aguas ,Public Works ININ=_ 2000 Main Street ATTN: Vido Artukovich 11155 Rush St. S. El Monte, CA 91733 Huntington Beach, CA 92648 35. SECTION HEADINGS The titles, captions, section, paragraph and subject headings, and descriptive phrases at the beginning of the various sections in this Agreement are merely descriptive and are included solely for convenience of reference only and are not representative of maters included or excluded from such provisions,and do not interpret,define,limit or describe,or construe the intent of the parties or affect the construction or interpretation of any provision of this Agreement. 21 16-5195/City Funded Construction Contract.docx—revised 04/2016 36. IMMIGRATION CONTRACTOR shall be responsible for full compliance with the immigration and naturalization laws of the United States and shall, in particular, comply with the provisions of United States Code Section 1324a regarding employment verification. 37. LEGAL SERVICES SUBCONTRACTING PROHIBITED CONTRACTOR and CITY agree that CITY is not liable for payment of any subcontractor work involving legal services, and that such legal services are expressly outside the scope of services contemplated hereunder. CONTRACTOR understands that pursuant to Huntington Beach City Charter Section 309, the City Attorney is the exclusive legal counsel for CITY; and CITY shall not be liable for payment of any legal services expenses incurred by CONTRACTOR. 38. ATTORNEY'S FEES In the event suit is brought by either party to construe, interpret and/or enforce the terms and/or provisions of this Agreement or to secure the performance hereof, each party shall bear its own attorney's fees, such that the prevailing party shall not be entitled to recover its attorney's fees from the non-prevailing party. 39. INTERPRETATION OF THIS AGREEMENT The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any of the parties. If any provision of this Agreement is held by an arbitrator or court of competent jurisdiction to be unenforceable, void, illegal or invalid, such holding shall not invalidate or affect the remaining covenants and provisions of this Agreement. No covenant or provision shall be deemed dependent upon any other unless so expressly provided here. As used in this Agreement, the masculine or neuter gender and singular or plural number shall be deemed to include the other whenever the 22 16-5195/City Funded Construction Contract.docx—revised 04/2016 context so indicates or requires. Nothing contained herein shall be construed so as to require the commission of any act contrary to law, and wherever there is any conflict between any provision contained herein and any present or future statute, law, ordinance or regulation contrary to which the parties have no right to contract, then the latter shall prevail, and the provision of this Agreement which is hereby affected shall be curtailed and limited only to the extent necessary to bring it within the requirements of the law. 40. GOVERNING LAW This Agreement shall be governed and construed in accordance with the laws of the State of California. 41. DUPLICATE ORIGINAL The original of this Agreement and one or more copies hereto have been prepared and signed in counterparts as duplicate originals, each of which so executed shall, irrespective of the date of its execution and delivery, be deemed an original. Each duplicate original shall be deemed an original instrument as against any party who has signed it. 42. CONSENT Where CITY's consent/approval is required under this Agreement, its consent/approval for one transaction or event shall not be deemed to be consent/approval to any subsequent occurrence of the same or any other transaction or event. 43. SURVIVAL Terms and conditions of this Agreement, which by their sense and context survive the expiration or termination of this Agreement shall so survive. 44. MODIFICATION No waiver or modification of any language in this Agreement shall be valid unless in writing and duly executed by both parties. 23 16-5195/City Funded Construction Contract.docx—revised 04/2016 45. SIGNATORIES Each undersigned represents and warrants that its signature hereinbelow has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify CITY fully for any injuries or damages to CITY in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. 46. ENTIRETY The parties acknowledge and agree that they are entering into this Agreement freely and voluntarily following extensive arm's length negotiation,and that each has had the opportunity to consult with legal counsel prior to executing this Agreement. The parties also acknowledge and agree that no representations, inducements, promises, agreements or warranties, oral or otherwise, have been made by that party or anyone acting on that party's behalf, which are not embodied in this Agreement, and that that party has not executed this Agreement in reliance on any representation, inducement, promise, agreement, warranty, fact or circumstance not expressly set forth in this Agreement. This Agreement, and the attached Exhibit "A", contain the entire agreement between the parties respecting the subject matter of this Agreement, and supersede all prior understandings and agreements whether oral or in writing between the parties respecting the subject matter hereof. • 24 16-5195/City Funded Construction Contract.docx—revised 04/2016 IN WITNESS WHEREOF,the parties hereto have caused this Agreement to be executed by and through their authorized officers on M,AVZ/iL I1''", 20210 . CONTRACTOR: CITY OF HUNTINGTON BEACH,a municipal VIDO ARTUKOVICH & SON, INC./VIDMAR, corporation of e State of California INC.. A JV /2"243°.°. ayor By: City Clerk (print name) ITS: Chairman/President/Vice-President INITIATED A AP OVED: (circle one) Director of Public Works AND By: REVIEWED AND APPROVED: (print name) City Manager ITS: Secretary / Chief Financial Officer / Asst. Secretary/Treasurer (circle one) APPROVED AS TO FORM: pt.A."'r vvti g. City Attorney COUNTERPART 25 16-5195/City Funded Construction Contract.docx—revised 04/2016 IN WITNESS WHEREOF,the parties hereto have caused this Agreement to be executed by and through their authorized officers on M aviitl. I , 20 pp . CONTRACTOR: CITY OF HUNTINGTON BEACH,a municipal VIDO ARTUKOVICH & SON, INC./VIDMAR, corporation of the State of California INC.. A JV By: Mayor Vido Artukovich City Clerk (print name) ITS: Chairman/P idiLSL' -President INITIATED A AP OVED: (circle one anaging Par Director of Public Works AND By: REVIEWED AND APPROVED: (print name) City Manager ITS: Secretary / Chief Financial Officer / Asst. Secretary/Treasurer (circle one) APPROVED AS TO FORM: City Attorney COUNTERPART 25 16-5195/City Funded Construction Contract.docx—revised 04/2016 26 16-5195/City Funded Construction Contract.docx—revised 04/2016 SECTION C PROPOSAL for the construction of MCFADDEN SEWER LIFT STATION REPLACEMENT PHASE 2 CC No. 1610 in the CITY OF HUNTINGTON BEACH TO THE HONORABLE MAYOR AND MEMBERS OF THE COUNCIL OF HUNTINGTON BEACH: In compliance with the Notice Inviting Electronic Bids, the undersigned hereby proposes and agrees to perform all the work therein described,and to furnish all labor,material, equipment and incident insurance necessary therefor,in accordance with the plans and specifications on file in the office of the City Engineer of the City of Huntington Beach. The undersigned agrees to perform the work therein to the satisfaction of and under the supervision of the City Engineer of the City of Huntington Beach, and to enter into a contract at the following prices. The undersigned agrees to complete the work within 200 working days, starting from the date of the Notice to Proceed. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, Instructions to Bidders and all other contract documents. If this proposal is accepted for award,BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the guaranty accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses,taxes,royalties, fees, etc., and will be guaranteed for a period of sixty days from the bid opening date. If at such time the contract is not awarded,the AGENCY will reject all bids and will readvertise the project. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned agrees that in the event of the BIDDER'S default in executing the required contract and filing the necessary bonds and insurance certificates within 10 working days after the date of the AGENCY'S notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option,be considered null and void. c-i Accompanying this proposal of bid,find bidder's bond in the amount of I.10%oo.. :..LWhich said amount is not less than 10%of the aggregate of the total bid price, as required by the Notice Inviting Electronic Bids, payable to the AGENCY. (Please insert the words "Cash", "Certified Check", or "Bidder's Bond for_% ",as the case may be) Any standard Surety Bid Bond form is acceptable. Bidder shall signify receipt of all Addenda here, if any: Addenda No. Date Received Bidder's Signature 1 11/7/2025 dA"45. C-2 SCHEDULE A BID SCHEDULE(CC-1610) MCFADDEN SEWER LIFT STATION REPLACEMENT PROJECT PHASE 2 Bid Description Estimated Unit Unit Price Total Price Item Quantity Per Plans and Specifications, furnish all 1 labor, material and equipment to mobilize, 1 LS $ 76-0/0 00 $ Z50,d ere demobilize, and provide cleanup of construction site: provide all bonds, insurance, and obtain all permits. Per Plans and Specifications, furnish all 2 labor, material and equipment to conduct 1 LS $ 20i 00° $ 20,MO construction survey and staking of the construction site. Per Plans and Specifications, furnish all labor,materials,and equipment as required to implement Construction Traffic and Pedestrian Control Plans to provide public convenience, safety and traffic control; 3 including warning signs, high level warning 1 LS $ ,p►p,0a9 $ Wei"0 devices, delineators, regulatory signs, barricades,and recessed trench plate bridging throughout the project. Traffic Control Plans were prepared by the Design Engineer and are provided in the Construction Drawings. Per Plans and Specifications, furnish all labor,materials and equipment to pothole and locate horizontal and vertical positions of all 4 existing utilities in the vicinity of the work. 6 EA $ 3� $ Ig.0NoD Prepare a report and submit it to the City a minimum of four 1 week prior to start of construction to allow revisions to current design. C-2.1 SCHEDULE A BID SCHEDULE(CC-1610) MCFADDEN SEWER LIFT STATION REPLACEMENT PROJECT PHASE 2 Bid Description Estimated Unit Unit Price Total Price Item Quantity Per Plans and Specifications, furnish all labor, materials, and equipment as required, develop, design, and implement trench and excavation safety measures for shallow excavations, consisting of sheeting, shoring, and bracing, or equivalent method for the protection of life and limb in trenches, pump station excavation, valve vault excavation, 5 and other miscellaneous open excavations; 1 LS $ 1 0 0f4CO $ Val and protection of all adjacent structures in conformance with applicable safety orders. The work includes preparation of shoring plans and calculations by a California registered structural engineer incorporating the requirements of the dewatering plan, and recommendations contained in the geotechnical study performed by the Contractor. Per Plans and Specifications, develop a Dewatering Plan prepared by a California Registered Geotechnical Engineer for shallow excavations, incorporating the requirements of the shoring plan and any additional geotechnical information developed by the Contractor. The work 0 BOO' O �o� 6 includes: obtaining NPDES permit from the 1 LS $ $ Z Regional Water Quality Control Board, well drilling and destruction permits from Orange County' Health Department, field testing required for the design of the dewatering system, implementation of the dewatering program, and removal of the dewatering system, including monitoring wells, when no longer needed. C-2.2 SCHEDULE A BID SCHEDULE(CC-1610) MCFADDEN SEWER LIFT STATION REPLACEMENT PROJECT PHASE 2 Bid Description Estimated Unit Unit Price. Total Price Item Quantity Per Plans and Specifications,furnish all labor materials and equipment necessary to implement deep soil mixing (DSM) as a soil stabilization and dewatering measure for deep excavations as described in the AESCO Report. Work under this item will include the design of the shoring systems by a California 7 Registered Structural Engineer with 1 LS $ fD�0�$ �,300�G� experience in designing successful shoring systems for similar projects with DSM implementation, utilizing the geotechnical findings presented in the AESCO Report and in accordance with the requirements of OSHA and the Construction Safety Orders of the State of California. Per Plans and Specifications, develop Storm Water Pollution Prevention Plan (SWPPP) furnish all labor, materials, and equipment as required to install and maintain all BMP's identified in the approved SWPPP throughout 8 the duration of construction. At the 1 LS $ �f(y, a $ ?d d completion of construction, all BMP's shall be removed by the CONTRACTOR, and the site and all facilities restored to their original condition. Per Plans and Specifications, implement a site monitoring program to evaluate groundwater, settlement, and vibration in accordance with 9 the recommendations contained in the 1 LS $ Z0,4ot $ Zo dao Contractor's Geotechnical Investigation Report for construction of the lift station sewers,wet well and valve vault. C-2.3 SCHEDULE A BID SCHEDULE(CC-1610) MCFADDEN SEWER LIFT STATION REPLACEMENT PROJECT PHASE 2 Bid Estimated Item Description Unit Unit Price Total Price Quantity Per Plans and Specifications,furnish all labor materials and equipment necessary for sitework demolition and preparation for the new pump station site and the legal disposal of all removed materials. The work includes, 10 but is not limited to:demolition,removal,and 1 LS $ MO" $ Z®a d do disposal of pavement, curb, gutter, sidewalk, conduits, wires, irrigation piping, and pull boxes;documentation of pre-construction site conditions; and all other appurtenant work required. Per Plans and Specifications,furnish all labor materials and equipment necessary to abandon the existing gravity sewer, force main,and manhole.The work includes,but is not limited to:cement slurry;asphalt concrete paving, curb, gutter, and sidewalk removal 11 and restoration; plugging of existing 1 LS $ !D 'o $ SO'p o manholes; removal of existing manhole, channel modification in existing discharge manhole (MH 1588) in McFadden Avenue; fill with sand and reconstruct surface; and all other appurtenant work required. Per Plans and Specifications, furnish all labor, material and equipment necessary, to construct 4-foot diameter polymer concrete sewer manhole and composite frame and 12 cover. The work includes, but is not limited 1 LS $ 17,0 pG $ Z 0� to: rechannelization of existing MH 1633;; Sancon rehabilitation of MH 1633;composite manhole frame and cover;connections to new and existing sanitary sewers; and all appurtenant work required. Per Plans and Specifications, furnish all labor, materials and equipment necessary, to Sipe , /a too 13 construct 8-inch diameter VCP sewer in 64 LF $ $ Dawson Lane. • C-2.4 SCHEDULE A BID SCHEDULE(CC-1610) MCFADDEN SEWER LIFT STATION REPLACEMENT PROJECT PHASE 2 Bid Estimated Description Unit Unit Price Total Price Item Quantity, Per Plans and Specifications, furnish all labor, materials and equipment necessary to construct reinforced concrete, Studliner HDPE lined wet well with H-20 rated 316 14 stainless steel lockable access hatch with 1 LS $ 3Ba3014 $ 30mp,d fiberglass safety rack, access manway, exterior waterproofing and all other required appurtenances. The precast concrete wet well will be CITY-furnished. Per Plans and Specifications, furnish all labor, materials and equipment necessary to construct reinforced concrete valve vault, 15 with H-20 rated aluminum 2-door lockable 1 LS $ 3dd�dpO $ 3OV,t,oA access hatch, 316 stainless steel ladders, sump, exterior waterproofing, and all other required appurtenances. The precast concrete valve vault will be CITY-furnished. Per Plans and Specifications, Furnish all labor,materials and equipment necessary and Install Wet Well Mechanical Equipment, including 5 HP, 117 gpm recessed impeller slide-rail submersible pumps and motors;316 stainless steel discharge elbows; 4-inch 316 16 stainless steel discharge piping, fittings and 1 LS $ 176,P e° $ j 76.0," support brackets; 316 stainless steel slide-rail system, guide brackets, lifting chain and bails; 316 stainless steel cable racks, level transducer stilling well; duckbill check valve; and all other required appurtenances. Pumps and some appurtenances will be CITY- furnished per Appendix L. Per Plans and Specifications, furnish all labor,materials and equipment necessary and Install Valve Vault Mechanical Equipment, including pipe, valves, fittings, couplings, electromagnetic flow meter, insulating 17 flanges, flexible expansion joint with joint 1 LS $ ►75dao $ /Zddo bonding and sacrificial anodes, 316 stainless steel pipe supports,bypass connection,ladder up device and all other required appurtenances. Some parts and appurtenances will be CITY-furnished per Appendix L. C-2.5 1 ii SCHEDULE A BID SCHEDULE(CC-1610) MCFADDEN SEWER LIFT STATION REPLACEMENT PROJECT PHASE 2 Bid Description Estimated Unit Unit Price Total Price Item Quantity i I. Per Plans and Specifications, furnish all labor, materials and equipment necessary to construct piping between the wet well and valve vault, and construct miscellaneous pipe, including all fittings; buried insulating flange 18 kits and test stations; flexible expansion joint 1 LS $ tea,t ab $ /1",0' -O with joint bonding; 6-inch, 316 stainless steel pipe; 3-inch,PVC pipe; excavation;imported backfill; compaction; and all required appurtenances. Some parts and appurtenances will be CITY-furnished per Appendix L. Per Plans and Specifications, furnish all labor, materials and equipment necessary, and construct 6-inch AWWA C900 DR 14 PVC sewer force main, including all fittings; 19 thrust blocks,cathodic protection;connection 1 LS $ /t i£ ' $ to discharge manhole; and Sancon rehabilitation of MH 1588. Some parts and appurtenances will be CITY-furnished per Appendix L. Per Plans and Specifications, furnish all labor, materials and equipment necessary to coordinating with SCG to install gas meter 20 and activate the gas service, and constructing 1 LS $ /d $ /Gt' o the gas service connection between the new I SCG meter on the outside of the generator enclosure and the emergency generator.. Per Plans and Specifications, furnish all labor, materials, and equipment necessary and install 30 kW natural gas fuel emergency generator set in a sound attenuated enclosure, including all conduits, wires, pipes, fittings, 21 valves, controls, reinforced concrete base, 2- 1 LS $ tic deed $ 1/ ;00a' inch tape wrapped steel pipe from the meter service meter to the generator, 8' CMU enclosure with wall spikes, and all appurtenances. Generator and some appurtenances will be CITY-furnished per Appendix L. II � I l C-2.6 Th II SCHEDULE A • BID SCHEDULE(CC-1610) MCFADDEN SEWER LIFT STATION REPLACEMENT PROJECT i' PHASE 2 I Bid Description .Estimated Unit Uni�� Price Total Price Item Quantity . I' Per Plans and Specifications, furnish all labor, materials, equipment necessary to I furnish and install site electrical and 1, instrumentation systems; including ;I 22 conductors, raceway, switches, lights, 1 LS $ 341,11'doa $ 70o,o6P0 receptacles, level transducers, float switches, and all required appurtenances. Someii electrical components and parts will be CITY-furnished per Appendix L. Per Plans and Specifications, furnish all I labor,materials and equipment necessary and 11 install 316 stainless steel,NEMA 4X transfer switch enclosure, including automatic transfer switch with manual bypass, double li throw manual transfer switch, portable generator receptacle; coordination with SCE 23 to provide electrical service to site; 4-inch 1 LS $ Z ' " $ Z 5,d°'0 conduit with pull-rope for SCE conductor; it 100 amp main switchboard;concrete pads for ji • ; electrical equipment; and all required ;I , appurtenances; complete and in place, with all required appurtenances. Some electrical 1. components and parts will be CITY-furnished a per Appendix L. Per Plans and Specifications, furnish all labor,materials and equipment necessary and install pump control panel and PLC panel and 24 appurtenances, as well as mounting those 1 LS $ aile o $ 30, t°'o panels to a reinforced concrete base. Some electrical components and parts will be CITY-furnished per Appendix L. Per Plans and Specifications, furnish all • 25 labor, material and equipment necessary, and 1 LS $ WI, "(9 $ hogOw" conduct lift station start up and testing to full i satisfaction of the City of Huntington Beach. • 1 i C-2.7 1 SCHEDULE A BID SCHEDULE(CC-1610) MCFADDEN SEWER LIFT STATION REPLACEMENT PROJECT PHASE 2 Bid. Estimated Item Description Unit Unit Price Total Price Quantity I Per Plans and Specifications, furnish all labor, materials and equipment necessary, .. and demolish existing City of Huntington Beach McFadden Sewer Lift Station, including removal, handling, and proper disposal of lead-based paint; removal and proper disposal of all equipment within the existing Lift Station; coordination and removal of SCE service meter, main disconnect, and manual transfer switch, and 1 A,d oo 00,d e o 26 delivery of salvaged equipment to City Yard; 1 LS $ 2 ' $ Z cleaning, lining, and rechanneling of the wet well;removal of the top 8-feet of the dry well structure; backfilling of remaining dry well with Class 100-E-100 slurry; re-channelizing and interior coating of an existing influent manhole; filling of existing to be abandoned pipes with low strength slurry mix; backfilling of the excavation with approved materials;and all appurtenant work. Per Plans and Specifications furnish all labor, materials and equipment necessary,to restore j and construct concrete curb,gutter,driveway, 27 local depressions,sidewalk,and ramps to pre- 1,310 SF $ 0 $ (,5,500 construction condition, and construction of new concrete pad around the wet well, valve vault, and meter vault. Per Plans and Specifications, furnish all i labor, materials, and equipment necessary to restore and construct the landscape and 28 irrigation system as directed by the City 1 LS $ /0 0 av $ foe, d Inspector, the installation of 36-gallon trees, and the installation of shrubs along Dawson Lane for screening, and raising an existing storm manhole to new finished grade. C-2.8 SCHEDULE A BID SCHEDULE(CC-1610) MCFADDEN SEWER LIFT STATION REPLACEMENT PROJECT PHASE 2 Bid Estimated Item Description Quantity Unit. Unit Price Total Price Per Plans and Specifications, furnish all labor, materials, and equipment necessary to remove and full depth replace existing disturbed aggregate base (AB), sawcut remove and full depth replace existing disturbed asphalt concrete (AC), within the 700 29A Dawson Lane and McFadden Ave (6" AC 780 SF $ '1 5 $ it, over 10" AB). Work also includes removal and replacement of all impacted pavement and curb markings, striping, and adjustment of existing boxes, manholes, valve cans to grade, in Dawson Lane and McFadden Avenue. Per Plans and Specifications, furnish all labor, materials, and equipment necessary to provide a 2-inch asphalt cement grind, and provide a 2-inch asphalt cement cap within the Dawson Lane,McFadden Ave,and North 29B Greer Park parking lot. Work also includes 47,900 SF $ 3 $ l y3,7®O removal and replacement of all impacted pavement and curb markings, striping, and adjustment of existing boxes, manholes, valve cans to grade, in Dawson Lane and McFadden Avenue. Per Plans and Specifications, furnish all labor, materials, and equipment necessary to 30 provide the services of a California 1 LS $ � off' $ Registered Professional Land Surveyor, with experience in all elements of the project, for the replacement of survey monuments. Per Plans and Specifications, furnish all labor, materials, and equipment necessary to provide the services for sewer flow bypass plan preparation, furnishing, operating, maintaining, and removing all such pipe, apo 0' Ste© 31 fittings, pumps, diversion devices, and all 1 LS $ $ Z earthwork including excavation, removal, imported material, backfill, compaction, pipe restoration required to bypass live sewers, and all incidentals necessary for doing all the work required, complete and in place. C-2.9 SCHEDULE A BID SCHEDULE(CC-1610) MCFADDEN SEWER LIFT STATION REPLACEMENT PROJECT PHASE 2 Bid Description Estimated Unit Unit Price . Total Price Item Quantity Per Plans and Specifications, furnish all labor, materials, and equipment necessary to provide the services for post-construction pipeline CCTV inspection including shall 32 include CCTV inspection, review of CCTV 1,270 LF $ j. $ b,35& videos, submittal of CCTV videos and logs, coordination with the CITY, and all incidentals necessary for doing all the work required, complete and in place. Per Plans and Specifications, furnish all labor, materials, and equipment necessary to repair any pipe defects identified in the 8-inch gravity main installed in McFadden Avenue as part of Phase 1 (between SSMH #1 and 33 MH 1588 per the Drawings), including --- DLR $ --=- $15,000.00 excavation, removal, imported material, backfill, compaction, replacement pipe segments, fittings, lining and appurtenances, and all incidentals necessary for doing all the work required, complete and in place. (Allowance) Per Plans and Specifications, furnish all labor, materials, and equipment necessary to construct the 6" vent line influent line 34 between wet well and valve vault and 1 LS $ 2 5ed00 $ ?5,000 electrical junction box inside valve vault and electrical junction box for the future air scrubber. Per Plans and Specifications, furnish all labor, materials, and equipment necessary to perform aesthetics vinyl wrap for the electrical cabinets and enclosures including ____ 35 DLR $ ---- $7,500.00 but not limited to cleaning and surface preparation, vinyl wraps, finishers and all incidentals necessary for doing all the work required, complete and in place. (Allowance) C-2.10 SCHEDULE A BID SCHEDULE(CC-1610) MCFADDEN SEWER LIFT STATION REPLACEMENT PROJECT PHASE 2 Bid Estimated Description Unit Unit Price Total Price Item Quantity Per Plans and Specifications, furnish all labor, materials, and equipment necessary to to construct the PVC storm drains (8" force main and 18" gravity main). The work includes but is not limited to: survey; PVC storm pipe construction; ductile iron restrained fittings with 8 mil green polyethylene wrap; connection to existing storm force main; connection to discharge manhole; double sweep cleanout; pavement 36 removal and disposal; trenching; disposal of 1 LS $ 75;d°° $ 7 5 01°4° native soils; imported bedding; imported backfill; temporary paving; compaction; pressure testing; storm force main abandonment;storm manhole removal and all required appurtenant work complete and in place. The work also includes landscaping restoration (grass, trees, irrigation system etc.) and pavement restoration (street, sidewalk, curb and gutter etc.) for the areas affected by the park storm pipeline construction. TOTAL BID ITEMS 1 THRU 36 FOR MCFADDEN SEWER PUMP $ y, y q g, 65 STATION REPLACEMENT PROJECT Total Amount of Base Bid in Writing: Pi a MlutfA t 1rV.& . Nt f FW6 1 oosA r ' Note: Refer to Section 01025,Measurement and Payment for description of each Item on Bid Schedule.Refer to Section 01025 Measurement and Payment for additional details. All extensions of unit process will be subject to verification by Owner.In case verification is required between the unit price and the extension,the unit price will govern.The Owner reserves the right to reject any or all proposals and bid items. C-2.11 LIST OF SUBCONTRACTORS In accordance with Government Code Section 4104, the Bidder shall set forth the name and business address of each subcontractor who will perform work or render service to the bidder on said contract in an amount in excess of one-half of one percent of the total bid or $10,000, whichever is greater, and the portion of the work to be done by such subcontractor. Bid Name and Address of State Class DIR PWC Dollar %of Item(s) Subcontractor License Registration# Amount Contract Number All. Americanz Asphalt 29B P.O. Box 2229 267073 A 1000001051 120,708 2% Corona, CA 92878 Big Bear Electric 22;23 644 W Fairway Blvd #6 972582 C-10 1000002330 224,494 6% 241.25 Big Bear City, CA92314 C-7 LNA Concrete Structures 14,27 15455 Tern Street 611949 A 100000E.29 48,609 1.i% Chino Hills, CA 91709 Condon Johnson Associates 7 480 RolanddWay 300068 A 1000004463 831,768 23% ii Oakland, CA 94621 C-57 C-61 By submission of this proposal,the Bidder certifies: 1. That he is able to and will perform the balance of all work which is not covered in the • above subcontractors listing. 2. That the AGENCY will be furnished copies of all subcontracts entered into and bonds furnished by subcontractor for this project. C-3 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed onil/20/ at South El Monte , CA Date City State Vido Artukovich , be first cdulyk sworn, deposes and says that he or she is Managing Partner of Vidmar, IncvAciv on, mg the party.making the foregoing bid that the bid is not made in the interest of,or on the behalf of,any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham;that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded,conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract;that all statements contained in the bid are true;and,further,that the bidder has not,directly or indirectly, submitted his or her bid price or any breakdown thereof,or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation,partnership,company association,organization,bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Vido Artukovich & Son, Inc/Vidmar, Inc A JV Name of Bidder Signature of Bidder 11155 Rush Street South El Monte, CA 91733 Address of Bidder C-4 UTILITY AGREEMENT HONORABLE MAYOR AND CITY COUNCIL CITY OF HUNTINGTON BEACH,CALIFORNIA Gentlemen: The undersigned hereby promises and agrees that in the performance of the work specified in the contract, known as the MCFADDEN SEWER LIFT STATION REPLACEMENT PHASE 2, (I)(we)(it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary or transmission facilities. The term "Qualified Person" is defined in Title 8, California Administrative Code, Section 2700,as follows: "Qualified Person: A person who, by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved." The undersigned also promised and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal-OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. Vido Artukovich & Son, Inc/Vidmar, Inc A JV Contractor By7 Managing Partner Title Date: 11/20/2025 C-5 DISQUALIFICATION QUESTIONNAIRE In accordance with Government Code Section 10162,the Bidder shall complete, under penalty of perjury,the following questionnaire. QUESTIONNAIRE Has the Bidder, any officer of the Bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation? ❑ Yes No If the answer is yes,explain the circumstances in the space provided. Note: This questionnaire constitutes a part of the Proposal, and a signature portion of the Proposal shall constitute signature of this questionnaire. C-6 COMPENSATION INSURANCE CERTIFICATE Pursuant to Section 1861 of the State Labor Code,each contractor to whom a public works contract has been awarded shall sign the following certificate. I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Vido Artukovich & Son, Inc/Vidmar, Inc A JV Contractor By Managing Partner Title • Date: 11/20/2025 C-7 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: Vido Artukovich & Son, Inc/Vidmar, Inc A JV Bidder Name 11155 Rush Street; Business Address South El Monte, South El Monte, CA 91733 City, State Zip ( 626 ) 444-4286 info@artukovich.com Telephone Number Email Address 726231 A State Contractor's License No. and Class 8/14/1996 Original Date Issued 8/31/2026 Expiration Date The work site was inspected by Anthony Attukoviohifour office on 10/29; . ,2025 . The following are persons,firms,and corporations having a principal interest in this proposal: Vido Artukovich - Managing Partner Vido Artukovich & Son, Inc - Joint Venturer Vidmar, Inc - Joint Venturers The undersigned is prepared to satisfy the Council of the City of Huntington Beach of its ability, financially or otherwise, to perform the contract for the proposed work and improvements in accordance with the plans and specifications set forth. Vido Artukovich & Son, Inc/Vidmar, Inc A JV Company Name Signature of Bidder Vido Artukovich Printed or Typed Signature C-8 CALIFORNIA ACKNOWLEDGMENT CIVIL CODE§1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached,and not the truthfulness,accuracy,or validity of that document. State of California County of Los P1{/{r eit5 On t•Ak1t,p( TCr 2.A, 2.025 before me, 1ctt 1U Mc _ Wewc. 1 Nutro ,� P'Mic Date Here Insert Name and Title of t e Officer J personally appeared V%dO RvIu1<ovicl4 Name(s)of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s)whose name(s)is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies),and that by his/her/their signature(s) on the instrument the person(s),or the entity upon behalf of which the person(s)acted,executed the instrument. • I certify under PENALTY OF PERJURY under the � . GUADALUPE MARIE NAVA laws of the State of California that the foregoing ` : Notary Public-California 2 -ice` Los Angeles County paragraph Is true and correct. Z Commission#2394032 • •�'� My Comm.Expires Feb 15,2026 WITNESS my hand and official seal. Signature idegic-14/FIA-- Place Notary Seal and/or Stamp Above • SIgna ure of Notary Public OPTIONAL Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Signer's Name: ❑ Corporate Officer—Title(s): 0 Corporate Officer—Title(s): ❑ Partner— 0 Limited 0 General 0 Partner— 0 Limited 0 General ❑ Individual 0 Attorney in Fact 0 Individual 0 Attorney in Fact ❑ Trustee ❑ Guardian or Conservator 0 Trustee 0 Guardian or Conservator o Other: ❑ Other: Signer is Representing: Signer is Representing: Nite ©2019 National Notary Association NOTARY CERTIFICATE Subscribed and sworn to before me this_day of ,202_. State of ) County of ) On before me, Month,Day, and Year Insert Name and Title of Notary personally appeared Name(s)of Signer(s) • who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies),and that by his/her/their signature(s)on the instrument the person(s),or the entity upon behalf of which the person(s)acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature Signature of Notary Public (PLACE NOTARY SEAL ABOVE) C-9 Bidder's Project History (GENERAL CONTRACTOR) For the purposes of this project, the bidder shall provide project history of at least three similar public work projects within the past five years, specifically referencing the construction of sanitary sewer lift stations, including concrete wet wells and valve vaults installation with deep excavation in high groundwater conditions, and construction of sewer force mains and gravity sewer pipelines in the public right of way. Contractor shall posses a valid A- General Engineering License. Bidders are encouraged to submit supplemental relevant project history in addition to the projects listed herein. Listed below are the names, address and telephone numbers for three public agencies for which the bidder has performed similar work within the past five years: 1. Public Agency Name: City of Huntington Beach Public Agency Address: 2000 Main Street, Huntington Beach, CA 92648 Project Manager Name: Lili Hernandez Phone Number: 714 536-5921 Contract Amount: $4,405,361 Date Completed: 9/25/2025 Type of Work: Humboldt Sewer Lift Station Replacement Project Project Description: Furnish and install 8" PVC gravity sewer, 4" PVC force main and Sewer Lift Station with all appurtenance 2. Public Agency Name: City of Los Angeles Department of Public Works Public Agency Address: 1149 S. Broadway, Suite 700, Los Angeles, CA 90015 Project Manager Name: Robert Garcia Phone Number: 626 272-3957 Contract Amount: $24,220,196 Date Completed: 10/15/2021 Type of Work: NOS 12 (Ave 19 and Humboldt St) SZC13696 Project Description: Repair/Replace 48" concrete sewer with fiberglass liner, including 65' wetrwell, sheet pile shoring system, 40MGD and 23MGD by-pass SystPm Adjacent to hi o voltaap am raiJrnad in public right-of-way. 3. Public Agency Name: City of Malibu Public Agency Address: 23825 Stuart Ranch Road, Malibu, CA 90265 Project Manager Name: Rob DuBoux Phone Number: 310 456-2489 x339 Contract Amount: $20,451,881 Date Completed: 9/30/2018 Type of Work: Civic Center WTF Phase 1, Pipelinesc.arid Pump Stations Project Description: Furnish and install 21,2001f open cut4" to 14" HDPE, 13,7061f reclaimed water line, 2 sewer lift stations with wet well excavation. 3.907' 24" to 42" bore and jerk steel rasing with all appurtenance and tie in to treatment plant C-10 Bidder's Critical Staff(GENERAL CONTRACTOR) Listed below are the names of the bidders proposed Construction Project Manager, and Superintendent. For each of these critical positions,please list at least three projects for which the critical staff has performed similar work within the last five years. These projects do not have to be under the employment of the bidder of this project.Bidders are encouraged submit supplemental relevant project history in addition to the projects listed herein. 1. Name of Proposed Construction Project Manager: Vido Artukovich Phone Number: 626 444-4286 A) Project Name: ValiNess::Water Wells Transmission Main Contract Amount: $14,740,450 Date Completed: 7/18/2024 Project Description: Furnish and install 14,0774.f 24", 4,5301f 12", CML&C, 691f 32" steel casing w/jack and bore, 6ea butterfly valves, 21ea air vacs, 7 blow-offs and all appurtenance B) Project Name: NOS Unit 12 (Ave 19 and Humboldt) SZC13696 Contract Amount: $21,652,450 Date Completed: 9/30/2020 Project Description: Repair/Replace 48" concrete sewer with fiberglass liner, including 65' wet well, sheet pile shoring system, 40MGD and 23MGD. by-pass system adjacent to railroad and high voltafeepower lines C) ProjectName: Civic Center WTF Phase 1, Pipelines.and Pump Stations Contract Amount: $20,451,881 Date Completed: 9/30/2018 Project Description: Furmihh and inptall 21,2001f open cut 4" to 14" HDPE 13,7061f reclaimed water line, 2 sewer lift stations with wet well excavation and tie-in to treatment plant 2. Name of Proposed Superintendent: Mabk Artukovich Phone Number: 626.:>444-4286 A) ProjectName: Humboldt Sewer Lift Station Replacement Project Contract Amount: $4,405,361 Date Completed: 9/25/2025 Project Description: Furnish and install 8" PVC gravity sewer, 4" PVC force main and §ewer lift ttation with all appurtenanoec: B) ProjectName: Civic Center WTF Phase 1, Pipelines and Pump _Stations Contract Amount: $20,451,881 Date Completed: 9/30/2018 Project Description: Furnish and install 21,2001f open cut 4" to 14" HDPE 13,7061f reclaimed water line, 2 sewer lift stations with wet well excavation and tie-in to treatment plant. C) Project Name: Phase 2 RTM - Segment B&C Contract Amount: $11,490,484 Date Completed: 10/31/2019 Project Description: Furnish and install 10,001f 30", 4,8631f 42", 1,5361f 24 ' CML&C, 1,6901f ductile iron water main, 3091f 48" micro-tunnel with all appurtenance,. C-11 VIDO ARTUKOVICH & SON, INC. / VIDMAR, INC. A J.V. 11155 RUSH STREET SO. EL MONTE, CA 91733 THE ARTUKOVICH COMPANIES SINCE 1919 Telephone 626.444.4286 Fax 626 444-3989 JOINT VENTURE DECLARATION Vido Artukovich & Son, Inc and Vidmar, Inc A Joint Venture and the partners of same hereby authorize Vido Artukovich to sign and execute documents on behalf of the Joint Venture. Vido Artukovich & Son, Inc Vidmar, Inc By: i �� �'�' "1/ Vido Artukovich Vido Artukovich 8/30/2023 8/30/2023 CONTRACTOR'S SWORN STATEMENT AND WARRANTY REGARDING CONTINUING INSURANCE OBLIGATIONS Vido Artukovich & Son, Inc/ FROM: Vidmar, Inc A JV PROJECT: McFadden;;Sewer Lift Station (Contractor Name) and Wet Well, CC1610 11155 Rush Street (Street Address) South El Monte, CA 91733 (City, State, Zip Code) TO: CITY OF HUNTINGTON BEACH DECLARATION Attached hereto is a true and correct copy of the current Certificate of Insurance and Additional Insured Endorsement CG 2010 1185, which Certificate complies with the insurance requirements of the Contract by and between the City of Huntington Beach ("City") and the above-named Contractor ("Contractor")for the above-described project("Project"). I declare under penalty of perjury under the laws of the State of California that the above statement is true and correct. Signed on March 18 20 26 , at South El Monte, CA (Date) ( state) 7./71i (Signature of I dividual W• is Making Declaration) WARRANTY Contractor hereby warrants and agrees to maintain Products and Complete Operations Insurance in compliance with the insurance requirements of the Contract for the Project. Said insurance shall be maintained through and until the expiration of all Warranties provided by the Contractor. Said insurance shall contain Additional Insured Endorsement CG 2010 1185, naming the City as an additional insured. Contractor shall supply to the City, on at least an annual basis, a Certificate of Insurance and the aforementioned Endorsement evidencing continued coverage which meets the Contract requirements. Signed on March 18, 20 26 at South El Monte, CA (Date) (City, State) CONTRACTOR: Vido Artukovich & Son, Inc/ Name: Vidmar, Inc A JV By: /1 6 Name: Vido Artukovich Title: Managing Partner DATE(MM(OD/YYYY) ACORN CERTIFICATE OF LIABILITY INSURANCE 3/18/2026 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the poilcy(tes)must have ADDITIONAL INSURED provisions or be endorsed, If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement, A statement on this certificate does not confer rights to the certificate holder In Ileu of such endorsement(s). PRODUCER NAME CT Rachael Monaghan Alliant Insurance Services, Inc. PHONE FAX 333 S Hope St Ste 3750 1Atc Nn_Ex& LAIC,NO, Los Angeles CA 90071 ADDRESS_ rachael,monaghan@alliant.com INSURER(S)AFFORDING COVERAGE NAIL I License#:oC36861 INSURER A:Arch Indemnity Insurance Compa _ 30830 INSURED VIDOART-02 INSURER B:Arch Insurance Company 11150 Vido Artukovich&Son,Inc.Nidmar, Inc.A JV 11155 Rush St. INSURERC: South El Monte, CA 91733 INSURERD: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:1090258748 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WIIH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPEOF INSURANCE ADDL SUER POLICY OFF POLICY EXP LTRINSD WAD POLICY NUMBER (MMlDDIYYYY) (MMIDD/YYYY) LIMITS B X COMMERCIAL GENERAL LIABILITY Y Y 71PKG2091801 12/31/2025 12/31/2028 EACH OCCURRENCE $1,000,000 CLAIMS-MADE X OCCUR D TREN`7OD PRR EMIEMI SES(Ea occurrence) $100,000 MED EXP(Any one person) $5,000 PERSONAL&ADV INJURY $1,000,000 OENL AGGREGATE LLiiIT APPLIES PER: GENERAL AGGREGATE $2,000,000 1 POLICY f X 1 PELT X LOC PRODUCTS-COMP/OP AGG $2,000,000 OTHER: S B AUTOMOaILELIABILITY Y Y 71PKG2091801 12/31/2025 12/31/2026 CO.Y NEDSINGLELIMIT g1,000,000 fEa acddeM) X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accidenl) 5 _ _AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY (Per accident) Comp./Coll.Ded. $'See Below B X UMBRELLA LIAB X OCCUR Y Y 71UFP2091801 12/31/2025 12/31/2026 EACH OCCURRENCE $10,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $10,000,000 DEO X RETENTIONS C1 nj)nn $ A WORKERS COMPENSATION Y 71WCI2091801 12/31/2025 12/31/2028 X s ArurE 0TFI AND EMPLOYERS'LIABILITY Y/N - ANYPROPRIETOWPARTNER/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICEWMEMBEREXCLUOED? N I A (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE S 1,000,000 II yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT' $1,000,000 APPIlOVT:)A8 TO IFb DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached II more space IS required) AUT CoII./Comp.Deductible:PPT,Light,Medium:$2,500,Heavy,Extra Heavy:$5,000,Trailers:$500. Re:McFadden Sewer Lift Station Replacement Project Phase 2(CC 1610) MICHAEL J.VIGLIOTTA City of Huntington Beach,Its officers,elected or appointed officials,employees,agents,and volunteers arerilYeAllIWINE111 Insured as respects to General Liability and Auto Liability arising out of work performed by the Named Insured.The Insurance preIII pjl nce maintained by the Additional Insured Is excess and non-contributory as respects to General Liability and Auto Liabll S.WailYer drSLSDfd llb �ilfZS f5`�neral Liability,Auto Liability,and Workers Compensation as required by contract.Thirty(30)Days Notice of Cancellation/Non-Renewal-Ten(10)Days Notice For Non-Payment of Premium with respect to General Liability,Auto Liability,and Workers Compensation. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Huntington Beach ACCORDANCE WITH THE POLICY PROVISIONS. 2000 Main Street P.O.Box 190 AUTHORIZED REPRESENTATIVE Huntington Beach CA 92648 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks of ACORD POLICY NUMBER: 71 PKG2091801 COMMERCIAL GENERAL LIABILITY CG20100413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or OrganizatIon(s) Locatfon(s)Of Covered Operations The City of Huntington Beach, its officers, elected or Humbolt Sewer Lift Station Replacement- appointed officials, employees, agents and volunteers Humboll Drive&Wayfarer Lane, Huntington Beach, CA Information required to complete this Schedule,if not shown above,will be shown in the Declarations. A. Section II — Who Is An Insured is amended to B. With respect to the insurance afforded to these Include as an additional insured the person(s) or additional insureds, the following additional organization(s) shown in the Schedule, but only with exclusions apply: respect to liability for "bodily injury", "property This insurance does not apply to "bodily injury" or damage" or "personal and advertising injury" "properly damage" occurring after: caused,in whole or in part, by: 1. All work, including materials, parts or equipment 1. Your acts or omissions; or furnished in connection with such work, on the 2. The acts or omissions of those acting on your project (other than service, maintenance or behalf; repairs) to be performed by or on behalf of the in the performance of your ongoing operations for additional insured(s) at the location of the the additional insured(s) at the location(s) covered operations has been completed;or designated above. 2. That portion of "your work"out of which the injury However: or damage arises has been put to its intended 1. The insurance afforded to such additional use by any person or organization other than insured only applies to the extent permitted by another contractor or subcontractor engaged in law;and performing operations for a principal as a part of the same project. 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. CG 20 10 0413 ©Insurance Services Office, Inc., 2012 Page 1 of 2 C. With respect to the Insurance afforded to these 2. Available under the applicable Limits of additional Insureds, the following is added to Insurance shown in the Declarations; Section III—Limits Of Insurance: whichever Is less, If coverage provided to the additional Insured is This endorsement shall not increase the applicable required by a contract or agreement, the most we Limits of Insurance shown in the Declarations. will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement;or • • • Page 2 of 2 ©Insurance Services Office, inc.,2012 CG 2010 0413 POLICY NUMBER: 71 PKG2091801 COMMERCIAL GENERAL LIABILITY CG20370413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location And Description Of Completed Operations The City of Huntington Beach, its officers, elected or Humbolt Sewer Lift Station Replacement- appointed officials, employees, agents and volunteers Humbolt Drive &Wayfarer Lane, Huntington Beach, CA Information required to complete this Schedule, if not shown above,will be shown In the Declarations. A. Section II — Who Is An Insured is amended to B. With respect to the insurance afforded to these include as an additional insured the person(s) or additional insureds, the following is added to Section III organization(s) shown in the Schedule, but only —Limits Of Insurance: with respect to liability for "bodily injury" or If coverage provided to the additional insured is "property damage" caused,in whole or in part, by required by a contract or agreement, the most we will "your work" at the location designated and pay on behalf of the additional insured is the amount of described in the Schedule of this endorsement insurance: performed for that additional insured and included in the "products-completed operations 1. Required by the contract or agreement;or hazard". 2. Available under the applicable Limits of Insurance However: shown in the Declarations; 1. The insurance afforded to such additional whichever is less. insured only applies to the extent permitted This endorsement shall not increase the applicable by law; and Limits of Insurance shown in the Declarations. 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional Insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. CG 20 37 04 13 ©Insurance Services Office, Inc., 2012 Page 1 of 1 POLICY NUMBER: 71PKG2091801 COMMERCIAL GENERAL LIABILITY VIDO ARTUKOVICH&SONS, INC. CG 20 01 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance (2) You have agreed In writing in a contract or Condition and supersedes any provision to the agreement that this insurance would be contrary: primary and would not seek contribution Primary And Noncontributory Insurance from any other insurance available to the additional insured. This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and CG 20 01 12 19 ©Insurance Services Office, Inc.,2018 Page 1 of 1 POLICY NUMBER:71 PKG2091801 COMMERCIAL GENERAL LIABILITY CG24041219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITED COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS SCHEDULE Name Of Person(s)Or Organization(s): Any person or organization where waiver of our right to recover is permitted by law and is required by written contract provided such contract was executed prior to the loss Information required to complete this Schedule,if not shown above,will be shown in the Declarations. The following Is added to Paragraph 8.Transfer Of Rights Of Recovery Against Others To Us of Section IV—Conditions: We waive any right of recovery against the person(s).or organization(s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization(s) prior to loss. This endorsement applies only to the person(s) or organization(s) shown in the Schedule above. CG 24 041219 ©Insurance Services Office, Inc.,2018 Page 1 of 1 . . ti . THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. • ADDITIONAL INSURED - BLANKET This endorsement modifies Insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM Under Covered Autos Liability Coverage, the Who is An Insured provision is amended to include as an "insured" the person or organization who is required under a written contract to be Included as an "Insured"under this policy, but only with respect to their legal liability for your acts or omissions or the act or omissions of a person for whom Covered Autos Liability Coverage is afforded under this policy. All other terms and conditions of this policy remain unchanged. Endorsement Number: Policy Number:71PKG2091801 Named Insured:Vido Artukovich&Son,Inc. This endorsement is effective on the Inception date of this Policy unless otherwise stated herein: Endorsement Effective Date: 12/31/2025 00 CA0115 00 10 13 Page 1 of 1 POLICY NUMBER:71PKG2091801 COMMERCIAL AUTO CA 04 4911 16 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. A. The following is added to the Other Insurance B. The following is added to the Other Insurance Condition in the Business Auto Coverage Form Condition In the Auto Dealers Coverage Form and and the Other Insurance— Primary And Excess supersedes any provision to the contrary: Insurance Provisions in the Motor Carrier This Coverage Form's Covered Autos Liability Coverage Form and supersedes any provision to Coverage and General Liability Coverages are the contrary: primary to and will not seek contribution from any This Coverage Form's Covered Autos Liability other Insurance available to an "Insured" under Coverage is primary to and will not seek your policy provided that: contribution from any other insurance available to 1. Such"insured" is a Named Insured under such an"Insured"under your policy provided that: other insurance;and 1. Such"insured"is a Named Insured under such 2. You have agreed in writing in a contract or other Insurance;and agreement that this Insurance would be • 2. You have agreed in writing in a contract or primary and would not seek contribution from agreement that this insurance would be any other insurance available to such primary and would not seek contribution from "insured". any other insurance available to such "insured". • CA 04 4911 16 ©Insurance Services Office, Inc.,2016 Page 1 of 1 POLICY NUMBER: 71 PKG2091801 COMMERCIAL AUTO VIDO ARTUKOVICH&SONS,INC. CA 04 44 10 13 • THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: VIDO ARTUKOVICH&SONS,INC. Endorsement Effective Date: 12/31/2025 SCHEDULE Name(s)Of Person(s)Or Organization(s): ANY PERSON OR ORGANIZATION WHERE WAIVER OF OUR RIGHT TO RECOVER IS PERMITTED BY LAW AND IS REQUIRED BY WRITTEN CONTRACT PROVIDED SUCH CONTRACT WAS EXECUTED PRIOR TO THE LOSS. Information required to complete this Schedule, if not shown above,will be shown in the Declarations. The Transfer Of Rights Of Recovery Against Others To Us condition does not apply to the person(s) or organization(s) shown in the Schedule, but only to the extent that subrogation is waived prior to the "accident" or the 'loss" under a contract with that person or organization. CA 04 441013 ©Insurance Services Office, Inc.,2011 Page 1 of 1 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 04 03 06 (Ed.04-84) WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT - CALIFORNIA We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named In the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) You must maintain payroll records accurately segregating the remuneration of your employees while engaged in the work described in the Schedule. The additional premium for this endorsement shall be INCL % of the California workers' compensation premium otherwise due on such remuneration. SCHEDULE PERSON OR ORGANIZATION JOB DESCRIPTION ANY PERSON OR ORGANIZATION WHERE WAIVER OF OUR RIGHT TO RECOVER IS PERMITTED BY LAW AND IS REQUIRED BY WRITTEN CONTRACT PROVIDED SUCH CONTRACT WAS EXECUTED PRIOR TO DATE OF LOSS This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The Information below Is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Policy No.71 WC12091801 Endorsement No. Effective insured VIDO ARTUKOVICH&SON, INC. Premium $ INCL. Insurance Company Countersigned By U 1998 by the Workers'Compensation Insurance Rating Bureau of California. All rights reserved. From the WCIRB's California Workers'Compensation Insurance Forms Manual O 1999. Bond No.72BCSJG5572 Premium: Included in Performance Bond PAYMENT BOND (LABOR AND MATERIAL) KNOW ALL PERSONS BY THESE PRESENTS: WHEREAS, City of Huntington Beach (hereafter referred to as"City") has awarded to Vido Artukovich &Son, IncNidmar, Inc A JV 11155 Rush Street, South El Monte, CA 91733 (Contractor's Name and Address) (hereafter referred to as"Principal"), a contract("Contract")for the work described as follows: McFadden Sewer Lift Station and Wet Well, CC1610 (Project Title) WHEREAS, Principal is required under the terms of the Contract and the California Civil Code to furnish a bond to secure the payment of claims of laborers, mechanics, materialmen, and other persons as provided by law, by a duly admitted surety insurer under the laws of the State of California (hereinafter referred to as"Surety"); and Surety is certified and listed in the U.S. Department of the Treasury Circular 570, and has provided proof of sufficient bonding limitation, as shown in said circular to provide bonds in the amount required by said Contract; and Surety has provided financial strength ratings from reputable companies, such as from A.M. Best, Moody's or Standard & Poor's, to validate that Surety has positive ratings of being secure or stable; and Surety has provided financial strength ratings from reputable companies, such as from A.M. Best, Moody's, or Standard & Poor's, to validate that Surety has positive ratings of being secure or stable; and Surety is registered and listed with the California Department of Insurance, NOW,THEREFORE,we, the undersigned, as Principal, and Hartford Fire Insurance Company One Pointe Drive, Brea, CA 92821 (Surety's Name and Address) as Surety, are held and firmly bound unto City in the penal sum of Four Million Four Hundred Ninety-Five Thousand Five Hundred Fifty and 00/100 Dollars ($ 4,495,550.00 ), this amount being not less than one hundred percent(100%) of the total price set forth in the Contract, in lawful money of the United States of America,for the payment of which sum,well and truly to be made,we bind ourselves, and each of our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the Principal, his, her, or its heirs, executors, administrators, successors or assigns, or subcontractors shall fail to pay any of the persons named in Section 3181 of the California Civil Code("Claimants")for all labor, materials or services used or reasonably required for use in performance of the work described in the Contract, or any amounts due under the Unemployment Insurance Code with respect to work or labor performed by any such Claimant,or prevailing wages due and penalties incurred pursuant to Sections 1774, 1775, 1813 or 1815 of the Labor Code, or any amounts required to be deducted,withheld and paid over to the Employment Development Department from the wages of employees of the Principal and Subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to the work or labor performed under the Contract, Surety will pay for the same,in an amount not exceeding the penal sum specified in this bond;otherwise,this obligation shall be null and void. This bond shall inure to the benefit of any of the persons named in Section 3181 of the California Civil Code so as to give a right of action to such persons or their assigns. In case any action is brought upon this bond, Surety further agrees to pay all court costs and a reasonable attorney's fee in an amount fixed by the court. 15-4584/117357 Page 1 of 2 Surety stipulates and agrees, for value received, that no change, extension of time, alteration, addition or modification to the terms of the Contract,or any contract document or any work to be performed thereunder, whether made after notice or not, shall in any way affect, impair or release the obligations of Surety under this bond. Surety hereby waives notice of any such change, extension of time, alteration, addition, or modification to the terms of the Contract,the contract documents or the work thereunder.Surety also waives the provisions of California Civil Code§§2845 and 2849. IN WITNESS WHEREOF, each party represents and warrants that this instrument has been duly executed by Principal and Surety, on the date set forth below, that the name of each corporate party being affixed hereto is such party's proper legal name and that the individuals signing this instrument have been duly authorized pursuant to the authority of its governing body. Surety, by execution of this bond, waives any defense which Surety has or may have by reason of any failure of the Principal to execute or properly execute this bond. Dated: March 12, 2026 ATTEST [Corporate Seal] Vido Artukovich &Son, IncNidmar, Inc A JV (Principal Nam-) By: Name: Vido Artukovic ' Title: Managing Partner ATTEST [Corporate Seal] Hartford Fire Ins nce Company ur a By: Name: tumn Stockton, Attorney-in-Fact • (Signature of Attorney-in-Fact for Surety) (213)270-0970 (Attach Attorney-in-Fact Certificate) (Area Code&Telephone Number for Surety) APPROVED f,4S TO FORM: > By: V' - Michael J. Vigliotta, City Attorney Note: This bond must be executed in duplicate and dated, all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached. 15-4584/117357 Page 2 of 2 PAYMENT BOND ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of TEXAS County of Dallas ) O /' " �2`before me, Diana A. Cervantes, Notary Public (insert name and title of the officer) personally appeared Autumn Stockton who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of TEXAS that the foregoing paragraph is true and correct. WITNESS my hand and official seal. ,�aYP�e DIANAA.CERVANTES =°4�s Notary ID#1335iNTES V^ My Commission Expires January 5, 2030 Signature ,/�l (Seal) 1 Direct inquiries,Bond Authenticity. and Claims to: POWER OF ATTORNEY THE HARTFORD BOND,T-14 One Hartford Plaza Hartford,Connecticut 06155 Bond.0 la imsOthehartford.com call:888-266-3488 or fax:860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: ALLIANT INSURANCE SERVICES INC Agency Code: 46-507745 ® Hartford Fire Insurance Company,a corporation duly organized under the laws of the State of Connecticut IN Hartford Casualty Insurance Company,a corporation duly organized under the laws of the State of Indiana ® Hartford Accident and Indemnity Company,a corporation duly organized under the laws of the State of Connecticut ❑ Hartford Insurance Company of the Midwest,a corporation duly organized under the laws of the State of Indiana having their home office in Hartford,Connecticut,(hereinafter collectively referred to as the"Companies")do hereby make,constitute and appoint, up to the amount of Unlimited : Carlos A. Albelo, Diana Cervantes, S. Nicole Evans, Stephanie Gunderson, Autumn Stockton of DALLAS, Texas their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above,to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof,on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 23, 2016 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies,the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. "F\RE'I ys'+��q, r�.�`Zr�INs,' �p0E111411'cp ,`,:,II�oMp,'''b l'?r m1 isy=r0'Ti 2 K (% ���t5 o �4f�AGOR* Ee'E *a-0 A. ..,_f2„,d,.._.__, ,.0.,..tab(gga i/ Phyllis A.Clark,Assistant Secretary Joelle L.LaPierre,Assistant Vice President STATE OF FLORIDA ss. Lake Mary COUNTY OF SEMINOLE On this 1st day of March, 2024, before me personally came Joelle L.LaPierre, to me known, who being by me duly sworn, did depose and say: that (s)he resides in Seminole County,State of Florida that (s)he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that (s)he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that (s)he signed his/her name thereto by like authority. 1 ]n Z �! GZiZ l.i _J a;•J4�,,•`` Mariluz Arce ,,.OF fl:�' My Commission HH 287363 Expires July 13,2026 I,the undersigned,Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which is still in full force effective as of March 12, 2026 Signed and sealed in Lake Mary, Florida. „.. ,"+'"O RE rySG ��,.......Y pit,',. `0,,,,arwnt+ 9 `.................�pNI 1111, �. :F.; •i.1,�; �cr.,�&o• Egty - ,l+ 9 4• `„ _rr coae0114,•.. Lam4a _„,: ;$': . •1=-�S=.�l�17 $ Via: ;b= ��•.. +{ ?`'` •WOIAtlA ;Aar`' s • ra a, 1979 ;yF 'bArORAZ��, �ii * `��1 �, SEAL a ' 010111N�•* s � .W,rrrr�' '!lllf ll lllt:� FWIiR[0 i9 '''.Ell 111111tO "41 -.4 . Keith D.Dozois,Assistant Vice President Revised:July 31,2024 CALIFORNIA ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies onlythe identity of the individual who signed the document to which this certificate is attached,and not the truthfulness,accuracy,or validity of that document. State of California County of Los Angeles J} On March 12, 2026 before me, Sharon Artukovich, Notary Public Date Here Insert Name and Title of the Officer personally appeared Vido Artukovich Name(s)of Signer(s) who proved to me on the basis of satisfactory evidence to be the persons)whose name(s)is/ale subscribed to the within instrument and acknowledged to me that he/s1a/they executed the same in hisietltja.crir authorized capacity(jps), and that by hist.er/ter signature( )-on the instrument the person(sr); or the entity upon behalf of which the person acted, executed the instrument. I certify under PENALTY OF PERJURY under the 01 °°��>a� SHARONARTUKOCH laws of the State of California that the foregoing ,ta„. Notary Public-California W._ -q.�� 74 Los Angeles County paragraph is true and correct. Y � erj ^ Commission#2458773 ���Fo% My Comm.Expires Aug tt,2027 WITNESS my hand and official seal. Signature �ClJ° Place Notary Seal and/or Stamp Above • Signature of Notary Public OPTIONAL Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Signer's Name: ❑ Corporate Officer—Title(s): 0 Corporate Officer—Title(s): ❑ Partner— 0 Limited 0 General 0 Partner— 0 Limited 0 General ❑ Individual 0 Attorney in Fact ❑ Individual 0 Attorney in Fact ❑ Trustee ❑ Guardian or Conservator 0 Trustee 0 Guardian or Conservator ❑ Other: 0 Other: Signer is Representing: Signer is Representing: ©2019 National Notary Association Bond No.72BCSJG5572 Premium: $33,719.00 PERFORMANCE BOND KNOW ALL PERSONS BY THESE PRESENTS: WHEREAS, City of Huntington Beach (hereafter referred to as"City") has, by written agreement dated , 20 26 , entered into a contract with Vido Artukovich & Son. Inc./ Vidmar Inc., a JV, 11155 Rush Street, South El Monte, CA 91733 (Contractor's Name and Address) (hereafter referred to as"Principal")for performance of the work described as follows: McFadden Sewer Lift Station and Wet Well. CC1610 (Project Title) WHEREAS, said contract, and all documents referenced therein (hereinafter collectively "Contract"), are incorporated herein by this reference made a part hereof as though set forth herein in full; and Said Principal is required under the terms of the Contract to furnish a bond guaranteeing the prompt, full and faithful performance of said Contract, by a duly admitted surety insurer under the laws of the State of California(hereinafter referred to as"Surety"); and Surety is certified and listed in the U.S. Department of the Treasury Circular 570, and has provided proof of sufficient bonding limitations as shown in said circular to provide bonds in the amount required by said Contract; and Surety has provided financial strength ratings from reputable companies, such as from A.M. Best, Moody's, or Standard & Poor's, to validate that Surety has positive ratings of being secure or stable; and Surety is registered and listed with the California Department of Insurance, NOW,THEREFORE, we, the undersigned, as Principal, and Hartford Fire Insurance Company One Pointe Drive, Brea, CA 92821 (Surety's Name and Address) as Surety, are held and firmly bound unto City in the penal sum of Four Million Four Hundred Ninety-Five Thousand Five Hundred Fifty and 00/100 Dollars ($ 4,495,550.00 ), this amount being not less than one hundred percent of the price set forth in the Contract, in lawful money of the United States,for the payment of which sum,well and truly to be made,we bind ourselves, our heirs, executors, administrators and successors,jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH THAT if the Principal shall promptly, fully and faithfully perform each and all of the covenants, obligations and things to be done and performed by the Principal in strict accordance with the terms of the Contract as said contract may be altered, amended or modified from time to time; and if the Principal shall indemnify and save harmless City and all of City's officers, agents and employees (hereinafter collectively referred to as"Obligees")from any and all losses, liability and damages, claims, judgments, stop notices, fees and costs of every description, whether imposed by law or in equity, which may be incurred by the Obligees by reason of the failure or default on the part of the Principal in the performance of any or all of the terms or the obligations of the Contract, including all alterations, amendments and modifications thereto, and any warranties or guarantees required thereunder, then this obligation shall be void; otherwise, it shall be and shall remain in full force and effect. Surety stipulates and agrees, for value received, that no adjustment of the time or price in the Contract or any alteration, change, deletion, addition or other modification to the Contract, or the work to be performed thereunder, shall in any way affect, limit, restrict, impair or release the obligations of the Surety under this Bond. Surety waives notice of any adjustment of contract or contract price, and any other alteration, change, deletion, addition or other modification to the Contract, or the work to be performed thereunder, and agrees to automatically adjust the penal sum of this Bond to reflect such adjustments, alterations, changes, deletions, additions or other modifications. Surety agrees to provide written confirmation of such adjustments in the penal sum to City on not less than a quarterly basis. Surety also waives the provisions of Civil Code§§2845 and 2849. 15-4584/117174 Page 1 of 2 Bond No. 72BCSJG5572 The obligations of this Bond shall survive the completion of the work described in the Contract as to all obligations and liabilities of the Principal which survive completion of the work. IN WITNESS WHEREOF, each party represents and warrants that this instrument has been duly executed by Principal and Surety, on the date set forth below, that the name of each corporate party being affixed hereto is such party's proper legal name and that the individuals signing this instrument have been duly authorized pursuant to the authority of its governing body. Surety, by execution of this bond, waives any defense which Surety has or may have by reason of any failure of the Principal to execute or properly execute this bond. Dated: March 12,2026 ATTEST Vido Artukovich &Son, Inc./Vidmar, Inc.a JV [Corporate Seal] (Principal Name) By: /./1164141=z1" Name: Vido Artukotd:ch �r Title: Managing Partner ATTEST • [Corporate Seal] Hartford Fire Insurance Company B Y• • Name: Autumn Stockton, Attorney-in-Fact (Signature of Attorney-in-Fact for Surety) (213)270-0970 (Attach Attorney-in-Fact Certificate) (Area Code&Telephone Number for Surety) APPROVED AS TO FORM. • By: / Q Mich er- Vigliotta, City Attorney NOTES:This bond must be executed in duplicate and dated,all signatures must be notarized, and evidence of the authority of any person signing as attorney-in-fact must be attached. 15-4584/117174 Page 2 of 2 PERFORMANCE BOND ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of TEXAS County of Dallas ) O 0)diteAs / .' 2°2 ore me, Diana A. Cervantes, Notary Public (insert name and title of the officer) personally appeared Autumn Stockton who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of TEXAS that the foregoing paragraph is true and correct. 1*aYPue DIANAA.CERVANTES WITNESS my hand and official seal. y'^`' Notary ID#133518424 a'�� My Commission Expires 0 SOP January 5, 2030 I Signature (Seal) Direct inquiries,Bond Authenticity and Claims to: POWER OF ATTORNEY THE HARTFORD BOND,T-14 One Hartford Plaza Hartford,Connecticut 06155 Bond.Claimst&thehartford.com call:888-266-3488 or fax:860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: ALLIANT INSURANCE SERVICES INC Agency Code: 46-507745 ® Hartford Fire Insurance Company,a corporation duly organized under the laws of the State of Connecticut IN Hartford Casualty Insurance Company,a corporation duly organized under the laws of the State of Indiana IN Hartford Accident and Indemnity Company,a corporation duly organized under the laws of the State of Connecticut ❑ Hartford Insurance Company of the Midwest,a corporation duly organized under the laws of the State of Indiana having their home office in Hartford,Connecticut,(hereinafter collectively referred to as the"Companies")do hereby make,constitute and appoint, up to the amount of Unlimited : Carlos A. Albelo, Diana Cervantes, S. Nicole Evans, Stephanie Gunderson, Autumn Stockton of DALLAS,. Texas their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof,on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 23, 2016 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed,duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies,the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. ��.•.F� EIIAIS'1j' .a'''fSYIINS°'' ',w„Emuirrcop .`,,�I:OMP�,,, Art e%,,, rI N XA tT` ' S. 1979 . • % DIA , '-�� : :4'z3 .b 0V0 H a , *'i,*INOTAIIN `. M2tioE� �i;,rr,r*p,l`E,��` co a�a ,II ` (4?,10-0 A. ,.,q,,,,,,___, ,0„.1,6M,gtA., Phyllis A.Clark,Assistant Secretary Joelle L.LaPierre,Assistant Vice President STATE OF FLORIDA ss. Lake Mary COUNTY OF SEMINOLE On this 1st day of March, 2024, before me personally came Joelle L.LaPierre, to me known,who being by me duly sworn, did depose and say: that (s)he resides in Seminole County,State of Florida that (s)he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that (s)he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that(s)he signed his/her name thereto by like authority. ,, p •:4•.• .. •0•:. 71//a.A 4.;(.4., a— ,Ti - -rs• .7461-nor` Mariluz Arce ?rk•• o'r` ' ,: My Commission HH 287363 Expires July 13,2026 I,the undersigned,Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which is still in full force effective as of March 12, 2026 . Signed and sealed in Lake Mary, Florida. „ ,,,,I,I,rr-or pas, EaN„ `�E111,I III,„come.,/ ,,,iNc.F 1.1.vo 4\ .Q•' ...:- %n3 �P.. INDIANS 'ia: s „'�—� "66;�'•11 1979 ;'erg •L;4tr...°'•. ''ir * ,,,,, "co4P %SEAL i'O NatEN,,``,.� W.,,,,,�„�",,, hnnn,q anA,so 'On/zit _ Ze--4 A:57/,......6i) • . Keith D.Dozois,Assistant Vice President Revised July 31,2024 CALIFORNIA ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached,and not the truthfulness,accuracy,or validity of that document. State of California County of Los Angeles J} On March 12, 2026 before me, Sharon Artukovich, Notary Public Date Here Insert Name and Title of the Officer personally appeared Vido Artukovich Name(s)of Signer(s) who proved to me on the basis of satisfactory evidence to be the person4 whose name(s)-is/subscribed to the within instrument and acknowledged to me that he/ rE-/tDey executed the same in hisieritja.dr authorized capacity( ), and that by his/fir/thfiir signature(s''on the instrument the person or the entity upon behalf of which the person,(a)"acted, executed the instrument. I - I certify under PENALTY OF PERJURY under the SHARON ARTUKOVICH laws of the State of California that the foregoing � NotaryPublic-California paragraph is true and correct. _ _; Los Angeles County Y� qrj f.. Commission#2458773 4L1FOP, My Comm.Expires Aug 11,tOn+ WITNESS my hand and official seal. _ Signature�4. `2 -A---C Place Notary Seal and/or Stamp Above • Signature of Notary Public OPTIONAL Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Signer's Name: ❑ Corporate Officer—Title(s): ❑ Corporate Officer—Title(s): ❑ Partner— 0 Limited 0 General 0 Partner— 0 Limited 0 General ❑ Individual 0 Attorney in Fact 0 Individual 0 Attorney in Fact ❑ Trustee ❑ Guardian or Conservator 0 Trustee 0 Guardian or Conservator ❑ Other: 0 Other: Signer is Representing: Signer is Representing: ©2019 National Notary Association 0" 9;Grw� City of Huntington Beach �r v Business License P.O. Box 190 %y r.Q��' (714)536-5267 FAX(714)536-5934 Huntington Beach, CA 92648-2702 LC twirl Robert Torrez Interim Chief Financial Officer VIDO ARTUKOVICH AND SON INCNIDMAR INC A J V 11155 RUSH ST SOUTH EL MONTE, CA 91733 Dear Business Owner: Thank you for your payment. Attached is your City of Huntington Beach Business License certificate. Please note that approximately one month prior to the license expiration date,you will be mailed a renewal notice for the upcoming year. If for any reason your renewal notice does not arrive,you are still responsible for renewing and paying your business license prior to the expiration date. Penalties will be incurred if the payment is not received by the expiration date. Please post the business license in public view. If you do not transact business from a fixed location within the City,you must carry this license with you at all times. If a vehicle license plate number is displayed on the Business License certificate below,you must carry a copy of the certificate in that vehicle. Please contact the Business License office if there are any changes to:ownership, address,business name, business vehicle,or type of business conducted.Additionally, please notify our office if you discontinue your business. The Gender Tax Repeal Act of 1995(Act)prohibits a business from discriminating based on a person's gender for prices of similar or like-kind goods and services. However,the Act does not prohibit price differences based on the amount of time,difficulty,or cost of providing the services. In addition to prohibiting discrimination based on a person's gender,the Act requires certain businesses to clearly and conspicuously disclose to customers in writing the pricing for each standard service provided.The posting requirement applies to barbers and hair salons,tailors or businesses providing aftermarket clothing alterations,dry cleaners,and laundries providing services to individuals.To access the Department of Consumer Affairs publication, please use the following webpage: https://www.barbercosmo.ca.gov/consumers/genderipolicy.pdf. To access the publication in Korean,Spanish,Vietnamese, Traditional Chinese,Simplified Chinese,or Tagalog,please use the following webpage: https://www.dca.ca.gov/publications/index.shtml There are many resources available to our business owners. Listed below are a few that might be of interest and assistance to you. Office of Business Development -(714)536-5582 Service Corps of Retired Executives-(714)550-7369 Huntington Beach Chamber of Commerce-(714)536-8888 Fictitious Business Name Information-(714)834-2889 CA Department of Tax and Fee Administration-(949)440-3473 Community Development-(714)536-5271 If you have any questions, please call a Business License representative at (714) 536-5267. City of Huntington Beach Business License License Number Business Name/Service Address POST IN PUBLIC VIEW A311206 VIDO ARTUKOVICH AND SON INC/VIDMAR INC A J V Effective Date p+• 12/01/2025 Owner/Corporation .`9 Expiration Date VIDO ARTUKOVICH AND SON INC/VIDMAR INC A J �, s{ i V t ; 11/30/2026 License Type cF ��o� Amount Paid CONTRACTOR > UNTV,/�d� $111.86 THIS LICENSE IS ONLY FOR THE BUSINESS AND TYPE SHOWN. IT IS FOR THE PERSON TO WHOM ISSUED AND IS NON-TRANSFERABLE. RENEWAL IS DUE ON OR BEFORE THE EXPIRATION DATE. RECEIVED BY: CITY CLERK RECEIPT COPY Return DUPLICATE to City Clerk's Office (Name) after signing/dating (Date) %, CITY OF HUNTINGTON BEACH ,,, INTERDEPARTMENTAL COMMUNICATION ,o, TO: City Treasurer FROM: City Clerk DATE: L4/t (2-IP SUBJECT: Bond Acceptance I have received the bonds for VI' AD 'MAW uV C ) "Viol/mat() I tiic.. (Company Name) CAPITAL PROJECTS (Includes CC's and MSC's) Performance Bond No. Payment Bond (Labor and Materials) Bond No. S B Warranty or Maintenance Bond No. TRACT AND DEVELOPMENT Faithful Performance Bond No. Labor and Material Bond No. Guarantee and Warranty Bond No. Monument Bond No. Franchise Bond No. Letter of Credit Bond No. Other � qAThyn- Re: Tract No. Approved 3 IniZIP (CouncilApproval Date) CC No. (OIO — firvtv) Agenda Item No. 1 " W) MSC No. City Clerk Vault No. If/00. SD Other No. SIRE System ID No. g:/forms/bond transmittal to treasurer Switzer, Donna From: Aguas, Michael Sent: Thursday, April 2, 2026 8:19 AM To: Huntington Beach; Info; per@artukovich.com Cc: Fait, David; Poehler,John; Switzer, Donna; Bannon, Patrick; Reidinger, John; Madrid, Vince Subject: [RESPONSE REQUIRED] Artukovich Construction Contract - Mcfadden Sewer Lift Station Wet Well - Phase 2 Attachments: CC-1610 Phase 2.pdf Importance: High Good morning Mark,Anthony, Per, Please find attached, the fully executed construction contract for the McFadden Sewer Lift Station, Wet Well—Phase 2 Project. A physical copy of the contract has been mailed to your El Monte office. Please confirm receipt of this email for City records. We look forward to getting this project started. See you Tuesday afternoon, Michael Aguas t:41111011 Capital Projects Administrator Public Works Engineering-Utilities - / Phone:(714)375-5011 Cell: (657)531-9761 Michae1.Aauas(a)surfcity-hb.orq H3000 2000 Main Street,Huntington Beach,CA 92648 1 ,�iUNTINGT! CITY OF HUNTINGTON BEACH 0 :001 ��e�� RCA Contract ~' �9n t ;S Agreement Summary kV".". -4=cDU6 C......` GENERAL INFORMATION DATE PRESENTED REQUESTING DEPARTMENT 03/17/2026 Public Works INSURANCE STATUS STAFF CONTACT[S) Active Patrick Bannon CONTRACT INFORMATION TOTAL COMPENSATION TERM OF CONTRACT/AGREEMENT $4,495,550 200 Days VENDOR NAME+TYPE OF SERVICE Artukovich & Son, Inc. /Vidmar, Inc. A providing construction services and materials procurement for the McFadden Lift Station and Wet Well Project CC1610, located at Greer Park South TYPE OF AGREEMENT(Professional Services,Service Agreement) Construction Contract CC-1610. PROCUREMENT Procurement through a Request for Bids (RFB) on Planet Bids, under which project-specific bid requirements where required in the bid specifications and the lowest responsive and responsible bid was selected. SCOPE OF WORK Provide construction services, materials procurement and installation for the McFadden Sewer Lift Station at Greer Park South OTHER:Bonds,Special Contract Terms,Emergency Request for Additional Fund Appropriations in the amount of$4,188,990.09 from the Sewer Service Fund (511) and $167,310 from Sewer Development Fee (210). HUNTINGTON BEACH 332 A,/► rdinli .rr►Atf# ,,,r,, 111110. \ -Is I N G ,... , c �.•• 7 toR P0RAr ••• Ilk w ... \ D O. ---- ---....... _-- - -_ _� ••• McFadden Sewer Lift ,,,,,,„,, . , ,,, , �J ` _ it c--) Station , Wet Well _ ._._ ______ -- _ ��.„._______ _ _ i •• z Phase 2 CCI6IO .,,,,,i,,....a60.,______,,..,„:._,.„: , ...., ,_<,ft,,,,,,, .....,... _ --- . 410, tp... ---- ' ----.--- c\ . .... r,„,.--s; 0 Ce4i.10i.ii.40 17 190 , • 0.6.0)•••••11*. % o \e \ r ..,,. �/ c ,1, March 17 , 2026 Cit Council Meetin� T� Y g 333 • Project Location map ,. . .. , Station, Wet Lift w Well Location er .t. .. ..,/ ., ,-- ,-,,,-- =, ,,,,, .1-‘4,. ,• '-'7 ,.44',*-''''• ''''' 'f',,"1 ,•'41" ,... .,... • ,c'l ' 9 ({‘ ' ''''''. 4,44,W" 'k"''''' ' c,r,,4"•tk--,;."'-ioii,ti,, ,..,, --, ,.. .., , . ,--- # C:).• ---.--,- -' .1, c-) .. ,.. 1 A---..` -, •-• _..4,-- ; % ._ ,,••A i:, ''- `-‘ ‘ -i• .• ,z• ' ni,'''.•-‘'S f' 14, 's,,, ee. /7,1S;...•k\,:' i .r.* r•AA, i Iklikleue,..61,...U.0.N...r.13\1 34.0\"..,,, ,, - Mc Fadden Sewer Lift Station , Wet Well 001610 • Wet Well € i.. >� ft, o 4 ".v et r • Valve v a u I t � �� �� ; � at.ri� Gravity Sewer `t - 1ST t} } Ry 0.k \f#6, 4 4 k , 4 f Force Main ' • Infrastructure Investment � • Or g Wally constructed in 1 972 K3g m-'�` '* + <tixa+3 £ A�"4(W.: .... i.� «tom" v. �y �'` ^- ��fs���r� �...�- ��r��N1 I N G T ar ra y "" *�..« �� •� ORATE, .... C� Itt ; OONT( C�/��l 335 Construct new valve vault, wet S COpe of VVo r well , gravity sewer, force main , emergency gas generator & enclosure, and associated site ` improvements n Utility Coordination i � • Envronmentaocumentation an d regulatory agency permits d Construction engineer• ing and x environmental monitoring ,i INGr� �t � * lRa•i . ,c,O ArE .* 6'© N. �` \ ; µ Nv' x i 1i ©'s .=, Q t ��V j...O.: t 7,.19 t9,_***** c , .�-e©ONT`1 �,;#.1F 336 Fundingand S Current Funding Sewer Service Fund (511 ) $ 1 ,462 ,325 .01 Reappropriation Sewer Service Fund (511 ) $ 3 ,705 ,260.35 New Appropriation Sewer Service Fund (51 1 ) $651 ,039.74 Total Funding: $ 5,818,625. 10 40/6-0N67- << •°RQoear a'••.. Schedule: - - .� v Design - Complete FY 24/25 Construction - To Begin Spring FY 25/26 ��9�•..ti,FfB _^0.0.., etjar =GouNTY 0;„ , 337 • Questions ? .„,,,:,,,,„,,,,,,,„:,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,;,,,,,,,, ,,.,,,,,,-,1,,,,,--.-,,t---- , ,-„,-,,,„„,, :.,,„-, ,tioi ...... ,,,, , , . .. „ , , , . ,,,,,,,,,,,,„,,,,,,,,„,,,,,,i,,,,,,,,,,,,,,,,,,,,,,:,,,,,,.,,,,,,,,,,,,,„,„..,,,, ,,,,,,„.„4, ,,,t,,4,4,,,,,,,,,,,,...„.,,,,.....„,, ,,, i, ., ,,. .., ,,,, ,, '--...'"..- 7-: *.,......k .'': 4;1!:, -r...4.,,---.. "-'-;--.' , .. , . ,. , , ,,,,,_,, ,,, .,,.„.,.,.,,v r. ......,i 338 am, /%k/.22 b ia/ j,25. SECTION A 104.25 NOTICE INVITING ELECTRONIC BIDS for the construction of MCFADDEN SEWER LIFT STATION REPLACEMENT PHASE 2 CC No. 1610 in the CITY OF HUNTINGTON BEACH PUBLIC NOTICE IS HEREBY GIVEN that the CITY OF HUNTINGTON BEACH, as AGENCY, invites electronic bids for the above stated project and will receive such bids prior to 10:00 AM on THURSDAY, NOVEMBER 20, 2025, on the City's PlanetBids System Vendor Portal, at which time or thereafter bids will be opened and made available online. Bids received after this time will be considered non-responsive. Prospective bidders must first register as a vendor and then bid on this project via the City's PlanetBids System Vendor Portal website at: https://www.planetbids.com/portal/portal.cfin?CompanylD=15340 Copies of the bid documents, including instructions to bidders, bidder proposal form, and specifications may be downloaded free at: https://www.planetbids.com/portal/portal.cfm?CompanylD=15340. Bidders must first register as a vendor on the City of Huntington Beach PlanetBids system to view and download the Contract Documents, to be added to the prospective bidders list, and to receive addendum notifications when issued. SCHEDULE OF EVENTS Release of Invitation For Bids October 20, 2025 Mandatory Pre-Job Walk— 10:00 am to 12:00 pm(*) October 29, 2025 Deadline for Written Questions November 4, 2025 Responses to Questions Posted on Web November 12, 2025 Bids are Due 10:00 a.m. via Planet Bids November 20, 2025 (*) The Mandatory Pre-Job Walk will consist of visiting the following three locations: 1. Greer Park(Job Site)—6700 W. McFadden Avenue 2. City Municipal Yard(City Furnished Material)— 17371 Gothard Street 3. City Sports Complex(Pre-Cast Vault Material)— 18121 Gothard Street Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Pursuant to the provisions of the Labor Code of the State of California, the minimum A-1 prevailing rate of per diem wages for each craft, classification or type of workman needed to execute the contract shall be those determined by the Director of Industrial Relations of the State of California,which are available online at www.dir.ca.gov/DLSR and also on file at the Office of the Director of Public Works, 2000 Main Street, Huntington Beach, CA 92648. The AGENCY will deduct 5% retention from all progress payments. The Contractor may substitute an escrow holder surety of equal value to the retention in accordance with the provisions of the Public Contract Code,Section 10263. The Contractor shall be beneficial owner of the surety and shall receive any interest thereon. The AGENCY hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. No bid shall be considered unless it is prepared on the approved Proposal forms in conformance with the Instructions to Bidders as determined by the AGENCY. The bid must be accompanied by a certified check, cashier's check, or bidder's bond made payable to the AGENCY for an amount no less than 10% of the amount bid. For electronic submittal of bids, the bid security must be received at the City of Huntington Beach Public Works Office,2000 Main Street,no later than the bid opening date and time. The bid security must be submitted in a sealed envelope bearing the name and address of the bidder, and the outside of the envelope must read as follows: OFFICIAL BID SECURITY-DO NOT OPEN Project Name: MCFADDEN SEWER LIFT STATION REPLACEMENT PHASE 2 CC#: 1610 Bid Opening Date: November 20,2025 at 10:00 AM The successful bidder shall be licensed in accordance with provisions of the Business and Professions Code and shall possess a State Contractor's License Class A, at the time of the bid opening. The successful Contractor and his subcontractors will be required to possess business licenses from the AGENCY. All extension of unit prices will be subject to verification by the AGENCY. In case of a variation between the unit price and the extension,the unit price will govern. Project Description: The Work consists of replacement and modernization of the McFadden Sewer Lift Station (Station No. 21), located at 6900 W. McFadden Avenue,Huntington Beach, California. The Work includes construction of a new 120 gpm submersible sewer lift station,wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk,AC paving, and other appurtenant work. Refer to Section 01010—Summary of Work for the complete scope and requirements. Specialty subcontractor qualifications for Deep Soil Mixing (DSM) are specified therein. A-2 The.contract shall allow the Contractor 200 working days to complete the contract. The Engineer's Estimate is $3.85 million. All questions related to this bid solicitation must be submitted through the City's PlanetBids System Vendor Portal per the information provided in the Instructions to Bidders. Any other contact to City staff regarding this bid solicitation will be referred back to the PlanetBids system. The AGENCY reserves the right to reject any or all bids,to waive any irregularity and to take all bids under advisement for a maximum period of 60 days. Attest: /s/Lisa Lane Barnes CITY CLERK OF THE CITY OF HUNTINGTON BEACH A-3 Column INTERIM AD DRAFT This is the proof of your ad scheduled to run in Huntington Beach Wave on the dates indicated below. If changes are needed, please contact us prior to deadline at(714) 796-2209. Notice ID: FVCfdX15hDP0m1SeuUef I Proof Updated: Oct.16,2025 at 01:29pm PDT Notice Name: NIEB-CC No. 1610 See Proof on Next Page This is not an invoice.Below is an estimated price,and it is subject to change.You will receive an invoice with the final price upon invoice creation by the publisher. FILER FILING FOR Donna Switzer Huntington Beach Wave donna.switzer@surfcity-hb.org (714)374-1649 Columns Wide: 5 Ad Class: Legals Total Column Inches: 56.88 Number of Lines: 117 10/23/2025:City Notices 863.60 10/30/2025:City Notices 863.59 Subtotal $1727.19 Tax $0.00 Processing Fee $0.00 Total $1727.19 NIEB - CC No. 1610 - Page 1 of 3 SECTION A NOTICE INVITING ELECTRONIC BIDS for the construction of MCFADDEN SEWER LIFT STATION REPLACEMENT PHASE 2 CC No.1610 in the CITY OF HUNTINGTON BEACH PUBLIC NOTICE IS HEREBY GIVEN that the CITY OF HUNTINGTON BEACH,as AGENCY invites electronic bids for the above stated protect and will receive such bids prior to 10:00 AM on THURSDAY,NOVEMBER 20,2025,on the City's PlanetBlds System Vendor Portal,at which time or thereafter bids will be opened and made available online.Bids received after this time will be considered non-responsive. Prospective bidders must first register as a vendor and then bid on this protect via the City's PlanetBids System Vendor Portal website at: https://www.planetblds.cam/portal/portal.cfm?Companyi D=15340 Copies of the bid documents,including instructions to bidders,bidder proposal form, and specifications may be downloaded free at: hops://www.planetblds.cam/portal/portai.cfrn?Companyi D=15340.Bidders must first register as a vendor on the City of Huntington Beach PlanetBlds system to view and download the Contract Documents,to be added to the prospective bidders list,and to receive addendum notifications when Issued. SCHEDULE OF EVENTS Release of invitation For Bids October 20,2025 Mandatory Pre-Job Walk-10:00 am to 12:00 pm (*) October 29,2025 Deadline for Written Questions November 4,2025 Responses to Questions Posted on Web November 12,2025 Bids are Due 10:00 a.m.via Planet Bids November 20,2025 (*)The Mandatory Pre-Job Walk will consist of visiting the following three locations: • 1.Greer Park(Job Site)-6700 W.McFadden Avenue 2.City Municipal Yard (City Furnished Material)-17371 Gothard Street 3.City Sports Complex(Pre-Cast Vault Material)-18121 Gothard Street Any contract entered into pursuant to this notice will Incorporate the provisions of the State Labor Code. Pursuant tothe provisions of the Labor Code of the State of California, the minimum prevailing rate of per diem wages for each craft,classification or type of workman needed to execute the contract shall be those determined by the Director of Industrial Relations of the.State of California,which are available online at www.dlr. ca.gov/DLSR and also on file at the Office of the Director of Public Works,2000 Main Street,Huntington Beach,CA 92648. The AGENCY will deduct 5%retention from all progress payments. The Contractor may substitute an escrow holder surety of equal value to the retention in accordance with the provisions of the Public Contract Code,Section 10263. The Contractor shall be beneficial owner of the surety and shall receive any interest thereon. The AGENCY hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. No bid shall be considered unless it is prepared on the approved Proposal forms in conformance with the Instructions to Bidders as determined by the AGENCY. The bid must be accompanied by a certified check, cashiers check, or bidders bond made payable to the AGENCY for an amount no less than 10%of the amount bid. For electronic submittal of bids,the bid security must be received at the City of Huntington Beach Public Works Office,2000 Main Street, no later than the bid opening date and time.The bid security must be submitted in a sealed envelope bearing the name and address of the bidder,and the outside of the envelope must read as follows: • OFFICIAL BID SECURITY-DO NOT OPEN Project Name:MCFADDEN SEWER LIFT STATION REPLACEMENT PHASE 2 CC#:1610 Bid Opening Date:November 20,2025 at 10:00 AM • The successful bidder shall be licensed in accordance with provisions of the Business and Professions Code and shall possess a State Contractors License Class A,at tile time of the bid opening. The successful Contractor and his subcontractors will be required to possess business licenses from the AGENCY.All extension of unit prices will be sublect to verification by the AGENCY. In case of a variation between the unit price and the extension,the unit price will govern. Project Description: NIEB - CC No. 1610 - Page2of3 The Work consists of replacement and modernization of the McFadden Sewer Lift Station (Station No. 21), located at 6900 W. McFadden Avenue, Huntington Beach, California.The Work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The protect includes construction of curb,gutter,sidewalk,AC paving,and other appurtenant work. Refer to Section 01010 -Summary of Work for the complete scope and requirements. Specialty subcontractor qualifications for Deep Soil Mixing(DSM)are specified therein. The contract shal I allow the Contractor 200 working days to complete the contract.The Engineer's Estimate is$3.85 million. All questions related to this bid solicitation must be submitted through the City's PlanetBids System Vendor Portal per the information provided in the Instructions to Bidders.Any other contact to City staff regarding this bid solicitation will be referred back to the PlanetBids system. The AGENCY reserves the right to relect any or all bids,to waive any irregularity and to take all bids under advisement for a maximum period of 60 days. Attest: /s/Lisa Lane Barnes CITY CLERK OF THE CITY OF HUNTINGTON BEACH Huntington Beach Wave Published:10/23,10/30/25 NIEB - CC No. 1610 - Page3of3 S H FOUNTAIN .' VALLEY VIETW E 1920 Main St. Suite 225, Irvine Irvine, California 92614 (714) 796-2209 legals@inlandnewspapers.com City of Huntington Beach - City Clerk's Office 2000 Main Street Huntington Beach, California 92648 Account Number: 5272431 Ad Order Number: 0011760904 Customer's Reference/PO Number: Publication: Huntington Beach Wave Publication Dates: 10/23/2025 and 10/30/2025 Total Amount: $1727.19 Payment Amount: $0.00 Amount Due: $1727.19 Notice ID: FVCfdXI5hDP0m1SeuUef Invoice Text: SECTION A NOTICE INVITING ELECTRONIC BIDS for the construction of MCFADDEN SEWER LIFT STATION REPLACEMENT PHASE 2 CC No. 1610 in the CITY OF HUNTINGTON BEACH PUBLIC NOTICE IS HEREBY GIVEN that the CITY OF HUNTINGTON BEACH, as AGENCY, invites electronic bids for the above stated project and will receive such bids prior to 10:00 AM on THURSDAY, NOVEMBER 20, 2025, on the City's PlanetBids System Vendor Portal, at which time or thereafter bids will be opened and made available online. Bids received after this time will be considered non-responsive. Prospective bidders must first register as a vendor and then bid on this project via the City's PlanetBids System Vendor Portal website at: https://www.planetbids.com/portal/portal.cfm?CompanylD=15340 Copies of the bid documents, including instructions to bidders,bidder proposal form,and specifications may be downloaded free at: https://www.planetbids.com/portal/portal.cfm? CompanylD=15340. Bidders must first register as a vendor on the City of Huntington Beach PlanetBids system to view and download the Contract Documents,to be added to the prospective bidders list, and to receive addendum notifications when issued. SCHEDULE OF EVENTS Release of Invitation For Bids October 20, 2025 Mandatory Pre-Job Walk—10:00 am to 12:00 pm(*)October 29,2025 Deadline for Written Questions November 4, 2025 Responses to Questions Posted on Web November 12, 2025 Bids are Due 10:00 a.m.via Planet Bids November 20, 2025(*) The Mandatory Pre-Job Walk will consist of visiting the following three locations: 1. Greer Park(Job Site)—6700 W. McFadden Avenue 2. City Municipal Yard (City Furnished Material)—17371 Gothard Street 3. City Sports Complex(Pre-Cast Vault NIEB- CC No. 1610 - Page 1 of 3 See Proof on Next Page INCLUDES THE 1(al , / VALLEY VIEW Huntington Beach Wave 1920 Main St.Suite 225,Irvine Irvine,California 92614 (714)796-2209 2000 Main Street Huntington Beach,California 92648 AFFIDAVIT OF PUBLICATION STATE OF CALIFORNIA County of Orange County I am a citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years, and not a party to or interested in the above-entitled matter. I am the principal clerk of the Huntington Beach Wave, a newspaper that has been adjudged to be a newspaper of general circulation by the Superior Court of the County of Orange County, State of California, on July 1, 1998, Case No. A- 185906 in and for the City of Irvine, County of Orange County, State of California; that the notice, of which the annexed is a true printed copy, has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates,to wit: 10/23/2025,10130/2025 I certify (or declare) under the penalty of perjury under the laws of the State of California that the foregoing is true and correct: Executed at Anaheim,Orange County,California, on Date: Oct 30,2025. Si ure L. NIEB -CC No. 1610 - Page 1 of 3 SECTION A NOTICE INVITING ELECTRONIC BIDS for the construction of • MCFADDEN SEWER LIFT STATION.REPLACEMENT PHASE2 CC No.1610 in the CITY.OF HUNTINGTON BEACH • PUBLIC NOTICE IS HEREBY GIVEN that the CITY OF HUNTINGTON BEACH,as AGENCY, ' • invites electronic bids for the above stated project and will receive such bids prior to •10:00 AM on THURSDAY,NOVEMBER 20,2025,on the City's PlanetBlds System Vendor 'Portal atwhich time or thereafter bids will be opened and made available online.Bids received after.this time will be considered non=responsive. Prospective bidders must first register as a vendor and then bid on this prolect via the City's PlanetBids System Vendor Portal webslteat: . hfips://www.piapetbicis.com/portaI/portaI.cfm?Company I D=15340 Copies of the bid documents,including,Instructions to bidders,'bidder proposal form, • and specifications may be downloaded free at:. . littps://www.planetblds.com/portal/portal.cfm?Companyi D=15340.Bidders must first register as a vendor on the City-of Huntington Beach PlanetB Ids-system to-view and download the Contract Documents,to be added to the prospective bidders list,and to receive:addendum notifications when issued. SCHEDULE OF EVENTS Release of Invitation For Bids• October 20,•2025 Mandatory.Pre-Job Walk—10:00 am to 12:00.pm (*) 'October 29,2025 Deadline for Written Questions November 4,2025 Responses to Questions Posted on Web November 12,2025 Bids are Due.10:00 a.m.via Planet Bids November 20,2025 (*)The Mandatory Pre-Job-Walk will consist of visiting the following three.iocations: 1.Greer Park(Job Site)—6700 W.McFadden Avenue 2.City Municipal Yard (City Furnished Material)—17371 Gothard Street 3.'City Sports Complex (Pre-Cast Vault Material)—18121 Gothard Street- Any contract entered-Into pursuant to this noticewlII Incorporate the provisions of the StateLaborCode. Pursuanttothe provisions of the Labor.Code of the State of California, the minimum prevailing rate of per diem wages for each craft,ciasslftcation-or type of workman needed to execute the contract shall be those determined by the Director of Industrial Relations of the State-of California,which are available online-at www.dlr. ca.gov/DLSR and also on file at the Office of the Director of-Public Works,2000 Main Street,Huntington Beach,CA 92648. The AGENCY will deduct 5%retention from all progress payments. The Contractor may substitute an escrow holder surety of equal value to the retention in accordance with the provisions of the Public Contract Code,Section 10263. The Contractor shall he beneficial owner of the surety and.shall receive any interest thereon. The AGENCY hereby affirmatively ensures that minority business enterprises will be-afforded full opportunity to submit-bids in response to this notice and will not be discriminated against on the basis of-race, color, national origin,'ancestry, sex, or • religion In any consideration leading to the award of contract. No-bid shall be considered unless it is prepared on the approved Proposal forms in conformance with the Instructions to Bidders as determined by the AGENCY. The bid must-he accompanied by a certified check, cashiers check, or.bidders bond -made payable to the AGENCY for an amount no-less than 10%of the amount bid. For electronic submittal of bids,the bid security must be received at the City of Huntington Beach Public-Works Office,2000 Main Street,•no later than the bid opening date and time.-The bid security must be submitted in a sealed envelope hearing the name and address of the bidder,and the outside of the envelope must read as follows: OFFICIAL BID SECURITY-DO NOT OPEN Project Name:MCFADDEN SEWER LIFT STATION REPLACEMENT PHASE 2 CC#:1610 • - Bid Opening,Date:November 20,2025 at 10:00 AM , The successful bidder shrill be.licensed in accordance with provisions of the Business and Professions Code and shall possess.a State Contractors License Class A,at the time of the bid opening. The successful Contractor and his subcontractors will be required-to possess business licenses•from the.AGENCY.All extension of unit prices will be sublect to verification by the AGENCY. in.case of a,variation between the unit price and the extension,the unit price will govern.: Project Description:- • NIEB-CC No. 1610- Page 2 of 3 The Work consists of replacement and modernization,of the McFadden Sewer Lift Station (Station No. 21), located at 6900 W.-McFadden Avenue, Huntington Beach, California.The Work Includes-construction of a new 120 gpm submersible sewer11ft station, wet well and valve vault,'installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration., Tile protect includes construction of curb,gutter,sidewalk,AC paving,and other appurtenant work. Refer to Section 01010 -Summary of Work for the complete,scope and requirements. Specialty subcontractor qualifications for Deep Soil Mixing(DSM)are specified therein. The contract shall allow the Contractor 200 working days to cainplete the contract.The Engineer's Estimate is$3.85 million. All,questions'related to this bid.solicitation must be submitted through-the City's PlanetBlds System Vendor Portal per the information provided in the.Instructions to Bidders.Any other contact to City staff-regarding this bid solicitation will be referred back-to the PlanetBlds'system. The AGENCY reserves the right to reiect any or all bids,to waive any irregularity and to take all bids under advisement for a Maximum period of 60 days.. Attest: Is/Llsa Lane Barnes CITY CLERK OF THE CITY OF HUNT.INGTON BEACH Huntington Beach Wave - Published:'10/23,10/30/25• • • • • • NIEB-CC No. 1610- Page3of3